UPDATE GEOTECHNICAL INVESTIGATION FOR THE
PROPOSED POINSETTIA VILLAGE
CARLSBAD, CALIFORNIA
Gentlemen:
This report presents the results of our update soil investigation at the
subject site. The site (also designated Carlsbad Tract 81-6(B)) is located
south of Poinsettia Lane between Avenida Encinas and Interstate 5 in
Carlsbad, California.
To assist us In our study, we have discussed the project with you and
with Coombs-Mesquita Architects and have been provided a copy of a
preliminary plan dated December 23, 1985, prepared by Brian Smith Engi-
neers., Inc. In addition, we have reviewed our records of work done
previously on*the site. Our previous reports are entitled "Final Report of
Engineering Observation of Grading and Testing of Compacted Fill, Lots 1
through 12, Carlsbad Tract 81-6, Carlsbad, California," dated February 7,
1985, and "Recommended Pavement Sections, Avenida Encinas and
Loganberry Avenue, Carlsbad Tract No. 81-6, Carlsbad, California," dated
January 23, 1985. We have also reviewed "Preliminary Soils and Geologic
Investigation, Proposed 22.89 Acre Site for Industrial Commercial Develop-
ment, Carlsbad, California," prepared by Medall, Aragon, Worswick &
Associates,* Inc., dated August 31, 1981.
We understand that the project will include minor regrading of the site
(1-2 foot cuts and fills with a 4 foot cut in the area at the northwest
corner of the site) and construction of a one- and two-story shopping
center complex. We further understand that eight building sites will be
rough graded only for future sale or development by others, and are not a
part of this investigation.
Figure 1, the Site Plan, shows the building sites planned for development
by Poinsettia Associates, and the building sites planned for development
by others.
Consulting Engineers. Geologists
and Environmental Scientists JffA_
Offices in Other Principal Cit!eS qV
Poinsettia Associate
Project No. 541681-th
June 23, 1986
Page 2
0
Woodward-Clyde Consultants
PURPOSE OF INVESTIGATION
The purpose of our investigation will be to provide information to assist
you and your consultants In evaluating the property and for project de-
sign. In particular, our investigation is designed to address:
General surface and subsurface soil conditions;
Presence and effect of expansive soils;
Grading and earthwork;'
Types and depths of foundations and allowable soil bearing
pressure; and
Pavement design.
Field and Laboratory Investigation
Our field investigation included making a visual geologic reconnaissance of
the existing surface conditions, making 4 test pits on May 29, 1986 and
obtaining representative soil samples. The pits were advanced to a depth
of approximately 6 feet, at the approximate locations shown on Figure 1.
A Key to Logs is presented in Appendix A as Figure A-1. Final logs of
the test pits are presented in Appendix A as Figures A-2 and A-3. The
description of the logs are based on field logs, sample inspection, and
laboratory tests. The results of laboratory tests are shown in Appendix
B. The field investigation and laboratory testing programs are discussed
in Appendices A and B.
Review of Existing Final Report
The February 7, 1985 WCC report indicates that the site is a cut-fill site.
The cut area, toward the southeast along the freeway has been cut to a
maximum of approximately 15 feet. The north and westerly part of the
site has been filled to a maximum of approximately 5 feet.
Loose natural surface soils in the central part of the site, were removed
prior to placement of fill. Non-expansive granular fill was placed within 3
feet of rough grade in the fill portions of the site. Soils exposed in the
cut areas are also non-expansive.
General Surface and Subsurface Soil Conditions
The site is essentially constructed in 1984, consisting of 12 level lot pads
and a central paved access road. A subdrain system has been installed
with lateral pipes aligned under the lot boundaries and a central collector
line under the access road, which drains to the south into the existing
storm drain under Avenida Encinas.
Poinsettia Associate#
Project No. 541681-PROl
June 23, 1986 WbodWard-CWe Consukants
Page 3
The cut slope along the southeast site boundary (approximately 15 feet
high and 2:1 slope inclination) and the fill slopes along the west site
boundary (approximately 5 feet high and 2:1 slope inclination) both appear
to be only very slightly eroded, and there were no piles of dumped trash
or fill on the site at the time of our investigation. -
Our test excavations indicate that both the compacted fill soils and the
natural formational soils are non-expansive granular silty and clayey
sands.
