HomeMy WebLinkAbout2693 ROOSEVELT ST; ; CBRA2018-0230; PermitBuilding Permit Finaled
Ccityof
Carlsbad
Residential Associated Permit
Print Date: 12/07/2020 Permit No: CBRA2018-0230
Job Address: 2693 ROOSEVELT ST, CARLSBAD, CA 92008
Permit Type: BLDG-Associated Permit Residential Work Class:
Parcel#: 2031013808 Track#:
Valuation: $267,769.30 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Project#:
Plan#:
Bedrooms: 3 Construction Type:
Condo
CT140007
8
DEV04098
Bathrooms: 3.0 Orig. Plan Check#: PC2018-0019
Plan Check#:
Project Title: BEACHWALK AT ROOSEVELT
Status:
Applied:
Issued:
Fina led Close Out:
Inspector:
Final Inspection:
Description: BEACHWALK AT ROOSEVELT: BLDG 1 // UNIT 8 //PLANA// 1,623 SF LIV// 434 SF GARAGE// 232 SF DECK
Applicant:
VESTA PROPERTIES
GEOFF MCCOMIC
1818 lSTAVE
SAN DIEGO, CA 92101-2662
(616) 481-3830
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
Total Fees: $12,246.37 Total Payments To Date:
Building Division
$12,246.37 Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Closed -Finaled
11/15/2018
01/11/2019
MColl
12/07/2020
AMOUNT
$1,222.40
$787.23
$66.00
$175.00
$92.00
$182.00
$9,371.93
$11.00
$34.81
$246.00
$58.00
$0.00
Page 1 of 1
PERMIT INSPECTION HISTORY for (CBRA2018-0230)
Permit Type: BLDG-Associated Permit Residentil Application Date: 11/15/2018 Owner:
Work Class: Condo Issue Date: 01/11/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 01/25/2021 Address: 2693 ROOSEVELT ST
IVR Number: 15497 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Relnspectlon Inspection
Date Start Date Status
01/1512020 01/1512020 BLDG-16 Insulation 116574-2020 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior 116381-2020 Cancelled Michael Collins Relnspectlon Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/29/2020 01/29/2020 BLDG-17 lntorlor 117782-2020 Partial Pass Michael Collins Re Inspection Incomplete
Leth/Drywall
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
BLDG-Building Deficiency Drywall only Yes
02/13/2020 02/13/2020 BLDG-18 Exterior 119351.2020 Cancelled Michael Collins Relnspectlon Incomplete
Leth/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wrong code No
BLDG-82 Drywall, 119503-2020 Passed Michael Collins Complete
Exterior Lath, Gas Test
Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
07/29/2020 07/29/2020 BLDG-11 134071-2020 Partial Pass Mlchael Collins Relnspectlon Incomplete
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Deck column footing/steel Yes
12/07/2020 12/07/2020 BLDG-Final Inspection 145552-2020 Passed Peter Dreibelbis Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Monday, December 7, 2020 Page 3 of 3
PERMIT INSPECTION HISTORY for (CBRA2018-0230)
Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner:
Work Class: Condo Issue Date: 01/11/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 01/25/2021 Address: 2693 ROOSEVELT ST
IVR Number: 15497 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspectlon Inspection
Date Start Date Status
06/28/2019 06/28/2019 BLDG-14 096110-2019 Failed Michael Collins Relnspectlon Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready, no super on site No
BLDG-Building Deficiency Not ready No
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
07/02/2019 07/02/2019 BLDG-14 096493-2019 Partial Pass Michael Collins Relnspectlon Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
BLDG-Building Deficiency Not ready, no super on site No
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
08/30/2019 08/30/2019 BLDG-15 Roof/ReRoof 102691-2019 Partial Pass Michael Collins Reinspectlon Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Sheathing/strap nailing only Yes
09/04/2019 09/0412019 BLDG-15 Rool/RoRoof 102990-2019 Partial Pass Chris Renfro Relnspectlon Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Sheathing/strap nailing only Yes
10/21/2019 10/21/2019 BLDG-13 Shear 108105-2019 Failed Michael Collins Relnspectlon Incomplete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
10/22/2019 10/22/2019 BLDG-13 Shear 108285-2019 Passed Michael Collins Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-Building Deficiency Minor pick up Yes
01/10/2020 01/10/2020 BLDG-14 116025-2020 Passed Paul York Complete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready, no super on site Yes
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
BLDG-Building Deficiency Not ready Yes
Monday, December 7, 2020 Page 2 of 3
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBRA2018-0230)
Permit Type: BLDG-Associated Permit Residenlii Application Date: 11/15/2018 Owner:
Work Class: Condo Issue Date: 01/11/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 01/25/2021 Address: 2693 ROOSEVELT ST
IVR Number: 15497 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. ln$pectlon Primary Inspector Reinspectlon Inspection
Date Start Date Status
02/26/2019 02/26/2019 BLDG-21 084644-2019 Passsd Michael Collins Complete
Underground/Undorfio
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wasle to POC only Yes
04/10/2019 04/10/2019 BLDG-11 088478-2019 Failed Michael Collins Relnspectlon Incomplete
Foundatlon/Ftg/Ploni
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready, need electrical sub feed below No
grade
04/15/2019 04/1512019 BLDG-11 088923-2019 Passed Michael Collins Complete
Foundatlon/Ftg/Ploni
(Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ufer ok, see CBRA2018-0223 for conduit Yes
notes
BLDG-Building Deficiency Not ready, need electrical sub feed below No
grade
06/07/2019 06/07/2019 BLDG-14 094155-2019 Failed Michael Collins Relnspectlon Incomplete
Frame/SteoUBoltlng/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
06/10/2019 06/10/2019 BLDG-14 094246-2019 Partial Pass Michael Collins Relnspectlon Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
BLDG-Building Deficiency Not ready No
06/27/2019 06/27/2019 BLDG-14 095959-2019 Failed Michael Collins Relnspectlon Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-Building Deficiency Not ready, no super on site No
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
Monday, December 7, 2020 Page 1 of 3
IC:INGI
! IIUPECTION IIEllYICEII !
