HomeMy WebLinkAbout2017-04-25; Municipal Water District; ; Adopt a Resolution approving plans and specifications and authorizing the Secretary to the Board to advertise and receive bids for the La Costa Water Main Replacement ProCA Review its
CAR.
ao %so MUNICIPAL WATER DISTRICT
Staff Report
%For.
Meeting Date:April 25, 2017
To:President and Board Members
From:Kevin Crawford, Executive Manager
Staff Contact:Lindsey Stephenson, Associate Engineer
Lindsey.Stephenson@carlsbadca.gov
Subject:Adopt a Resolution approving plans and specifications and authorizing the
Secretary to the Board to advertise and receive bids for the La Costa Water
Main Replacement, Project No. 5035.
Recommended Action
Adopt a Resolution approving plans and specifications and authorizing the Secretary to the
Board to advertise and receive bids for the La Costa Water Main Replacement, Project No.
5035.
Executive Summary
In 2013,a pipeline failed within the south golf course of the Omni La Costa Resort. The existing
asbestos cement pipeline, constructed in 1961,has reached the end of its useful life and is in
need of replacement. Approximately 580 linear feet of new pipeline is proposed to be
constructed by horizontal directional drilling (HDD) to minimize damage to the existing golf
course. The remaining 390 linear feet will be standard open -cut construction. Additionally, two
nearby waterline segments within limited access easements are also recommended to be
replaced by a single pipeline. Service to customers will be maintained during construction. Staff
recommends approval of the project plans and specifications, and authorization to advertise
and receive construction bids for Project No. 5035.
Discussion
In 2013, an asbestos cement pipeline failed within the south golf course of the Omni La Costa
Resort and has since been out of service while a new alignment was negotiated with the
property owner.In order to mitigate future line -breaks including water loss,interruption of
service, and property damage, staff recommends replacement of the old pipeline and a new
alignment. The revised alignment allows easier access for maintenance and operations staff.
The construction will include approximately 970 linear feet of 8-inch PVC waterlines crossing
the south golf course and connection to the existing potable water distribution system adjacent
to a condominium complex at 2500 Navarra Drive (2500 Navarra Drive Homeowners'
Association). To minimize impacts to the golf course, approximately 580 linear feet of water line
will be constructed using a trenchless construction method. The remaining 390 linear feet to
connect to the condominium complex will be completed with standard open -cut construction.
Item #10 April 25, 2017 Page 1 of 5
In addition, approximately 90 linear feet of new 8-inch waterline will be installed at 2522
Navarra Drive (La Costa Riviera Homeowners' Association) to provide a more reliable service to
those customers and allow easier access for maintenance and operations staff. The current
alignment is located between units in a very narrow easement which makes maintenance
difficult.
Fiscal Analysis
The engineer's estimate of the construction cost of the La Costa Water Main Replacement,
Project No. 5035 is $300,000. The total project cost of $465,000 includes: construction contract;
contingency for change orders management; construction management and inspection;
engineering support for contractor shop drawings, requests for information, and meetings; and
community outreach. The project will be funded by the Limited Access Pipeline Relocation
Program. A summary of available funds and estimated construction costs is shown below:
LIMITED ACCESS PIPELINE RELOCATION PROGRAM
CURRENT APPROPRIATION:$1,940,000
Current Expenditures/Encumbrances —Planning, Design and Staff Administration
I
$106,927
LA COSTA WATER MAIN REPLACEMENT, PROJECT NO. 5035 ESTIMATED COSTS
Construction Contract (Engineer's Estimate)$300,000
Construction Contingency $45,000
Construction Management, Inspection, and Material Testing $75,000
TOTAL ESTIMATED CONSTRUCTION COSTS $420,000
Engineering Support During Construction and Contingency, Staff and Consultant $30,000
Community Outreach $15,000
TOTAL PROJECT COSTS $465,000
Remaining Balance after Project No. 5035 $1,368,073
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0
Next Steps
A Construction Contract Request for Bids will be advertised on the city bid site. Staff will then
return to the Board to recommend awarding a contract to the lowest responsive and
responsible bidder.
