HomeMy WebLinkAboutSDP 2019-0014; CARLSBAD OAKS NORTH LOT 2; FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING SITE GRADING; 2006-08-30FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING SITE GRADING CARLSBAD OAKS NORTH BUSINESS PARK –PHASE 1 LOTS 1 THROUGH 9 CARLSBAD, CALIFORNIA PREPARED FOR TECHBILT CONSTRUCTION COMPANY SAN DIEGO, CALIFORNIA AUGUST 30, 2006 PROJECT NO. 06442-32-04A Project No.06442-32-04A August 30, 2006 Techbilt Construction Company 3575 Kenyon Street San Diego, California 92110 Attention:Mr.Raul Guzman Subject:CARLSBAD OAKS NORTH BUSINESS PARK –PHASE 1 LOTS 1 THROUGH 9 CARLSBAD, CALIFORNIA FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING SITE GRADING Gentlemen: In accordance with your request and our Proposal No. LG-05260 revison dated August 1, 2005, we have provided testing and observation services during grading for Phase 1 of Carlsbad Oaks North Business Park, Lots 1 through 9.The site is located to the west of the intersection of Melrose Drive and Faraday Avenue. The scope of our services included the following: Observing the grading operation including the placement of compacted fill,the removal and/or processing of loose topsoil,alluvial deposits,landslide debris and undocumented fill placed by others; and the undercutting of formational material exposed at or near street subgrade to facilitate utility excavations. In addition, we observed the placement of several subdrain systems to verify proper installation. Performing in-place density and moisture content tests in fill placed and compacted on the pads/lots and associated streets. Performing laboratory tests to aid in evaluating the compaction, shear strength, and expansion characteristics of the soil material used as fill.In addition,the water-soluble sulfate content of randomly selected samples from finish grade was tested. Preparing an As-Graded Geologic Map. Preparing this final report of grading. The purpose of this report is to document that the grading of the subject business park has been performed in substantial conformance with the recommendations of the project geotechnical report and subsequent consultations and that the fill materials have been properly compacted. At the time of this report, the grading for Lots 1,2, and 6 was incomplete and an addendum report will be provided for these lots after completion. In addition, the density tests for portions of Lots 13 and 14 (Phase 2) that were part of the overall mass grading plan for Phase 1 have also been included herein. Grading operations for Phase 1 were performed concurrently with those for El Fuerte Street and Faraday Avenue. Geotechnical information relating to the grading of these roads is presented in the following reports: . Final Report of Testing and Observation Services During Roadway Grading, Carlsbad Oaks North Business Park. Faraday Avenue Extension - StationlO+OO through 80+80, Carlsbad, California, prepared by Geocon Incorporated, dated July 27, 2006 (Project Nos. 06442-32- 05A and 06442-32-06A). . Final Report of Testing and Observation Services During Site Grading, Carlsbad Oaks North Business Park, El Fuerte Street Extension - StationJO+OO through 38+00, Carlsbad, California, prepared by Geocon Incorporated, dated July 13, 2006 (Project No. 06442-32- 08A). An update geotechnical report presenting fine grading recommendations and geotechnical design criteria for the proposed ultimate development should be prepared by Geocon Incorporated once final plans have been prepared for the individual building pads. GENERAL The grading contractor for the project was Pinnick Incorporated of El Cajon, California. The project grading plans were prepared by O'Day Consultants, the project civil engineer, and are entitled Grading and Erosion Control Plans for: Carlsbad Oaks North, Phase 1, C. T. 97-]3, City of Carlsbad approval dated October 26, 2004 (Drawing No. 4l5-9A). Recommendations for grading were provided in our report entitled Update Geotechnical Investigation, Carlsbad Oaks North, Business Park and Faraday Avenue Offsite, Carlsbad, California, dated October 21,2004 (Project No. 06442- 32-03). Staking and collection of the field survey information was performed by O'Day Consultants. The exhibit used as a base map to present the as-graded geologic information and in-place density test locations (Figures 1 through 4) is a copy of a compilation of digital information provided by O'Day Consultants. The map depicts the ultimate grading configuration with respect to lot lines, slope areas, lot numbers, and finish pad elevations. In addition, the existing ground topography prior to grading is shown. The base-of-fill elevations are also presented. This information was collected by surveyors from O'Day Consultants during remedial grading operations. The as-graded geologic contacts were Project No. 06442-32-04A - 2- August 30, 2006 derived from intermittent field survey shots and estimates made by our field representatives based on survey and/or grade-checkers' stakes. In this regard, the contacts should be considered approximate. References to elevations and locations herein are based on as-graded survey information (remedial grading exhibits) provided by ü'Day Consultants or grade-checkers' stakes in the field. Geocon Incorporated does not provide surveying services and, therefore, has no opinion regarding the accuracy of the as-graded elevations or surface geometry with respect to the approved grading plans or proper surface drainage. GRADING Grading began with removing and exporting brush and vegetation from the areas to be graded. Topsoil, alluvium, landslide debris, and undocumented fill deposits were then removed to expose formational material. Within areas to receive fill, the exposed soil was then scarified, moisture conditioned and compacted. Fill materials from on-site excavations were then placed and compacted in layers until the design elevations were attained. The areas where hard rock or dense formational material was exposed at or near street subgrade were undercut approximately 7 feet to facilitate the excavations for underground utilities. The undercut criteria where formational materials exposed near finish grade of the building pads was determined on a case-by-case basis by the owner, depending upon the apparent rippability of the materials exposed. Future excavations in areas where undercuts were not performed may encounter difficult digging and require breaking and/or localized blasting. Also, oversize material may be generated by the excavations and require special handling. Refer to the "As-Graded" Geologic Map (Figures I through 4) for the approximate delineation of formational areas. Fill Materials and Placement Procedures The on-site fill materials generally consisted of silty to clayey sands and sandy clays with mixtures of gravel and boulders generated from the various formational units exposed on site. In general, the upper 10 feet of building pads and roadways were limited to oversize material less than 12 inches in maximum dimension and 6 inches in the upper 3 feet. Rock material greater than 12 inches was placed deeper than 10 feet below proposed finish grade and at least 3 feet below the deepest utility. Fill materials classified as "soil-rock" mixtures were placed in some portions of the site by spreading and compacting the materials with a Caterpillar bulldozer in lifts 2 to 3 feet thick or less. During placement of each lift, the fill was uniformly wheel-rolled with loaded rock trucks. These materials were heavily watered during spreading prior to compacting. Soil fills were placed in lifts no thicker than would allow for adequate bonding and compaction. The soil was moisture conditioned, as necessary, and mixed during placement. Project No. 06442-32-04A - 3 - August 30, 2006 Field In-Place Density and Laboratory Testing During grading, compaction procedures were observed and in-place density tests were performed to evaluate the relative compaction of the fill material. The in-place density tests were performed in general conformance with ASTM Test Method D 2922-01 (nuclear). Results of the field density tests and moisture content tests performed during grading are summarized on Table I and the approximate locations are presented on the "As-Graded" Geologic Map. In general, the in-place density test results indicate that the fill at the locations tested has a relative compaction of at least 90 percent and an appropriate moisture content. Laboratory tests were performed on samples of