HomeMy WebLinkAboutPRE 2020-0030; BOB BAKER MAZDA ADDITION AND REMODEL; Admin Decision LetterNovember 19, 2020
Carl Chrisman
815 Civic Center Drive, Suite 101
Oceanside, CA 92054
C City of
Carlsbad
8FILE COPY
ff/a1!,I 1!/-zs-/2020
SUBJECT: PRE 2020-0030 (DEVZ0Z0-0245)-BOB BAKER MAZDA ADDITION AND REMODEL
APN: 211-080-07-00
Thank you for submitting a preliminary review for the proposed addition and remodel project for Bob Baker Mazda
located at 5365 Car Country Drive. The project site, a 117,394-square-foot lot, currently is developed with a car
dealership. The project proposes to remodel the building fa,ade and add 517 square feet of showroom area and
1,810 square feet of service area.
In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose
of a preliminary review is to provide you with direction and comments on the overall concept of your project. This
preliminary review does not represent an In-depth analysis of your proJect. It Is Intended to give you feedback on
critical issues based upon the information provided In your submittal. This review Is based upon the plans. policies.
and standards in effect as of the date of this review. Please be aware that at the time of a formal application
submittal, new plans. policies. and standards may be In effect and additional Issues of concern may be raised
through a more specific and detailed review.
Planning:
General
1. General Plan and zoning designations for the property are as follows:
a. General Plan: Regional Commercial (R)
b. Zoning: General Commercial Zone, Qualified Development Overlay (C-2-Q)
c. The property is in the Coastal Zone. The coastal land use designation and zone are the same as the
general plan and zoning above.
d. Specific Plan: Car Country Specific Plan 19(J)
2. The project requires the following permits:
a. Minor Site Development Plan (SDP) for additions that exceed 10 percent of the existing square
footage for the buildings (first and second stories combined).
b. Coastal Development Permit (CDP) for development in the coastal zone.
c. Landscaping Plan Check is required if the project proposes at least 2,500 square feet of landscaping
area.
d. A separate Sign Permit will be required for all proposed signs.
Community Development Department . .
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008°7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
PRE 2020-0030 (DEV2020-0245) -BOB BAKER MAZDA ADDITION AND REMODEL
November 19, 2020
Pa e 2
3. As described in the scope of work, this preliminary review application is for the addition to and remodel of the
existing buildings. The Carlsbad Municipal Code {CMC) and Car Country Specific Plan (SP 19) permit and
encourage the operation of car dealerships on the property. Staff supports the proposed project with revisions
to meet all city applicable codes, standards, and policies. The Planning Commission is the final decision-making
body for theCIWitlhl' building permit valuation for the project exceeds $60,000, otherwise the decision-maker
would be the City Planner. The Minor SDP and CDP will be processed concurrently to the appropriate decision-
maker.
4. Pursuant to Part 3, Section Ill (D) of SP 19, the design of exterior building elements shall be of a Spanish or
Mediterranean architectural style. The texture, color and materials used shall be harmonious with this motif
and the quality of design and the selection of the materials and colors are subject to 'approval by the city.
Specifically, all structures shall comply with the following design standards:
a. Exterior walls shall incorporate design elements that are consistent with the Spanish or Mediterranean
architectural styles. Examples of these include, but are not limited to, slump stone adobe, stucco, arches,
arcades, cornices, corbels, balustrades, fountains, and door/window details. Alternative design elements
and materials may be incorporated into the architecture subject to the determination that the elements
are found to be consistent with the Spanish or Mediterranean styles;
b. All buildings shall have an exterior color consistent with the Spanish and Mediterranean architectural styles.
The use of warm, muted earth tones is required; and
c. If a roof element is incorporated into the building design, the roof shall include a mission clay barrel tile or
S-tile design of terracotta coloring.
