HomeMy WebLinkAbout2016-02-03; Planning Commission; ; CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
The City of Carlsbad Planning Division
A REPORT TO THE PLANNING COMMISSION
Item No.
Application complete date: August 7, 2015
P.C. AGENDA OF: February 3, 2016 Project Planner: Shannon Werneke
Project Engineer: Steve Bobbett
SUBJECT: CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT – Request for a recommendation of
approval of a Tentative Tract Map and a Major Review Permit to allow for the
construction of 16 multi-family residential air space condominiums, including two (2)
inclusionary units, on a 0.70-acre site located on the west side of Roosevelt Street in
Land Use District 8 of the Village Review zone and within Local Facilities Management
Zone 1. The project qualifies as a CEQA Guidelines Section 15332 (In-Fill Development
Projects) Class 32 Categorical Exemption.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 7146 RECOMMENDING
APPROVAL of Tentative Tract Map CT 14-07 and Major Review Permit RP 14-20 to the City Council based
on the findings and subject to the conditions contained therein.
II. PROJECT DESCRIPTION AND BACKGROUND
The subject 0.70-acre (gross) site comprises two parcels (APNs 103-101-02, -05) located on the west side
of Roosevelt Street, in between Laguna Drive to the north and Beech Avenue to the south. The
properties are addressed as 2683, 2687, and 2715 Roosevelt Street and are currently developed with
four (4) detached residential structures which are vacant. Based on a review of a Cultural Resources
Survey prepared by Roth and Associates (February, 1990) of potentially historic resources in the city, the
structures are not listed as having any potential historical significance. Given the developed nature of
the site, the project area is devoid of any sensitive vegetation. Topographically, the site is generally flat
and slopes from a high point of 41 feet above mean sea level (MSL) along the eastern property line to 39
feet above MSL along the western property line. The project site is located outside of the coastal zone
and within Land Use District 8, the Residential Support Area, of the Village Master Plan.
The proposed project entails a request for approval of a Tentative Tract Map and Major Review Permit
to construct 16 attached air-space condominiums which are arranged on-site as duplexes (3), triplexes
(2) and one (1) four-plex. To comply with the inclusionary housing requirements, two (2) of the 16 units
are proposed to be income-restricted. Five different plan types are proposed, which range in size from
1,291 square feet (SF) to 1,672 SF. Each of the units is three stories tall and will have an approximate
height of 32’-3”. Parking is proposed to be provided by an attached two-car garage for each unit; one
open/uncovered accessible parking stall is also proposed on-site.
The proposed density of the project is 22.9 dwelling units per acre. A detailed breakdown of each type
of unit is summarized in Table 1 below.
2
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 2
TABLE 1 – DETAILS FOR UNIT TYPE
Unit Type Quantity Size
(Gross SF) Bedroom/Bathrooms Garage Private Open
Space/Balconies
A 4 1,638 SF 3/3 Two-car 289 SF
B 6 1,624 SF 3/3 Two-car 287 SF
C 2 1,599 SF 3/3 Two-car 207SF
D 2 1,291 SF 2/2.5 Two-car 415 SF
E 2 1,672 SF 3/3 Two-car 376 SF
Access to the site is proposed to be provided by two, 24-foot-wide driveways located off of Roosevelt
Street, which will be enhanced with concrete pavers. The primary pedestrian entrance to four of the 16
units is oriented towards the street, while pedestrian access to the remaining units is either taken from
a perimeter walkway adjacent to the side property lines or a central walkway. In order to ensure that
the site adequately drains, as well as to provide adequate privacy to the adjacent uses to the north,
south and west, a combination retaining/screen wall ranging in height from approximately 3’-6”’ to 6’
feet is proposed along the north, south and west property lines. Grading for the proposed project
includes 2,000 cubic yards of fill and 50 cubic yards of cut. As a result, a total of 1,950 cubic yards of
material is proposed to be imported to the site.
The architectural design is characterized as contemporary with a coastal influence. Primary building
materials include a light cream-colored stucco and olive-colored horizontal composite siding. Asphalt
shingles cover a 5:12 pitched roof over each unit; and metal awnings adorn some of the windows, doors,
and balconies throughout. A variety of roof planes are included that provide different roof heights and
each elevation includes off-setting building planes.