material used for fill to evaluate moisture-density relationships, optimum moisture content and maximum dry density (ASTM D 1557-02), expansion characteristics (ASTM D 4829-03), sulfate potential (CA Test No. 417) and shear strength (ASTM D 3080-03). Laboratory testing for Phase I (Lots 1 through 9) was performed concurrently with the grading for Faraday Avenue and EI Fuerte Street; as such, the sample numbers are not in consecutive order. The results of the laboratory tests that are applicable to the subject grading are summarized on Tables II through V. Slopes Cut and fill slopes were graded at design inclinations of 2: 1 (horizontal:vertical) or flatter, with maximum heights of approximately 70 feet. Slopes that exposed potentially adverse conditions (e.g., weak siltstones and claystones, erosive soils, extensive seepage, etc.) were provided with a stability fill. The area where a stability fill was constructed is shown on the "As-Graded" Geologic Map. In general, fill slopes were either over-filled and cut back or track-walked with a bulldozer during grading. Fill slopes comprised of clayier soil may be prone to surficial loosening due to cyclical wetting and drying and may require increased maintenance. All slopes should be planted, drained, and maintained to reduce erosion. Slope irrigation should be kept to a minimum to just support the vegetative cover. Surface drainage should not be allowed to flow over the top of the slope. Stabilization Fill Slopes A drained stabilization fill was constructed behind Lot 2 to reduce the potential of surficial slope instability due to the presence of weak claystone and siltstone materials and extensive seepage. In general, a 1: 1 (horizontal:vertical) backcut was initiated beyond the top of slope and was extended below pad grade. A heel drain and panel drain system was installed to collect the seepage encountered along the temporary backcut. The excavation was then was backfilled with compacted granular fill material. Figure 5, Geologic Cross Section A-A', shows the approximate limits of the stability fill. Project No. 06442-32-04A - 4- August 30, 2006 Subdrains (General) Two types of subdrains were constructed in accordance with our recommendations. The systems consisted of a stability fill backdrain and canyon subdrains. The subdrain locations were surveyed by the project civil engineer and the locations are presented on the "As-Graded" Geologic Map. Additional discussion regarding the construction of the drainage systems is provided below. The final segment of subdrains consisted of non-perforated drainage pipe provided with a concrete cut-off wall constructed at the perforated/non-perforated interface. It is recommended that all subdrain outlets that empty into open space or brow ditches be provided with a headwall structure to protect the end of the pipe from damage or burial. Stability Fill Backdrains The stability fill constructed on the north facing slope behind Lot 2 was provided with a drain system consisting of 4-foot-wide Mirafi drainage panels positioned approximately 20 to 30 feet on center and vertically oriented against the temporary backcut and connected to a heel drain at the bottom. The heel drain consisted of an 8-inch-diameter perforated PVC pipe surrounded by %-inch, open-graded gravel wrapped in filter fabric. The heel drain was extended to the west and east along the stability fill backcut and ultimately connected to a storm drain box structure located outside of the toe of slope at El Fuerte Street approximate Station 17+75 and into the brow ditch situated on the west side of Lot 2. In addition, heel drain cleanouts were installed along the stability fill backcut in the event that future maintenance is necessary. The cleanouts were capped at the finish ground surface and their locations have been shown on the "As-Graded" Geologic Map. Canyon Subdrains Typical canyon subdrains consisting of 8-inch, perforated PVC pipe encapsulated in gravel and filter fabric were placed at the base of the remedial excavations where a depression occurred in the bedrock topography. Some of the original subdrain alignments were later diverted due to conflicts with underground utilities in Faraday A venue which were not known during the initial placement of the subdrain system. Finish Grade Soil Conditions Observations and laboratory test results indicate that prevailing soils randomly sampled (for Lots 3, 4, 5, 7 and 8) at finish grade have an Expansion Index (EI) ranging from 0 to 2 and are classified as having a "very low" expansion potential (El of 20 or less) as defined by Uniform Building Code (UBC) Table 18-I-B. The expansion condition for the lots in an interim condition will be provided upon completion of grading. Table III presents the results of the expansion classification for the prevailing soils at finish grade. Project No. 06442-32-04A - 5 - August 30, 2006 Oversize fragments and rock materials were generated from excavations during the grading operation. To the extent possible, the oversize material was placed within the "hold down" areas as previously discussed. The potential for encountering oversize materials (12 inches or greater) should be considered if deep excavations (10 feet or more) are proposed (i.e., underground utilities, etc.). Although particular attention was given to restricting the oversize material to the placement zones described previously, some randomly occurring fragments larger than 12 inches in nominal diameter may be present in the upper portions of fill areas. The performance of the fill, however, should not be adversely affected and the grading performed is considered to be in substantial conformance with our recommendations. Corrosion Laboratory tests performed on random soil samples to measure the percentage of water-soluble sulfate of the compacted fill at finish grade for Lots 3 through 5, and 7 and 8 indicate that the on-site materials possess a "negligible" to "moderate" potential for sulfate exposure to concrete structures, as defined by UBC Table 19-A-4. Table V presents the results of the water-soluble sulfate for the various lots sampled (Lots 3, 4, 5, 7, and 8). Geocon Incorporated does not practice m the field of corrosion engineering. Therefore, it is recommended that further evaluation by a corrosion engineer be performed if improvements are planned that are susceptible to corrosion. SOIL AND GEOLOGIC CONDITIONS In general, the soil and geologic conditions encountered during grading were found to be similar to those described in the referenced project geotechnical report. The enclosed "As-Graded" Geologic Map (Figures 1 through 4) depicts the general geologic conditions observed. Information provided by the project paleontologist was utilized in identifying the geologic units. Figure 5 (Geologic Cross Section A-A') represents the general geometry of the stability fill. The figures have been annotated to show a general representation of the as-graded geologic conditions observed during grading. Geologic contacts should be considered approximate. No geologic conditions were observed during grading that would preclude the continued development of the lots. CONCLUSIONS AND RECOMMENDATIONS 1.0 General 1.1 Based on observations and test results, it is the opinion of Geocon Incorporated that the grading, which is the subject of this report, has been performed in substantial conformance with the recommendations of the referenced project soil reports. Soil and geologic conditions encountered during grading that differ from those anticipated by the project soil Project No. 06442-32-04A - 6- August 30, 2006 report are not uncommon. Where such conditions required a significant modification to the recommendations of the project soil report, they have been described herein. 1.2 No soil or geologic conditions were observed during grading that would preclude the continued development of the property as planned. Based upon laboratory test results and field observations, it is our opinion that the fill soils within the subject lots and associated streets have generally been compacted to at least 90 percent relative compaction at the locations tested. 1.3 Fine grading and construction of utilities/foundations may encounter non-rippable formational material and/or generate some concretionary fragments and/or rock material 12 inches or greater in situ. Deeper excavations within the fill (10 feet or greater) for improvements such as utility lines, loading docks, etc., may also encounter oversize material (12 inches or greater). The potential for these conditions should be taken into consideration when determining the type of equipment to utilize for future excavation operations. The oversize material may require special handling techniques and exportation. 