CONCLUSIONS AND RECOMMENDATIONS
The conclusions and recommendations presented below are based on the
results of our field investigation, review of our files and available plans,
laboratory tests results, engineering analysis, and professional judgement.
Grading
We recommend that the proposed grading be performed in accordance with
the attached Guide Specifications for Site Grading. We recommend that
backfill placed in utility trenches located within 5 feet of a building and
deeper than 12 inches, or backfill placed in any trench located 5 feet or
more from a building and deeper than 5 feet, be placed in accordance with
the above specifications. We also recommend that all grading be performed
under the observation and testing services of our firm.
Drainage
We recommend that positive measures be taken to properly finish grade
building pads after structures and other improvements are completed so
that all drainage waters from the building pad and adjacent properties are
directed off the site and away from foundations and floor slabs. Even
when these measures have been taken, experience has shown that a
shallow ground water or surface water condition can and may develop in
areas where no such water condition existed prior to site development; this
is particularly true where a substantial increase water infiltration results
from landscaping irrigation.
To further reduce the possibility of moisture related problems, we recom-
mend that all landscaping and irrigation be kept as far away from the
building perimeter as possible. Irrigation water, especially close to the
building, should be kept to the minimum required level. We recommend
that the ground surface in all areas be graded to slope away from the
building foundations and floor slabs and that all runoff water be directed
to proper drainage areas and not be allowed to pond.,
Foundations
We recommend that conventional spread or continuous footings be designed
for an allowable soil bearing pressure of 3,000 psf (total dead plus live
Poinsettia Associate*
Project No. 541681-PROl
June 23, 1986 WoodMmrd-Clyde Consuftarft
Page 4
load) at a depth below lowest adjacent rough grade of 18 inches. This is
assuming that foundations are placed in properly compacted low expansion
fill or undisturbed native soil. All footings should have a minimum width
of 12 inches. The bearing pressure may be Increased by one third for
loads that include wind or seismic forces. We recommend that all continu-
ous footings be reinforced top and bottom with at least one No. 4 rebar.
Pavement Design
An R value test was performed on a sample of the probable pavement
subgrade soils. Results of this test are presented in Appendix B. Based
on the results of this test it is our opinion that the existing fill soils and
formational soils are suitable for use as pavement subgrade soils. Where
pavements are placed on fill, soils, we recommend that the top 12 inches of
subgrade be scarified and compacted to at least 95 percent of the maximum
dry density. Where pavements are placed on undisturbed formational
soils, we recommend that the top 6 inches of subgrade be scarifled and
compacted to 95 percent relative compaction.
For design purposes we have used an R value of 50 for probable subgrade
soils, which, in our opinion, is representative of the average subgrade
conditions on the site. If import soils are used for subgrade under paved
areas, an R test value should be performed on a sample and new pavement
section used if necessary.
Based on the above assumption we recommend the following pavement
sections.
Area
Light vehicle
parking
Access Roads
A.C. over Crushed Aggregate Base
Full Depth
A. C. P.C.C.*
311
3ft
411
611
411
511
Loading Docks 611
*Portland Cement Concrete
These sections are based on a design life of 20 years with normal mainte-
nance.
We recommend that asphalt concrete, base, and concrete paving be provid-
ed and placed in accordance with the latest edition of "Standard Specifica-
tions for Public Works Construction".
We recommend that mix designs for the. asphalt concrete and the PCC be
made by engineering companies specializing in these types of work, and
that the paving operations be inspected by a qualified testing laboratory.
Poinsettia Asso~ciate*
Project No. 541681-PROl
June 23, 1986
Page 5
Woodvmrd-Clyde Consukarft
We recommend that adequate surface drainage be provided to reduce pond-
ing and infiltration of water into the subgrade materials. We suggest that
paved areas have a minimum, gradient of 1 percent. It is important to
provide adequate drainage to reduce possible future ponding and distress
of the pavement section.
UNCERTAINTY AND LIMITATIONS
We have observed only a very small portion of the pertinent soil and
groundwater conditions. The recommendations made herein are based on
the assumption that soil conditions do not deviate appreciably from those
found during our field investigation. We recommend that Woodward-Clyde
Consultants review the foundation and grading plans to verify that the
intent of the recommendations presented herein has been properly inter-
preted and incorporated into the contract documents. We further recom-
mend that Woodward-Clyde Consultants observe the site grading, subgrade
preparation under concrete slabs and paved areas, and foundation exca-
vations to verify that site conditions are as anticipated or to provide
revised recommendations if necessary. If the plans for site development
are changed, or if variations or undesirable geotechnical conditions are
encountered during construction, we should be consulted for further
recommendations.
