HomeMy WebLinkAboutCUP 08-19; BRESSI RANCH ASSISTED LIVING FACILITY; PRELIMINARY GEOTECHNICAL INVESTIGATION; 2009-07-07 (2)CV'I' Dc. I9
N
CHRISTIAN WHEELER-
EN GIN EERING
REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED BRESSI RANCH ASSISTED LIVING FACILITY
NYGAARJ) STREET
CARLSBAD, CALIFORNIA
SUBMITTED TO
HEATH CARE GROUP
9.619 CHESAPEAKE DRIVE, SUITE 103
SAN DIEGO, CALIFORNIA 92123
SUBMITTED BY:
CHRISTIAN WHEELER ENGINEERING
3980 HOME AVENUE
SAN DIEGO, CALIFORNIA 92105
3980 Home Avenue + San Diego, CA 92105 + 619-550-1700 + FAX 619-550-1701
REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED BRESSI RANCH ASSISTED. LIVING FACILiTY
NYGAABD STREET
CAI(ISBAD. CALIFORNIA
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of a preliminary geotechnical investigation performed for the
proposed assisted living facility to be constructed southwest of the intersection of Town Garden
Road and Nygaard Street, in the city of Carlsbad, California. The following Figure Number 1
presents a site vicinity map showing the location of the property.
We understand that it is proposed to construct an assisted living facility on the subject property. The
building will be one story high with a basement under a small portion of the building. The structure will
be of wood-frame and masonry construction, will be supported by conventional shallow foundations,
and will have an on-grade concrete floor slab. The main floor will cover an area of approximately
36,865 square feet and the basement will be approximately 2,545 square feet in area. Asphalt concrete
pavement will be used to construct most of thedriveways and a parking lot associated with the facility.
Grading is expected to consist of cuts and fills of up to approximately 7 feet and 12 feet from existing
grades, respectively. The quantities of both cut and fill will be approximately 6,500 cubic yards.
Retaining walls ranging up to approximately 14 feet high will be constructed as part of the structure.
Exterior retaining walls up to about six feet in height are proposed.
To assist in the preparation of this report, we have obtained or been provided with the folio'ing
documents:
Conceptual Grading Plan for Bressi Ranch Assisted Living Facility by Nasland Engineering
dated April 1, 2009.
R
CWE 2090331.02 July 7, 2009 Cover Letter Page No. 2
If you have questions after reviewing this report, please do not hesitate to contact our office. This
opportunity to be of professional service is sincerely appreciated.
Respectfully submitted, 0NAL G.,
' cs 0
CHRISTIAN WHEELER ENGINEERING .
(
~,?—O:fS!o ;4N CERTIFIED --4 \
GEOLOGIST EX .10710
Daniel B.
-V
Charles H. Christian, RGE #00215
CHC:CRB:DBA
cc (6) Submitted
Curtis R. Burdett, #1090
L - -
JCO TTACLP4 : - i-ci A
/7N \• --L_---_-
' .___S_\__
--'
J 11 4
W land et Sys tem
38o-
.5 r
' T._--(72
7 (
,..
j waies 1 SI
L iw
- 1
I
/ / -S
I -j3.z
1 2
7 ,' QD
Bio—r tentjon
Bio—retention t5 / c
- -
- I
1
I 0 -
I - Vegetated - -
::-'Vegetated
swal~s
Setate
S
d 1 7
I wales - r Swales I' wales Veg
I
A NYGAARD ST (formerly ASTOR/A ST). .
- ___ -.
711 - I -- -- -
F