1.4 It is not uncommon for groundwater or seepage conditions to develop where none previously existed, particularly after landscape irrigation is initiated. The occurrence of induced groundwater seepage from landscaping can be greatly reduced by implementing and monitoring a landscape program that limits irrigation to that sufficient to support the vegetative cover without overwatering. Shallow subdrains may be required in the future if seeps occur after rainy periods or after landscaping is installed. 1.5 References to the thickness and extent of rock hold-down areas within roadways or capping of building pads are approximate and were based upon the finish grade elevations of the approved referenced grading plans. 2.0 Drainage 2.1 Adequate drainage provisions are imperative. Under no circumstances should water be allowed to pond adjacent to footings. The building pads should be properly finish graded after the buildings and other improvements are in place so that drainage water is directed away from foundations, pavements, concrete slabs, and slope tops to controlled drainage devices. Project No. 06442-32-04A - 7 - August 30, 2006 3.0 Update Geotechnical Report 3.1 An update geotechnical report presenting fine-grading recommendations and geotechnical design criteria should be prepared by Geocon Incorporated once the final development plans have been prepared for the subject lots. LIMITATIONS The conclusions and recommendations contained herein apply only to our work with respect to grading and represent conditions at the date of our final observation of grading operations on June 13, 2006. Any subsequent grading should be done in conjunction with our observation and testing serVices. As used herein, the term "observation" implies only that we observed the progress of the work with which we agreed to be involved. Our services did not include the evaluation or identification of the potential presence of hazardous materials. Our conclusions and opinions as to whether the work essentially complies with the job specifications are based on our observations, experience and test results. Due to the inaccuracies inherent in most field and laboratory soil tests, and the necessary assumption that the relatively small soil sample tested is representative of a significantly larger volume of soil, future tests of the same soil location or condition should not be expected to duplicate specific individual test results of this report. Subsurface conditions, and the accuracy of tests used to measure such conditions, can vary greatly at any time. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and location. We will accept no responsibility for any subsequent changes made to the site by others, by the uncontrolled action of water, or by the failure of others to properly repair damages caused by the uncontrolled action of water. It is the responsibility of Techbilt Construction Company to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project, are incorporated into the plans, and that the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field. Recommendations that pertain to the future maintenance and care for the property should be brought to the attention of future owners of the property or portions thereof. The findings and recommendations of this report may be invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and should not be relied upon after a period of three years. Project No. 06442-32-04A - 8 - August 30, 2006 Should you have any questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED TKR:SR:anh (Wldel) Addressee Project No. 06442-32-04A August 30, 2006 - 9 - 320 300 ~ 280 ãí Q) ~ Z o f= <( > W ...J w 260 240 220 X:/06442-32-04A1RAfTR_ 6.442 X-SECTNIDWG. A uc ~ Kp CARLSBAD OAKS BUSINESS PARK PHASE 1 LOTS 1 THROUGH 9 CARLSBAD, CALIFORNIA AI 320 TOE 280 ~ ãí Q) ~ z o f= <( > W ...J W Tsa / CLAYSTONE AND / SILTSTONE /~---------------------? PANEL .// ... SANDSTONE DRAINyr_!-_ ----? Qcf //~ Tsa '/' CLAYSTONE ~ -- - ? HEEL' ? 0 DRAIN 300 ~-=- 260 Kp Kp 240 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I o 20 40 60 80 100 120 140 160 DISTANCE (Feet) I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 180 200 220 240 220 GEOCON LEGEND Qcf ........COMPACTED FILL Que ........COMPACTED FILL IN UNDERCUT AREA Tsa ........SANTIAGO FORMATION Kp ........POINT LOMA FORMATION r-- ? J .......APPROX LOCATION OF GEOLOGIC CONTACT (Queried Where Uncertain) GEOLOGIC CROSS - SECTION A - A' SCALE: 1" = 20' (Hariz. = Vert.) e GEDeON INCORPORATED GEOTEG-lNICAL CONSULTANTS 6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121- 2974 PHONE 858 558-6900 - FAX 858558-6159 PROJECT NO. 06442 - 32 - 04A FIGURE 5 DATE 8/30/2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS E1ev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pcf) (%) (%) (%) 1 07111/05 Lot 6 312 1 0 119.9 8.7 93 90 2 07/11/05 Lot 6 312 1 0 117.3 9.1 91 90 3 07/11/05 Lot 6 316 1 0 116.3 8.9 90 90 4 07/12/05 Lot 5 308 4 0 111.7 17.6 90 90 5 07/12/05 Lot 6 317 4 0 114.1 18.2 92 90 - - - - - - - - --- - ~ - ~ - ~ - ~ - --- - - -- - -- - - - - ~ - - - ~ - ~ - -- -- -- ---- -- - ---- ---- -- -- ------- -- -- ---- - ---- - -- ~ - - - -- - - -- - - -- - -- - - -- -- -- - - - -- - -- - -- - - - --- - ----- --- ----- --- -- --- - - -- - -- 6 07/12/05 Lot 5 312 4 0 111.5 16.4 90 90 7 07/12/05 Lot 6 319 4 0 111.4 16.6 90 90 8 07/14/05 Lot 1 230 1 0 116.3 9.7 90 90 9 07/14/05 Lot 1 232 1 0 118.5 10.1 92 90 10 07114/05 Lot 1 236 1 0 117.6 10.0 91 90 -.----------- ----- ----------------------------------------------------------------------------------- 11 07/14/05 Lot 1 240 1 0 116.7 9.8 90 90 12 07/15/05 Lot 1 238 1 0 119.1 10.4 92 90 13 07/15/05 Lot 1 242 1 0 117.1 9.3 91 90 14 07/15/05 Lot 1 244 1 0 116.3 9.5 90 90 15 07/15/05 Lot 1 245 1 0 116.8 10.7 91 90 ------------------- ~ . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.. - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------------------------------- 16 07/19/05 Lot 6 320 4 0 115.0 14.1 93 90 17 07119/05 Lot 6 322 4 0 111.6 13.2 90 90 18 07/20/05 Lot 6 328 3 0 117.8 10.1 92 90 19 07/20/05 Lot 1 236 3 0 116.0 9.3 91 90 20 07/20/05 Lot 1 244 3 0 115.2 9.5 90 90 .------------------------------------ 21 07/20/05 Lot 1 246 3 0 118.0 9.6 92 90 22 07/22/05 Lot 6 318 2 0 117.1 9.3 90 90 23 07/22/05 Lot 6 323 2 0 119.3 8.5 92 90 24 07/22/05 Lot 6 322 2 0 117.4 8.4 90 90 25 07/22/05 Lot 6 334 2 0 119.3 9.0 92 90 ---------------------------------------------------------- 26 07/22/05 Lot 8 307 1 0 116.3 8.9 90 90 27 07/22/05 Lot 8 311 1 0 116.7 9.3 90 90 28 07/22/05 Lot 8 316 1 0 121.2 10.0 94 90 29 07/22/05 Lot 8 320 1 0 116.4 11.0 90 90 30 07/25/05 Lot 6 338 1 0 117.1 8.9 91 90 --------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~ - - - - ~ - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 31 07/25/05 Lot 6 340 1 0 119.8 11.2 93 90 32 07/25/05 Lot 6 342 1 0 116.3 9.2 90 90 33 07/25/05 Lot 6 343 1 0 121.7 9.6 94 90 34 07/25/05 Lot 6 345 1 0 116.4 8.6 90 90 35 07/25/05 Lot 6 345 1 0 118.0 9.7 91 90 ------- ~ - - - - - - - - - - - - - - -- --------------------------------.------..- 36 07/25/05 Lot 6 346 4 0 113.7 12.7 92 90 37 07/25/05 Lot 6 346 4 0 118.0 11.9 95 90 38 07/25/05 Lot 6 347 3 0 115.6 9.9 90 90 39 07/25/05 Lot 6 347 3 0 116.0 10.4 91 90 40 07/26/05 Lot 6 347 4 0 114.0 13.7 92 90 - - - - - - - - - - - - ~ - - - - -- ------------------- ------------------------------------------ ------- - - - ~ - - - - - - - - 41 07/26/05 Lot 6 326 4 0 111.6 14.1 90 90 42 07/26/05 Lot 6 328 3 0 116.1 11.1 91 90 43 07/26/05 Lot 6 348 3 0 116.6 10.3 91 90 44 07/26/05 Lot 6 349 3 0 118.3 9.7 92 90 45 07/26/05 Lot 6 345 3 0 115.6 9.2 90 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pcf) (%) (%) (%) 46 07/26/05 Lot 6 349 3 0 115.2 11.4 90 90 47 07/26/05 Lot 6 349 3 0 120.4 12.2 94 90 48 07/26/05 Lot 6 350 3 0 116.5 9.4 91 90 49 07/26/05 Lot 6 343 2 0 122.8 9.0 94 90 50 07/27/05 Lot 6 352 3 0 118.7 9.5 93 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 51 07/27/05 Lot 6 352 3 0 116.4 10.7 91 90 52 07/27/05 Lot 6 351 3 0 117.5 9.4 92 90 53 07/27/05 Lot 6 333 3 0 124.9 10.9 98 90 54 07/27/05 Lot 6 350 3 0 115.6 12.0 90 90 55 07/27/05 Lot 6 353 3 0 118.8 9.2 93 90 ----------------.