This report is intended for design purposes only and may not be sufficient
to prepare an accurate bid.
California, including San Diego, is an area of high seismic risk. It is
generally considered economically unfeasible to build a totally earth-
quake-resistant project; it is therefore possible that a large or nearby
earthquake could cause damage at the site.
Geotechnical engineering and the geologic sciences are characterized by
uncertainty. Professional judgements presented herein are based partly on
our understanding of the proposed construction, and partly on our general
experience. Our engineering work and judgements rendered meet current
professional standards; we do not guarantee the performance of the project
in any respect.
Inspection services allow the testing of only a small percentage of the fill
placed at the site. Contractual arrangements with the grading contractor
should contain the provision that he is responsible for excavating, placing,
and compacting fill in accordance with project specifications. Inspection
by the geotechnical engineer during grading should not relieve the grading
contractor of his primary responsibility to perform all work in accordance
with the specifications.
This firm does not practice or consult in the field of safety engineering.
We do not direct the contractor's operations, and we can not be respon-
sible for the safety of personnel other than our own on the site; the
safety of others is the responsibility of the contractor. The contractor
Poinsettia Associate*
Project No. 541681-PROl
June 23, 1986
Page 6
Woodward-Clyde Consultants
should notify the owner if he considers any of the recommended actions
presented herein to be unsafe.
If you have any questions, please give us a call.
Very truly yours,
WOODWARD-CLYDE CONSUL ANTS
Joseph G. Kocherhans
R.E. 23060
JGK/BRS/cyh
OF ESS/ -in
No.23060
Ax -Ji - J4
clo,
OF C,
0
Q~
(D
4T
0
4)
m
to u
W6
W
c
4- 0
to co
a co
m
ix t
ul 4CC
m
44
..
0 c
U) ul t
C 0 Lu C
-C
'o
Im
CL
oo w
4), qj Ln
E E
CL r- ui I- f
0 0
(D
— LU
CL > >
(4 -0
Z
0
AC z
u 4- 40- 40-
z ui
0 -0 -0
C 0 0
0 C C
C C
.2 m
'& 06 0
AU
AU
M . to ta
C C
'0 -0
.0 J2
to A
M
-0
E c . c
z
LU
u Lu
1 0
16i w
w
z
INI
Project No. 541681-101 0
Woodward-Clyde Consultants
APPENDIX A
Four exploratory test pits were advanced at the approximate locations
shown on the Site Plan (Figure 1). The pits were dug on May 29, 1986
with a 24-Inch bucket backhoe under the direction of a geologist from our
firm.
Samples of the soils encountered were obtained from the test pits in sacks,
and transported to the laboratory for examination and testing.
-1-
Location Boring Number Elevation
DEPTH
IN TEST DAT!__JOTHER
I TESTS]
SAMPLE SOIL DESCRIPTION
I I 'MC I 'DD I iR8C FEET NUMBER
12 110 65 Very dense, moist, b rown silty sand (SM)
d 6
WATER LEVEL
At time of drilling or as indicated.
SOIL CLASSIFICATION
Soil Classifications are based on the Unified Soil Classification System
and include color, moisture and consistency. Field descriptions have
been modified to,refi,ect results of laboratory analyses where
appropriate.
DISTURBED SAMPLE LOCATION
Obtained by collecting the augler cuttings in a plastic or cloth bag.
DRIVE SAMPLE LOCATION
MODIFIED CALIFORNIA SAMPLER
Sample with recorded blows per,foot was obtained with a Modified
California drive sampler (7' inside diameter, 2.5" outside diameter)
lined with sample tubes. The sampler was driven into the soil at the
bottom of the hole with a 140 pound hammer failing 30 inches.
