HomeMy WebLinkAboutPE 2.85.81; POINSETTIA VILLAGE; ENGINEERING OBSERVATION; 1987-09-14S
3467 Kurtz Street
San Diego, California 92110
(619) 224-2911 . S
Woodward-Clyde Consultants
itdUINEERING p4c
September 14, 1987
Revised. September 29, 1987
Project No. 8751264W-EW02
Poinsettia Associates
do Holmes and Reynolds Development Company
2398 San Diego Avenue
San Diego, California 92110
Attention: Mr. Fred Delany
REPORT OF ENGINEERING OBSERVATION OF
REGRADING AND. TESTING OF COMPACTED FILL
LOTS 7 AND 8.
POINSETTIA VILLAGE
CARLSBAD, CALIFORNIA
Gentlemen:
In accordance with your request and' our authorized 'proposal dated July 8,
1987 'and your 'authorization dated 'July 14, 1987, we have provided
engineering services in conjunction with the grading at the 'subject site.
SCOPE OF WORK
Our services include:
Providing engineering observation of the grading operation;
Performing field density tests' in the, placed and compacted fill;
O Performing labortory tests on samples of the material use,d for
fill'; and
-
Providing professional opinions regarding the contractor's
general adherence to plans and specifications.
SUMMARY OF GENERAL EARTHWORK AND TESTING
Site preparation, compaction, and testing were done between July 20, 1987
and September 10, 198. In our opinion, based on our observation and
testing, the work performed during that period was in general conformance
with the ' Guide Specifications for Site Grading attached to our report
entitled "Update Geotechnical Investigation for the Proposed Poinsettia
Village, Carlsbad, California," 'dated June 27, 1986 and our letter dated
September 4, 1987.
Consulting Engineers, Geologists
and Environmental Scientists
Offices in Other Principal Cities qW
d / rp w 12r
Poinsettia AssoStes
Project No. 8751264W-EW02 Woodward-Clyde Consultants
September 14, 1987
Revised September 29, 1987
Page
Previous grading of the subject site was completed between May 7 and
August 29,'1984. That grading consisted of excavation up to 15 feet near
the, eastern site boundary of Lots 7 and 8 and shallow cut at the western
boundary. That work is summarized in a report dated February 7, 1985.
During this period the surfaces to receive fill were scarified, watered and
compacted. and new 1111 was placed over the site. Approximately 2 reet of
fill was placed. The maximum depth of fill on the lots is on the order of 6
feet.
Field density tests were in accordance with Test Method ASTM D2922-81
(Density of Soil and Soil Aggregate in Place by Nuclear Methods). Maxi-
mum dry density and optimum moisture content measurements were made in
accordance with Test Method ASTM D1557-78, (Moisture-Density Relations
of Soils and Soil-Aggregate Mixtures).
The reported tests represent the relative compaction and water content at
the locations tested. The observations of construction and field density
testing procedures used followed normally accepted procedures which are
not exact. The accuracy of the maximum dry density determination (Test
Method ASTM D1557-7) is discussed in the 1985 Annual Book of ASTM
Standards, Section 4, Volume 04.08 "Soil and Rock; Building Stones".
Variations in relative compaction should be expected in lateral and vertical
extent.
Subject to these precision limitations discussed above, field observations
and results of field density tests indicate that the fill has been generally
compacted to 90 percent or more of maximum dry density as determined in
accordance with Test Methods ASTM D2922-81 and D1557-78.. Our observa-
tions were not continuous. We have no knowledge as to the condition of
fill not observed or tested during placement. For reference, the approxi-
mate 'location of field density tests and the limits of compacted fill have
been recorded on a copy of the grading plan. The results of field density
tests, expressed as a percent of maximum laboratory dry density (relative
compaction), are presented on the attached forms.
Laboratory tests were made on samples of the materials used for fill. The
tests were performed to evaluate moisture-density relationships, maximum
dry density, optimum moisture content, grain size distribution and
plasticity characteristics. The results of laboratory tests are attached.