The proposed modern architectural style does not comply with the design intent of SP 19. Additionally, the
project proposes a double-volume, one-story showroom with a jewel-box-type display. Based on the Specific
Plan provisions, staff cannot support either the jewel box display or the proposed modern architectural style as
it is not compatible with the design requirements of SP 19. Staff recommends the project be redesigned to
incorporate a more Spanish or Mediterranean architectural style which utilizes the design elements referenced
above.
4. Pursuant to SP 19, buildings shall not exceed two stories and 30 feet. Please show building height on all elevation
plans at the highest point as defined in CMC Section 21.04.065 at the time of formal submittal.
5. All proposed signs are subject to Part 4 of SP 19 and CMC Chapter 21.41. A separate sign permit and review will
be required.
6. Parking for the proposed project is subject to Section Ill (F) of SP 19 and CMC Chapter 21.44. The following items
should be included in the plans at the time of formal submittal:
a. Show the location of the 20 percent of parking spaces that are allocated to sales customers.
b. Parking space dimensions shall be consistent with Table B in CMC Section 21.44.050. Please note that
parking spaces across the drive aisle running along the new service bays may not meet the necessary length
to count as parking spaces.
c. Please ensure that parking is calculated for all interior areas. All interior areas are calculated using the Sales
standard per CMC Chapter 21.44 except the service and parts areas.
PRE 2020-0030 (DEV2020-0245)-BOB BAKER MAZDA ADDITION AND REMODEL
November 19, 2020
Pa e 3
7. A phasing and interim parking plan describing how the construction of the project will be phased while still
providing access and parking for the existing business will be required. The plan should provide the following
information:
a. Parking analysis table and plan showing:
i. Required parking for the current dealership configuration broken down by square footage (ie: sales,
service, parts) per Part 3, Section Ill (F) of SP 19.
ii. The number of parking spaces that will remain available on-site for each of the construction phases.
iii. A plan showing the area of the property that will be used for staging construction equipment, trailer,
and materials.
b. If parking agreements with adjacent properties are planned, please provide the following:
i. Evidence/copies of the agreements.
ii. A parking analysis table showing the number of off-site spaces to be provided, the property location,
and walking distance to the subject property.
iii. Parking analysis table for each of the properties that will provide parking to the subject project during
construction and how those properties will meet their own parking requirements.
c. Alternative parking solutions, such as employer-supported rideshare programs, may be considered as part
of the plan.
d. Please note that parking spaces along the street may not be counted towards the parking requirement.
8. The maximum allowable exterior noise level of any use shall not exceed 65 Ldn as measured at the property
line. Noise caused by motor vehicles traveling to and from the site are exempt from this standard. A noise study
shall be submitted with the project application.
9. Outdoor eating facilities for employees shall be provided consistent with CMC Section 21.34.070(3).
10. All exterior lighting shall be consistent with Part 3, Section Ill (L) of SP 19. Lighting shall be designed to minimize
glare to surrounding properties and distant neighborhoods.
11. Mechanical equipment located on the roof shall be consistent with Part 3, Section Ill (0) of SP 19.
12. Trash receptacle areas shall be enclosed by a six-foot high masonry wall with gates pursuant to Part 3, Section
Ill (N) of SP 19. Enclosures shall be of similar colors and/or materials to the project. Please show the location
and details of the existing or proposed trash enclosure on the plans at the time of formal submittal.
13. Proposed landscaping is subject to Part 3, Section IV of SP 19 and the City of Carlsbad Landscape Manual. A
conceptual landscape plan will be required if proposing landscaping modifications totaling 2,500 square feet or
more. Please note that the Conceptual Landscape Plans shall be prepared in accordance with the General
Requirements listed in Section 3 of the City of Carlsbad Landscape Manual (February 2016). The City of
Carlsbad's Landscape Manual document can be found on the Planning Division's web page at the following
address:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx7Blob1D=24086.
