HomeMy WebLinkAbout2017-07-11; Municipal Water District; ; Adopt a Resolution accepting bids and awarding a contract to Creative Home DBA CHI Construction for the construction of the La Costa Water Main Replacement, Project No. 5CA Review
0"".s.MUNICIPAL WATER DISTRICT
--
,44.)().°7:Staff Report
--4/F00
Meeting Date:July 11, 2017
To:President and Board Members ‘1/From:Kevin Crawford, Executive ManageP'
Staff Contact:Lindsey Stephenson, Senior Engineer
Lindsey.Stephenson@carlsbadca.gov or 760 -603 -7356
Subject:Adopt a Resolution accepting bids and awarding a contract to Creative
Home DBA CHI Construction for the construction of the La Costa Water
Main Replacement, Project No. 5035.
Recommended Action
Adopt a Resolution accepting bids and awarding a contract to Creative Home DBA CHI
Construction for the construction of the La Costa Water Main Replacement, Project No. 5035.
Executive Summary
In 2013,a pipeline failed within the south golf course of the Omni La Costa Resort. The existing
asbestos cement pipeline, constructed in 1961, has reached the end of its useful life and is in
need of replacement. Approximately 580 linear feet of new pipeline will be constructed using a
trenchless construction method to minimize damage to the existing golf course. The remaining
390 linear feet will be standard open -cut construction. Additionally, two nearby waterline
segments located within substandard easements will also be replaced by a single pipeline.
Service to customers will be maintained during construction with minor interruptions. Staff
recommends accepting bids and awarding a contract to Creative Home DBA CHI Construction
for the construction of the La Costa Water Main Replacement, Project No. 5035.
Discussion
In 2013, an asbestos cement pipeline failed within the south golf course of the Omni La Costa
Resort and has since been out of service while a new alignment was negotiated with the
property owner.In order to mitigate future line -breaks, interruption of service, property
damage, and water loss, staff recommends replacement of the old pipeline within a new
alignment. The revised alignment will allow more efficient access for maintenance and
operations staff.
The construction will include approximately 970 linear feet of 8 -inch high density polyethylene
(HDPE) and polyvinyl chloride (PVC)waterline that will cross the south golf course and connect
to the existing potable water distribution system adjacent to a condominium complex at 2500
Navarra Drive (2500 Navarra Drive Homeowners' Association). To minimize impacts to the golf
course, approximately 580 linear feet of HDPE water line will be constructed using a trenchless
construction method. The remaining 390 linear feet of 8 -inch PVC will connect to the
condominium complex and will be completed with standard open -cut construction.
450
In addition, approximately 90 linear feet of new 8 -inch PVC waterline will be installed at 2522
Navarra Drive (La Costa Riviera Homeowners' Association) to provide a more reliable service to
those customers and allow more efficient access for maintenance and operations staff. The
current alignment is located between units in a very narrow easement which makes
maintenance difficult.
On April 25, 2017, through the adoption of Resolution No. 1565, the Carlsbad Municipal Water
District (CMWD) Board approved plans and specifications and authorized the secretary to the
Board to advertise to receive bids for the La Costa Water Main Replacement, Project No. 5035.
On May 25, 2017, seven sealed bids were received for the construction of this project as shown
in the following table:
LA COSTA WATER MAIN REPLACEMENT, PROJECT NO. 5035
CONTRACTOR TOTAL BID
1.Creative Home DBA CHI Construction $364,392
2.J.R.Filanc Construction Company, Inc.$396,333
3.Burtech Pipeline, Inc.$446,100
4.Palm Engineering Construction Company $528,500
5.PAL General Engineering $640,650
6.CCL Contracting, Inc.$645,500
7.Genesis Construction $653,832
Creative Home DBA CHI Construction submitted the lowest bid in the amount of $364,392. The
engineer's estimate of the construction cost of the La Costa Water Main Replacement, Project
No. 5035, was $310,000.
Staff has completed the review of the bid documents and has determined that Creative Home
DBA CHI Construction is responsive and responsible and the confirmed low bidder. Creative
Home DBA CHI Construction submitted a list of similar projects to show their capabilities and
qualifications to perform the specified work. Creative Home DBA CHI Construction did not
include notarization for their signatures which is a minor irregularity that staff recommends
waiving under Carlsbad Municipal Code section 3.28.080(G)(3). Staff recommends that Creative
Home DBA CHI Construction be awarded the contract.
The construction contract contains general performance standards, references technical
specifications, and includes a one year warranty period. A 10 percent retention will be withheld
from each progress payment until final acceptance of the project. The construction contract
includes liquidated damages which may be assessed in the amount of $2,500 per day for each
day in excess of the time specified for completion of the work. The contract also contains
provisions for an incentive program to incentivize the contractor to work diligently to complete
the project ahead of schedule. For each calendar day the contractor completes the work early,
the contractor shall earn $1,000, with a cap of $30,000.
451
Fiscal Analysis
As shown in the table below, the estimated total project cost of $614,392 includes the
following: construction contract;15 percent contingency for change orders management;
construction management and inspection; engineering support for contractor shop drawings,
requests for information and meetings; and community outreach. The project will be funded by
the Limited Access Pipeline Relocation Program.