------------------------------------------------------------------------------------------------------------------------------------------ 56 07/27/05 Lot 6 330 3 0 116.5 9.6 91 90 57 07/28/05 Lot 1 255 3 0 117.4 9.6 92 90 58 07/28/05 Lot 1 249 3 0 115.2 9.9 90 90 59 07/28/05 Lot 6 336 2 0 119.8 8.4 92 90 60 07/28/05 Lot 6 340 2 0 122.4 9.3 94 90 ---------------------------------------------------------------------- ..----------- 61 07/28/05 Lot 6 358 2 0 117.1 9.5 90 90 62 07/28/05 Lot 6 333 2 0 117.2 8.7 90 90 63 08/01105 Lot 8 325 3 0 118.7 10.4 93 90 64 08/02/05 Lot 8 310 3 0 117.4 9.1 92 90 65 08/02/05 Lot 8 313 3 0 116.5 8.9 91 90 ..-._-------------------------------------------------------. 66 08/02/05 Lot 8 315 3 0 115.2 10.2 90 90 67 08/02/05 Lot 8 317 3 0 115.9 11.4 91 90 68 08/03/05 Lot 8 327 3 0 117.8 9.3 92 90 69 08/03/05 Lot 8 325 3 0 115.5 10.4 90 90 70 08/03/05 Lot 8 330 3 0 121.3 9.7 95 90 ---- - - - - - -- -- - - - - - - - - - - - - - - - - - - - - - -- -~ ~ - ~ ~~ ~ - ~ -~ - ~ ~ ~ ~ - ~ ~ .------ -~~-~-~~~~~- 71 08/03/05 Lot 8 332 3 0 118.2 10.2 92 90 72 08/03/05 Lot 8 336 3 0 115.2 10.5 90 90 73 08/03/05 Lot 8 334 3 0 116.7 10.0 91 90 74 08/03/05 Lot 8 336 3 0 121.6 9.4 95 90 75 08/03/05 Lot 8 316 3 0 118.9 9.0 93 90 - - - - -- -- - -- -- -~- - ~-- - - -- -- - - -- -~-- -~-- -- ~- ~ ~ - -- - -- ~- ~ ~ - ~ - ~ ~ - - ~- - ~ - ~ ~ - ~ ~ - - ~ - - ~ - ~ - - - -- --- -~-- -~-- - - --~-~~-- - -- - - -- - --- 76 08/04/05 Lot 8 318 3 0 115.3 9.0 90 90 77 08/04/05 Lot 8 322 3 0 120.1 8.9 94 90 78 08/04/05 Lot 8 314 3 0 124.4 9.7 97 90 79 08/04/05 Lot 8 319 3 0 116.0 10.4 91 90 80 08/04/05 Lot 8 322 3 0 118.0 10.2 92 90 on --------- - - - - - - --- -~-_. 81 08/04/05 Lot 8 325 3 0 115.2 8.5 90 90 82 08/04/05 Lot 8 327 3 0 118.7 8.8 93 90 83 08/04/05 Lot 6 355 2 0 120.0 9.0 92 90 84 08/04/05 Lot 6 356 2 0 118.7 9.4 91 90 85 08/05/05 Lot 6 356 2 0 121.0 8.4 93 90 . - - - - - - - - - - - ~ -- - - - - - - - - * - - - - ~ - - - - - - -- ---------------------------------------------------- ------------------ - - - - - - - - - - - - - - - - - ~ - -- - ------ ~- -- --- -~~--- -- -- - -~ - --- 86 08/05/05 Lot 6 357 2 0 123.9 8.5 95 90 87 08/05/05 Lot 6 358 2 0 117.2 9.0 90 90 88 08/05/05 Lot 6 358 2 0 118.0 9.1 91 90 89 08/05/05 Lot 6 359 2 0 122.0 8.9 94 90 90 08/05/05 Lot 6 348 2 0 119.4 8.3 92 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS E]ev. Plus Fie]d Fie]d Field Reg'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 91 08/08/05 Lot 6 335 2 0 122.6 8.7 94 90 92 08/08/05 Lot 6 341 2 0 121.4 8.9 93 90 93 08/08/05 Lot 6 346 2 0 118.0 9.1 91 90 94 08/09/05 Lot 5 305 3 0 120.0 9.7 94 90 95 08/09/05 Lot 5 308 3 0 115.2 10.0 90 90 ---- ---------------------- -------------- --------------------------------------------------------------- ----------------------------------------------------------------- 96 08/1 0/05 Lot 5 309 3 0 118.8 12.2 93 90 97 08/10/05 Lot 5 313 3 0 ] ]5.3 ]1.4 90 90 98 08/1 0/05 Lot 5 317 3 0 118.1 9.3 92 90 99 08/10/05 Lot 5 320 3 0 123.1 10.5 96 90 100 08/10/05 Lot 1 255 3 0 1 ]5.5 11.3 90 90 ---------------------.-- ------------------------ ---..---.-----..------------------------------- ------------------------------------------ 101 08/1 0/05 Lot] 259 3 0 117.5 10.2 92 90 102 08/11/05 Lot 5 320 1 0 ] 17.3 ]1.4 91 90 103 08/11/05 Lot 5 321 1 0 121.7 9.8 94 90 104 08/11/05 Lot 5 324 4 0 112.4 13.7 91 90 105 08/11/05 Lot 5 324 4 0 11 1.6 12.9 90 90 106 08/11/05 Lot 5 326 4 0 116.2 ]3.9 94 90 107 08/11/05 Whiptail Loop 62+00 342 3 0 118.8 9.7 93 90 108 08/11/05 Whiptail Loop 63+30 328 3 0 116.0 10.2 91 90 109 08/11/05 Lot 8 335 3 0 120.3 9.5 94 90 ]10 08/12/05 Whiptail Loop 60+75 356 3 0 117.0 10.3 91 90 ------ ------------------------ ------ ._-.------- 111 08/12/05 Lot 8 338 3 0 115.2 9.6 90 90 112 08/12/05 Lot 5 329 2 0 125.9 9.5 97 90 113 08/12/05 Lot 5 334 2 0 119.3 8.9 92 90 ]]4 08/12/05 Lot 5 332 2 0 1 ]8.4 8.5 91 90 115 08/12/05 Lot 6 336 2 0 117.1 8.9 90 90 ------------.--. ]16 08/1 5/05 Lot 3 269 1 0 117.9 9.1 91 90 117 08/15/05 Lot 3 271 1 0 116.3 8.7 90 90 ] ]8 08/1 5/05 Lot 3 275 1 0 118.6 9.6 92 90 119 08/16/05 Lot 3 272 2 0 118.1 9.4 91 90 120 08/16/05 Lot 3 285 2 0 ] 19.7 10.0 92 90 ----------. -----------_.--------- -------------------------------------------------.----------.--------------------------------------------------- 12] 08/1 6/05 Future Park Site 235 4 0 111.6 13.6 90 90 122 08/16/05 Future Park Site 237 4 0 116.3 14.8 94 90 123 08/16/05 Lot 3 275 2 0 122.6 8.5 94 90 124 08/16/05 Future Park Site 242 4 0 115.0 12.7 93 90 125 08/17/05 Lot 1 245 4 0 112.3 15.5 91 90 - - - - - - - - - - ~ - - - - ~ - - - - ~ - - - ~- - - - - - - - - ~ - - - - - - ~ - - ~ - - - - - - ~- - - - ~ -- - - - - ~~ - . - ~ ~ - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - ~ - - -- ------------ __n__ ------------ 126 08/17/05 Lot 1 247 4 0 111.6 16.0 90 90 127 08/17/05 Lot 8 328 2 0 117.1 8.2 90 90 128 08/17/05 Lot 8 330 2 0 123.3 8.5 95 90 129 08/18/05 Whiptail Loop 59+25 373 2 0 119.6 9.3 92 90 130 08/18/05 Lot 7 387 2 0 122.3 9.0 94 90 ------------------------- - - - ~ - ~ - ~ - - - - - - - - ~ - - - - - - - - - - -- - - ~ ~ - - - - - -- 131 08/18/05 Lot 7 389 2 0 ] 17.6 9.0 90 90 132 08/18/05 Lot 7 394 2 0 120.0 8.7 92 90 ST 133 08/18/05 Lot 1 250 2 0 119.6 8.9 92 90 ST 134 08/18/05 Lot 1 250 2 0 ]21.0 9.0 93 90 135 08/18/05 Lot 8 335 2 0 118.5 9.4 91 90 Project No. 06442-32-04A August 30, 2006 TABLEt SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 136 08/18/05 Lot 8 340 2 0 117.6 8.3 90 90 137 08/18/05 Lot 8 338 2 0 117.4 8.5 90 90 138 08/18/05 Whiptail Loop 60+ 1 0 360 2 0 119.3 8.9 92 90 139 08/18/05 Lot 8 342 2 0 118.0 10.1 91 90 140 08/18/05 Lot 6 353 2 0 123.3 8.5 95 90 - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 141 08/18/05 Lot 6 353 2 0 123.3 8.5 95 90 142 08/22/05 Lot 8 338 2 0 120.7 8.7 93 90 143 08/22/05 Lot 8 332 2 0 117.4 9.3 90 90 144 08/22/05 Lot 8 340 2 0 118.6 10.7 91 90 145 08/22/05 Lot 8 341 2 0 122.7 10.0 94 90 -..---------- -------------------------------------------------------------------------------------------- ------ ------------ -------------------- 146 08/22/05 Lot 8 342 2 0 120.2 9.7 92 90 147 08/22/05 Lot 8 344 2 0 117.1 10.4 90 90 148 08/23/05 Lot 8 342 2 0 123.3 9.0 95 90 149 08/23/05 Lot 8 340 2 0 118.7 8.3 91 90 150 08/23/05 Future Park Site 246 4 0 116.7 13.5 94 90 ..--- ------------ 151 08/23/05 Lot 1 252 4 0 114.1 12.5 92 90 152 08/23/05 Future Park Site 250 4 0 111.6 13.0 90 90 153 08/23/05 Lot 8 343 2 0 117.6 8.3 90 90 154 08/23/05 Lot 8 342 2 0 118.8 8.9 91 90 155 08/24/05 Lot 8 325 2 0 120.6 8.7 93 90 ---- ------------------------- --------------------------------------------------------------------------------- ------------------------------ ----------- 156 08/24/05 Lot 8 327 2 0 123.9 8.8 95 90 157 08/24/05 Lot 8 345 2 0 117.1 9.0 90 90 ST 158 08/24/05 Lot 1 243 1 0 117.1 8.2 91 90 ST 159 08/24/05 Lot 1 240 1 0 116.3 8.0 90 90 160 08/25/05 Lot 3 279 1 0 118.5 12.0 92 90 161 08/25/05 Lot 3 280 1 0 116.4 9.1 90 90 162 08/25/05 Lot 6 350 2 0 117.2 9.0 90 90 163 08/25/05 Lot 6 351 2 0 122.2 9.9 94 90 164 08/25/05 Lot 8 328 2 0 118.5 10.0 91 90 165 08/25/05 Lot 3 282 1 0 116.8 8.7 91 90 - ---- ------------ -------------- ------------------------ 166 08/25/05 Lot 3 285 1 0 119.3 9.4 92 90 167 08/25/05 Lot 5 334 1 0 116.3 8.3 90 90 168 08/25/05 Lot 5 333 1 0 121.4 9.6 94 90 169 08/26/05 Lot 3 288 4 0 111.6 12.5 90 90 170 08/26/05 Lot 3 288 4 0 112.4 11.8 91 90 ------ --------------------- ------------------------------------------------------ -------------------- ------------ 171 08/26/05 Lot 3 295 4 0 115.0 12.7 93 90 172 08/26/05 Lot 3 293 4 0 112.0 11.4 90 90 173 08/26/05 Lot 3 295 4 0 114.2 12.2 92 90 174 08/26/05 Lot 3 298 4 0 111.7 11.4 90 90 175 08/26/05 Lot 5 315 2 0 121.0 9.2 93 90 - - - - - - - - - - ~ ------------------------ ------------------------------- ----------------------- ------ ----------------- 176 08/29/05 Lot 5 308 1 0 116.2 9.9 90 90 177 08/29/05 Lot 5 311 1 0 116.7 9.3 90 90 178 08/29/05 Lot 5 332 2 0 118.7 8.8 91 90 179 08/29/05 Lot 5 335 2 0 120.4 9.0 93 90 180 08/29/05 Lot 5 309 1 0 115.3 4.6 89 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 180A 08/29/05 Lot 5 309 I 0 119.2 10.1 92 90 181 08/29/05 Lot 5 324 1 0 114.8 6.1 89 90 181 A 08/29/05 Lot 5 324 1 0 117.4 8.6 91 90 182 08/29/05 Lot 5 318 1 0 122.6 7.8 95 90 183 08/29/05 Lot 5 334 I 0 122.1 7.6 95 90 ---------------------------------.---------------------.-------------------------------.-.----------------------_.----.