SUMMARY OF FINISH GRADE SOIL CONDITIONS
Observation and laboratory tests indicate that low expansive fill was placed
within 2 feet of rough grade' on both lots noted herein. Underlying the
fill formational soils are also considered low expansive.
d/rpwl2r
Poinsettia Ass•tes
Project No. 8751264W-EWO2
September 14, 1987
Revised September 29, 1987
Page 3
Woodward-Clyde Consultants
RECOMMENDATIONS
Foundations for Structures on Low Expansive Soil
We recommend that foundations for single-story or two-story light to
medium weight commercial structures placed on low expansive, undisturbed
soi, properly compacted fill be designed for a bearing pressure not ex-
ceeding 3, UUO psf (dead plus live loads). We recommend that footings be
founded at least 18 inches below finished grade, and have a minimum width
of 12 inches. In our opinion, this bearing pressure can be increased by
no more than one-third for loads that include wind or seismic forces.
Steel reinforcing is recommended in concrete footings. Reinforcement
recommendations should be obtained from an engineer knowledgeable in
concrete structures.
Concrete Slabs-On-Grade
We recommend that floor slabs be properly designed in accordance with the
proposed slab loading. We recommend that the slab thickness be at least 4
inches thick and at least reinforced with steel mesh. An underlay of 2
inches of sand and plastic membrane is recommended whereon moisture
sensitive floor coverings are used.
Additional Fill and Utility Trenches
This report discusses the fill placement observed by personnel from our
firm during the periods specified. We recommend that any additional fill
placed, as well as backfill placed in utility trenches located within 5 feet
of any improvements and deeper than 12 inches, or backfill placed in any
trench located 5 feet or more from a building and deeper than 5 feet, be
compacted under our observation and tested to verify compliance witn the
earthwork specifications for the project.
Scheduling Earthwork Observations and Testing services
It is our intent to provide prompt, efficient and effective earthwork
observation and testing services. To provide such services, we need the
cooperation of our clients. Please provide us with lead time. regarding the
need for our field services ox at least 48 hours when ever possible. We
may not be able to fill requests for services made later than 4 p.m. of the
previous evening.
Drainage
We recommend that positive measures be taken to properly finish grade each
lot after structures and other improvements are in place, so that drainage
waters from the lots and adjacent properties are directed off the lots and
away from foundations, floor slabs, and slope tops. Even when these
measures are taken, a shallow ground-water or surface-water condition can
and may develop in areas where no such water condition existed prior to
d / rp w 12r
Poinsettia Asso tes
Project No. 8751264W-EW02 Woodward-Clyde Consultants
September 14, 1987
Revised September 29, 1987
Page
site development; this is particularly true where a substantial increase in
surface-water infiltration results from landscape irrigation.
If a subsurface moisture condition occurs such , as from landscape
irrigation, leaking utilities or other sources, foundation settlements can
occur.
Exterior Concrete Flatwork'
We recommend that contractual arrangements between the builder and the
subcontractor constructing concrete patio slabs, sidewalks, driveways and
garage slabs hold the subcontractor responsible for proper preparation of
the subgrade prior to placing concrete slabs. Our services in connection
with this project do not include design of slabs or inspection prior to
placing concrete slabs, hence we will not accept any responsibility for
performance of exterior or garage concrete slabs.
LIMITATIONS
The elevations of compaction tests known as finished grade (FG) tests on the
attached forms correspond to the elevations shown on Sheet 3 of 5 of the
plans entitled "Grading Plan For CT 81-6(B) (Poinsettia Village)", dated
December 23, 1985, prepared by Rodney C. Imming. Elevations and
locations used in this report were based on field surveys done by others.
The soil conditions described in this report are based on observations and
periodic testing. This office should be notified of any indications that soil
conditions are not as described herein. We will examine foundation excava-
tions for each lot if we are requested to do so.
