HomeMy WebLinkAboutCT 13-06; LA COSTA VILLAS; TEMPORARY VERTICAL WALL BACKCUT REPORT; 2015-03-09SMS GEOTECHNICAL SOLUTIONS, INC.
Consulting Geotechnical Engineers & Geologists
1645 South Rancho Santa Fe Road, Suite 208, San Marcos, California 92078
Office: 760-761-0799, Cell: 760-331-8738
smsgeosol.incgmail.com
Project No.: FC-12-14-33
March 9, 2015
Rancho Farms Construction
Mr. Majid Mortazavi
1608 Lake Drive
Cardiff, California 92007
Southern Property Margin Temporary Vertical Wall Backcut, La Costa Villas Project, Lot
401, 7570 Gibraltar Street, Carlsbad, California (Drawing No. 483-2A)
In accordance with your request, the undersigned have visited the site on March 9, 2015 to
further observe and evaluate the temporary wall vertical backcut excavation developed along the
southern property margins at the time of recent pad grading operations. The temporary wall
backcut approaches 13 feet in vertical height and exposes very stiff and moderately to well
compact compacted fills placed during the original site development. The southern building
basement type wall foundations and lower C1P stem have been poured, and we understand wall
water proofing, backdrain (perforated pipe surrounded in crushed rocks) installations and
backfilling are now planned. The purpose of our visit and this transmittal was to further evaluate
temporary stability of the exposed temporary wall backcut for the waterproofing and backfilling
to proceed.
Further geologic and engineering inspection of the southern margins temporary wall backcut
excavation indicated that clayey fill exposures remain in a very stiff and compact conditions and
are performing satisfactorily for temporary conditions . No indication of adverse geologic
structure or immanent instability was in evidence in the temporary wall backcut exposures.
However, prolonged exposures shall be not allowed and wall constructions and backfilling
carried out as soon as possible.
Hard hats shall be worn when working behind the wall during waterproofing and backdrain
Page lof 2
installations. As an extra safety precautionary measure, a designated worker with a "blow-horn"
should be situated at the top of excavations and observing the backcut conditions when a work is
inside the confined space between of the lower pour section of the wall and the backcut.
Based on our conversations with the project developer Mr. Majid Motazavi of Rancho Farms
Construction, the dumping of the %-inch crushed rocks on the backside of the wall will be done
with proper construction equipment to expedite the operation and minimize manual work, and as
long as there is no rain for the next 10 days, his prediction is that this wall will be backfilled,
compacted, protected and completed in less than one week.
We appreciate this opportunity to be of service to you. If you have any questions or need
clarification, please contact this office at your convenience. Reference to our Project No. FC-
12-14 -33 will help to expedite our response to your inquiries.
SMS Geotechnical Solutions, Inc.
Addressee (3, e-mail)
Attachment: Field Report dated March 9, 2015
Page 2 of 2
SMS Geotechnical Solutions, Inc. Phone: 760-761-0799
Consulting Geotechnical Engineers & Geologists
smsgeosol nc@grnai! corn
1645 South Rancho Santa Fe Rd., Suite 208
San Marcos, CA 92078
FIELD REPORT
Field Reports will be distributed to the parties listed below within 14 days. Reports of non-compliant cohditiôns will be distributed immediately.
Project Name: t4 t6:ULV.:( V1 i/of, Zzi Lk/ Date: 31 9/'S
Project #:J2.. - 1;1 - __-_33 Time Arrived: Time Departed:9.? 4~
Project Location: 755o J)v/,7 i. Time On-Site: Travel Time:_____________________
Contractor: Total Time:_________________________
Type of inspection 0 Engineered Fill 0 Foundation 0
Gp# 40 3 Bldg. Permit #_. Present
Summary of observations & testing: — Test Location
'I -
IJ
,& bdi/, W2P: /J Q2 e---
-7'b
Use Additional
Sheets if Needed
The Work 0 WAS 0 WAS NOT
IN ACCORDANCE WITH THE REQUIREMENTS OF THE
APPROVED PLANS AND GEOTECHNICAL INVESTICATION
REPORT.
CC: Client
Project Architect
Structural Engineer
Project Inspector
Contractor
Signature of Client Representative Eng./Geo/Fiel echnician
.N'.