------------------------------------------------- FG 184 08/29/05 Lot 1 260 1 0 117.4 7.2 91 90 FG 185 08/29/05 Lot 1 263 1 0 116.8 7.0 91 90 186 08/30/05 Lot 3 308 2 0 120.1 7.8 92 90 187 08/30/05 Lot 3; North 309 2 0 119.8 7.9 92 90 188 08/30/05 Lot 5 317 2 0 120.8 8.0 93 90 --------------------- .-------------.-------------- -------------------------------------------------------- --------.--.----- 189 08/30/05 Lot 5 324 2 0 116.6 5.5 90 90 189 A 08/30/05 Lot 5 324 2 0 119.0 8.0 91 90 190 08/30/05 Lot 5 326 2 0 118.9 6.1 91 90 190A 08/30/05 Lot 5 326 2 0 122.6 8.4 94 90 191 08/30/05 Lot 5 333 2 0 120.1 6.8 92 90 ----.. ----- ------- .-- --------------------- 191 A 08/30/05 Lot 5 333 2 0 121.3 8.1 93 90 192 08/30/05 Lot 5 334 1 0 122.7 11.1 95 90 193 08/30/05 Lot 5 326 1 0 124.7 9.3 97 90 194 08/31/05 Lot 5 332 2 0 120.2 8.3 92 90 195 08/31/05 Lot 5 333 2 0 123.1 9.7 95 90 ~.- - - - - - - - -- ---------------------------- .-.-------------------- -----.--------------------- ---. ------- .--.----------..----- 196 08/31105 Lot 4 416 2 0 119.2 11.4 92 90 197 08/31105 Lot 4 425 4 0 116.5 8.2 94 90 198 08/31105 Lot 4 428 2 0 120.1 9.6 92 90 199 08/31/05 Lot 5 337 2 0 114.1 5.5 88 90 199 A 08/31/05 Lot 5 337 2 0 117.9 10.5 91 90 ---- - -------------------.-------- ------------------------- ------------ 200 08/31/05 Lot 4 430 2 0 118.9 7.8 91 90 201 08/31/05 Lot 5 337 2 0 120.4 8.8 93 90 202 09/01/05 Lot 5 335 2 0 120.5 9.5 93 90 203 09/01/05 Lot 5 335 2 0 119.6 9.5 92 90 204 09/01/05 Lot 5 440 2 0 120.9 10.5 93 90 ----------- ----------------------- .----- ------------------------------ ----------------------.-- 205 09/01/05 Lot 5 441 2 0 122.9 10.0 94 90 206 09/01/05 Lot 3 297 4 0 113.6 14.6 92 90 207 09/01/05 Lot 3 298 2 0 120.1 9.0 92 90 208 09/01/05 Lot 3 297 2 0 118.0 9.2 91 90 209 09/01/05 Lot 3 299 2 0 118.9 8.8 91 90 ----------- - - - - - - - - - - - ~ - - - - - - ------------- -------------- ----------- ------------------------ ------------- -------- 210 09/02/05 Lot 3 300 2 0 121.0 9.0 93 90 211 09/02/05 Lot 3 299 2 0 122.2 7.6 94 90 212 09/02/05 Lot 3 295 2 0 117.4 8.8 90 90 213 09/02/05 Lot 3 301 2 0 118.8 8.6 91 90 214 09/02/05 Lot 3 302 2 0 120.0 8.9 92 90 ------------------------ ------------------------------------- ----------------------. 215 09/02/05 Lot 3 310 2 0 117.4 8.0 90 90 216 09/02/05 Lot 3; North 311 2 0 117.1 7.9 90 90 217 09/06/05 Lot 3 312 2 0 120.5 9.6 93 90 218 09/06/05 Lot 3; North 314 2 0 122.7 8.6 94 90 219 09/06/05 Lot 3 315 2 0 121.4 9.8 93 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. Rei. Rei. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pcf) (%) (%) (%) 220 09/06/05 Lot 3; North 317 2 0 124.6 8.7 96 90 221 09/06/05 Lot 3 316 2 0 121.9 9.5 94 90 222 09/06/05 Lot 3; North 318 2 0 123.7 8.7 95 90 223 09/06/05 Lot 3 300 2 0 119.0 10.6 91 90 224 09/06/05 Lot 3 302 2 0 118.7 9.6 91 90 -----------------------------------------------------------------------------------------.---------------------.-------.----------------.------------------------------- 225 09/07/05 Lot 3 304 2 0 120.2 9.3 92 90 226 09/07/05 Lot 3 305 2 0 118.2 8.8 91 90 227 09/07/05 Lot 3 306 2 0 117.0 9.2 90 90 228 09/07/05 Lot 3 318 2 0 122.8 9.5 94 90 229 09/07/05 Lot 3; North 319 2 0 121.7 7.8 94 90 ".------- ----.-._------------------_.._-------- -------------------------- ------------------.--.-.-------------------------------._-------- 230 09/07/05 Lot 3 307 2 0 117.9 8.0 91 90 231 09/07/05 Lot 3 310 2 0 118.8 12.6 91 90 232 09/07/05 Lot 3 319 2 0 118.9 8.5 91 90 233 09/08/05 Lot 3 308 2 0 119.6 8.8 92 90 234 09/08/05 Lot 3 309 2 0 118.6 9.4 91 90 235 09/08/05 Lot 3 313 2 0 122.4 9.2 94 90 236 09/08/05 Lot 3 312 2 0 122.8 8.9 94 90 237 09/08/05 Lot 3 308 2 0 121.7 10.7 94 90 238 09/08/05 Lot 3 310 2 0 121.5 8.5 93 90 239 09/09/05 Lot 3 314 2 0 117.7 10.2 90 90 ---- -,-----------------_.._- ----------------- ---------. -------------- .u --------------- ------ -.---------. 240 09/09/05 Lot 3 311 2 0 122.9 8.0 94 90 24] 09/09/05 Lot 3 309 2 0 119.4 8.7 92 90 242 09/13/05 Lot 3 320 2 0 120.1 8.7 92 90 243 09/13/05 Lot 3; North 325 2 0 120.6 9.0 93 90 244 09/13/05 Lot 3; North 322 2 0 117.1 8.4 90 90 ------ ---------------------- -------------------------------+---------------- - -----------------~~-~~~----- - - - ~ - ~ ~ - - -. 245 09/13105 Lot 3 328 2 0 117.5 8.7 90 90 246 09/14/05 Lot 3; North 331 2 0 119.7 9.2 92 90 247 09/14/05 Lot3 335 2 0 121.9 8.7 94 90 248 09/14/05 Lot 3 337 2 0 118.9 8.9 91 90 249 09/14/05 Lot 3; North 338 2 0 117.3 8.0 90 90 - - - - - - ~ - ~ - - - ~ -------------..---..-.---- - . - - - - - - - ~~ ~ - ~~ ~ - - ~ - - ~- - - - ~~ -~ -- -~~ ----~- - ~ - - - ~ - - - - -- ----- . - - - - - - - - - - - - - - - - - - ~ - ~ - ~ - - - - - - - - - - - - - - - - - - - - - -- 250 09/14/05 Lot 3 340 2 0 117.9 8.6 91 90 251 09/15/05 Lot 6 352 2 0 117.2 ]1.0 90 90 252 09/15/05 Lot 6 354 2 0 120.9 10.4 93 90 253 09/15/05 Lot 6 355 2 0 121.9 9.0 94 90 254 09/15/05 Lot 6 357 2 0 117.6 9.3 90 90 - - - - - ~ - - ~ - - - - - - - - - - - -- --------------- - - - ~ - - - - - - ~ - - - - -- ---------------- - - - - - - - - - - - - ~ ~ - - - ~ - - -- ----- 255 09/16/05 Lot 3 313 2 0 121.4 8.4 93 90 256 09/16/05 Lot 3 318 2 0 119.6 8.9 92 90 257 09/16/05 Lot 3 315 2 0 118.4 9.2 91 90 258 09/16/05 Lot 3 316 2 0 118.8 8.8 91 90 259 09/19/05 Lot 3; North 345 5 0 122.0 8.6 90 90 --- --. ------- - - - - - - - - - - - - - - - ~ - - - - ~ - - - - - - - - - - - - - - - - - -, - - - - - - - - - ~ - - - ~ - - ~ - - - - ~ - - - -- ---- --------- - - - - - - ~ - - - - - - ~ ------------ ----- - - ~ - - - - - - -,- 260 09/19/05 Lot 3; North 347 5 0 125.4 8.0 93 90 261 09/19/05 Lot 3; North 348 2 0 119.4 8.5 92 90 262 09/19/05 Lot 3 35] 2 0 118.1 9.0 91 90 263 09/]9/05 Lot 3; North 352 5 0 121.6 8.1 90 90 ST 264 09120/05 Lot 3 300 5 0 119.2 9.0 88 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) ST 264 A 09/26/05 Lot 3 300 5 0 122.0 7.5 90 90 265 09/20/05 Lot 3 352 5 0 121.6 8.0 90 90 266 09/20/05 Lot 3; North 354 5 0 123.9 7.8 92 90 267 09/20/05 Lot 3; North 355 5 0 122.4 8.2 91 90 268 09/21/05 Lot 3; North 358 5 0 121.7 7.0 90 90 - - - - - .. - - .... - ~ - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.. - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 269 09/21/05 Lot 3; North 360 5 0 121.6 7.6 90 90 270 09/21/05 Lot 3; North 364 5 0 124.7 7.5 92 90 271 09/21/05 Lot 3; North 267 5 0 121.6 7.0 90 90 272 09/22/05 Lot 6 340 5 0 121.6 7.9 90 90 273 09/22/05 Lot 6 343 5 0 125.4 8.2 93 90 . H__________ .-------------------------------------------------------------------------... -------- ------------- 274 09/22/05 Lot 8 344 2 0 118.0 8.5 91 90 275 09/22/05 Lot 8 346 2 0 117.6 9.0 90 90 276 09/22/05 Lot 6 344 5 0 121.9 7.9 90 90 277 09/22/05 Lot 6 349 5 0 127.1 7.6 94 90 278 09/22/05 Lot 8 346 2 0 117.5 9.0 90 90 -------------------------------------------------------------- 279 09/22/05 Lot 8 347 2 0 119.4 8.2 92 90 280 09/23/05 Lot 6 346 5 0 125.4 7.0 93 90 281 09/23/05 Lot 6 349 5 0 123.2 8.2 91 90 282 09/23/05 Lot 8 346 2 0 117.2 9.1 90 90 283 09/23/05 Lot 8 349 2 0 122.0 8.7 94 90 ------ -------------------- .------- ._.....__n ----- ------------ 284 09/23/05 Lot 8 320 2 0 120.6 9.0 93 90 285 09/23/05 Lot 8 325 2 0 117.1 8.5 90 90 286 09/23/05 Lot 6 344 2 0 117.6 9.3 90 90 287 09/23/05 Lot 6 346 2 0 120.2 9.0 92 90 288 09/26/05 Lot 6 360 2 0 114.5 4.5 88 90 ------- - - - - - - - - - -.... - - - -.. - - - -.... -....... .