For this report, rough grade is defined as that grade set in the field by
the grade checker from reference stakes established by the surveyor, and
represents rough grade at the time we were observing the grading opera-
tion. Likewise, the indicated depths of undercutting of low expansive soil
and/or depths of placement of soil were based on the measurements made
by and grades set by the contractor's grade checker.
rhe conclusions and opinions drawn from the test results and site
observations apply only to our work with respect to grading, and repre-
sent conditions at the date of our final site visit on September 10, 1987.
We will accept no responsibility for any subsequent changes made to this
site by others, or by uncontrolled action of water, or by failure of others
to properly repair damages by uncontrolled action of water. We cannot
provide advice, opinions or conclusions relative to site preparation
(clearing, grubbing, canyon clean-out, and installation of canyon sub-
drains etc.) which we have not observed.
d / rp wi 2 r
Poinsettia AssoSes
Project No. 8751264W-EW02
September 14, 1987
Revised September 29, 1987
Page 5
S
Woodward-Clyde Consultants
Professional judgments represented in this report are based partly on our-
evaluations of the technical information gathered, partly on our under-
standing of the proposed construction, and partly on our general ex-
perience in the geotechnical field. Our engineering work and judgments
rendered meet or exceed the standard care of our profession at this time.
We do not guarantee the performance of the project in any respect.
Very truly yours,
WOODWARD-CLYDE CONSULTANTS
ESS
P.
Richard P. While
R.E. 21992 21992
RPw/rlg Exp.
cm
Attachments OF C
d / rp w 12r
Compaction Test Results
Job Name Poinsettia Village Date Reported 9/14/87
Job Number 8751264W-EW02 (Fill)
Dates covered July 20, 1987 through September 10, 1987 . Page 1 Of 4
TEST
DATE NUMBER
RETEST
OF LOCATION
FIELD MOIST. ELEVATION CONTENT
OF TEST ¼ DRY WT. FIELD DENSITY PCF LAB
SAMPLE NO.
LAB
DENSITY PCF
ADJ. MOIST. . RELATIVE FIELD ROCK ADJ. LAB CONTENT COMPACTION ¼ OF ¼ DRY WT. DENS. PCF ¼ DRY WI. LAB. DENS.
Jul 20 35 Lot 8 68' 9.2 119.0 3 126.5 . 94
1987 36 Lot 7 67' 9.2 121.7 3 126.5 92
37 Lot 7 . 66' 8.9 119.3 3 126.5 . . 94
Jul 21 38 Lot 8 70' 9.0 120.6 3 126.5 . .95
1987 39 Lot 7 69'. 8.4 120.3 3 126.5 . 95
40 Lot 7 68' .7.9 119.4 3 126.5 . 94
41 Lot 8 70' 11.8 118.1 3 126.5 93 -
42 Lot 8 71' 7.7 121.2 3 126.5 . 95
43 Lot 8 72' 10.5 117.3 3 126.5 . .92
Jul 29 44 Parking Lot W. Side .
1987 Bldg. G FIG 66.9' . 6.2 126.1 4 131.0 96
45 Parking Lot W. Side .
Bldg. F FIG 66.5' 11.4 123.3 4 131.0 . . 94
46 Parking Lot W. Side
Bldg. F FIG 67.3' 7.2 . 127.6 4 131.0 . 97
47 Parking Lot W. Side . . .
48
Bldg. E
Parking Lot W.
FIG
Side
67.3' 8.1 127.0 4 131.0 . . . . . 96
Bldg. C FIG 67.1' 9.3 125.8 4 131.0 96
49 Parking Lot W. Side
Bldg. C FIG 67.0' 7.5 121.5 4 131.0 . 9.2
Jul 30 50 Parking Lot W. Side .
