Loading...
HomeMy WebLinkAbout1666 PLOVER CT; ; CB970095; Permit0 /22/97 1 ge 1 Job Addre., Perm t Tyt arc N · 1 Valuation C cupancy script1 B 5 • 1664 PL VER CT NDOMIN UMS 37 ,029 Gour;>: R3 I ! N P E R M ~ Suite: L t#: 21 C R ference#: n: SANDLING-PH : 14 3 GA 9-BLDG 6-,4922+ DE K, 064,6&,68 PL VER CT ::>eve App /Ownr: BARRE~T AMERICAN 619-431-80 035 CORE DE N GAL, STE 1 0 CARLSBAD (rl Oe.tl,-l'.£~'-l'O~b *** an Check Num Fe~ Requi~ed *** *** 20 8 01/22 97 000 0 Fee Co l •ct & Cr 1 t Rf"rT Fe s: A u tm nt..,: 1otal Fee : de ... r1p ion Erter # Unit * Entel "Y' for Plt..mbl E h Pluming F1xtur Each Building ewer Ea h rn tall/Repair Wt E ch Water He tr a1d/or Ga., P'pinJ Sy..,t m Ea h Vacuum teakPr * PLUM [N T TA..., Enter 'Y for Electr1 I J ngle hase Pr AMP * ELECTRI AL TOTAL Enter 'Y' for M ch1nic l Is e F In tal Fuzn/Duct /Hat Pump., > Each nstall Fir pl ce Each Exh u~t F n > * M ~HANICAL TOTAL ~~~- 37 3 2 6. 1,0 0.00 2b, 4 . Ext f e 1 1 19 . ,. 78. 140 D t / y y APPROVAL ~-DATrf:µdn_ NCE ftJ ~ g~-'17 /lf CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB970095 FOR 06/23/97 DESCRIPTION: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT TYPE: CONDO JOB ADDRESS: 1664 PLOVER CT APPLICANT: BARRETT AMERICAN CONTRACTOR: OWNER: PHONE: PHONE: PHONE: INSPECTOR AREA PY PLANCK# CB970006 OCC GRP R3 CONSTR. TYPE VN STE: LOT: 21 619-431-0800 REMARKS: R/MORGAN/930-0722 SPECIAL INSTRUCT: INSPECTOR ~n'-n·,;{~_· _______ _ TOTAL TIME: CD 39 LVL DESCRIPTION EL Final Electrical --- ***** INSPECTION DATE DESCRIPTION ACT 061297 Final Electrical PA 061197 Final Electrical NS 053097 Gas/Test/Repairs AP 050697 Exterior Lath/Drywall AP 050297 Interior Lath/Drywall AP 050297 Exterior Lath/Drywall AP 042897 Rough Combo AP 042597 Frame/Steel/Bolting/Welding NR 042597 Rough/Topout AP 042597 Rough Electric NR 042597 Rough/Ducts/Dampers NR 042497 Rough Combo NR 041697 Shear Panels/HD's AP 041597 Shear Panels/HD's NS 040497 Roof/Reroof AP 021497 Ftg/Foundation/Piers AP 021497 Underground/Under Floor AP 021497 Underground/Conduit-Wiring AP 020797 Underground/Under Floor AP HISTORY ***** INSP COMMENTS PY METER REL PY PY TP 1964-66-68 PY PY PY PY PY PY PY PY PY PY PY PD PD PD PY I DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING FIRE e U/M PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PH$ 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA ========· ~ INSPE~ BY: INSPECTED BY: INSPECTED BY: DATE c.Lt .... INSPECTED:~ DATE INSPECTED: DATE INSPECTED: Lot# 21 APPROVED APPROVED APPROVED WATER DATE: 06/07/97 PERMIT TYPE: CONDO DISAPPROVED DISAPPROVED DISAPPROVED -------=----------------------------------===---============================= COMMENTS : FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING CHECK#: CB970095 PERMIT#: CB970095 FIRE PLANNING PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ U/M 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA §) 21 DATE: 06/07/97 PERMIT TYPE: CONDO JUN 9 =============================================---============================= INSPECTED 07&. DATE BY: INSPECTED: b-17-17 APPROVED DISAPPROVED ..L_ INSPECTED /?4 DATE APPROVED ✓ BY: INSPECTED: 6'·zP---'J7 DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ============================================================================= COMMENTS: DEPT: BUILDING FINAL BUILDING INSPECTION ~ FIRE PLANNING U/M CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# 21 CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: .CA WATER DATE: 06/07/97 PERMIT TYPE: CONDO 9 ============================================================================= INSPECTED y,:~ DATE DISAPPROVED ✓ BY: INSPECTED: 6-/?-"77 APPROVED INSPECTED 9,,4;? DATE BY: INSPECTED: b·Z o~'lJ APPROVED V DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED COMMENTS: DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING ~ PLANNING U/M WATER PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# DATE: 06/07/97 PERMIT TYPE: CONDO CONTACT PERSON/PHONE#: MORGAN/930-0722 Y JUN 16 1997 SEWER DIST: CA WATER DIST: CA L ======================================================== °'F=============!