Table 2 below identifies the General Plan designations, zoning and current land uses of the project site
and surrounding properties.
TABLE 2 – SURROUNDING LAND USES
Location General Plan
Designation Zoning Village Master Plan
Land Use District Current Land Use
Site V
(Village)
V-R
(Village Review)
Land Use District 8
Residential Support
Four vacant single-
family homes
North V V-R Land Use District 8
Residential Support Single-family home
South V V-R Land Use District 8
Residential Support Professional offices
East V V-R Land Use District 8
Residential Support
Single-family, multi-
family and an urgent
care office
West V V-R Land Use District 4
Residential Support
Cabinet-making
business, gift
shop/boutique, and auto
repair.
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 3
III. ANALYSIS
The proposed project is subject to the following ordinances, standards, and policies:
A. Village (V) General Plan Land Use designation;
B. Village Review (V-R) Zone (CMC Chapter 21.35), Land Use District 8 (Residential Support Area,
Village Master Plan and Design Manual)/Development Standards Modification;
C. Inclusionary Housing Ordinance (CMC Chapter 21.85);
D. Subdivision Ordinance (CMC Title 20); and
E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1.
The recommendation for approval of this project was developed by analyzing the project’s consistency
with the applicable regulations and policies. The project’s compliance with each of the above
regulations and policies is discussed in the sections below.
A. Village (V) General Plan Land Use Designation
The subject property, comprising two legal parcels, has a General Plan Land Use designation of Village
(V). As discussed in the Village Master Plan, properties within the Village Area do not have an assigned
residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and
maximum densities for residential development are established in the Village Master Plan. Table 3
below identifies the permissible density range for properties located outside of the coastal zone and
within Land Use District 8. In addition, the allowable range for the number of dwelling units based on
the size of the project site and a comparison to what is currently proposed is included in the table.
TABLE 3 – PROPOSED DENSITY
Gross Acres Net Acres
Allowable Density Range;
Min/Max Dwelling Units per
Village Master Plan
Project Density;
Proposed Dwelling Units
0.70 0.70
18-23 du/ac
Minimum: 13 dwelling units
Maximum: 16 dwelling units
22.9 du/ac
16 units
As identified above, the project’s density of 22.9 dwelling units per acre falls within the allowable
density range of 18 to 23 dwelling units per acre.
Pursuant to the Housing Element of the General Plan, because a Growth Management Control Point has
not been established for residential development in the Village, all residential units approved in the
Village must be withdrawn from the City’s Excess Dwelling Unit Bank (EDUB). The EDUB is implemented
through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation
of dwelling units shall agree to provide the number of inclusionary units as required pursuant to CMC
Section 21.85.050 and shall execute an affordable housing agreement (AHA) prior to recordation of the
final map pursuant to CMC Section 21.85.140. As discussed in Section C below, the proposal to
construct 16 units onsite, including two inclusionary units, is consistent with the inclusionary housing
requirement as set forth in City Council Policy No. 43. In addition, the project is accordingly-conditioned
to require the execution of the AHA prior to recordation of the Tentative Tract Map.
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 4
In approving a request for an allocation of excess dwelling units, the project shall meet the findings
identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be
compatible with adjacent land uses and the project is consistent with the General Plan and any other
applicable planning document. As discussed in the attached Planning Commission Resolution No. 7146,
the proposed project meets these findings. As the proposed project requires approval from City Council,
the City Council is the final decision-making authority for the allocation from the EDUB.
The following Table 4 describes how the proposed project is consistent with the various elements of the
Carlsbad General Plan.
TABLE 4 – GENERAL PLAN COMPLIANCE
ELEMENT USE, CLASSIFICATION, GOAL,
OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY?
Land Use Goal 2-G.29
Maintain the Village as a center
for residents and visitors with
commercial, residential, dining,
civic, cultural, and entertainment
activities.
Goal 2-G.30
Develop a distinct identity for the
Village by encouraging a variety
of uses and activities, such as a
mix of residential, commercial,
office, restaurants and specialty
retail shops, which traditionally
locate in a pedestrian-oriented
downtown area and attract
visitors and residents from across
the community by creating a
lively, interesting social
environment.
