HomeMy WebLinkAboutCT 98-10; CARLSBAD RACEWAY; A PORTION OF HYDROLOGY AND HYDRAULIC STUDY; 2003-06-20.It
A PO\-\t'oV) off ;
HYDROLOGY AND HYDRAULIC STUDY
FOR
CARLSBAD RACEWAY
C.T.98-10
J.N. 981012/5
DECEMBER 20, 2002
REVISED: APRIL 17, 2003
REVISED: JUNE 20, 2003
BY
O'DAY CONSULTANTS
2710 LOKER AVENUE WEST, SUITE 100
CARLSBAD, CA 92008
(760) 931-7700
J
,/
Basin 13
Desiltation Basin Calculations
Qavg=CxiavgxA
C= 0.45
iav9 = Pa/6 hr.
Pa = 1.9 in.
iav9 = 0.32 in.lhr
A= ,,:2.8 ac.
0.399 cfs
Vs = 0.00024 ftlsec
min. As = 1995 sf
actual As = ;".-~:3146'6: ,'~~: sf
". ,'.:~ Y. "n.( v< t ... ",
Soil Loss Calculations
A = R x K x LS x C x P
R =16.55(p)2.2
p= 1.4 in.
R = 34.70
K= 0.26
C= 1.0
P = 1.3
C=
p=
d=
Area Use % Area Length Siopel Grade
Slope 26 30 2:1
Pad 74 250 2.5
Ave LS = 2.77
A= 32.54 tn/yr/ac
Soil Loss = 91.1 tnlyr
= "~656 . cf
Standpipe Calculations
Q = 21.3 cfs
H = 1 ft.
Case 1
Q = CPH3/2
3.0
7.10
2.26
ft
ft
Case 2
Q = CA(2gh) 1/2
C = 0.67
A = 3.96 ft2
d = 2.25 ft
Basin Dewatering Calculations
LS
9.76
0.32
Ao = As(2H) 1/2
3600(T)Cd(g) 1/2
H=
T=
Cd =
2
40
0.6
g= 32.2
ft
hr
ftlsec
Ao = 0.014114 tr
\
.~./
Basin 14
Desiltation Basin Calculations
Qavg = C x iavg x A
C= 0.45
iavg = Ps/6 hr.
P6 = 1.9 in.
iav9 = 0.32 in.lhr
A= 4 .. 5 ac.
0.64125 cfs
Vs = 0.00024 ftlsec
min. As = 3206 sf
~~' ~..-"-~ ..... /. actual As = .,.\ij{840, ):~:.sf ,>' ~ ... ~'f, <~ ~;" 1.)'.';; ~
Soil Loss Calculations
A=RxKxLSxCxP
R =16.55(p)2.2
p= 1.4
R= 34.70
K= 0.26
C= 1.0
P = 1.3
Area Use % Area Length
Slope 10 40
Pad 90 400
AveLS = 1.46
A= 17.12
Soil Loss = 77.0
= 1'401 .
in.
C=
P=
d=
Slopel Grade
2:1
2.5
tn/yr/ac
tn/yr
cf
Standpipe Calculations
Q:i: 34.1 cfs
H = 1 ft.
Case 1
Q= CPH3/2
3.0
11.37
3.62
ft
ft
•
Case 2
Q = CA(2gh) 1/2
C = 0.67
A = 6.34 ft2
d = 2.84 ft
Basin Dewatering Calculations
LS
11.27
0.37
Ao = A.(2H) 112
3600(T)Cd(g) 1/2
H=
T=
Cd =
2
40
0.6
g= 32,2
ft
hr
ftlsec
Ao = 0.019744 ff
"
t','
'.
I
Basin 15
Desiltation Basin Calculations
Qavg = C x iavg x A
C= 0.45
iavg = Psl6 hr.
P6 = 1.9 in.
iavg = 0.32 in.lhr
A= -:6".1 ac.
0.86925 cfs
As= 1.2Q
Vs
Vs=' 0.00024 ftIsec
min. As ~ 4346 sf
actual As = ,~, ~6.a26:,<,',sf ~ 'P:;t.'" ":~, t ." ":
Soil Loss Calculations
A=RxKxLSxCxP
R =16.55(p)2.2
p= 1.4 in.
R= 34.70
K= 0.26
C= 1.0
P= 1.3
C=
P=
d=
Area Use % Area Length Slopel Grade
Slope 8 50 2:1
Pad 92 500 2.5
Ave LS = 1.38
A= 16.14 tn/yr/ac
Soil Loss = 98.4 tn/yr
= 4,790 '. cf
Standpipe Calculations
Q = 45.9 cfs
H = 1 ft.
Case 1
Q = CPH3/2
3.0
15.30
4.87
ft
ft
Case 2
Q = CA(2gh) 1/2
C = 0.67
A = 8.53 ft2
d = 3.30 ft
Basin Dewatering, Calculations
LS
12.6
0.40
Ao = A.(2H) 1/2
3600(T)Cd(g) 1/2
H=
T=
Cd =
2
40
0.6
g= 32.2
ft
hr
ftlsec
Ao = 0.025781 'ft2
e' •
CARLSBAD RACEWAY
CONSTRUCTION CHANGE NO~ 1
REVISION TO HYORAULIC CALCS
DECEMBER 17, 2004
(,1 08"(0
.., .' •
RACEIREV. RES
******************************************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyright 1982-2001 Advanced Engineering software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, Suite 100
carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY **************************
* CARLSBAD RACEWAY *
* REVISED NEAR DELETED WILDLIFE CROSSING *
* C:\EAS2001\HYDROSOFT\RATSCX\RACE1REX.RES * **************************************************************************
FILE NAME: RACE1REV.DAT
TIME/DATE OF STUDY: 14:05 12/16/2004
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: "*,, indicates nodal point data used.)
UPST~EAM RUN DOWNSTREAM RUN
NODE MODEL PRESSURE PRESSURE+ FLOW PRESSURE+ NUMBER ' PROCESS HEAD(FT) MOMENTUM (POUNDS) DEPTH (FT) MOMENTUM(POUNDS) 115.00-2.52 Dc 1600.13 1.47* 2240.88
} FRICTION
110.50-2.52 Dc 1600.13 1. 37* 2412.75
} JUNCTION
110.,00-2.35 DC 1552.71 1.30* 235.5.24
} FRICTION
135.50-2.35 DC 1552.71 1.30* 2345.32
} JUNCTION 135.00-2.35 Dc 1552.71 1.29* 2363.48
} FRICTION
106.50-2.35 DC 1552.71 1.28* 2390.49
} JUNCTION
106.00-2.63 1472.31 1.15* 2416.18
-} FRICTION
105.50-2.32*DC 1414.43 2.32*Dc 1414;43
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
-----------------------------------------------------------------------~------NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON THE MOST
CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM.
'******************************************************************************
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 115.00 FLOWLINE ELEVATION = 391.33
PIPE FLOW = 61.10 CFS PIPE DIAMETER = 36.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 392.627 FEET
*NOTE: ASSUMED DOWNSTREAM CONTROL DEPTH( 1.30 FT.)
IS LESS THAN CRITICAL DEPTH( 2.52 FT.)
===> CRITICAL DEPTH IS ASSUMED AS DOWNSTREAM CONTROL DEPTH
FOR UPSTREAM RUN ANALYSIS
-------~----------------------------------------------~-------------~---------NODE 115.00: HGL = < 392.796>; EGL= < 397.717>; FLOWLINE= < 3'91. 330>
******************************************************************************
page 1
RACEIREV.RES
FLOW PROCESS FROM NODE 115.00 TO NODE 110.50 IS CODE = 1
UPSTREAM NODE 110.50 ELEVATION = 401. 50 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 61.10 CFS PIPE DIAMETER = 36.00 INCHES
PIPE LENGTH = 283.50 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 1.47 CRITICAL DEPTH(FT) = 2.52
=============================================================~================ UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.37
============================================================================== GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE ,FROM
CONTROL (FT)
0.000
4.149
8.453
12.926
17.583
22.444
27.528
32.860
38.469
44.388
50.657
57.325
64.451 72.108
80.390 89.415
99.341
110.381
122.832
137.132
153.958 174.444 200.719
237.564 283.500
FLOW DEPTH
(FT)
1.371
1.375
1.379
1.383
1. 387
1. 391
1.395
1.399
1.403
1.407
1.411
1.415
1.419
1.423
1.427 1.431
1.435
1.439
1.443
1.447
1.451
1.455
1.459
1.463 1.466
VELOCITY
(FT/SEC)
19.413
19.339
19.266
19.193
19.121
19.049
18.978
18.907
18.837
18.768
18.698
18.630
18.561
18.494
18.427 18.360
18.294
18.228
18.162
18.098
18.033 17.969
17.906 17.843
17.797
SPECIFIC
ENERGY(FT)
7.226 7.186
7.146 7.106
7.067
7.029
6.991
6.953
6.916 6.879
6.843
6.807 6.772
6.737 6.702
6.668
6.635
6.601
6.568
6.536
6.504 6.472
6.441
6.410
6.387
PRESSURE+
MOMENTUM(POUNDS) 2412.75 .