--_.. -- -.. -- --- --.... -- ---- - --.. -- -- ------ -- ----- -- - - - - - - - - - -.......... - - - -.... - ~ ~ ~ ~ -~ ~ - ~ ~ ~~~-~-~~ ~-~ ~~-~ -~-~~ ~~ ~~ ~~-~ - --- - - -- -- -- 288A 09/26/05 Lot 6 360 2 0 119.7 8.9 92 90 289 09/26/05 Lot 6 359 2 0 113.4 4.9 87 90 289A 09/26/05 Lot 6 359 2 0 117.2 8.7 90 90 ST 290 09/26/05 Lot 3 305 5 0 122.1 7.5 90 90 ST 291 09/26/05 Lot 3 285 5 0 123.3 8.0 91 90 - -- ---- -- --- - -- ~ - - ---- -- ------------------~~~~ - ST 292 09/26/05 Lot 3 295 5 0 121.6 7.9 90 90 293 09/26/05 Lot 8 340 3 0 116.8 9.0 91 90 294 09/26/05 Lot 8 336 3 0 121.1 8.9 95 90 295 09/27/05 Lot 3 319 5 0 127.3 8.5 94 90 296 09/27/05 Lot 3 315 5 0 122.9 8.7 91 90 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - -- - ---~~-~ ~ ~ - ~ ~ ~ 297 09/27/05 Lot 5 324 5 0 121.6 7.5 90 90 298 09/27/05 Lot 5 329 5 0 122.0 7.6 90 90 299 09/27/05 Lot 8 350 2 0 119.3 9.4 92 90 300 09/27/05 Lot 8 346 2 0 121.6 8.7 93 90 301 09/28/05 Lot 6 350 2 0 120.7 9.4 93 90 ------------------ ------------------------- ~ - - - - - - ~ ~ ~~~~~~~~~~~~ . ~ ~ - ~ - - - - - - -- 302 09/28/05 Lot 6 353 2 0 117.1 8.5 90 90 303 09/28/05 Lot 6 354 2 0 118.1 8.9 91 90 304 09/29/05 Lot 6 358 2 0 117.5 8.5 90 90 305 09/29/05 Lot 6 360 2 0 119.3 9.0 92 90 306 09/29/05 Lot 13 355 2 0 117.6 9.2 90 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESUL TS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pcf) (%) (%) (%) 307 09/29/05 Lot 8; North 355 2 0 117.1 9.0 90 90 308 09/29/05 Lot 8 328 2 0 122.0 8.4 94 90 309 09/29/05 Lot 8 330 2 0 118.5 8.9 91 90 310 09/30/05 Lot 7 367 2 0 118.1 8.7 91 90 311 09/30/05 Lot 7 368 2 0 117.3 8.5 90 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 312 09/30/05 Lot 8; North 375 2 0 122.4 8.3 94 90 313 09/30/05 Lot 8; North 378 2 0 117.2 9.3 90 0 314 09/30/05 Lot 13 380 2 0 119.3 8.5 92 90 315 09/30/05 Lot 13 375 2 0 117.6 9.1 90 90 316 09/30/05 Lot 13 373 2 0 118.5 8.8 91 90 ------- -"--------------------- 317 10/03/05 Lot 8; North 365 2 0 120.0 9.0 92 90 318 10/03/05 Lot 8; North 370 2 0 117.6 8.4 90 90 319 10/03/05 Lot 8; North 375 2 0 117.2 9.5 90 90 320 10/03/05 Lot 8; North 377 2 0 118.8 11.2 91 90 321 10/03/05 Lot 13 376 2 0 123.3 9.4 95 90 ----------------------------- ST 322 10/04/05 Lot 3; North 345 5 0 121.7 8.0 90 90 ST 323 10/04/05 Lot 3; NOlth 355 5 0 124.2 7.5 92 90 ST 324 10/04/05 Lot 3; North 355 5 0 121.6 7.0 90 90 ST 325 10/04/05 Lot 3; North 365 5 0 122.2 7.1 90 90 326 10/04/05 Lot 13 380 2 0 118.0 8.4 91 90 -- ------- --------------------------------------------------------- ------------- .---- ------ --------- 327 10/04/05 Lot 8; North 380 2 0 122.3 8.8 94 90 328 10/04/05 Lot 13 383 2 0 119.8 9.4 92 90 329 10/05/05 Lot 8; North 385 2 0 120.7 9.1 93 90 330 10/05/05 Lot 13 383 2 0 117.1 8.4 90 90 331 10/05/05 Lot 8; North 360 2 0 117.9 8.5 91 90 ------- ----------------------------------------------------------------------------------------------- -----------------------------------..----------------- 332 10/05/05 Whiptail Loop 13+50 305 2 0 113.4 4.0 87 90 332A 10/05/05 Whiptail Loop 13+50 305 2 0 117.1 8.4 90 90 333 10/05/05 Whiptail Loop 11 +50 290 2 0 114.7 4.6 88 90 333 A 10/05/05 Whiptail Loop 11 +50 290 2 0 117.4 8.7 90 90 334 10/06/05 57+00 389 2 0 120.7 8.5 93 90 u. -------- 335 10/06/05 Whiptail Loop 58+00 381 2 0 117.2 8.7 90 90 336 10/06/05 Lot 13 365 2 0 117.9 8.4 91 90 337 10/06/05 Lot 13 370 2 0 117.1 8.6 90 90 338 10/06/05 Lot 8 350 2 0 123.9 9.3 95 90 339 10/06/05 Lot 8 325 2 0 118.1 9.0 91 90 ~ ~ - - - - - - - ~ -- ----------------------------------------------------------------------- ---------..--- - ~ - - - - - - - 340 10/07/05 Lot 8; North 352 2 0 123.3 9.1 95 90 341 10/07/05 Lot 8; North 354 2 0 119.8 8.8 92 90 342 10/07/05 Lot 8 330 2 0 117.6 9.0 90 90 343 10/07/05 Lot 8 330 2 0 120.2 8.5 92 90 344 10/07/05 Lot 8 388 2 0 122.4 8.7 94 90 -------- ~ - ~ - - - - - - - - - - - - * - - - - - - - - - - - - - - - - - - - - - - - - - - -- ----------- ------------------ --------------------- - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - -. 345 10/07/05 Lot 13 364 2 0 117.1 8.1 90 90 346 10/07/05 Lot 13 368 2 0 121.1 8.4 93 90 347 10/07/05 Lot 8; North 370 2 0 117.6 8.8 90 90 348 10/07/05 Lot 8 330 2 0 118.4 8.7 91 90 349 10110/05 Lot 8; North 368 2 0 117.2 8.6 90 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Reg'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 350 10/1 0/05 Lot 13 370 2 0 122.7 9.2 94 90 351 10/10/05 Lot 8; North 372 2 0 117.5 8.2 90 90 352 10/10/05 Lot 8 334 2 0 120.0 8.5 92 90 353 10/10/05 Lot 8 338 2 0 117.5 8.4 90 90 354 10/10/05 Lot 8 336 2 0 121.8 8.9 94 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 355 10/10/05 Lot 8 332 2 0 117.2 9.0 90 90 356 10/11/05 Lot 8; North 385 2 0 120.0 9.0 92 90 357 10/11/05 Lot 8; North 376 2 0 118.1 8.8 91 90 358 10/11/05 Lot 8; North 387 2 0 117.6 8.5 90 90 359 10/11/05 Lot 8 338 2 0 120.7 8.8 93 90 ------------ -------------------------------------------- 360 10/11/05 Lot 8 333 2 0 118.4 8.2 91 90 361 10/12/05 Lot 6 358 2 0 117.1 8.0 90 90 362 10/12/05 Lot 6 360 2 0 119.4 8.7 92 90 363 10/12/05 Lot 6 362 2 0 123.6 8.5 95 90 364 10/12/05 Lot 4 355 2 0 120.3 8.7 92 90 ----------- ------ --------------------------------------------._---- -----------------------------------------------------------------------._-- __________n 365 10/12/05 Lot 4 362 2 0 117.1 9.0 90 90 366 10/13/05 Lot 13 393 2 0 118.0 8.4 91 90 367 10/13/05 Lot 13 385 2 0 117.5 8.2 90 90 368 10/13/05 Lot 13 395 2 0 118.4 8.6 91 90 369 10/13/05 Lot 7 360 2 0 120.7 9.0 93 90 -.---- ------------------------ ---------------------------... ---- -------------- --------- ----------------------- 370 10/14/05 Lot 13 396 2 0 119.9 8.5 92 90 371 10/14/05 Lot 13 380 2 0 123.7 9.3 95 90 372 10/14/05 Lot 8; North 375 2 0 117.2 9.0 90 90 373 10/14/05 Lot 7 363 2 0 120.7 8.9 93 90 374 10/17/05 Lot 8 329 2 0 117.5 9.0 90 90 .u - - - - - - - - - - ~ ~~ ~ - ~~ ~ - ~~ ~ ~ ~ ~ - ~ ~- ~ ---- -- -- -- - -.... - - - - -~- --~-~-~~~~~~~~--~---- ---- 375 10/17/05 Lot 8 332 2 0 117.6 9.2 90 90 376 10/17/05 Lot 8; North 390 2 0 123.9 8.7 95 90 377 10/17/05 Lot 8 380 2 0 120.7 8.8 93 90 378 10/18/05 Lot 8 335 2 0 120.6 8.9 93 90 379 10/18/05 Slope Between Lots 6/7 366 2 0 118.0 9.4 91 90 - - - - - - - - ~ - ~ -- - - ~ - ~ ~ - ~ ~ - ~ -- - - - -- - - - - - ~~ - - - - ~- -~ - -- -~ -- -- ~ * ---- -- - - - - - ~ - - ~ ~ - - - - - - - - - - -- -----. - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - ~ - ~ - - - - - - - -- 380 10/18/05 Slope Between Lots 6/7 382 2 0 123.1 8.9 95 90 381 10/18/05 Lot 8 344 2 0 121.8 9.6 94 90 382 10/18/05 Lot 8 345 2 0 117.1 10.4 90 90 383 10/18/05 Lot 8 340 2 0 117.5 9.9 90 90 384 10/18/05 Lot 7 375 2 0 120.0 10.2 92 90 - - - - - - - - - - - ~ - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - ~ - - - - - - - - - - - - - -.. - -- ----------- 385 10/21/05 Lot 8 343 2 0 128.6 4.7 99 90 385 A 10/21/05 Lot 8 343 2 0 127.2 11.1 98 90 386 10/21/05 Lot 8 345 2 0 127.4 3.8 98 90 386A 10/21/05 Lot 8 345 2 0 125.7 12.4 97 90 387 10/21/05 Lot 8 345 2 0 122.9 6.9 94 90 --.---- - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - -- ---------- ------- -------------------- - - - - - ~ - ~ ~ - - - - - - - - - -- 387 A 10121/05 Lot 8 345 2 0 119.2 11.2 92 90 388 10/21/05 Lot 9 243 4 0 113.2 16.2 91 90 389 10/21/05 Lot 9 246 4 0 115.2 15.4 93 90 390 10/24/05 Lot 9 238 4 0 112.2 17.9 91 90 391 10/24/05 Lot 9 240 4 0 114.7 18.2 93 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pcf) (%) (%) (%) 392 10/24/05 Lot 9 241 4 0 113.9 18.6 92 90 393 10/25/05 Lot 9 250 4 0 112.9 18.0 91 90 394 10/25/05 Lot 9 250 4 0 114.2 17.4 92 90 395 10/27/05 Lot 9 253 4 0 115.0 16.5 93 90 396 10/27/05 Lot 9 255 4 0 112.9 17.2 91 90 ____________________________________________________________________________________________________________________________________________________________________n___ ST 397 10131/05 Lot 6 350 2 0 119.4 6.8 92 90 ST 398 10/31/05 Lot 6 350 2 0 119.1 6.7 92 90 ST 399 10/31/05 Lot 6 350 2 0 119.8 6.7 92 90 ST 400 10/31/05 Lot 6 345 2 0 119.5 6.9 92 90 ST 401 10/31/05 Lot 6 345 2 0 120.4 7.0 93 90 ------------------------------------------------------- ------------ ----- ---.-------- ----------- ST 402 10/31/05 Lot 6 350 2 0 121.8 5.6 94 90 ST 403 10/31/05 Lot 6 345 2 0 120.3 8.4 92 90 ST 404 10/31/05 Lot 6 345 2 0 117.6 7.9 90 90 ST 405 10/31/05 Lot 6 350 2 0 118.0 8.7 91 90 ST 406 10/31/05 Lot 6 355 2 0 117.0 8.5 90 90 --------- -------- ------------------------------------- ------------------------- --------------------------------------- ST 407 10/31/05 Lot 5 325 2 0 116.6 7.1 90 90 ST 408 10/31/05 Lot 5 325 2 0 117.5 7.3 90 90 FO 409 10/31/05 Lot 3 317 2 0 120.3 7.4 92 90 FO 410 10/31/05 Lot 3 317 2 0 121.1 6.8 93 90 FO 411 10/31/05 Lot 3 320 2 0 120.1 7.2 92 90 ----------- ------------------------------------------------------------------------------- ---------- --------- ------ ........ ~ ~ - - - - -- FO 412 10/31/05 Lot 3 324 2 0 120.3 8.0 92 90 413 11/03/05 Lot 2 257 9 0 104.8 18.4 93 90 414 11/03/05 Lot 2 257 9 0 101.7 19.0 90 90 415 11/04/05 Lot 8 354 2 0 116.5 8.2 90 90 416 1l/04/05 Lot 8 351 2 0 117.2 9.3 90 90 ~~~~~-~~~ ~~ -~--~-~~- ~-~~ -~~ -~ - - --- 417 11/04/05 Lot 8; North 394 2 0 119.7 8.7 92 90 418 11/04/05 Lot 8; North 397 2 0 118.7 7.7 91 90 ST 419 1l/14/05 Lot 13; East 390 3 0 117.2 7.1 92 90 ST 420 11/14/05 Lot 13; East 392 3 0 115.5 7.5 90 90 ST 421 11/14/05 Lot 8; North 386 2 0 118.7 8.1 91 90 ------- - -.. - -- -- - - - ~- -- - -- - ~ ~ - - ~ - - -- -~ -- - -- -- --- -- -- ---- ~- -- - - - - ~ -- - - - - - ~ - - - - -- -------- ---------------- -------------------- ST 422 11/14/05 Lot 13; East 395 3 0 116.5 7.8 91 90 ST 423 11/14/05 Lot 8; North 387 3 0 115.0 7.5 90 90 ST 424 ll/l4/05 Lot 13; East 395 3 0 115.1 7.8 90 90 ST 425 11/14/05 Lot 8; North 386 3 0 115.9 7.4 91 90 426 11/15/05 Lot 8 348 9 0 104.0 18.5 92 90 - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------------ 427 11/15/05 Lot 8 346 9 0 101.7 20.2 90 90 428 ll/l5/05 Lot 8 350 9 0 102.1 22.1 90 90 429 ll/l6/05 Lot 8 349 9 0 104.8 19.4 93 90 430 11/16/05 Lot 8 348 9 0 103.0 20.1 91 90 431 1l/17/05 Lot 7 383 3 0 115.0 8.6 90 90 --.