Policy 2-P.70
Seek an increased presence of
both residents and activity in the
Village with new development,
particularly residential, including
residential as part of mixed-use
development, as well as commer-
cial, entertainment and cultural
uses that serve both residents
and visitors.
The proposed project, which includes
the construction of 16 multi-family
air space condominiums, will
enhance the vitality of the Village by
providing new residential units in
close proximity to the downtown
core area, as well as the train station.
The project reinforces the
pedestrian-orientation desired for
the downtown area by providing an
opportunity for the residents to walk
to shopping, recreation, and mass
transit functions. The project’s
proximity to existing bus routes and
mass transit will help to further the
goal of providing new economic
development near transportation
corridors.
Overall, the residential project will
contribute to the revitalization of the
Village area.
Yes
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 5
TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED)
ELEMENT USE, CLASSIFICATION, GOAL,
OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY?
Mobility Goal 3-G.3
Provide inviting streetscapes that
encourage walking and promote
livable streets.
The proposed project includes the
dedication of eight (8) feet of right-
of-way for the development of a
sidewalk and street trees along the
project’s Roosevelt Street frontage.
In addition, the units facing the street
each include porches which enhance
the streetscape and promote livable
streets.
The proposed project has been
designed to meet all of the
circulation requirements, which
includes two 24-foot-wide driveways
off of Roosevelt Street.
Yes
Sustainability Policy 9-P.10
Decrease the need for artificial
cooling, heating and lighting, and
promote outdoor lifestyles in
Carlsbad’s sunny and moderate
climate by:
Ensuring that the Zoning
Ordinance provides for
adequate private and common
open spaces as part of
multifamily developments.
Encouraging residential and
office buildings to have
windows that open to the
outside in all habitable rooms,
and maximize the use of
daylight.
Policy 9-P.11
Implement the city’s Landscape
Manual to mitigate urban heat
island effects through maximum
tree canopy coverage and
minimum asphalt and paving
coverage, particularly for denser
areas like the Village and the
Barrio, shopping centers, and
industrial and other areas with
expansive surface parking.
Each of the 16 multi-family air space
condominiums has its own porch
and/or fenced rear yard and private
balcony areas. The open space
provided for each unit ranges from
207 to 943 square feet, which
exceeds the requirements of the
Village Master Plan.
Given the nature of the product type,
attached multi-family units, not all
units have windows on all four
elevations. However, the elevations
which do have sun exposure, include
several windows which maximize the
use of daylight.
The project includes a landscape plan
which has been determined to be
consistent with the city’s Landscape
Manual. Perimeter landscaping,
which includes trees, reduces the
urban heat island effect throughout
the site.
Yes
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 6
TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED)
ELEMENT USE, CLASSIFICATION, GOAL,
OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY?
Housing Goal 10-G.3
Sufficient new, affordable
housing opportunities in all
quadrants of the city to meet the
needs of current lower and
moderate income households
and those with special needs, and
a fair share proportion of future
lower and moderate income
households.
Goal 10-P.15
Pursuant to the Inclusionary
Housing Ordinance, require
affordability for lower income
households of a minimum of 15
percent of all residential
ownership and qualifying rental
projects. For projects that are
required to include 10 or more
units affordable to lower income
households, at least 10 percent
of the lower income units should
have three or more bedrooms
(lower income senior housing
projects exempt).
Policy 10-P.18
Adhere to City Council Policy
Statement 43 when considering
allocation of “excess dwelling
units” for the purpose of allowing
development to exceed the
Growth Management Control
Point (GMCP) density, as
discussed in Section 10.3
(Resources Available). With
limited exceptions, the allocation
of excess dwelling units will
require provision of housing
affordable to lower income
households.
The proposed project includes the
construction of two (2) inclusionary
units on-site which will be required to
be rented at a low income level.
The provision for inclusionary
housing will contribute towards
achieving the city’s Regional Housing
Needs. The project has been
accordingly-conditioned to require
the approval of an Affordable
Housing Agreement prior to
recordation of the final map.
