Loading...
HomeMy WebLinkAboutMS 09-04; DOS COLINAS; Site Plan-j- APPROX LOCA TIC# OF PROPOSfD FLOODPLAIN ,,. •• . 0,0-~ 0 -0 0 <> "·""-00 0 .0 0 0 o 0 O 0 O 0 0 0 O ,;.O • 0 ' 1,2' -----;~EXJSIING 100 l£AR FLOODPLAJN PER Ll1£ ENG. HYDRAULIC 0 .7' ANAL~ DA1ED IIARCH 2010 .8' 3. 1' ----- 2,6' . STORM DF.lAINAGE BASIN IN OPEN ~'lf,-CE PARCEL EXISTING RANCHO CARLSBAD GOLF COURSE ---------- CHANN£L FLOWUN£ P£R L 11£ ENG. HYORAUUC ANAL 'f'Sl'S DA TED MARCH 2010 HEDIONDA ,,--··-.... ____ _ # - ----- ... --- -·-···-·· -··-···-. -· - ....... ...., ______ __ FLOODPLAIN MODIFICATION ANALYSIS Senior Living Site VOLUME SUMMARY 1,425,270* Existing Storage Vol ume Lo ss (C u.Ft.) 287,870 * Includes Volume Creation Outside Existing Floodplain AREA SUMMARY Senior Site Existing Area Area Modification No Modification Floodplain Ga in (Loss) Graded to Increase Capacity No Grading Proposed Area T otal No Chan;Je to Limits No Change to Limits On site Storage Volume Net Gain (Cu .Ft.) 1, 137,400* Proposed Net Gain/ Floodplain Area (Loss) Total -- 1-2,48 ---(;J,94; 3'50 --~---------&-0 . -----&54 --{3-94)----(Inside Existing Floodplain) Ons ite 0.00 0,30 0.30 0.30 0.30 -- (Outside Existing Floodplain) College 0.04 (0 .04) 0.00 (0.04 ) (Onsite Non -ROW) --- Colleg e 0.16 (0 .09) .07* 0.07 (0.09) (Onsite -ROW) -- Onsite Subtota l 12,68 0.30 (4,07) 3,80 5.11 8.91 (3 ,77) Offs ite 0.04 -- (Separate Private Ownership) -0.04 0,04 0.00 Coll ege (Offsite Separate Private 0.01 -(0 .01) --0.00 (0.01) Ownership) Coll eg e 0.04 (0.04) (Offsite -ROW) ---0.00 (0,04) Offsite 0.78 4.79 4.79 0,78 5.57 4.79 (BJ Basin) - Offsite Subtota l 0.87 4 ,79 (0 .05) 4 ,79 0,82 5.6 1 4.74 Gran d To1al 13.55 5,09 (4, 12) 8 ,59 5,93 14.52 0.97 *(Erosion Matting Under Bridge Only) UNIT SUMMARY Unit Typ e # Of Units Total# Of Units Independ ent Living 166 Units Se ni or Living Site Ass ited Living 81 Units Cottages 58 Units 305 Units -----' ' ' \ ' ' . ," ~- \ \ \ \ \ \ '---- ----------------------------------------,,;;, ~ -'I\-' / + ( FLOODPLAIN LEGEND FLOODPLAIN MODIFICATION AREA (PROPOSED STORAGE VOLUME GAIN WITHIN EXISTING 100-YR FLOODPLAIN) FLOODPLAIN MODIFICATION AREA (PROPOSED STORAGE VOLUME GAIN OUTSIDE EXISTING 100-YR FLOODPLAIN) FLOODPLAIN MODIFICATION AREA (PROPOSED STORAGE VOLUME LOSS WITHIN EXIST'G 100-YR FLOODPLAIN) •._ 11 UNDISTURBED FLOODPLAIN (ONS/TE AND OFFS/TE) ···-···-·· -···-···----. CHANNEL FLOWLINE 0000000000000000000000 100-YR FLOODPLAIN LINE EXISTING (LYLE) 100-YR FLOODPLAIN LINE PROPOSED (LYLE) FLOODWAY LINE EXISTING (LYLE) FLOODWA Y LINE PROPOSED (LYLE) ---------- 57. 