SPECIAL INSPECTION DAILY REPORT
3406 Texas Street
San Diego, CA, 92104
619-261-9022
desmond@Kingisi.com
www.Kingisi.com
Special Inspection Reports shall be prepared on a Daily Basis. All Non..Compliant conditions must be reported
IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special
Inspector conducting the Inspection / Testing.
Project Name: Roosevelt Apartments I Date: 10/17/19
Buildlnn Permit#: Build #1 Unit #8, CBRA2018-0230 Time Arrived: 7am
Proiect Location: 2675 Roosevelt Street, vansoaa, VI"\, 92u08 Time Deoarted:
Contractor: Vesta Pacific Development Architect:
Sub-Contractor: UPF Engineer:
Inspection / Material Description Sheathina, Anchors, nailina, straos, clips
Samnles
Ticket No#: AirTemo: I Concrete Temn :
I
@ Mins. lSlumo:
I
Approved Drawings: SN-1, General notes
Work Inspected: Inspection and Observation continues for Interior and Exterior Shearwalls.
Verified stamped sheathing secured in place; All nails·driven flush and staggered.
Walls #2: 8d's@4/12, #3:3/12. #4 and #5:2/12.
All Header, Straps, Blocking, A35 Clips and .Brackets per Shearwall Schedule.
Holddown / anchors in place per plan schedule, engineers details.
Hours: 4
Note : Partial interior inspectio_n,AU party_walls: After plumbing, electr1c:al, ga:;placemenland insulation will be
palace and wall closed, Fire stop @10'0".
City inspector will verify·prior to building1>eing rapped,
Report emailed to Super Raul
~
WORK: (~ ~-----
INSPECTED l~ANCE WITH THE REQUIREMENTS
OF THE APPROVED DOCUMENTS.
MATERIAL SAMPLING:-~
INSPECTED IN ACCORDANCE WITH T~EQ~S C/
OF THE APPROVED DOCUMENTS.
LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK-UP
THE WORK INSPECTED:
Signature of Special Inspector:
~PIP NQT MfET
~
Print Name: Desmond King
CERTIFICATION#: SD #1169, ICC #8132156
Signature of Superintendent ii;
GeoTek, Inc.
I S48 North Maple Street, Corona, California 92880
(9S1) 710-1160 Office (9S1) 710-1167 Fax www.geotekusa.com
DAIL V INSPECTION REPORT
CLIENT: Vesta pacific development PROJECT NO: _344_7_-s_o ______ _
PROJECT: :R::oo::se::v::ett:::... _ _.,..,,,,."3----------------DATE: 04/10/19
PROJECT LOCATION: .!.!l!'i~R"J~oo~seve~n~. C~•~rls!2ba~d~, C,:!A!.._ ______ ---:---------:::-:-=:::------
CONTRACTOR: v:.:or:..du=go:..con:.:..,,str::::.;,ucliOn,...·-n--------PLANS BY: Gouvis engineer DATED: _____ _
BUILDING PERMIT NO:C8.2112{)19,-t):{30 APPROVED BY: CartsbadPC2018--0Cl19 DATED: ____ _
TYPE OF INSPECTION: _:R_:::ebar~ _______ SHEETS & DETAILS:
LOCATION OF INSPECTION: _See=~be~low~------------------------
fllt'ft!nowing items were observed and / or tested:
Inspection and observation continues for SOG / FTG reinforcement for Building #2 Units 1 &2, building #3 units 3,4,5, buiktlng #1 units 8&9, Building #4
units 6,7,10 and 11.
Permils #CBRA2018-0223, CBRA2018-0224, CBRA2018-0225, CBRA2018-0226, CBRA2018-0227, CBRA2018-0230, CBRA2018-0231,
CBRA2018-0228, CBRA2018-0229, CBRA2018-0232, CBRA2018-0233
Verified rebar is securely tied, with laps and clearance In place. #3@24• ocew, Cont (2)#4 TB, reinforcement for spread FTGs,
All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule.
FTGs are debris free, Anchors in placed for sill plates, strong wall and HDUs,
Visqueen topped with 2• clean sand.
General Notes, SN1, S01, exterior FT Gs, foundation plans, Holddowns schedule
2500 psi Concn,te scheduled for 04/11119@0700orn TBO.
Raguinaga@vestapacificdevelopment.com
E] Work observed during this inspection substantially
complies to approved plans and specifications.
Hours: _4 __________ _
SUPERVISOR: ~,,
PAGE ____ OF ____ _
ONot Complete. Work observed is still in progress and
will require additional inspections.
~
Signature
Desmond King S0#1169 /8132156
Print Name
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS