HomeMy WebLinkAbout2343 PASEO SAUCEDAL; ; CB983482; Permit✓ 0523711 I
1 0 / i.t6'/ 9 8 11 : 4 3
Page 1 of 1
B U I L D I N G P E R M I T
Job Address : 2343 PASEO SAUCEDAL Suite :
Permit Type: SINGLE FAMILY DWLNG -DETACHED
Parcel No: 255-272-30-00 Lot#: 335
Permit No: CB983482
Project No: A9804536
Development No: DEV89110
Valuation : 171,898 Construction Type : VN
ISSUED
06/01/98
10/16/98
RMA
Occupancy Group : Reference#: CT88-03 Status:
Description: PLAN 1~PHS 9,1968+419 GAR+122 Applied:
: SF PORCH,VILLAGE P ,LA COSTA VALLEY-KAUFM Apr/Issue:
Appl/Ownr : KAUFMAN & BROAD
12626 HIGH BLUFF DR STE 400
SAN DIEGO CA 92130
Entered By :
619 259-6000
~ P_.lan Check Numbers ) ORIG 972 910 PCK 983217
*** Fees Required ** , Fe s C J.le5!4Bd l<f>lfMd~ts ? *** ----~----~---· __________________ Qt ~l __ Q2.. __ _
Fees:
Adjustments:
Total Fees :
Fee description
Number of Bedroom
Number of Bathroo
Building Permit
Plan Check
Strong Motion Fee
Enter Plan Check D scount Ari!
Enter "Y" to Autoca.lc
Enter "Y" to Autoca c
Payoff Fee for CFD
Enter LFM Fee (Zones= ,11,
Enter "Y" for Plumbing sstfe
Each Plumbing Fixture or
Each Building Sewer
Each Install/Repair Water Line
Each Water Heater and/or Vent
Gas Piping System
Each Vacuum Breaker
Enter "Y" for Electric Issue Fee
>
>
>
> Single Phase Per AMP
Enter 'Y' for Mechanical Issue
Install Furn/Ducts/Heat Pumps
Each Install fireplace
Each Exhaust Fan
Each Install/Reloc Vent
Fee>
> >
>
>
-1. 0
7.00
15.00
7 .00
7 .00
7.00
7.00
125 .25
2 9.00
1 6.50
3 6.50
2 4.50
-----·
C-PRHT 9918-32
.00
.00
9 ,918.32
Ext fee Data
3 .00
2.00
873.00
567 .00
17.00
-45.00
3129.00 Y
550.00 Y
4254.32
310.00
20.00 Y
84.00
15.00
7.00
7 ,00
7 .tlO
14.00
10.00 Y
31.25
15.00 Y
18.00
6.50
19.50
9.00
-----.......----
FIN AL Ai 1 VAL I I
1',P,--f!j:2,U c_:J/J~/,1 I I
CITY OF CA -~~QllNCE _(: ~ CJ ..:xb.~.c\'-1@.tt~s .. '
2075 Las Palmas Dr., Carlsbad, C~.::_'619)..~ -" -· ---
City of Carlsbad Inspection Request
For: 7/8/99
Permit# CB983482 Inspector Assignment: TP ---
Title: PLAN 1,PHS 9,1968+419 GAR+122
Description: SF PORCH,VILLAGE P,LA COSTA VALLEY-KAUFM
Type:SFD Sub Type:
Job Address:
Suite:
Location:
2343 PASEO SAUCEDAL
Lot 335
APPLICANT KAUFMAN & BROAD
Owner: ACACIA CREDIT FUND 5-A LLC
Remarks:
Total Time:
Phone: 7604366516
Inspector: L
Requested By: MIKE
Entered By: CHRISTINE
CD Description Act Comments
19
29
39
Final Structural
Final Plumbing
Final Electrical
49 Final Mechanical
A!_ ___________ _
-t---
Inspection History
Date Description Act lnsp Comments
6/14/99 39 Final Electrical PA TP FOR MTR REL ONLY
5/17/99 82 Drywall/Ext Lath/Gas Test AP SP
5/11/99 16 Insulation AP TP
5/10/99 16 Insulation NR TP
5/7/99 64 Rough Combo AP TP
4/26/99 83 Roof Sheathing/Ext Shear AP TP
12/1/98 81 Underground Combo AP NF
11/30/98 81 Underground Combo NR PD
11/30/98 81 Underground Combo WC PD
11/19/98 21 Underground/Under Floor AP NF
11/19/98 22 Sewer/Water Service AP NF
11/18/98 21 Underground/Under Floor NR PD
11/18/98 22 Sewer/Water Service NR PD
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDALE STREET, P. 0. Box 600627, SAN DIEGO, CA 92160 (619) 280-4321
Concrete Compressive Strength Test Report
File Number:
Project Title:
Project Location:
Architect:
Engineer:
Contractor:
Location In Structure:
Material Supplier:
Mix Designation:
Admixture(s):