7 X EXISTING SPOT ELEVATION 3.6' PROPOSED STORAGE VOLUME DEPTH (GA IN OR LOSS) ,--- WS ELEV 69.3 PR WS ELEV 69.3 EX ..L. PROPOSED & EXISTING AGUA HEDIONDA CREEK STATION , POINT & WATER SURFACE ELE VATION (LYLE ) ---. ' ............ -' ' '' ~------,,. ......... PROPOSED Fl.O!'.VWAY Pm L )1£ ENG. HYDRAUUC ANALYSIS OA 7ED MARCH 2010 EXISTING E~ESTRIAlll £1:;NTE R · . ....._ ...._ ;11STTNG FLOOOWA Y -... PfR L 11£ ENG. ', HYDRAULJC ANALYSIS , , DA TED MARCH 2010 \ -..,_ I -- / --- ' ' ' PROPOSED Fl.oa:>WAY PERL~~ -- fNG. H't'Df?AUUO 'ANALYSIS \ ~~----F~DA1ED MARCH 2010 \ STING .t PROPOSED \ ' , ____ _ PR"OPOSED 100 'r'E'AR Fl.OODPLAIN PER L 'fLE ENG. HtfJRAULJC ANAL YSJS OA TED MARa-1 2010 ' ' ' ' ----------~ ----~- PROJ ECT T EAM D[V[LOPEF? PLA,Y!VER LANDSCAPE ARCHITECT ARCHI TECT CIVIL El'</Gl/ol[ER WES T L/Vi,.YG LLC AAR, JOHN RIMBACH 5 796 ARMADA DRIVE, #JOO CARLSBA D, CA 92008 LADWIG DESIG!V GROUP 2234 FARADAY AVE CARLSBA D, CA 92008 WIL i<INS OIV DESIGN GROUP 28 7 0 ROOSEVELT ST CARLSBAD, CA 92008 IRWl1Y PANCAKE DAWSON ARCHITECTS 245 FISCHER AVE STE 8 -2 COS TA MESA, CA 92626 HUNSAKEF/ & ASSOCIATES 9707 VvAPLES ST SAN DIEGO, CA 92 i 21 FLO ODP __ IN MODI F IC ATI O N EX HI BI T RECEIVED PREPABED BY: HUNSAKER & ASSOCIATES >A • DIECO. INC. PLANNING 'fl(Jl Wapie:I Street ENGINEERJ,K; larllliego.C.. ~ZIZ'I =-~)s&.45oo. FX(858)558-1-414 Ju., • ~ ""'11 i, I t L1.J, C!TY OF CARLSBAD PLANNi NG DEP T DATE: JUN-15-11 MS 09-04//RMHP 96-01 (D) COMPO SITE DO S COLINAS S ENIOR SITE CITY OF CARLSBAD, CALI FORNIA fi'.: \0897\&Pin\Exhibits\EX 052 (exhibit)Dos Co/inos -Overofl Site Composite (Flood info-Agency Mtg)-dwg[}Jun-15-2017:13:28 - ' ~ a ~ a ~ / ) 4 5 2 0 0 458 I 370 \ 55,7 \ j x55 ~ X • \ , Iv--:: L. L1 'J ' 'J C/1Nr...P1: ' -/ _,,-' o11c--\ _y~O . + < ~ f5 I IC:> I 56, X I 57.7 I X ' 57,7 X 59,J X 58,6 X o.or 8 Ac AC X FLOODPLAIN MODIFICATION EXHIBIT FLOODPLAIN LEGEND FLOODPLAIN MODIFICATION AREA (PROPOSED STORAGE VOLUME GAIN WITHIN EXISTING 100-YR FLOODPLAIN) Q ' , (\) DJ X 604 X -------. ., ~-•" ----.,-------1-· --• ,-,.,-----------",-/1--·-·· . -\-/, --. 