Please Print Name / Title Print Name / Title
Registration #_________________________________
White Yellow - Contractor Pink - Building Official
SMS GEOTECHNICAL SOLUTIONS, INC.
Consulting Geotechnical Engineers & Geologists
1645 South Rancho Santa Fe Road, Suite 208, San Marcos, California 92078
Office: 760-761-0799, Cell: 760-331-8738
smsgeoso1.incgmaiLcom
Project No.: FC-12-14-33
March 9, 2015
Rancho Farms Construction
Mr. Majid Mortazavi
1608 Lake Drive
Cardiff, California 92007
Southern Property Margin Temporary Vertical Wall Backcut, La Costa Villas Project, Lot
401, 7570 Gibraltar Street, Carlsbad, California (Drawing No. 483-2A)
In accordance with your request, the undersigned have visited the site on March 9, 2015 to
further observe and evaluate the temporary wall vertical backcut excavation developed along the
southern property margins at the time of recent pad grading operations. The temporary wall
backcut approaches 13 feet in vertical height and exposes very stiff and moderately to well
compact compacted fills placed during the original site development. The southern building
basement type wall foundations and lower CIP stem have been poured, and we understand wall
water proofing, backdrain (perforated pipe surrounded in crushed rocks) installations and
backfilling are now planned. The purpose of our visit and this transmittal was to further evaluate
temporary stability of the exposed temporary wall backcut for the waterproofing and backfilling
to proceed.
Further geologic and engineering inspection of the southern margins temporary wall backcut
excavation indicated that clayey fill exposures remain in a very stiff and compact conditions and
are performing satisfactorily for temporary conditions . No indication of adverse geologic
structure or immanent instability was in evidence in the temporary wall backcut exposures.
However, prolonged exposures shall be not allowed and wall constructions and backfilling
carried out as soon as possible.
Hard hats shall be worn when working behind the wall during waterproofing and backdrain
Page 1 of 2
installations. As an extra safety precautionary measure, a designated worker with a "blow-horn"
should be situated at the top of excavations and observing the backcut conditions when a work is
inside the confined space between of the lower pour section of the wall and the backcut.
Based on our conversations with the project developer Mr. Majid Motazavi of Rancho Farms
Construction, the dumping of the 3/4-inch crushed rocks on the backside of the wall will be done
with proper construction equipment to expedite the operation and minimize manual work, and as
long as there is no rain for the next 10 days, his prediction is that this wall will be backfihled,
compacted, protected and completed in less than one week.
We appreciate this opportunity to be of service to you. If you have any questions or need
clarification, please contact this office at your convenience. Reference to our Project No. FC-
12-14 -33 will help to expedite our response to your inquiries.
SillS Geotechnical Solutions, Inc.
Distribution: Addressee (3, e-mail)
Attachment: Field Report dated March 9, 2015
Page 2 of 2
SMS Geotechnical Solutions, Inc. Phone: 760-761-0799
COnsuIting Geotechnical Engineers & Geologists smsgeosol.inc@gmail.com
1645 South Rancho Santa Fe Rd., Suite 208
San Marcos, CA 92078
Il!'I;14ZI.];ii
Field Reports will be distributed to the parties listed below within 14 days. Reports of non-compliant conditions will be distributed immediately.
Project Name: 4bh V1 / /a Zzi 40 1 Date: 31 9 /J
Project #:j-3_-It.1 - Time Arrived: 59..&C Time Departed:_
Project Location: 7S-50 jbka ~5/- Time On-Site: Travel Time:_____________________
Contractor: Total Time:__________________________
Type of inspection 0 Engineered Fill 0 Foundation 0
Gp# 40 3 Bldg. Permit # Present
Summary of observations & testing: - Test Location
/
Use Additional
Sheets if Needed
The Work 0 WAS 0 WAS NOT
IN ACCORDANCE WITH THE REQUIREMENTS OF THE
APPROVED PLANS AND GEOTECHNICAL INVESTICATION
REPORT.
CC: Client
Project Architect
Structural Engineer
Project Inspector
Contractor
Signature of Client Representative Eng ./GeolFiel echnician
'tc,,fZ,qI
Please Print Name I Title Print Name / Title
Registration #_________________________________
White Yellow - Contractor Pink - Building Official