--- ---------------------------- --------._---------------------- ------- -----..--..--- ------ 432 11/17/05 Lot 7 389 2 0 122.9 8.6 94 90 433 11/18/05 Lot 7 386 2 0 123.5 8.8 95 90 434 11/18/05 Lot 7 389 2 0 119.9 8.1 92 90 435 11/21/05 Lot 2 256 13 0 113.2 14.1 93 90 436 1l/21/05 Lot 2 258 13 0 11 1.0 12.7 91 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 437 11/30/05 Lot 8 397 18 0 104.0 19.5 90 90 438 12/01/05 Lot 8 335 14 0 100.8 23.3 94 90 439 12/01/05 Lot 8 337 14 0 97.8 22.6 91 90 440 12/01/05 Lot 8 352 14 0 98.5 20.0 92 90 441 12/01/05 Lot 8 340 15 0 101.0 21.7 90 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 442 12/09/05 Lot 8 343 2 0 120.0 6.8 92 90 443 12/09/05 Lot 8 345 2 0 117.1 7.9 90 90 444 12/09/05 Lot 8 347 2 0 119.3 8.4 92 90 445 12/09/05 Lot 2; Stability Fill 2+90 256 20 0 121.4 8.5 91 90 446 12/09/05 Lot 2; Stability Fill 1 +90 255 20 0 122.1 7.9 92 90 ~ .. - - - - - - - - -- -------------------------------------------------. ---------------------------------------------------------------------- ---------------------- 447 12/09/05 Lot 2; Stability Fill 2+50 260 16 0 110.8 16.2 93 90 448 12/12/05 Lot 7; North 406 2 0 117.1 8.5 90 90 449 12/12/05 Lot 7; North 425 2 0 119.3 7.8 92 90 450 12/12/05 Lot 7; North 415 2 0 118.4 7.5 91 90 451 12/12/05 Lot 14 431 2 0 117.2 7.9 90 90 ..-----------..---------------- --.-.----..--- -------------------- ------------------------------- 452 12/13/05 Slope Between Lots 6/7 382 2 0 120.0 6.8 92 90 453 12/13/05 Lot 7 378 2 0 117.1 7.3 90 90 454 12/13/05 Slope Between Lots 6/7 390 2 0 117.5 7.5 90 90 455 12/13/05 Lot 2 256 13 0 114.3 15.6 94 90 456 12/13/05 Slope Between Lots 6/7 394 2 0 117.9 7.0 91 90 -------------------------------------------- 457 12/14/05 Lot 7; North 436 2 0 117.5 7.5 90 90 458 12/14/05 Lot 7; North 442 2 0 118.5 8.0 91 90 459 12/14/05 Lot 2; Stability Fill 3+95 258 16 0 111.2 13.1 93 90 460 12/14/05 Lot 2; Stability Fill 4+80 257 16 0 110.5 12.8 93 90 461 12/14/05 Lot 2; Stability Fill 4+30 262 16 0 107.9 14.9 90 90 -- ------ ------------------------------------------------------------------ ----------- ----------- ----- ------------------- 462 12/15/05 Lot 2; Stability Fill 6+ 70 262 16 0 107.6 15.8 90 90 463 12/15/05 Lot 2; Stability Fill 7+25 265 16 0 112.5 16.1 94 90 464 12/15/05 Lot 2; Stability Fill 5+70 267 16 0 110.1 16.5 92 90 465 12/15/05 Lot 2; Stability Fill 3+25 266 21 0 116.0 15.2 93 90 466 12/15/05 Lot 2; Stability Fill 4+35 269 21 0 112.5 13.8 90 90 ----- ------------------------------------------ ------------- - ----- 467 12/15/05 Lot 2; Stability Fill 5+00 275 21 0 112.9 14.0 90 90 468 12/16/05 Lot 8 351 3 0 116.6 7.5 91 90 469 12/16/05 Lot 8 352 3 0 117.4 8.6 92 90 470 12/16/05 Whiptail Loop 18+00 337 2 0 120.6 7.8 93 90 471 12/16/05 Lot 2; Fill 8+20 262 21 0 112.5 12.2 90 90 - - ----------------- ,----- ------------ 472 12/16/05 Lot 2; Stability Fill 7+90 266 2] 0 114.5 11.8 92 90 473 12/19/05 Lot 2; Stability Fill 3+50 271 21 0 115.9 14.5 93 90 474 12/19/05 Lot 2; Stability Fill 4+55 278 21 0 113.7 12.2 91 90 475 12/19/05 Lot 2; Stability Fill 6+75 270 21 0 112.6 11.4 90 90 476 12/19/05 Lot 2; Fill 4+10 281 16 0 107.8 16.0 90 90 -- --------- ------ ---------------- ----------------------- 477 12/19/05 Lot 2; Stability Fill 6+40 282 21 0 115.8 16.2 93 90 478 12120/05 Lot 2; Stability Fill 4+65 286 21 0 113.7 15.1 91 90 479 12/20/05 Lot 2; Stability Fill 3+75 292 21 0 118.9 16.2 95 90 480 12120/05 Lot 2; Stability Fill 4+30 297 21 0 114.5 13.0 92 90 481 12/20/05 Lot 8 352 3 0 116.0 12.0 91 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. Rei. Rei. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 482 12/20/05 Lot 8 354 3 0 115.2 9.1 90 90 483 12/20/05 Lot 2; Stability Fill 9+30 258 20 0 122.5 8.1 92 90 484 12/20/05 Lot 2; Stability Fill 9+70 262 20 0 120.9 6.9 91 90 485 12/21/05 Lot 14 448 3 0 115.3 10.1 90 90 486 12/21/05 Lot 14 452 3 0 118.8 7.5 93 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 487 12/21/05 Lot 14 455 3 0 116.5 8.0 91 90 488 12/22/05 Lot 2; Stability Fill 8+85 268 21 0 116.2 11.5 93 90 489 12/22/05 Lot 2; Stability Fill 8+20 275 21 0 112.5 15.6 90 90 490 12/22/05 Lot 2; Stability Fill 9+60 275 21 0 113.8 14.2 91 90 491 12/22/05 Lot 2; Fill 8+80 279 21 0 118.7 13.7 95 90 492 12/22/05 Lot 2; Stability Fill 5+65 295 21 0 112.5 12.9 90 90 ST 493 12/23/05 Lot 8; East 350 5 0 124.9 7.1 92 90 ST 494 12/23/05 Lot 8; South 342 2 0 116.6 7.5 90 90 ST 495 12/23/05 Lot 8; South 345 2 0 118.5 8.2 91 90 496 12/23/05 Lot 2; Stability Fill 263 15 0 101.3 18.9 90 90 -- .------- ----------------------------..------------------------------- ------------------------------. -------- ----------------------------...-- 497 12/23/05 Lot 2; Stability Fill 265 15 0 102.9 20.2 92 90 498 12/27/05 Lot 2; Stability Fill 263 15 0 105.7 20.4 94 90 499 12/27/05 Lot 2; Stability Fill 267 15 0 102.3 22.1 91 90 500 12/29/05 Lot 2; Stability Fill 261 15 0 103.2 18.2 92 90 501 12/29/05 Lot 2; Stability Fill 273 21 0 113.7 13.5 91 90 ---..--.---- ------------------------ ----------------------- -.--------- -------- ------- ----------------------------------------- ST 502 12/30/05 Lot 8; South 341 2 0 116.9 7.3 90 90 ST 503 12/30/05 Lot 8; South 341 2 0 117.1 9.0 90 90 ST 504 12/30/05 Lot 8; South 344 2 0 117.5 7.5 90 90 ST 505 12/30/05 Lot 8; South 342 20 0 121.9 7.0 92 90 ST 506 12/30/05 Lot 4; South 353 5 0 121.1 6.0 90 90 . n ._________________________ ------------------------------------- - - ~ - - - - - - - - - - - - - - -- ST 507 12/30/05 Lot 4; West 355 2 0 116.7 6.6 90 90 508 12/30/05 Lot 2; Stability Fill 265 18 0 107.1 17.5 93 90 509 12/30/05 Lot 2; Stability Fill 271 20 0 119.8 9.7 90 90 510 12/30/05 Lot 2; Stability Fill 278 20 0 122.7 9.9 92 90 511 01/06/06 Lot 8 351 2 0 118.5 10.2 91 90 - ~ ~~ ~~ - - ~~ -- - - - -- - - -- - - - - -- - - - -- -------------------- 512 01/06/06 Lot 8 354 2 0 117.5 8.7 90 90 513 01/10/06 Lot 7 397 2 0 122.0 8.9 94 90 514 01/10/06 Lot 7 395 2 0 118.3 7.5 91 90 515 01/10/06 Lot 7 375 2 0 117.1 9.2 90 90 516 01/10/06 Lot 7; Stability Fill 269 14 0 98.6 18.0 92 90 ~~~~-~~ - ------------ - - - - ~ - ~ - ~ - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - -- - - ~ - - - ~ - - - - - - - - - - - -- 517 01/11/06 Lot 7 398 2 0 118.1 10.0 91 90 518 01/11/06 Lot 7 399 2 0 117.3 9.0 90 90 519 01/12/06 Lot 2; Stability Fill 265 12 0 119.9 10.4 93 90 520 01/12/06 Lot 2; Stability Fill 276 21 0 117.4 11.5 94 90 521 01/12/06 Lot 2; Stability Fill 280 21 0 113.7 15.0 91 90 - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - . - ~ - - - - - - - - - - - - - - - - - - - - - - -- ---------------- --------- ---------- ------- 522 01/13/06 Lot 7 400 2 0 120.7 9.9 93 90 523 01/13/06 Lot 7 400 2 0 119.3 10.0 92 90 524 01/16/06 Lot 7 401 2 0 120.1 9.5 92 90 525 01/16/06 Lot 7 399 2 0 117.6 8.9 90 90 526 01/16/06 Lot 2; Stability Fill 271 24 0 112.3 13.1 91 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pct) (%) (%) (%) 527 01/16/06 Lot 2; Stability Fill 274 24 0 113.1 12.8 91 90 528 01/17/06 Lot 2; Stability Fill 275 24 0 111.7 12.2 90 90 529 01/17/06 Lot 2; Stability Fill 285 24 0 112.1 10.9 90 90 530 01/17/06 Lot 7 383 2 0 119.7 9.0 92 90 531 01/17/06 Lot 7 389 2 0 118.7 8.5 91 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ST 532 01/18/06 Lot 7; North 439 2 0 116.7 8.6 90 90 ST 533 01/18/06 Lot 7; North 441 5 0 123.0 6.5 91 90 ST 534 01/18/06 Lot 7; North 445 2 0 118.0 7.5 91 90 535 01/18/06 Lot 2; Stability Fill 266 18 0 107.2 20.1 93 90 536 01/18/06 Lot 2; Fill 277 24 0 113.8 12.2 92 90 537 01/19/06 Lot 2; Stability Fill 283 24 0 112.3 11.3 91 90 538 01/19/06 Lot 2; Stability Fill 290 24 0 115.3 10.9 93 90 539 01/23/06 Lot 2; Stability Fill 290 24 0 114.3 12.4 92 90 540 01/23/06 Lot 2; Stability Fill 315 24 0 116.4 13.3 94 90 541 01/25/06 Lot 6 349 2 0 125.1 8.0 96 90 ------------ ---------- 542 01/25/06 Lot 6 350 2 0 118.1 9.9 91 90 543 01/31/06 Lot 6 352 2 0 120.1 8.5 92 90 544 01/31/06 Lot 6 353 2 0 123.9 8.7 95 90 FO 545 02/01/06 Lot 8 356 2 0 121.3 8.7 93 90 FO 546 02/01/06 Lot 8 352 2 0 123.4 8.5 95 90 -.