In approving a request for an
allocation of excess dwelling units,
the project shall meet the findings
identified in CC Policy No. 43.
Specifically, the project location and
density shall be found to be
compatible with adjacent land uses
and the project is consistent with the
General Plan and any other
applicable planning document. As
discussed in the attached Planning
Commission Resolution No. 7146, the
proposed project meets these
findings.
Yes
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 7
TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED)
ELEMENT USE, CLASSIFICATION, GOAL,
OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY?
Public Safety Goal 6-G.1
Minimize injury, loss of life, and
damage to property resulting
from fire, flood, hazardous
material release, or seismic
disasters.
Policy 6-P.6
Enforce the requirements of
Titles 18, 20, and 21 pertaining to
drainage and flood control when
reviewing applications for
building permits and
subdivisions.
Policy 6-P.34
Enforce the Uniform Building and
Fire codes, adopted by the city,
to provide fire protection
standards for all existing and
proposed structures.
Policy 6-P.39
Ensure all new development
complies with all applicable
regulations regarding the
provision of public utilities and
facilities.
The proposed structural
improvements are required to be
designed in conformance with all
seismic design standards. In
addition, the proposed project is
consistent with all of the applicable
fire safety requirements.
Further, the project has been
conditioned to develop and
implement a program of “best
management practices” for the
elimination and reduction of
pollutants which enter into and/or
are transported within storm
drainage facilities.
Yes
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 8
TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED)
Noise Goal 5-G.2
Ensure that new development is
compatible with the noise
environment, by continuing to
use potential noise exposure as a
criterion in land use planning.
Policy 5-P.3
For all projects that require
discretionary review and have
noise exposure levels that exceed
the standards in Table 5-1,
require site planning and
architecture to incorporate
noise-attenuating features. With
mitigation, development should
meet the allowable outdoor and
indoor noise exposure standards
in Table 5-2 (45 dBA). When a
building’s openings to the
exterior are required to be closed
to meet the interior noise
standard, then mechanical
ventilation shall be provided.
The project site is impacted by noise
from the railroad, which is located
approximately ¼ mile west of the
site. A noise study was prepared for
the proposed project (Wieland
Acoustics, July, 2014). The project
has been conditioned to comply with
the recommendations of the noise
report to ensure that the proposed
building design adequately
attenuates the noise levels for the
new condominiums. The
recommendations include the
requirement for mechanical
ventilation (i.e., air conditioning
units). In addition, a Notice will be
required to be recorded on title to
notify future owners that the
property is subject to noise from the
railroad.
Yes
B. Village Review Zone (CMC Chapter 21.35), Land Use District 8, Residential Support Area
(Village Master Plan and Design Manual)
The subject property is located within Land Use District 8, Residential Support Area, of the Village
Master Plan. The proposed project entails a request to construct a total of 16 multi-family residential
airspace condominiums. The specific development standards for new development within Land Use
District 8 and the project’s compliance with these standards are shown in Table 5 below:
TABLE 5
VILLAGE MASTER PLAN, LAND USE DISTRICT 8, RESIDENTIAL SUPPORT AREA
STANDARD REQUIRED/ALLOWED PROPOSED COMPLY?
Intent Intent
Develop Land Use District 8
with a relatively dense urban
residential neighborhood with
a Village scale and character.
The proposed project
contributes towards the
overall goal of creating a
dense urban residential
neighborhood since the
density is being
maximized and a
contemporary
architectural design is
proposed which
complements the Village
atmosphere.
Yes
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 9
TABLE 5
VILLAGE MASTER PLAN, LAND USE DISTRICT 8, RESIDENTIAL SUPPORT AREA (CONTINUED)
STANDARD REQUIRED/ALLOWED PROPOSED COMPLY?
Front Yard Setback 5-15 feet 13’- 15’ Yes
Side Yard Setback 10% of lot width, 5-10 feet 10’ Yes
Rear Yard Setback 5-10 feet 10’ –15’ Yes
Max Building Height 35’ 32’ – 3” Yes
Building Coverage 60-80% 45.79% Yes. Pursuant to the
Universal Standards in
the Village Master
Plan, the bottom of
the range is
considered the
desired standard. Due
to setback, access and
stormwater
requirements, it is not
feasible to meet the
bottom of the range
for the building
coverage. Further, a
Standards
Modification is only
required for projects
which exceed the
maximum of the
range (i.e., 80%).
