HomeMy WebLinkAbout2015-04-14; City Council; 21927; Accept the SANDAG Energy RoadmapCITY OF CARLSBAD - AGENDA BILL
AB# 21,927 ACCEPT THE SAN DIEGO ASSOCIATION OF
GOVERNMENTS (SANDAG) ENERGY ROADMAP
FOR THE CITY OF CARLSBAD
DEPT. DIRECTOR
DATE: 04/14/2015
ACCEPT THE SAN DIEGO ASSOCIATION OF
GOVERNMENTS (SANDAG) ENERGY ROADMAP
FOR THE CITY OF CARLSBAD CITYATTY. UgL
DEPT. PW- PEM
ACCEPT THE SAN DIEGO ASSOCIATION OF
GOVERNMENTS (SANDAG) ENERGY ROADMAP
FOR THE CITY OF CARLSBAD
CITY MGR. if\-^^'d
RECOMMENDED ACTION:
Adopt Resolution No. 2015-091, accepting the SANDAG Energy Roadmap for the City of Carlsbad.
ITEM EXPLANATION:
In 2006, the City of Carlsbad participated in the SANDAG Energy-Saving Pilot Program for Local
Governments, which involved energy audits of nine city facilities and led to 32 energy-saving
recommendations. It also involved energy efficiency assessments of two future buildings. This pilot
program was the precursor of the current Energy Roadmap program, a collaboration between SANDAG
and San Diego Gas & Electric.
Starting in 2010, the Energy Roadmap program began providing free energy assessments and energy
management plans to SANDAG member agencies. These energy management plans contain
recommendations for ways to reduce energy use in municipal operations and the community. The
recommendations cover topics such as saving energy in city facilities and vehicle fleet, demonstrating
emerging energy technologies, leveraging local planning and development authority, marketing energy
programs to local residents and businesses, and supporting green jobs.
The information and recommendations contained within the Energy Roadmap can support other city
efforts to save energy and reduce greenhouse gas emissions, such as the draft Climate Action Plan and
the property division's work with San Diego Gas and Electric's rebate and incentive programs.
Acceptance of the Energy Roadmap is also consistent with both the city's Sustainability Guiding
Principles, which call for developing a sustainable community based on cost effective programs; and the
city's Environmental Guiding Principles, which call for efforts to reduce the use of energy (in any form),
greenhouse gas emissions (consistent with AB 32) and to find new and more energy efficient methods for
delivering services.
DEPARTMENT CONTACT: Michael Grim 760-602-4623 Mil<e.Grim@carlsbadca.gov
FOR CLERK USE.
COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC •
DENIED • CONTINUED TO DATE UNKNOWN •
CONTINUED • RETURNED TO STAFF •
WITHDRAWN • OTHER - SEE MINUTES •
AMENDED • REPORT RECEIVED •
Accept SANDAG Energy Roadmap
April 14, 2015
Page 2 of 2
FISCAL IMPACT:
Acceptance of the Energy Roadmap has no direct fiscal impact since there are no programs or actions
being recommended at this time. The fiscal impact of the implementation of future programs or actions
will be evaluated once the project description and scope of those programs and/or actions have been
defined.
ENVIRONMENTAL IMPACT:
This project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines
Section 15306 - Information Collection, which exempts data collection and studies, including resource
evaluation activities that do not significantly impact the environment, leading to an action which a public
agency has not yet approved, adopted, or funded.
EXHIBITS:
1. Resolution No. 2015-091 , accepting the SANDAG Energy Roadmap for the City of Carlsbad.
2. Report titled "City of Carlsbad Energy Roadmap" dated October 2014, previously distributed, on file
with the Public Works Department.
EXHIBIT
1 RESOLUTION NO. 2015-091
5
6
7
8
9
10
2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
3 CALIFORNIA, ACCEPTING THE SAN DIEGO ASSOCIATION OF
GOVERNMENTS (SANDAG) ENERGY ROADMAP FOR THE CITY OF
4 CARLSBAD
WHEREAS, the City of Carlsbad's Sustainability Guiding Principles call for developing a
sustainable community based on cost effective programs; and,
WHEREAS, the City of Carlsbad's Environmental Guiding Principles call for the city to
support efforts to reduce energy and greenhouse gas emissions and find new and more energy
11 efficient methods for delivering services; and,
12 WHEREAS, the City of Carlsbad and San Diego Association of Governments (SANDAG)
have partnered to prepare an Energy Roadmap; and,
WHEREAS, the Energy Roadmap provides a framework to assist in reducing energy
usage in city operations and in the community.
13
14
15
16
Ij NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California
18 as follows:
1. That the above recitations are true and correct.
2. The City Council accepts the SANDAG Energy Roadmap for the City of Carlsbad.
19
20
21
22
23
24 ///
///
///
25 ///
26
27
28 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City
of Carlsbad on the 14**^ day of April 2015, by the following vote to wit:
AYES:
NOES:
ABSENT:
Council Members Hall, Blackburn, Schumacher, Wood, Packard.
None.
None.
ATTEST:
BARBARA ENp/ESON, City Clerk
(SEAL)
Prepared through the SANDAG
Energy Roadmap Program
April 2011
This Program is a collaboration between SANDAG and San Diego Gas & Electric®
Prepared through the SANDAG
Energy Roadmap Program
October 2014
City of Carlsbad
Energy Roadmap
i City of Carlsbad Energy Roadmap Table of Contents Energy Roadmap for the City of Carlsbad
Table of Contents
Acknowledgements and Program Contacts ii
Introduction 1
SAVING ENERGY IN CITY GOVERNMENT OPERATIONS
1. Save Energy in City Buildings and Facilities 5
2. Green the City Vehicle Fleet 11
3. Develop Employee Knowledge of Energy Efficiency 23
4. Implement a Commuter Benefits Program 25
SAVING ENERGY IN THE COMMUNITY
5. Leverage Planning and Development Authority 31
6. Market Energy Programs to Local Residents, Schools, and Businesses 41
7. Support Green Jobs and Workforce Training 49
Looking Forward 53
APPENDICES (provided under separate cover)
A. Municipal Energy Assessments: Phase 1 Energy Report Cards
B. Municipal Energy Assessments: Priority Site List for Phase 2 Assessments
C. Municipal Energy Assessments: Phase 2 Energy Audit Findings
D. Alternative Fuel Options and Local Infrastructure Availability
E. Transportation Demand Management Policies and Resources
F. Sample Smart Growth Policies and Resources
G. Sample Energy-Saving Policies and Resources
H. Sample Clean and Efficient Transportation Policies and Resources
ii City of Carlsbad Energy Roadmap Acknowledgements and Program Contacts Acknowledgements and Program Contacts
Acknowledgements
The San Diego Association of Governments (SANDAG) would like to acknowledge and
thank the following individuals for their contributions to this document.
City of Carlsbad San Diego Gas & Electric Company®
David Hauser
Elaine Lukey
Joe Garuba
Patrick McGarry
Bob Richardson
Tony Winney
Robert Ferris
Glen Boodry
Mike Grim
Josh Brock
Kimberly Burke
Dinah Willier
The Energy Roadmap Program is a partnership between SANDAG and San Diego Gas &
Electric Company (SDG&E). It is funded primarily by California utility customers under
the auspices of the California Public Utilities Commission. Transportation components
are funded by SANDAG.
Program Contacts
Energy Roadmap Coordinator
Allison Wood, SANDAG, allison.wood@sandag.org, (619) 699-1973
iCommute Program
Maria Filipelli, SANDAG, maria.filipelli@sandag.org, (619) 515-1177
SDG&E Energy Efficiency Programs
Josh Brock, JBrock@semprautilities.com, (858) 636-5733
SDG&E Account Representative
Dinah Willier, DWillier@semprautilities.com, (858) 654-1135
Building Energy Audits
John Woolsey, EFM Solutions, john.woolsey@efm-solutions.com, (951) 200-3178
Fleet Analysis
Kevin Wood, California Center for Sustainable Energy, kevin.wood@energycenter.org,
(858) 244-7295
1 City of Carlsbad Energy Roadmap Introduction Introduction
This energy management plan, or “Energy Roadmap,”
prepared by the San Diego Association of
Governments (SANDAG) in consultation with city staff,
provides a framework for the City of Carlsbad (City) to
identify ways to save energy in government
operations and in the community, resulting in
municipal cost savings and benefits to the
environment. These wide-ranging, cost-effective opportunities to save electricity,
natural gas, and transportation fuel include:
No-cost expert technical assistance, such as free energy audits of government
buildings
Help identifying and applying for energy efficiency rebates and innovative programs
like zero-percent on-bill financing
Energy-saving resources for cutting edge topics like general plan updates, electric
vehicles, alternative fuels, and transportation demand management strategies to
save energy and reduce Greenhouse Gas (GHG) emissions
The latest information on critical subjects like financing energy efficiency projects,
emerging technology demonstrations, and residential retrofit programs.
The Energy Roadmap also recognizes steps the City has taken to become more
sustainable. In 2006, the City participated as a pilot city in the Sustainable Region
Program. Through the program, the City received free technical and policy guidance,
which identified energy saving opportunities in City facilities. In addition to building
retrofits, the City has retrofitted its streetlights through an Energy Efficiency and
Conservation Block Grant.
The Energy Roadmap builds upon the Sustainable Region Program and updates and
identifies new opportunities for energy savings. The City is in the process of completing
The Carlsbad Energy
Roadmap charts a path to
saving energy in
government operations
and in the community.
California’s Vision for Local Governments
By 2020, California’s local governments will be leaders in using energy-
efficiency to reduce energy use and global warming emissions both in their
own facilities and throughout their communities.
California Long-Term Energy Efficiency Strategic Plan
2 City of Carlsbad Energy Roadmap Introduction a Climate Action Plan, which includes a GHG emissions
inventory of both municipal and community-wide emissions
and measures to reduce emissions into the future.
By building on its existing energy-saving efforts and taking
advantage of some or all of the opportunities identified herein,
the City can continue to demonstrate leadership in energy
efficiency and work toward greater sustainability in municipal operations and
throughout the community – saving money for taxpayers, households, and businesses,
keeping the air clean, supporting green jobs, and improving quality of life for everyone
in the City.
Section I. Saving Energy in City Government Operations
City government can be a significant user of energy in its own buildings, facilities, and
equipment. City employees also play a role through their commute choices, equipment
usage, and use of government vehicles. These and other energy-using activities required
to operate city government provide the City with an opportunity to lead by example.
The City can improve energy efficiency, and in the process, spend fewer taxpayer dollars
on utilities and gasoline, contribute to cleaner air, and reduce GHG emissions. The City
also can develop staff knowledge of energy efficiency and use its operations to
showcase emerging energy-efficient technologies.
The section on saving energy in government operations identifies four distinct
opportunities for the City to lead by example with its buildings and facilities, vehicles,
and energy usage practices:
1. Save Energy in City Buildings and Facilities
2. Green the City Vehicle Fleet
3. Develop Employee Knowledge of Energy efficiency
4. Promote Commuter Benefits to City Employees
Section II. Saving Energy in the Community
Looking beyond its own operations, city government can play an important role in
influencing the energy attitudes and actions of local residents and businesses.
Opportunities for influence vary widely, from public education to adopting policies and
implementing programs to save energy.
Energy use can be a major expense for households and businesses, and it is a
predominant source of air pollution and GHG emissions. Saving energy benefits the
The Carlsbad website can
be a portal for local
residents and businesses
to access energy-saving
programs and rebates.
3 City of Carlsbad Energy Roadmap Introduction environment, puts money in the pockets of households and businesses, and supports
growing economic opportunities including well-paying green jobs.
This section of the Energy Roadmap identifies the following opportunities to lead the
community with innovative programs for energy efficiency and sustainability:
5. Leverage Planning and Development Authority
a. Smart growth development policies
b. Energy-efficient building upgrades
c. Clean and efficient transportation options
6. Market Energy Programs to Residents, Schools, and Local Businesses
7. Support Green Jobs and Workforce Training
Potential Uses of the Energy Roadmap
Examples of activities this Energy Roadmap could assist the city with include:
Reducing government spending on energy use such as utilities and gasoline
Implementing measures from the City’s Climate Action Plan to reduce GHG
emissions from government operations and community activities
Integrating sustainability, energy efficiency, or GHG reduction measures into
planning processes
Using government operations to demonstrate the feasibility of energy-efficient and
sustainable practices to local residents and businesses
Managing the City vehicle fleet
Promoting energy efficiency programs through City
communications such as newsletters, email, and website
Training of employees that deal with energy issues
Offering commuter information and alternative
transportation incentives as part of the City’s employee
benefits package
Staying on top of the latest developments, programs, and trends in energy efficiency
Applying and qualifying for future funding opportunities related to energy efficiency
About the Energy Roadmap Program
The Energy Roadmap Program is a partnership between the SANDAG and San Diego Gas
& Electric® (SDG&E) that offers local jurisdictions assistance in making their buildings
and processes energy-efficient, implementing state energy codes through access to
training and workshops, and being a conduit to their constituents on programs that help
Handouts on green jobs
and training opportunities
can be located at
City Hall.
4 City of Carlsbad Energy Roadmap Introduction reduce their energy bills, as well as the environmental impact on the community as a
whole.
The program provides free energy assessments of government buildings and online
tools to monitor electricity, natural gas, and transportation fuel use. It provides
continued access to experts that can assist jurisdictions in taking the next steps to
implement building improvements, petroleum reduction measures, and community
outreach.
Each participating jurisdiction receives a customized Energy Roadmap that offers a
comprehensive framework for saving energy at city government facilities and in the
community. Each Energy Roadmap is consistent with the SANDAG Sustainable
Communities Strategy (2011); Regional Energy Strategy (2009), which serves as the
San Diego region’s energy policy blueprint; and the Climate Action Strategy (2010),
SANDAG’s first ever guide on climate change. All strategies are available on the SANDAG
website at www.sandag.org/energy.
The Energy Roadmap Program was developed based on existing, successful SDG&E local
government partnerships with the Cities of Chula Vista and San Diego and the County of
San Diego and pilot projects undertaken through the SANDAG Sustainable Region
Program with the California Center for Sustainable Energy for the Cities of Carlsbad,
Poway, and Solana Beach. The Energy Roadmap Program is funded primarily by
California utility customers under the auspices of the California Public Utilities
Commission. Transportation components are funded by SANDAG.
5 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities 1
Save Energy in City Buildings and Facilities
Energy is a major operating cost for local governments. The City of Carlsbad (City) has
already taken steps to reduce energy usage in its operations using Energy Efficiency and
Conservation Block Grant funding to retrofit
streetlights. By evaluating energy usage in municipal
buildings and facilities (“sites”) and identifying
additional energy-saving opportunities, the City can
further reduce its energy-related operating costs and
use the savings for other government services. This
chapter highlights:
Free site assessments provided to the City
Energy-saving opportunities identified at each one
Costs and paybacks to the city to undertake the energy-saving projects
Energy Assessments
Two types of energy assessment services were provided at no cost to the City:
1) preliminary energy assessments, called “Energy Report Cards,” of sites determined by
municipal staff; and 2) more in-depth energy audits, called “Phase 2 Audits” for a subset
of government buildings based on their Report Cards and direction from City staff.
Energy Report Cards were prepared for eighteen municipal sites (listed below). Each
Energy Report Card is included in Appendix A. These preliminary assessments
established each site’s baseline energy use and benchmarked it against similar building
types in the country.
Calavera Hills Park
Carlsbad City Library
City Hall
Carlsbad Municipal Water District
Administration
Cole Library
Faraday Center
Farmers Insurance Claims Building
Fire Station 1
Fire Station 2
Fire Station 4
Fire Station 5
Fleet Maintenance
Harding Community Center
Monroe Street Pool
Safety Center
Senior Center
Stagecoach Park
The Crossings
Carlsbad could save over
$76,000 each year from
energy efficiency upgrades
identified at municipal
sites.
6 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities Benchmarking is a useful tool for judging a site’s energy performance compared to
national or state averages, and it is a new requirement to participate in the San Diego
Gas & Electric® (SDG&E) rebate and incentive programs. Two online tools were
employed to help determine how “good” or “bad” a site was performing. The SDG&E
Energy Waves program provided historical energy usage and will enable the City to
continue monitoring energy consumption/site performance online. The United States
Environmental Protection Agency’s Portfolio Manager program identified how each site
compared against national averages for similar facilities, and provided climate change
information in carbon dioxide equivalent (CO2e).
The preliminary energy assessments indicate that all the City municipal sites would
benefit from lighting retrofits, so all sites were evaluated for indoor and outdoor lighting
in the Phase 2 assessments. Five sites were targeted for additional evaluation in the
form of a comprehensive energy audit, and two sites underwent a rate analysis. Sites
were determined in response to a specific issue discovered through the site assessment
process, or as instructed by city staff. The priority site list is provided as Appendix B.
The Phase 2 Energy Audits were to identify energy efficiency improvements in
indoor/outdoor lighting; Heating, Ventilation, and Air Conditioning (HVAC); building
controls; and overall building operations and performance. These engineering
assessments included utility rate review, recommended retrofit projects, and rebate
programs and costs. The Phase 2 utility rate analyses and energy audit findings are
summarized here and included as Appendix C.
EFM Solutions, an engineering firm and small business in San Diego, performed all site
assessments on behalf of SANDAG and provided the City with project results in the form
of the Energy Report Cards, rate analyses, Phase 2 energy audit findings, and a master
spreadsheet of energy conservation measures identified.
Energy Audit Findings
Carlsbad has the potential to realize over $76,000
in annual savings on its utility bills by
implementing the rate changes and energy
conservation measures in the Potential Savings
by Energy Conservation Measure table on the
following page. The City could undertake
upgrades at its audited municipal sites through
the SDG&E On-Bill Financing Program. This could enable the City to avoid paying
upfront capital costs associated with energy-saving retrofits through zero-percent
interest loan(s) on its utility bill(s).
Energy conservation
measures can be funded
through zero-percent
interest loans in the On-Bill
Financing Program from
SDG&E.
7 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities All Sites Replace Indoor
Lighting
162,168 47.68 $20,042 53.49
Replace Outdoor HID
Lighting
127,067 37.53 $14,388 41.92
Cole Library Install Turbocor
Compressor
65,221 49.41 $9,457 21.51
Monroe Street
Pool
Install Pump Controls 34,502 0 $3,572 11.38
Safety Center Retrocommission
HVAC
59,700 0 $6,719 16.27
TOTALS 448,658 134.62 $54,178 144.57
Notes:
1. kWh = kilowatt hours, MTCO2e = metric tons of carbon dioxide equivalent.
2. Energy assessments included HVAC systems, indoor and outdoor lighting, and building controls.
3. No opportunities for natural gas savings were identified during the energy audits.
Potential Savings from Rate Changes
Location Estimated Cost* Annual Cost Savings Simple Payback
Calaveras Hills Park $8,000 $4,684 1.7
Stagecoach Park $10,000 $17,885 0.6
TOTAL $18,000 $22,570 0.8
*Includes costs associated with splitting existing electrical meter into two service meters.
Energy Conservation Measure Economics
Location Measure Gross
Project Cost
Total SDG&E
Incentives
Net Project
Cost
Simple
Payback
(years)
All Sites Replace Indoor
Lighting
$169,361 $5,621 $163,740 8.2
Replace Outdoor HID
Lighting
$168,550 $24,703 $143,847 10.0
Cole Library Install Turbocor
Compressor
$60,000 $10,159 $49,841 5.3
Monroe
Street Pool
Install Pump Controls $1,200 $600 $600 0.2
Safety Center Retrocommission
HVAC
$40,000 $4,776 $35,224 5.2
TOTALS $439,111 $45,859 $393,252 7.3
Notes: Gross and net installation and equipment costs are estimated and do not replace product
specifications and contractor bids.
Potential Savings by Energy Conservation Measure
Location Measure
Annual Savings for City
Electricity
(kWh)
Demand
(kW) Bill Savings
Greenhouse
Gases
(MTCO2e)
8 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities Finance Options for Energy Projects
SDG&E provides rebates, incentives, and financing options to pay for all or part of the
costs of energy conservation measures. The SDG&E On-Bill Financing Program provides
zero-percent financing for the installation of energy efficiency improvements meeting
certain criteria. Financial assistance also is available from other agencies like the
California Energy Commission (CEC).
No-cost assistance with rebates, incentives, and financing options is available to the City
as part of the Energy Roadmap Program. Please contact your Energy Roadmap
coordinator with requests for assistance or questions.
SDG&E Rebates and Incentives
As part of the energy audit findings, EFM Solutions identified the appropriate SDG&E
rebates and incentives1 for each municipal site. Generally, programs that apply to
commercial businesses also apply to public agencies. To review all of the SDG&E rebate
and incentive programs, see Chapter 6 of this Energy Roadmap or visit
sdge.com/business/rebatesincentives/.
Zero-Percent Interest On-Bill Financing from SDG&E
Through its On-Bill Financing Program2, SDG&E provides interest-free, unsecured
financing to qualified commercial and taxpayer-funded customers for the installation of
energy-efficient upgrades. Financed equipment must qualify for a rebate or incentive
from the SDG&E rebate/incentive program(s). EFM Solutions have met with City staff
and discussed on-bill financing. The program for public agencies includes:
Zero-percent financing on qualifying measures for up to ten years
Offsets to energy-efficient upgrade costs after rebates and incentives through
SDG&E
Loan amounts that range from a minimum of $5,000 up to $250,000 per meter
Loan installments that are added to monthly SDG&E bills
For more information, contact Kraig Akers at KWAkers@semprautilities.com or visit
sdge.com/obf.
1 SDG&E programs are funded by California utility customers and administered by SDG&E under
the auspices of the California Public Utilities Commission. Rebates and incentives are provided
on a first-come, first-served basis until program funds are no longer available. 2 The On-Bill Financing program is funded by California utility customers and administered by
SDG&E under the auspices of the California Public Utilities Commission. The On-Bill Financing
program may be modified or terminated without prior notice and is provided to qualified
customers on a first-come, first-served basis until program funds are no longer available.
Eligibility requirements apply.
9 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities Low-Interest Loans from the CEC
The Energy Efficiency Financing Program provides financing for local governments,
schools, and hospitals through low-interest loans for feasibility studies and installation
of energy-saving measures. As of September 2014, terms included an interest rate
of one percent (fixed), a maximum loan of $3 million per application, and a
maximum loan term of 20 years. Again, EFM Solutions can assist the City with applying
for this loan, if needed. For more program information, contact the CEC
Special Projects Office, (916) 654-4104, email: pubprog@energy.state.ca.us, or
energy.ca.gov/efficiency/financing.
Post-assessment assistance in identifying energy project financing and implementation
is a service provided to the City through the Energy Roadmap Program. Contact your
Energy Roadmap coordinator for further assistance.
Implementation Strategy for Energy and Cost Savings
1. Pursue energy retrofit projects that qualify for on-bill financing and/or have an
immediate payback.
2. Seek approval from SDG&E to use its On-Bill Financing Program (zero-percent
interest loans) to cover upfront costs for energy upgrades.
3. Undertake internal city processes to implement energy upgrade projects.
4. Monitor site performance to ensure energy and cost savings are achieved.
The Energy Roadmap team can assist the City with these implementation steps over the
duration of the Roadmap Program (until December 2015).
10 City of Carlsbad Energy Roadmap Government Operations: Save Energy in City Buildings and Facilities This page left intentionally blank.
11 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet 2
Green the City Vehicle Fleet
The City of Carlsbad (City) maintains a fleet of more than 250 vehicles and over
100 pieces of other equipment. These vehicles range from sedans and pick-up trucks to
fire engines and other heavy-duty trucks. The City can achieve transportation-related
energy savings through actions that promote fuel conservation, efficiency, and an
increased use of clean, alternative fuels in its vehicle fleet.
The City has recognized that fleet operations contribute significantly to its total energy
use and budget and has adopted practices to ensure the fleet is operated as efficiently
as possible. As part of this effort, the City performs full suite of preventative
maintenance on each vehicle and uses refined oil and recycled materials. This ensures
that vehicles are running at maximum
efficiency, and minimizes costly repairs as
vehicles age. The City is dedicated to
replacing older vehicles with hybrid units
when most economically feasible, to help
meet carbon emission reduction goals and
build a more sustainable community. This Roadmap chapter offers tools and
information that can support the City’s efforts to maintain efficient fleet operations and
meet its environmental goals through the use of advanced technology and alternative
fuel vehicles.
California Goals for Transportation Fuels
The State of California has adopted several transportation fuel laws and goals, and the
California Energy Commission (CEC) has been the responsible agency for the targets
shown in the California Goals for Transportation Fuels table. In order to meet these
goals the state allocates grant funds through the Assembly Bill 118 Program to help
address barriers to the production and deployment of alternative fuels, vehicles, and
infrastructure. Millions of dollars are available annually through 2015, for which the City
and local businesses can apply. Additional information is provided later in this section.
The City of Carlsbad has
adopted practices to ensure
the fleet is operated as
efficiently as possible.
12 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet California Goals for Transportation Fuels
Objective State Goals and Milestones
Petroleum Reduction Reduce petroleum fuel use to 15 percent below 2003 levels by 2020
Alternative Fuel Use Increase alternative fuel use to 20 percent of on-road fuel demand
by 2020 and 30 percent by 2030
In-State Biofuels Use Increase biofuel use to one billon gasoline gallons equivalent (gge)
by 2010, 1.6 billion gge by 2020, and two billion gge by 2050
In-State Biofuels
Production
In-state production of 20 percent of biofuels used in California by
2010, 40 percent by 2020, 75 percent by 2050
The City’s Fleet
The City’s fleet supports the provision of essential public services such as police and fire
protection, street services, park maintenance, and wastewater operations. Vehicles are
replaced on regular schedules. Vehicle replacements offer the City the chance to adopt
more efficient vehicles.
When replacing vehicles, City staff evaluates vehicle duty requirements and selects the
most efficient vehicle that can do the job. The City currently operates the smallest
trucks available for regular duty, including the Ford Ranger and Chevy Colorado.
In recent years, the City purchased several hybrid vehicles as new or replacement units
for the fleet. Currently 15 percent of the City’s fleet is made up of hybrid vehicles.
Hybrid vehicles are selected in cases where it makes the most economic and operational
sense. The City has also replaced or retrofitted many of its heavy-duty diesel vehicles to
meet the most stringent emissions standards.
Over the past few years, the City of Carlsbad has made substantial strides in reducing its
overall fuel consumption and GHG emissions. The table Fuel Use 2005, 2011, 2012
below outlines these changes.
Fuel Use 2005, 2011, 2012
2005 2011 2012 % Change
2005 to 2012
Gasoline (Gallons) 207,286 167,345 128,897 -37%
Diesel (Gallons) 54,589 62,407 66,345 17%
Note:
Sources: Carlsbad Government Operations Greenhouse Gas Inventory Update – 2011 , California Center for
Sustainable Energy estimates
13 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet Through the development of the City’s General Plan Envision Carlsbad, the City is
committed to moving towards integrating more alternative fuel and hybrid vehicles into
its fleet. These vehicles could help the City further reduce its fuel consumption and
emissions. With the rising cost of gas or diesel and a diesel, advanced and alternative
fuel vehicles could help reduce fuel costs as well as emissions.
Online Fleet Planning Tools
The United States Department of Energy’s (DOE) Petroleum Reduction Planning Tool
(afdc.energy.gov/afdc/prep), at the Alternative Fuels and Advanced Vehicles Data
Center, could supplement the City’s current fleet management system by evaluating and
calculating petroleum reductions through three categories of reduction measures
including efficiency (e.g., fuel economy, idling reductions), conservation (e.g., VMT
reductions), and alternative fuels (e.g., vehicles that run on electricity, compressed
natural gas). A petroleum reduction goal (e.g., 10% savings) can be set and the free
online tool can identify potential savings based on the fleet information entered
and petroleum reduction measures selected. The Vehicle Cost Calculator
(www.afdc.energy.gov/calc) uses basic information on driving habits to calculate total
cost of ownership and emissions for makes and models of most vehicles, including
alternative fuel and advanced technology vehicles.
Argonne National Lab has developed a more advanced model called the Alternative
Fuel Life-Cycle Environmental and Economic Transportation (AFLEET) Tool
(greet.es.anl.gov/afleet) for fleets to estimate petroleum use, Greenhouse Gas (GHG)
emissions, air pollutant emissions, and total cost of ownership of light-duty and
heavy-duty vehicles using a spreadsheet format. The AFLEET tool allows comparisons
between vehicles using different fuel technologies and is customizable with fleet specific
inputs.
The FuelEconomy.gov website is a partnership between DOE and the United States
Environmental Protection Agency. It serves as the official United States government
source for fuel economy information, and allows users to compare the efficiency of all
vehicle models in production since 1984. It contains information on the energy and
environmental performance of vehicles as well as tools to improve fuel economy.
When considering a new fleet vehicle purchase, the Cool Fleets website (coolfleets.com)
has a free online calculator that can help the City identify the most cost-effective vehicle
with the best environmental performance. It provides helpful information on a variety
of indicators, including costs and GHG emissions. The user can compare each vehicle to
itself or other models using different variables such as the lease term and average
annual mileage scenarios. The user chooses the applicable fuel cost for their location
and selects vehicles individually or by category.
14 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet The City also can reduce fuel use by encouraging employees to use fleet vehicles
efficiently. This includes trip planning, efficient driving habits, and routine maintenance.
Specific tips are described in Appendix D.
Alternative Fuels for Fleet Applications
Alternative fuel and vehicle selection may depend on several factors including:
Vehicle cost
Availability and proximity of refueling infrastructure
Availability of grants and tax credits
Whether new purchase or retrofit/conversion is being considered
Vehicle maintenance
Descriptions of each type of alternative fuel and information on the availability of
alternative fuel vehicles for a variety of fleet applications are provided in Appendix D.
Opportunities for vehicle replacements specific to the City’s fleet are described below.
Vehicle Replacement: Alternative Fuel Options for the City
SANDAG partnered with the California Center for Sustainable Energy (CCSE) to provide
an assessment tailored to the City’s fleet and vehicle replacement protocols.
The following Potential Vehicle Replacements and Savings table identifies conventional,
advanced technology, and alternative fuel replacement options that could be suitable
for vehicles in the City’s fleet. The table identifies potential fuel and cost savings on an
annual basis using mileage estimates provided by the City. Not all City vehicles have
mileage as high as in the example, but would still accrue savings over their lifetimes.
15 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet Potential Vehicle Replacements and Savings
Vehicle
Model
Fuel
Tech1
Annual
Mileage
Gallons
Fuel
Reduced/
Displaced2
Estimated
Annual
Savings
Years to
Payback
w/
incentives
Yearly
GHG
Savings
MTCO2e)
Sedans (Replacing Ford Taurus)
Ford Focus Gas 6,000 109 $402 - 1.0
Toyota Prius HEV 9,000 282 $1,086 5.1 2.5
Sedans (Replacing Honda Accord)
Honda Accord
Hybrid HEV 10,000 235 $916 5.5 2.1
Nissan Leaf BEV 10,000 435 $1,204 7.4 3.2
Compressed Natural Gas Vehicles
Ford F150 CNG 15,000 1,250 $2,028 2.5 2.0
Ford F250 CNG 10,000 909 $1,543 3.2 1.7
Ford F250 CNG 5,000 455 $771 6.5 0.8
Propane Vehicles
Ford F150 LPG 15,000 1,250 $1,715 6 1.8
Ford F250 LPG 10,000 909 $1,215 8.5 1.3
Ford F250 LPG 5,000 445 $607 17 0.6
Note:
1. BEV= battery electric vehicle, HEV= hybrid electric vehicle, CNG = compressed natural gas, LPG= liquefied
petroleum gas (Propane)
2. Reducing/ displacing the use petroleum-based fuels is a goal of state policy and the federal Energy Policy
Act and Energy Independence and Security Act.
Source: CCSE
The vehicle replacement analysis used current fuel prices, mileage, and fuel
consumption of the City’s vehicles, details of which are provided in Appendix D. This
analysis showed that the CNG or LPG replacements for larger trucks could save $700 to
$2000 a year per vehicle. Vehicles may see payback periods as low as two and a half
years, including rebates. If alternative fuel replacements are considered, the vehicles
with the highest mileage and high fuel
consumption are the best candidates. The
replacement of older Ford Taurus sedans with
compact Ford Focus sedans could reduce fuel
costs by $400 dollars a year. Replacement of
higher mileage sedans with hybrids could save
more than $1000; however the payback periods may be two to six years or more due to
the incremental cost of hybrid technology over traditional vehicles.
CNG or LPG vehicles can cost between $10,000 and $15,000 more than their gasoline- or
diesel-fueled counterparts before rebates and could require additional fueling
infrastructure. The substantial fuel savings that would be achieved from large trucks,
CNG or LPG vehicles could
offer savings of $700 to $2000
a year based on based on
vehicle usage seen in the City
16 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet some of the biggest consumers of fuel, could offset the higher purchase costs within a
few years when combined with available incentives. Currently the only public fueling
stations for CNG is located approximately five miles away adjacent to the Encina Power
Station
Electric vehicles offer the greatest greenhouse gas reduction benefits with savings of
3.2 MTCO2e per year, followed by hybrids with reductions up to 2.5 MTCO2e a year. LPG
and CNG vehicles showed savings between 0.6 and 2 MTCO2e. These savings could
contribute to the City’s environmental goals.
Biodiesel can be made from a variety of vegetable oils and fats. Biodiesel from waste
vegetable oil is some of the lowest carbon fuel currently available. Blends of up to
five percent biodiesel are compatible with all diesel vehicles, while blends of up to B20
can be used in most vehicles, although some special handling and maintenance
requirements must be followed. The use of locally produced B20 from waste vegetable
oil would reduce GHG emissions 15 to 18 percent. The table below shows the potential
emissions reduction the use of B20 or B5 in a heavy duty vehicle and fleet wide.
Biodiesel Emissions Reduction Potential
Gallons MTCO2 Reduced
Dump Truck B5 1,500 0.6
Dump Truck B20 1,500 2.8
Fleet-wide B5 66,345 27.2
Fleet-wide B20 66,345 122.1
The City should carefully evaluate all fuel types and available incentives when vehicle
replacement decisions are made. California offers rebates and incentives for alternative
fuel vehicles and infrastructure; currently available rebates are outlined later in this
chapter.
Fuel Availability in the City
Additional fueling infrastructure throughout the region is needed for widespread
adoption of alternative fuel vehicles. The City maintains its own fueling facility and also
provides fuel to the Carlsbad Unified School District. Other available refueling sites near
the City are identified in the Summary of Alternative Fuel Infrastructure Availability table
below. Appendix D contains details on each location and the costs of installing each
type of fueling infrastructure.
17 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet Summary of Alternative Fuel Infrastructure Availability
Fuel Existing Fueling Sites within Ten Miles of
Carlsbad Public Works Yard
Availability of Production-
Distribution Infrastructure
Electricity There are number of public charging locations
in and near the City.
Existing electricity grid and
distributed energy sources.
Biodiesel One public access station in Kearny Mesa. Fuel
could be delivered on site
Storage and blending
terminals, port off-loading
sites needed. Local producer
is New Leaf Biofuel.
CNG One public access station in the City. Existing natural gas pipeline
network.
Propane
(LPG)
One public access station in the City. Existing distribution by
multiple vendors.
E85 One public access station in the City Storage and distribution
facilities needed in order to
scale-up consumption.
LNG No fueling sites in or near the City. Existing.
Hydrogen No fueling sites in or near the City. Significant investment
required.
Source: afdc.energy.gov/afdc/locator/stations.