==== INSPECTEJ? DATE - BY: C: . '/3 u c_L INSPECTED: l /9 7 APPROVED _K._ DISAPPROVED INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: I APPROVED DISAPPROVED APPROVED DISAPPROVED ============================================================================= COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING e) WATER PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS : 1664 PLOVER CT Lot# CONTACT PERSON/PHONE#: MORGAN/930-0722 DATE: 06/07/97 PERMIT TYPE: CONDO @~0\'1/§~ ►--. -9 1991 l!J SEWER DIST: CA WATER DIST: CA CARLSBAD TRICT ~~~~~::::::~~i:::::=:::=::~~::::::~== INSPECTED DATE BY: __________ INSPECTED: ___ APPROVED DISAPPROVED INSPECTED BY: COMMENTS: DATE INSPECTED: APPROVED DISAPPROVED , SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PRO.JECT TITLE: PKOJECT LOCATION: Sanderling at Aviara See Project Summary SCS&T FILENO: PERMIT NO: 9412315 I.It.NO: 21 (Pg 1 of 2) See Summary PLAN FILE NO, AROUTECT, The KTGY Group ENGINEER: Gouvis Engineering CENERALCONTRACTOR: Barratt American, Inc. suecoNTRACTOR: Mueller Lewis 2/17 /97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover .Court 970092 16 1664 Plover Court 970095 17 1671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1 530 Reinforcing Steel: ASTM A615 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs·on· grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 18 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. 121 Barratt American, Inc. I 11 City of Carlsbad -r Michael B. Wheeler, R.C.E. #45358 ' SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PROJECT TITLE: PRo.n:CT LOCATION: Sanderling at Aviara See Project Summary SCS&T FILE NO: PERMIT NO: 9412315 I.R.NO: 21 (Pg2of2) See Summary PLAN FILE NO: ARC1DTEcr, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suBCONTRAcroa: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112·, 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17 /97 ). The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. (21 Barratt American, Inc. (1 I City of Carlsbad REVIEWED BY: ~~4«1/ Michael B. Wheeler, R.C.E. #45358 • SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SCS£ T FILE NO: PERMIT NO: 9412315 I.R.NO: 21 (Pg 1 of 21 See Summary l"LAN FILE NO: ARCHITECT, The KTGY Group ENG[NEER: Gouvis Engineering cl:NERAL CONTRACTOR: Barratt American, Inc. suacoNTRACTOR: Mueller Lewis 2/17 /97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover Court 970092 16 1 664 Plover Court 970095 17 1671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1530 Reinforcing Steel: ASTM AS 1 5 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs-on- grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 1 8 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. 12) Barratt American, Inc. I 1 I City of Carlsbad Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280--l321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SC:W. T FILE NO: l'ERMITNO: 9412315 I.R.NO: 21 (Pg 2 of 21 See Summary PLAN FILE NO: ARCHITECT, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suBCONTRACTOR: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112·. 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 1667. 1669, 1671. 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17 /97 I. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. 121 Barratt American. Inc. 111 City of Carlsbad REVIEWED BY: Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNL.\ SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-1321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SCS&TFILENO: l'ERMITNO: 9412315 J.R.NO: 21 (Pg 1 of 21 See Summary PLAN FILE NO: ARCHITECT, The KTGY Group ENGINEER: Gouvis EnQineering CENERALCONTRAcroR: Barratt American, Inc. suacoNTRACTOR: Mueller Lewis 2/17 /97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover Court 970092 16 1664 Plover Court 970095 17 1 671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1530 Reinforcing Steel: ASTM A615 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs-on- grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 18 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. (2) Barratt American, (nc. ( 1 I City of Carlsbad Michael 8. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SC!i&T FILE NO: PERMIT NO: 9412315 I.R.NO: 21 (Pg 2 of 21 See Summary PLAN FILE NO: ARCHITECT, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR; Barratt American, Inc. suacoNTRACTOR: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112·, 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17/971- The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. 121 Barratt American, Inc. 111 City of Carlsbad REVIEWED BV: ~~4«1/ Michael B. Wheeler, R.C.E. #45358