2404.80
2396.90
2389 .. 08
2381. 32
2373.63
2366.00
2358.44
2350.94
2343.50 2336.12
2328.81
2321. 56 2314 . .37
2307.24 2300.17
2293.16 2286.20
2279 :31
2272.47
2265.69
2258.97 2252.30
2245 :68
2240.88
NODE 110.50: HGL = < 402.871>;EGL= < 408.726>;FLOWLINE= < 401.500>
******************************************************************************
FLOW PROCESS FROM NODE 110.50 TO NODE 110.00 IS CODE = 5
UPSTREAM NODE 110.00 ELEVATION = 402.00 (FLOW IS SUPERCRITICAL)
--------------------------------------------------------------~---------------
CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER ANGLE FLOWLINE
ELEVATION
402.00·
401.50
UPSTREAM
DOWNSTREAM
LATERAL #1
LATERAL #2
Q5
(CFS) (INCHES),· (DEGREES)
54.80 30.00 0.00
61.10 36.00'
5.10 24.00 45.00 402.00
1. 20 18.00 90.00 402.50
0.00===Q5 EQUALS BASIN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY=(Q2*V2-Ql*Vl*COS(DELTA1)-Q3*V3*COS(DELTA3)-
CRITICAL
DEPTH(FT.)
2.35
2.52
0.80
0.41
Q4*V4*COS(DELTA4))/((Al+A2)*16.1)+FRICTION LOSSES
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.06336
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.04586
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.05461
JUNCTION LENGTH = 4.00 FEET
Page 2
VELOCITY
(FT/SEC)
21. 346
19.419.
2.937
1.890
· , ,
RACEIREV.RES
FRICTION LOSSES = 0.218 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 1.645)+( 0.000) = 1.645
NODE 110.00: HGL = < 403.295>;EGL= < 410.371>;FLOWLINE= < 402.000>
******************************************************************************
FLOW PROCESS FROM NODE 110.00 TO NODE 135.50 IS CODE = 1
UPSTREAM NODE 135.50 ELEVATION = 416.33 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 54.80 CFS PIPE DIAMETER = 30.00 INCHES
PIPE LENGTH = 226.00 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 1.29 CRITICAL DEPTH(FT) = 2.35
==============================================================================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.30
=========================================================~==================== GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM
CONTROL (FT)
0.000
3.168 6.472
9.923
13.536
17.327
21.313
25.516
29.960
34.675
39.696
45.064
50.832
57.064 63.841
71.265
79.475
88.655
99.065
111.085
125.307 142.715
165.166 196.820
226.000
FLOW DEPTH
(FT)
1.300
1.300
1.300
1.299
1.299
1.299
1.299
1.299
1.298
1.298
1.298
1.298 1.298
1.297 1.297
1.297
1.297
1.296
1.296
1.296
1.296 1.296
1.295
1.295
1.295
VELOCITY
(FT/SEC)
21. 239
21. 243
21.248
21.252
21. 256
21.260
21. 265
21. 269
21. 273
21.278
21.282
21.286
21.290
21. 295
21.299 21.303
21. 307
21. 312
21. 316
21.320
21. 325 21.329 21. 333
21. 338
21.340
SPECIFIC
ENERGY(FT)
8.309
8.312
8.314
8.317
8.319
8.322 8.325
8.327
8.330 8.333
8.335 8.338
8.340
8.343
8.346
8.348
8.351
8.3"54
8.356
8.359 8.361
8.364 8.367
8.369
8.371
PRESSURE+
MOMENTUM (POUNDS)
2345.32
2345.73
2346.15
2346.57
2346.99
2347.41
2347.83
2348.26
2348.68
2349.10 2349~52
2349.94
2350.36
2350.78
2351.20 2351. 63
2352.05
2352.47
2352.89
2353.32
2353.74
2354.16
2354.59 2355.,01
2355.24
------------------------------------------------------------------~----~--:---
NODE 135.50: HGL = < 417.630>;EGL= < 424.639>;FLOWLINE= < 416.330>
,,~
**********************************************************~*******************
FLOW PROCESS FROM NODE 135.50 TO NODE 135.00 IS CODE = 5
UPSTREAM NODE 135.00 ELEVATION = 416.66 (FLOW IS SUPERCRITICAL)
CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER ANGLE FLOWLINE
UPSTREAM
DOWNSTREAM
LATERAL #1
LATERAL #2
Q5
(CFS) (INCHES) (DEGREES) ELEVATION
416.66
416.33
54.80 30.00 0.00
54.80 30.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00===Q5 EQUALS BASIN INPUT===
page 3
CRITICAL
DEPTH(FT.)
2.35
2.35
0.00
0.00
VELOCITY
(FT/SEC)
21.430
21.246
0.000
0.000
RACEIREV.RES
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY=(Q2*V2-Ql*Vl*cOS(DELTA1)-Q3*V3*COS(DELTA3)-
Q4~'V4*COS(DELTA4))/((Al+A2)*16.1)+FRICTION LOSSES
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.06402
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.06257
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.06330
JUNCTION LENGTH = 4.00 FEET
FRICTION LOSSES = 0.253 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HVI-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 0.443)+( 0.000) = 0.443
NODE 135.00: HGL = < 417.951>;EGL= < 425.082>;FLOWLINE= < 416.660>
******************************************************************************
FLOW PROCESS FROM NODE 135.00 TO NODE 106.50 IS CODE = 1
UPSTREAM NODE 106.50 ELEVATION = 427.24 (FLOW IS SUPERCRITICAL)
----------------------------------------------------------------------------~~ CALCULATE FRICTION LOSSES(LACFCD)=
PIPE FLOW = 54.80 CFS PIPE DIAMETER = 30.00 INCHES
PIPE LENGTH = 166.03 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 1.29 CRITICAL DEPTH(FT) = 2.35
==============================================================================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.28
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
------------------------------------------------------------------------------DISTANCE FROM
CONTROL,( FT)
0.000
3 . .247
6.630
10.160
13.852
17.720
21. 785
26.065
30.587
35.380
40.477
45.923
51. 768
58.075
64.927 72.427
80.711 89.964
100.446
112.538
126.828
144.305
166.030
FLOW DEPTH
(FT)
1.278
1.279
1.279
1.280
1.281
1.281
1.282
1.282
1.283
1.284
1.284
1.285
1.285
1.286
1.286
1. 287 1.288
1.288
1.289
1.289
'1. 290
1.291
1.291
VELOCITY
(FT/SEC)
21. 697
21. 684
21. 672
21. 659
21.647
21. 634
21.622
21. 609
21. 597
21. 584
21. 572
21. 559
21. 547
21. 534
21. 522
21. 509 21. 497 21.485
21.472
21.460
21.448
21.435
21.424
SPECIFIC
ENERGY(FT)
8.593
8.585
8.577
8.569
8.561
8.553
8.545
8.538
8.530
8.522
8.514
8.507
8.499
8.491
8.483
8.476 8.468 8.460
8.453
8.445
".8.437 8.430
8.422
PRESSURE+
MOMENTUM(POUNDS)
2390.49 2389.24
2388.00
2386.75
2385.51
2384.27
2383.03
2381. 80
2380;56
2379.33
2378.10
2376.87 2375.64
2374.41
2313.19
2371. 96
2370.74
2369.52
2368 .. 30 2367.08
2365 .. 87
2364.65
2363.48
------------------------------------------~----------------~--~---------~-~---NODE 106.50: HGL = < 428.518>;EGL= < 435.833>;FLOWLINE= < 427.240>
******************************************************************************
FLOW PROCESS FROM NODE 106.50 TO NODE 106.00 IS CODE = 5
UPSTREAM NODE 106.00 ELEVATION = 427.57 (FLOW IS SUPERCRITICAL)
-----~-----------------------------------------~~---------------~----------~~-CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER ANGLE FLOWLINE
(CFS) (INCHES) (DEGREES) ELEVATION
UPSTREAM 51.60 30.00 0.00 427.57
page 4
CRITICAL V~LOCITY
DEPTH (FT.) -eFT /SEC)
2.32 23.5Ul
+ , ,
DOWNSTREAM
LATERAL #1
LATERAL #2
Q5
54.80 30.00
2.20 18.00
1.00 18.00
0.00===Q5 EQUALS
RACEIREV.RES
427.24
90.00 428.24
90.00 428.2·4
BASIN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY=(Q2*V2-Q1*V1*COS(DELTA1)-Q3*V3*COS(DELTA3)-
2.35
0.56
0.37
21.704
3.655
2.869
Q4*V4*COS(DELTA4))/((A1+A2)*16.1)+FRICTION LOSSES .