Notes:
1. Site names, addresses, and distances are provided in Appendix D.
2. Contact your Energy Roadmap coordinator for information regarding the installation of publicly
available EVSE at city government sites.
The infrastructure for alternative fuels is currently limited in the region, but is expanding
slowly. As more fueling infrastructure becomes available, the alternative fuel vehicles
could be more seriously considered.
The San Diego Regional Clean Cities Coalition, along with its members, have committed
to addressing the need for more fueling choices across the region. The Coalition can
provide more information on alternative fuel infrastructure and vehicles in the region.
State Grants and Rebates
The California Air Resources Board (ARB) and CEC offers grants and rebates for
alternative fuel and advanced technology vehicles. Funding is allocated annually and the
FY 2014-2015 budget for the CEC Alternative and Renewable Fuel and Vehicle
Technology Program (energy.ca.gov/altfuels) is about $100 million. ARB manages about
$30 million in rebates and projects through the Air Quality Improvement Program.
(arb.ca.gov/msprog/aqip/aqip.htm). The 2013 passage of Assembly Bill 8 (AB 8) extends
funding for the Carl Moyer Program, local diesel emission reduction programs, and
Alternative and Renewable Fuel and Vehicle Technology Program through 2023. These
programs accelerate the turnover of older vehicles and equipment and invest in the
development and deployment of advanced clean emissions technology. Additionally,
18 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet AB 8 allocates $20 million in funding toward the installation of hydrogen fueling
infrastructure and supports the deployment of hydrogen fuel cell electric vehicles.
The CEC has allocated $10.8 million in funding for light-, medium-, and heavy-duty
natural gas vehicles that use. Natural gas trucks are gaining increased market attention
due to their lower fuel costs, ability to reduce GHG emissions by 15 to 20 percent, and
decreased nitrogen oxide emissions. Expanding alternative fuel infrastructure is another
funding priority with allocations for electric vehicle charging stations and CNG station
upgrades or expansions.
CEC Gaseous Vehicle Buydown Incentives
Gross Vehicle Weight in Pounds (lbs.) Natural Gas
Up to 8,500 $1,000
8,501 – 16,000 $6,000
16,001 – 26,000 $11,000
26,001 -33,000 $20,000
33,001 & greater $25,000
Notes:
Buy-down funding must be secured through an eligible dealer.
CCSE manages ARB’s Clean Vehicle Rebate Project (CVRP) (energycenter.org/cvrp),
which provides rebates of up to $2,500 for light duty battery electric and plug-in hybrid
vehicle purchases. CCSE received approximately $110 million in funding for FY 2014-
2015. The CVRP Rebate Amounts for Light-Duty Vehicles table summarizes the rebates
available.
CVRP Rebate Amounts for Light-Duty Vehicles
Vehicle Class Maximum Incentive
Light duty zero emission vehicles (ZEV) $2,500
Plug-in hybrid electric vehicles (PHEV) $1,500
Zero emission motorcycles (ZEM) $900
Neighborhood electric vehicles (NEV) $900
Note: Eligible vehicles and associated rebate amounts are subject to change. Visit the CVRP program
site for eligible vehicle models and associated rebates.
Rebates for commercial vehicles including trucks and buses are available through ARB’s
Hybrid Truck and Bus Voucher Incentive Project (HVIP) (californiahvip.org). As of
September 2014, $6.3 million of HVIP funding is remaining. A summary of the incentives
available is provided in the ARB HVIP Voucher Amounts for Trucks and Buses tables on
the following page.
19 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet HVIP Voucher Amounts for Zero-Emissions Trucks & Busses
Gross Vehicle Weight (in pounds)
5,001 – 8,500 lbs $20,000
8,501 – 10,000 lbs $25,000
10,001 – 14,000 lbs $50,000
14,001 – 19,500 lbs $80,000
19,501 – 26,000 lbs $90,000
> 26,000 lbs $95,000
HVIP Voucher Amounts for Hybrid Trucks & Busses
Gross Vehicle Weight (in pounds)
6,001 – 8,500 lbs (plug-in hybrids only) $8,000
8,500 – 10,000 lbs (plug-in hybrids only) $10,000
10,001 – 19,500 lbs $15,000
19,501 – 33,000 lbs $20,000
33,001 – 38,000 lbs $25,000
> 38,000 lbs $30,000
Note: The first three vouchers redeemed by a fleet are eligible for the following additional
voucher amount:
$2,000 per vehicle if below 8,500 lbs.;
$5,000 per vehicle if 8,501 to 10,000 lbs.;
$10,000 per vehicle if over 10,000 lbs.
20 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet Regional Electric Vehicle and Alternative Fuels Planning
Electric Vehicle Planning
Electric Vehicle (EV) adoption is increasing rapidly by consumers as well as fleets. The
San Diego region was selected to take part in the largest EV rollout in United States
history, through the EV Project (theevproject.com). In the San Diego region, work
towards increasing EV infrastructure through the EV Project began in 2011 and
continued through 2013, with more than 450 public charging stations installed. SANDAG
and San Diego Gas & Electric® were local project partners provided in-kind assistance.
As a result of the project, many public sites throughout the region were identified as
potential locations for EV charging stations including restaurants, community and
regional shopping centers, large venue entertainment centers, transportation corridors,
schools, hotels, airports, convenience retail, and retail shopping. A number of public
chargers were installed in or near the City.
Most major automobile manufacturers have
now introduced plug-in electric vehicles.
Since December 2010, the Nissan Leaf and
Chevrolet Volt have been available in
San Diego. Additional plug-in vehicles are
available from BMW, Fiat, Ford, Honda,
Mitsubishi, Toyota, Tesla, and other
manufacturers. There are more than 6,000
EVs on the road in the region, with that number increasing by approximately 100 per
month. Regional infrastructure also continues to grow. NRG’s eVGo subsidiary has
recently installed a DC fast charge station in the City, as well as others along major
regional transportation corridors
San Diego Regional Electric Vehicle Infrastructure Working Group
Through a grant from the CEC, SANDAG established the San Diego Regional Electric
Vehicle Infrastructure Working Group (REVI) to develop a readiness plan for the
San Diego region. The REVI has been meeting since March 2012 in order to share
experiences to address regional barriers to PEV infrastructure and discuss potential best
practices for incorporation into a PEV readiness plan. The City staff has participated as
the North County Coastal representative on REVI.
Through earlier PEV planning and siting efforts, several barriers had been identified as
obstacles to charging infrastructure installation and plug-in vehicle adoption. The REVI
Through the EV Project, about
450 public EV chargers have been
installed around San Diego
County. More than 6,000 EVs are
now on the road in the region
21 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet has built upon these efforts and identified challenges, successes, and outstanding issues
for continued PEV adoption and charging infrastructure deployment.
The San Diego Regional Plug-in Electric Vehicle Readiness Plan (Plan) was accepted by
the SANDAG Board of Directors as a regional guide for use by local governments, public
agencies, and others to support plug-in electric vehicle adoption and electric vehicle
charging station deployment throughout the region. The Plan discusses and addresses
barriers to the deployment of plug-in vehicle infrastructure in the San Diego region. This
Plan is designed for local government officials, such as planners and building staff, as a
resource to assist them in helping their local governments prepare their communities
for a growing plug-in vehicle market. The Plan is available for download at:
sandag.org/uploads/publicationid/publicationid_1817_17061.pdf
Alternative Fuels Planning
Building upon work done by the REVI, SANDAG has received a $300,000 grant from the
CEC to expand the EV planning effort and develop a regional readiness plan for all
alternative fuels. Planning and related staff from the City and other local governments
are encouraged to participate. SANDAG will be working with the San Diego Regional
Clean Cities Coalition on this project that will assess the current state of alternative fuel
vehicles and infrastructure in the region; create sector-specific tools and resources for
fleet managers, local government staff, and other stakeholders; and prepare a regional
readiness plan to help advance the use of alternative fuels and vehicles.
22 City of Carlsbad Energy Roadmap Government Operations: Green the City Vehicle Fleet This page intentionally left blank.
23 City of Carlsbad Energy Roadmap Government Operations: Develop Employee Knowledge of Energy Efficiency 3
Develop Employee Knowledge of Energy Efficiency
Developing employee knowledge of energy efficiency is another way for the City of
Carlsbad (City) to promote energy savings in city government operations and
throughout the community.
Overview
This chapter identifies free educational seminars offered by San Diego Gas & Electric®
(SDG&E) and the California Center for Sustainable Energy (CCSE) available to City
employees at the SDG&E Energy Innovation Center (EIC), located in Clairemont Mesa.
Additionally, local colleges and universities host educational programs. Professional
certifications in the energy management field also are identified. If City staff is
interested in one of these courses, your Energy Roadmap coordinator can help facilitate
participation in certification programs and may be able to assist with enrollment costs.
Getting Started
As a first step in identifying educational, training, and certification opportunities, the
City is asked to please identify the following:
Staff positions or employees that could benefit from energy-related workshops and
trainings such as those listed in this section
Other workshops or trainings of interest (even if not listed here)
Workshops or trainings that the City may be interested in hosting at a city facility
SDG&E and CCSE conduct hundreds of expert-facilitated seminars on a broad spectrum
of energy topics at the EIC. Workshop costs are covered by California utility customers
under the auspices of the California Public Utilities Commission, unless otherwise
posted. An RSVP is generally requested for workshops to ensure that adequate space
and food are provided. For more information on programs hosted by the EIC, contact
SDG&E: seminars@sdge.com.
The following table identifies quarterly workshops offered at the EIC as well as
energy-related training and certification programs that could benefit city employees.
24 City of Carlsbad Energy Roadmap Government Operations: Develop Employee Knowledge of Energy Efficiency Free Educational Seminars Audience
Building Performance and
Monitoring
Energy management systems
SDG&E’s kWickview energy management tool
Energy Star Portfolio Manager
Benchmarking tools
Building information modeling
Facilities, public
works
General Energy Workshops Energy efficiency 101
Electricity 101
Basics of solar, basics of solar water heating
Lunch and learn topics
Layperson
Best Practices and Programs ENERGY STAR best practices
Rebate programs
Planning, public
works, City
administration
Training and Certification Programs Audience
Building Code
Inspector Training
SDG&E offers free inspector training for city employees.
Curriculum includes equipment identification and
compliance, residential and commercial California Energy
Code documentation and compliance, building plan
verification for energy efficiency standards, and 2010
California Green Building Code.
Code inspectors,
planning staff
Building Operator
Certification (BOC)
SDG&E offers BOC Level 1 and 2 trainings and certifications
to city staff at a reduced rate. A BOC is a nationally-
recognized training and certification program offering
improved job skills and more comfortable energy-efficient
facilities. The training is led by experienced, professional
instructors.
Facilities, public
works staff
Certified Energy Manager
(CEM)
Certification is through the Association of Energy
Engineers. CEM distinguishes high levels of competency
and proficiency in energy management, demonstrating
expertise in several areas ranging from standards, air
quality, energy audits, lighting, procurement, and
financing.
Facilities, public
works staff
North American Technician
Excellence (NATE)
Certification Exam (HVAC)
SDG&E and the Institute of Heating and Air Conditioning
Industries, Inc. co-sponsor seminars designed to help
experienced HVAC professionals prepare for successfully
completing the NATE Certification Exam.
Facilities, public
works staff
LEED® Professional
Credentials
The Leadership in Energy and Environmental Design®
(LEED) designation acknowledges expertise in green
planning, design, construction, operations, neighborhood
development, and other sustainable practices. SDG&E will
cover the cost of appropriate city employees to undergo
training for a LEED Professional Credential.
City
administration,
planning, facilities,
public works,
environmental
services
Online Workshop Calendar To view upcoming workshops, visit sdge.com/seminars
25 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program 4
Implement a Commuter Benefit Program
The City of Carlsbad (City) can achieve transportation-related energy savings by
promoting the City’s commuter benefit program offered to its employees. Such
programs provide alternative transportation choices to driving alone and incentives to
use them. Support services from the SANDAG Transportation Demand Management
Division, which oversees the iCommute program, are offered at no cost to the City as
part of the Energy Roadmap. Services are customized to address the specific needs of
your city and its employees. Needs are identified through City staff direction, a survey of
employee commute habits and preferences, and the mapping of employee commutes
so that iCommute can recommend to the City which commute choices may make sense
to promote to staff.
How it Works
A Commuter Benefit Program provides employees with alternative transportation
choices for their commute, as well as incentives for using them. A custom program
could include everything from helping connect employees who want to carpool or
vanpool with one another, to offering flexible or telework schedules, to providing free
or reduced-cost transit passes.
iCommute services are offered at no cost to the City. Other programs are inexpensive
for the City to implement, or come with subsidies sponsored by SANDAG. For example,
SANDAG provides a $400 per month
subsidy for qualifying vanpools. The
Commuter Benefit Starter Kit for
Employers, available through
iCommuteSD.com, provides your city
with the tools to get started, including
an overview of options, sample
policies, promotional materials, and tax
benefit information.
iCommuteSD.com offers employees
free and convenient ride matching and
trip tracking tools. The website also
provides the means to create a
customized incentive program for
Commuter Program Benefits
By providing alternative transportation
choices for its employees Carlsbad can:
Improve traffic flow, and reduce
employee parking congestion
Set an example for residents and
businesses
Reduce commuter-related expenses, and
add commuter benefits to employee
compensation packages at little or no cost
Measure and reduce petroleum
consumption and carbon footprint
26 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program alternative transportation commuters. The website comes with a convenient reporting
feature that details how many employees are participating, as well as measures the
agency and employees financial and environmental savings including; the amount of air
pollution and greenhouse gas emissions avoided, cost savings, and fuel savings.
Existing Commuter Trends
An employee commuter survey was conducted in 2009, with a total of 250 employees
participating, and it revealed that 88 percent of employees drove alone, 2 percent
carpooled, and 10 percent took other modes to work. When considering alternative
transportation modes, employees responded with the most interest in carpooling,
public transportation, and bicycling. Employee interest in alternative transportation
mode choices is as follows:
• Carpooling (33%)
• Public Transit (26%)
• Bicycling (21%)
• Vanpooling (12%)
The survey also suggested that employees have a great interest in improved public
transit choices and a telework option. The Commuter Program Recommendations
section offers guidance and examples of iCommute programs that will assist the City
with encouraging employees to utilize alternative modes of transportation.
Commuter Program Recommendations
According to the 2009 survey, the following programs have the greatest potential
benefit for the City to reduce energy consumption, greenhouse gas emissions, and
vehicle miles traveled by employees. Of those surveyed, 33 percent were interested in
carpooling, and 12 percent were interested in the vanpool program. iCommuteSD.com
has two tools that can help.
iCommuteSD.com
The City can reduce energy consumption and congestion by encouraging carpools,
vanpools, and bicycling. The City has an established network within the iCommute
website and employees can use the RideMatcher tool to find other employees who have
similar commutes. With 88 percent of Carlsbad employees driving alone, but 33 percent
expressing interest in carpooling, RideMatcher can assist an employee in finding a
carpool, vanpool, or bike buddy.
TripTracker is an easy and convenient way for an employee to record trips made by
alternative modes of transportation. It calculates the number of gallons of fuel saved,
27 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program monetary savings, pounds of carbon dioxide not emitted into the atmosphere, and how
many miles an employee has not traveled alone. Tracking trips also enters the employee
into the iCommute monthly prize drawing. Through TripTracker the City can implement
its own incentive program to encourage alternative modes of transportation. For
example, if an employee tracks 20 completed trips, or 10 roundtrips, in a month by an
alternative mode they would receive a cash incentive. There are many ways to structure
an incentive program, and iCommute offers free assistance to create the ideal incentive
program for the City.
Regional Vanpool Program
For City employees that have longer distance commutes (20 miles or more), vanpools
are a comfortable, cost-effective, and convenient way for groups of seven to fifteen
people to share their commute. Employees or the employer, can lease a vehicle through
one of the vanpool vendors contracted by iCommute, and receive up to $400 per month
to help offset the cost of the lease. On average, vanpool participants cut their commute
costs by many hundreds of dollars per year. Typical savings to each passenger:
• 20 miles round-trip commute = $1,000/year
• 50 miles round-trip commute = $4,000/year
Guaranteed Ride Home
To support alternative modes, iCommute offers the Guaranteed Ride Home Program.
Enrollment in this program allows for the use of a rental car or taxi in the case of:
• Personal or family illness or emergency
• Unscheduled overtime
• Your rideshare partner is unavailable
Employees who carpool, vanpool, take a Premium Express Bus, or the COASTER three or
more times per week are eligible. In addition, commuters that walk or bike 75 percent
or more of their trip, three or more days per week, are eligible. This program may be
used up to three times per year, and requires a $3.00 copay per use.
Transit
Carlsbad is well served by the North County Transit District transit system, with stations
near multiple municipal facilities, including City Hall, the Maintenance and Operations
facility, and the Faraday Center. To promote increased usage of public transportation,
employer supplied transit passes and pretax incentives could be effective tools. With
minimal cost to the City there is an option to subsidize part of the employees’
commuting costs, allowing employees to pay for the remainder with pre-tax dollars. To
further encourage participation in transit, the City could offer discounted monthly
28 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program transit passes to employees as part of the overall benefits package for employees.
Additional information on specific routes and timetables can be found at gonctd.com
Employees that use transit to commute are also eligible for the pretax incentive.
Pre-tax Incentive
Employers can take advantage of employee and employer payroll tax savings offered
through the IRS Commuter Fringe Benefit Program (IRS Section 132). The IRS allows
employers to offer employees the opportunity to set aside a portion of their pre-tax
salary to pay for transit and vanpooling. Bicyclist can also receive up to $20 per month,
but this cannot be combined with other incentives. Employers benefit by not paying
payroll taxes on that money, while in effect adding value to their employee’s
compensation package. Consult with your payroll department to take full advantage of
this option.
Telework and Flexible Schedules
Teleworking is a convenient solution that enables employees to work from home or a
remote location one or more days per week. Flexible schedules offer hours outside of
the traditional 9 a.m. to 5 p.m. schedule. For example, employees can work a 4/10
(4 days per week, 10 hours per day) or 9/80 schedule. Teleworking has been shown to
help recruit and retain high performing employees, and help the employees become
more productive and happier. The employee gain additional benefit from the reduction
of commute-related expenses. Jobs that are most suited for teleworking are those that
require reading, writing, researching, working with data, and talking on the phone, often
referred to as “information-based jobs.”
Bicycling
Bicycling is an excellent choice for commuting that will save employees money, reduce
stress, and help the environment. iCommuteSD.com has resources and tools for
commuters that help plan routes, provide safety information, track trips, find bike
buddies, and to learn more information about bike-to-work events. Bicycling is also a
first or last mile solution if transit is out of walking distance, as bicycles are allowed on
the COASTER, SPRINTER, and buses. iCommute maintains bicycle lockers throughout
San Diego County located at many transit stations and park and ride lots. Twenty-one
percent of employees stated they would consider bicycling as an alternative to driving
alone; the City could encourage bicycling to work by having bicycle lockers at the various
City facilities, and by providing locker rooms with showers.
SchoolPool
29 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program SchoolPool is the iCommute ridematching service for parents of children who attend the
same school. With this safe and secure service, you are matched with other parents in
your neighborhood who are interested in sharing the driving responsibilities or would
like to have their children bike or walk to school with other students and a parent
leader. SchoolPool is available region-wide for all K-12 public and private schools. These
alternative modes of transportation reduce congestion around schools while helping the
environment. SchoolPool also puts an emphasis on safety, as safety events are held at
various schools throughout the year
Getting Started
At any time, the City can request assistance from iCommute to develop a customized
commuter benefit program to take full advantage of these no-to-low cost programs. The
iCommute team can also help the City to engage employees in learning about
alternative transportation choices, and to establish municipal commuter policies.
Actions could include:
• Meet with iCommute to review no cost online tools and functionality of the iCommute
website
• Survey staff on their current commute habits and preferences
• Formalize a commuter benefit policy that outlines the commuter benefits that the City
can offer (samples available on iCommuteSD.com)
• Include commuter benefit information in new employee orientation packets and link
to iCommute on your intranet site
• Participate in and promote iCommute annual events such as Rideshare Week, Bike to
Work Day, and Walk and Bike to School Day. Join the Rideshare Week and Bike to
Work Corporate Challenges to showcase your commitment to sustainable commute
choices.
For more information on iCommute programs and services, and to download the
Commuter Benefit Starter Kit for Employers, visit iCommuteSD.com, or contact
Goldin Doles at (619) 699-4814 or goldin.doles@sandag.org.
30 City of Carlsbad Energy Roadmap Government Operations: Implement a Commuter Benefit Program This page intentionally left blank.
31 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority 5
Leverage Planning and Development Authority
Local governments can promote
energy efficiency in their
communities by leveraging their
authority over local land use and
development activity. This chapter
addresses ways in which energy
considerations can be integrated into
local land use and transportation
planning. These energy efficiency
and/or petroleum reduction measures are consistent with regional and state energy
policies, and fall under the following categories:
1. Smart growth development policies
2. Energy efficiency planning and permitting
3. Clean and efficient transportation planning
The Planning Role of Local and Regional Governments
Regional energy consumption is strongly related to urban form – i.e., the physical
features and composition of the built environment. Local governments and SANDAG can
influence the built environment, including the amount of energy consumed, through
regulations, incentives, collaborative planning, and infrastructure investments that
affect land use patterns, the transportation system, and other public facilities.
State law specifically vests local governments with authority over land use and
development activities within their jurisdictions in accordance with their general plans
and other policy documents that address land use, circulation (transportation), housing,
public facilities, environmental management (open space, conservation, safety, scenic
highways), and economic development. Local governments develop regulations and
programs to implement their planning policies and goals.
Sustainable Communities Strategy
Pursuant to Senate Bill 375 (Steinberg 2008), SANDAG and regional planning agencies
across the state are required to develop a Sustainable Communities Strategy (SCS) in
order to reduce per capita Greenhouse Gas (GHG) emissions from passenger vehicles
consistent with targets set by the California Air Resources Board (CARB). The following
32 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority table, GHG Reductions in the SANDAG Sustainable Communities Strategy, presents the
assigned CARB targets and the projected GHG reductions and Vehicle Miles Traveled
(VMT) reductions projected in the SCS. On October 28, 2011, SANDAG became the first
metropolitan planning organization in the state to adopt an SCS as part of its
2050 Regional Transportation Plan (RTP). SANDAG is using this strategy as the
foundation for updating its Regional Comprehensive Plan (RCP), which provides a
long-term strategic planning framework for the region based on “smart growth” and
“sustainability.” These principles are described in the next section.
GHG Reductions in the SANDAG Sustainable Communities Strategy
Average Weekday Per Capita CO2 and VMT Reductions for
Cars and Light Trucks from 2005
Target Year CARB Target GHG VMT
2020 7% 14% 12%
2035 13% 13% 10%
Notes: CO2 = carbon dioxide.
CARB identifies CO2 as the GHG whose concentration is being most affected directly by human
activities. CO2 also serves as the reference to compare all other GHGs.
SB 375 also provides an opportunity for streamlining the California Environmental
Quality Act (CEQA) process for certain local redevelopment projects, if they are
consistent with the SCS as either a “residential/mixed use project” or as a “Transit
Priority Project” (TPP). Environmental review of a residential/mixed use project
consistent with the SCS would not need to consider growth-inducing impacts or
increases in GHG emissions from passenger cars and light trucks. For a TPP, the project
would need to be at least 50 percent residential with a density of at least 20 units per
acre and be within a one-half mile of a major transit stop or a high quality transit
corridor included in the 2050 RTP. Appendix F contains larger definitions for what
projects could qualify for this type of CEQA streamlining.
SANDAG, working closely with all local jurisdictions, is undertaking a combined update
to its RCP and RTP/SCS, called San Diego Forward: The Regional Plan (the Regional Plan).
The Regional Plan is scheduled for adoption in 2015, and will include a review of smart
growth designated areas in relation to the SCS.
Envision Carlsbad
In order to inform the City of Carlsbad’s (City) General Plan Update, the City undertook a
visioning process to gain input from residents on developing the core values for their
community. The result was the City’s Community Vision, adopted in 2010, which among
other core values, calls for the City to be a leader in sustainability. The City also adopted
a series of Sustainability Guiding Principles that describe ways for the City to be a model
community, create a sustainable system, engage Carlsbad residents, take a proactive
33 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority approach to sustainability in city policy, recognize the local and global impacts of
decision making, and develop a sustainable community based on cost effective
programs.
In February 2014, the City released its draft General Plan Update, and the theme of
sustainability is resonated throughout the General Plan. In particular, the Land Use and
Community Design Element establishes sustainable development patterns that seek to
decrease dependency on the automobile. The Mobility Element emphasizes balanced
transportation choices and improving connectivity within the City. The City also
developed a Climate Action Plan (CAP) concurrently with the General Plan. The CAP
includes specific targets and programs for GHG reductions in the City.
1. Smart Growth Development Policies
Smart growth can be defined as a compact, efficient, and environmentally sensitive
pattern of development that provides people with additional travel, housing, and
employment choices by focusing future growth away from rural areas and closer to
existing and planned job centers and public facilities, while preserving open space and
natural resources. Smart growth policies fit into the broader context of sustainability by
guiding development to preserve access to natural resources. The principles of
sustainability are based on achieving conservation goals and objectives in three broad
areas: a prosperous economy, a healthy environment, and social equity. With the
adoption of SB 375, the state is recognizing the influence that smart growth policies
have on long term sustainability.
The SANDAG Smart Growth Concept Map, last updated in 2012, identifies locations of
existing, planned, and potential smart growth areas. One example of an
existing/planned smart growth area in the City is the Carlsbad Village COASTER Station.
Envision Carlsbad – Community Vision Core Value
Sustainability
“Build on the City’s sustainability initiatives to emerge as a leader in
green development and sustainability. Pursue public/private
partnerships, particularly on sustainable water, energy,
recycling, and foods.”
34 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority Carlsbad Village COASTER Station,
located at Grand Avenue and
State Street, consists of the Village
Master Plan area, and the City’s Barrio.
The City has taken steps to encourage
residential/retail development near
the commuter rail service and
approved revisions to the development
standards to increase flexibility for
mixed-use, parking, and higher-density
residential development. The Barrio is a smart growth opportunity area where the City
allows for medium and high-density infill residential development while being sensitive
to historic and cultural resources.
The City will continue to focus its smart growth planning efforts in its downtown. In
April 2014, the City initiated a comprehensive update to the Village Master Plan and
Design Manual to support the Community Vision and implement the new General Plan.
Specific objectives of the update are to: unify the Village and Barrio areas; incentivize
and attract smart growth, mixed-use developments; foster better transit; support
non-vehicular access and emphasize the pedestrian through design, uses, and the
streetscape; recognize and be sensitive to historic and cultural resources; support future
housing needs for all income groups; and encourage quality design.
Funding for Smart Growth Planning
SANDAG manages the TransNet Smart Growth Incentive Program (SGIP), which funds
transportation and transportation-related infrastructure improvements and planning
efforts that support smart growth development. The SGIP awards two percent of the
annual TransNet revenues to local governments through a competitive grant program.
For more information on the SGIP, and upcoming funding cycles, visit
sandag.org/smartgrowth.
The City’s draft General Plan policies call for prioritizing capital funding in infill, transit
priority, and smart growth areas (Policy 2-page 57), as well as to actively pursue grant
funding such as SANDAG’s Active Transportation Grant and SGIP programs to improve
non-automotive connectivity in the city (Policy 3-page 30).
In addition to the policies in the draft General Plan update, Appendix F contains further
sample policies that encourage smart growth development. The City could determine
which measures are most appropriate for it to consider. This appendix also contains the
35 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority existing and potential “smart growth opportunity areas” that the City provided SANDAG
for inclusion in the adopted Smart Growth Concept Map (2012).
2. Energy Efficient Building Upgrades
On a statewide scale, three decades of energy efficiency programs have saved
Californians $65 billion and avoided the need for 30 additional power plants. In addition,
most energy efficiency measures boost the local economy since retrofits must be
performed by a local labor force. In 2012, California-based clean-energy startups
brought in nearly $9 billion in investments over the previous three years, enough to
surpass the sum of activity in all 49 other states.
Energy Codes and Permits Review
Through building codes, local governments require a minimum level of protections to
occupants on many fronts. Fire safety and electrical codes save lives. Energy codes
improve indoor air quality, make homes and offices more comfortable, and reduce
utility bills.
The City’s draft General Plan Sustainability Element contains goals and policies to
promote energy efficiency and conservation, through green building programs and
sustainable energy projects (Goal 9-page 3, Policy 9-page 12, Policy 9-page 13). The
draft Climate Action includes measures to encourage energy efficiency retrofits in
residential, commercial, and city facilities (Measures D-F).
The state’s framework for energy efficiency strategies is the California Long Term Energy
Efficiency Strategic Plan (LTEESP), prepared by the California Public Utilities
Commission’s (CPUC). The LTEESP identifies the following areas where local government
authority can influence energy use in new and existing buildings:
1. Ensuring compliance and enforcement of the Title 24 energy code for residential
and commercial buildings.
2. Adopting and implementing voluntary and mandatory “reach” (enhanced energy
efficiency) codes beyond Title 24’s energy requirements (and potentially other
“green” requirements).
3. Supporting highly efficient projects that voluntarily exceed minimum energy codes
through favorable fee structures, fast-tracked permitting and other innovative and
locally appropriate approaches.
4. Enacting ordinances with point-of-sale or other approaches that spur efficiency
actions in existing, privately-owned buildings.
5. Applying efficiency-related “carrots” and “sticks” using local zoning and
development authority.
36 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority If the City has interest in learning more about code, permit and compliance options, the
Energy Roadmap coordinator and San Diego Gas & Electric® (SDG&E) can provide
assistance. For example, the City can receive free energy code compliance training for
local building inspectors, or receive materials needed to consider adoption of voluntary
reach codes, which go beyond the traditional minimum code requirements to make
buildings more energy efficient.
Energy Upgrade California – Home Retrofit Programs
Energy Upgrade California (EUC) (www.energyupgradeca.org) is a statewide
comprehensive retrofit program for residential and small commercial buildings. The
program coordinates federal, state, utility, and local retrofit program outreach,
incentives, training, and qualifications. Locally, the California Center for Sustainable
Energy (CCSE) is collaborating with SDG&E to coordinate the EUC program. CCSE
manages additional rebates offered in San Diego County; as well as workforce training
that qualifies local contractors to perform the work.
The EUC program promotes a “whole house” performance approach to efficiency that
focuses on the elements within a home that affect energy use, how they interact, and
how they influence health and safety. This approach diverges from the traditional
“widget” approach to energy efficiency program delivery, which targets only one
building aspect at a time, such as lighting, air conditioners, or insulation. To determine
the best approach for improvements to an individual home, a home energy assessment
is done. The assessment can pinpoint exactly what upgrades can be made, the costs,
and the rebates or incentives that may apply. The home assessments and retrofit
projects are performed by licensed building contractors that have been trained for the
EUC program. (More information on workforce development programs is contained in
Chapter 7.)
The San Diego Regional Energy Partnership (SDREP) has tasked CCSE with continuing
several local EUC programs that were previously funded through American Recovery
and Reinvestment Act grants from the City of Chula Vista, City of San Diego and County
of San Diego and expanding them regionally. Those jurisdictions, along with SANDAG,
have dedicated grant funds to the SDREP to provide additional EUC resources to all local
jurisdictions in San Diego County through 2014. The SANDAG contribution is to:
“Further develop and support regional EUC implementation and the
broader existing home retrofit market to facilitate “deep energy
retrofits” (both in terms of high energy savings and untapped markets in
existing residential buildings) for member jurisdictions.”
37 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority City residents can take advantage of this program to reduce their energy consumption,
while improving the comfort of their homes, and municipal staff is encouraged to
participate in the planning and implementation of these programs through a regional
Retrofit Advisory Council (RAC). Appendix G includes details about the RAC and the
region-wide projects underway through the SDREP.
Property Assessed Clean Energy Programs
Property Assessed Clean Energy (PACE) is a financing mechanism that allows property
owners to pay for energy and water efficiency upgrades and renewable energy
improvements without having to pay the costs upfront. PACE affords a qualifying home
or business owner a loan for eligible upgrades or improvements, which is paid back via
their tax bill. Assembly Bill 811 and Senate Bill 555 serve as legislative authority for PACE
operations. These two legislative actions enable the use of PACE as a financing tool, but
provide slightly different structures.
PACE participation throughout the San Diego region varies by jurisdiction, and several
companies offer PACE programs. The City has joined three PACE programs, allowing
residents and businesses to participate in CaliforniaFIRST, HERO, and Figtree financing.
HERO, a residential PACE program, has taken over 200 applications from the San Diego
region’s participating cities with over $7.5 million worth of energy retrofit projects
under review for financing. CaliforniaFIRST has 16 active commercial applications in the
region valued at over $16.5 million which should be funded in summer 2014. More
information on PACE programs including which jurisdictions are participating is available
in Appendix G.
3. Clean and Efficient Transportation Options
Saving energy through clean and efficient transportation options includes reducing
petroleum use by reducing single occupancy driving and increasing use of electric
vehicles and alternative fuels. This section describes the City’s current efforts to
promote clean and efficient transportation options and additional resources for active
transportation, transportation demand management (TDM), and alternative fueling
infrastructure.
Envision Carlsbad – Community Vision
Walking, biking, public transportation and connectivity
“Increase travel options through enhanced walking, bicycling and
public transportation systems. Enhance mobility through increased
connectivity and intelligent transportation management.”
38 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority Active Transportation
Active transportation includes biking and walking as a means of getting from one place
to another. Having facilities to support active transportation offers multiple travel
choices for residents, fosters healthy lifestyles, and provide sustainable transportation
options. The Carlsbad Community Vision calls for increasing travel options through
enhanced pedestrian and bicycling systems, and the draft General Plan Mobility Element
contains a number of policies that support active transportation. Recently, the City has
taken steps to provide more options for walking, hiking, running, and biking, by updating
the Trails Master Plan and developing a Comprehensive Active Transportation Strategy.
To support the City’s active transportation plans and projects, the City received four
TransNet Active Transportation grants in 2012 totaling $1.25 million. The grants include
the following projects:
• $800,000 to construct a roundabout at the Carlsbad Boulevard-State Street
intersection and reconfigure existing right-of-way to include bicycle lanes on each
side of the street, a sidewalk on the east side of the street, and the Coastal Rail Trail
on the west side of the street.
• $267,000 for the Active Village Campaign to boost awareness of bicycling and
walking opportunities in the Carlsbad Village. The City is partnering with several
organizations including Urban Place, the Carlsbad Village Association,
WalkSanDiego, the San Diego County Bicycle Coalition and local schools to
encourage people to use active transportation.
• $150,000 to develop and implement a citywide Active and Livable Streets Strategy
for Active Transportation.
• $33,000 for 80 new custom bicycle racks and six bike corrals, consisting of seven
racks each, to improve access for bicyclists in northwestern Carlsbad.
TDM
TDM is the application of strategies to reduce single occupancy vehicle travel by
encouraging alternative transportation options. Including TDM measures in the
development review process may offer developers creative, affordable, and effective
ways to reduce vehicle trips and their impacts. TDM measures also contribute toward
Leadership in Energy and Environmental Design® certification.
The City’s draft General Plan and Climate Action Plan support transportation and
parking demand programs. Draft Mobility Element policies call for developing flexible
parking requirements and providing development incentives to implement TDM
programs (Policies 3-page 34 through 3-page 37). Similarly, the draft Climate Action Plan
calls for preparation of a citywide TDM plan and ordinance to reduce GHG emissions
(Measure K). Through its capital improvement program, the City will develop a
multimodal infrastructure plan to expand transportation choices for the coastal
39 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority corridor. The plan will focus on transit accessibility, “first mile-last mile” solutions,
low-emission and zero-emission travel, and viable alternatives to single-occupant
driving.
