November 20, 2015
Davis Partners MTGL Project No: 1845A02
1420 Bristol Street North, Suite 100 MTGL Log No: 15-2385
Newport Beach, California 92660
Attention: Mr. Daniel Karcher
Subject; BUILDING PAD CERTWICATION - BUILDING 'F'
Palomar Business Park Phase II
Tiger Run Court
Carlsbad, California
Dear Mr. Karcher:
Per your request, we have prepared this letter to certify that remedial grading for
Building 'F' at the Palomar Business Park Phase II project was accomplished in
general accordance with the approved plans, specifications and geotechnical
investigation (see references).
Remedial grading for the building pad included over-excavation of the existing soils
on-site to an approximate depth of two feet below bottom of proposed footing depths,
with a minimum of four feet below finish pad grade. The exposed excavation bottom
was then scarified, moisture conditioned to at least three percent above optimum
moisture content, and compacted to at least 90 percent relative compaction. The
excavated soils were then moisture conditioned to at least three percent above
optimum moisture content and compacted to at least 90 percent relative compaction.
Grading activities occurred between November 5 and 19, 2015. Based on our
observations and the results of our tests the building pad construction complies with
the project approved documents.
We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest
convenience.
bI.A.I) EiPIRE
14467 Meridian Parkway
Building 2A
Riverside, CA 92518
Tel! 951.653,4999
Fax: 951.653.4666
INDlO
44917 Golf Center Pkwy
Suite I
India, CA 92201
Tel: 760.342.4677
Fu': 760.3424525
SM DIEGO DISPATCH
888,8445060
www.nitglinc.com
Respectfully submitted,
MTGL, Inc.
, (0/
Sam E. Va1d, RCE 56226, RGE 2813
Vice President I Chief Engineering
Page 1 of 2
Palomar Business Park Phase II— Building 'F' MTGL Project No. 1845A02
Carlsbad, California MTGL Log No. 15-2385
REFERENCES
Construction Testing & Engineering, Inc. (2015). Review of Structural/Foundation Plans and
Details, Proposed Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and
8), Carlsbad, California, CTE Project No. 10-12598G, September 16.
Construction Testing & Engineering, Inc. (2015). Update to Geotechnical Investigation, Proposed
Palomar Forum Business Park Phase II, Tiger Run court (Lots 1, 2, and 8), Carlsbad,
California, CTE Project No. 10-12598G, July 23.
Construction Testing & Engineering, Inc. (2005). Update to Geotechnical Investigation, Proposed
Palomar Forum East, Lots 1, 2, and 8, North East Corner of Palomar Airport Road and
Melrose Drive, Carlsbad, California, CTE Project No. 10-7619G, December 23.
MTGL, Inc. (2015). Change of Geotechnical Consultant of Record, Palomar Business Park Phase
II, Tiger Run Court, Carlsbad, California, MUG Project No. 1845A02, MUG
Log No. 15-235 1, November 2.
Page 2 of 2
rip b 5-05
Geote-chnical Engineering
Construction Inspection
Materials Testing
Environmental
OFFICE LOCATIONS
S.s DIEGO
IMPERIAL CouNry
6295 Ferris Square
Suite C
San Diego. CA 92121
Tel, 858.537.3999
Fix: 858.537.3990
ORANGE' COUNTY
CORPORATE BRANCH
2992 E La Palma Avenue
Suite A
AnaheiniCA 92806
Tel-, 714.632.2999
Fax:. 714.632.2974
November 16, 2015
Davis Partners MTGL Project No: 1845A02
1420 Bristol Street North, Suite 100 MTGL Log No: 15-2369
Newport Beach, California 92660
Attention:. Mr. Daniel Karcher
Subject BUILDING PAD CERTIFICATION - BUILDING 'E'
Palomar Business Park Phase II
Tiger Run Court
Carlsbad, California
Dear Mr. Karcher:
Per your request, we have prepared this letter to certify that remedial grading for
Building 'E' at the Palomar Business Park Phase II project was accomplished in
general accordance with the approved plans, specifications and geotechnical
-vvw.mtgIinccom
investigation (see references).
Remedial grading for the building pad included over-excavation of the existing soils
on-site to an approximate depth of two feet below bottom of proposed footing depths,
with a minimum of four feet below finish pad grade. The exposed excavation bottom
was then scarified, moisture conditioned to at least three percent above optimum
moisture content, and compacted to at least 90 percent relative compaction. The
excavated soils were then moisture conditioned to at least three percent above
optimum moisture content and compacted to at least 90 percent relative compaction.