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.08536
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.06621
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.07579
JUNCTION LENGTH = 4.00 FEET
FRICTION LOSSES = 0.303 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 1.460)+( 0.000) = 1.460 ------------------------------------------------------------------------------NODE 106.00: HGL = < 428.716>;EGL= < 437.292>;FLOWLINE= < 427.570> .
******************************************************************************
FLOW PROCESS FROM NODE 106.00 TO NODE 105.50 IS CODE = 1
UPSTREAM NODE 105.50 ELEVATION = 440.29 (FLOW IS SUPERCRITI~AL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 51.60 CFS PIPE DIAMETER = 30.00 INCHES
PIPE LENGTH = 121.32 FEET MANNING'S N =0.01300
---------------------------------------------------------------------~------~-NORMAL DEPTH(FT) = 1.08 CRITICAL DEPTH(FT) = 2.32
==================================================================~=========== UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) =. 2.32
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM CONTROL (FT)
0.000 0.045
0.181
0.410
0.740
1.178
1. 735
2.425
3.266
4.278
5.486
6.924
8.630
10.657
13.067
15.947
19.409'
23.607
28.759
35.187
43.394
54.223
69.262
92.088
121. 320
FLOW DEPTH
(FT)
2.319 2.269
2.220
2.170
2.121
2.071
2.022
1.973
1.923
1.874
1.824
1. 775
1. 725
1.676
1.626
1.577
1. 527
1.478
1.428
1.379
1.329
1.280
1.230
1.181
1.146
VELOCITY
(FT/SEC)
10.860
11.018
11.197
11. 397
11.618
11.862
12.127
12.417
12.731
13 .073
13 .443
13.843
14.278
14.749
15.260
15.816
16.420
17.079
17.798
18.585
19.449
20.399
21.449
22.611
23.493
SPECIFIC
ENERGY(FT)
4.151
4.156
4.168
4.189
4.218
4.258
4.307
4.368
4.442
4.529
4.632
4.752
4.893
5.056
5.244
5.463
5.716
6.010
6.350
6.745
7.206
7.745
8.378
9.124
9.722
PRESSURE+
MOMEN,TUM(POUNDS)
1414.43
1415.63
1419·.20
1425.i3
1433.43
1444.19
1457.49
1473.46
i492.25
1514.04
1539.02
1567.44
1599.56
1635.70
1676.22
1721.52
1772.08
1828.45 .
1891. 26
i961.24
2039.27
2126.34
2223. (i8
2332.71 .
2416.18
------------------------------------------------------------------------------
NODE 105.50: HGL = < 442.609>;EGL= < 444.441>;FLOWLINE= < 440.290>
******************************************************************************
page 5
· ~ ,
RACEIREV.RES
UPSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 105.50 FLOWLINE ELEVATION = 440.29
ASSUMED UPSTREAM CONTROL HGL = 442.61 FOR DOWNSTREAM RUN ANALYSIS
==============================================================================
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 6
· , '
R4179.RES
******************************************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyright 1982-2001 Advanced Engineering Software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, S~ite 100
carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-86S0
************************** DESCRIPTION OF STUDY
* CARLSBAD, RACEWAY
* 41+79.32 LIONSHEAD * C:\AES2001\HYDROSOFT\RATSCX\R4179.RES
*************,(*****.*******
* * * **************************************************************************
FILE NAME: R4179.DAT
TIME/DATE OF STUDY: 07:42 12/17/2004
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: "*" indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RUN
NODE
NUMBER
115.00-
}
117.00-
MODEL PRESSURE PRESSURE+ FLOW
PROCESS HEAD(FT) MOMENTUM (POUNDS) DEPTH (FT)
2.0S DC S94.41 1.55*
PRESSURE+ MOM'ENTUM (pOUNDS)
1000.02
FRICTION
2.0S*DC S94.41 2.0S*DC 894.41
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON tHE MOST
CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM. ******************************************************************************
DOWNSTREAM PIPE FLOW CONTROL DATA: NODE NUMBER = 115.00 FLOWLINE ELEVATION = 391.S3
PIPE FLOW = 37.S0 CFS PIPE DIAMETER = 30.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 392.800 FEET
*NOTE: ASSUMED DOWNSTREAM CONTROL DEPTH( 0.97 FT.)
IS LESS THAN CRITICAL DEPTH( 2.0S FT.)
===> CRITICAL DEPTH IS ASSUMED AS DOWNSTREAM CONTROL DEPTH
FOR UPSTREAM RUN ANALYSIS
--~~------------~-------------------------------------------------------------NODE 115.00: HGL = < 393.3S0>;EGL= < 395. 549>;FLOWLINE= < 391.S30>
******************************************************************************
115.00 TO NODE 117.00 IS CODE = 1 FLOW PROCESS FROM NODE
UPSTREAM NODE 117.00 ELEVATION = 393.44 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 37.80 CFS PIPE DIAMETER = 30.00 INCHES
PIPE LENGTH = SO.OO FEET MANNING'S N = 0.01300
------------------------------------------------------------------~------~---~ NORMAL DEPTH.(FT) = 1.47 CRITICAL DEPTH(FT) = 2.0S
==========================================================~===================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 2.0S '
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
page 1
R4179.RES
-----------------------------------------------------------------------~------DISTANCE FROM
CONTROL(FT)
0.000
0.058
0.23'7
0.547
1.000
1.610
2.391
3.363
4.547
5.970
7.663
9.663
12.019
14.787
18.042
21.878
26.420
31.839
38.372
46.370
56.373
69.290
80.000
FLOW DEPTH
(FT)
2.079
2.054
2.030
2.006
1.981
1.957
1.932
1.908
1.883 1.859
1.834
1.810
1. 785
1. 761 1. 737
1. 712
1.688
1.663
1.639
1.614
1. 590
1. 565
1. 551
VELOCITY
(FT/SEC)
8.662
8.755
8.851
8.953
9.058
9.168
9.282
9.402
9.526
9.655
9.789
9.929
10.074
10.226
10.383 10.547
10.718 10.895
11.080 11. 273
11.474
11. 683 11.815
SPECIFIC
ENERGY(FT)
3.245
3.245
3.247
3.251
3.256
3.263
3.271
3.281
3.293
3.307
3.323
3.342
3.362
3.386 3.412 3.441
3.472
3.508
3.546
3.589
3.635
3.686
3.719
PRESSURE+
MOMENTUM(POUNDS)
894.41
894.59
895.15
896.08
897.41
899.13
901. 27
903.83
906.83
910.28
914.19
918.58
923.48
928.88
934.83
941.33 948.40
956.·08 964.39
973.34
982.98
993.34 1000.02
NODE 117.00: HGL = < 395.519>;EGL= < 396. 685>;FLOWLINE= < .393.440>
******************************************************************-************ UPSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 117.00 FLOWLINE ELEVATION = 393.44
ASSUMED UPSTREAM CONTROL HGL = 395.52 FOR DOWNSTREAM RUN ANALYSIS
==============================================================================
END OF GRADUALLY VARIED FLOW ANALYSIS
o
page 2
R4467L.RES
********************~*********************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyri ght 1982-2001 Advanced Engi neeri ng Software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, suite 100
Carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY *************************-*
* CARLSBAD RACEWAY * * C:\AES2001\HYDROSOFT\RATSCX\R4467L.RES * * 44+66.77 L T LIONSHEAD *
**************************************************************************
FILE NAME: R4467L.DAT
TIME/DATE OF STUDY: 07:45 12/17/2004
****************~*************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: "*" indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RUN
NODE NUMBER
110.00-
}
212.00-
MODEL PRESSURE PRESSURE+ FLOW PROCESS HEAD (FT) MOMENTUM(POUNDS) DEPTH(FT)
0.80 35.16 0.31*
PRESSURE+
MOMENTUM (POUNDS)
54.97 FRICTION
0.62*DC 31. 66 0.62*DC 31.66
-------------------------------------------------------------~--------~-------MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
-----~-----------------------------------------------------------~------------NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON THE MOST
CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM.