The iCommute program offers free assistance to regional businesses and agencies in
establishing and implementing customized TDM policies and programs that reduce
traffic congestion, fuel use, air pollution, and GHG emissions. SANDAG recently
completed a TDM tool for city planners: Integrating Transportation Demand
Management into the Planning and Development Process - A Reference for Cities. The
report is available as part of the SANDAG smart growth toolbox at the following link:
sandag.org/uploads/publicationid/publicationid_1663_14425.pdf.
Another TDM strategy is parking management that provides parking options to reduce
the amount of driving. Parking strategies can be effective in, and complement smart
growth areas with compact land use patterns and alternative travel options. Parking
policies complement many TDM efforts, and normally have included incentives or
disincentives for fewer spaces per unit of development (parking maximums rather than
minimums), encourage shared parking among land uses (retail and office for example),
and/or a fee per parking space. In 2010, SANDAG published Parking Strategies for Smart
Growth: Planning Tools for the San Diego Region and continues to work with local
governments on innovative parking policies. The parking report is available at:
sandag.org/uploads/publicationid/publicationid_1499_11603.pdf.
Alternative Fueling Infrastructure
As automakers offer greater numbers of vehicles powered by a variety of fuels,
infrastructure must keep up to enable this market growth. For example, Cadillac,
Chevrolet, Daimler, Fiat, Ford, Honda, Mitsubishi, Nissan, Tesla, and Toyota all offer
plug-in electric vehicles today. Also, Honda, Toyota, General Motors, Daimler, Hyundai,
and Nissan have stated they plan to bring hydrogen fuel cell vehicles to market in the
2015 to 2017 timeframe.
In order to keep pace with the market and reach state petroleum reduction targets,
regional planning and actions are necessary to incorporate alternative fuel
infrastructure (e.g., fueling stations and Electric Vehicle [EV] chargers) where little to
none exist today. Requests for availability of EV chargers and other fueling
infrastructure will grow in the near future.
The City’s draft Climate Action Plan promotes increased use of Zero-emission Vehicle
(ZEV) travel through development of a charging station siting plan and action program
to install alternative fueling stations, adopting ZEV parking standards, and updating the
40 City of Carlsbad Energy Roadmap Community: Leverage Planning and Development Authority City’s fleet management program to increase the use of alternative fuel vehicles in City
operations (Measure L).
Recognizing these factors, the SANDAG Board included several recommended actions in
the 2050 RTP/SCS (2011) to begin planning for an increase in alternative fuel vehicles.
Specifically, Sustainable Communities Strategy Actions 21, 22, and 24 addressed
alternative fuels, the transportation network, and the need for adequate infrastructure.
21. Support planning and infrastructure development for alternative fueling stations
and plug-in EV chargers.
22. Develop or facilitate a regional approach to long-term planning for alternative fuel
infrastructure that includes the continued development of public-private strategic
alliances.
24. Integrate alternative fuel considerations into the development of the regional
transportation network by, for example, integrating infrastructure for EV charging
into regional park-and-ride lots and transit stations.
Siting alternative fueling stations is important to provide customers like fleet managers
and the general public with a level of certainty that infrastructure will be available to
support their investment in an alternative fuel vehicle. Support for alternative fuel
infrastructure also can help attract private investment associated with alternative
transportation to the region. The San Diego Regional Clean Cities Coalition, along with
its members including the County, SANDAG, local cities, the Airport Authority, the Port
of San Diego, and CCSE have committed to addressing the need for more fueling choices
across the region. A list of both publicly and privately available alternative fueling
stations is included in Appendix D.
SANDAG received a $200,000 Energy Commission grant in 2012 to work with local
governments and stakeholders to prepare a regional readiness plan for electric vehicles.
Subsequently, SANDAG has received a $300,000 grant to expand the EV planning effort
and develop a regional readiness plan for all alternative fuels. Planning and related staff
from the City and other local governments are encouraged to participate. The San Diego
Regional EV Readiness Plan was accepted by the SANDAG Board in January 2014 and the
alternative fuel readiness plan is to be completed in summer 2016. Factsheets and best
practices on permitting EV chargers, parking accessibility, types of chargers, and other
topics are included in the San Diego Regional Plug-in EV Readiness Plan available at:
sandag.org/uploads/publicationid/publicationid_1817_17061.pdf.
41 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses 6
Market Energy Programs to Local Residents, Schools, and Businesses
This chapter provides the City of Carlsbad (City) with internet links to existing energy
efficiency and fuel-saving resources that the City could include on its website,
newsletters, and email alerts. This would enable the City to serve as a conduit to its
constituents on energy-saving residential, commercial, and school programs. The City
could help promote messages of sustainability that foster a greater local understanding
of the connection between energy/fuel use and environmental impacts. The City also
could become a local government partner with national energy-saving educational
campaigns like ENERGY STAR® and WaterSense.
The following five outreach mechanisms are provided as sample ways in which the City
can engage residents and businesses in energy programs:
1. Provide summary descriptions and links to San Diego Gas & Electric® (SDG&E)
programs and rebates and related resources on the Carlsbad – Sustainable City
website.
2. Include articles about opportunities to save energy with links to existing programs
and community resources, like the California Center for Sustainable Energy (CCSE),
in City newsletters (print or email) or similar media.
3. Provide educational materials on saving energy at City venues such as the permit
desk, parks and recreation areas, and city hall. SDG&E, CCSE, and SANDAG
iCommute can provide materials about programs and services for residents and
businesses.
4. Invite SDG&E, SANDAG iCommute and/or CCSE to host an information booth on
energy-saving programs or commuter programs at community events.
5. Help coordinate presentations by SDG&E and SANDAG iCommute to community
organizations such as a neighborhood planning group or local chamber of
commerce.
California’s Vision for Marketing, Education, and Outreach
Californians will be engaged as partners in the state’s energy-
efficiency, demand-side management, and clean energy efforts by
becoming fully informed of the importance of energy-efficiency and
their opportunities to act. California Long-Term Energy Efficiency Strategic Plan
42 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses
Comprehensive Energy Program Websites
Residential Energy-Saving
Programs
sdge.com/residential/rebates.shtml
Commercial Energy-Saving
Programs
sdge.com/business/rebatesincentives
Educational Resources
for All
SDG&E and CCSE conduct hundreds of expert-facilitated seminars on
a broad spectrum of energy topics at two locations in central
San Diego, the Energy Innovation Center (EIC). The online calendar
lists workshops from both organizations and venues.
sdge.com/energy-innovation-center/seminars
SANDAG iCommute Free online gateway to commuter choices in the San Diego region;
hosted by SANDAG. Includes 511, transit trip planner, online ride
matching service, and cost of commute calculator. icommutesd.com
Energy Upgrade California energyupgradecalifornia.org
Local Educational Resources
SDG&E Energy Innovation Center
In January 2012, SDG&E opened the EIC, which was designed to be one of San Diego’s
first Leadership in Energy and Environmental Design® Platinum buildings open to the
public. The EIC is a community resource to explore the latest green technologies and
learn about energy efficiency. It hosts a variety of workshops and includes a Food
Service Demonstration Kitchen that hosts free seminars on energy-efficient cooking,
equipment, lighting, and food safety. Additionally the CCSE hosts workshops related to
renewable energy at the EIC.
The EIC is located at 4760 Clairemont Mesa Blvd, San Diego, California 92117. Call
(800) 411-7343 or visit sdge.com/eic. For information related to solar programs and
workshops, contact CCSE at (858) 244-1177 or visit energycenter.org.
SANDAG iCommute Programs for the Community
In addition to supporting City-employee commuter programs like those identified in
Chapter 5, the City could help educate its residents and local businesses about
alternatives to driving alone in the community. The City could:
Provide information on commuting resources at the Civic Center, libraries and other
public sites, and/or on municipal websites and newsletters. Include links to the 511
43 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses transit trip planner, iCommute online ridematching service, and an online cost-of-
commute calculator.
Participate in annual events and campaigns that encourage commute alternatives to
driving alone such as Bike to Work Day, Dump the Pump, Rideshare Week, Walk and
Bike to School Day:
o Adopt proclamations and celebrate these events in your community.
o Participate in the Bike to Work and Rideshare Week Corporate Challenges to
demonstrate your commitment to sustainable commute choices.
o Host a Bike to Work Day pit stop(s)
Recognize and/or honor local commuters and employers who have demonstrated a
commitment to sustainable commute choices.
SANDAG SchoolPool Program
SchoolPool is iCommute’s free ridematching service for parents of children who attend
the same school anywhere in the region. With this safe and secure service, parents are
matched with other parents in their neighborhood who are interested in sharing the
driving responsibilities or would like to have their kids bike or walk to school with other
students and a parent leader. The City could:
Encourage the school district and/or individual schools to enroll in SchoolPool, a
secure online ridematching service administered by SANDAG for parents with
children in kindergarten through 12th
grade. SchoolPool can be a
transportation solution for parents who
live in districts where school bus
services have been cut.
o SchoolPool enables parents of
children who attend the same
school and live in the same
neighborhood to share responsibilities of getting their children to and from
school.
o SchoolPool helps parents connect their children with bike buddies and “walking
school buses” – groups that ride their bikes or walk to school together with one
or more adults.
o Parents who use SchoolPool to find bike buddies and walking school buses can
receive a free helmet for each child who bikes and a free baseball cap for each
child who walks. All children who either bike or walk can receive reflective
backpacks. Safety vests are provided for parent leaders.
Through SchoolPool, parents can
receive a free helmet for each child
who bikes and a free baseball cap for
each child who walks. All children
who bike or walk can receive
reflective backpacks, and safety vests
are provided for parent leaders.
44 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses National Educational Resources
ENERGY STAR Government Partnerships
In addition to appliance labeling, the ENERGY STAR program seeks partnerships with
local businesses, congregations, industries, schools, and others. By becoming a
Government ENERGY STAR Partner, a local government can receive recognition
nationally and can co-brand local energy-saving initiatives with ENERGY STAR. More
information is available at energystar.gov.
The United States Environmental Protection Agency and United States Department of
Energy also host an annual ENERGY STAR Awards ceremony to honor organizations that
have made outstanding contributions to protecting the environment through energy
efficiency. For more information on government partnerships, visit
energystar.gov/index.cfm?c=government.bus_government.
WaterSense Promotional Partners
WaterSense helps consumers identify water-efficient products and programs that meet
WaterSense water efficiency and performance criteria. Products carrying the
WaterSense label perform well, help save money, and encourage innovation in
manufacturing. More information is available at epa.gov/watersense.
Local governments, utilities, and other organizations can become WaterSense
Promotional Partners to help provide outreach on water-efficiency measures.
Jurisdictions can receive recognition nationally and can co-brand local water-saving
initiatives with WaterSense as a promotional partner. For more information on
promotional partners, visit epa.gov/watersense/partners/promotional.html.
45 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses Energy Programs for Residential and Business Audiences
Renewable Energy Programs
Self-Generation
Incentive Programs
energycenter.org/index.php/incentive-programs/self-generation-incentive-
program
The California Solar
Initiative (CSI)
energycenter.org/index.php/incentive-programs/california-solar-initiative
CSI Thermal Program
(Solar Water Heating)
energycenter.org/index.php/incentive-programs/solar-water-heating
Sustainable
Communities Program
sdge.com/environment/sustainable-communities-overview
SDG&E Solar Initiative sdge.com/clean-energy/going-solar/solar-rebate-programs
Net Energy Metering sdge.com/nem
Energy and Water
20-Gallon Challenge The 20-Gallon Challenge is a call for residents and businesses to reduce our
region's water use on average by 20 gallons per person, per day. Hosted by
the San Diego County Water Authority.
20gallonchallenge.com
Smart Grid
SDG&E Smart Grid
Program
Smart meter and smart grid technologies are being deployed throughout
the San Diego region and across the state. sdge.com/smartgrid
Clean Transportation and Petroleum Reduction Programs
Clean Vehicle Rebate
Project
energycenter.org/cvrp
SANDAG iCommute icommutesd.com
SDG&E Clean
Transportation
sdge.com/cleantransportation
The EV (Electric
Vehicle) Project
theevproject.com
SANDAG SchoolPool
Program
icommutesd.com/Schoolpool
46 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses Energy Programs and Assistance for Local Businesses
Energy efficiency and Demand Response
Business Incentives sdge.com/business/rebatesincentives
Critical Peak Pricing sdge.com/cpp
Technical Assistance and
Technology Incentives
sdge.com/tati
Project Management Builder
Services
sdge.com/builderservices
Summer Saver sdge.com/vendor/summersaver
On-Bill Financing sdge.com/obf
Energy Savings Bid sdge.com/bid
Energy Challenger
(energy audit tool)
sdge.com/save-money/no-cost-audits/business-energy-
assessment-program
Energy efficiency Seminars sdge.com/training
PACE Financing: CaliforniaFIRST californiafirst.org
New Construction
Savings by Design sdge.com/clean-energy/savings-design/savings-design
Sustainable Communities
Program
sdge.com/environment/sustainablecommunities
Energy Programs and Assistance for Residents
Comprehensive Residential Websites
SDG&E’s
Residential
Rebates and
Services
All SDG&E residential programs can be accessed from this website.
sdge.com/saveenergy
Energy Upgrade
California (EUC)
EUC is a statewide brand for all energy-saving building retrofit programs. EUC
coordinates federal, state, utility, and local retrofit program outreach,
incentives, training, and qualifications. Locally, CCSE is collaborating with SDG&E
to coordinate the program. energyupgradeca.org
Property
Assessed Clean
Energy (PACE)
and Assembly
Bill (AB) 811
Programs
PACE or AB 811 programs are intended to give cities and counties the ability to
offer low-interest loans for energy efficiency and solar energy projects to
commercial and/or residential property owners. *Residential PACE programs
are currently on hold nationwide. Commercial programs are emerging.
pacenow.org
47 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses Energy efficiency and Demand Response
Advanced Home
Program
californiaadvancedhomes.com
Air Conditioning Tune-
Ups
actimeprogram.com/ProjectCenter
Summer Saver
Program
sdge.com/summersaver
Refrigerator-Freezer
Recycling Program
arcaincutility.com/CA/SDGE/Step2_ZipCode.cfm?ServiceCompany=43
Clothes Washer
Rebate Program
20gallonchallenge.com/programs_residential.html or
(888) 376-3314
Residential Energy
Survey
sdge.com/energy-efficiency-survey-0
(800) 411-SDGE (7343)
Lighting Turn in
Program
sdge.com/lighting
Tax Credits energytaxincentives.org
New Construction Programs
Advanced Home
Program
californiaadvancedhomes.com
New Solar Homes
Partnership
sdge.com/clean-energy/going-solar/applying-solar-rebates
Low Income Assistance
Residential Rate
Assistance Program
sdge.com/residential/assistance/assistServCare.shtml
The Energy Team
Program
sdge.com/energy-savings-assistance-program
Programs for
Customers with
Special Needs
sdge.com/available-assistance-programs
Multi-Family
Affordable Solar
Housing
energycenter.org/index.php/incentive-programs/multifamily-affordable-
solar-housing
Energy and Water
WECalc Home
Water-Energy-
Climate Calculator
Free online tool from the Pacific Institute that estimates home water-
related energy use and associated greenhouse gas emissions.
wecalc.org
SoCal Water Smart
for Residential
Customers
Available water efficiency product rebates.
socalwatersmart.com
Clothes Washer
Rebate Program
20gallonchallenge.com/programs_residential.html or (888) 376-3314
48 City of Carlsbad Energy Roadmap Community: Market Energy Programs to Local Residents, Schools, and Businesses This page intentionally left blank.
49 City of Carlsbad Energy Roadmap Community: Support Green Jobs and Workforce Training California’s Vision for Workforce Education and Training
By 2020, California’s workforce is trained and fully engaged to provide the
human capital necessary to achieve California’s economic, energy efficiency,
and demand-side management potential.
California Long-Term Energy Efficiency Strategic Plan
7
Support Green Jobs and Workforce Training
The City of Carlsbad (City) can increase local awareness of workshops, training, and
employment resources available to its constituents. It can make this information more
widely available by including it on its website and/or providing handouts at local
libraries and city hall.
Training and Education Resources
Sample Green Job Fields Sample Green Jobs
• Building retrofitting
• Smart grid
• Wind power
• Solar power
• Advanced biofuels
• Alternative
transportation
vehicles and
infrastructure
Electricians, heating, ventilation and air conditioning
installers, carpenters, construction workers and
managers, home builders, roofers, building inspectors,
engineers (civil, mechanical, environmental, electrical),
welders, metal fabricators, assemblers, transit and truck
drivers, dispatchers, software engineers, technicians,
machinists, power line installers and repairers, iron and
steel workers, sheet metal workers, equipment
operators, chemists, chemical technicians, agricultural
workers, farm product purchasers, agricultural inspectors
San Diego Miramar College’s Advanced
Transportation Technology and Energy Center
Advanced Transportation Technology and Energy (ATTE) Centers were created as a
means for keeping California competitive as a national leader in advanced
transportation and energy technologies, and to transform the workforce in the rapidly
developing, technology-driven transportation and energy industries. San Diego Miramar
College’s ATTE Center is the regional center for San Diego County.
50 City of Carlsbad Energy Roadmap Community: Support Green Jobs and Workforce Training Courses, assistance, and outreach programs are tailored to the needs of regional
employers and employees in California. The ATTE Center provides students, technicians,
faculty, public, and other initiative centers with the education, training, and resources
they need to effectively learn, teach, and work with advanced transportation and
energy technologies, including:
Electric, hybrid, and hydrogen fuel cell programs
Gaseous fuel programs for light and/or heavy duty vehicles
Intelligent transportation systems programs
Railroad operation programs
Light rail maintenance aeronautics and flight
Technology programs and energy programs
Motorcycle maintenance programs
Automotive clean-air car emissions programs
The Miramar College ATTE Center is located at 10440 Black Mountain Road, San Diego,
California 92126. Call (619) 388-7673 or visit attemiramar.com for more information.
Cuyamaca Community College’s San Diego Green
Building Training Collaborative
The Grossmont-Cuyamaca Community College District (GCCCD) was awarded American
Recovery and Reinvestment Act (ARRA) funds to launch the San Diego Green Building
Training Collaborative under California’s Clean Energy Workforce Training Program. The
collaborative trains unemployed or underemployed workers with previous construction
experience to be building analyst professionals, water auditors, solar photovoltaic
installers, and solar thermal installers.
Trainings serve all of San Diego County and are offered at Cuyamaca College in Rancho
San Diego and Palomar College in San Marcos. Certificates of Achievement are awarded
upon program completion. GCCCD plans to continue the green building training
collaborative after ARRA funds are expended. Cuyamaca College already offers green
workforce training certificates and degrees in water/wastewater technology,
environmental health and safety, sustainable landscaping, and renewable energy. For
more information, visit cuyamaca.edu/preview/cleanenergy.
The San Diego Workforce Partnership
The San Diego Workforce Partnership (sandiegoatwork.com) works with public and
private agencies, local businesses, and educational institutions to create workforce
solutions for the San Diego region. It provides services for employers and job seekers,
online access to workforce training and resource, and has ten One-Stop Career Centers
51 City of Carlsbad Energy Roadmap Community: Support Green Jobs and Workforce Training located throughout San Diego County. The Workforce Partnership serves as this region’s
Workforce Investment Board.
The nearest One-Stop Career Center to the City is:
• North County Coastal Career Center, located at 1949 Avenida del Oro, Suite 106,
Oceanside California, 92056. For more information, visit
northcountycareercenters.com
San Diego Gas & Electric Energy Innovation Center
The Energy Innovation Center (EIC) hosts a variety of workshops and includes a Food
Service Demonstration Kitchen that hosts free seminars on energy-efficient cooking,
equipment, lighting, and food safety. The EIC is located at 4760 Clairemont
Mesa Boulevard, San Diego, California 92117. Contact (800) 411-7343 or visit
sdge.com/eic.
Statewide Resources for Training and Education
Grid Alternatives
Grid Alternative (gridalternatives.org) offers volunteer opportunities to gain hands-on
solar experience and network with others interested in renewable energy, the
environment, and our communities.
Solar Training Institute
The Solar Training Institute (trainingforsolar.com) provides accelerated training classes
for contractors, electricians, engineers, solar energy entrepreneurs, sales people and
anyone who is considering a career change to the growing solar industry.
California Community Colleges Economic and
Workforce Development
The California Community Colleges Economic and Workforce Development (CCCEWD)
program provides industry-specific workforce education, training, and consulting
services to help California businesses compete. CCCEWD (cccewd.net) is the state
program from which the local ATTE Center, San Diego Workforce Partnership, and
One-Stop Career Centers stem.
52 City of Carlsbad Energy Roadmap Community: Support Green Jobs and Workforce Training This page intentionally left blank.
53 City of Carlsbad Energy Roadmap Looking Forward Looking Forward
This Energy Roadmap provides the City of Carlsbad (City) with a framework for
continued efforts to save energy in government operations and the community that
supports the broad energy conservation goals articulated in its General Plan and Climate
Action Plan. After the City participates in the SANDAG Energy Roadmap Program, there
may be local, state, and federal funding opportunities for the City to continue
energy-saving activities, either on its own or in partnership with SANDAG. These funding
sources are described below, followed by non-financial resources.
Energy-Saving Funding Opportunities
Local Government Partnerships with San Diego Gas & Electric
The SANDAG Energy Roadmap Program is primarily funded through a local government
partnership with San Diego Gas & Electric® (SDG&E). The utility manages several local
government energy efficiency partnerships in the region for jurisdictions, public
agencies, and the California Center for Sustainable Energy. The duration is typically
three years, and they are approved by the California Public Utilities Commission (CPUC).
Prior to the start of new program cycles, SDG&E announces a request for abstracts for
future local government partnership programs. The next program cycle, to be
determined by the CPUC, will likely begin in January 2016. Using its Energy Roadmap as
a guide, the City can decide if it would like to propose to SDG&E its own local
government partnership, have SANDAG continue to serve as a mechanism to provide
added energy efficiency services, or take a different course of action.
Local Government Energy efficiency Partnerships have three focus areas:
1. Identify energy efficiency savings in municipal sites
2. Utilize core energy efficiency programs
3. Engage the community on energy efficiency
The County of San Diego, City of Chula Vista, and the City of San Diego have their own
local government partnerships with SDG&E. Examples of programs funded through
these partnerships include:
Municipal facility retrofit for energy efficiency improvements
Strengthened building energy codes and code enforcement
54 City of Carlsbad Energy Roadmap Looking Forward Land use planning and design
Education and outreach
Green building, permit expedite, and fee reduction programs
Peer-to-peer best practices and networking
Staff training programs
Energy plan development
Emerging Cities Program with SDG&E
SDG&E has developed a smaller grant program that cities can apply to for funding to
implement specific components of their Energy Roadmaps that cannot be funded
through the SANDAG Local Government Partnership. The program is available through
2015, and your Energy Roadmap coordinator can arrange a meeting with the
appropriate SDG&E program staff to learn about this grant opportunity. In 2014,
activities funded at local cities include:
Expansion of a green business program
Assessment of property assessed clean energy programs for City consideration
Greenhouse gas inventory
Energy chapters for a Climate Action Plan
Energy-related implementation measures for an adopted Climate Action Plan
The United States Department of Energy (DOE) and California Energy Commission
release State Energy Program solicitations that support transportation, residential,
commercial, agricultural, industrial, institutional energy efficiency, and renewable
energy programs.
Both agencies also release Energy Efficiency and Conservation Block Grants (EECBG)
solicitations. The EECBG provides local government grants to reduce fossil-fuel
emissions, reduce total energy use, and improve energy efficiency and conservation in
the transportation and building sectors. Grants originate from DOE and are released
from both the Energy Commission and DOE. For program opportunities, visit
energy.ca.gov/contracts/index.html.
State Energy Program Grants and Energy efficiency and
Conservation Block Grants
55 City of Carlsbad Energy Roadmap Looking Forward
Clean Vehicle Rebate Project
The Clean Vehicle Rebate Project is funded by the California Air Resources Board and
administered statewide by the California Center for Sustainable Energy (CCSE). A total of
$63.7 million was appropriated for FY 2009-2013 to promote the production and use of
zero-emission vehicles, including electric, plug-in hybrid electric, and fuel cell vehicles.
Rebates of up to $2,500 per light-duty vehicle are available for individuals and business
owners who purchase or lease new eligible zero-emission or plug-in hybrid electric
vehicles. The program received funds for 2014 and is expected to be funded in future
years.
California Energy Commission Assembly Bill 118: Alternative and
Renewable Fuel & Vehicle Technology Program
Assembly Bill 118 (AB 118): Alternative and Renewable Fuel and Vehicle Technology
Program (ARFVTP) authorized the California Energy Commission (CEC) to develop and
deploy alternative and renewable fuels and advanced transportation technologies to
help attain the state's climate change policies. The program runs through 2024 and the
CEC has an annual program budget of approximately $100 million to support projects
that:
• Develop and improve alternative and renewable low-carbon fuels.
• Optimize alternative and renewable fuels for existing and developing engine
technologies.
• Produce alternative and renewable low-carbon fuels in California.
• Decrease, on a full fuel cycle basis, the overall impact and carbon footprint of
alternative and renewable fuels and increase sustainability.
• Expand fuel infrastructure, fueling stations, and equipment.
• Improve light-, medium-, and heavy-duty vehicle technologies.
• Retrofit medium- and heavy-duty on-road and non-road vehicle fleets.
• Expand infrastructure connected with existing fleets, public transit, and
transportation corridors.
• Establish workforce training programs, conduct public education and promotion,
and create technology centers.
Additional information on the ARFVTP and the associate investment plan can be found
on the CEC website: energy.ca.gov/altfuels.
56 City of Carlsbad Energy Roadmap Looking Forward
TransNet: Smart Growth Incentive Program and
Active Transportation Grants
The TransNet Smart Growth Incentive Program (SGIP) funds transportation-related
infrastructure improvements and planning efforts that support smart growth
development. The SGIP awards two percent of the annual TransNet revenues for the
next 40 years to local governments through a competitive grant program to support
projects that will help better coordinate transportation and land use in the San Diego
region. Additional information on the current funding cycle is available at
sandag.org/smartgrowth.
The goal of the Active Transportation Grant Program is to encourage local jurisdictions
to plan and build facilities that promote multiple travel choices for residents and
connectivity to transit, schools, retail centers, parks, work, and other community
gathering places. The grant program also encourages local jurisdictions to provide
bicycle parking, education, encouragement, and awareness programs that support
pedestrian and bicycle infrastructure. More information on current funding
opportunities is available at sandag.org/active.
Non-Financial Resources for Local Governments
ENERGY STAR® Government Partnerships
In addition to appliance labeling, the ENERGY STAR program seeks partnerships with
local businesses, congregations, industries, schools, and others. By becoming a
Government ENERGY STAR Partner, a local government can receive recognition
nationally and can co-brand local energy-saving initiatives with ENERGY STAR. More
information is available at energystar.gov.
The United States Environmental Protection Agency (EPA) and United States
Department of Energy also host an annual ENERGY STAR Awards ceremony to honor
organizations that have made outstanding contributions to protecting the environment
through energy efficiency. For more information on government partnerships, visit
energystar.gov/index.cfm?c=government.bus_government.
WaterSense Promotional Partners
The EPA also promotes water conservation efforts through its WaterSense program that
helps consumers identify water efficient products and programs that meet EPA’s water
efficiency and performance criteria. Products carrying the WaterSense label perform
57 City of Carlsbad Energy Roadmap Looking Forward well, help save money, and encourage innovation in manufacturing. More information is
available at epa.gov/watersense.
Local governments, utilities, and other organizations can become WaterSense
Promotional Partners to help provide outreach on water-efficiency measures.
Jurisdictions can receive recognition nationally and can co-brand local water-saving
initiatives with WaterSense as a promotional partner. For more information on
promotional partners, visit epa.gov/watersense/partners/promotional.html.
The Beacon Award
The Institute for Local Governments’ California Climate Action Network
(CCAN) has created the Beacon Award to recognize cities and counties that
reduce Greenhouse Gas (GHG) emissions and save energy. To receive a silver, gold, or
platinum Beacon Award, jurisdictions must achieve measurable GHG reductions and
energy savings in agency facilities, and achieve measurable GHG reductions and
promote energy conservation activities in the community.
Once a local government applies, it is designated as a Beacon Award program
participant, and will then begin working toward achieving the first Beacon Award level.
There is no deadline to apply; applications will be accepted on an ongoing basis.
Becoming a Beacon Award participant is a simple process. Agencies at every step of the
climate action journey are welcome to consider applying. To be accepted as a Beacon
Award participant, cities and counties will complete a simple application form and do
the following:
Adopt a resolution by the governing body committing the agency to participate in
the program
Designate a lead staff person as a point of contact
Prepare, or commit to prepare, a baseline GHG emissions inventory for agency
facilities and the community as a whole (previously completed inventories using a
commonly accepted methodology will be accepted)
Prepare, or commit to prepare, a climate action plan that includes actions in each of
the Best Practice Areas (previously completed plans using a commonly accepted
methodology will be accepted)
Demonstrate compliance with Assembly Bill 939, the California Integrated Waste
Management Act of 1989
Visit ca-ilg.org/BeaconAward for more information.
58 City of Carlsbad Energy Roadmap Looking Forward SDG&E
As described in previous chapters, SDG&E (sdge.com) manages a variety of
energy-saving programs that:
Promote energy efficiency, demand response, and conservation programs, services,
and resources
Provide energy education and outreach to the community
California Center for Sustainable Energy
The CCSE (energycenter.org) works with local governments on several initiatives
including:
The San Diego Regional Retrofit Advisory Committee, that includes several local
jurisdictions, SANDAG, and SDG&E
The Energy Upgrade California program
San Diego Regional Electric Vehicle Infrastructure Working Group, in partnership
with SANDAG, that includes representatives from local jurisdictions, regional
agencies, SDG&E, workforce training partners, and electric vehicle and equipment
manufacturers
San Diego Regional Clean Cities Coalition
California Clean Vehicle Rebate Project
Energy Policy Initiatives Center
The Energy Policy Initiatives Center (EPIC) is a nonprofit academic and research center
of the University of San Diego, School of Law that studies energy policy issues affecting
the San Diego region and California. EPIC serves as a source of legal and policy expertise,
and provides information on the development of sustainable solutions that meet the
region’s future energy needs. For more information, contact (619) 260-4589 or visit
sandiego.edu/epic.
San Diego Association of Governments
SANDAG Energy and Climate Change Planning Program staff is knowledgeable about
federal, state, regional, and local issues and can be a resource for jurisdictions after its
Energy Roadmaps are completed. For more information on SANDAG energy and climate
change planning, contact Susan Freedman at (619) 699-7387,
susan.freedman@sandag.org or visit sandag.org/energy.
59 City of Carlsbad Energy Roadmap Looking Forward
SANDAG iCommute Program
The SANDAG iCommute team can assist local governments with staff commuter
programs, Transportation Demand Management (TDM) ordinances, online tools, and
outreach on alternative transportation options for the commute. For more information,
contact Kimberly Weinstein at (619) 699-0725, kimberly.weinstein@sandag.org, or visit
icommutesd.com.
Statewide Energy Efficiency Best Practices Coordinator
Patrick Stoner serves as the Statewide Local Government Energy Efficiency Best
Practices coordinator. The position is part of the CPUC 2010 through 2012 statewide
energy efficiency programs. Like SANDAG is available to you locally, Mr. Stoner is a
statewide resource. The statewide coordinator develops and distributes best practices
case studies, provides information and examples of energy efficiency policies and
programs, provides materials that may help local governments implement climate
action plans, and serves as a resource to help local government energy programs
achieve success. Mr. Stoner is housed at the Local Government Commission (LGC) and
has been part of the LGC since 1993. He can be reached at (916) 448-1198, extension
309 or email pstoner@lgc.org.
Statewide Energy Efficiency Collaborative
The Statewide Energy Efficiency Collaborative (SEEC) was formed in 2010 as an alliance
to help cities and counties reduce greenhouse gas emissions and save energy. SEEC
(californiaseec.org) serves as a statewide local government partnership and is an
alliance among the Local Government Commission, ICLEI – Local Governments for
Sustainability, the Institute for Local Government, and California’s four investor-owned
utilities, including San Diego Gas & Electric. Resources provided by these agencies are
described below.
Local Government Commission provides free webinars, holds an annual statewide
conference, and provides peer-to-peer networking opportunities
ICLEI is conducting a series of workshops and trainings for local governments on
taking key steps to reduce GHG emissions
Institute for Local Governments’ CCAN is providing recognition for cities and
counties through the Beacon Award
60 City of Carlsbad Energy Roadmap Looking Forward
San Diego Regional Clean Cities Coalition
The San Diego Regional Clean Cities Coalition is the local affiliate of the DOEs Clean
Cities program. Coordinated by the CCSE, the Clean Cities Coalition brings together
stakeholders in the public and private sectors to increase the use of alternative fuel and
alternative fuel vehicles. The Clean Cities Coalition holds educational events on a regular
basis and board of directors meets monthly. More information and a calendar of events
can be found at sdcleancities.org.
61 City of Carlsbad Energy Roadmap Looking Forward This page intentionally left blank.
Prepared through the SANDAG
Energy Roadmap Program
April 2011
This Program is a collaboration between SANDAG and San Diego Gas & Electric®
www.sandag.org/energy
Prepared through the SANDAG
Energy Roadmap Program
April 2011
This Program is a collaboration between SANDAG and San Diego Gas & Electric®
APPENDICES
Prepared through the SANDAG
Energy Roadmap Program
October 2014
City of Carlsbad
Energy Roadmap
Table of Contents APPENDICES
Energy Roadmap for the City of Carlsbad
Table of Contents
A. Municipal Energy Assessments: Phase 1 Energy Report Cards A-1
B. Municipal Energy Assessments: Priority Site List for Phase 2 Assessments B-1
C. Municipal Energy Assessments: Phase 2 Energy Audit Findings C-1
D. Petroleum Reduction, Alternative Fuels, and Local Infrastructure D-1
E. Transportation Demand Management Policies and Resources E-1
F. Sample Smart Growth Policies and Resources F-1
G. Sample Energy Saving Policies and Resources G-1
H. Sample Clean and Efficient Transportation Policies and Resources H-1
Program Contacts
Energy Roadmap Program Manager:
Susan Freedman, SANDAG, susan.freedman@sandag.org, (619) 699-7387
Carlsbad Energy Roadmap Coordinator:
Allison Wood, SANDAG, allison.wood@sandag.org, (619) 699-1973
SDG&E Energy Efficiency Programs:
Joshua Brock, JBrock@semprautilities.com, (858) 503-5129
Building Energy Audits:
John Woolsey, EFM Solutions, john.woolsey@efm-solutions.com, (951) 200-3178
!
!!
!Prepared!by!
!
!!
9919!Hibert!St!Suite!A!
San!Diego,!CA!92123!
City%of%Carlsbad%
Complete%Facility%List%
%
Phase%1:%Energy%Report%Cards%
1200!Carlsbad!Village!Dr.!
Carlsbad,!CA!92008!
ENERGY!REPORT!CARDS!
!
Introduction!to!Report!Card!
Billing!Analysis!
Benchmarking!
GHG!Emission!!!
Building!Energy!Use!by!System!