------------ FO 547 02/01/06 Lot 8 348 2 0 124.3 8.6 96 90 FO 548 02/01/06 Lot 8 350 2 0 123.8 8.5 95 90 PO 549 02/01/06 Lot 8 348 2 0 123.6 8.7 95 90 FO 550 02/01/06 Lot 7 406 1 0 120.5 8.4 93 90 PO 551 02/01/06 Lot 7 400 1 0 122.3 8.6 95 90 ------------- -------------------------------------------------------------------------- FO 552 02/01/06 Lot 7 402 1 0 121.7 8.7 94 90 ST 553 02/01/06 Lot 7; Southwest 385 1 0 115.9 11.1 90 90 ST 554 02/01/06 Lot 7; Southwest 395 1 0 117.6 10.5 91 90 ST 555 02/01/06 Lot 7; Southwest 400 1 0 116.0 10.9 90 90 556 02/02/06 Lot 6 356 2 0 117.2 9.9 90 90 -----------------------------------------------------------------------------------.-.----- ------- 557 02/02/06 Lot 6 354 2 0 121.0 10.2 93 90 FO 558 02/06/06 Lot 4 364 2 0 119.1 8.7 92 90 PO 559 02/06/06 Lot 5 340 2 0 121.3 7.8 93 90 FO 560 02/06/06 Lot 5 340 2 0 120.7 8.1 93 90 FO 561 02/06/06 Lot 5 343 2 0 119.2 8.3 92 90 --------------------- ------------------------------- --------- ------- 562 03/02/06 Lot 1 255 13 0 109.8 12.5 90 90 563 03/02/06 Lot 1 256 13 0 111.3 13.0 91 90 564 03/06/06 Lot 1 250 15 0 101.3 20.1 90 90 565 03/06/06 Lot 1 258 15 0 103.4 22.1 92 90 566 03/06/06 Lot 1 252 15 0 103.7 19.8 92 90 - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - -- ~ - - - - - - - - -- 567 03/06/06 Lot 1 255 15 0 101.9 21.7 91 90 568 03/07/06 Lot 1 251 15 0 103.3 22.0 92 90 569 03/16/06 Lot 1 255 19 0 103.0 10.4 88 90 569 A 03/16/06 Lot 1 255 19 0 105.3 14.8 90 90 570 03/16/06 Lot 1 252 19 0 104.3 11.1 89 90 Project No. 06442-32-04A August 30, 2006 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Elev. Plus Field Field Field Req'd. or 3/4" Dry Moist. ReI. ReI. Depth Curve Rock Dens. Cont. Compo Compo Test No. Date Location (ft) No. (%) (pet) (%) (%) (%) 570A 03/16/06 Lot 1 252 19 0 105.6 14.9 90 90 571 03/27/06 Lot 2 258 13 0 110.7 13.3 91 90 572 03/27/06 Lot 2 262 13 0 113.2 12.7 93 90 573 03/28/06 Lot 1 253 12 0 116.1 11.8 90 90 574 03/28/06 Lot 1 254 12 0 121.5 12.7 94 90 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 575 03/28/06 Lot 1 255 12 0 119.5 10.1 93 90 576 04/03/06 Lot 1 255 19 0 105.7 16.9 90 90 577 04/03/06 Lot 1 258 19 0 106.5 15.9 91 90 578 04/11/06 Lot 1 252 19 0 108.6 16.8 93 90 579 04/ ll/06 Lot 1 252 19 0 105.7 17.4 90 90 ..----------------------------------- ------------------------ ------------------ ---------------------- ------------ ST 580 04/14/06 Lot 2; Stability Fill 285 21 0 115.2 10.8 92 90 ST 581 04/14/06 Lot 2; Stability Fill 285 21 0 112.8 12.3 90 90 ST 582 04/20/06 Lot 2; Stability Fill 292 19 0 107.9 14.9 92 90 ST 583 04/20/06 Lot 2; Stability Fill 283 19 0 111.0 14.6 95 90 ST 584 04/20/06 Lot 2; Stability Fill 285 19 0 106.5 14.7 91 90 ----- --- -------- ------------------- ------------------ ----------------- -------_.-------------------------------- ST 585 04/20/06 Lot 2; Stability Fill 285 19 0 105.4 14.5 90 90 586 04/21/06 Lot 9 256 16 0 107.8 15.6 90 90 587 04/21/06 Lot 9 259 16 0 109.8 16.0 92 90 FG 588 04/26/06 Lot 9 258 13 0 110.8 12.7 91 90 FG 589 04/26/06 Lot 9 260 13 0 110.3 13.1 90 90 --------------------- -------------------- -_.,------------------ ------------- ---------------------------------------- FG 590 04/26/06 Lot 9 262 13 0 109.9 13.5 90 90 ST 591 04/26/06 Lot 9 253 13 0 109.8 15.5 90 90 ST 592 04/26/06 Lot 9 250 13 0 111.0 14.8 91 90 593 04/28/06 Lot 6 364 22 0 113.5 16.5 93 90 594 04/28/06 Lot 6 363 22 0 109.8 15.4 90 90 .----------- - - - - - - - ~ - -- ----------- -------------------- - - - ~ - - -- ------------------ 595 05/03/06 Lot 6 360 22 0 116.2 11.8 95 90 596 05/03/06 Lot 6 360 22 0 113.1 ]2.7 93 90 597 06/13/06 Lot 6 357 32 0 119.5 4.5 89 90 597 A 06/13/06 Lot 6 357 32 0 122.2 7.0 91 90 598 06/13/06 Lot 6 357 32 0 118.8 5.5 89 90 --------------------------..--------------------- --------------------- 598 A 06/13/06 Lot 6 357 32 0 120.6 7.2 90 90 Project No. 06442-32-04A August 30, 2006 TABLE I EXPLANATION OF CODED TERMS - TEST SUFFIX A, B, C, . . . : Retest of previous density test failure, following moisture conditioning and/or recompaction. - STRIKE OUT Fill in area of density test failure was removed and replaced with properly compacted fill soil. - PREFIX CODE DESIGNATION FOR TEST NUMBERS DTN - DUPLICATE TEST NUMBER ST - SLOPE TEST -CURVENO. FG - FINISH GRADE Corresponds to curve numbers listed in the summary of laboratory maximum dry density and optimum moisture content test results table for selected fill soil samples encountered during testing and observation. - ROCK CORRECTION For density tests with rock percentage greater than zero, laboratory maximum dry density and optimum moisture content were adjusted for rock content. For tests with rock content equal to zero, laboratory maximum dry density and optimum moisture content values are unadjusted. - TYPE OF TEST SC: Sand Cone Test (ASTM D1556) NU: Nuclear Density Test (ASTM D2922) OT: Other - ELEV ATION/DEPTH Test elevations/depths have been rounded to the nearest whole foot. Project No. 06442-32-04A August 30, 2006 TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557-02 Proctor Maximum Optimum Curve No. Source and Description Dry Density Moisture Content (pet) (%) 1 Dark brown, Silty, fine SAND 129.2 8.5 2 Olive brown, Silty, fine to coarse SAND with trace gravel 130.1 8.6 3 Very dark brown, Clayey, fine to coarse 128.0 8.9 SAND with trace gravel 4 Very dark brown, Clayey, fine to medium 123.9 12.0 SAND, with trace gravel 5 Dark reddish brown, Clayey, fine to coarse 135.1 7.4 SAND with trace gravel 9 Light olive, fine to medium, Sandy SILT 112.9 17.3 with little clay 12 Olive gray, Silty, fine to medium SAND 128.9 9.2 13 Light yellowish brown, Silty, fine to coarse 122.0 11.8 SAND with silt 14 Light yellowish brown, Silty CLA Y / 107.5 17.8 Clayey SILT 15 Olive green, Silty CLAY 112.2 17.8 16 Light yellowish brown, Clayey, fine to 119.4 12.6 coarse SAND 18 Light brown, fine, Sandy SILT 115.5 15.0 19 Dark brown, Clayey, fine to coarse SAND 117.0 14.7 with trace gravel 20 Very dark reddish brown, Silty, fine to 133.1 7.6 medium SAND 21 Light brown, fine to coarse, Clayey, SAND 124.9 11.4 with trace gravel 22 Brown, Clayey, fine to medium SAND 122.0 11.4 24 Olive brown, Clayey, fine to coarse SAND 124.0 11.3 with trace silt 32 Dark yellowish brown, Silty, fine to coarse 134.0 7.3 SAND with trace gravel and clay Project No. 06442-32-04A August 30, 2006 TABLE III SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS ASTM D 4829-03 Sample No. Moisture Content Dry Density Expansion (Lot No.) Before Test (% ) After Test (% ) (pet) Index EI-1 (Lot 8) 7.7 13.9 118.8 0 EI-2 (Lot 8) 9.1 13.7 113.2 0 EI-3 (Lot 8) 8.1 14.9 118.4 0 EI-4 (Lot 8) 8.2 13.5 118.2 0 EI-5 (Lot 5) 8.9 14.8 113.2 0 EI-6 (Lot 5) 8.8 14.7 113.2 0 EI-7 (Lot 5) 8.8 14.1 113.2 0 EI-8 (Lot 7) 8.5 15.6 117.9 0 EI-9 (Lot 7) 8.9 14.2 113.0 0 EI -10 (Lot 7) 8.2 13.1 117.9 0 EI-ll (Lot 4) 8.3 14.3 117.8 0 EI-12 (Lot 4) 8.4 13.9 113.8 0 EI-13 (Lot 4) 8.4 15.8 117.6 2 EI-14 (Lot 3) 9.0 16.5 113.0 1 EI-15 (Lot 3) 9.3 14.9 113.9 2 EI-16 (Lot 3) 8.4 14.2 117.8 1 TABLE IV SUMMARY OF LABORATORY DIRECT SHEAR TEST RESULTS ASTM D 3080-03 Sample Dry Density Moisture Content Unit Cohesion Angle of Shear No. (pet) (%) (pst) Resistance (degrees) 5 121.5 7.4 1015 48 9 102.6 17.1 250 18 12 116.2 9.1 220 30 13 111.3 11.9 440 39 14 99.3 16.3 230 34 15 100.3 18.5 400 19 16 108.3 12.7 360 33 Project No. 06442-32-04A August 30, 2006 TABLE IV (Continued) SUMMARY OF LABORATORY DIRECT SHEAR TEST RESULTS ASTM D 3080-03 Sample Dry Density Moisture Content Unit Cohesion Angle of Shear No. (pcn (%) (psn Resistance (degrees) 18 104.2 14.7 570 28 19 105.8 14.1 580 33 20 120.9 6.6 380 39 21 112.6 11.3 110 34 24 112.0 10.7 500 37 Samples were remolded to approximately 90 percent of maximum dry density at near optimum moisture content. TABLE V SUMMARY OF LABORATORY WATER-SOLUBLE SULFATE TEST RESULTS CALIFORNIA TEST NO. 417 Sample No. (Lot No.) EI-l (Lot 8) EI-2 (Lot 8) EI-3 (Lot 8) EI-4 (Lot 8) EI-5 (Lot 5) EI-6 (Lot 5) EI-7 (Lot 5) EI-8 (Lot 5) EI-9 (Lot 5) EI-lO (Lot 5) EI-11 (Lot 4) EI-12 (Lot 4) EI-13 (Lot 4) EI-14 (Lot 3) EI-15 (Lot 3) EI-16 (Lot 3) Water-Soluble Sulfate (%) 0.020 0.111 0.012 0.024 0.012 0.017 0.047 0.003 0.009 0.007 0.004 0.007 0.011 0.002 0.008 0.004 Sulfate Exposure Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Negligible Project No. 06442-32-04A August 30, 2006