******************************************************************************
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 110.00 FLOWLINE ELEVATION = 402.50
PIPE FLOW = 2.70 CFS PIPE DIAMETER = 18.00 INCHES ASSUMED DOWNSTREAM CONTROL HGL = 403.300 FEET -------------------------------------------------------------------------------NODE 110.00: HGL = < 402.813>;EGL= < 404.396>;FLOWLINE= < 402.500>
*************************************************************************~****
110.00 TO NODE 212.00 IS CODE = 1 FLOW PROCESS FROM NODE
UPSTREAM NODE 212.00 ELEVATION = 404.91 (FLOW IS SUPERCRITICAL)
-------------------------------------------------------------------------~---~ CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 2.70 CFS PIPE DIAMETER = 18.00 INCHES
PIPE LENGTH = 28.00 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 0.30 CRITICAL DEPTH(FT) = 0.62
===========================================================~================== UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 0.62
======================================================~=======================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM
CONTROL (FT)
0.000
FLOW DEPTH
(FT)
0.623
VELOCITY
(FT/SEC)
3.888
page 1
SPECIFIC
EN ERGY(FT)
0.858
PRESSURE+
MOMENTUM(POUNDS)
31.66
.
~ .. e
R4467L.RES
0.007 0.610 3.997 0.859 31. 68 0.027 0.597 4.113 0.860 31. 75 0.064 0.584 4.236 0.863 31.87 0.119 0.572 4.365 0.868 32.04
0.194 0.559 4.502 0.873 32.26 0.292 0.546 4.646 0.881 32.55
0.417 0.533 4.800 0.891 32.89
0.572 0.520 4.964 0.903 33.30
0.761 0.507 5.137 0.917 33.78
0.992 0.494 5.323 0.934 34.33
1.269 0.481 5.520 0.955 34.96
1.603 0.468 5.732 0.979 35.68
2.004 0.455 5.958 1.007 36.49
2 .. 485 0.442 6.201 1.040 37.41
3.064 0.429 6.463 1.078 38.43 3.764 0.416 6.744 1.123 39.58
4.619 0.403 7.049 1.175 40.86 5.672 0.391 7.378 1.236 42.28
6.991 0.378 7.736 1.308 ·43.86
8.679 0.365 8.126 1.391 45.63 10.910 0.352 8.552 1.488 47.60
14.012 0.339 9.018 1.603 49 .. 79
18.719 0.326 9.531 1. 737 52.24
27.393 0.313 10.097 1.897 54.98
28.000 0.313 10.095 1.896 54.97
NODE 212.00: HGL = < 405.533>;EGL= < 405.768>;FLOWLINE~ < 404.9l0>
******************************************************************************.
UPSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 212.00 FLOWLINE ELEVATION = 404.91
ASSUMED UPSTREAM CONTROL HGL = 405.53 FOR DOWNSTREAM RUN ANALYSIS
======================================================================~===?==~
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 2
•
R4467R.RES
******************************************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyright 1982-2001 Advanced Engineering software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, suite 100
Carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY **************************
~ CARLSBAD RACEWAY *
* 44+66.77 RT LIONSHEAD *
* C:\AES2001\HYDROSOFT\RATSCX\R4467R.RES *
**************************************************************************
FILE NAME: R4467R.DAT
TIME/DATE OF STUDY: 07:47 12/17/2004
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: "*" indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RUN
NODE NUMBER
110.00-
}
114.00-
MODEL PRESSURE PRESSURE+ FLOW
PROCESS HEAD(FT) MOMENTUM(POUNDS) DEPTH(FT) 1.30* 136.86 0.84
PRESSURE+
MOMENTUM (POUNDS)
131. 59 FRICTION } HYDRAULIC JUMP
1.02*Dc 124.48 1.02*DC 124.48
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
-----------------------------------------------------------------~------------NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED' ON THE MOST CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM. .
******************************************************************************
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 110.00 FLOWLINE ELEVATION = 402.00
PIPE FLOW = 8.20 CFS PIPE DIAMETER = 24.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 403.300 FEET
NODE 110.00: HGL = < 403.300>;EGL= < 403.523>;FLOWLINE= < 402.000>
******************************************************************************
110.00 TO NODE 114.00 IS CODE = 1 FLOW PROCESS FROM NODE
UPSTREAM NODE 114.00 ELEVATION = 403.13 (HYDRAULIC JUMP OCCURS)
-----------------------------------------,-------------~-----------------------
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 8.20 CFS PIPE DIAMETER = 24.00 INCHES
PIPE LENGTH = 113.00 FEET MANNING'S N = 0.01300
--------------------------------------------------------------~----------------HYDRAULIC JUMP: DOWNSTREAM RUN ANALYSIS RESWLTS
NORMAL DEPTH(FT) = 0.83 CRITICAL DEPTH(FT) = 1.02
===================================================================~======~=== .
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.02
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM FLOW DEPTH VELOCITY SPECIFIC PRESSURE+
page 1
CONTROL (FT)
0.000
0.021
0.087 0.203
0.372
0.600
0.894
1.261
1.709
2.248 2.891
3.652 4.549 5.604
6.845
8.307
10.038
12.101
14.588 17.627
21. 424
26.319 32.952
42.759
60.350
113 .000
(FT)
1.020
1.012
1.005
0.997
0.990
0.982
0.975
0.967
0.960
0.952
0.945
0.937
0.930 0.922
0.915 0.908 0.900
0.893 0.885 0.878
0.870
0.863 0.855
0.848 0.840 0.840
R4467R.RES
(FT/SEC)
5.091
5.138 5.187
5.237 5.287
5.339
5.391
5.445
5.499
5.555
5.612
5.670
5.729 5.789
5.851 5.914 5.978 6.044
6.111 6.179
6.249 6.321
6.394 6.468
6.545 6.549
ENERGY(FT)
1.422
1.423
1.423 1.423
1.424
1.425
1.426
1.428
1.430
1.432
1.434
1.437
1.44"0
1.443
1.447 1.451 1.455 1.460
1.465 1.471
1.477
1.483 1.490 1.498
1.506
1. 506
HYDRAULIC JUMP: UPSTREAM RUN ANALYSIS RESULTS
•
MOMENTUM (POUNDS)
124.48 124.49
124.52
124.58
124.65
124.75
124.87
125.02 125.19
125.38
125.60 125.84
126.11
126.40
126.73
127.08
127.45
127.86
128.29
128.76
129.26
129.78
130.34
. 130.93
131. 56
131. 5~
==============================================================================
DOWNSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.30
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM CONTROL(FT) 0.000
0.875
1. 736
2.583
3.415
4.231
5.030
5.812
6.573
7.315
8.034
8.730
9.401
10.045
10.659
11. 242
11.791 12.302
12.773
13.199
13.577
13 .902
14.167
14.367
14.494
14.538
113 .000
FLOW DEPTH (FT)
1.300 1.289
1.278
1.266
1.255
1.244
1.233
1.222
1.210
1.199
1.188
1.177
1.165
1.154
1.143
1.132
1.121 1.109
1.098
1.087
1.076
1.065
1.053
1.042
1.031
1.020
1.020
VELOCITY (FT/SEC)
3.792
3.830 3.869
3.909
3.950
3.991
4.034
4.078
4.123
4.169
4.216
4.264
4.314
4.365
4.417
4.470
4.525
4.582
4.639
4.699
4.760
4.822
4.887
4.953
5.021
5.091
5.091
page 2
SPECIFIC
ENERGY(FT)
1. 523
1.517 1. 510
1. 504
1.498
1.491
1.486 1.480
1.474
1.469
1.464
1.459
1.455
1.450
1.446
1.442
1.439
1.436
1.433
1.430
1.428
1.426
1.424
1.423
1.423
1.422
1.422
PRESSURE+
MOMENTUM(POUNDS)
136.86
135.96
135.08 i34.24
133.43 132.65
131. 90
131.18
130.50
'129.85
129.23
128.65
128.10
127·.--58 127.11 126.67
126.26
125.90
125.57
125.29
125.05 124.85
124.69
124.57
124.50
i24.48
124 .. 48
R4467R.RES
------------------------END OF HYDRAULIC JUMP ANALYSIS------------------------I PRESSURE+MOMENTUM BALANCE OCCURS AT 5.37 FEET UPSTREAM OF NODE 110.00 I I DOWNSTREAM DEPTH = 1.228 FEET, UPSTREAM CONJUGATE DEPTH = 0.840 FEET I
-------------------------------------------------------------------.---~-------NODE 114.00: HGL = < 404.150>;EGL= < 404.552>;FLOWLINE= < 403.130>
*****************************************************************************,
UPSTREAM PIPE FLOW CONTROL DATA: NODE NUMBER = 114.00 FLOWLINE ELEVATION = . 403.13
ASSUMED UPSTREAM CONTROL HGL = 404.15 FOR DOWNSTREAM RUN ANALYSIS
==============================================================================
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 3
R4875L. RES
******************************************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyright 1982-2001 Advanced Engineering software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, suite 100
carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY **************************
* CARLSBAD RACEWAY *
* 48+75.00 LT LIONSHEAD *
* C:\AES2001\HYDROSOFT\RATSCX\R4875L.RES *
**************************************************************************
FILE NAME: R4875L.DAT
TIME/DATE OF STUDY: 07:49 12/17/2004
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: n*n indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RUN
NODE
NUMBER
106.00-
}
109.00-
MODEL PRESSURE PRESSURE+ FLOW
PROCESS HEAD(FT) MOMENTUM (POUNDS) DEPTH(FT)
0.71 DC 44.24 0.39*
PRESSURE+
MOMENTUM (POUNDS)
68.91
FRICTION
0.71*DC 44.24 0.71*DC
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON rHE MOST CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM.