Phase!1!Audit!Summary:!!List!of!systems!inspected!
Potential!Energy!Conservation!Measures!
!
SANDAG%
Energy%Roadmap%
Program%
!!
This!program!is!funded!by!California!customers!under!the!auspices!of!the!
California!Public!Utilities!Commission.!
!
FACILITY!SITE!LIST!
!
Calavera!Hills!Park!!
Carlsbad!City!Library!
City!Hall!
CMWD!Administration!
Cole!Library!
Faraday!Center!
Farmers!Insurance!Claims!Building!
Fire!Station!1!
Fire!Station!2!
Fire!Station!4!
Fire!Station!5!
Fleet!Maintenance!
Harding!Community!Center!
Monroe!Street!Pool!
Safety!Center!
Senior!Center!
Stagecoach!Park!
The!Crossings!
!
!
!!
!!
!!
!!
!
City of Carlsbad Energy Roadmap Appendix A-1
APPENDIX A
Introduction!to!Report!Cards!
!
Welcome!to!the!Building!Energy!Assessment!component!of!the!SANDAG!Energy!Roadmap!Program!!!!
This!is!the!Phase!1!Assessment!defined!as!the!Energy!Report!Card,!commencing!your!City’s!2013!energy!
assessments.!!These!assessments!are!funded!by!San!Diego!Gas!&!Electric!and!come!at!no!out!of!pocket!
cost!to!the!City.!!The!San!Diego!Association!of!Governments!is!implementing!this!project!and!has!
contracted!with!EFM!Solutions!to!conduct!both!Phase!1!and!Phase!2!Energy!Assessments.!!It!is!our!hope!
that!you!will!find!the!following!Phase!1!Energy!Report!Card!helpful!in!better!understanding!the!energy!
usage!patterns!throughout!your!City’s!facilities.!!!
!
What!is!the!purpose!of!a!Phase!1!Energy!Report!Card?!
!
The!Energy!Roadmap!Program!has!chosen!to!utilize!a!two^pronged!approach!to!providing!energy!
assessment!assistance!to!cities!throughout!the!San!Diego!Region.!!The!purpose!of!this!dual!phase!
approach!is!to!provide!a!brief!overview!of!the!current!facility!energy!usage!patterns!and!predict!the!
strongest!candidates!for!cost^effective!energy!efficiency!projects.!!These!Report!Cards!are!meant!to!be!a!
simplified!overview!of!the!facilities!and!a!guide!for!further!investigation.!!The!goals!of!the!Energy!Report!
Cards!are!to!state!the!billing!details!for!a!given!facility,!compare!it!to!similar!types!of!facilities,!
benchmark!this!facility!against!similar!facilities,!and!ultimately!develop!a!simple!list!of!energy!
conservation!measures!that!are!deemed!worthy!of!investigation.!!The!end!goal!of!the!Energy!Report!
Card!is!to!provide!information!to!your!City!that!will!help!you!understand!what!systems!are!using!the!
most!energy!in!a!given!building!and!what!the!likely!candidates!are!for!improving!your!building!
operation.!!These!Energy!Report!Cards!will!be!discussed!between!your!City,!EFM!Solutions,!SANDAG,!and!
SDG&E!to!identify!those!energy!conservation!measures!that!the!City!would!like!to!further!explore!for!a!
more!detailed!energy!assessment.!
!
Please!find!enclosed!a!2^page!Energy!Report!Card!for!each!City!Facility!that!was!discussed!during!the!
program!kickoff!event.!
City of Carlsbad Energy Roadmap Appendix A-2
Energy'Report'Card
Calaveras'Hills'Park Billing'Analysis'and'Benchmarking
2999#GLASGOW#DR CARLSBAD,#CA##9201016539
BILLING'DATA
Site'Data
Facility#Square#Footage 19,471#sqft
Electrical#Meter#No.#*6583530
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*713124
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 153,434#kWh/yr
Max#Demand 118.0#kW
Annual#Gas#Consumption 1,817#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $11,931
Electrical#Demand#Cost $21,325
Natural#Gas#Cost $1,034
Taxes#and#Fees $297
Other#Costs $1,620
Total $36,206
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 100.0#kBtu/sqft
Calaveras#Hills#Park#EUI 99.6#kBtu/sqft
Difference O0.4%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type NA
Electrical#Energy#Density 7.9#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.09#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 9.7#(MtCO2e)
Indirect#GHG#Emissions 50.6#(MtCO2e)
Total#GHG#Emissions 60.3#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 26,520 17.3%
Exhaust#fans HVAC 12,757 8.3%
Gym,#meeting#room#and#office#lighting Indoor#Lighting 7,200 4.7%
Parking#lots#and#wallpacks Outdoor#Lighting 7,665 5.0%
Sports#lighting Outdoor#Lighting 74,880 48.9%
Court#lighting Outdoor#Lighting 1,650 1.1%
Plug#loads Equipment 19,471 12.7%
Office#Eqiupment Equipment 2,921 1.9%
Total 153,063 99.8%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 430 23.7%
Heating HVAC 1,387 76.3%
Total 1,817 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
10,000#
20,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
400#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$500###$1,000###$1,500###$2,000###$2,500###$3,000###$3,500###$4,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
14%#
HVAC#
26%#
Indoor#Lighbng#5%#
Outdoor#Lighbng#
55%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
Nabonal#Average#Source#EUI#Calaveras#Hills#Park#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-3
Calaveras'Hills'Park
2999#GLASGOW#DR CARLSBAD,#CA##9201016539
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Calavera#Hills#Community#Park#is#a#mix#of#sports#fields,#playgrounds,#ball#courts#and#a#recreabon#building.##The#building#is#a#1#story#19,471#e2#building#built#in#1989.##The#building#is#occupied#approximately#40#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC#–#Four#package#DX#air#condiboners#serve#the#community#center#controlled#by#digital#programmable#thermostats.##Two#natural#gas#unit#heaters#heat#the#gym.##Eight#exhaust#fans#serve#
restrooms,#electrical#rooms#and#the#gym.##
#Indoor'Lighang'–#The#building#interior#and#gym#are#lit#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#fixture#configurabons.##The#lights#are#controlled#manually.###'
Outdoor'Lighang'–#The#parking#lot#is#lit#with#250#wai#HPS#pole1top#fixtures#and#park#area#lights#are#lit#with#150#wai#HPS#pole1top#fixtures.##Smaller#HPS#wallpacks#are#mounted#on#the#building#perimeter.##All#outdoor#lighbng#is#controlled#for#dusk#to#dawn#operabon.##Addibonally#there#is#a#large#lighted#mulb1sport#ball#field,#two#lighted#tennis#courts#and#lighted#basketball#courts.##Sports#
lighbng#is#operated#by#scheduled#events.##Court#lights#are#on#a#separate#bme#clock#to#turn#them#off#at#10pm#and#have#spring#wound#bmers#for#public#control.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#pole1top#fixtures#with#appropriate#LED#pole1top#fixtures.#
'ECM'3:'Replace#HID#wallpacks#with#an#alternabve#low#waiage#technology.#
'
CSM'1:'Consider#splilng#the#electrical#meter#into#two#meters#and#wiring#sports#field#lighbng#to#one#meter.##The#sports#lighbng#meter#can#then#apply#for#an#outdoor#lighbng#rate#tariff#from#SDG&E#to#pay#a#reduced#price#per#kWh.##
City of Carlsbad Energy Roadmap Appendix A-4
Energy'Report'Card
Carlsbad'City'Library Billing'Analysis'and'Benchmarking
1775#DOVE#LN CARLSBAD,#CA##9201114048
BILLING'DATA
Site'Data
Facility#Square#Footage 73,537#sqft
Electrical#Meter#No.#*1829495
Electrical#Rate#Tariff ALTOUCP2
Gas#Meter#No.#*1164627
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 1,486,063#kWh/yr
Max#Demand 273.0#kW
Annual#Gas#Consumption 10,826#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $114,785
Electrical#Demand#Cost $62,360
Natural#Gas#Cost $6,061
Taxes#and#Fees $2,072
Other#Costs $8,576
Total $193,853
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 246.0#kBtu/sqft
Carlsbad#City#Library#EUI 245.7#kBtu/sqft
Difference O0.1%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Library
Electrical#Energy#Density 20.2#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.15#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 57.6#(MtCO2e)
Indirect#GHG#Emissions 490.2#(MtCO2e)
Total#GHG#Emissions 547.8#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Split#DX#air#conditioners HVAC 54,492 3.7%
Chillers HVAC 302,400 20.3%
Circulation#Pumps HVAC 34,857 2.3%
Cooling#tower#fan HVAC 9,959 0.7%
Air#handler#fans HVAC 51,123 3.4%
Power#exhaust#fans HVAC 6,528 0.4%
Library#lighting Indoor#Lighting 441,222 29.7%
Office#Eqiupment Equipment 220,611 14.8%
Parking#lot#and#exterio#lighting Outdoor#Lighting 18,384 1.2%
Plug#loads Other 73,537 4.9%
Unknown Unknown 272,950 18.4%
Total 1,486,063 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 240 2.2%
Heating HVAC 10,586 97.8%
Total 10,826 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
50,000#
100,000#
150,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
500#
1,000#
1,500#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$5,000###$10,000###$15,000###$20,000###$25,000###$30,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#16%#
HVAC#33%#
Indoor#Lighbng#
31%#
Outdoor#Lighbng#1%#
Unknown#19%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
300#
Nabonal#Average#Source#EUI#Carlsbad#City#Library#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-5
Carlsbad'City'Library
1775#DOVE#LN CARLSBAD,#CA##9201114048
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Dove#Library#is#a#two#story,#73,537#e2#library#built#in#1999.##The#building#is#occupied#approximately#40#hours#per#week.##
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Indoor#Lighbng#
1#Outdoor#Lighbng##
HVAC#–#The#library#is#served#by#a#chiller#plant#with#an#air#cooled#chiller#and#gas#heabng#hot#water#boiler.##Water#is#circulated#to#air#handlers#with#water#pumps#controlled#by#VFD.##The#air#handlers#distribute#air#to#VAV#terminals#throughout#the#building#and#are#also#equipped#with#VFD.##The#system#is#controlled#by#a#DDC#system.##Three#split#DX#air#condiboners#serve#special#needs#areas#like#
equipment#and#server#rooms.#
#Indoor'Lighang'–#The#interior#is#lit#with#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#configurabons.##Incandescent#flood#lamps#are#used#in#the#auditorium.##
Outdoor'Lighang'–#HID#wall#packs#are#located#on#the#perimeter#of#the#buildings.##The#parking#lot#is#lit#with#pole#top#HID#lamps#and#fixtures.##Both#are#controlled#for#dusk#to#dawn#operabon.##
ECM'1:#Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:#Replace#incandescent#flood#lamps#in#Auditorium#with#LED#lamps.#
'ECM'3:#Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#
'
ECM'4:#Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.##ECM'5:'Datalog#HVAC#equipment#to#verify#that#it#is#operabng#according#to#the#sequence#of#operabons#in#the#DDC.#
'Observaaon'1:'September#of#2012#showed#a#spike#in#electrical#consumpbon#cost.'
#
City of Carlsbad Energy Roadmap Appendix A-6
Energy'Report'Card
City'Hall Billing'Analysis'and'Benchmarking
1200#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811949
BILLING'DATA
Site'Data
Facility#Square#Footage 16,000#sqft
Electrical#Meter#No.#*6574389
Electrical#Rate#Tariff ALTOU
Gas#Meter#No.#*131857
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 655,484#kWh/yr
Max#Demand 181.0#kW
Annual#Gas#Consumption 5,978#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $50,984
Electrical#Demand#Cost $43,984
Natural#Gas#Cost $3,373
Taxes#and#Fees $1,056
Other#Costs $4,912
Total $104,308
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 209.0#kBtu/sqft
City#Hall#EUI 506.0#kBtu/sqft
Difference 142.1%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Small#Office
Electrical#Energy#Density 41.0#kWh/sqft1yr
Electrical#Energy#Density#Standard 12.1#kWh/sqft1yr
Gas#Energy#Density 0.37#Therms/sqft1yr
Gas#Energy#Density#Standard 0.02#Therms/sqft1yr
12'Month'GHG'Emissions
Direct#GHG#Emissions 31.8#(MtCO2e)
Indirect#GHG#Emissions 216.2#(MtCO2e)
Total#GHG#Emissions 248.0#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 115,632 17.6%
Chiller HVAC 86,940 13.3%
Circulation#pumps HVAC 23,499 3.6%
Air#handlers HVAC 11,190 1.7%
Exhaust#Fans HVAC 15,246 2.3%
Interior#Lighting Indoor#Lighting 57,600 8.8%
Parking#lots,#wallpacks#and#landscape Outdoor#Lighting 23,360 3.6%
Office#Equipment Equipment 35,680 5.4%
Broadcast#Equipment Equipment 15,000 2.3%
Unknown Unknown 271,337 41.4%
Total 655,484 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 612 10.4%
Heating HVAC 5,266 89.6%
Total 5,878 98.3%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
50,000#
100,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
500#
1,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$2,000###$4,000###$6,000###$8,000###$10,000###$12,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
8%#
HVAC#38%#
Indoor#Lighbng#
9%#
Outdoor#Lighbng#
4%#
Unknown#
41%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
100#
200#
300#
400#
500#
600#
Nabonal#Average#Source#EUI#City#Hall#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
0.0#
5.0#
10.0#
15.0#
20.0#
25.0#
30.0#
35.0#
40.0#
45.0#
Electrical#Energy#Density#Electrical#Energy#Density#Standard#
CEUS'Electrical'Energy'Density'(kWh/sq^Oyr)'
0.0#
0.1#
0.1#
0.2#
0.2#
0.3#
0.3#
0.4#
0.4#
Gas#Energy#Density#Gas#Energy#Density#Standard#
CEUS'Natural'Gas'Energy'Density'(Therms/sq^Oyr)'
City of Carlsbad Energy Roadmap Appendix A-7
City'Hall
1200#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811949
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov ALTOU 6574908
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
City#Hall#offices#and#Council#Chambers#are#in#21one#story#buildings.##The#office#building#is#13,500#e2#and#the#chamber#is#2,500#e2.##The#offices#are#occupied#approximately#50#hours#per#week#and#the#chamber#building#is#occupied#approximately#15#hours#per#week#average.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC#–#A#central#chiller#and#heabng#hot#water#boiler#serves#the#buildings#with#air#handlers#and#a#digital#control#system.##The#chiller#plant#has#been#recently#installed.##Small#package#and#split#DX#air#
condiboners#serve#241hour#server#rooms#and#electrical#rooms.#
#Indoor'Lighang'–#The#interior#of#the#building#is#lit#with#21lamp#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#as#well#as#24”#T8#lamps#in#2x2#fixtures.##The#lights#are#controlled#with#mechanical#wall#switches.###
#Outdoor'Lighang'–#HID#wall#packs#are#located#on#the#perimeter#of#the#buildings#and#are#controlled#for#dusk#to#dawn#operabon.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:#Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#
'ECM'3:'Datalog#HVAC#equipment#to#verify#that#it#is#operabng#according#to#the#sequence#of#operabons#in#the#DDC.'
City of Carlsbad Energy Roadmap Appendix A-8
Energy'Report'Card
CMWD'Administration Billing'Analysis'and'Benchmarking
5950#EL#CAMINO#REAL CARLSBAD,#CA##9200818802
BILLING'DATA
Site'Data
Facility#Square#Footage 18,085#sqft
Electrical#Meter#No.#*6583602
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*1228517
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 176,510#kWh/yr
Max#Demand 65.3#kW
Annual#Gas#Consumption 91#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $13,515
Electrical#Demand#Cost $15,045
Natural#Gas#Cost $51
Taxes#and#Fees $104
Other#Costs $1,740
Total $30,456
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 110.0#kBtu/sqft
CMWD#Administration#EUI 111.8#kBtu/sqft
Difference 1.6%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Office/Shop/Warehouse
Electrical#Energy#Density 9.8#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.01#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 0.5#(MtCO2e)
Indirect#GHG#Emissions 58.2#(MtCO2e)
Total#GHG#Emissions 58.7#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 70,200 39.8%
Office#lighting Indoor#Lighting 49,755 28.2%
Maintenance#lighting Indoor#Lighting 4,900 2.8%
Office#Eqiupment Equipment 36,985 21.0%
Tools Equipment 14,670 8.3%
Total 176,510 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Handwashing DHW 84 92.3%
Heating HVAC 7 7.7%
Total 91 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
10,000#
20,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
5#
10#
15#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$500###$1,000###$1,500###$2,000###$2,500###$3,000###$3,500##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#29%#
HVAC#40%#
Indoor#Lighbng#31%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
Nabonal#Average#Source#EUI#CMWD#Administrabon#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-9
CMWD'Administration
5950#EL#CAMINO#REAL CARLSBAD,#CA##9200818802
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Ublibes#facility#consists#of#two1one#story#buildings.##The#office#building#is#13,010#e2#and#the#maintenance#building#is#5,075#e2.##Both#buildings#were#built#in#1989.##The#buildings#house#much#of#the#maintenance#personnel#for#the#city#and#supporbng#office#staff.##The#buildings#are#occupied#approximately#40#to#50#hours#per#week#with#occasional#aeer#hours#use#in#the#maintenance#building.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
1#Other#Equipment#'
HVAC'–#The#buildings#are#served#by#package#DX#air#condiboners#controlled#by#digital#programmable#thermostats.##The#maintenance#building#has#natural#gas#unit#heaters.##Exhaust#fans#serve#
restrooms#and#work#rooms.#'Indoor'Lighang'–The#interior#is#lit#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#primarily#21lamp#fixtures.##CFL#in#recessed#can#fixtures#provide#addibonal#lighbng#in#the#lobby#and#hallways.##Open#
office#spaces#have#some#daylight#from#windows#or#skylights.##Some#private#offices#have#occupancy#sensors#to#control#lighbng,#however#not#all#private#offices#have#these#controls.##
Outdoor'Lighang'–#The#parking#lot#is#lit#with#pole1top#150#wai#HPS#lamps#controlled#for#dusk#to#dawn#operabon.##
#Other'Equipment'–#The#maintenance#building#has#some#light#power#equipment#and#tools#and#an#ice#machine#for#personnel#spending#the#day#on#jobs.##A#fountain#is#located#on#the#grounds#between#the#two#buildings#with#a#¾#hp#pump.##The#fountain#runs#from#6:30am#to#5pm#daily.##Two#vending#machines#are#located#in#the#break#room#with#no#perishable#goods.##The#break#room#also#has#a#
refrigerator,#two#microwaves#and#a#television.###
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#pole1top#fixtures#with#appropriate#LED#pole1top#fixtures.#
#
City of Carlsbad Energy Roadmap Appendix A-10
Energy'Report'Card
Cole'Library Billing'Analysis'and'Benchmarking
1250#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811949
BILLING'DATA
Site'Data
Facility#Square#Footage 25,033#sqft
Electrical#Meter#No.#*6574908
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*1373258
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 414,445#kWh/yr
Max#Demand 115.2#kW
Annual#Gas#Consumption 1,843#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $32,327
Electrical#Demand#Cost $27,772
Natural#Gas#Cost $1,057
Taxes#and#Fees $438
Other#Costs $2,954
Total $64,549
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 246.0#kBtu/sqft
Cole#Library#EUI 196.4#kBtu/sqft
Difference O20.2%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Library
Electrical#Energy#Density 16.6#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.07#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 9.8#(MtCO2e)
Indirect#GHG#Emissions 136.7#(MtCO2e)
Total#GHG#Emissions 146.5#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners#(equipment#loads) HVAC 10,800 2.6%
Air#cooled#chiller HVAC 158,760 38.3%
Circulation#pumps HVAC 37,300 9.0%
Air#handler#fans HVAC 33,570 8.1%
Library#lighting Indoor#Lighting 112,649 27.2%
Parking#lot#and#wallpacks Outdoor#Lighting 13,518 3.3%
Office#Equipment Equipment 19,538 4.7%
Plug#loads Other 21,278 5.1%
Water#heating Other 6,759 1.6%
Total 414,172 99.9%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Heating HVAC 1,843 100.0%
Total 1,843 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
20,000#
40,000#
60,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
200#
400#
600#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$1,000###$2,000###$3,000###$4,000###$5,000###$6,000###$7,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#5%#
HVAC#
63%#
Indoor#Lighbng#22%#
Outdoor#Lighbng#3%#
Other#
7%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
300#
Nabonal#Average#Source#EUI#Cole#Library#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-11
Cole'Library
1250#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811949
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Cole#Library#is#a#two#story,#25,033#e2#library#built#in#1967.##The#building#is#occupied#approximately#40#hours#per#week.##
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Indoor#Lighbng#
1#Outdoor#Lighbng##
HVAC#–#The#library#is#served#by#a#chiller#plant#with#an#air#cooled#scroll#chiller#and#gas#heabng#hot#water#boiler.##Water#is#circulated#to#air#handlers#with#water#pumps#controlled#by#VFD.##The#air#handlers#distribute#air#to#VAV#terminals#throughout#the#building.##The#system#is#controlled#by#a#DDC#system.#
'
Indoor'Lighang'–#The#interior#is#lit#with#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#configurabons.##Outdoor'Lighang'–#HID#wall#packs#are#located#on#the#perimeter#of#the#buildings.##The#parking#lot#is#lit#with#pole#top#HID#lamps#and#fixtures.##Both#are#controlled#for#dusk#to#dawn#operabon.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#
'ECM'3:'Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.#
#
ECM'4:'Replace#scroll#compressor#on#chiller#wbh#Turbocor#compressor.'#
City of Carlsbad Energy Roadmap Appendix A-12
Energy'Report'Card
Faraday'Center Billing'Analysis'and'Benchmarking
1635#FARADAY#AVE CARLSBAD,#CA##9200817314
BILLING'DATA
Site'Data
Facility#Square#Footage 68,000#sqft
Electrical#Meter#No.#*1867515
Electrical#Rate#Tariff ALTOUCP2
Gas#Meter#No.#*886888
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 1,149,170#kWh/yr
Max#Demand 273.0#kW
Annual#Gas#Consumption 1,777#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $91,700
Electrical#Demand#Cost $59,531
Natural#Gas#Cost $1,010
Taxes#and#Fees $820
Other#Costs $6,817
Total $159,879
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 209.0#kBtu/sqft
Faraday#Center#EUI 195.3#kBtu/sqft
Difference O6.5%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Large#Office
Electrical#Energy#Density 16.9#kWh/sqft1yr
Electrical#Energy#Density#Standard 19.2#kWh/sqft1yr
Gas#Energy#Density 0.03#Therms/sqft1yr
Gas#Energy#Density#Standard 0.39#Therms/sqft1yr
12'Month'GHG'Emissions
Direct#GHG#Emissions 9.5#(MtCO2e)
Indirect#GHG#Emissions 379.1#(MtCO2e)
Total#GHG#Emissions 388.5#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 473,918 41.2%
Exhaust#and#make1up#air#fans HVAC 43,604 3.8%
Office#Lighting Indoor#Lighting 204,000 17.7%
Parking#lot#and#wallpacks Outdoor#Lighting 38,760 3.4%
Office#Equipment Equipment 221,000 19.2%
Heating HVAC 32,640 2.8%
Plug#loads Other 136,000 11.8%
Total 1,149,921 100.1%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 220 12.2%
Heating HVAC 1,577 87.8%
Total 1,797 101.1%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
50,000#
100,000#
150,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$4,000###$8,000###$12,000###$16,000###$20,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#19%#
HVAC#
48%#
Indoor#Lighbng#18%#
Outdoor#Lighbng#3%#Other#
12%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
Nabonal#Average#Source#EUI#Faraday#Center#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
0.0#
5.0#
10.0#
15.0#
20.0#
25.0#
Electrical#Energy#Density#Electrical#Energy#Density#Standard#
CEUS'Electrical'Energy'Density'(kWh/sq^Oyr)'
0.0#
0.1#
0.1#
0.2#
0.2#
0.3#
0.3#
0.4#
0.4#
0.5#
Gas#Energy#Density#Gas#Energy#Density#Standard#
CEUS'Natural'Gas'Energy'Density'(Therms/sq^Oyr)'
City of Carlsbad Energy Roadmap Appendix A-13
Faraday'Center
1635#FARADAY#AVE CARLSBAD,#CA##9200817314
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Faraday#Center#is#a#two#story#68,000#e2#office#building#constructed#in#2000.##It#houses#several#city#departments#and#provides#a#public#access#for#engineering#and#planning.###The#building#is#occupied#approximately#50#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC#–#Eighteen#package#and#twenty1three#split#DX#air#condiboners#serve#the#building#and#are#controlled#by#digital#programmable#thermostats.##The#air#condiboning#is#approximately#10#years#old#
and#is#in#good#condibon.##Twelve#exhaust#fans#and#two#make1up#air#fans#also#serve#the#building#and#provide#fresh#air#venblabon.#
#Indoor'Lighang'–#The#interior#is#lit#with#3#lamp#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#in#most#areas.##Some#areas#are#lit#with#24”#T8#lamps#in#2x2#fixtures.##Private#office#lighbng#is#controlled#with#occupancy#sensors,#the#lighbng#in#open#areas#is#manually#controlled.##The#first#floor#open#office#area#has#recessed#can#fixtures#mixed#into#the#recessed#troffers.##There#is#a#
mix#of#CFL#and#halogen#PAR#lamps.##
Outdoor'Lighang'–#HID#wall#packs#are#located#on#the#perimeter#of#the#buildings.##The#parking#lot#is#lit#with#pole#top#HID#lamps#and#fixtures.##Both#are#controlled#for#dusk#to#dawn#operabon.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#
'ECM'3:'Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.#
#
City of Carlsbad Energy Roadmap Appendix A-14
Energy'Report'Card
Farmers'Insurance'Building Billing'Analysis'and'Benchmarking
2351#FARADAY#AVE CARLSBAD,#CA##9200817217
BILLING'DATA
Site'Data
Facility#Square#Footage 6,100#sqft
Electrical#Meter#No.#*6562684
Electrical#Rate#Tariff A#######
Gas#Meter#No.#*0
Gas#Rate#Tariff 1
12'Month'Consumption'Summary
Annual#Electrical#Consumption 8,920#kWh/yr
Max#Demand 0.0#kW
Annual#Gas#Consumption 0#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $1,487
Electrical#Demand#Cost $0
Natural#Gas#Cost $0
Taxes#and#Fees $5
Other#Costs $145
Total $1,636
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 1.0#kBtu/sqft
Farmers#Insurance#Building#EUI 16.7#kBtu/sqft
Difference 1566.4%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Small#Office
Electrical#Energy#Density 1.5#kWh/sqft1yr
Electrical#Energy#Density#Standard 12.1#kWh/sqft1yr
Gas#Energy#Density 0.00#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 0.0#(MtCO2e)
Indirect#GHG#Emissions 2.9#(MtCO2e)
Total#GHG#Emissions 2.9#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Parking#lot#lights Outdoor#Lighting 7,008 79.3%
Office#and#storage#lights Indoor#Lighting 1,830 20.7%
Total 8,838 99.1%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
#DIV/0!
#DIV/0!
Total 0 #DIV/0!
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
1,000#
2,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
1#
1#
2#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'
THIS'SPACE'NOT'USED'#$(50)##$1###$50###$100###$150###$200###$250###$300###$350##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Indoor#Lighbng#
21%#
Outdoor#Lighbng#
79%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
2#
4#
6#
8#
10#
12#
14#
16#
18#
Nabonal#Average#Source#EUI#Farmers#Insurance#Building#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
0.0#
2.0#
4.0#
6.0#
8.0#
10.0#
12.0#
14.0#
Electrical#Energy#Density#Electrical#Energy#Density#Standard#
CEUS'Electrical'Energy'Density'(kWh/sq^Oyr)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-15
Farmers'Insurance'Building
2351#FARADAY#AVE CARLSBAD,#CA##9200817217
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Farmers#Insurance#Building#is#a#one#story#6,100#e2#building#that#is#currently#unoccupied.##The#building#is#used#primarily#for#storage#and#the#occasional#meebng#or#city#personnel#event.####
The#following#systems#were#included#in#the#phase#1#audit:##
1#Indoor#Lighbng#
1#Outdoor#Lighbng#
#Indoor'Lighang'–#The#interior#is#lit#with#2x4#recessed#troffers#with#T12#lamps#and#magnebc#ballasts.##Hours#of#operabon#for#this#lighbng#is#very#low.#
#Outdoor'Lighang'–#Bollards#with#50#wai#HPS#lamps#are#located#around#the#front#entrance#of#the#building,#however#the#lamps#are#either#disconnected#or#burned#out.##The#parking#lot#is#lit#with#150#
wai#HPS#pole1top#fixtures#controlled#for#dusk#to#dawn#operabon.#
#
ECM'1:'Replace#T12#lamps#and#magnebc#ballasts#with#low#waiage#T8#lamps#and#premium#efficiency#ballasts.#'ECM'2:'Replace#HID#pole1top#fixtures#with#appropriate#LED#pole1top#fixtures#
#
City of Carlsbad Energy Roadmap Appendix A-16
Energy'Report'Card
Fire'Station'1 Billing'Analysis'and'Benchmarking
1275#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811950
BILLING'DATA
Site'Data
Facility#Square#Footage 4,756#sqft
Electrical#Meter#No.#*6561430
Electrical#Rate#Tariff A#######
Gas#Meter#No.#*1211720
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 63,400#kWh/yr
Max#Demand 0.0#kW
Annual#Gas#Consumption 1,206#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $10,435
Electrical#Demand#Cost $0
Natural#Gas#Cost $686
Taxes#and#Fees $177
Other#Costs $538
Total $11,835
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 169.0#kBtu/sqft
Fire#Station#1#EUI 178.5#kBtu/sqft
Difference 5.6%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type NA
Electrical#Energy#Density 13.3#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.25#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 6.4#(MtCO2e)
Indirect#GHG#Emissions 20.9#(MtCO2e)
Total#GHG#Emissions 27.3#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioning HVAC 23,040 36.3%
Exhaust#Fans HVAC 10,031 15.8%
Interior#Lighting Indoor#Lighting 17,122 27.0%
Wallpacks#and#pole#lights Outdoor#lighting 2,711 4.3%
Commercial#Refrigerators Equipment 5,610 8.8%
Shop#Equipment Equipment 5,000 7.9%
0.0%
0.0%
0.0%
Total 63,513 100.2%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Showers,#hand#washing,#kitchen DHW 685 56.8%
Heating HVAC 521 43.2%
Total 1,206 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
5,000#
10,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
50#
100#
150#
200#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$200###$400###$600###$800###$1,000###$1,200###$1,400###$1,600##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#17%#
HVAC#52%#
Indoor#Lighbng#27%#
Outdoor#lighbng#4%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
160#
180#
200#
Nabonal#Average#Source#EUI#Fire#Stabon#1#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-17
Fire'Station'1
1275#CARLSBAD#VILLAGE#DR CARLSBAD,#CA##9200811950
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Fire#Stabon#1#has#a#is#a#one#story#fire#house#and#a#separate#building#(Butler#Building)#with#a#combined#4,756#e2.##The#stabon#was#built#in#1965.##The#building#is#occupied#24#hours#per#day#year#round.####
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Equipment#
#HVAC#–#Heabng#and#cooling#at#the#stabon#house#is#provided#by#two#split#systems.##Digital#programmable#thermostats#control#the#systems.##The#Butler#Building#is#served#by#three#split#air#condiboners#
controlled#by#digital#programmable#thermostats.##
Equipment'–#The#fire#stabon#has#typical#power#tools#and#equipment#in#the#shop#along#with#an#air#compressor.##The#kitchen#has#a#mulbple#commercial#refrigerators#to#accommodate#mulbple#staff#
shies.##
ECM'1:#Replace#HID#outdoor#lighbng#with#appropriate#LED#fixtures.##
City of Carlsbad Energy Roadmap Appendix A-18
Energy'Report'Card
Fire'Station'2 Billing'Analysis'and'Benchmarking
1906#ARENAL#RD CARLSBAD,#CA##9200916726
BILLING'DATA
Site'Data
Facility#Square#Footage 3,650#sqft
Electrical#Meter#No.#*5337875
Electrical#Rate#Tariff A#######
Gas#Meter#No.#*1062591
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 34,259#kWh/yr
Max#Demand 0.0#kW
Annual#Gas#Consumption 1,043#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $5,631
Electrical#Demand#Cost $0
Natural#Gas#Cost $593
Taxes#and#Fees $142
Other#Costs $378
Total $6,744
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 146.0#kBtu/sqft
Fire#Station#2#EUI 136.9#kBtu/sqft
Difference O6.2%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Fire#Station
Electrical#Energy#Density 9.4#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.29#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 5.5#(MtCO2e)
Indirect#GHG#Emissions 11.3#(MtCO2e)
Total#GHG#Emissions 16.8#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#Conditioners HVAC 8,640 25.2%
Exhaust#Fans HVAC 8,952 26.1%
Interior#Lighting Indoor#Lighting 5,037 14.7%
Wallpacks#and#pole#lights Outdoor#lighting 1,000 2.9%
Commercial#Refrigerators Equipment 5,610 16.4%
Shop#Equipment Equipment 5,000 14.6%
Total 34,239 99.9%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing,#showers,#cooking DHW 765 73.3%
Heating HVAC 278 26.7%
Total 1,043 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
2,000#
4,000#
6,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
50#
100#
150#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$100###$200###$300###$400###$500###$600###$700###$800###$900##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
31%#
HVAC#51%#
Indoor#Lighbng#
15%#
Outdoor#lighbng#
3%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
160#
Nabonal#Average#Source#EUI#Fire#Stabon#2#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-19
Fire'Station'2
1906#ARENAL#RD CARLSBAD,#CA##9200916726
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Fire#Stabon#2#is#a#one#story#3,650#e2#building#built#in#1969.##The#building#is#occupied#24#hours#per#day#year#round.##
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Indoor#Lighbng#
1#Outdoor#Lighbng#1#Equipment#
#HVAC#–#A#61ton#package#DX#air#condiboner#with#gas#heat#serves#the#firehouse#controlled#by##digital#programmable#thermostats.##A#gas#unit#heater#serves#the#service#bay;#a#snorkel#exhaust#system#
venblates#the#garage.##A#small#exhaust#fan#serves#the#laundry#room.#
#Indoor'Lighang'–#The#interior#of#the#building#is#lit#with#21lamp#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts.##50#wai#MR16#halogen#lamps#are#used#in#the#media#room.##The#lights#are#controlled#with#mechanical#wall#switches.#
#Outdoor'Lighang'–#An#HID#flag#light#illuminates#the#flag#at#the#fire#stabon.##There#are#no#other#significant#outdoor#fixtures.#
'
Equipment'–#The#garage#has#an#air#compressor#and#small#power#tools.##Laundry#facilibes#are#located#at#the#firehouse.##The#fire#stabon#has#a#backup#generator#for#use#in#the#event#of#a#power#failure.##The#kitchen#has#a#commercial#refrigerator#and#cooking#range.##
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#flag#light#with#an#appropriate#LED#fixture.#
'ECM'3:'Replace#halogen#MR16#lamps#with#LED#alternabves.'