STANDARD PENETRATION SAMPLER
Sample with recorded blows per foot was obtained using
standard split spoon sampler (IV Inside.diameteri 2-
utside diameter). The sampler was driven Into the soil
at the bottom of the hole with a 140 pound hammer falling
30 Inches and the sample placed In a plastic bag.
INDICATES SAMPLE TESTED FOR OTHER PROPERTIES GS — Grain Size Distribution , CT — Consolidation Test
LC— Laboratory Compaction UCS— Unconfined Compression Test
Test SDS -Slow Direct Shear Test
PI — Atterberg Limits Test DS — Direct Shear Test
ST — Loaded Swell Test TX— Triaxial Compression Test
CC — Confined Compression 'R'— R—Value
Test
NOTE: In this column the results of these tests may be recorded
where applicable.
BLOW COUNT
Number of blows needed to advance sampler one foot or as indicated.
DRY DENSITY See Note 2.
Pounds per Cubic Foot
MOISTURE CONTENT
Percent of Dry Weight
NOTES ON FIELD INVESTIGATION
1. REFUSAL indicates the inabilitV to extend excavation, practically.
with equipment being used in the investigation.
KEY TO LOGS
POINSETTIA VILLAGE _T_ DRAWN BY: ch CHECKED 111Y:,~')It [ PROJECT mo: 541681-PROl DATE. 6-19-86 FIGURE NO:. A
WOOOWARO-CLYOE CONSULTANTS
0 0
Test Pit 1
ADnroximate El. 68'
DEPTH
IN
TEST DATA 100THER
I
SAMPLE S OIL DE'SCRIPTION -
I
*BC
I FEET TESTS NUMBER
Moist, light red brown, medium grained GS 1-1 sand FILL
GS 1-2 Moist, light brown, fine to medium sand
FILL
5 GS,PI 1-3 Dense, moist, reddish brown, clayey sand
with silt (SC-SM) SANTIAGO FORMATION
Dense, moist, brown and gray brown mottled,
clayey sand with gray clay seams (SC)
101 Bottom of Hole
SANTIAGO FORMATION
15
Test Pit 2
Approximate El. 661
DEPTH
IN
FEET
TEST DATA *OTHER
TESTS SAMPLE
NUMBER I
SOIL DESCRIPTION
I I -MC I -DDT".SC
moist, reddish brown, silty sand
FILL
2-1
Dense, moist, deep brown and gray brown, 5- GS,PI 2-2 clayey sand with gray clay seams (SC)
SANTIAGO FOP14ATION
Bottom of Hole
10
15
*For description of symbols, see Figure A-1
LOG OF TEST PITS 1 AND 2
POINSETTIA VILLAGE
I FIGURE NO: A DRAWNIBY: ch I CHECKED BY:,,~~Lj PROJECTNO: 541681—PROI I DATE- 6-19-86 —2
WOOO,WARO-CLYOE CONSULTANTS
9
Test Pit 3
Approximate El. 661
Moist, reddish brown, silty sand
FILL
Dense, moist, brown and gray brown, clayey
sand with gray clay seams (SC)
SANTIAGO FORMATION
SOIL DESCRIPTION DEPTH IN FEET
TEST DATA *OTHER
TESTS I
13AMPLE
NUMBER I I -MC I -DD I -BC I
5
I ,
Bottom of Hole
10
15
Test Pit 4
Approximate El. 681
DEPTH
IN TEST DATA *OTHER IIIAWLE
I
I IL SOIL DESCR PT'ION
I --- [7*MC D~. I - BC -I FEET TEMM NUMBER
5
GS,NPI L4-1
Moist, brown, silty sand
FILL
Dense, moist, light brown, silty sand
(SM) SANTIAGO FORMATION
Bottom of Hole
10
15 -1 1 1 1 1
*For description of symbols, see Figure A-1
LOG OF TEST PITS 3 AND 4
POINSETTIA VILLAGE ZI -
---T- - DRAWNjBY: ch I CHECKED BY: ~11(rPROJECT NO: 541681-PROl DATE: 6-19-86 FIGURE Z. A-3
WOODWARD-CLYDE CONSULTANTS
Project No. 541681-al Woodward-Clyde Consultants
APPENDIX B
LABORATORY TESTS
The materials observed in the borings were visually classified and evalu-
ated with respect to strength, swelling, and compressibility characteris-
tics; dry density; and moisture content. The classifications were substan-
tiated by performing grain size analyses on representative samples of the
soils. "R"-value tests were performed on selected samples as an aid in the
design of pavement sections.
The results of the grain size and plasticity analyses are shown in FIgure
B-1. The results of the "RII-value tests are also presented in Appendix