Grading activities occurred between November 5 and 13, 2015. Based on our
observations and the results of our tests the building pad construction complies with
the project approved documents.
We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest
convenience.
Respectfully submitted,
MTGL, Inc.
Sam E. Valdez, RCE 56226, RGE 2813
Vice President I Chief Engineering
1rLAI Eii'iRs
14467 Meridian Parkway
Building 2A
Rivcride, CA 92518
Tel; 951.653.4999
Fax: 95 1'.'03.4666
INIMO
44917 Golf Center Pkwv
Suite I -
Inrijo, CA 92201
Tel- 760.342.4677
Fax.: 760.342.4525
OCILA/INLNE' E\II'IRE
Disp,vrcii
800.491,2990
SAN DIEGO DISPATCH
888.844,5060
Page 1 of 2
Palomar Business Park Phase II- Building D MTGL Project No. 1845A02
Carlsbad, California MTGL Log No. 15-2369
REFERENCES
Construction Testing & Engineering, Inc. (2015). Review of Structural/Foundation Plans and
Details, Proposed Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and
8), Carlsbad, California, CTE Project No. 10-12598G, September 16.
Construction Testing & Engineering, Inc. (2015). Update to Geotechnical Investigation, Proposed
Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and 8), Carlsbad,
California, CTE Project No. 10-12598G, July 23.
Construction Testing & Engineering, Inc. (2005). Update to Geotechnical Investigation, Proposed
Palomar Forum East, Lots 1, 2, and 8, North East Corner of Palomar Airport Road and
Melrose Drive, Carlsbad, California, CTE Project No. 10-7619G, December 23.
MTGL, Inc. (2015). Change of Geotechnical Consultant of Record, Palomar Business Park Phase
II, Tiger Run Court, Carlsbad, California, MTLG Project No. 1845A02, MTLG
Log No. 15-2351, November 2.
Page 2 of 2
Geotechnical Engineering
Construction Inspection
Materials Testing
Environmental
OrricE LocATioNs
SAN DIEGO
iMI'ERI,u. Coucr
6295 Penis Square
Suite C
San Diego. CA 92121
Teh 858.537.3999
Fax: 858.537.3990
ORANGE COUNTY
CORPORATE BRANch
2992 E. La Palma Avenue
Suite A
Anaheim. CA 92806
Tel: 714.632.2999
Fax: 714.632.2974
INLAND EMPIRE
14467 Meridian Parkway
Building 2A
Riverside, CA 92518
Tel: 951.653.4999
Fax: 951.653.4666
vvw.nitgIincconi
November 20, 2015
Davis Partners MTGL Project No: 1845A02
1420 Bristol Street North, Suite 100 MTGL Log No: 15-2384
Newport Beach, California 92660
Attention: Mr. Daniel Karcher
Subject: BUILDING PAD CERTIFICATION -BUILDING 'D'
Palomar Business Park Phase II
Tiger Run Court
Carlsbad, California
Dear Mr. Karcher:
Per your request, we have prepared this letter to certify that remedial grading for
Building 'D' at the Palomar Business Park Phase II project was accomplished in
general accordance with the approved plans, specifications and geotechnical
investigation (see references).
Remedial grading for the building pad included over-excavation of the existing soils
on-site to an approximate depth of two feet below bottom of proposed footing depths,
with a minimum of four feet below finish pad grade. The exposed excavation bottom
was then scarified, moisture conditioned to at least three percent above optimum
moisture content, and compacted to at least 90 percent relative compaction. The
excavated soils were then moisture conditioned to at least three percent above
optimum moisture content and compacted to at least 90 percent relative compaction.
Grading activities occurred between November 5 and 18, 2015; Based on our
observations and the results of our tests the building pad construction complies with
the project approved documents.
We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest
convenience.
Respectfully submitted,
MTGL, Inc.
03
'( No. C662261
Sam E. Valdez, RCE 56226, RGE 2813
Vice President 1 Chief Engineering
INOlO
44917 Golf Center Pkwy
Suite I
Indio. CA 92201
Tel: 760.342.4677
Fax: 760.3424.525
0C/LA/INL,D EMPIRE
DISPATCh
800.491.2990
SAN DIEGO Disiwrcu
888.844.5060
Page 1 Of 2
Palomar Business Park Phase II— Building D MTGL Project No. 1845A02
Carlsbad, California MTGL Log No. 15-2384
REFERENCES
Construction Testing & Engineering, Inc. (2015). Review of Structural/Foundation Plans and
Details, Proposed Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and
8), Carlsbad, California, CTE Project No. 10-12598G, September 16.