#
City of Carlsbad Energy Roadmap Appendix A-20
Energy'Report'Card
Fire'Station'4 Billing'Analysis'and'Benchmarking
6885#BATIQUITOS#DR CARLSBAD,#CA##9201113916
BILLING'DATA
Site'Data
Facility#Square#Footage 3,718#sqft
Electrical#Meter#No.#*6508893
Electrical#Rate#Tariff A#######
Gas#Meter#No.#*1382031
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 26,446#kWh/yr
Max#Demand 0.0#kW
Annual#Gas#Consumption 817#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $4,339
Electrical#Demand#Cost $0
Natural#Gas#Cost $478
Taxes#and#Fees $111
Other#Costs $364
Total $5,293
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 146.0#kBtu/sqft
Fire#Station#4#EUI 104.1#kBtu/sqft
Difference O28.7%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Fire#Station
Electrical#Energy#Density 7.1#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.22#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 4.3#(MtCO2e)
Indirect#GHG#Emissions 8.7#(MtCO2e)
Total#GHG#Emissions 13.1#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#Conditioners HVAC 5,760 21.8%
Exhaust#Fans HVAC 4,476 16.9%
Interior#Lighting Indoor#Lighting 5,577 21.1%
Wallpacks#and#pole#lights Outdoor#lighting 1,000 3.8%
Commercial#Refrigerators Equipment 5,610 21.2%
Shop#Equipment Equipment 4,000 15.1%
Total 26,423 99.9%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing,#showers DHW 300 36.7%
Heaters HVAC 517 63.3%
Total 817 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
1,000#
2,000#
3,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$100###$200###$300###$400###$500###$600##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#36%#
HVAC#
39%#
Indoor#Lighbng#21%#
Outdoor#lighbng#
4%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
160#
Nabonal#Average#Source#EUI#Fire#Stabon#4#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-21
Fire'Station'4
6885#BATIQUITOS#DR CARLSBAD,#CA##9201113916
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Fire#Stabon#4#is#a#one#story#3,718#e2#building#built#in#1986.##The#building#is#occupied#24#hours#per#day#year#round.##
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Indoor#Lighbng#
1#Outdoor#Lighbng#1#Equipment#
#HVAC'–#A#41ton#split#DX#air#condiboner#serves#the#firehouse#controlled#by#a#digital#programmable#thermostat.##Two#gas#unit#heaters#serve#the#garage,#as#well#as#a#snorkel#exhaust#system#for#the#
vehicles.##Individual#exhaust#fans#serve#the#washrooms.#
#Indoor'Lighang'–#The#interior#of#the#building#is#lit#with#21lamp#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts.##50#wai#MR16#halogen#lamps#are#used#in#the#media#room.##The#lights#are#controlled#with#mechanical#wall#switches.#
#Outdoor'Lighang'–#An#HID#flag#light#illuminates#the#flag#at#the#fire#stabon.##There#are#no#other#significant#outdoor#fixtures.#
#
Equipment#–#The#garage#has#an#air#compressor#and#small#power#tools.##Laundry#facilibes#are#located#at#the#firehouse.##The#fire#stabon#has#a#backup#generator#for#use#in#the#event#of#a#power#failure.###The#kitchen#has#a#commercial#refrigerator#and#cooking#range.##
ECM'1:#Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:#Replace#HID#flag#light#with#an#appropriate#LED#fixture.#
#ECM'3:'Replace#halogen#MR16#lamps#with#LED#alternabves.#
#
Observaaon:'The#natural#gas#usage#at#this#facility#depects#an#unusual#paiern#of#use.##Closer#inspecbon#may#be#appropriate#to#determine#the#cause.'#
City of Carlsbad Energy Roadmap Appendix A-22
Energy'Report'Card
Fire'Station'5 Billing'Analysis'and'Benchmarking
2540#ORION#WAY CARLSBAD,#CA##9201017240
BILLING'DATA
Site'Data
Facility#Square#Footage 12,709#sqft
Electrical#Meter#No.#*6583570
Electrical#Rate#Tariff ATOU####
Gas#Meter#No.#*1306623
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 102,518#kWh/yr
Max#Demand 28.5#kW
Annual#Gas#Consumption 1,578#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $16,165
Electrical#Demand#Cost $0
Natural#Gas#Cost $904
Taxes#and#Fees $242
Other#Costs $770
Total $18,080
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 146.0#kBtu/sqft
Fire#Station#5#EUI 104.9#kBtu/sqft
Difference O28.1%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Fire#Station
Electrical#Energy#Density 8.1#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.12#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 8.4#(MtCO2e)
Indirect#GHG#Emissions 33.8#(MtCO2e)
Total#GHG#Emissions 42.2#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#Conditioners HVAC 31,680 30.8%
Exhaust#Fans HVAC 17,904 17.4%
Interior#Lighting Indoor#Lighting 32,789 31.8%
Wallpacks#and#pole#lights Outdoor#lighting 10,000 9.7%
Commercial#Refrigerators Equipment 5,610 5.4%
Shop#Equipment Equipment 5,000 4.9%
Total 102,983 100.5%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Showers,#hand#washing,#cooking DHW 900 57.0%
Heating HVAC 678 43.0%
Total 1,578 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
5,000#
10,000#
15,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
400#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$500###$1,000###$1,500###$2,000###$2,500##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#10%#
HVAC#
48%#
Indoor#Lighbng#32%#
Outdoor#
lighbng#10%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
160#
Nabonal#Average#Source#EUI#Fire#Stabon#5#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-23
Fire'Station'5
2540#ORION#WAY CARLSBAD,#CA##9201017240
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Fire#Stabon#5#is#a#two#story#12,709#e2#building#built#in#1988.##The#building#is#occupied#24#hours#per#day#year#round.##
The#following#systems#were#included#in#the#phase#1#audit:##
1#HVAC#
1#Indoor#Lighbng#
1#Outdoor#Lighbng#1#Equipment#
#HVAC#–#Eight#package#DX#air#condiboners#of#various#sizes#serve#the#firehouse#controlled#by#digital#programmable#thermostats.##Six#exhaust#fans#serve#the#equipment#bays#and#laundry.##Two#small#
roof#top#exhaust#fans#serve#the#restrooms.#
#Indoor'Lighang'–#The#interior#of#the#building#is#lit#with#11lamp#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#as#well#as#24”#T8#lamps#in#2x2#fixtures.##Recessed#can#fixtures#with#CFL#are#used#in#the#media#room.##The#lights#are#controlled#with#mechanical#wall#switches.##In#addibon#to#11lamp#fluorescent#fixtures#the#equipment#bay#HID#fixtures#are#mounted#on#pillars#and#walls.#
#Outdoor'Lighang'–#HID#wall#packs#are#located#on#the#front#and#rear#of#the#building.##Pole#top#HID#lights#provide#lighbng#to#the#parking#lot#and#driveway#in#the#rear#of#the#building.##An#HID#flag#light#
illuminates#the#flag#at#the#fire#stabon.#
#Equipment#–#The#garage#has#an#air#compressor#and#small#power#tools.##Laundry#facilibes#are#located#at#the#firehouse.##The#fire#stabon#has#a#backup#generator#for#use#in#the#event#of#a#power#failure.##The#kitchen#has#a#commercial#refrigerator#and#cooking#range.#
#
ECM'1:#Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.####ECM'2:'Install#occupancy#sensors#on#lights#in#private#offices.'
'ECM'3:#Replace#HID#flag#light#with#an#appropriate#LED#fixture.#
'
ECM'4:#Replace#HID#wallpacks#with#appropriate#low#waiage#fixtures.#'ECM'5:#Replace#HID#pole1top#lights#with#LED#pole#top#fixtures.#
#
City of Carlsbad Energy Roadmap Appendix A-24
Energy'Report'Card
Fleet'Maintenance Billing'Analysis'and'Benchmarking
2480#IMPALA#DR CARLSBAD,#CA##9201017226
BILLING'DATA
Site'Data
Facility#Square#Footage 10,540#sqft
Electrical#Meter#No.#*6582969
Electrical#Rate#Tariff ATOU####
Gas#Meter#No.#*685580
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 71,653#kWh/yr
Max#Demand 29.6#kW
Annual#Gas#Consumption 423#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $12,021
Electrical#Demand#Cost $0
Natural#Gas#Cost $247
Taxes#and#Fees $88
Other#Costs $609
Total $12,965
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 96.0#kBtu/sqft
Fleet#Maintenance#EUI 81.7#kBtu/sqft
Difference O14.9%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Vehicle#Maintenance
Electrical#Energy#Density 6.8#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.04#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 2.3#(MtCO2e)
Indirect#GHG#Emissions 23.6#(MtCO2e)
Total#GHG#Emissions 25.9#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Shop#exhaust#fans HVAC 2,238 3.1%
Office#AC HVAC 6,336 8.8%
Hibay#lights Indoor#Lighting 6,750 9.4%
Office#equipment Equipment 5,000 7.0%
Shop#equipment Equipment 50,059 69.9%
Pole#top#fixture Outdoor#Lighting 1,270 1.8%
Total 71,653 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 40 9.5%
Heating HVAC 383 90.5%
Total 423 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
5,000#
10,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
50#
100#
150#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$200###$400###$600###$800###$1,000###$1,200###$1,400###$1,600##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#77%#
HVAC#12%#
Indoor#Lighbng#9%#
Outdoor#Lighbng#2%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
Nabonal#Average#Source#EUI#Fleet#Maintenance#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-25
Fleet'Maintenance
2480#IMPALA#DR CARLSBAD,#CA##9201017226
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Fleet#Services#Center#is#a#10,540#e2#building#with#a#mezzanine#built#in#1986.##The#building#serves#the#repair#needs#for#city#maintained#vehicles.##The#building#is#occupied#approximately#40#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC#–#The#offices#are#served#by#two#31ton#package#DX#air#condiboners#controlled#by#digital#programmable#thermostats.##Eight#natural#gas#unit#heaters#serve#the#shop.##Eleven#exhaust#fans#provide#
forced#venblabon#to#the#shop#space.#
#Indoor'Lighang'–#Offices#are#lit#with#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts.##The#shop#spaces#are#lit#with#linear#fluorescent#hibay#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts.##
#Outdoor'Lighang'–#150#wai#and#250#wai#HPS#pole#top#fixtures#light#the#area#around#Fleet#Services.##They#are#controlled#to#operate#from#dusk#to#dawn.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.#
#ECM'3:'Replace#lamps#and#ballasts#in#fluorescent#hibay#fixtures.##Exisbng#ballasts#must#be#verified#before#proceeding#with#this#measure.'
#
City of Carlsbad Energy Roadmap Appendix A-26
Energy'Report'Card
Harding'Community'Center Billing'Analysis'and'Benchmarking
3096#HARDING#ST CARLSBAD,#CA##9200812320
BILLING'DATA
Site'Data
Facility#Square#Footage 2,669#sqft
Electrical#Meter#No.#*6555704
Electrical#Rate#Tariff A#######
Gas#Meter#No.#*712079
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 60,360#kWh/yr
Max#Demand 0.0#kW
Annual#Gas#Consumption 966#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $9,891
Electrical#Demand#Cost $0
Natural#Gas#Cost $559
Taxes#and#Fees $147
Other#Costs $532
Total $11,129
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 100.0#kBtu/sqft
Harding#Community#Center#EUI 295.6#kBtu/sqft
Difference 195.6%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Community#Center
Electrical#Energy#Density 22.6#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.36#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 5.1#(MtCO2e)
Indirect#GHG#Emissions 19.9#(MtCO2e)
Total#GHG#Emissions 25.0#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
DX#air#conditioners HVAC 15,600 25.8%
Exhaust#fans HVAC 8,000 13.3%
Office#lighting Indoor#Lighting 1,325 2.2%
Hall#lighting Indoor#Lighting 750 1.2%
Commercial#kitchen Equipment 7,260 12.0%
Office#equipment Equipment 2,083 3.5%
Plug#loads Equipment 25,342 42.0%
Total 60,360 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Hand#washing DHW 175 18.1%
Heating HVAC 791 81.9%
Total 966 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
5,000#
10,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$200###$400###$600###$800###$1,000###$1,200###$1,400##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Row#Labels#
0%#
Equipment#
18%#
HVAC#54%#
Indoor#Lighbng#28%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
300#
350#
Nabonal#Average#Source#EUI#Harding#Community#Center#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-27
Harding'Community'Center
3096#HARDING#ST CARLSBAD,#CA##9200812320
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Harding#Community#Center#is#a#2,669#e2#building#built#in#the#1940’s.##The#building#hosts#offices,#an#auditorium#and#a#recreabon#hall.##The#offices#are#occupied#40#hours#per#week#and#the#other#facilibes#average#10#to#15#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC'–#The#buildings#are#condiboned#by#three#package#DX#air#condiboners#and#a#ductless#air#condiboner.##Digital#programmable#thermostats#control#the#air#condiboners.##Natural#gas#unit#heaters#
serve#the#auditorium#and#recreabon#hall.##Five#exhaust#fans#venblate#the#auditorium,#recreabon#hall#and#restrooms.#
#Indoor'Lighang'–#The#offices#and#auditorium#are#lit#with#32#wai#T8#lamps#and#electronic#ballasts.##The#recreabon#hall#is#lit#with#T5#lamps#and#electronic#ballasts.##All#indoor#lighbng#is#controlled#manually.#
'Outdoor'Lighang'–#A#few#CFL#wallpacks#are#located#near#doors#and#are#controlled#for#dusk#to#dawn#operabon.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.####Observaaon:'Energy#Star#Benchmarking#puts#this#facility#at#195.6%#of#the#Nabonal#Average#Source#EUI#however#the#building#does#not#seem#to#be#using#an#excessive#amount#of#energy.##Somebmes#
the#Energy#Star#Nabonal#Average#does#not#apply#well#to#smaller#facilies#with#usage#paierns#that#don't#match#their#populabon#sample.'
City of Carlsbad Energy Roadmap Appendix A-28
Energy'Report'Card
Monroe'Street'Pool Billing'Analysis'and'Benchmarking
3401#MONROE#ST CARLSBAD,#CA##9200812092
BILLING'DATA
Site'Data
Facility#Square#Footage 3,787#sqft
Electrical#Meter#No.#*1482525
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*930333
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 247,720#kWh/yr
Max#Demand 51.2#kW
Annual#Gas#Consumption 30,184#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $18,216
Electrical#Demand#Cost $12,257
Natural#Gas#Cost $14,606
Taxes#and#Fees $3,710
Other#Costs $2,112
Total $50,901
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 100.0#kBtu/sqft
Monroe#Street#Pool#EUI 1580.0#kBtu/sqft
Difference 1480.0%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Swim#Complex
Electrical#Energy#Density 65.4#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 7.97#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 160.6#(MtCO2e)
Indirect#GHG#Emissions 81.7#(MtCO2e)
Total#GHG#Emissions 242.3#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Exhaust#fans HVAC 1,454 0.6%
Office#and#locker#room#lighting Indoor#Lighting 9,089 3.7%
Deck#lights Outdoor#Lighting 3,480 1.4%
Pool#lights Outdoor#Lighting 2,000 0.8%
Filter#pump#motor Equipment 161,740 65.3%
Plug#loads Equipment 6,817 2.8%
Unknown Unknown 63,140 25.5%
Total 247,720 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Pool#heating Equipment 30,184 100.0%
0.0%
Total 30,184 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
10,000#
20,000#
30,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
2,000#
4,000#
6,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$1,000###$2,000###$3,000###$4,000###$5,000###$6,000###$7,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
91%#
HVAC#1%#
Indoor#Lighbng#5%#
Outdoor#Lighbng#3%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
200#
400#
600#
800#
1,000#
1,200#
1,400#
1,600#
1,800#
Nabonal#Average#Source#EUI#Monroe#Street#Pool#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-29
Monroe'Street'Pool
3401#MONROE#ST CARLSBAD,#CA##9200812092
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Swim#Complex#has#two#buildings.##Recepbon#and#changing#is#a#2,665#e2#one#story#building#and#the#equipment#building#is#1,112#e2.##The#main#building#is#occupied#approximately#40#hours#per#week.##The#pool#is#used#year#round.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
1#Other#Equipment##
HVAC#–#No#mechanical#cooling#is#used#at#the#Swim#Complex.##Wall#mounted#gas#unit#heaters#serve#the#aquabc#building#recepbon,#lobby,#office#and#first#aid#room.##A#centrifugal#exhaust#fan#serves#
the#equipment#building.##Indoor'Lighang'–#Lighbng#is#provided#by#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#configurabons.##Daylight#is#available#through#windows#and#skylights.##Indoor#lights#are#manually#
controlled.##
Outdoor'Lighang'–#Metal#halide#pole1top#flood#fixtures#light#the#pool#deck#and#are#controlled#manually#from#the#office.##Submersed#pool#lights#are#controlled#from#the#office#and#are#used#when#the#
pool#is#in#use#aeer#sunset.##Other'Equipment'–#Two#25#hp#pumps#that#alternate#to#run#one#at#a#bme#serve#the#pool.##The#pumps#run#24/7#with#no#speed#control.##A#solar#hot#water#array#is#installed#on#the#ground#southwest#of#
the#pool.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#pole1top#fixtures#with#appropriate#LED#pole1top#fixtures.#
'ECM'3:'Replace#submersed#incandescent#lamps#with#LED.#
'
ECM'4:'Install#VFD#on#pool#filtrabon#pumps#to#reduce#flow#to#minimum#required#flow#for#pool#health#and#to#turn#pump#off#when#not#needed.##
City of Carlsbad Energy Roadmap Appendix A-30
Energy'Report'Card
Safety'Center Billing'Analysis'and'Benchmarking
2560#ORION#WAY CARLSBAD,#CA##9201017240
BILLING'DATA
Site'Data
Facility#Square#Footage 55,027#sqft
Electrical#Meter#No.#*6583569
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*1226938
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 1,064,934#kWh/yr
Max#Demand 195.2#kW
Annual#Gas#Consumption 21,368#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $80,271
Electrical#Demand#Cost $45,630
Natural#Gas#Cost $10,820
Taxes#and#Fees $3,097
Other#Costs $6,717
Total $146,536
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 146.0#kBtu/sqft
Safety#Center#EUI 261.2#kBtu/sqft
Difference 78.9%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Police#Station
Electrical#Energy#Density 19.4#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.39#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 113.7#(MtCO2e)
Indirect#GHG#Emissions 351.3#(MtCO2e)
Total#GHG#Emissions 465.0#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#cooled#chiller HVAC 168,000 15.8%
Pumps HVAC 7,967 0.7%
Air#handlers HVAC 84,954 8.0%
DX#air#conditioners HVAC 184,320 17.3%
Exhaust#fans HVAC 10,631 1.0%
Interior#Lighting Indoor#Lighting 289,222 27.2%
Office#Equipment#&#Dispatch Equipment 275,135 25.9%
Parking#lot#and#wallpacks Outdoor#Lighting 13,140 1.2%
Plug#loads Other 30,000 2.8%
Total 1,063,369 99.9%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Handwashing,#showers DHW 9,600 44.9%
Heating HVAC 11,768 55.1%
Total 21,368 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
50,000#
100,000#
150,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
1,000#
2,000#
3,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$2,000###$4,000###$6,000###$8,000###$10,000###$12,000###$14,000###$16,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#26%#
HVAC#
43%#
Indoor#Lighbng#27%#
Outdoor#Lighbng#1%#
Other#
3%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
300#
Nabonal#Average#Source#EUI#Safety#Center#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-31
Safety'Center
2560#ORION#WAY CARLSBAD,#CA##9201017240
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov A 6521656
760160214623 A 6489183
GN3 856882
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Public#Safety#Service#Center#is#a#two#story,#55,027#e2#building#built#in#1986.##The#building#houses#police#department#offices,#training#rooms,#meebng#spaces#and#locker#rooms.##The#building#is#occupied#24#hours#per#day.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
1#Other#Equipment##
HVAC#–#A#central#chiller#plant#serves#the#building#with#an#1001ton#air#cooled#scroll#chiller,#heabng#hot#water#boiler,#and#circulabon#pumps#located#in#a#mechanical#building#across#the#parking#lot#from#
the#building.##The#building#has#one#air#handler#per#floor#located#in#mechanical#rooms.##Openings#in#the#exterior#wall#of#the#mechanical#room#allow#the#intake#of#fresh#air.##The#air#handlers#have#economizers#with#outside#air#temperature#resets.##Sixty1eight#VAV#terminals#provide#venblabon#control#to#the#building.##Twenty1four#of#the#terminals#provide#reheat#with#hot#water#coils.##Fieeen#exhaust#fans#serve#the#building#locker#rooms,#restrooms,#and#electrical#rooms#and#provide#make#up#air.##Four#package#DX#air#condiboners#are#located#on#the#lower#roof;#they#serve#a#large#conference#
room.##Three#split#DX#air#condiboners#serve#special#241hour#areas.##A#DDC#system#manages#the#HVAC#system#in#this#building.##
Indoor'Lighang'–#The#interior#is#lit#with#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#configurabons.##Metal#halide#lamps#are#located#in#the#stairwell#and#in#the#
central#interior#lobby.##The#lobby#has#large#skylights#and#is#over#lit#with#the#metal#halide#pendant#lights.##Outdoor'Lighang'–#Lighted#bollards#with#50#wai#HPS#lamps#are#located#outside#the#building.##CFL#wallpacks#are#located#near#the#main#entrance.##The#parking#lot#is#lit#with#HPS#pole#top#fixtures.##All#
outdoor#lighbng#is#controlled#for#dusk#to#dawn#operabon.#
#Other'Equipment'–#A#backup#generator#is#located#on#site#for#use#in#the#event#of#power#failure.##A#vending#machine#is#located#inside#the#building#in#a#241hour#area.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Install#photocells#on#lobby#metal#halide#pennant#lamps.##The#lobby#has#skylights#and#the#lamps#can#be#turned#off#on#sunny#days.###
'ECM'3:'Verify#economizers#are#working#properly#on#first#and#second#floor#air#handlers.##Verify#controls#order#of#operabons#and#set#points#and#that#the#hardware#is#correctly#responding#to#commands#
from#the#DDC.##During#the#phase#1#audit#the#economizer#mode#didn’t#appear#to#be#acbve#with#an#outside#air#temperature#of#60#degrees#F.#
'ECM'4:'Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#'
ECM'5:'Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.##
#
City of Carlsbad Energy Roadmap Appendix A-32
Energy'Report'Card
Senior'Center Billing'Analysis'and'Benchmarking
799#PINE#AVE#HM CARLSBAD,#CA##9200812428
BILLING'DATA
Site'Data
Facility#Square#Footage 31,896#sqft
Electrical#Meter#No.#*6556542
Electrical#Rate#Tariff AYTOU###
Gas#Meter#No.#*1300200
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 298,491#kWh/yr
Max#Demand 127.4#kW
Annual#Gas#Consumption 2,987#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $28,526
Electrical#Demand#Cost $29,417
Natural#Gas#Cost $1,680
Taxes#and#Fees $512
Other#Costs $3,351
Total $63,487
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 120.0#kBtu/sqft
Senior#Center#EUI 116.5#kBtu/sqft
Difference O3.0%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Senior#Center
Electrical#Energy#Density 9.4#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.09#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 15.9#(MtCO2e)
Indirect#GHG#Emissions 98.5#(MtCO2e)
Total#GHG#Emissions 114.4#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Package#DX#air#conditioners HVAC 134,160 44.9%
Heating#hot#water#pump HVAC 560 0.2%
Evaporative#cooler HVAC 4,163 1.4%
Center#lighting Indoor#Lighting 95,688 32.1%
Office#Equipment Equipment 7,500 2.5%
Commercial#kitchen Equipment 7,260 2.4%
Parking#lot#lights#and#wallpacks Outdoor#Lighting 18,834 6.3%
Plug#loads Other 30,301 10.2%
Total 298,465 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Cooking Equipment 1,800 60.3%
Hand#washing,#showers DHW 120 4.0%
Heating HVAC 1,067 35.7%
Total 2,987 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
20,000#
40,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
100#
200#
300#
400#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$1,000###$2,000###$3,000###$4,000###$5,000###$6,000###$7,000###$8,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#5%#
HVAC#
47%#
Indoor#Lighbng#32%#
Outdoor#Lighbng#6%#Other#10%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
Nabonal#Average#Source#EUI#Senior#Center#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-33
Senior'Center
799#PINE#AVE#HM CARLSBAD,#CA##9200812428
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov A 6503204
760160214623 ALTOU 6556541
A 5269598
GN3 1329304
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Senior#Center#is#a#two#story,#31,896#e2#building#built#in#1989.##The#building#also#hosts#the#Parks#Administrabon#offices#on#the#second#floor.##The#first#floor#has#a#commercial#kitchen,#exercise#facilibes#and#meebng#halls.##The#building#is#occupied#40#to#50#hours#per#week.###
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC'–#DX#air#condiboning#systems#serve#the#building.##A#mulb1zone#DX#air1handling#unit#with#gas#heat#and#eight#VAV#units#serve#part#of#the#building.##Thermostats#in#each#VAV#zone#control#the#
system.##In#addibon#to#the#mulb1zone#system#six#package#DX#air#condiboners#and#two#split#DX#air#condiboners#serve#the#rest#and#are#controlled#by#digital#programmable#thermostats.##A#protecbve#
cover#is#placed#over#all#thermostats#to#restrict#access.##An#evaporabve#cooler#serves#the#kitchen.##An#air#curtain#is#used#in#the#kitchen#entrance.##Several#exhaust#fans#serve#the#building#as#well.##Indoor'Lighang'–#Offices#are#lit#with#fluorescent#fixtures#with#32#wai#T8#lamps#and#electronic#ballasts.##24”#T8#lamps#in#2x2#ceiling#fixtures#are#also#used.##All#lighbng#is#controlled#manually.##
#Outdoor'Lighang'–#The#parking#lot#is#lit#with#250#wai#HPS#pole#top#fixtures#controlled#for#dusk#to#dawn#operabon.##A#metal#halide#flag#light#illuminates#the#flag#pole.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#wallpacks#with#appropriate#low1waiage#fixtures.#
'ECM'3:'Replace#HPS#pole1top#fixtures#with#LED#pole1top#fixtures.#
#
City of Carlsbad Energy Roadmap Appendix A-34
Energy'Report'Card
Stagecoach'Park Billing'Analysis'and'Benchmarking
3420#CAMINO#DE#LOS#COCHES CARLSBAD,#CA##9200918927
BILLING'DATA
Site'Data
Facility#Square#Footage 18,268#sqft
Electrical#Meter#No.#*6583655
Electrical#Rate#Tariff ALTOU###
Gas#Meter#No.#*636635
Gas#Rate#Tariff GN3#####
12'Month'Consumption'Summary
Annual#Electrical#Consumption 235,773#kWh/yr
Max#Demand 204.8#kW
Annual#Gas#Consumption 1,814#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $17,963
Electrical#Demand#Cost $44,280
Natural#Gas#Cost $1,046
Taxes#and#Fees $340
Other#Costs $2,049
Total $65,679
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 100.0#kBtu/sqft
Stagecoach#Park#EUI 157.5#kBtu/sqft
Difference 57.5%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Community#Center
Electrical#Energy#Density 12.9#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.10#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 9.7#(MtCO2e)
Indirect#GHG#Emissions 77.8#(MtCO2e)
Total#GHG#Emissions 87.4#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 21,060 9.0%
Exhaust#fans HVAC 10,071 4.3%
Gym,#meeting#room#and#office#lighting Indoor#Lighting 7,200 3.1%
Parking#lots#and#wallpacks Outdoor#Lighting 10,950 4.7%
Sports#lighting Outdoor#Lighting 137,200 58.4%
Court#lighting Outdoor#Lighting 25,500 10.9%
Plug#loads Equipment 20,095 8.6%
Office#Eqiupment Equipment 2,740 1.2%
Total 234,816 99.6%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
Handwashing DHW 480 26.5%
Heating HVAC 1,334 73.5%
Total 1,814 100.0%
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
10,000#
20,000#
30,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
200#
400#
600#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'#$1###$1,000###$2,000###$3,000###$4,000###$5,000###$6,000###$7,000###$8,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
10%#
HVAC#13%#
Indoor#Lighbng#3%#
Outdoor#Lighbng#
74%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
20#
40#
60#
80#
100#
120#
140#
160#
180#
Nabonal#Average#Source#EUI#Stagecoach#Park#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-35
Stagecoach'Park
3420#CAMINO#DE#LOS#COCHES CARLSBAD,#CA##9200918927
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
Stagecoach#Community#Center#is#a#mix#of#sports#fields,#playgrounds,#ball#courts#and#a#recreabon#building.##The#building#is#a#1#story#19,471#e2#building#built#in#1989.##The#building#is#occupied#approximately#40#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
#HVAC#–#Four#package#DX#air#condiboners#serve#the#community#center#controlled#by#digital#programmable#thermostats.##Two#natural#gas#unit#heaters#heat#the#gym#and#a#third#serves#the#park#office.##
Five#exhaust#fans#serve#restrooms,#electrical#rooms#and#the#gym.##
#Indoor'Lighang'–#The#building#interior#and#gym#are#lit#with#32#wai#T8#lamps#and#electronic#ballasts#in#a#variety#of#fixture#configurabons.##The#lights#are#controlled#manually.####
Outdoor'Lighang'–#The#parking#lot#is#lit#with#250#wai#HPS#pole1top#fixtures#and#park#area#lights#are#lit#with#150#wai#HPS#pole1top#fixtures.##Smaller#HPS#wallpacks#are#mounted#on#the#building#perimeter.##All#outdoor#lighbng#is#controlled#for#dusk#to#dawn#operabon.##Addibonally#there#are#three#large#lighted#mulb1sport#ball#fields,#four#lighted#tennis#courts#and#two#lighted#basketball#courts.##
Sports#lighbng#is#operated#by#scheduled#events.##Court#lights#are#on#a#separate#bme#clock#to#turn#them#off#at#10pm#and#have#spring#wound#bmers#for#public#control.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#pole1top#fixtures#with#appropriate#LED#pole1top#fixtures.#
'ECM'3:'Replace#HID#wallpacks#with#an#alternabve#low#waiage#technology.#
'
CSM'1:'Consider#splilng#the#electrical#meter#into#two#meters#and#wiring#sports#field#lighbng#to#one#meter.##The#sports#lighbng#meter#can#then#apply#for#an#outdoor#lighbng#rate#tariff#from#SDG&E#to#pay#a#reduced#price#per#kWh.##
City of Carlsbad Energy Roadmap Appendix A-36
Energy'Report'Card
The'Crossings Billing'Analysis'and'Benchmarking
5800#HIDDEN#VALLEY#RD#######################################CARLSBAD,#CA##9200814727######
BILLING'DATA
Site'Data
Facility#Square#Footage 28,025#sqft
Electrical#Meter#No.#*6585162
Electrical#Rate#Tariff ALTOU
Gas#Meter#No.#*0
Gas#Rate#Tariff 1
12'Month'Consumption'Summary
Annual#Electrical#Consumption 566,781#kWh/yr
Max#Demand 135.7#kW
Annual#Gas#Consumption 0#Therms/yr
12'Month'Energy'Cost'Summary
Electrical#Energy#Cost $42,338
Electrical#Demand#Cost $31,989
Natural#Gas#Cost $0
Taxes#and#Fees $300
Other#Costs $3,656
Total $78,284
*#Additional#Meter#Numbers#are#listed#on#the#back#side#of#the#Energy#Report#Card
BENCHMARKING
Energy'Star'Benchmarking'(Energy'Use'Intensity)
National#Average#Source#EUI 100.0#kBtu/sqft
The#Crossings#EUI 230.5#kBtu/sqft
Difference 130.5%
California'EndOUser'Survey'(CEUS)'Energy'Density'Data
Building#Type Golf#course#and#club
Electrical#Energy#Density 20.2#kWh/sqft1yr
Electrical#Energy#Density#Standard NA
Gas#Energy#Density 0.00#Therms/sqft1yr
Gas#Energy#Density#Standard NA
12'Month'GHG'Emissions
Direct#GHG#Emissions 0.0#(MtCO2e)
Indirect#GHG#Emissions 187.0#(MtCO2e)
Total#GHG#Emissions 187.0#(MtCO2e)
BUILDING'ENERGY'USE'BY'SYSTEM
Electrical'Energy'Use'Itemization
Description System'Category Hrs/Yr kWh/Yr
Percent'of'
Total'Load
Air#conditioners HVAC 302,670 53.4%
Store,#office#and#restaurant#lighting Indoor#Lighting 84,075 14.8%
Wallpacks#and#parking#lot#lighting Outdoor#Lighting 10,074 1.8%
Golf#cart#charging Equipment 162,702 28.7%
Kitchen Equipment 7,260 1.3%
Total 566,781 100.0%
Natural'Gas'Energy'Use'Itemization
Description System'Category Hrs/Yr Therms
Percent'of'
Total'Load
#DIV/0!
#DIV/0!
Total 0 #DIV/0!
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
4/2/13
0#
50,000#
100,000#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'kWh'Usage'
0#
1#
1#
2#
Jan#Feb#Mar#Apr#May#Jun#Jul#Aug#Sep#Oct#Nov#Dec#
2012'Monthly'Therm'Usage'
THIS'SPACE'NOT'USED'
'#$1###$1,000###$2,000###$3,000###$4,000###$5,000###$6,000###$7,000###$8,000###$9,000##Jan#
Mar#
May#
Jul#
Sep#
Nov#
2012'Monthly'Energy'Cost'
kWh#Cost#Demand#Cost#
Natural#Gas#Cost#Tax#Cost#
Other#Costs#
Equipment#
30%#
HVAC#53%#
Indoor#Lighbng#15%#
Outdoor#Lighbng#2%#
2012'Annual'Electrical'Energy'Use'by'Category'(kWh/Yr)'
0#
50#
100#
150#
200#
250#
Nabonal#Average#Source#EUI#The#Crossings#EUI#
Energy'Star'Benchmark'(kBtu/sq^)'
THIS'SPACE'NOT'USED'
THIS'SPACE'NOT'USED'
City of Carlsbad Energy Roadmap Appendix A-37
The'Crossings
5800#HIDDEN#VALLEY#RD#######################################CARLSBAD,#CA##9200814727######
ADDITIONAL'SITE'DATA
Contact#Person Mike#Grim Additional'Meters Additional'Meters
Contact#Info mike.grim@carlsbadca.gov
760160214623
PHASE'1'AUDIT'SUMMARY
Targeted#Systems#and#Observations
Potential#Energy#Conservation#Measures
Prepared#by#EFM#Solutions#through#SANDAG#Energy#Roadmap#Program,#2013.
The#Crossings#clubhouse#is#a#split#level,#28,025#e2#building.##It#houses#a#clubhouse,#a#restaurant,#bar#and#pro#shop#and#a#golf#cart#‘barn’.##It#was#built#in#2008#and#is#occupied#approximately#50#hours#per#week.#
#The#following#systems#were#included#in#the#phase#1#audit:#
#
1#HVAC#
1#Indoor#Lighbng#1#Outdoor#Lighbng#
1#Other#Equipment##
HVAC#–#The#building#is#served#by#eight#package#DX#air#condiboners#and#five#split#DX#air#condiboners#controlled#by#digital#programmable#thermostats.##Exhaust#fans#serve#the#kitchen#and#restrooms.##
An#evaporabve#cooler#condibons#make1up#air#in#the#kitchen.##Indoor'Lighang'–#The#offices,#pro#shop#and#garage#areas#are#lit#with#32#wai#T8#lamps#and#electronic#ballasts#in#31lamp#fixtures.##The#restaurant#has#LED#MR16#lamps#on#track#fixtures#and#CFL#in#
recessed#cans.##The#restaurant#has#large#windows#allowing#a#lot#of#daylight#in.##The#bar#has#halogen#spotlights#on#tracks.##Interior#lights#are#controlled#manually.#'
Outdoor'Lighang'1#The#parking#lot#is#lit#with#pole1top#1501wai#HPS#fixtures#and#lamps.##Wallpacks#with#small#HID#lamps#are#located#near#doorways#and#above#the#garage.##The#golf#course#is#not#lit.###
Outdoor#lighbng#is#controlled#for#dusk#to#dawn#operabon.#'Other'Equipment'–#The#golf#cart#garage#houses#the#enbre#fleet#of#electric#golf#carts#and#the#charging#stabons.##The#golf#carts#are#charged#overnight#and#as#needed#during#the#day.##The#restaurant#is#
equipped#with#a#commercial#kitchen#including#a#commercial#range#and#refrigerator.#
#
ECM'1:'Replace#32#wai#T8#lamps#and#electronic#ballasts#with#28#wai#T8#lamps#and#premium#efficiency#ballasts.###'ECM'2:'Replace#HID#pole1top#fixtures#with#LED#pole1top#fixtures.#
#
City of Carlsbad Energy Roadmap Appendix A-38
Prepared
by
9919
Hibert
St
Suite
A
San
Diego,
CA
92123
City
of
Carlsbad
Priority
Site
List
for
Phase
2
Assessments
1200
Carlsbad
Village
Dr
Carlsbad,
CA
92008
SANDAG
Energy
Roadmap
Program
This
program
is
funded
by
California
customers
under
the
auspices
of
the
California
Public
Utilities
Commission.