9812070
Parkridge Village "P" Phase 9
2343 Paseo Sauceda!
Kaufman & Broad
J.L. Davidson
Kaufman & Broad/Concrete Concepts
Lot 335 -house foundation slab
Superior Ready Mix
CC-5
Pozz
Time In Mixer (Minutes): 55 Slump, Inches: 4-1/2
Truck Number: 441 Ticket Number: 111501
Samples Fabricated By: GAW Samples Tested By: GG
Laboratory Number: 5029 5030 5031
Mark: 335
Date Made: 12-03-98
Date Received 12-04-98
Date Tested 12-14-98 12-31-98 12-31-98
Diameter, Inches 6.00
Area, Square Inches 28.27
Maximum Load, Pounds 87,750 102,500 103,500
Compressive Strength, psi 3,100 3,630 3,660
Age Tested, Days 11 28 28
Required 28 Day Strength, psi 2,500
Permit No: 983482
Plan File No:
CC Temp:
Air Temp:-
Air Content:
0
0
"
Specimen sampling, transportation and compressive strength testing were performed by this agency in accordance with the applicable ASTM
standards. This agency makes no other warranties express or implied.
Distribution:
(2) Kaufman & Broad
( 1) City of Carlsbad
(1) Superior Ready Mix
12-03c.doc 117199
Reviewed By:
George Gavit, RCE #56564
a CltJ of Carlsbad m final Bulldlng Inspection
Dept: Buildin~ Planning CMWD St Lite Fire
Plan Check#: Date:
RECEiiVED
7/6/99 12:18:50
Permit#: CB983482 Permit Type: SFD
Project Name:
Address:
Contact Person:
Sewer Dist:
PLAN 1,PHS 9,1968+419 GAR+122
SF PORCH.VILLAGE P,LA COSTA VALLEY-KAUFM
2343 PASEO SAUCEDAL
Phone:
Water Dist:
Sub Type:
Lot: 335
•• • • • • • e ■ 1 t t t t•■• I■ I tt■I I■■ I I I I 11 ■■■■ 1■1 I I■■ I I I 11 I■ I■ I■■ I I■■ I ■■■■ I I 111 I I■■■■■ II I 111 ■■■II ■I I I■ 11111111 I I 11 ■II■ I I■■■■ I II I ■■I I I■,■■■■■ I I I■■ I I I I I 111 I ti I ll I Ill
Inspected Q,/2'? Date
7L7/'f9 ✓ By: Inspected: Approved: Disapproved: __
l
Inspected · Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
■I■■ 1 ■■I It 11 I I I■ I■ 11■■ 11 ■II I I I I I I II I I I■■■ I I I I I■■ ■t ■ ■■ ■ 11■1 ■■■11111 ■■■ f I■■■••••••■ I I I I I II II■■■■ l■■■I I I■ I■ I ■■tt■■ ■ I■■■ I I 111111 ■I •••••••■■ ■II ■ ■I I 111 ■■a■ I■■■ ■I
Comments: _____________________________ _
City DI Carlsbad
~ ·; Final Building lnsnecuon
~i'--..
Dept: Building Engineering
Plan Check #:
CMWD St Lite Fire
Date: 7 /6/99 12: 18:50
Permit#: CB983482 Permit Type: SFD
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected
By:
Inspected
By:
PLAN 1,PHS 9,1968+419 GAR+122
SF PORCH.VILLAGE P,LA COSTA VALLEY-KAUFM
2343 PASEO SAUCEDAL
Phone:
Water Dist:
Date
Inspected:
Date
Inspected:
Sub Type:
Lot: 335
Approved: Disapproved: __
Approved: Disapproved: __
I■■■■ I 1 1 111 I I I I ■-1■1111 I I I■ I■ I I■ I ■I I 11111111 I I I I I I 11I1111111111I111111 I II I I 1 111 I I I I I l l I I 1111 II I I l l I I I 1 1 11111111 11 I I I II I I I I I I I I 111111 Ill I I II 1111 I I I 11 1 1 I ll I I
Comments: _______________________________ _
Cltv of Carlsbad
Final Building Inspection ------
Dept: Building Engineering
Plan Check #:
Permit#:
Project Name:
Address:
Contact Person:
Sewer Dist:
CB983482
PLAN 1,PHS 9,1968+419 GAR+122
SF PORCH.VILLAGE P,LA COSTA VALLEY-KAUFM
2343 PASEO SAUCEDAL
Phone:
Water Dist:
Lot:
ire
Date: 7/6/99 12:18:50
Permit Type: SFD
Sub Type:
335
■■■■■■It I It I I I 1 ■ 11 ■■11■11 ■ 1 t I I I I 1111 I 111111 I I I I II I I I 111111111 I I II I I II I l■I I 111111111 I I 11 I 11111111■1111 I I I I I fl I I I 111 I 1111 I I I I 11111 I It■■ I II I I 11 I I I I I I I II ■■I I I
lnspe~ (2_ Date 7 y
By: ___,~..._......,._..L.;::.. ______ Inspected: ~ \ L-Approved: ~ Disapproved: __
In spected Date
By: __________ Inspected: _____ Approved: ___ Disapproved: __
Inspected Date
By : __________ Inspected: _____ Approved: ___ Disapproved: __
Comments: ______________________________ _