1987 Bldg. B . FIG 67.1' 4.5 117.4 3 126.5 . 92
51 Parking Lot W. Side . .
Bldg. C FIG 66.2' 9.2 120.0 4 131.0 . 91
52 Parking Lot W. Side .
Bldg. C FIG 66.0' 6.8 121.8 4 131.0 93
Woodward-Clyde Consultants Mv
COmpaction Test Results
Job Name Poinsettia Village Date Reported 9 /14/87
Job Number 8751264W-EW02 (Fill)
Dates Covered July 20, 1987 through September 10, 1987 Page of
TEST RETEST DATE NUMBER OF
Jul 30 53
1987
54
55
56
57
58
59
LOCATION
FIELD MOIST. ADJ. MOIST. RELATIVE ELEVATION CONTENT FIELD LAB LAO FIELD ROCK ADJ. LAB CONTENT COMPACTION % OF OF TEST % DRY WY. DENSITY PCF SAMPLE NO. DENSITY PCF T'. DRY WT, DENS. PCF V. DRY WI. LAB DENS
Parking Lot W. Side
Bldg. F I FIG 66.4' 7.1 122.0 4 131.0 93
Parking Lot W. Side
Bldg. F FIG 66.4' 6.1 116.7 3 126.5 . 92
Parking Lot W. Side
Bldg. C FIG 65.4' 5.6 118.1 4 131.0 90
Parking Lot W. Side
Bldg. F FIG 66.0' 6.4 124.0 4 131.0 . 94
Parking Lot W. Side
Bldg. E FIG 65.4' 7.5 120.8 4 131.0 92
Parking Lot W. Side
Bldg. C FIG 66.0' 6.9 123.1 4 131.0 94
Parking Lot 1st
Entrance off Avenida
Encinas FIG 66.0' 8.5 117.0 3 126.5 92
Lot 12 Driveway Off
Avenue Encinas FIG 65.7' 6.3 111.4 4 131.0 85
Parking Lot S. of . .
Bldg. G FIG 65.0' 6.5 123.7 4 131.0 . 94
Future Pad 6 FIG 66.4' 9.1 115.8 3 126.5 91
Future Pad 6 FG 66.4' 9.6 114.7 3 126.5 90
Lot 8 72' 8.9 114.6 3 126.5 . 90
Lot 8 71' 8.3 118.7 4 131.0 90
Lot 8 71' 8.5 119.7 4 131.0 91
Bldg. A . 59' 12.5 115.1 5 127.0 . . 90
Parking Lot N. Bldg. .
A 59' 12.0 115.1 5 126.0 90
Woodward-Clyde Consultants
Jul 31 60
1987
61
62
63
Aug 20 64
1987 65
66
Aug 26 67
1987 68
Compaction Test Results V
Job Name Poinsettia Village Date Reported 9/14/87 .
Job Number . 8751264W-EW02 (Fill) .
Dates Covered July 20, 1987 through September 10, 1987 Page 3 Of 4
V
TEST DATE NUMBER
RETEST
OF LOCATION ELEVATION
OF TEST
FIELD MOIST.
CONTENT
¼ DRY WT. FIELD
DENSITY PCF LAB
SAMPLE NO.
ADJ. MOIST. 1.58 FIELD ROCK ADJ. LAB CONTENT DENSITY PCF ¼ DRY WI. DENS. PCF ¼ DRY WI.
. . RELATIVE COMPACTION ¼ OF
LAB DENS
Aug 26 69 Parking Lot S. Bldg.
1987 . A 60' 11.2 115.6 5 127.0 91
70 Parking Lot N. Bldg. • A V 61' 10.3 113.9 4 131.0 . 86
71 . Bldg. A 61' 10.3 117.5 4 131.0 89
72 71 Bldg. A 61' 9.0 119.2 4 . 131.0 91
73 70 Parking Lot N. of .