City of Carlsbad Energy Roadmap Appendix B-1
APPENDIX B
2
|
Page
Priority
Site
List:
Sites
Recommended
for
Phase
2
Assessment
How
Phase
2
Recommendations
Are
Made
The
Phase
2
Assessments
are
the
second
phase
of
the
energy
assessment
assistance
provided
to
the
City
by
San
Diego
Gas
and
Electric.
Using
the
overview
of
current
energy
usage
patterns
at
the
17
qualifying
city
sites
established
by
the
Phase
1
Energy
Report
Cards
(“Phase
1”)
as
a
guide
for
further
investigation,
the
5
sites
identified
above
are
recommended
for
a
more
in-‐depth
Phase
2
Assessment.
After
discussion
of
the
Priority
Site
List
with
the
City
and
upon
receipt
of
the
City’s
permission
to
proceed,
the
Phase
2
Assessments
will
examine
the
feasibility
of
implementing
potential
energy
conservation
measures
(ECMs)
identified
during
Phase
1.
The
potential
ECMs
identified
for
each
of
the
5
sites
are
listed
on
the
pages
that
follow.
A
Phase
2
Assessment
is
not
recommended
for
the
other
12
sites
because
either
no
ECMs
were
identified
or
a
Phase
2
Assessment
is
not
needed
for
their
implementation.
The
Priority
Site
List
was
developed
by
EFM
Solutions
in
consultation
with
City
personnel.
Final
decisions
regarding
Phase
2
Assessments
are
made
by
City
decision
makers.
Site
Phase)2)
Recommneded
Phase)2)Not)
Required)for)
Implementation*
Data)Logging)May)
Be)Required
Rate)
Analysis
Fire Station #2 +
Fire Station #4 +
Fire Station #5 +
City Hall +
Faraday Center +
Cole Lbrary ++
Dove Library ++
Fleet Services Center +
Senior Center/Parks Admin +
Public Safety Service Center ++
Farmers Insurance Claims Bldg +
Utilities/CMWD +
Harding Community Center +
Stagecoach Community Center ++
Calavera Hills Park ++
Swim Complex ++
Crossings(Golf(Course +
Total 5 12 4 2
*(A(phase(two(chapter(will(not(be(provided(for(these(sites(however(tables(and(calculations(may(be(provided(as(needed(based(on(
individual(ECM(interest(by(city(personnel.
City of Carlsbad Energy Roadmap Appendix B-2
3
|
Page
Phase
2
Sites
and
Potential
Energy
Conservation
Measures
(ECM)
City
Hall
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
3:
Data
log
HVAC
equipment
to
verify
that
it
is
operating
according
to
the
sequence
of
operations
in
the
DDC.
Cole
Library
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
3:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
ECM
4:
Replace
scroll
compressor
on
chiller
wtih
Turbocor
compressor.
Dove
Library
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
incandescent
flood
lamps
in
Auditorium
with
LED
lamps.
ECM
3:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
4:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
ECM
5:
Datalog
HVAC
equipment
to
verify
that
it
is
operating
according
to
the
sequence
of
operations
in
the
DDC.
Observation
1:
September
of
2012
showed
a
spike
in
electrical
consumption
cost.
City of Carlsbad Energy Roadmap Appendix B-3
4
|
Page
Public
Safety
Service
Center
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Install
photocells
on
lobby
metal
halide
pennant
lamps.
The
lobby
has
skylights
and
the
lamps
can
be
turned
off
on
sunny
days.
ECM
3:
Verify
economizers
are
working
properly
on
first
and
second
floor
air
handlers.
Verify
controls
order
of
operations
and
set
points
and
that
the
hardware
is
correctly
responding
to
commands
from
the
DDC.
During
the
phase
1
audit
the
economizer
mode
didn’t
appear
to
be
active
with
an
outside
air
temperature
of
60
degrees
F.
ECM
4:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
5:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
Observation:
Why
did
the
electrical
consumption
rate
drop
so
drastically
in
December?
Swim
Complex
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
pole-‐top
fixtures
with
appropriate
LED
pole-‐top
fixtures.
ECM
3:
Replace
submersed
incandescent
lamps
with
LED.
ECM
4:
Install
VFD
on
pool
filtration
pumps
to
reduce
flow
to
minimum
required
flow
for
pool
health
and
to
turn
pump
off
when
not
needed.
City of Carlsbad Energy Roadmap Appendix B-4
5
|
Page
Phase
1
Sites
and
Energy
Conservation
Measures
(ECM)
not
requiring
Phase
2
Audit
Fire
Station
2
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
flag
light
with
an
appropriate
LED
fixture.
ECM
3:
Replace
halogen
MR16
lamps
with
LED
alternatives.
Fire
Station
4
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
flag
light
with
an
appropriate
LED
fixture.
ECM
3:
Replace
halogen
MR16
lamps
with
LED
alternatives.
Observation:
The
natural
gas
usage
at
this
facility
depects
an
unusual
pattern
of
use.
Closer
inspection
may
be
appropriate
to
determine
the
cause.
Fire
Station
5
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Install
occupancy
sensors
on
lights
in
private
offices.
ECM
3:
Replace
HID
flag
light
with
an
appropriate
LED
fixture.
ECM
4:
Replace
HID
wallpacks
with
appropriate
low
wattage
fixtures.
ECM
5:
Replace
HID
pole-‐top
lights
with
LED
pole
top
fixtures.
City of Carlsbad Energy Roadmap Appendix B-5
6
|
Page
Faraday
Center
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
3:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
Fleet
Services
Center
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
ECM
3:
Replace
lamps
and
ballasts
in
fluorescent
hibay
fixtures.
Existing
ballasts
must
be
verified
before
proceeding
with
this
measure.
Senior
Community
Center
/
Park
Admin
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
wallpacks
with
appropriate
low-‐wattage
fixtures.
ECM
3:
Replace
HPS
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
Farmers
Insurance
Building
ECM
1:
Replace
T12
lamps
and
magnetic
ballasts
with
low
wattage
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
pole-‐top
fixtures
with
appropriate
LED
pole-‐top
fixtures
Utilities
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
City of Carlsbad Energy Roadmap Appendix B-6
7
|
Page
ECM
2:
Replace
HID
pole-‐top
fixtures
with
appropriate
LED
pole-‐top
fixtures.
Harding
Community
Center
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
Observation:
Energy
Star
Benchmarking
puts
this
facility
at
195.6%
of
the
National
Average
Source
EUI
however
the
building
does
not
seem
to
be
using
an
excessive
amount
of
energy.
Sometimes
the
Energy
Star
National
Average
does
not
apply
well
to
smaller
facilies
with
usage
patterns
that
don't
match
their
population
sample.
Stagecoach
Community
Center
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
pole-‐top
fixtures
with
appropriate
LED
pole-‐top
fixtures.
ECM
3:
Replace
HID
wallpacks
with
an
alternative
low
wattage
technology.
CSM
1:
Consider
splitting
the
electrical
meter
into
two
meters
and
wiring
sports
field
lighting
to
one
meter.
The
sports
lighting
meter
can
then
apply
for
an
outdoor
lighting
rate
tariff
from
SDG&E
to
pay
a
reduced
price
per
kWh.
Calavera
Hills
Park
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
pole-‐top
fixtures
with
appropriate
LED
pole-‐top
fixtures.
ECM
3:
Replace
HID
wallpacks
with
an
alternative
low
wattage
technology.
CSM
1:
Consider
splitting
the
electrical
meter
into
two
meters
and
wiring
sports
field
lighting
to
one
meter.
The
sports
lighting
meter
can
then
apply
for
an
outdoor
lighting
rate
tariff
from
SDG&E
to
pay
a
reduced
price
per
kWh.
Crossings
Golf
Course
City of Carlsbad Energy Roadmap Appendix B-7
8
|
Page
ECM
1:
Replace
32
watt
T8
lamps
and
electronic
ballasts
with
28
watt
T8
lamps
and
premium
efficiency
ballasts.
ECM
2:
Replace
HID
pole-‐top
fixtures
with
LED
pole-‐top
fixtures.
City of Carlsbad Energy Roadmap Appendix B-8
City
of
Carlsbad
Phase
2
Audit
Findings
1200
Carlsbad
Village
Dr.
Carlsbad,
CA
92008
Prepared
by
9919
Hibert
St.
San
Diego,
CA
92131
858.717.9523
SANDAG
Energy
Roadmap
Program
This
program
is
funded
by
California
customers
under
the
auspices
of
the
California
Public
Utilities
Commission.
May
2013
Summary
of
Findings
Electrical
Energy
Savings
.......................
448,657kWh/yr
Demand
Savings………………………………..
134.6
kW/yr
Natural
Gas
Energy
Savings
..................
-‐644
Therms/yr
GHG
Emission
Reduction
......................
144.6
mt
CO2e/yr
Cost
Savings
.............................................
$76,748/yr
Rebate
.....................................................
$45,859
Estimated
Cost
........................................
$457,111
Net
Estimated
Implementation
Cost
.......
$411,252
Estimated
Combined
Simple
Payback
......
5.4
yrs
SDG&E
On
Bill
Financing
Available...........
Yes
City of Carlsbad Energy Roadmap Appendix C-1
APPENDIX C
TABLE
OF
CONTENTS
Audit
Process
.....................................................................................................................................
1
On
Bill
Financing
.................................................................................................................................
1
Observations
......................................................................................................................................
1
Audit
Results
......................................................................................................................................
2
All-‐Sites:
Indoor
Lighting
Replacement
...................................................................................................
4
Measure
A:
Replace
Indoor
Lighting
...................................................................................................
4
Calavera
Hills
Park
..................................................................................................................................
4
Carlsbad
City
Library
...............................................................................................................................
6
City
Hall
..................................................................................................................................................
8
CMWD
Administration
...........................................................................................................................
9
Cole
Library
..........................................................................................................................................
10
Faraday
Center
.....................................................................................................................................
11
Fire
Station
1
........................................................................................................................................
12
Fire
Station
2
........................................................................................................................................
13
Fire
Station
4
........................................................................................................................................
14
Fire
Station
5
........................................................................................................................................
15
Fleet
Maintenance
...............................................................................................................................
16
Harding
Community
Center
.................................................................................................................
17
Monroe
Street
Pool
..............................................................................................................................
18
Safety
Center
........................................................................................................................................
19
Senior
Center
........................................................................................................................................
20
Stagecoach
Community
Park
................................................................................................................
21
The
Crossings
at
Carlsbad
.....................................................................................................................
22
All
Sites:
Outdoor
Lighting
Replacement
...............................................................................................
23
Measure
B:
Replace
Outdoor
Lighting
................................................................................................
23
Calavera
Hills
Park
................................................................................................................................
23
Carlsbad
City
Library
.............................................................................................................................
25
CMWD
Administration
.........................................................................................................................
26
Cole
Library
..........................................................................................................................................
27
Faraday
Center
.....................................................................................................................................
28
Fire
Station
1
........................................................................................................................................
29
Fire
Station
2
........................................................................................................................................
30
Fire
Station
4
........................................................................................................................................
31
Fire
Station
5
........................................................................................................................................
32
Fleet
Maintenance
...............................................................................................................................
33
Harding
Community
Center
.................................................................................................................
34
Monroe
Street
Pool
..............................................................................................................................
35
Safety
Center
........................................................................................................................................
36
Senior
Center
........................................................................................................................................
37
Stagecoach
Community
Center
............................................................................................................
38
The
Crossings
at
Carlsbad
.....................................................................................................................
39
City of Carlsbad Energy Roadmap Appendix C-2
Cole
Library
...........................................................................................................................................
40
Energy
Conservation
Measures
for
Cole
Library
.................................................................................
41
Measure
1:
Install
Turbocor
Compressor
on
Chiller
.............................................................................
41
Monroe
Street
Pool
...............................................................................................................................
42
Energy
Conservation
Measures
for
Monroe
Street
Pool
.....................................................................
43
Measure
2:
Install
Pump
Controls
........................................................................................................
43
Safety
Center
........................................................................................................................................
44
Energy
Conservation
Measures
for
Safety
Center
..............................................................................
45
Measure
3:
Perform
Retrocommission
on
HVAC
System
.....................................................................
45
Sports
Park
Rate
Analysis
......................................................................................................................
48
Measure
C:
Rate
Change
....................................................................................................................
49
Calavera
Hills
........................................................................................................................................
49
Stagecoach
Park
...................................................................................................................................
49
City of Carlsbad Energy Roadmap Appendix C-3
Page
|
1
Audit
Process
In
201 3,
two
types
of
energy
auditing
services
were
provided
at
no
cost
to
the
City
of
Carlsbad:
1)
Preliminary
energy
assessments,
called
“Energy
Report
Cards,”
of
sites
determined
by
city
personnel,
and
2)
More
in
depth
Energy
Audits
(Phase
2)
for
a
subset
of
government
buildings
based
on
their
Energy
Report
Cards
and
personnel
input.
Energy
Report
Cards
are
designed
to
produce
energy
and
greenhouse
gas
(GHG)
emission
baselines
for
each
city
site,
and
to
evaluate
which
sites
should
undergo
more
comprehensive
Energy
Audits
(Phase
2).
The
goal
of
Phase
2
audits
is
to
identify
potential
savings
for
energy
conservation
measures
(ECM)
and
estimate
energy
savings
and
the
associated
project
economics.
GHG
Emissions
are
quantified
in
units
of
metric
tons
of
CO2
equivalent
for
regional
direct
combustion
and
indirect
energy
use.
Calculations
are
based
on
constants
and
methods
used
by
the
Energy
Star
Portfolio
Manager.
In
cases
where
collected
data
will
not
reliably
predict
savings
or
where
savings
is
estimated
to
be
too
small,
an
ECM
will
be
presented
as
an
additional
measure
(AM)
and
will
not
be
included
in
the
savings
totals.
A
third
type
of
measure
that
will
be
presented
is
a
cost
savings
measure
(CSM).
These
measures
typically
do
not
reduce
energy
consumption,
but
will
likely
lower
operating
costs.
The
most
common
examples
are
electricity
rate
changes.
On
Bill
Financing
On
Bill
Financing
(OBF)
is
a
loan
that
helps
taxpayer-‐funded
customers
pay
for
energy
efficiency
improvements
through
their
SDG&E
bill.
The
loan
term
for
the
project
is
determined
by
the
repayment
period
of
the
equipment
selected
through
the
eligible
programs
and
is
calculated
based
on
estimated
annual
energy
savings
not
to
exceed
the
maximum
loan
term.
Loan
funds
must
be
used
for
the
purchase
and
installation
of
qualifying
energy
efficiency
measures.
The
City
of
Carlsbad
may
be
able
to
obtain
up
to
$250,000
on
projects
that
pay
back
in
10
years
or
less.
Observations
During
the
phase
1
audits
City
Hall
was
flagged
for
further
investigation
as
a
result
of
higher-‐than-‐
expected
electrical
energy
consumption.
During
the
phase
2
audits
access
to
the
DDC
at
city
hall
was
obtained
as
well
as
a
discussion
with
the
HVAC
contractor
that
maintains
the
building.
Hours
of
operation
are
higher
than
the
original
estimates
accounted
for.
The
DDC
reported
high
outside
air
temperatures
that
may
be
affecting
economizers.
According
to
the
HVAC
contractor
the
system
currently
runs
as
designed.
At
this
time
the
additional
energy
load
is
considered
to
be
a
result
of
originally
underestimating
operating
hours
of
the
building
and
a
higher-‐than-‐expected
energy
consumption
of
the
AV
and
television
equipment
in
the
City
Hall.
Not
every
site
in
the
phase
1
audit
was
identified
as
requiring
a
phase
2
audit,
however
every
site
would
benefit
from
an
indoor
lighting
and
outdoor
lighting
retrofit.
For
the
purposes
of
this
report
all
of
the
sites
indoor
and
outdoor
lighting
retrofit
recommendations
have
been
put
into
one
chapter
for
all
indoor
lighting
and
all
outdoor
lighting.
Only
sites
with
non-‐lighting
recommendations
have
been
given
a
chapter
for
discussion.
City of Carlsbad Energy Roadmap Appendix C-4
Page
|
2
Audit
Results
Table&of&Energy&and&Cost&Conservation&Measure&Savings
Location
Measur
e&No.Name kW kWh Therm
GHG&
(mtCO2e)
Annual&Cost&
Saving Rebate
Estimated&
Cost
Estimated&
Net&Cost
Simple&Payback&
(yrs)
Calaveras(Hills(Park A Replace(Indoor(Lighting 0.20 436 0 0.14 $70 $22 $814 $792 11.3
Calaveras(Hills(Park B Replace(Outdoor(HID(Lighting 4.45 14,656 0 4.83 $1,466 $2,140 $23,400 $21,260 14.5
Calaveras(Hills(Park C Rate(Change 0.00 0 0 0.00 $4,684 $0 $8,000 $8,000 1.7Sub&Total 4.65 15,091 0 4.98 $6,220 $2,162 $32,214 $30,052 4.8
Carlsbad(City(Library A Replace(Indoor(Lighting 12.99 50,000 0 16.49 $5,950 $1,737 $47,591 $45,854 7.7Carlsbad(City(Library B Replace(Outdoor(HID(Lighting 1.57 6,894 0 2.27 $689 $1,375 $6,450 $5,075 7.4
Sub&Total 14.56 56,894 0 18.77 $6,639 $3,112 $54,041 $50,929 7.7
City(Hall A Replace(Indoor(Lighting 0.67 1,389 0 0.46 $201 $75 $2,775 $2,700 13.4
Sub&Total 0.67 1,389 0 0.46 $201 $75 $2,775 $2,700 13.4
CMWD(Administration A Replace(Indoor(Lighting 1.67 3,701 0 1.22 $600 $185 $6,845 $6,660 11.1
CMWD(Administration B Replace(Outdoor(HID(Lighting 0.67 2,913 0 0.96 $291 $560 $2,800 $2,240 7.7Sub&Total 2.33 6,614 0 2.18 $891 $745 $9,645 $8,900 10.0
Cole(Library A Replace(Indoor(Lighting 5.22 19,263 0 6.35 $2,793 $552 $20,844 $20,292 7.3Cole(Library B Replace(Outdoor(HID(Lighting 0.76 3,329 0 1.10 $499 $640 $3,200 $2,560 5.1
Cole(Library 1 Install(Turbocor(Compressor 49.41 65,221 0 21.51 $9,457 $10,159 $60,000 $49,841 5.3
Sub&Total 55.39 87,813 0 28.97 $12,750 $11,351 $84,044 $72,693 5.7
Faraday(Center A Replace(Indoor(Lighting 8.69 18,753 0 6.19 $2,475 $883 $27,413 $26,531 10.7
Faraday(Center B Replace(Outdoor(HID(Lighting 4.47 19,596 0 6.46 $2,939 $3,850 $17,900 $14,050 4.8Sub&Total 13.17 38,349 0 12.65 $5,415 $4,733 $45,313 $40,581 7.5
Fire(Station(1 A Replace(Indoor(Lighting 0.68 2,025 0 0.67 $332 $75 $2,775 $2,700 8.1Fire(Station(1 B Replace(Outdoor(HID(Lighting 0.35 1,542 0 0.51 $154 $375 $1,900 $1,525 9.9
Sub&Total 1.03 3,567 0 1.18 $486 $450 $4,675 $4,225 8.7
Fire(Station(2 A Replace(Indoor(Lighting 0.28 837 0 0.28 $137 $31 $1,147 $1,116 8.1
Fire(Station(2 B Replace(Outdoor(HID(Lighting 0.14 609 0 0.20 $61 $150 $850 $700 11.5
Sub&Total 0.42 1,446 0 0.48 $198 $181 $1,997 $1,816 9.2
Fire(Station(4 A Replace(Indoor(Lighting 0.14 405 0 0.13 $66 $15 $555 $540 8.1
Fire(Station(4 B Replace(Outdoor(HID(Lighting 0.10 429 0 0.14 $64 $100 $600 $500 7.8Sub&Total 0.23 834 0 0.28 $131 $115 $1,155 $1,040 8.0
Fire(Station(5 A Replace(Indoor(Lighting 0.90 2,700 0 0.89 $427 $100 $3,700 $3,600 8.4Fire(Station(5 B Replace(Outdoor(HID(Lighting 0.96 4,196 0 1.38 $420 $975 $4,600 $3,625 8.6
Sub&Total 1.86 6,896 0 2.27 $846 $1,075 $8,300 $7,225 8.5
Fleet(Maintenance A Replace(Indoor(Lighting 0.27 675 0 0.22 $101 $30 $1,110 $1,080 10.7
Fleet(Maintenance B Replace(Outdoor(HID(Lighting 1.54 6,745 0 2.23 $675 $1,225 $5,950 $4,725 7.0
Sub&Total 1.81 7,420 0 2.45 $776 $1,255 $7,060 $5,805 7.5
Harding(Community(Center A Replace(Indoor(Lighting 0.93 1,740 0 0.57 $285 $112 $3,782 $3,671 12.9
Harding(Community(Center B Replace(Outdoor(HID(Lighting 0.38 1,673 0 0.55 $167 $430 $2,400 $1,970 11.8Sub&Total 1.31 3,413 0 1.13 $453 $542 $6,182 $5,641 12.5
Monroe(Street(Pool A Replace(Indoor(Lighting 0.32 492 0 0.16 $61 $33 $1,256 $1,223 20.2Monroe(Street(Pool B Replace(Outdoor(HID(Lighting 8.83 9,432 0 3.11 $943 $3,423 $28,050 $24,627 26.1
Monroe(Street(Pool 2 Install(Pump(Controls 0.00 34,502 0 11.38 $3,572 $600 $1,200 $600 0.2
Sub&Total 9.15 44,425 0 14.65 $4,576 $4,056 $30,506 $26,450 5.8
Safety(Center A Replace(Indoor(Lighting 7.35 30,104 0 9.93 $3,552 $1,151 $25,983 $24,832 7.0
Safety(Center B Replace(Outdoor(HID(Lighting 2.17 9,505 0 3.14 $950 $2,175 $10,000 $7,825 8.2Safety(Center 3 Retrocommission(HVAC 0.00 59,700 T644 16.27 $6,719 $4,776 $40,000 $35,224 5.2
Sub&Total 9.52 99,309 T644 29.33 $11,222 $8,102 $75,983 $67,881 6.0
Senior(Center A Replace(Indoor(Lighting 6.69 14,169 0 4.67 $2,749 $511 $18,785 $18,274 6.6
Senior(Center B Replace(Outdoor(HID(Lighting 2.35 10,280 0 3.39 $1,542 $2,325 $10,650 $8,325 5.4
Sub&Total 9.03 24,449 0 8.06 $4,291 $2,836 $29,435 $26,599 6.2
Stagecoach(Park A Replace(Indoor(Lighting 0.20 14,169 0 4.67 $70 $22 $814 $792 11.3
Stagecoach(Park B Replace(Outdoor(HID(Lighting 6.55 25,449 0 8.39 $2,545 $3,070 $34,500 $31,430 12.4Stagecoach(Park C Rate(Change 0.00 0 0 0.00 $17,885 $0 $10,000 $10,000 0.6
Sub&Total 6.74 39,618 0 13.07 $20,500 $3,092 $45,314 $42,222 2.1
The(Crossings A Replace(Indoor(Lighting 0.51 1,311 0 0.43 $172 $88 $3,172 $3,084 18.0
The(Crossings B Replace(Outdoor(HID(Lighting 2.24 9,820 0 3.24 $982 $1,890 $15,300 $13,410 13.7
Sub&Total 2.75 11,131 0 3.67 $1,154 $1,978 $18,472 $16,494 14.3
City&Wide&Totals 134.6 448,657 T644 144.57 $76,748 $45,859 $457,111 $411,252 5.4
City of Carlsbad Energy Roadmap Appendix C-5
Page
|
3
Table&of&Energy&Conservation&Measure&Savings&by&Site&for&On&Bill&Financing&
Location ECM&No.Name kW kWh Therm
GHG&
(mtCO2e)
Annual&Cost&
Saving Rebate
Estimated&
Cost
Estimated&
Net&Cost
Simple&
Payback&
(yrs)
Calaveras(Hills(Park A Replace(Indoor(Lighting 0.20 436 0 0.14 $70 $22 $814 $792 11.3
Calaveras(Hills(Park B Replace(Outdoor(HID(Lighting 4.45 14,656 0 4.83 $1,466 $2,140 $23,400 $21,260 14.5Sub&Total 4.65 15,091 0 4.98 $1,536 $2,162 $24,214 $22,052 14.4
Carlsbad(City(Library A Replace(Indoor(Lighting 12.99 50,000 0 16.49 $5,950 $1,737 $47,591 $45,854 7.7Carlsbad(City(Library B Replace(Outdoor(HID(Lighting 1.57 6,894 0 2.27 $689 $1,375 $6,450 $5,075 7.4
Sub&Total 14.56 56,894 0 18.77 $6,639 $3,112 $54,041 $50,929 7.7
City(Hall A Replace(Indoor(Lighting 0.67 1,389 0 0.46 $201 $75 $2,775 $2,700 13.4
Sub&Total 0.67 1,389 0 0.46 $201 $75 $2,775 $2,700 13.4
CMWD(Administration A Replace(Indoor(Lighting 1.67 3,701 0 1.22 $600 $185 $6,845 $6,660 11.1
CMWD(Administration B Replace(Outdoor(HID(Lighting 0.67 2,913 0 0.96 $291 $560 $2,800 $2,240 7.7
Sub&Total 2.33 6,614 0 2.18 $891 $745 $9,645 $8,900 10.0
Cole(Library A Replace(Indoor(Lighting 5.22 19,263 0 6.35 $2,793 $552 $20,844 $20,292 7.3
Cole(Library B Replace(Outdoor(HID(Lighting 0.76 3,329 0 1.10 $499 $640 $3,200 $2,560 5.1Cole(Library 1 Install(Turbocor(Compressor 49.41 65221.2 0 21.51 $9,457 $10,159 $60,000 $49,841 5.3
Sub&Total 55.39 87,813 0 28.97 $12,750 $11,351 $84,044 $72,693 5.7
Faraday(Center A Replace(Indoor(Lighting 8.69 18,753 0 6.19 $2,475 $883 $27,413 $26,531 10.7
Faraday(Center B Replace(Outdoor(HID(Lighting 4.47 19,596 0 6.46 $2,939 $3,850 $17,900 $14,050 4.8
Sub&Total 13.17 38,349 0 12.65 $5,415 $4,733 $45,313 $40,581 7.5
Fire(Station(1 A Replace(Indoor(Lighting 0.68 2,025 0 0.67 $332 $75 $2,775 $2,700 8.1
Fire(Station(1 B Replace(Outdoor(HID(Lighting 0.35 1,542 0 0.51 $154 $375 $1,900 $1,525 9.9Sub&Total 1.03 3,567 0 1.18 $486 $450 $4,675 $4,225 8.7
Fire(Station(2 A Replace(Indoor(Lighting 0.28 837 0 0.28 $137 $31 $1,147 $1,116 8.1Fire(Station(2 B Replace(Outdoor(HID(Lighting 0.14 609 0 0.20 $61 $150 $850 $700 11.5
Sub&Total 0.42 1,446 0 0.48 $198 $181 $1,997 $1,816 9.2
Fire(Station(4 A Replace(Indoor(Lighting 0.14 405 0 0.13 $66 $15 $555 $540 8.1
Fire(Station(4 B Replace(Outdoor(HID(Lighting 0.10 429 0 0.14 $64 $100 $600 $500 7.8
Sub&Total 0.23 834 0 0.28 $131 $115 $1,155 $1,040 8.0
Fire(Station(5 A Replace(Indoor(Lighting 0.90 2,700 0 0.89 $427 $100 $3,700 $3,600 8.4
Fire(Station(5 B Replace(Outdoor(HID(Lighting 0.96 4,196 0 1.38 $420 $975 $4,600 $3,625 8.6Sub&Total 1.86 6,896 0 2.27 $846 $1,075 $8,300 $7,225 8.5
Fleet(Maintenance A Replace(Indoor(Lighting 0.27 675 0 0.22 $101 $30 $1,110 $1,080 10.7Fleet(Maintenance B Replace(Outdoor(HID(Lighting 1.54 6,745 0 2.23 $675 $1,225 $5,950 $4,725 7.0
Sub&Total 1.81 7,420 0 2.45 $776 $1,255 $7,060 $5,805 7.5
Harding(Community(Center A Replace(Indoor(Lighting 0.93 1,740 0 0.57 $285 $112 $3,782 $3,671 12.9
Harding(Community(Center B Replace(Outdoor(HID(Lighting 0.38 1,673 0 0.55 $167 $430 $2,400 $1,970 11.8
Sub&Total 1.31 3,413 0 1.13 $453 $542 $6,182 $5,641 12.5
Monroe(Street(Pool A Replace(Indoor(Lighting 0.32 492 0 0.16 $61 $33 $1,256 $1,223 20.2
Monroe(Street(Pool B Replace(Outdoor(HID(Lighting 8.83 9,432 0 3.11 $943 $3,423 $28,050 $24,627 26.1Monroe(Street(Pool 2 Install(Pump(Controls 0.00 34,502 0 11.38 $3,572 $600 $1,200 $600 0.2
Sub&Total 9.15 44,425 0 14.65 $4,576 $4,056 $30,506 $26,450 5.8
Safety(Center A Replace(Indoor(Lighting 7.35 30,104 0 9.93 $3,552 $1,151 $25,983 $24,832 7.0
Safety(Center B Replace(Outdoor(HID(Lighting 2.17 9,505 0 3.14 $950 $2,175 $10,000 $7,825 8.2Safety(Center 3 Retrocommission(HVAC 0.00 59,700 T644 16.27 $6,719 $4,776 $40,000 $35,224 5.2
Sub&Total 9.52 99,309 V644 29.33 $11,222 $8,102 $75,983 $67,881 6.0
Senior(Center A Replace(Indoor(Lighting 6.69 14,169 0 4.67 $2,749 $511 $18,785 $18,274 6.6
Senior(Center B Replace(Outdoor(HID(Lighting 2.35 10,280 0 3.39 $1,542 $2,325 $10,650 $8,325 5.4
Sub&Total 9.03 24,449 0 8.06 $4,291 $2,836 $29,435 $26,599 6.2
Stagecoach(Park A Replace(Indoor(Lighting 0.20 14,169 0 4.67 $70 $22 $814 $792 11.3
Stagecoach(Park B Replace(Outdoor(HID(Lighting 6.55 25,449 0 8.39 $2,545 $3,070 $34,500 $31,430 12.4Sub&Total 6.74 39,618 0 13.07 $2,615 $3,092 $35,314 $32,222 12.3
The(Crossings A Replace(Indoor(Lighting 0.51 1,311 0 0.43 $172 $88 $3,172 $3,084 18.0The(Crossings B Replace(Outdoor(HID(Lighting 2.24 9,820 0 3.24 $982 $1,890 $15,300 $13,410 13.7
Sub&Total 2.75 11,131 0 3.67 $1,154 $1,978 $18,472 $16,494 14.3
City&Wide&Totals 134.6 448,657 V644 144.57 $54,178 $45,859 $439,111 $393,252 7.3
City of Carlsbad Energy Roadmap Appendix C-6
Page
|
4
ALL-‐SITES:
INDOOR
LIGHTING
REPLACEMENT
For
the
purposes
of
this
report
every
site
included
in
the
phase
1
audit
was
evaluated
for
an
indoor
lighting
replacement,
primarily
to
replace
existing
32-‐watt
T8
lamps
and
electronic
ballasts
with
28-‐watt
T8
lamps
and
premium
efficiency
electronic
ballasts.
At
some
sites
other
lighting
types
such
as
HID
and
incandescent
were
found
and
included
as
well.
For
all
sites,
28-‐watt
T8
lamps
have
been
recommended.
It
is
not
recommended
to
use
25-‐watt
T8
lamps
as
they
do
not
produce
the
same
lumen
output
and
would
result
in
a
lower
light
level.
Unless
otherwise
noted,
it
is
not
the
intention
of
these
recommendations
to
reduce
the
lighting
level
in
any
spaces.
Lighting
counts
and
replacement
options
are
listed
in
the
tables
below
with
savings
calculations.
The
overall
results
for
each
site
are
summarized
in
Audit
Results
tables
on
page
2
and
3
and
are
designated
as
Measure
A.
Measure
A:
Replace
Indoor
Lighting
CALAVERA
HILLS
PARK
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,200
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
22
22
Grand
Total
22
22
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.20
436
0
0.14
Grand
Total
0.20
436
0
0.14
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$70
$814
22
$792
11.3
$70
$814
22
$792
11.3
City of Carlsbad Energy Roadmap Appendix C-7
Page
|
5
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
SPACE
LEFT
INTENTIONALLY
BLANK
City of Carlsbad Energy Roadmap Appendix C-8
Page
|
6
CARLSBAD
CITY
LIBRARY
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
3,850
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
722
722
F32T8-‐PREM
Electronic
F43ILL
171
171
F32T8-‐PREM
Elec-‐Prem
F41ILL
52
52
MH450PS
Mag-‐CWA
MH450PS/1
13
13
50w
Inc.