PRE 2020-0030 (DEV2020-0245}-BOB BAKER MAZDA ADDITION AND REMODEL
November 19, 2020
Pa e4
14. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact
development requirements of this project. A formal application submittal will need to include a completed
Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG
reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating
and traffic demand management requirements, as set forth in the California Green Building Standards Code and
in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the
following address:
http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on
To the extent that new GHG reduction requirements are in effect at the time of application for grading or
building permits, the project will be required to comply with the effective requirements even if different than
what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not
limited to, site design and local building code requirements. If incorporating new GHG reduction requirements
results in substantial modifications to the project after planning approvals are obtained, then prior to issuance
of grading or building permits, the applicant may be required to submit and receive approval of a Consistency
. Determination or an Amendment application for the project through the Planning Division.
15. All development applications that require Planning Commission or City Council approval shall provide early
public notification. If the project will be subject to City Planner approval, then this requirement does not apply.
This requirement may be met by sending a public notice to the surrounding property owners (600-foot radius)
within 30 days of submittal of the development application pursuant to City Council Policy No. 84,and Form P-
21. The policy and form may be referenced online at:
City Council Policy No. 84: http://www.carlsbadca.gov/civicax/filebank/b1obdload.aspx?Blob1D=35578.
Form P-21:
https://www.carlsbadca.gov/civicax/fi1ebank/blobdload.aspx?Blob1D=24l17
All necessary application forms, submittal requirements; and fee information are available at the Planning counter
located in the Faraday Building at 1635 Faraday Avenue or online at
http://www.carlsbadca.gov/services/depts/planning/default.asp. You may also access the General Plan Land Use
Element and the Zoning Ordinance online at the website address shown; select Department Listing; select Planning
Home Page. Please review all information carefully before submitting.
Land Development Engineering:
1. Complete a Stormwater Standards Questionnaire. This questionnaire will guide you and the City in determining
what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality
requirements, The questionnaire can be printed from the following website link:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=227l1
If the total new and replaced impervious area is less than 5,000 square feet, preliminary analysis suggests that
the project is a Standard Project and subject to installing site design and source control BMPs per Chapter 4 of
the Carlsbad BMP Design Manual and per the Standard Project Requirement Checklist (E36) that will also need
to be completed. The link to the form is at:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=30141
PRE 2020-0030 (DEV2020-0245)-BOB BAKER MAZDA ADDITION AND REMODEL
November 19, 2020
Pa e 5
2. On the site plan, identify the net increase in average daily trips (ADT). Show calculations of existing and proposed
generation rates. If more than 110 net ADT is generated, a traffic impact analysis will be required in accordance
with the City's Transportation Impact Analysis Guidelines. Prior to submittal of any required discretionary
permits, however, submit a scoping agreement to the city for review and approval in accordance with these
Guidelines to determine the focus of the study.
Also, add the gross total (not net but existing and proposed) employee ADT generation on the pr_operty based
on Table 2-2 of the Carlsbad Transportation Demand Management (TDM) Handbook. Add this information and
calculations on the site plan. Submit a TDM plan if more than 110 employee ADT is generated per the Handbook.
3. Include a site plan that plots the entire lot and street frontage. Show all existing street and utility improvements
such as curb, gutter, sidewalk, water service and sewer laterals/mains. If any water or sewer facilities require
upgrading to accommodate the proposed development, plot these upgrades. Also, include a plan that only
shows existing features.
4. Add topographic contours and/or spot elevations to illustrate drainage flow.
5. Submit a title report with your application for permits and plot any easements identified in the report on the
property.
6. List grading quantities even if they are a small amount (i.e. include quantities required to establish foundations
for the expanded building footprint).
If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact
Esteban Danna at the number below. You may also contact each department individually as follows:
• Planning Division: Esteban Danna, Associate Planner, at (760) 602-4629
• Land Development Engineering: David Rick, Project Engineer, at (760) 602-2781
Sincerely,
DON NEU, AICP
City Planner
DN:ED:cf
c: Bob Baker Mazda (Christopher Baker), 5365 Car Country Dr., Carlsbad, CA 92008
David Rick, Project Engineer
Fire Prevention
HPRM/File Copy
Data Entry
,.