Bldg. A 61' 10.8 121.8 4 131.0 93
74 Parking Lot S. of .
Bldg. 'A 63' 9.9 118.3 4 131.0 . . .90
75 Bldg. A 63' 10.6 114.3 3 126.5 . 90
77 Parking Lot S. of V
Bldg. A 64' 10.0 115.3 3 126.5 . 91
78 . Parking Lot N. of
Bldg. A 64' 11.6 116.5 3 126.5 V 92
79 Bldg. A . 64' 11.2 117.2 3 126.5 . 92
80 Parking Lot N. of
Bldg. A 64' 8.5 118.5 4 131.0 . 90
81 Parking Lot S. of .
Bldg. A 65' 9.9 116.0 3 126.5 V 91
82 Bldg. A 65' 14.0 11.4.1 3 126.5 . 90
Sep 09 87 Lot 8, W. End FIG 68' 8.5 129.3 4 131.0 98
1987 88 Lot 8, Middle FIG 70' 9.1 . 124.2 4 131.0 . V . . 94
89 Lot 8, E. End FIG 72' 6.8 107.3 4 131.0 . 81
90 . Lot 7, E. Corner FIG 70.5' 8.5 122.7 4 131.0 . 93
91 Lot 7, Middle FIG 68.5' 6.6 121.8 4 131.0 93
92 Lot 7, W. End FIG 66.5' 10.2 114.1 4 131.0 . 87
Woodward-Clyde Consultants mW V
Compaction Test Results
Job Name Poinsettia Village S Date Reported 9/14/87
Job Number 8751264W—EW02 (Fill)
Dates Covered July 20, 1987 through September 10, 1987 Page 4 Of 4
TEST
DATE NUMBER
RETEST
OF LOCATION ELEVATION OF TEST
FIELD MOIST. CONTENT V. DRY WT. FIELD DENSITY PCF LAB SAMPLE NO. LAB
DENSITY PCF
ADJ. MOIST. FIELD ROCK ADJ. LAB CONTENT % DRY WT. DENS. PCF V. DRY WT.
RELATIVE COMPACTION V. OF LAB. DENS.
Sep 10 93 92 Lot 7, W. End FG 66.5' 10.0 117.8 4 131.0 5 90
1987 94 89 Lot 8, E. End FIG 72' 7.9 124.6 4 131.0 . 95
Sep 24 95 60 Driveway, Lot 12 65.7' 6.4 117.5 4 131.0 5 . 90.
Woodward. Clyde Consultants 0
120
SAMPLE LOCATION
3 BLDG. C
4 PKG. LOT, W. SIDE OF
BLDG.
MECHANICAL/MOIST
40 LABORATORY CQMPACTION TEST METHOD: 3—ASTM—D155778 A
PLASTICITY CHARACTERISTICS 3 4 5
Liquid Limit, % 24
Plasticity Index, % NP NP 14
Classification by Unified Soil
Classification System
SM SM sc
(COBBLES REfL SAND j SILT & CLAY]
0
100
z 80
150
140
ZERO AIR VOIDS CURVES
—2.80 SG
- 2.70 SG
—2.6OSG
2.50 SG
60
I—
uj 40 0 Cr
o. 20
01 l III liii liii Ill I J
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
130 DIRECT SHEAR TEST DATA
Dry Density, pcf
Initial Water Content, %
Final Water Content, %
Apparent _Cohesion, _psf
Apparent Friction Angle, degrees
SWELL TEST DATA
Initial _Dry _Density, _pcf
Initial Water Content, %
Final _Dry _Density, _pcf
Final Water Content, %
Load, psf
Swell, percent
#5—LOCATION—SEWER & STORM DRAIN
TR.B.F.
03 04 s Maximum Dry
Density, pcf 126.5 131.0 127.0 - - -
Optimum Moisture Content,% 9.51 8.0 9.0
80 I TMOISTURE CONTENT,
- -
10 20 30
I ARnPATflRV COMPACTION TEST ... ...............-
SAMPLE #4—ASTM—D 1557-7E
1 FILL SUITABILITY TESTS
I POINSETTIA VILLAGE
[RAWNBY:cb _ CHECKED BY:'l4V[ PROJECT NO: 8751264w_Ewo2I_ DATE: 9/11/8 7 _ FIGURE NO: 1
WOODWARD-CLYDE CONSULTANTS