NA
I50/1
10
10
F96T8
Electronic
F84ILL
8
8
Grand
Total
976
976
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
6.50
25,017
0
8.25
F28T8-‐PREM-‐ES
Elec-‐Prem
F43WLL
2.57
9,875
0
3.26
F28T8-‐PREM-‐ES
Elec-‐Prem
F41WLL
0.16
601
0
0.20
220
lamp
LED
Fixture
NA
LED220
3.25
12,513
0
4.13
13w
CFL
Electronic
CFQ13/1-‐L
0.35
1,348
0
0.44
F28T8-‐PREM-‐ES
Elec-‐Prem
F44WLL
0.17
647
0
0.21
Grand
Total
12.99
50,000
0
16.49
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$2,977
$26,714
722
$25,992
8.7
$1,175
$7,695
256.5
$7,439
6.3
$71
$1,092
26
$1,066
14.9
$1,489
$11,050
700.375
$10,350
7.0
$160
$80
0
$80
0.5
$77
$960
32
$928
12.1
$5,950
$47,591
1736.875
$45,854
7.7
City of Carlsbad Energy Roadmap Appendix C-9
Page
|
7
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F43WLL
L-‐T21
Lamp
$0.50
F41WLL
L-‐T21
Lamp
$0.50
F44WLL
L-‐T21
Lamp
$0.50
LED220
EEBI
Lighting
NA
$0.00
CFQ13/1-‐L
NA
NA
$0.00
SPACE
LEFT
INTIONALLY
BLANK
City of Carlsbad Energy Roadmap Appendix C-10
Page
|
8
CITY
HALL
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,500
1,800
1,500
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
34
26
15
75
Grand
Total
34
26
15
75
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.67
1,389
0
0.46
Grand
Total
0.67
1,389
0
0.46
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$201
$2,775
75
$2,700
13.4
$201
$2,775
75
$2,700
13.4
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-11
Page
|
9
CMWD
ADMINISTRATION
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,500
1,800
1,000
1,500
3,500
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
84
34
29
11
27
185
Grand
Total
84
34
29
11
27
185
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
1.67
3,701
0
1.22
Grand
Total
1.67
3,701
0
1.22
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$600
$6,845
185
$6,660
11.1
$600
$6,845
185
$6,660
11.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-12
Page
|
10
COLE
LIBRARY
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
1,800
1,000
500
4,050
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
12
13
40
403
468
F32T8-‐PREM
Electronic
F41ILL
168
168
Grand
Total
12
13
40
571
636
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
4.21
15,181
0
5.01
F28T8-‐PREM-‐ES
Elec-‐Prem
F41WLL
1.01
4,082
0
1.35
Grand
Total
5.22
19,263
0
6.35
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$2,201
$17,316
468
$16,848
7.7
$592
$3,528
84
$3,444
5.8
$2,793
$20,844
552
$20,292
7.3
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F41WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-13
Page
|
11
FARADAY
CENTER
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,500
1,800
1,000
500
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
4
4
FU31T8/6
Electronic
FU2ILL
123
1
6
130
F32T8-‐PREM
Electronic
F43ILL
262
212
25
499
Grand
Total
385
213
25
10
633
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.04
18
0
0.01
F28U8-‐PREM-‐ES
Elec-‐Prem
FU2
T8
28RW
1.17
2,811
0
0.93
F28T8-‐PREM-‐ES
Elec-‐Prem
F43WLL
7.49
15,924
0
5.25
Grand
Total
8.69
18,753
0
6.19
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$2
$148
4
$144
60.6
$371
$4,810
130
$4,680
12.6
$2,102
$22,455
748.5
$21,707
10.3
$2,475
$27,413
882.5
$26,531
10.7
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F43WLL
L-‐T21
Lamp
$0.50
FU2
T8
28RW
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-14
Page
|
12
FIRE
STATION
1
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
3,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
75
75
Grand
Total
75
75
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.68
2,025
0
0.67
Grand
Total
0.68
2,025
0
0.67
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$332
$2,775
75
$2,700
8.1
$332
$2,775
75
$2,700
8.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-15
Page
|
13
FIRE
STATION
2
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
3,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
31
31
Grand
Total
31
31
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.28
837
0
0.28
Grand
Total
0.28
837
0
0.28
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$137
$1,147
31
$1,116
8.1
$137
$1,147
31
$1,116
8.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-16
Page
|
14
FIRE
STATION
4
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
3,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
15
15
Grand
Total
15
15
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.14
405
0
0.13
Grand
Total
0.14
405
0
0.13
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$66
$555
15
$540
8.1
$66
$555
15
$540
8.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-17
Page
|
15
FIRE
STATION
5
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
3,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
100
100
Grand
Total
100
100
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.90
2,700
0
0.89
Grand
Total
0.90
2,700
0
0.89
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$427
$3,700
100
$3,600
8.4
$427
$3,700
100
$3,600
8.4
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-18
Page
|
16
FLEET
MAINTENANCE
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,500
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
30
30
Grand
Total
30
30
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.27
675
0
0.22
Grand
Total
0.27
675
0
0.22
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$101
$1,110
30
$1,080
10.7
$101
$1,110
30
$1,080
10.7
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-19
Page
|
17
HARDING
COMMUNITY
CENTER
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐
Fixtures
2,500
500
2,000
1,600
250
800
3,000
1,500
750
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
6
14
1
32
2
2
57
F32T8-‐PREM
Electronic
F44ILL
16
5
3
2
26
F32T8-‐PREM
Electronic
F41ILL
1
4
5
I60
0
I60/1
1
1
Grand
Total
6
14
18
5
5
3
32
4
2
89
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.51
1,121
0
0.37
F28T8-‐PREM-‐ES
Elec-‐Prem
F44WLL
0.34
590
0
0.19
F28T8-‐PREM-‐ES
Elec-‐Prem
F41WLL
0.03
18
0
0.01
CFQ13W
Electronic
CFQ13/1-‐L
0.05
11
0
0.00
Grand
Total
0.93
1,740
0
0.57
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$184
$2,109
57
$2,052
11.2
$97
$1,560
52
$1,508
15.6
$3
$105
2.5
$103
34.7
$2
$8
0
$8
4.3
$285
$3,782
111.5
$3,671
12.9
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F44WLL
L-‐T21
Lamp
$0.50
F41WLL
L-‐T21
Lamp
$0.50
CFQ13/1-‐L
NA
NA
$0.00
City of Carlsbad Energy Roadmap Appendix C-20
Page
|
18
MONROE
STREET
POOL
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
500
2,000
1,500
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
22
4
26
F32T8-‐PREM
Electronic
F41ILL
14
14
Grand
Total
14
22
4
40
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.23
450
0
0.15
F28T8-‐PREM-‐ES
Elec-‐Prem
F41WLL
0.08
42
0
0.01
Grand
Total
0.32
492
0
0.16
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$55
$962
26
$936
16.9
$5
$294
7
$287
55.6
$61
$1,256
33
$1,223
20.2
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F41WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-21
Page
|
19
SAFETY
CENTER
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,000
8,760
4,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
58
221
279
F32T8-‐PREM
Electronic
F43ILL
286
12
298
MH150
Mag
MH150/1
5
5
Grand
Total
344
233
5
582
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
2.51
18,468
0
6.09
F28T8-‐PREM-‐ES
Elec-‐Prem
F43WLL
4.47
10,157
0
3.35
100
lamp
LED
NA
LED100
0.37
1,480
0
0.49
Grand
Total
7.35
30,104
0
9.93
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$2,179
$10,323
279
$10,044
4.6
$1,199
$13,410
447
$12,963
10.8
$175
$2,250
425
$1,825
10.5
$3,552
$25,983
1151
$24,832
7.0
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F43WLL
L-‐T21
Lamp
$0.50
LED100
L-‐S31
Lamp
$85.00
City of Carlsbad Energy Roadmap Appendix C-22
Page
|
20
SENIOR
CENTER
Count
by
Hours
Pre-‐Fixtures
1,800
1,000
500
2,500
2,700
Grand
Total
F42ILL
91
25
25
69
36
246
FU2ILL
26
23
10
59
CFQ26/2L
38
18
56
MH175/1
15
15
Grand
Total
155
25
25
110
61
376
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
2.21
4,239
0
1.40
F28U8-‐PREM-‐ES
Elec-‐Prem
FU2
T8
28RW
0.53
1,182
0
0.39
No
Replacement
0
2.80
5,670
0
1.87
LED
120
0
LED120
1.14
3,078
0
1.02
Grand
Total
6.69
14,169
0
4.67
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$822
$9,102
246
$8,856
10.8
$229
$2,183
59
$2,124
9.3
$1,100
$0
0
$0
0.0
$597
$7,500
206.34
$7,294
12.2
$2,749
$18,785
511.34
$18,274
6.6
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
LED120
NA
NA
$0.00
FU2
T8
28RW
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-23
Page
|
21
STAGECOACH
COMMUNITY
PARK
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,200
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
22
22
Grand
Total
22
22
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.20
436
0
0.14
Grand
Total
0.20
436
0
0.14
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$70
$814
22
$792
11.3
$70
$814
22
$792
11.3
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-24
Page
|
22
THE
CROSSINGS
AT
CARLSBAD
Count
by
Hours
Existing
Lamp
Existing
Ballast
Pre-‐Fixtures
2,000
3,000
Grand
Total
F32T8-‐PREM
Electronic
F42ILL
10
10
F32T8-‐PREM
Electronic
F43ILL
8
8
F96T8
Electronic
F82ILL
33
33
Grand
Total
18
33
51
Results
New
Lamp
New
Ballast
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
F28T8-‐PREM-‐ES
Elec-‐Prem
F42WLL
0.39
1,071
0
0.35
F28T8-‐PREM-‐ES
Elec-‐Prem
F43WLL
0.12
240
0
0.08
Grand
Total
0.51
1,311
0
0.43
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$140
$2,812
76
$2,736
19.5
$31
$360
12
$348
11.1
$172
$3,172
88
$3,084
18.0
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
F42WLL
L-‐T21
Lamp
$0.50
F43WLL
L-‐T21
Lamp
$0.50
City of Carlsbad Energy Roadmap Appendix C-25
Page
|
23
ALL
SITES:
OUTDOOR
LIGHTING
REPLACEMENT
For
the
purposes
of
this
report
every
site
included
in
the
phase
1
audit
was
evaluated
for
an
outdoor
lighting
replacement.
Replacing
high
intensity
discharge
(HID)
lamps
and
ballasts
with
LED
or
other
more
efficient
technology
provides
a
reduction
in
energy
consumption
as
well
as
improving
the
quality
of
light.
Lighting
counts
and
replacement
options
are
listed
in
the
tables
below
with
savings
calculations.
The
overall
results
for
each
site
are
summarized
in
Audit
Results
tables
on
page
2
and
3
and
are
designated
as
Measure
B.
Measure
B:
Replace
Outdoor
Lighting
CALAVERA
HILLS
PARK
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
1,000
4,380
Grand
Total
HPS250
HPS250/1
8
8
HPS150
HPS150/1
15
15
MH1000
MH1000/1
9
9
MH400
MH400/1
6
6
Grand
Total
15
23
38
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
LED120
LED120
1.40
6,132
0
2.02
LED80
LED80
1.62
7,096
0
2.34
MH1000
MH1000/1
0.00
0
0
0.00
LED220
LED220
1.43
1,428
0
0.47
Grand
Total
4.45
14,656
0
4.83
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$613
$7,200
640
$6,560
10.7
$710
$9,000
750
$8,250
11.6
$0
$0
0
$0
0.0
$143
$7,200
750
$6,450
45.2
$1,466
$23,400
2140
$21,260
14.5
City of Carlsbad Energy Roadmap Appendix C-26
Page
|
24
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED80
L-‐S91
Lamp
$50.00
LED120
L-‐S71
Lamp
$80.00
LED220
L-‐S51
Lamp
$125.00
SPACE
LEFT
INTENTIONALLY
BLANK
City of Carlsbad Energy Roadmap Appendix C-27
Page
|
25
CARLSBAD
CITY
LIBRARY
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
MH250
MH250/1
9
9
MH1000
MH1000/1
6
6
MH100
MH100/1
5
5
Grand
Total
20
20
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
LED
LED140
1.18
5,164
0
1.70
40
LED
LED40
0.40
1,730
0
0.57
No
Replacement
MH1000/1
0.00
0
0
0.00
Grand
Total
1.57
6,894
0
2.27
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$516
$4,950
1125
$3,825
7.4
$173
$1,500
250
$1,250
7.2
$0
$0
0
$0
0.0
$689
$6,450
1375
$5,075
7.4
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED40
L-‐S91
Fixture
$50.00
LED140
L-‐S61
Fixture
$125.00
City of Carlsbad Energy Roadmap Appendix C-28
Page
|
26
CMWD
ADMINISTRATION
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS150
HPS150/1
7
7
Grand
Total
7
7
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
80
LED
LED80
0.67
2,913
0
0.96
Grand
Total
0.67
2,913
0
0.96
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$291
$2,800
560
$2,240
7.7
$291
$2,800
560
$2,240
7.7
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED80
L-‐S81
Fixture
$80.00
City of Carlsbad Energy Roadmap Appendix C-29
Page
|
27
COLE
LIBRARY
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS150
HPS150/1
8
8
Grand
Total
8
8
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
80
LED
LED80
0.76
3,329
0
1.10
Grand
Total
0.76
3,329
0
1.10
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$499
$3,200
640
$2,560
5.1
$499
$3,200
640
$2,560
5.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED80
L-‐S81
Fixture
$80.00
City of Carlsbad Energy Roadmap Appendix C-30
Page
|
28
FARADAY
CENTER
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS250
HPS250/1
26
26
HPS100
HPS100/1
12
12
Grand
Total
38
38
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
LED
LED140
3.41
14,918
0
4.92
40
LED
LED40
1.07
4,678
0
1.54
Grand
Total
4.47
19,596
0
6.46
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$2,238
$14,300
3250
$11,050
4.9
$702
$3,600
600
$3,000
4.3
$2,939
$17,900
3850
$14,050
4.8
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED40
L-‐S91
Fixture
$50.00
LED140
L-‐S61
Fixture
$125.00
City of Carlsbad Energy Roadmap Appendix C-31
Page
|
29
FIRE
STATION
1
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS250
HPS250/1
1
1
MH100
MH100/1
1
1
HPS50
HPS50/1
4
4
Grand
Total
6
6
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
LED
LED140
0.13
574
0
0.19
60
LED
LED60
0.06
250
0
0.08
20
LED
LED20
0.16
718
0
0.24
Grand
Total
0.35
1,542
0
0.51
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$57
$550
125
$425
7.4
$25
$350
50
$300
12.0
$72
$1,000
200
$800
11.1
$154
$1,900
375
$1,525
9.9
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED140
L-‐S61
Fixture
$125.00
LED60
L-‐S91
Fixture
$50.00
LED20
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-32
Page
|
30
FIRE
STATION
2
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
MH100
MH100/1
1
1
HPS50
HPS50/1
2
2
Grand
Total
3
3
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
60
LED
LED60
0.06
250
0
0.08
20
LED
LED20
0.08
359
0
0.12
Grand
Total
0.14
609
0
0.20
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$25
$350
50
$300
12.0
$36
$500
100
$400
11.1
$61
$850
150
$700
11.5
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED140
L-‐S61
Fixture
$125.00
LED60
L-‐S91
Fixture
$50.00
LED20
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-33
Page
|
31
FIRE
STATION
4
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
MH100
MH100/1
1
1
HPS50
HPS50/1
1
1
Grand
Total
2
2
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
60
LED
LED60
0.06
250
0
0.08
20
LED
LED20
0.04
180
0
0.06
Grand
Total
0.10
429
0
0.14
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$37
$350
50
$300
8.0
$27
$250
50
$200
7.4
$64
$600
100
$500
7.8
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED60
L-‐S91
Fixture
$50.00
LED20
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-34
Page
|
32
FIRE
STATION
5
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
MH100
MH100/1
1
1
HPS250
HPS250/1
5
5
HPS50
HPS50/1
6
6
Grand
Total
12
12
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
60
LED
LED60
0.06
250
0
0.08
140
LED
LED140
0.66
2,869
0
0.95
20
LED
LED20
0.25
1,077
0
0.36
Grand
Total
0.96
4,196
0
1.38
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$25
$350
50
$300
12.0
$287
$2,750
625
$2,125
7.4
$108
$1,500
300
$1,200
11.1
$420
$4,600
975
$3,625
8.6
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED140
L-‐S61
Fixture
$125.00
LED60
L-‐S91
Fixture
$50.00
LED20
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-35
Page
|
33
FLEET
MAINTENANCE
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS250
HPS250/1
7
7
HPS100
HPS100/1
7
7
Grand
Total
14
14
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
LED
LED140
0.92
4,016
0
1.32
40
LED
LED40
0.62
2,729
0
0.90
Grand
Total
1.54
6,745
0
2.23
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$402
$3,850
875
$2,975
7.4
$273
$2,100
350
$1,750
6.4
$675
$5,950
1225
$4,725
7.0
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED40
L-‐S91
Fixture
$50.00
LED140
L-‐S61
Fixture
$125.00
City of Carlsbad Energy Roadmap Appendix C-36
Page
|
34
HARDING
COMMUNITY
CENTER
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS50
HPS50/1
7
7
HPS150
HPS150/1
1
1
Grand
Total
8
8
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
20
LED
LED20
0.29
1,257
0
0.41
80
LED
LED80
0.10
416
0
0.14
Grand
Total
0.38
1,673
0
0.55
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$126
$1,750
350
$1,400
11.1
$42
$650
80
$570
13.7
$167
$2,400
430
$1,970
11.8
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED20
L-‐S91
Fixture
$50.00
LED80
L-‐S81
Fixture
$80.00
City of Carlsbad Energy Roadmap Appendix C-37
Page
|
35
MONROE
STREET
POOL
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
1,000
600
4,380
Grand
Total
MH400
MH400/1
18
18
300w
Inc.
I300/1
18
18
HPS70
HPS70/1
7
7
HPS250
HPS250/1
2
2
Grand
Total
18
18
9
45
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
240
LED
LED240
3.22
3,222
0
1.06
Submersed
LED
SubLED30
4.86
2,916
0
0.96
20
LED
LED20
0.49
2,146
0
0.71
140
LED
LED140
0.26
1,148
0
0.38
Grand
Total
8.83
9,432
0
3.11
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$322
$14,400
2250
$12,150
37.7
$292
$10,800
573.48
$10,227
35.1
$215
$1,750
350
$1,400
6.5
$115
$1,100
250
$850
7.4
$943
$28,050
3423.48
$24,627
26.1
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
kWh
Peak
LED20
L-‐S91
Fixture
$50.00
$0.00
$0.00
LED140
L-‐S61
Fixture
$125.00
$0.00
$0.00
SubLED30
EEBI
Lighting
$0.00
$0.03
$100.00
LED240
L-‐S51
Fixture
$125.00
$0.00
$0.00
City of Carlsbad Energy Roadmap Appendix C-38
Page
|
36
SAFETY
CENTER
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS250
HPS250/1
13
13
MH100
MH100/1
1
1
Grand
Total
14
14
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
LED
LED140
1.70
7,459
0
2.46
60
LED
LED60
0.06
250
0
0.08
Grand
Total
1.76
7,709
0
2.54
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$746
$7,150
1625
$5,525
7.4
$25
$350
50
$300
12.0
$771
$7,500
1675
$5,825
7.6
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED140
L-‐S61
Fixture
$125.00
LED60
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-39
Page
|
37
SENIOR
CENTER
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS250
HPS250/1
13
13
HPS70
HPS70/1
14
14
Grand
Total
27
27
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
140
lamp
LED
LED140
1.70
7,459
0
2.46
40
lamp
LED
LED40
0.64
2,821
0
0.93
Grand
Total
2.35
10,280
0
3.39
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$1,119
$7,150
1625
$5,525
4.9
$423
$3,500
700
$2,800
6.6
$1,542
$10,650
2325
$8,325
5.4
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED40
L-‐S91
Fixture
$50.00
LED140
L-‐S61
Fixture
$125.00
City of Carlsbad Energy Roadmap Appendix C-40
Page
|
38
STAGECOACH
COMMUNITY
CENTER
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
1,000
4,380
Grand
Total
HPS250
HPS250/1
19
19
HPS150
HPS150/1
21
21
MH1000
MH1000/1
24
24
MH400
MH400/1
4
4
Grand
Total
28
40
68
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
LED120
LED120
3.33
14,564
0
4.80
LED80
LED80
2.27
9,934
0
3.28
MH1000
MH1000/1
0.00
0
0
0.00
LED220
LED220
0.95
952
0
0.31
Grand
Total
6.55
25,449
0
8.39
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$1,456
$17,100
1520
$15,580
10.7
$993
$12,600
1050
$11,550
11.6
$0
$0
0
$0
0.0
$95
$4,800
500
$4,300
45.2
$2,545
$34,500
3070
$31,430
12.4
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED80
L-‐S91
Lamp
$50.00
LED120
L-‐S71
Lamp
$80.00
LED220
L-‐S51
Lamp
$125.00
City of Carlsbad Energy Roadmap Appendix C-41
Page
|
39
THE
CROSSINGS
AT
CARLSBAD
Count
by
Hours
Existing
Lamp
Pre-‐Fixtures
4,380
Grand
Total
HPS150
HPS150/1
23
23
MH100
MH100/1
1
1
Grand
Total
24
24
Results
New
Lamp
Row
Labels
kW
Reduction
kWh
Savings
Therm
Saving
GHG
Offset
(mtCO2e)
80
LED
LED80
2.19
9,570
0
3.16
60
LED
LED60
0.06
250
0
0.08
Grand
Total
2.24
9,820
0
3.24
Cost
Saving
Install
Cost
Rebate
or
Incentives
Net
Install
Costs
Simple
Payback
(yrs)
$957
$14,950
1840
$13,110
13.7
$25
$350
50
$300
12.0
$982
$15,300
1890
$13,410
13.7
Rebate
Codes,
Values,
and
Unit
of
Payment
(From
2013
SDG&E
EBR
Catalog
and
Business
Incentives)
Replacement
Fixture
Code
Rebate
Code
Unit
Rebate
Value
LED80
L-‐S81
Fixture
$80.00
LED60
L-‐S91
Fixture
$50.00
City of Carlsbad Energy Roadmap Appendix C-42
Page
|
40
COLE
LIBRARY
The
Cole
Library
is
a
two
story,
25,033-‐ft2
library
built
in
1967.
The
building
is
occupied
approximately
40
hours
per
week.
The
following
systems
were
included
in
the
phase
2
audit:
-‐ HVAC
-‐ Indoor
Lighting
-‐ Outdoor
Lighting
HVAC
–
The
library
is
served
by
a
chiller
plant
with
an
air
cooled
scroll
chiller
and
gas
heating
hot
water
boiler.
Water
is
circulated
to
air
handlers
with
water
pumps
controlled
by
VFD.
The
air
handlers
distribute
air
to
VAV
terminals
throughout
the
building.
The
system
is
controlled
by
a
DDC
system.
Indoor
Lighting
–
The
interior
is
lit
with
fluorescent
fixtures
with
32
watt
T8
lamps
and
electronic
ballasts
in
a
variety
of
configurations.
Indoor
lighting
recommendations
are
addressed
in
Measure
A
starting
on
page
4.
Outdoor
Lighting
–
HID
wall
packs
are
located
on
the
perimeter
of
the
buildings.
The
parking
lot
is
lit
with
pole
top
HID
lamps
and
fixtures.
Both
are
controlled
for
dusk
to
dawn
operation.
Outdoor
lighting
recommendations
are
addressed
in
Measure
B
starting
on
page
23.
City of Carlsbad Energy Roadmap Appendix C-43
Page
|
41
Energy
Conservation
Measures
for
Cole
Library
MEASURE
1:
INSTALL
TURBOCOR
COMPRESSOR
ON
CHILLER
The
existing
air-‐cooled
chiller
is
a
Carrier
30RBA090
(90
nominal
tons)
was
installed
in
2006
according
to
city
personnel.
The
chiller
uses
a
rotary
scroll
compressor
with
a
published
IPLV
13.5
EER.
This
compressor
should
be
replaced
with
an
appropriate
size
Turbocor
compressor.
Existing
Chiller
Replacement
Chiller
Make
Carrier
Make
Turbocor
Model
30RBA090
Model
TT300
Nom
Tons
90
Nom
Tons
90
IPVL
EER
13.5
IPVL
EER
-‐
kW/Ton
Refrigeration
0.889
kW/Ton
Refrigeration
0.34
Equivalent
Full
Load
Hours
per
Year
1,320
Equivalent
Full
Load
Hours
per
Year
1,320
Estimated
Annual
kWh
(Chiller
Only)
105,613
Estimated
Annual
kWh
(Chiller
Only)
40,392
Estimated
kWh
Reduction
(Chiller
Only)
65,221
Estimated
kW
Reduction
(Chiller
Only)
49.41
Blended
Electrical
Rate
$0.145
per
kWh
Estimated
Annual
Cost
Savings
$9,457.07
Estimated
Install
Cost
$60,000
Estimated
Incentive
$10,159
Net
Install
Cost
$49,841
Simple
Payback
5.3
yrs
City of Carlsbad Energy Roadmap Appendix C-44
Page
|
42
MONROE
STREET
POOL
The
Swim
Complex
has
two
buildings.
Reception
and
changing
is
a
2,665-‐ft2
one-‐story
building
and
the
equipment
building
is
1,112
ft2.
The
main
building
is
occupied
approximately
40
hours
per
week.
The
275,000-‐gallon
pool
is
used
year
round.
The
following
systems
were
included
in
the
phase
2
audit:
-‐ Indoor
Lighting
-‐ Outdoor
Lighting
-‐ Other
Equipment
Indoor
Lighting
–
Lighting
is
provided
by
32-‐watt
T8
lamps
and
electronic
ballasts
in
a
variety
of
configurations.
Daylight
is
available
through
windows
and
skylights.
Indoor
lights
are
manually
controlled.
Indoor
lighting
recommendations
are
addressed
in
Measure
A
starting
on
page
4.
Outdoor
Lighting
–
Metal
halide
pole-‐top
flood
fixtures
light
the
pool
deck
and
are
controlled
manually
from
the
office.
Submersed
pool
lights
are
controlled
from
the
office
and
are
used
when
the
pool
is
in
use
after
sunset.
Outdoor
lighting
recommendations
are
addressed
in
Measure
B
starting
on
page
23.
Other
Equipment
–
Two
25
hp
pumps
that
alternate
to
run
one
at
a
time
serve
the
pool.
The
pumps
run
24/7
with
no
speed
control.
A
solar
hot
water
array
is
installed
on
the
ground
southwest
of
the
pool.
Pump
water
flow
was
not
available
at
the
time
of
the
audit
so
the
pumps
are
assumed
to
be
properly
sized.
City of Carlsbad Energy Roadmap Appendix C-45
Page
|
43
Energy
Conservation
Measures
for
Monroe
Street
Pool
MEASURE
2:
INSTALL
PUMP
CONTROLS
The
pumps
are
assumed
to
be
properly
sized
for
the
pool
and
flow
requirements
based
on
currently
available
data.
The
pumps
operate
24
hours
per
day
year
round.
The
pumps
are
only
required
to
operate
during
hours
that
the
pool
is
or
may
be
occupied.
By
reducing
the
hours
of
operation
by
turning
off
the
pumps
during
the
night
energy
savings
will
be
realized.
The
above
calculations
are
based
on
shutting
off
the
pumps
55
hours
per
week,
which
is
less
than
8
hour
per
night
shut
down.
A
balance
must
be
struck
between
the
interests
of
cost
savings
and
the
interest
of
water
clarity.
The
following
table
is
provided
to
aid
in
selecting
the
appropriate
amount
of
time
to
shut
down
pumps
overnight.
Filtration
Controls:
Shut
Down
Times
by
Week
Rated
Measured
Weekly
Shutdown
Hours
Lap
Pool
Pump
Motor
kW
Lap
Pool
Pump
Motor
kW
Annual
Energy
Saved
Annual
Cost
Saved
90
18.7
12.3
55,215
$5,716
85
18.7
12.3
52,148
$5,399
75
18.7
12.3
46,018
$4,764
65
18.7
12.3
39,878
$4,128
55
18.7
12.3
33,743
$3,493
45
18.7
12.3
27,608
$2,858
35
18.7
12.3
21,473
$2,223
25
18.7
12.3
15,338
$1,588
15
18.7
12.3
9,203
$953
5
18.7
12.3
3,068
$318
Install'Controls'on'Filtration'Pumps
Pool
Current'Annual'
Hours'Open'to'
Public
Current'Annual'
Pumping'Hours
Pump'Motor'
Power'(kW)
Measured'Pump'
Motor'(kW)
Existing'Annual'
Pumping'Energy'
(kWh)
Municipal)Pool,)Lap)Pool 3,000 8,560 18.7 12.3 105,288
Total'Existing'Annual'Pumping'Energy'(kWh)105,288
Pool
Current'Annual'
Hours'Open'to'
Public
Recommended'
Pumping'Hours
Pump'Motor'
Power'(kW)
Measured'Pump'
Motor'(kW)
Recommended'
Annual'Pumping'
Energy'(kWh)
Municipal)Pool,)Lap)Pool 3,000 5,755 18.7 12.3 70,787
Total'Recommended'Annual'Pumping'Energy'(kWh)70,787
kW'Savings 0.00
Cost)per)kW)……………………………………………$20.0458 Annual'kWh'Savings 34,502
Cost)per)kWh)………………………………………….$0.1035 Annual'Cost'Savings $3,572
Rebate)Value $600
SDG&E)Incentive)Code…..……………………..…EEBI)OtherOMotor Estimated)Implementation)Cost $1,200
SDG&E)kWh)Incentive)Value…………………...$0.08 Net'Implementation'Cost $600
SDG&E)kW)Incentive)Value)…………………....$100 Simple'Payback'0.2'yrs
City of Carlsbad Energy Roadmap Appendix C-46
Page
|
44
SAFETY
CENTER
The
Public
Safety
Service
Center
is
a
two
story,
55,027-‐ft2
building
built
in
1986.
The
building
houses
police
department
offices,
training
rooms,
meeting
spaces
and
locker
rooms.
The
building
is
occupied
24
hours
per
day.
The
following
systems
were
included
in
the
phase
1
audit:
-‐ HVAC
-‐ Indoor
Lighting
-‐ Outdoor
Lighting
HVAC
–
A
central
chiller
plant
serves
the
building
with
an
100-‐ton
air
cooled
scroll
chiller,
heating
hot
water
boiler,
and
circulation
pumps
located
in
a
mechanical
building
across
the
parking
lot
from
the
building.
The
building
has
one
air
handler
per
floor
located
in
mechanical
rooms.
Openings
in
the
exterior
wall
of
the
mechanical
room
allow
the
intake
of
fresh
air.
The
air
handlers
have
economizers
with
outside
air
temperature
resets.
Sixty-‐eight
VAV
terminals
provide
ventilation
control
to
the
building.
Twenty-‐four
of
the
terminals
provide
reheat
with
hot
water
coils.
Fifteen
exhaust
fans
serve
the
building
locker
rooms,
restrooms,
and
electrical
rooms
and
provide
make
up
air.
Four
package
DX
air
conditioners
are
located
on
the
lower
roof;
they
serve
a
large
conference
room.
Three
split
DX
air
conditioners
serve
special
24-‐hour
areas.
A
DDC
system
manages
the
HVAC
system
in
this
building.
Indoor
Lighting
–
The
interior
is
lit
with
fluorescent
fixtures
with
32-‐watt
T8
lamps
and
electronic
ballasts
in
a
variety
of
configurations.
Metal
halide
lamps
are
located
in
the
stairwell
and
in
the
central
interior
lobby.
The
lobby
has
large
skylights
and
is
over
lit
with
the
metal
halide
pendant
lights.
Indoor
lighting
recommendations
are
addressed
in
Measure
A
starting
on
page
4.
Outdoor
Lighting
–
Lighted
bol lards
with
50-‐watt
HPS
lamps
are
located
outside
the
building.
CFL
wallpacks
are
located
near
the
main
entrance.
The
parking
lot
is
lit
with
HPS
pole
top
fixtures.
All
outdoor
lighting
is
controlled
for
dusk
to
dawn
operation.
Outdoor
lighting
recommendations
are
addressed
in
Measure
B
starting
on
page
23.
City of Carlsbad Energy Roadmap Appendix C-47
Page
|
45
Energy
Conservation
Measures
for
Safety
Center
MEASURE
3:
PERFORM
RETROCOMMISSION
ON
HVAC
SYSTEM
During
the
phase
1
audit
of
the
Safety
Center
the
outside
air
temperature
was
below
the
economizer
set
point
in
the
DDC
system
however
the
economizers
were
not
functioning
and
the
chiller
was
running
to
cool
the
building.
According
to
the
HVAC
technician
contracted
by
the
City
of
Carlsbad
the
economizer
system
as
well
as
other
controls
are
not
working
properly.
A
retrocommission
should
be
performed
on
the
HVAC
system
to
address
control
issues.
Specifically,
regaining
control
of
the
economizers
on
the
air
handlers
will
result
in
substantial
savings.
To
accurately
determine
the
energy
savings
and
costs
of
repairing
the
economizers
a
computer
simulation
was
created
using
eQuest.
A
baseline
case
was
established
with
no
working
economizers
and
was
then
calibrated
to
match
the
actual
billing
history
of
the
building.
The
model
was
then
re-‐run
with
economizers
in
place.
The
difference
in
energy
consumption
between
the
two
runs
is
the
energy
savings.
The
savings
are
summarized
here.
Blended
Electrical
Rate
from
Energy
Report
Cards:
$0.118
per
kWh
Blended
Natural
Gas
Rate
from
Energy
Report
Cards:
$0.506
per
Therm
Economizer
Repair
Electrical
Savings
(Annual):
59,700
kWh/yr
Economizer
Repair
Natural
Gas
Savings
(Annual):
-‐
644
Therms/yr
Economizer
Repair
Cost
Savings
(Annual):
$6,719
Estimated
Cost
of
Retrocommission:
$40,000
Estimated
Incentive
(SDG&E
EEBI
Non-‐Lighting
-‐
$0.08/kWh
plus
$100/kW
reduced):
$4,776
Estimated
Net
Cost:
$35,224
Simple
Payback:
5.2
years
eQuest
model
results
are
shown
below.