44.24
******************************************************************************'
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 106.00 ' FLOWLINE ELEVATION = 428.24
PIPE FLOW = 3.50 CFS PIPE DIAMETER = 18.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 428.720 FEET
*NOTE: ASSUMED DOWNSTREAM CONTROL DEPTH( 0.48 FT.)
IS LESS THAN CRITICAL DEPTH( 0.71 FT.)
===> CRITICAL DEPTH IS ASSUMED AS DOWNSTREAM CONTROL DEPTH
FOR UPSTREAM RUN ANALYSIS
NODE 106.00 ,: HGL = < 428.629>; EGL= < 430.067>; FLOWLINE= < 428.240>
******************************************************************************
106.00 TO NODE 109.00 IS CODE = 1 FLOW PROCESS FROM NODE
UPSTREAM NODE 109.00 ELEVATION = 429.24 (FLOW IS SUPERCRITICAI..)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 3.50 CFS PIPE DIAMETER = 18.00 INCHES
PIPE LENGTH = 5.26 FEET MANNING'S N = 0.01300
------------------------------------------------------------------~~----------NORMAL DEPTH(FT) = 0.28 CRITICAL DEPTH(FT) = 0.71
======================================================~======================= UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 0.71
=============================================================.=========;:::======= GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
page 1
'\ , . •
R4875L. RES
-----------~------------------------------------------------------------------DISTANCE FROM
CONTROL(FT)
0.000
0.005
0.019
0.045
0.083
0.136
0.206
0.296
0.408
0.547
0.717
0.925
1.178
1.485
1.858
2.314
2.874
3.567
4.435
5.260
FLOW DEPTH
(FT)
0.714
0.696
0.679
0.662
0.644
0.627
0.610
0.592
0.575
0.558
0.540
0.523
0.506
0.488
0.471
0.454
0.436
0.419
0.402
0.389
VELOCITY
(FT/SEC)
4.220
4.356
4.501
4.656
4.822
4.999
5.188
5.392 5.611
5.847
6.103
6.379
6.680
7.007
7.365
7.756
8.187
8.663
9.190
9.622
SPECIFIC
ENERGY(FT)
0.990
0.991
0.994
0.999
1.006
1.015
1.028
1.044
1.064
1.089 1.119
1.155
1.199
1.251
1.314
1.389
1.478 1. 585
1. 714
1.827
PRESSURE+
MOMENTUM(POUNDS)
44.24
44.28 44.41
44.64 44.96 45.39
45.93 46.60 47.40
48.34
49 .. 44
50·.71
52.17
53.84
55.74
57.90
60.34
63.12
66.28
68,'91
NODE 109.00: HGL = < 429.954>;EGL= < 430.230>;FLOWLINE= < 429.240>
****************************************************************************** UPSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 109.00 FLOWLINE ELEVATION = 429.24
ASSUMED UPSTREAM CONTROL HGL = 429.95 FOR DOWNSTREAM RUN ANALYSIS
==============================================================================
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 2
•
R4875R.RES
*************************************************************************~****
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Reference: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(c) copyright 1982-2001 Advanced Engineering software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, Suite 100
carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY **************************
* CARLSBAD RACEWAY *
* 48+75.00 RT LIONSHEAD * * C:\AES2001\HYDROSOFT\RATSCX\R4875R.RES . *
**************************************************************************
FILE NAME: R4875R.DAT TIME/DATE OF STUDY: 08:15 12/17/2004
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: n*n indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RUN
NODE
NUMBER
106.00-
}
103.00-
MODEL PRESSURE PRESSURE+ FLOW
PROCESS HEAD (FT) MOMENTUM(POUNDS) DEPTH(FT)
1.10 DC 131.77 0.63*
PRESSURE+
MOMENTUM (POUNDS)
186.41
FRICTION
1.10*DC 131. 77 1.10*DC
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON THE MOST
CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM.
131.77
******************************************************************************
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 106.00 FLOWLINE ELEVATION = 428.24
PIPE FLOW = 8.00 CFS PIPE DIAMETER = 18.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 428.720 FEET
*NOTE: ASSUMED DOWNSTREAM CONTROL DEPTH( 0.48 FT.)
IS LESS THAN CRITICAL DEPTH( 1.10 FT.)
===> CRITICAL DEPTH IS ASSUMED AS DOWNSTREAM CONTROL DEPTH
FOR UPSTREAM RUN ANALYSIS
-----------------------------------------------------------------------"-----~-NODE 106.00: HGL = < 428.874>;EGL= < 430.844>;FLOWLINE= < 428.240>
******************************************************************************
FLOW PROCESS FROM NODE
UPSTREAM NODE 103.00
106.00 TO NODE 103.00 IS CODE = 1 .
ELEVATION = 430.51 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 8.00 CFS PIPE DIAMETER = 18.00 INCHES
PIPE LENGTH = 43.23 FEET MANNING'S N = 0.01300
-------------------------------------------------------------------~----------
NORMAL. DEPTH(FT) = 0.60 CRITICAL DEPTH(FT) = 1.10
==============================================================================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 1.10
=========~=============================================================~=~===~ GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
Page 1
DISTANCE FROM
CONTROL(FT)
0.000
0.017 0.070
0.162
0.299
0.486
0.729
1.035
1.412
1.871
2.424
3.087
3.877 4,.819
5.941 7.281
8.890
10.836
13.216
16.172 19.923
24.838 31. 612
41.802 43.230
FLOW DEPTH
(FT)
1.096
1.076
1.056
1.036
1.016
0.996
0.976
0.956
0.936
0.916
0.896
0.876
0.856
0.836 0.816
0.796
0.776 0.756
0.736 0.716
0.696
0.676
0.655 0.635 0.634
R4875R.RES
VELOCITY
(FT/SEC)
5.782
5.897
6.018
6.145
6.280
6.422
6.572
6.731
6.900
7.078
.7.267
7.467
7.679
7.905
8.146
8.402 8.675
8.967
9.279
9.614
9.973
10.359 10.776
11. 225
11.261
SPECIFIC
ENERGY(FT)
1.615
1.616
1.618
1.622
1.628
1.636
1.647
1.660
1.675
1.694
1. 716
1. 742
1. 772
1.807
1.847
1.892 1.945
2.005 2.073
2.152
2.241
2.343
2.460
2.593 2.604
•
PRESSURE+
MOMENTUM(POUNDS)
131. 77
131.84
132.03
132.37
132.85
133.48
134.28
13'5.24
136.39 137.72
139.26 141.01
142.98
145.21
147.69
150.46
153.52
156.92
160.66
164.80
169.35
174.35
179.86
185.92
186.41
NODE 103.00 : HGL = < 431.606>;EGL= < 432.125>;FLOWLINE= < 430.510>
******************************************************************************
UPSTREAM PIPE FLOW CONTROL DATA:
NbDENUMBER = 103.00 FLOWLINE ELEVATION = 430.51
ASSUMED UPSTREAM CONTROL HGL = 431.61 FOR DOWNSTREAM RUN ANALYSIS
==================================================================~===========
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 2
RADER04.RES
******************************************************************************
PIPE-FLOW HYDRAULICS COMPUTER PROGRAM PACKAGE
(Refere"nce: WSPG COMPUTER MODEL HYDRAULICS CRITERION)
(C) copyright 1982-2001 Advanced Engineering software (aes)
Ver. 8.0 Release Date: 01/01/2001 License ID 1423
Analysis prepared by:
o'Day consultants, Inc.
2710 Loker Avenue West, suite 100 carlsbad, CA 92008
Tel: 760-931-7700 Fax: 760-931-8680
************************** DESCRIPTION OF STUDY **************************
* CARLSBAD RACEWAY *
* REVISED SD A *
* C:\AES2001\HYDROSOFT\RATSCX\RACER04.RES * **************************************************************************
FILE NAME: RACER04.DAT
TIME/DATE OF STUDY: 08:28 01/06/2005
******************************************************************************
GRADUALLY VARIED FLOW ANALYSIS FOR PIPE SYSTEM
NODAL POINT STATUS TABLE
(Note: "*,, indicates nodal point data used.)
