HomeMy WebLinkAbout2011 ESCENCIO TR; ; 87-139; PermitDECLARATIONSLENDERWORKER'S COMPENSATION OWNEfUBUILDER
White — Inspector Green —Yellow — Assessor Pink — Applicant Gold — Temporary File
SPECIAL CONDITIONSBUILDINGQCO MECHANICALELECTRICALPLUMBING*F
•nzr-2COS1SJ^CO;cm1.OmoCDSm pm ^
v. m
~D ^[^c^•=:i»IT] "hDTI
JDO
3)s
m VENTILATING SYSTEMSTm~4158oozpCOCOmSCO DacOH0°ma33m~ni?Q MECHANICAIi D BONDING D POOLD ELECTRIC SERVICE n Tm13J>3J-<ROUGH ELECTRICD ELECTRIC UNDERGROUNoLJc-nm
3J ELECTRICALG WATER HEATER D SOL,>3JSHm33 oCOHmCOH TUB AND SHOWER PANO•aOCHa:>COHmn1 JHm
31 UNDERGROUND n WASTIMlnHm
3J
nmm3]ZDCDOOa-ooo PLUMBINGINTERIOR LATH & DRYWALLINSULATIONEXTERIOR LATHFRAMESHEATHING D ROOFaCOIm>33 SUB FRAME D FLOOR COm"f™CD GUNITE OR GROUTMASONRYREINFORCED STEELFOUNDATIONBUILDING"Dm
O>Hm
_
zO)TJm
O
2075 LAS PALMAS DRIVE
CARLSBAD, CA 92009-4659
Citp of Cartebab
DEVELOPMENT PROCESSING
SERVICES DIVISION
TELEPHONE
(619) 438-1161
Date: 2-8-88
To: M. Van Nichols
2011 Escenico Terr
Carlsbad, cA 92008
PC#139
Last Inspection:
Date:2-8-88
none
PLEASE CALL FOR A FINAL INSPECTION
IF WORK DONE
BUILDING PERMIT EXPIRATION
Our records indicate that your building permit will expire by limitation of time on
7-iq-BR * 19 •
The provisions of UBC, Section 303(d) state: "(d) Expiration. Every permit issued
by the Building Official under the provisions of this code shall expire by limitation and
become null and void if the building or work authorized by such permit is not commenced
within 180 days from the date of such permit, or if the building or work authorized by
such permit is suspended or abandoned at any time after the work is commenced for
a period of 180 days. Before such work can be recommenced, a new permit shall be
first obtained so to do, and the fee therefor shall be one-half the amount required for
a new permit for such work, provided no changes have been made or will be made in
the original plans and specifications for such work; and provided further that such
suspension or abandonment has not exceeded one (1) year. Any permittee holding an
unexpired permit may apply for an extension of the time within which he may commence
work under that permit when he is unable to commence work within the time required by
this section for good and satisfactory reasons. The Building Official may extend the time
for action by the permittee for a period not exceeding 180 days upon written request by
the permittee showing that circumstances beyond the control of the permittee have
prevented action from being taken. No permit shall be extended more than once. In
order to renew action on a permit after expiration, the permittee shall pay a new full
permit fee."
Please check below indicating your intentions and return this letter to us.
Project abandoned. New permit will be obtained prior to commencing work.
Maximum 180-day time extension requested. NOTE: Separate letter for an
extension request and reason for such must accompany this form.
If you have questions, please contact this department at 438-1161.
MARTIN ORENY
Building Official
11/86