A summary of available funds and estimated construction costs is shown in the table below:
LIMITED ACCESS PIPELINE RELOCATION PROGRAM, CIP NO. 5035
Current Appropriation —Limited Access Pipeline Relocation Program,CIP No. 5035 $1,940,000
Current Expenditures/Encumbrances —Limited Access Pipeline Relocation Program,CIP
$No. 5035 116,506
TOTAL AVAILABLE LIMITED ACCESS PIPELINE RELOCATION PROGRAM, CIP NO. 5035 $1,823,494
LA COSTA WATER MAIN REPLACEMENT, PROJECT NO. 5035
Construction Contract $364,392
Incentive Program $30,000
Construction Contingency $55,000
Construction Management, Inspection, and Material Testing $120,000
TOTAL ESTIMATED CONSTRUCTION COSTS $569,392
Engineering Support During Construction and Contingency, Staff and Consultant
(Estimated)$30,000
Community Outreach (Estimated)$15,000
TOTAL ESTIMATED PROJECT COSTS $614,392
REMAINING BALANCE AFTER LA COSTA WATER MAIN RELOCATION, PROJECT NO. 5035 $1,209,102
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0
Next Steps
Once awarded, staff will provide the Public Works contract to Creative Home DBA CHI
Construction for their execution and request that Creative Home DBA CHI Construction provide
the required bonds and proof of insurance. Once this task is complete, staff will schedule a pre -
construction meeting with Creative Home DBA CHI Construction and a Notice -to -Proceed will
be issued.
The duration of the construction contract is 89 working days, exclusive of weather related
events and change orders that may extend the contract duration. Upon the successful
completion of the project, staff will request that the executive manager accept the construction
of the La Costa Water Main Replacement, Project No. 5035, and direct the secretary to the
Board to record a Notice of Completion and to release bonds.
Environmental Evaluation (CEQA)
The project is exempt from the California Environmental Quality Act (CEQA)per State CEQA
Guidelines Section 15301(b)—repair and minor alteration of existing facilities, including public
utility services, involving negligible or no expansion.
452
Public Notification
This item was noticed in accordance with the Ralph M. Brown Act and was available for public
viewing and review at least 72 hours prior to the scheduled meeting date. CMWD staff will
work closely with Omni La Costa Resort staff for any needed outreach.
Exhibits
1.Resolution accepting bids and awarding a contract to Creative Home DBA CHI Construction
for the construction of the La Costa Water Main Replacement, Project No. 5035.
2.Location Map.
3.Contract is on file with the Carlsbad Municipal Water District.
453
EXHIBIT 1
RESOLUTION NO. 1578
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD
MUNICIPAL WATER DISTRICT BOARD (CMWD),ACCEPTING BIDS AND
AWARDING A CONTRACT TO CREATIVE HOME DBA CHI CONSTRUCTION FOR
THE CONSTRUCTION OF THE LA COSTA WATER MAIN REPLACEMENT,
PROJECT NO. 5035.
WHEREAS,the Carlsbad Municipal Water District (CMWD)Board of the City of Carlsbad,
California has determined it necessary, desirable, and in the public interest to replace the water main
within and adjacent to the golf course at the Omni La Costa Resort; and
WHEREAS, on April 25, 2017, through the adoption of Resolution No. 1565, the CMWD Board
approved plans and specifications, and authorized the secretary to the Board to advertise to receive
bids for the La Costa Water Main Replacement, Project No. 5035; and
WHEREAS, seven sealed bids were received on May 25, 2017, by CMWD for the construction of
this project; and
WHEREAS,the lowest responsible and responsive bid was submitted by Creative Home DBA CHI
Construction in the amount of $364,392; and
WHEREAS,sufficient funds exist in the Limited Access Pipeline Relocation Program,CIP No.
5035, for the completion of this project; and
WHEREAS the project is exempt from CEQA per State CEQA Guidelines Section 15301(b)—repair
and minor alteration of existing facilities, including public utility services, involving negligible or no
expansion.
NOW, THEREFORE,BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City
of Carlsbad, California,as follows:
1.That the above recitations are true and correct.
EXHIBIT 1
2.That the minor irregularity in the bid submitted by Creative Home DBA CHI Construction,
in failing to include notarized signatures,is hereby waived under Carlsbad Municipal Code section
3.28.080(G)(3).
3.That the bid in the amount of $364,392 submitted by Creative Home DBA CHI
Construction for construction of the La Costa Water Main Replacement, Project No. 5035,is accepted
and the president of the Board is hereby authorized to execute a contract with Creative Home DBA CHI
Construction.
4.That the executive manager or designee is hereby authorized to approve construction
change orders up to $55,000 and incentive awards up to $30,000.
5.That the award of this contract is contingent upon Creative Homes DBA CHI Construction,
executing the required contract and submitting the required bonds and insurance policies,as described
in the contract,within 20 days of adoption of this Resolution.The executive manager may grant
reasonable extensions of time.
PASSED,APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water
District Board of the City of Carlsbad on the 11th day of July, 2017, by the following vote, to wit:
AYES:M. Hall,K.Blackburn, M. Schumacher,C.Schumacher, M. Packard.
NOES:None.
ABSENT:None.
MA HALL, PRESIDENT
BARB ENGLESON, SECRETARY
(SEAL)B/A0 /„
17(
o
=i•k •
0
••......
*•
Exhibit 2
LOCATION MAP
d
-"-------
11 1 11\1,1 •st tora )010-•41,6.,...,
1 k SITE 4111111Lx..,41111644
(
7
(I/
Lzi
.0/.NAvAiRRADR.
__--------
44 Cos?
,q 1.z.
CITY OF OCEANSIDE
HIGHWAY 741
'12
-TAI VICINITY
#71i.MAP,4 .
\lii.„mill CITY Of VISTA
* .w4 1001\SITE V°114.
cny Of
„*A\Nti.lik*C",i
VNIPWWII*AdIVOLOV44••
*
V PACIFIC4/1A.OCEAN
NOT TO SCALE
CITY or EmajOill.
m
PROJECT NAME PROJECT EXHIBIT
LA COSTA WATER MAIN NUMBER
REPLACEMENT 5035 2
456