Environmental Evaluation ICE0A)
The project is exempt from the California Environmental Quality Act (CEQA)per State CEQA
Guidelines Section 15301(6)—repair and minor alteration of existing facilities, including public
utility services, involving negligible or no expansion.
Public Notification
None required.
Exhibits
1.Resolution approving plans and specifications and authorizing the Secretary to the Board to
advertise and receive bids for the La Costa Water Main Replacement, Project No. 5035.
2.Location Map.
Item #10 April 25, 2017 Page 2 of 5
EXHIBIT 1
RESOLUTION NO. 1565
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD
MUNICIPAL WATER DISTRICT BOARD,APPROVING PLANS AND
SPECIFICATIONS AND AUTHORIZING THE SECRETARY TO THE BOARD TO
ADVERTISE AND RECEIVE BIDS FOR THE LA COSTA WATER MAIN
REPLACEMENT, PROJECT NO. 5035.
WHEREAS,the Carlsbad Municipal Water District Board of the City of Carlsbad, California has
determined it necessary,desirable, and in the public interest to replace the water main within and
adjacent to the golf course at the Omni La Costa Resort; and
WHEREAS,the plans and specifications for furnishing of all labor, materials, tools, equipment,
transportation, and other expenses necessary, or incidentals of said project, have been prepared and
are on file at the Carlsbad Municipal Water District of the City of Carlsbad and are incorporated by
reference herein; and
WHEREAS,the project is exempt from CEQA per State CEQA Guidelines Section 15301(b)—
repair and minor alteration of existing facilities, including public utility services, involving negligible or
no expansion; and
WHEREAS,the engineer's estimate for the project is $300,000; and
WHEREAS,sufficient funds exist in the Limited Access Pipeline Relocation Program.
NOW, THEREFORE,BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City
of Carlsbad, California,as follows:
1.That the above recitations are true and correct.
2.That the plans,specifications and contract documents for the La Costa Water Main
Replacement, Project No. 5035, on file in the Utilities Department of the City of Carlsbad are hereby
approved.
3.The Secretary to the Board is hereby authorized and directed to publish, in accordance with
State law,a Notice to Contractors Inviting Bids for the construction of the La Costa Water Main
Item #10 April 25, 2017 Page 3 of 5
EXHIBIT 1
Replacement, Project No. 5035, in accordance with the plans, specifications, and contract documents
referred to herein.
PASSED,APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water
District of the City of Carlsbad on the 25th day of April, 2017, by the following vote, to wit:
AYES:M. Hall,K.Blackburn, M. Schumacher,C.Schumacher.
NOES:None.
ABSENT:None.
MA HALL, PRESID NT
.)*
BARBAENGLESON,SEC ARY
(SEAL)
NN1 1111O1?.......C%
O st4R4
Jo*.
*-
Item #10 April 25, 2017 Page 4 of 5
LOCATION MAPMAP
0.....,it .„......).Lt's*
to1....11 A al ‘\t A
—114.09
0
47 \
illyelli til:,i rigai
11
S1 TECIIIIII4
00
(
±,A.ADR.
4,1
0087_,1
..ei
,11/.
V_7Th •IIN"WO
CM OF OCEAN5IDE
HIGHWAYfippi%VICINITY**4 ILI
MAP
NOT TO.il SCM1
11111111NIP
'
ilk.iwill C:1*(:OF
VISTA
*...mi.
SITE V‘Vitril;::0.i ...‘..„A.,lop SAII413,
5
I
i
VIIIIIPOri
4 W itt"*""if/1.•dli
CEAN11.40.OCEAN
NOT TO SCALE
CITY Or ENCINITASIIIVIIII
PROJECT NAME PROJECT EXHIBIT
LA COSTA WATER MAIN NUMBER
REPLACEMENT 5035 2
Item #10 April 25, 2017 Page 5 of 5