58,9 X 59,4 X X X 59,8 X 60.2 X 59.6 60.5 X 60.3 X X /\_\) 515 ~ I ~ X ,, 04.6 X 65,J, X,::;. ~ ,, ~( FLOODPLAIN MODIFICATION ANALYSIS PHASE 1 VOLUME SUMMARY Proposed Storage 70,200 CF Existing Storage Volume Loss (Cu.Ft.) 70,200 CF Storage Volume Net Gain (Cu.Ft.) OCF ----r--· --,--------,----------, ----- 70.8 X 71.1 X 70,8 X / 12.5 X PROJECT TEAM DEVELOPER PLA!VNER WEST LIVING LLC !vfR_ JOH!'I RIMBACH 5796 AR~IA DA DRIVE, j/300 CARLSBAD, CA 92008 LADvVIG DESIGf/ GROUP FLOODPLAIN MODIFICATION AREA 2234 FARADAY AVE CARLSBAD, C,Ji 92008 ,1-----------I PROPOSED STORAGE VOLUME GAIN OUTSIDE EXISu_T~IN~Ge,;1-"'00,<C-,!_!YR_,_,F,___.L~O,.,,,O,.,,D._,PLA=IN:-.L) ___ -t-----===========--========================== ------------------------t--- FLOODPLAIN MODIFICATION AREA (PROPOSED STORAGE VOLUME LOSS WITHIN EXIST'G 100-YR FLOODPLAIN) . ···-···-------···-···-···-. CHANNEL FLOWLINE DDDDDDDODDDDDDDDDDDD 100-YR FLOODPLAIN LINE EXISTING (LYLE) 100-YR FLOODPLAIN LINE PROPOSED (LYLE) FLOODWA Y LINE EXISTING (LYLE) FLOODWA Y LINE PROPOSED {LYL E) 0000000000000000000000 57,7 X 3.6' EXISTING SPOT ELEVATION PROPOSED STORAGE VOLUME DEPTH (GAIN OR LOSS) PROPOSED & EXISTING AGUA HEDIONDA CREEK STATION POINT & WATER SURFACE ELEVATION (LYLE) Phase 1 Site Modification Existing Area Area Floodplain Graded to Increase Capacity Gain (Loss) Area Total Grand Total 13.55 5.09 (4.12) 8.59 Phase 1 4.22 0.14 (2.66) 1.70 Phase 2 Remainder 9.33 4.95 (1.46)_ 6.89 No Modification Proposed No Grading Proposed Floodplain Area Total 5.93 14.52 0 1.70 5.93 12.82 Net Gain/ (Loss) 0.97 (2.52) * 3.49 LA1VDSCAPE AHCH!TEC T AHCl-/'TEr,T I I ii GI W!LKlfJS01V DES!G,V GROUP 2810 ROOSEVELT ST CAHLSBAD, CA 92008 !RWl1'J PA1'JCAKE DAVv'S01V ARCi--i!TECTS 245 FISCHER AI/E STE_ 8-2 COSTA 1\;/ESA, CA 92626 CIVIL Ei'JGli'/EER HUii/SAKER & ASSOCIATES 9707 lfAPLES ST *NOT£,-LOSS IN FLOOD PLAIN AREA DURING PHASE 1 WILL 8£ MIT/GA TED COMMENSURATE WITH TH£ CONSTRUCTION OF BJ BASIN AFTER TH£ RELOCATION OF TH£ EXISTING RV PARKING LOT IS COMPLETE_ PHASE 1 FLOODPLAIN MODIFICATION EXHIBIT PREPARED BY: HUNSAKER & ASSOCIATES PLANNING 9707 W~ S!JE!et ENONEERINC San Diego, Ca 92121 SURVEYING PH(858)S58-45CXJ· FX(858)558-1414 SAIi/ DIEGO, CA 92 7 2 7 JUN 1 6 20'!1 CITY OF CAR LSBAD PLANNING DEPT DATE: JUN-15-11 MS 09-04/RMHP 96-01 (D) COMPOSITE DOS COLINAS SENIOR SITE CITY OF CARLSBAD, CALIFORNIA R: \0897\&Pln\Exhibits\EX 052a (exhibit)Dos Co!inas -Phase 1 Site Comoosite (Flood info-Aoencv Mto).dwaf7Jun -15-2011:13:31