Construction Testing & Engineering, Inc. (2015). Update to Geotechnical Investigation, Proposed
Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and 8), Carlsbad,
California, CTE Project No. 10-12598G, July 23.
Construction Testing & Engineering, Inc. (2005). Update to Geotechnical Investigation, Proposed
Palomar Forum East, Lots 1, 2, and 8, North East Corner of Palomar Airport Road and
Melrose Drive, Carlsbad, California, CTE Project No. 10-7619G, December 23.
MTGL, Inc. (2015). Change of Geotechnical Consultant of Record, Palomar Business Park Phase
II, Tiger Run Court, Carlsbad, California, MTLG Project No. 1845A02, MTLG
Log No. 15-235 1, November 2.
Page 2 of 2
Geotechnical Engineering
construction Inspection
Materials Testing
Environmental
OFFIcELOCATIoNs
SAN DIEGO
IMPERIAL COUNTY
6295 Ferris Square
Suite C
San Diego, CA 92121
Tel: 858.537,3999
Fax: 858.537.3990
O RAN G E COUNTY
CORPORATE BRANCh
299211- La Palma Avenue
Suite A
Anahcii,CA 92806
Tek 714.632.2999'
Fax 714632.2974
INLAI) EMPIRE
14467 Meridian Parkway
Building 2A
Riverside. CA 92518
Tel: 951
'
.653-4999
Fat: 951.653.4666
44917 Golf Center Pkwy,
Suite I
Indio, CA 92201
Tel: 760.1342.4677
Fax: 760.342,4525
www.nitglinc.com
November 16, 2015
Davis Partners MTGL Project No: 1845A02
1420 Bristol Street North, Suite 100 MTGL Log No: 15-2368
Newport Beach, California 92660
Attention: Mr. Daniel Karcher
Subject BUILDING PAD CERTWICATION—BUILDING 'C'
Palomar Business Park Phase II
Tiger Run Court
Carlsbad, California
Dear Mr. Karcher:
Per your request, we have prepared this letter to certify that remedial grading for
Building 'C' at the Palomar Business Park Phase II project was accomplished in
general accordance with the approved plans, specifications and geotechnical
investigation (see references).
Remedial grading for the building pad included over-excavation of the existing soils
on-site to an approximate depth of two feet below bottom of proposed footing depths,
with a minimum of four feet below finish pad grade. The exposed excavation bottom
was then scarified, moisture conditioned to at least three percent above optimum
moisture content, and compacted to at least 90 percent relative compaction. The
excavated soils were then moisture conditioned to at least three percent above
optimum moisture content and compacted to at least 90 percent relative compaction.
Grading activities occurred between November 5 and 13, 2015. Based on our
observations and the results of our tests the building pad construction complies with
the project approved documents.
We appreciate this opportunity to be of continued service to you. Should you have any
questions regarding the information contained herein, please contact us at your earliest
convenience.
Respectfully submitted,,
MTGL, Inc. OES
CO CZ N. CBS 228)1
Sam E. Valdez, RCE 56226, RGE 2813
Vice President I Chief Engineering .
OCflA/IN LAND EMPIRE
DIsPATcH
800.491.2990
SAN DIEGO DisI',vicii
888.844.5060
Page 1 of 2
Palomar Business Park Phase II— Building C MTGL Project No. 1845A02
Carlsbad, California MTGL Log No. 15-2368
REFERENCES
Construction Testing & Engineering, Inc. (2015). Review of Structural/Foundation Plans and
Details, Proposed Palomar Forum Business Park Phase II, Tiger Run Court (Lots 1, 2, and
8), Carlsbad, California, CI'E Project No. 10-12598G, September 16.
Construction Testing & Engineering, Inc. (2015). Update to Geotechnical Investigation, Proposed
Palomar Forum Business Park Phase II, I Tiger Run Court (Lots 1, 2, and 8), Carlsbad,
California, CTE Project No. 10-12598G, July 23.
Construction Testing & Engineering, Inc. (2005). Update to Geotechnical Investigation, Proposed
Palomar Forum East, Lots 1, 2, and 8, North East Corner of Palomar Airport Road and
Melrose Drive, Carlsbad, California, CTh Project No. 10-7619G, December 23.
MTGL, Inc. (2015). Change of Geotechnical Consultant of Record, Palomar Business Park Phase