UPSTREAM RUN DOWNSTREAM RiJN
NODE MODEL PRESSURE PRESSURE+ FLOW PRESSURE+ NUMBER PROCESS HEAD (FT) MOMENTUM (POUNDS) DEPTH (FT) MOMENTUM(POUNDS) 413.00-4.53 DC 9209.09 2.61:'< 13009.95
} FRICTION 412.50-4.53 DC 9209.09 2.91* 11662.73
} JUNCTION 412.00-5.29 8814.56 2.58* 11535.29
} FRICTION
411.50-4.39 DC 8347.86 3.40* 9092.81
} JUNCTION
411.00-4.34 DC 8048.32 3.31* 8842.01
} FRICTION
410.50-4.33*DC 8048.31 4.33*DC 8048.32 } JUNCTION
410.00-7.45* 10923.66 2.45 10602.85
} FRICTION } HYDRAULIC JUMP
109.80-7.07 10453.52 2.31* 11277.67
} JUNCTION
409.70-'-6.77 10084.75 2.32* 11242.52
} FRICTION
409.50-4.22*DC 7538.21 4.22*DC 7538.21
- - - -"",:"":,,.,,:,,"--.---- - - - - - ------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --.. ":::".--.!!""_--------- ---- - - -~ --
MAXIMUM NUMBER OF ENERGY BALANCES USED IN EACH PROFILE = 25
-------------------------------------------------------------------~----------NOTE: STEADY FLOW HYDRAULIC HEAD-LOSS COMPUTATIONS BASED ON THE MOST
CONSERVATIVE FORMULAE FROM THE CURRENT LACFCD WSPG COMPUTER PROGRAM.
***************************************************************************~**
DOWNSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 413.00 FLOWLINE ELEVATION = 329.50
PIPE FLOW = 265.00 CFS PIPE DIAMETER = 66.00 INCHES
ASSUMED DOWNSTREAM CONTROL HGL = 333.900 FEET
*NOTE: ASSUMED DOWNSTREAM CONTROL DEPTH( 4.40 FT.)
IS LESS THAN CRITICAL DEPTH( 4.53 FT.)
===> CRITICAL DEPTH IS ASSUMED AS DOWNSTREAM CONTROL DEPTH
FOR UPSTREAM RUN ANALYSIS
page 1
•
RADER04.RES
NODE 413.00: HGL = < 332.111>;EGL= < 340.939>;FLOWLINE= < 329.500>
******************************************************************************
FLOW PROCESS FROM NODE 413.00 TO NODE 412.50 IS CODE = 1
UPSTREAM NODE 412.50 ELEVATION = 333.00 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 265.00 CFS PIPE DIAMETER = 66.00 INCHES
PIPE LENGTH = 66.00 FEET MANNING'S N = 0.01300
-----------------------------------------------------------------"----~--------NORMAL DEPTH(FT) = 2.22 CRITICAL DEPTH(FT) = 4.53
============================================================================== UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 2.91
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM
CONTROL(FT)
0.000 4.196
8.674 13.461
18.588 24.090
30.006
36.385
43.280
50.75.9
58.897
66.000
FLOW DEPTH (FT)
2.908
2.880
2.853
2.825 2.798 2.770
2.743
2.715
2.688
2.660
2.633 2.611
VELOCITY
(FT/sEC) 20.783
21.032
21.288
21. 550 21.818 22.093
22.375
22.665
22.962
23.267
23.580
23.836
SPECIFIC
ENERGY(FT)
9.619 9.754
9.894 10.041
10.194 10.354
10.522
10.697
10.880
11.072
11.272 11.439
PRESSURE+
MOMENTUM(POUNDS)
11662.73 11769.02,
11878.74
l1991.99 12108.90
12229.56 12354.11
12482.67
12615.37
12752.34
12893.74
13009.95
NODE 412.50: HGL = < 335.908>;EGL= < 342.619>;FLOWLINE= < 333.000>
******************************************************************************
FLOW PROCESS FROM NODE 412.50 TO NODE 412.00 IS CODE = 5
UPSTREAM NODE 412.00 ELEVATION = 333.33 (FLOW IS SUPERCRITICAL)
------------------------------------------------------------------------------
CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER
UPSTREAM
DOWNSTREAM
LATERAL #1
LATERAL #2
(CFS) (INCHES)
247.10 66.00
265.00 66.00
17.90 24.00
0.00 0.00
ANGLE
(DEGREES)
0.00
FLOWLINE
ELEVATION
333.33
333.00
90.00 336.50
0.00 0.00
Q5 0.00===Q5 EQUALS BASIN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY="(Q2*V2-Q1*V1*COS(DELTA1)-Q3*V3*COS(DELTA3)-
CRITICAL
DEPTH(FT.) ·4.39
4.53
1. 52
0.00
Q4*V4*COS(DELTA4)) I( (A1+A2)*16-.·1)+FRICTION LOSSES "('P"
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.02682
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.02066
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.02374
JUNCTION LENGTH = 4.00 FEET
VELOCITY
(FT/sEC)
22.530 20.790
6.968
0.000
FRICTION LOSSES = 0.095 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 1.177)+( 0.000) = 1.177
NODE 412.00: HGL = < 335.914>;EGL= < 343.796>;FLOWLINE= <. 333.330>
******************************************************************************
FLOW PROCESS FROM NODE 412.00 TO NODE 411.50 IS CODE = 1
UPSTREAM NODE 411.50 ELEVATION = 340.77 (FLOW IS SUPERCRITICAL)
page 2
•
RADERO'4.RES
. CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 247.10' CFS PIPE DIAMETER = 66.0'0' INCHES
PIPE LENGTH = 214.0'0' FEET MANNING'S N = 0'.0'130'0'
NORMAL DEPTH(FT) = 2.40' CRITICAL DEPTH(FT) = 4.39
============================================================================== UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 3.40'
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
----------------------------------------------------------------~---------~---
DISTANCE FROM
CONTROL (FT)
0'.0'0'0'
3.0'94
6.471
10'.156
14.183
18.588
23.412
28.70'3
34.521
40'.931
48.0'16
55.874
64.624
74.416
85.439
97.935
112.224
128.739
148.0'88 171.162
199.342
214.0'0'0'
FLOW DEPTH
(FT)
3.40'0'
3.360'
3.320'
3.280'
3.240'
3.20'0'
3.160
3.120'
3.0'80'
3.0'40'
3.0'0'0'
2.960'
2.920'
2.880'
2.840'
2.80'0'
2.760'
2.721 2.681
2.641
2.60'1
2.584
VELOCITY
(FT/SEC)
16.0'21
16.246
16.479
16.719
16.967
17.223
17.488
17.761
18.0'44
18.336
18.639
18.952
19.276
19.612
19.960'
20'.320'
20'.694
21.0'83 21. 485
21.90'4
22.339
22.523
SPECIFIC
ENERGY (FT)
7.388
7.461
7.539
7.623
7.713
7.80'9
7.912
8.0'21
8.139
8.264
8.398
8.541
8.694
8.856
9.0'30' 9.216
9.415 9.627
9.853
10'.095
10'.354
10'.466
PRESSURE+
MOMENTUM (POUNDS) 90'92.81
9162.59
9236.37
9314.28
9396.49
9483.14
9574.41
9670'.47
9771. 50'
9877.72
9989.32
10'10'6.54
10'229.60'
10'358.76
10'494.29 10'636.46
10'785.60' 10'942.0'1
1110'6.0'4
11278.0'7
11458.48
11535.29
NODE 411.50': HGL = < 344.17O'>;EGL'= < 348.158>;FLOWLINE= < 340'.770'>
******************************************************************************
FLOW PROCESS FROM NODE 411.50' TO NODE 411.0'0' IS CODE = 5
UPSTREAM NODE 411.0'0' ELEVATION = 341.10' (FLOW IS SUPERCRITICAL)
CALCULATE JUNCTION LOSSES: PIPE FLOW DIAMETER ANGLE FLOWLINE
ELEVATION
341.10'
340'.77 UPSTREAM
OOWNSTREAM
LATERAL #1
LATERAL #2
Q5
(CFS) (INCHES) (DEGREES)
240'.70' 66.0'0' 0'.0'0'
247.10' 66.00'
6.40' 18.0'0' 75.0'0' 342.52
0'.0'0' 0'.0'0' 0'.0'0' 0'.0'0'
O'.O'O'===Q5 EQUALS BASTN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
CRITICAL
DEPTH(FT.)