Parking 2 spaces per unit, one of which
is required to be covered; one
accessible parking stall
Two-car garage per unit,
20’ x 20’; one accessible
parking stall
Yes
Open Space 20% = 6,098 SF
*Includes patios/balconies,
landscape planters/pockets
31.3% or 9,544 SF
Yes
Density 18-23 dwelling units/acre 22.9 dwelling units/acre Yes
C. Inclusionary Housing
Pursuant to the City’s Inclusionary Housing regulations, specifically CMC Chapter 21.85.030, for any
market-rate residential development of seven (7) units or more units, not less than 15% of total units
shall be restricted both as to occupancy and affordability to lower income households. To satisfy the
above-noted requirement, the applicant proposes to designate two (2) of the 16 units on-site as rent-
restricted units. As required by CMC Chapter 21.85, the project has been accordingly-conditioned to
require the approval of an Affordable Housing Agreement prior to recordation of the final map.
D. Subdivision Ordinance
The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has
found that the subdivision for 16 air-space condominiums complies with all applicable requirements of
the Subdivision Map Act and the City’s Subdivision Ordinance (Title 20). The project has been
CT 14-07/RP 14-20 – BEACHWALK AT ROOSEVELT
February 3, 2016
Page 10
conditioned to install all infrastructure-related improvements and the necessary easements for these
improvements concurrent with the development, including the dedication of 8 feet for frontage
improvements adjacent to Roosevelt Street.
E. Growth Management
The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of
the city. The impacts on public facilities created by the project, and its compliance with the adopted
performance standards, are summarized in Table 5 below.
TABLE 5 – GROWTH MANAGEMENT COMPLIANCE
STANDARD IMPACTS COMPLIANCE
City Administration 163.4 sq. ft. Yes
Library 87.15 sq. ft. Yes
Waste Water Treatment 16 EDU Yes
Parks 0.33 acres Yes
Drainage 2.11 CFS Yes
Circulation 96 ADTs Yes
Fire Station 1 Yes
Open Space n/a n/a
Schools E: 5.65, M: 1.65, H: 1.53 Yes
Sewer Collection System 3,520 GPD Yes
Water 4,000 GPD Yes
Properties located within the boundaries of the Village Master Plan do not have a Growth Management
Control Point or an allocation for dwelling units. Therefore, as 16 units are proposed, a total of 16
dwelling units are proposed to be deducted from the City’s Excess Dwelling Unit Bank. Pursuant to
Planning Commission Resolution No. 7146, the allocation from the EDUB can be supported.
V. ENVIRONMENTAL REVIEW
The project qualifies as a CEQA Guidelines Section 15332 (In-Fill Development Projects) Class 32
Categorical Exemption. The project is consistent with the Village Master Plan, as well as the General
Plan, the project site is within the City limits, is less than 5 acres in size, and is surrounded by urban uses;
there is no evidence that the site has value as habitat for endangered, rare, or threatened species;
approval of the project will not result in significant effects relating to traffic, noise, air quality, or water
quality; and the site can be adequately served by all required utilities and public services. The project is
exempt from further environmental documentation pursuant to Section 15332 of the State CEQA
guidelines. A Notice of Exemption will be filed by the City Planner upon final project approval.
ATTACHMENTS:
1. Planning Commission Resolution No. 7146 (CT 14-07/RP 14-20)
2. Location Map
3. Disclosure Statement
4. Reduced Exhibits
5. Full Size Exhibits “A” – “S” dated February 3, 2016
S
T
A
T
E
S
T
R
O
O
S
E
V
E
L
T
S
T
M
A
D
I
S
O
N
S
T
S
T
A
T
E
S
T
A
L
L
E
Y BEECH AVCT 14-07 / RP 14-20Beachwalk at Roosevelt
SITE MAP
J
SITE
EL
CAMINO
R
E
A
LLA COSTA AV
A L G A R D
C
A
R
L
S
B
A
D
B
L