4.33
4.39 0'.98
0'.0'0'
DY=(Q2*V2-Q1*V1*COS(DELTA1)-Q3*V3*COS(DELTA3)-
Q4*V4*COS(DELTA4))/((A1+A2)*16.1)+FRICTION LOSSES
UPSTREAM: MANNING'S N = 0'.0'130'0'; FRICTION SLOPE = 0'.0'1123
DOWNSTREAM: MANNING'S N = 0'.0'130'0'; FRICTION SLOPE = 0'.0'10'96
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0'.0'1110'
JUNCTION LENGTH = 4.0'0' FEET
VELOCITY
(FTjSEC)
16.0'87
16.0'26
3.622 0'.0'0'0'
FRICTION LOSSES = 0'.0'44 FEET ENTRANCE LOSSES = 0'.0'0'0 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 0'.276)+( 0'.0'0'0') = 0'.276
NODE 411.0'0': HGL = < 344.415>;EGL= < 348.433>;FLOWLINE= < 341.10'0'>
page 3
.-•
RADER04.RES
******************************************************************************
FLOW PROCESS FROM NODE 411.00 TO NODE 410.50 IS CODE = 1
UPSTREAM NODE 410.50 ELEVATION = 344.00 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 240.70 CFS PIPE DIAMETER = 66.00 INCHES
PIPE LENGTH = 225.00 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 3.17 CRITICAL DEPTH(FT) = 4.33
==============================================================================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 4.33
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM FLOW DEPTH VELOCITY SPECIFIC PRESSURE+
CONTROL (FT) (FT) (FT/SEC) ENERGY(FT) MOMENTUM(POUNDS) -
0.000 4.329 11. 995 6.565 8048.32 0.172 4.283 12.122 6.566 8049.87
0.659 4.236 12.254 6.569 8054.14
1.487 4.190 12.390 6.575 8061.20
2.690 4.144 12.531 6.584 8071.12
4.303 4.097 12.677 6.594 8083.98
6.369 4.051 12.828 6.608 8099.8'5
8.939 4.005 12.984 6.624 8118.82 12.072 3.958 13.146 6.643 8140.98
15.836 3.912 13.313 6.666 8166.43 20.316 3.866 13.486 6.692 '8195.27
25.613 3.819 13.665 6.721 8227.59 31.852 3.773 13.851 6.754 8263.52 39.186 3.727 14.042 6.791 8303.,17
47.810 3.680 14.241 6.831 8346.67
57.977 3.634 14.447 6.877 8394.15
70.016 3.588 14.660 6.927 8445.75
84.377 3.541 14.881 6.982 8501.62
101.690 3.495 15.109 7.042 8561. 91
122.877 3.449 15.346 7.108 -8626.79
149.372 3.402 15.592 7.180 8696.45 183.572 3.356 15.847 7.258 8771.06 225.000 3.315 16.082 7.333 8842.01
-----------------------------------------------------------------~---~------~-NODE 410.50 : HGL = < 348.329>;EGL= < 350. 565>;FLOWLINE= < 344.000>
******************************************************************************
FLOW PROCESS FROM NODE 410.50 TO NODE 410.00 IS CODE = 5
UPSTREAM NODE 410.00 ELEVATION = 344.58 (FLOW IS AT CRITICAL DEPTH)
CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER
UPSTREAM
DOWNSTREAM
LATERAL #1
LATERAL #2
(CFS) (INCHES)
221. 80 60.00
240.70 66.00
18.90 24.00
0.00 0.00
ANGLE FLOWLINE
(DEGREES).---ELEVATION
80.00 344.58
344.00
0.00 345.25
0.00 0.00
Q5 0.00===Q5 EQUALS BASIN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY=(Q2*V2-Q1*V1*COS(DELTA1)-Q3*V3*COS(DELTA3)-
CRITICAL
DEPTH(FT.)
4.22
4.33
1. 56
0.00
Q4*V4*COS(DELTA4))/((A1+A2)*16.1)+FRICTION LOSSES
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.00725
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.00555
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.00640
JUNCTION LENGTH = 7.00 FEET
page 4
VELOCITY
(A/SEC)
11.296
11. 989
6.016
0.000
.. •
RADER04.RES
FRICTION LOSSES = 0.045 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 3.449)+( 0.000) = 3.449
NODE 410.00: HGL = < 352.033>;EGL= <. 354.014>;FLOWLINE= < 344.580>
******************************************************************************
FLOW PROCESS FROM NODE 410.00 TO NODE 109.80 IS CODE = 1
UPSTREAM NODE 109.80 ELEVATION = 345.38 (HYDRAULIC JUMP OCCURS)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 221.80 CFS PIPE DIAMETER = 60.00 INCHES
PIPE LENGTH = 57.40 FEET MANNING'S N = 0.01300
HYDRAULIC JUMP: DOWNSTREAM RUN ANALYSIS RESULTS
NORMAL DEPTH(FT) = 3.15 CRITICAL DEPTH(FT) = 4.22
============================================================================== UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 2.31
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION:
DISTANCE FROM
CONTROL (FT)
0.000
13.833
27.951
42.383
57.160
57.400
FLOW DEPTH
(FT)
2.312
2.345
2.379
2.412
2.445
2.446
VELOCITY
(FT/SEC)
24.973
24.514 24.071
23."644
23.231 23.224
SPECIFIC
ENERGY(FT)
12.002
11. 682 11.381
11. 098
10.831
10.827
PRESSURE+
MOMENTUM(POUNDS)
11277.67
11098.92
10927.50
10763.06
10605.29 10602.85
-------------------------------------------------------------------------~----
HYDRAULIC JUMP: UPSTREAM RUN ANALYSIS RESULTS
==============================================================================
DOWNSTREAM CONTROL ASSUMED PRESSURE HEAD(FT) = 7.45
==============================================================================
PRESSURE FLOW PROFILE COMPUTED INFORMATION:
--------------------------~---------------------------------------------------DISTANCE FROM PRESSURE VELOCITY SPECIFIC PRESSURE+
CONTROL (FT) HEAD(FT) (FT /SEC) ENERGY(FT) MOMENTUM(POUNDS)
0.000 7.453 11.296~ 9.434 10923.66
57.400 7.069 11.296 9.051 10453.52
------------------------END OF HYDRAULIC JUMP ANALYSIS------------------------I PRESSURE+MOMENTUM BALANCE OCCURS AT 16.94 FEET UPSTREAM OF NODE 410.00 I I DOWNSTREAM DEPTH = 7.340 FEET, UPSTREAM CONJUGATE DEPTH = 2.408 FEET I
NODE 109.80: HGL = < 347.692>;EGL= < ·357.382>;FLOWLINE= < 345.380>
******************************************************************************
409.70 IS CODE = 5 FLOW PROCESS FROM NODE· 409.80 TO NODE ·····UPSTREAM NODE 409.70· ELEVATION = 345.71 (FlOW IS SUPERCRITICAL) , .
-----------------------------------------------------------------------~------CALCULATE JUNCTION LOSSES:
PIPE FLOW DIAMETER ANGLE FLOWLINE
UPSTREAM
DOWNSTREAM
LATERAL #1
LATERAL #2
Q5
(CFS) (INCHES) (DEGREES) ELEVATION
345.71
345.38
221.80 60.00 0.00
221. 80 60.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00===Q5 EQUALS BASIN INPUT===
LACFCD AND OCEMA FLOW JUNCTION FORMULAE USED:
DY=(Q2*V2-Q1*V1*COS(DELTA1)-Q3*V3*COS(DELTA3)-
Q4*V4*COS(DELTA4))/((A1+A2)*16.1)+FRICTION LOSSES
page 5
CRITICAL
DEPTH(FT .)
4.22
4.22
0.00
0.00
VELOCITY
(FT/SEC)
24.891
24.981
0.000
·0.000
•
RADER04.RES
UPSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.03762
DOWNSTREAM: MANNING'S N = 0.01300; FRICTION SLOPE = 0.03798
AVERAGED FRICTION SLOPE IN JUNCTION ASSUMED AS 0.03780
JUNCTION LENGTH = 4.00 FEET
FRICTION LOSSES = 0.151 FEET ENTRANCE LOSSES = 0.000 FEET
JUNCTION LOSSES = (DY+HV1-HV2)+(ENTRANCE LOSSES)
JUNCTION LOSSES = ( 0.267)+( 0.000) = 0.267
NODE 409.70: HGL = < 348.029>;EGL= < 357.649>;FLOWLINE= < 345.710>
******************************************************************************
FLOW PROCESS FROM NODE 409.70 TO NODE 409.50 IS CODE = 1
UPSTREAM NODE 409.50 ELEVATION = 358.00 (FLOW IS SUPERCRITICAL)
CALCULATE FRICTION LOSSES(LACFCD):
PIPE FLOW = 221.80 CFS PIPE DIAMETER = 60.00 INCHES
PIPE LENGTH = 262.00 FEET MANNING'S N = 0.01300
NORMAL DEPTH(FT) = 2.18 CRITICAL DEPTH(FT) = 4.22
==============================================================================
UPSTREAM CONTROL ASSUMED FLOWDEPTH(FT) = 4.22
==============================================================================
GRADUALLY VARIED FLOW PROFILE COMPUTED INFORMATION: ------------------------------------------------------------------------------DISTANCE FROM FLOW DEPTH VELOCITY SPECIFIC PRESSURE+ CONTROL (FT) (FT) (FT/SEC) ENERGY(FT) MOMENTUM(POUNDS)
0.000 4.223 12.534 6.664 7538.21 0.098 4.141 12.752 6.668 7542.46
0.402 4.059 12.987 6.680 7555.41
0.932 3.977 13 .239 6.701 7577.40
1. 710 3.896 13.509 6.731 7608.83 2.763 3.814 13.798 6.772 7650.14
4.125 3.732 14.107 6.824 7701. 84 5.833 3.650 14.437 6.889 7764.50
7.934 3.568 14.790 6.967 7838.76
10.484 3.487 15.167 7.061 7925.32
13.550 3.405 15.570 7.171 8024.99 17.215 3.323 16.001 7.301 8138.64 21. 581 3.241 16.462 7.452 8267.27 26.777 3.160 16.956 7.627 8411.99
32.966 3.078 17.486 7.829 8574.04 40.361 2.996 18.055 8.061 8754.82
49.242 2.914 18.666 8.328 8955.90
59.995 2.832 19.323 8.634 9179.08
73.158 2.751 20.032 8.986 9426.37
89.527 2.669 20.798 9.390 9700.10
110.340 2.587 21. 626 9.854 10002.88 137.674 2.505 22.524 10.388 10337.76 175.431 2.424 23.500 11.004 10708.21 232.389 2.342 ~W' 24.564 11. 717 . 11118.29
262.000 2.319 24.883 11. 939 11242.52 ------------------------------------------------------------------------------NODE 409.50 : HGL = < 362.223>;EGL= < 364.664>;FLOWLINE= < 358.000>
******************************************************************************
UPSTREAM PIPE FLOW CONTROL DATA:
NODE NUMBER = 409.50 FLOWLINE ELEVATION = 358.00
ASSUMED UPSTREAM CONTROL HGL = 362.22 FOR DOWNSTREAM RUN ANALYSIS
==============================================================================
END OF GRADUALLY VARIED FLOW ANALYSIS o
page 6
.... ~.
----.--~--------~-----
" -IN.?
x -tltlB
NOTE/!
All EXIST POWER POLES HfTHIN
GRAOING AREA TO 8E REMOVED
NOTE/!
ElECTRONIC OATA fiLES ARE FOR REFERENCE
ONL Y ANO ARE NOT TO 8E USED FOR
HORIZONTAL OR VERTlCAL SURVEY CONTROL
©2003 a'Day Consultants, Inc.
2710 Loker Avenue West
Suite 100
Car/sbad. Callfornio 92008
760-931-7700
Fax' 760-931-8680
www odoyconsultonts com
CIVil Engmeenng
Planning
Processing
Surveying
----------------_._------
DESIGNED BY: .LA.",.B,-. ---,._ DATE: SEPT. 2002 "AS-BUILT
DRAWN BY: T.G. SCALE: ,. = 50'
PROJECT MGR.; T.O.C. JOB NO.: 98--1 012-04 1-____ ~ ______ ___1 P.E. EXP. ___ _
ENGINEER OF WORK: REVIEWED BY:
DATE:
llMOlHY 0. CARRou.. Jl. RCE: 55381 INSPECTOR
" 4711'"
"M85
/
." ----
" BENCHMARK:
DESCRIPTION: STANDARD STREET SURVEY MONUMENT
LOCATION: APPROX. 1400 FEET SOUTH OF PALOMAR
DATE AIRPORT ROAD ON CENTERLINE OF
R CAMINO REAL
RECORD FROM: NORTH COUNTY VERTICAL CONTROL DA TA
R-1800 308+76
DATE ELEVATION: 297.25 M.s.L. DAruM: NGVD 1929
, .
! I
J t-
o , , . , , .
. ,
<>----\ -'
,"--~ !
I
\
-.f71.{)
;..,,;;.-N 11 000
7.iJB Ac ' . ,
i I o
•
I
I -... ~
'I .. /
, ,
.. , .. ~.:':.--::.-=.!
," I
• \ \ ,
"SOIl? -
-.. ;~:-... -~-............... '"
-~----.. ~"'''''' < . ~--" -.... ~ .. _-{ /""
200' I
HYDROLOGY SHEET 2
~--r__+--------------------+-~~-+--~~ISHEETI CITY OF CARLSBAD I SH,E4ETS I
ENGINEERING DEPARTMENT
GHAOING PlANS FOR:
CARLSBAD RACEWAY
CT98-10
APPROVED
llOYO B. HUBBS
PE 23889 EXP: 12-31-05 CITY ENGINEER --=D-AT~E--
CITY APPROVAL
DATE INITIAL
ENGINEER OF WORK
DATE INITIAL
DWN BY: __ _
CHKD BY: __ _
RVWD BY:
DRAWING NO.
409-fA DATE INITIAL
REVISION DESCRIPTION OTHER APPROVAL
PROJECT NO.
c.T. 98-fO
G,\JOBS\971035\9735H'r'D2 D\lG 12-19-02 7137,08 0.1'1 PST
:<REf'S: 9735AG; 9735hyd. 9735agrd. 9735autl: 9735topo: 98227U1l.; 9822PlAN PSI>: 9735TO.J
u,
'JU
< ~J2.!J
'''''
/
, /
//
', .. --.-•.•.• ,_., ..................... ~ / / " 46!U
/
NOTE!!
ALL EXIST POWER POLES HfTHIN
GRADING AREA TO BE REMOVED
NOTEII
ElECTRONIC DATA flLES ARE FOR REFERENCE
ONLY AND ARE NOT TO BE USED FOR
HORIZONTAL OR £tERT/CAL SUR£tEY CONTROL.
©2003 O'Day Consultants, Inc.
/
/ ,
"
2710 Loker Avenue Wast
Suite 100
Carlsbad. Callforma 92008
760-931-7700
Fax 760-931-8680
www odoyconsultants com
Civil Engineenng
Planning
Processing
Surveying
DESIGNED BY: A.B. DATE: SEPT. 2002 "AS-BUILT
DRAWN BY: T.G. SCALE: l' = 50'
PROJECT MGR.: T.O.C. JOB NO.:98-1012-04
1----------------1 P.E. EXP. ___ _
ENGINEER Of WORK: REVIEWED BY:
DATE:
TIMOTHY O. CARROll, .Il. RCE: 55381 INSPECTOR
"
DATE
DATE
BENCHMARK:
DESCRIPTION: STANDARD SlREET SURVEY MONUMENT
LOCATION. APPROX. 1400 FEET SOUTH OF PALOMAR
AIRPORT ROAD ON CENTERLINE OF
EL CAMINO REAL
RECORD FROM: NORTH COUNTY VERTICAL CONTROL DATA
R-IBOO 308+76
ELEVATION' 297.25 M.s.L. DATUM. NGVD 1929
" 'IN.?
.. ,
, .. \
/ ~--.
o·
I
100i
SCAlE: l' = 100'
, ,
200'
!
~
• ~
~ ~ (I)
~ (I)
HYDROLOGY SHEET 1
r-__ r--+ ____________________ +-__ ~-+--~~ISHEETI CITY OF CARLSBAD IsH,E~sl
ENGiNEERING DEPARTMENT If'
CATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
GI\J[]BS\97103S\.Sl73:5HYDl n ...... G 12-24-02 7rl3141 0.1'\ PST
XREFS: 9735AG; 9735hy:l; 97J5agrd. 9735autl. 9715tcpo; 9B22PLAN
DATE INITIAL CATE INITIAL
OTHER APPROVAl CITY APPROVAL
GRADING PLANS FOR:
CARLSBAD HAC£WA r
eTgB-to
APPROVED
llOYD B. HUBBS
PE 23889 EXP: 12-31-05 CITY ENGINEER --=DCC"A=TE=---
OWN BY: PROJECT NO. DRAWING NO. CHKD BY: __ _
RVWD BY: C.T. 98-10 409-1A
pSI): 9735T03