City of Carlsbad Energy Roadmap Appendix C-48
Page
|
46
P r o j e c t / R u n : C a r l s b a d P D - B a s e l i n e v 1 - B a s e l i n e D esign R u n D a t e / T i m e : 0 6 / 0 3 / 1 3 @ 2 2 : 3 4
e Q U E S T 3 . 6 4 . 7 1 3 0 M o n t h l y E n e r g y C o n s u m p t i o n b y E n d u s e P a g e 1
0
20
40
60
80
100
120
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Electric Consumption (kWh) (x000)
0
50
100
150
200
250
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Gas Consumption (Btu) (x000,000)
Area LightingTask LightingMisc. Equipment
Exterior UsagePumps & Aux.Ventilation Fans
Water HeatingHt Pump Supp.Space Heating
RefrigerationHeat RejectionSpace Cooling
Electric Consumption (kWh x000)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Space Cool 33.4 30.1 34.7 35.4 38.4 41.1 48.2 47.0 44.0 40.7 35.1 33.5 461.6
Heat Reject.0.4 0.4 0.5 0.6 0.7 1.1 1.8 1.6 1.4 0.9 0.6 0.5 10.7
Refrigeration - - - - - - - - - - - - -
Space Heat - - - - - - - - - - - - -
HP Supp.- - - - - - - - - - - - -
Hot Water - - - - - - - - - - - - -
Vent. Fans 3.6 3.2 3.6 3.5 3.7 3.6 3.9 3.9 3.7 3.7 3.5 3.6 43.5
Pumps & Aux.12.8 11.5 12.8 12.4 12.8 12.4 12.8 12.8 12.4 12.8 12.4 12.8 150.5
Ext. Usage 0.9 0.7 0.8 0.8 0.7 0.6 0.7 0.9 0.9 0.9 0.9 0.9 9.7
Misc. Equip.20.3 18.4 20.3 20.8 21.0 19.4 21.0 21.0 19.4 21.0 18.8 20.3 241.8
Task Lights - - - - - - - - - - - - -
Area Lights 17.2 15.6 17.2 17.9 17.9 16.4 17.9 17.9 16.4 17.9 15.7 17.2 205.4
Total 88.6 79.9 90.0 91.4 95.2 94.7 106.3 105.2 98.2 98.0 86.9 88.8 1,123.2
Gas Consumption (Btu x000,000)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Space Cool - - - - - - - - - - - - -
Heat Reject.- - - - - - - - - - - - -
Refrigeration - - - - - - - - - - - - -
Space Heat 190.8 161.6 167.2 141.8 140.9 128.0 106.8 101.0 115.5 130.9 169.8 191.3 1,745.6
HP Supp.- - - - - - - - - - - - -
Hot Water 12.8 11.7 12.9 13.3 13.0 11.7 12.4 12.2 11.2 12.4 11.2 12.5 147.3
Vent. Fans - - - - - - - - - - - - -
Pumps & Aux.- - - - - - - - - - - - -
Ext. Usage - - - - - - - - - - - - -
Misc. Equip.- - - - - - - - - - - - -
Task Lights - - - - - - - - - - - - -
Area Lights - - - - - - - - - - - - -
Total 203.6 173.3 180.1 155.0 153.9 139.7 119.2 113.2 126.8 143.3 180.9 203.8 1,892.9
City of Carlsbad Energy Roadmap Appendix C-49
Page
|
47
P r o j e c t / R u n : C a r l s b a d P D - B a s e l i n e v 1 - E E M R e p a i r Economizers R u n D a t e / T i m e : 0 6 / 0 3 / 1 3 @ 2 2 : 3 7
e Q U E S T 3 . 6 4 . 7 1 3 0 M o n t h l y E n e r g y C o n s u m p t i o n b y E n d u s e P a g e 1
0
20
40
60
80
100
120
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Electric Consumption (kWh) (x000)
0
50
100
150
200
250
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Gas Consumption (Btu) (x000,000)
Area LightingTask LightingMisc. Equipment
Exterior UsagePumps & Aux.Ventilation Fans
Water HeatingHt Pump Supp.Space Heating
RefrigerationHeat RejectionSpace Cooling
Electric Consumption (kWh x000)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Space Cool 24.8 20.6 25.0 28.0 33.9 39.6 48.7 47.5 43.9 37.7 28.2 25.4 403.4
Heat Reject.0.3 0.2 0.3 0.4 0.6 1.0 1.8 1.7 1.4 0.8 0.5 0.4 9.4
Refrigeration - - - - - - - - - - - - -
Space Heat - - - - - - - - - - - - -
HP Supp.- - - - - - - - - - - - -
Hot Water - - - - - - - - - - - - -
Vent. Fans 3.6 3.2 3.6 3.5 3.6 3.6 3.9 3.9 3.7 3.7 3.5 3.6 43.4
Pumps & Aux.12.8 11.5 12.8 12.4 12.8 12.4 12.8 12.8 12.4 12.8 12.4 12.8 150.4
Ext. Usage 0.9 0.7 0.8 0.8 0.7 0.6 0.7 0.9 0.9 0.9 0.9 0.9 9.7
Misc. Equip.20.3 18.4 20.3 20.8 21.0 19.4 21.0 21.0 19.4 21.0 18.8 20.3 241.8
Task Lights - - - - - - - - - - - - -
Area Lights 17.2 15.6 17.2 17.9 17.9 16.4 17.9 17.9 16.4 17.9 15.7 17.2 205.4
Total 79.9 70.2 80.0 83.8 90.5 93.1 106.8 105.7 98.1 94.9 79.8 80.6 1,063.5
Gas Consumption (Btu x000,000)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Space Cool - - - - - - - - - - - - -
Heat Reject.- - - - - - - - - - - - -
Refrigeration - - - - - - - - - - - - -
Space Heat 198.9 169.3 175.2 148.5 146.4 131.7 108.8 102.7 117.6 134.9 176.4 199.7 1,810.0
HP Supp.- - - - - - - - - - - - -
Hot Water 12.8 11.7 12.9 13.3 13.0 11.7 12.4 12.2 11.2 12.4 11.2 12.5 147.3
Vent. Fans - - - - - - - - - - - - -
Pumps & Aux.- - - - - - - - - - - - -
Ext. Usage - - - - - - - - - - - - -
Misc. Equip.- - - - - - - - - - - - -
Task Lights - - - - - - - - - - - - -
Area Lights - - - - - - - - - - - - -
Total 211.6 181.0 188.2 161.8 159.4 143.4 121.2 115.0 128.8 147.2 187.6 212.2 1,957.3
City of Carlsbad Energy Roadmap Appendix C-50
Page
|
48
SPORTS
PARK
RATE
ANALYSIS
Most
sports
parks
with
high
wattage
lights
pay
for
energy
on
a
'time
of
use'
rate,
usually
identified
in
billing
as
a
TOU
rate.
These
rates
often
differentiate
electrical
energy
consumption
during
peak,
semi-‐
peak
and
off-‐peak
hours.
These
hours
change
between
summer
and
winter.
In
addition
to
the
electrical
energy
consumption
cost
a
demand
cost
is
associated
with
it
as
well.
These
rate
types
have
traditionally
caused
very
high
electrical
energy
rates
for
parks
with
soccer
or
ballpark
lighting,
often
resulting
in
a
blended
rate
of
up
to
$0.42
per
kWh.
Typical
commercial
buildings
pay
a
blended
rate
of
around
$0.125
to
$0.16
per
kWh.
SDG&E
has
begun
to
offer
rates
that
are
specifically
designed
for
these
parks
to
bring
their
blended
dollar
per
kWh
rate
in
line
with
other
commercial
or
public
buildings.
Two
rates
are
currently
available
for
consideration.
Both
will
require
an
on-‐site
visit
from
SDG&E
personnel
to
verify
that
the
requirements
for
the
rate
are
met.
This
report
will
show
the
rate
analysis
for
all
qualifying
city
parks.
The
existing
rates
will
be
compared
to
an
OL-‐2
rate
and
an
OL-‐TOU
rate
offered
by
SDG&E.
SDG&E
Schedule
OL-‐2
is
sometimes
difficult
to
qualify
for
if
a
snack
shack
is
located
at
the
park.
From
SDG&E
Schedule
OL-‐2,
"This
is
an
optional
schedule
provided
by
the
utility.
Applicable
to
metered
service
of
outdoor
area
lighting
load
for
customer-‐owned
facilities,
controlled
for
dusk
to
dawn
operation
and
used
for
the
purpose
of
lighting
sports
and
recreation
areas."
"Service
under
this
Schedule
requires
the
control
of
lamps
in
a
manner
acceptable
to
SDG&E
so
that
lamps
will
not
be
lighted
daily
from
dawn
to
dusk.
Customer
shall
install,
own,
operate,
and
maintain
the
control
device.
SDG&E
shall
have
the
right
to
periodically
inspect
the
control
device
to
ensure
its
correct
operation
and
maintenance."
"Incidental,
non-‐
lighting
loads
may
be
served
under
this
Schedule
only
where
such
connected
loads
for
that
meter
do
not
exceed
15
percent
of
the
customer’s
total
connected
load.
Incidental
loads
must
also
be
controlled
for
dusk
to
dawn
operation
exclusively."
An
alternative
to
the
SDG&E
Schedule
OL-‐2
is
the
Schedule
OL-‐TOU.
OL-‐TOU
is
a
time
of
use
rate
and
will
not
save
as
much
as
OL-‐2,
however
analysis
shows
significant
savings
are
possible
from
OL-‐TOU.
From
SDG&E
Schedule
OL-‐TOU,
"Applicable
to
metered
outdoor
sports
and
recreation
area
lighting
load,
not
including
street
or
highway
lighting,
controlled
exclusively
for
nighttime
operation.
Incidental,
non -‐
outdoor
area
lighting
load
shall
be
served
under
this
schedule
if
the
incidental
load
meets
the
following
conditions:
1)
does
not
exceed
15
percent
of
the
customer’s
Maximum
Monthly
Demand
and
2)
does
not
exceed
20
kW,
regardless
of
the
time
such
incidental
load
operates.
Service
under
this
schedule
is
not
applicable
to
any
customer
whose
monthly
maximum
demand
is
less
than
20
kW
and
to
any
customer
whose
incidental
load
causes
a
summer
on-‐peak
demand
that
equals,
exceeds,
or
is
expected
to
equal
or
exceed
20
kW
for
three
consecutive
billing
periods."
In
the
case
of
City
of
Carlsbad
sports
parks
a
switch
to
the
OL-‐TOU
rate
is
recommended
for
ease
of
implementation.
City of Carlsbad Energy Roadmap Appendix C-51
Page
|
49
Measure
C:
Rate
Change
CALAVERA
HILLS
STAGECOACH
PARK
Calavera
Hills
Stagecoach
Park
Current
Blended
Rate
$0.217
per
kWh
Current
Blended
Rate
$0.264
per
kWh
Total
Annual
kWh
153,434
kWh/yr
Total
Annual
kWh
235,773
kWh/yr
Electrical
Cost
$33,256
per
year
Electrical
Cost
$62,243
per
year
Portion
of
Outdoor
Lighting
55.00%
Portion
of
Outdoor
Lighting
74.00%
84,389
kWh/yr
174,472
kWh/yr
$18,312
per
year
$46,061
per
year
OL-‐TOU
Rate
per
kWh
$0.161
per
kWh
OL-‐TOU
Rate
per
kWh
$0.161
per
kWh
Portion
of
Outdoor
Lighting
84,389
kWh/yr
Portion
of
Outdoor
Lighting
174,472
kWh/yr
Estimated
Electrical
Cost
$13,628
per
year
Estimated
Electrical
Cost
$28,175
per
year
Estimated
Cost
Savings
$4,684
per
year
Estimated
Cost
Savings
$17,885
per
year
Estimated
Install
Cost
$8,000
Estimated
Install
Cost
$10,000
Incentive
or
Rebate
$0.00
Incentive
or
Rebate
$0.00
Simple
Payback
1.7
yrs
Simple
Payback
0.6
yrs
Implementation
of
a
rate
change
at
both
parks
will
likely
require
splitting
the
existing
electrical
meter
into
two
service
meters;
one
for
the
building
and
one
for
all
outdoor
lighting.
By
dedicating
one
meter
to
all
night
time
lighting
simplifies
the
process
of
a
rate
change
to
OL-‐TOU.
The
estimated
implementation
cost
of
the
meter
splits
are
included
in
the
tables
above.
This
measure
will
not
qualify
for
On
Bill
Financing
as
it
does
not
reduce
energy
consumption.
The
cost
of
splitting
the
meter
will
have
to
be
paid
by
the
city
in
full.
City of Carlsbad Energy Roadmap Appendix C-52
APPENDIX D:
PETROLEUM REDUCTION, ALTERNATIVE FUELS, AND
LOCAL INFRASTRUCTURE
Petroleum Reduction Measures
Driving Suggestions for City of Carlsbad Employees
Trip planning, efficient driving habits, and routine maintenance can reduce petroleum use and
transportation costs. Fleet managers can review vehicle scheduling and routing to determine potential
fuel efficiency improvements. In addition, employees can consider the following:
Alternatives to an in-person meeting or event such as a conference call or web cast
Alternative transportation options such as walking, bicycling, and public transit
Shared vehicle options like carpooling with other staff and staff from other agencies
Using the most fuel efficient vehicle that will serve the trip purpose
The official United Stated government source for fuel economy information is fueleconomy.gov. The site
provides data on new and used cars and trucks and the following fuel efficiency tips that the City could
make available to its employees:
Drive sensibly. Aggressive driving habits like speeding, rapid acceleration, and hard-stop braking can
lower fuel efficiency by 33 percent at highway speeds and by 5 percent around town.
Use cruise control. Using cruise control on the highway helps to maintain a constant speed and, in
most cases, saves fuel.
Observe the speed limit. While each vehicle reaches optimal fuel economy at a different speed, fuel
efficiency usually decreases at speeds above 60 miles per hour (mph). As a rule of thumb, each five-
mph increase over 60 mph can cost the city about $0.21 per gallon of gasoline.
Remove excess weight. Avoid keeping unnecessary and heavy items in vehicles. An extra 100
pounds can reduce fuel efficiency by up to two percent. The reduction is based on the percentage of
extra weight relative to the vehicle's weight and affects smaller vehicles more than larger ones.
Avoid excessive idling. Vehicles with larger engines typically waste more fuel while idling than
vehicles with smaller engines.
Use overdrive gears. Engine speed goes down when in overdrive gears, thereby saving fuel and
reducing engine wear.
Properly inflate tires. Check tires monthly for proper inflation. Under-inflated tires can lower fuel
efficiency by 0.4 percent for every one-psi drop in pressure of all four tires.
City of Carlsbad Energy Roadmap Appendix D-1
Alternative Fuels and Vehicles
The following table provides information on the availability of alternative fuel vehicles for a variety of
fleet applications.
Summary of Potential Alternative Fuel Fleet Applications
Fleet Application1 Biodiesel2 Electricity Ethanol
(E85) Hydrogen Natural
Gas Propane
Passenger Vehicle -- PHEV, BEV FFV FCV CNG LPG
Vanpool-Shuttle B20 n/a FFV -- CNG LPG
Refuse Hauler B20 HEV -- -- CNG, LNG --
Sweeper B20 n/a -- -- CNG, LNG --
Other Medium/Heavy-Duty B20 HEV -- -- CNG, LNG --
Forklift -- BEV -- FCV CNG LPG
Lawn/Landscape mower B20 -- -- -- -- LPG
Low-speed Vehicle3 -- NEV -- -- CNG LPG
Notes:
1. Check with original equipment manufacturer (OEM) regarding vehicle warranty and alternative fuels.
2. Diesel blends that are five to twenty percent biodiesel and 95 to 80 percent petroleum diesel, respectively.
3. Examples include a traffic checker and neighborhood electric vehicle.
B20 = twenty percent biodiesel blend PHEV = plug-in hybrid electric vehicle
BEV = battery electric vehicle HEV = hybrid electric vehicle
E85 = 85 percent ethanol, 15 percent gasoline FCV = fuel cell vehicle
FFV = flex fuel vehicle CNG = compressed natural gas
LPG = liquefied petroleum gas LNG = liquefied natural gas
NEV = neighborhood electric vehicle
Description of Alternative Fuels
Electricity
Battery Electric Vehicles (BEVs) and Plug-in Hybrid Electric Vehicles (PHEVs) are powered by a
source of electricity external to the vehicle, such as the electricity grid or a distributed energy
source. As opposed to conventional vehicles powered by the Internal Combustion Engine (ICE),
BEVs run on electric motors powered by rechargeable battery packs. The BEV stores electricity in
an energy storage device such as rechargeable battery packs. Electricity powers the vehicle’s
wheels via an electric motor. BEVs have a limited energy storage capacity, which must be
replenished by plugging into an electrical source external to the vehicle.
PHEVs are powered by an ICE and a rechargeable battery, which displaces the need for some or
all of the need for ICE power and gasoline consumption. In both BEV and PHEV technologies the
batteries must be charged externally (i.e., plugged-in). A plug-in is similar to a standard hybrid,
but is equipped with a battery that can be recharged by connecting a plug to an electric power
source. Most PHEVs are passenger cars, but commercial passenger vans, utility trucks, school
buses, and motorcycles also are available in plug-in versions. Standard hybrids are considered a
vehicle efficiency improvement rather than an alternative fuel vehicle technology.
City of Carlsbad Energy Roadmap Appendix D-2
Description of Alternative Fuels
Biofuels: Biodiesel
Biodiesel is a non-petroleum-based diesel made from vegetable oils or animal fats using a
process called transesterification, which produces a glycerol as a byproduct which remains mixed
in with the biodiesel. Pure biodiesel contains no petroleum, but it can be blended at any level
with petroleum diesel to create a biodiesel blend. Typical biodiesel blends range from 5 to
99 percent. Biodiesel can be legally blended with petroleum diesel in any percentage. Pure
biodiesel (B100) or higher-level biodiesel blends with petroleum diesel can be used in a standard
diesel engine. However, blends greater than B20 are not typically recommended for use without
at least some engine modifications, and may void the engine warranty. B100 and blends of B20
(20 percent biodiesel, 80 percent petroleum diesel) or higher are typically considered biodiesel
fuel. Lower level blends (below B20) are considered diesel fuel. Biodiesel is simple to use,
biodegradable, nontoxic, and essentially free of sulfur and aromatics.
Biodiesel works in any diesel engine with few or no modifications to the engine or the fuel
system. All diesel vehicles, new and old, can use B5 blends. The United States Navy and Marine
Corps are two of the largest users of biodiesel in the San Diego region. Biodiesel blends are used
in the City of Carlsbad (City) vehicle fleet, UC San Diego bus fleet, and Hornblower Cruises marine
vessels. The City of Chula Vista also uses biodiesel and requires fleets with city contacts, such as
refuse haulers and tow trucks to use biodiesel as well. UC San Diego imports approximately
10,000 gallons of biodiesel monthly from an Orange County distributor, while other fleets are
served by Soco Group, which sells approximately 25,000 gallons monthly in the region. Biodiesel
is locally produced by New Leaf Biofuels and can be delivered through most distributors.
Biofuels: Ethanol
Ethanol is an alcohol-based fuel derived from various plant materials (i.e., biomass feedstocks)
including corn, sugar cane, barley, and wheat. Ethanol is produced by fermenting and distilling
starch crops that have been converted into simple sugars. Ethanol can also be produced from
cellulosic biomass such as trees and grasses and is called bioethanol.
Ethanol is most commonly used to increase octane and improve the emissions quality of
gasoline. More than 95 percent of the gasoline in California contains a low-level blend of ethanol
(about 6%) to oxygenate the fuel and reduce air pollution. E85 (85% ethanol, 15% gasoline) is
considered an alternative fuel that can be used in Flexible Fuel Vehicles (FFVs). FFVs are capable
of operating on gasoline, E85 (85% ethanol, 15% gasoline), or a mixture of both. Despite the
limited availability of E85, the state features many flex-fuel vehicles, which are capable of
running on either gasoline or E85. Energy Commission staff estimate that one to two percent of
the California passenger vehicle fleet consists of FFVs, most of which are American-made
light-duty trucks and sport utility vehicles.
Hydrogen
Hydrogen is not naturally occurring and must be produced from an energy source, such as
natural gas or water. Hydrogen can be produced for use as a transportation fuel in fuel-cell
vehicles, which generate electricity from hydrogen. Hydrogen Fuel Cell Vehicles (FCVs) are
zero-emission vehicles that produce no tailpipe GHG emissions. Fuel cells generate electricity
through an electrochemical process, using hydrogen as the fuel, to power an electric motor
which drives the vehicle. When the hydrogen is used in a fuel cell, only water and heat are
produced. Hydrogen can be produced at a central station either through reforming hydrocarbon
fuels like natural gas or electrolyzing water. In either case, the produced hydrogen is then
City of Carlsbad Energy Roadmap Appendix D-3
Description of Alternative Fuels
delivered to fueling stations by truck or hydrogen pipeline to be pumped into vehicles’ hydrogen
tanks. Hydrogen can also be produced by reformation or electrolysis at the fueling station itself.
Today, little hydrogen is produced for use as a vehicle fuel, and hydrogen for industrial purposes
is produced through the reformation of natural gas. Hydrogen has the potential to be produced
from low-carbon renewable resources, providing significant GHG benefits from well to wheels
when used in a fuel cell vehicle.
Natural Gas
Natural gas has a high octane rating and excellent properties for spark-ignited internal
combustion engines. It is non-toxic, non-corrosive, and non-carcinogenic. It presents no threat to
soil, surface water, or groundwater. More than 99 percent of the natural gas used in the
United States comes from domestic or other North American sources. The expanding use of
horizontal drilling and hydraulic fracturing (“fracking”) in shale formations has led to greatly
increased domestic natural gas production in recent years. The Energy Information
Administration predicts that by 2035, the United States will still be producing nearly all of the
natural gas it consumes.
The vast majority of natural gas is a non-renewable fossil fuel extracted from gas and oil wells.
Much smaller amounts are derived from supplemental sources such as synthetic gas, landfill gas,
and other biogas resources and coal-derived gas. Because of the gaseous nature of this fuel, it
must be stored onboard a vehicle in either a compressed gaseous (Compressed Natural Gas
[CNG]) or liquefied (Liquefied Natural Gas [LNG]) state.
CNG, is a mixture of hydrocarbons, mainly methane. Found in gas wells or produced in
conjunction with crude oil, natural gas is a clean-burning, domestically produced fuel that
generates significantly fewer emissions than conventional gasoline or diesel when used to power
vehicles. Although vehicles can use natural gas as either a liquid or a gas, most vehicles use the
gaseous form. Compressed at pressures of 3,000 pounds to 3,600 pounds per square inch, the
natural gas is stored onboard a vehicle in specially designed and constructed cylinders. Vehicles
that run on CNG have engines and fuel systems that are optimized for gaseous fuel use. To store
more energy onboard a vehicle in a smaller volume, natural gas can be liquefied. To produce
LNG, natural gas is purified and condensed into liquid by cooling to -260°F (-162°C). At
atmospheric pressure, LNG occupies only 1/600 the volume of natural gas in compressed
gaseous form. Because it must be kept at such cold temperatures, LNG is stored in double-wall,
vacuum-insulated pressure vessels. LNG fuel systems typically are used only with heavy-duty
vehicles. LNG is clear, colorless, odorless, non-corrosive, and non-toxic.
Propane (Liquefied Petroleum Gas)
Propane, also known as liquefied petroleum gas (LPG), is produced as part of natural gas
processing and crude oil refining. Propane can be turned into a liquid at a moderate pressure
(160 pounds per square inch [psi]) and is stored in pressure tanks at about 200 psi at 100 degrees
Fahrenheit. When propane is drawn from a tank, it changes to a gas before it is burned in the
engine. Dedicated propane vehicles are designed to run only on propane; bi-fuel propane
vehicles have two separate fueling systems that allow the vehicle to be powered by either
propane or gasoline.
City of Carlsbad Energy Roadmap Appendix D-4
Available Alternative Fuel Infrastructure Near Carlsbad
Refueling stations for alternative fuel vehicles are significantly less in number than gasoline and diesel
stations. A primary consideration in purchasing any alternative fuel vehicle is that adequate fueling
sources exist near where the vehicle will be used. The tables below identify publicly accessible
alternative fuel infrastructure near the City. The City currently maintains its own gas and diesel fueling,
and there are a number of alternative fuel stations within a moderate distance. Electric charging sites
for plug-in electric vehicles are now widely available; however dedicated units would be need at City
facilities to serve fleet vehicles. To locate alternative fueling stations in the future, including electric
vehicle charging sites, use the United States Department of Energy’s Alternative Fuels and Advanced
Vehicles Data Center (afdc.energy.gov/afdc).
Alternative Fuel Infrastructure Near the City of Carlsbad
Fuel Type
Cost of Additional
Fueling/Charging
Infrastructure
Location of Fueling Infrastructure
Distance from
Public Works
Yard
Biodiesel
(B20 and
above)
SoCo offers B5 onsite.
Local producer is New
Leaf Biofuel.
Propel Fuels - 76
3860 Kearny Mesa Road
San Diego CA 92111
Phone: (800) 871-0773
Access: Public, 24 hours daily, credit
card at all times
23 Miles
CNG Small station: $350,000
Medium station:
$500,000
Large station: $950,000
Add public fast-fill
dispenser: $125,000
SDG&E Service Power Plant
602 Cannon Road
Carlsbad, CA 92008
Phone: (213) 244-5681
Access: Public- credit card at all times
5.7 miles
Poway Unified School District
13626 Twin Peaks Road
Poway, CA 92064
Phone: (858) 748-0010
Access: Public – 6 a.m.-6 p.m. M-F,
credit card at all times
21 miles
Electricity Publicly Available, Level
1, Level 2, DC Fast
Charger: $30,000-
$50,000
Carlsbad Premium Outlets
5620 Paseo Del Norte
Carlsbad, CA 92008
Type: Level 1, Level 2, DC Fast Charger
public access – card key at all times
3.3 miles
Publicly Available, Level
2: $2,500-$5,000.
Grand Pacific Resorts
5900 Pasteur Ct
Carlsbad, CA 92008
Type: Level 2, public access- card key
at all times
1.1 miles
City of Carlsbad Energy Roadmap Appendix D-5
Alternative Fuel Infrastructure Near the City of Carlsbad
Fuel Type
Cost of Additional
Fueling/Charging
Infrastructure
Location of Fueling Infrastructure
Distance from
Public Works
Yard
Sheraton Carlsbad
5440 Grand Pacific Dr
Carlsbad, CA 92008
Type: Level 2, public access- card key
at all times
2.4 miles
Ethanol (E85) $100,000 to $250,000
Storage and distribution
facilities needed in order
to scale-up consumption
Bressi Ranch Fuel Mart-Pearson Fuels
27414 Gateway Rd
Carlsbad, CA 92009
Phone: (760) 431-2741
Access: Public – credit and cash
1.0 miles
Hydrogen $500,000 to $5,000,000 No fueling sites in or near the city N/A
Liquefied
Petroleum Gas
(Propane)
$65,000 Westmart
4990 Avendia Encinas
Carlsbad, CA 92008
Access: Public 5:30 a.m.-12 a.m.
3.6 miles
LNG Large station:
$1,200,000
Combined LCNG and
LNG station: $1,600,000
Clean Energy – Downs Truckstop
27985 Diaz Road
Temecula, CA 92590
Access: 8 a.m.-4 p.m.
22 miles
Source: United States DOE, Alternative Fuels and Advanced Vehicles Data Center, afdc.energy.gov/afdc
Since some alternative fuel infrastructure is outside the City’s normal operation area, consideration
should be given the staff time necessary to access these stations.
Alternative Fuel Vehicle Replacement Analysis for Carlsbad
Additional details from the California Center for Sustainable Energy analysis are provided here. Regular
fleet turnover offers the chance for alternative fuel vehicle procurement. The following analysis uses
information provided by City Public Works staff to identify fuel savings from alternative fuel vehicle
adoption.
Replacing vehicles with alternative fuel or hybrid vehicles has the potential to save money and reduce
emissions in the long term. Light-duty CNG and LPG vehicles can be ordered through normal dealer
channels with OEM authorized upfitters installing alternative fueling systems before delivery to
customers. Light duty trucks with bi-fuel gasoline/CNG options are now available in California Air
Resources Board certified models. The table below shows the savings in fuel costs and potential
petroleum displacement from the adoption of these alternative fuels and technologies.
City of Carlsbad Energy Roadmap Appendix D-6
Table 2. Vehicle Replacement Options and Lifetime Savings Vehicle Model Fuel Tech Usage (miles/ year) Petroleum Displaced (Gallons) Fuel Cost Savings/Year Maintenance* Savings/Year Total Annual Savings (Fuel and Maintenance) Added Incremental Cost at Purchase Years to Payback W/ Incentives Yearly Co2 Reduction (MTCO2e)
Sedans (Replacing Taurus)
Focus gas 6,000 109 $402 $0 $402 $0 0.00 0.96
Prius gas 9,000 282 $1,041 $45 $1,086 $5,499 5.06 2.48
Sedans (Replacing Accord)
Accord
Hybrid HEV 10,000 235 $866 $50 $916 $5,000 6.38 2.06
Nisan
Leaf 10,000 435 $1,204 $50 $1,254 $12,000 7.38 3.18
Compressed Natural Gas
F150 CNG 15,000 1,250 $1,803 $225 $2,028 $11,000 2.46 1.98
F250 CNG 10,000 909 $1,393 $150 $1,543 $11,000 3.24 1.70
F250 CNG 5,000 455 $696 $75 $771 $11,000 6.48 0.85
Propane
F150 LPG 15,000 1,250 $1,490 $225 $1,715 $10,800 6.01 1.84
F250 LPG 10,000 909 $1,065 $150 $1,215 $10,800 8.48 1.28
F250 LPG 10,000 909 $1,065 $150 $1,215 $10,800 8.48 1.28
Notes: HEV = hybrid electric vehicle, CNG = compressed natural gas, LPG= liquid petroleum gas = propane, MD/HD = medium
duty/heavy duty, Petroleum Displaced = gasoline and diesel fuel
*Maintenance savings based on manufacturer estimates.
Source: California Center for Sustainable Energy
This analysis shows that the replacement of vehicles with alternative fuel ones could save the City up to
$1,600 per year per vehicle in fueling costs, using current fuel prices. Not all City vehicles have fuel
consumption as high as in the example, but would still offer savings. A more detailed study would be
needed to make vehicle purchase decisions, but this analysis shows the magnitude of potential
monetary and fuel savings.
The savings of any vehicle always depend on the price of fuel and the use of the vehicle. Further analysis
will be needed to assess whether the savings in fuel costs exceed the incremental cost of the vehicle,
although the price advantage of alternative fuels is expected to increase over time. Based on the low
annual mileage of city vehicles, payback including available incentives may be six years or more. High
efficiency traditional gasoline vehicles may offer more immediate savings.
City of Carlsbad Energy Roadmap Appendix D-7
The incremental cost of alternative fuel vehicles can vary based on the number of vehicles purchased at
once, as well as the availability of incentives and rebates. With a lower cost of fuel, natural gas or
propane vehicles could save the City money while also reducing emissions in the highest usage
applications. Additional infrastructure would be needed to support any new alternative fuel vehicle
deployment.
Higher efficiency gasoline vehicles are now available and should be strongly considered when making a
purchase. Replacing a mid-sized sedan with a compact one would offer savings in both the purchase
price and in fuel costs. Modern compact sedans offer similar comfort and amenities to older mid-sized
sedans.
The tables below outline the vehicle mileage and fuel price assumptions used in the Vehicle
Replacement Options and Lifetime Savings analysis.
Vehicle Mileage Assumptions
Vehicle Type
Fuel
Technol
ogy
Fuel Economy MPG (GGE)
Current Vehicle Replacement Vehicle
Ford Taurus Gas 19 -
Ford Focus Gas - 29
Toyota Prius HEV - 47
Honda Accord HEV 22 (non-hybrid) 50 (hybrid)
F-250 CNG/LPG 11 10
Dodge Ram CNG/LPG 8 7
Notes: HEV = hybrid electric vehicle, CNG = compressed natural gas, LPG= liquid
petroleum gas = propane
Source: California Center for Sustainable Energy/Fueleconomy.gov
Fuel Price Assumptions
Fuel Type Price per gallon
Unleaded $3.69
Diesel $4.00
CNG $2.06
LPG $2.29
Source:
afdc.energy.gov/afdc/price_report.html
City of Carlsbad Energy Roadmap Appendix D-8
APPENDIX E:
TRANSPORTATION DEMAND MANAGEMENT POLICIES AND
RESOURCES
This appendix consists of a variety of resources to aid the City of Carlsbad (City) in implementing a
transportation demand management program:
1. Sample Telework Program Policy
2. Sample Telework Agreement
3. Sample Teleworker’s Assignment
4. Sample iCommute Triptracker Program Reports
The sample telework documents can aid the City in coordinating agreements with employees and
ensuring a successful telework policy. The sample iCommute reports provide an example of the data and
information that can be collected from the Triptracker program as employees log their trips.
City of Carlsbad Energy Roadmap Appendix E-1
The Telework Policy provides guidelines on the teleworking program. It defines the parameters of the teleworking arrangement. The policies must fit the existing corporate
culture.
Sample
Telework Program Policy
Teleworking, or telecommuting, is the concept of working from home or another location
on a full- or part-time basis. Teleworking is not a formal, universal employee benefit.
Rather, it is an alternative method of meeting the needs of the company. The company has the right to refuse to make teleworking available to an employee and to terminate a
teleworking arrangement at any time. Employees are not required to telework.
Employees have the right to refuse to telework if the option is made available.
The company’s policies for teleworking are as follows:
Compensation and Work Hours
The employee’s compensation, benefits, work status and work responsibilities will not
change due to participation in the teleworking program.
The amount of time the employee is expected to work per day or pay period will not
change as a result of participation in the teleworking program.
Eligibility
Successful teleworkers have the support of their supervisors. Employees will be selected based on the suitability of their jobs, an evaluation of the likelihood of their
being successful teleworkers, and an evaluation of their supervisor’s ability to manage
remote workers. Each department will make its own selections.
Upon acceptance to the program both the employee and manager will be expected to complete a training course designed to prepare them for the teleworking experience. All
teleworkers must sign an agreement.
Equipment/Tools
The company may provide specific tools/equipment for the employee to perform his/her current duties. This may include computer hardware, computer software, phone lines,
email, voice-mail, connectivity to host applications, and other applicable equipment as
deemed necessary.
The use of equipment, software, data supplies and furniture when provided by the company for use at the remote work location is limited to authorized persons and for
purposes relating to company business. The company will provide for repairs to
company equipment. When the employee uses her/his own equipment, the employee is
responsible for maintenance and repair of equipment.
A loaner laptop may be provided when available. Loaner computers will vary in
performance and configuration. Loaners must be returned upon request.
City of Carlsbad Energy Roadmap Appendix E-2
Workspace
The employee shall designate a workspace within the remote work location for
placement and installation of equipment to be used while teleworking. The employee shall maintain this workspace in a safe condition, free from hazards and other dangers to the employee and equipment. The company must approve the site chosen as the
employee’s remote workspace. Employee is expected submit three photos of the home
workspace to management prior to implementation.
Any company materials taken home should be kept in the designated work area at home and not be made accessible to others.
Office Supplies
Office supplies will be provided by the company as needed. Out-of-pocket expenses for other supplies will not be reimbursed unless by prior approval of the employee’s manager.
Worker’s Compensation
During work hours and while performing work functions in the designated work area of the home, teleworkers are covered by worker’s compensation.
Liability
The employee’s home workspace will be considered an extension of the company’s
workspace. Therefore, the company will continue to be liable for job-related accidents that occur in the employee’s home workspace during the employee’s working hours.
The company will be liable for injuries or illnesses that occur during the employee’s
agreed-upon work hours. The employee’s at-home work hours will conform to a
schedule agreed upon by the employee and his or her supervisor. If such a schedule has not been agreed upon, the employee’s work hours will be assumed to be the same as before the employee began teleworking.
The company assumes no liability for injuries occurring in the employee's home
workspace outside the agreed-upon work hours. The company is not liable for loss, destruction, or injury that may occur in or to the
employee’s home. This includes family members, visitors, or others that may become
injured within or around the employee’s home.
Dependent Care Teleworking is not a substitute for dependent care. Teleworkers will not be available
during company core hours to provide dependent care.
Income Tax It will be the employee’s responsibility to determine any income tax implications of maintaining a home office area. The company will not provide tax guidance nor will the
company assume any additional tax liabilities. Employees are encouraged to consult
City of Carlsbad Energy Roadmap Appendix E-3
with a qualified tax professional to discuss income tax implications.
Communication Employees must be available by phone and email during core hours. All client
interactions will be conducted on a client or company site. Participants will still be
available for staff meetings, and other meetings deemed necessary by management.
The company will pay work-related voice and data communication charges
Evaluation
The employee shall agree to participate in all studies, inquiries, reports and analyses
relating to this program. The employee remains obligated to comply with all company rules, practices and
instructions.
City of Carlsbad Energy Roadmap Appendix E-4
The Teleworker Agreement is a legal document identifying the responsibilities of both the teleworker and the employer. The agreement mirrors the policies. The employee
signs the agreement.
Sample
Teleworker Agreement
This Agreement, effective ___________________, is between ______________, an
employee (referred to as “Employee”) and __________________(referred to as
“Employer”).
The parties, intending to be legally bound, agree as follows:
Scope of Agreement - Employee agrees to perform services for Employer as
“teleworker.” Employee agrees that teleworking is voluntary and may be terminated at
any time, by either the Employee or Employer, with or without cause.
Term of Agreement - This Agreement shall become effective as of the date written
above, and shall remain in full force and effect as long as Employee teleworks unless
the agreement is terminated.
Termination of Agreement - Employee’s participation as a teleworker is entirely
voluntary. Teleworking is available only to eligible employees, at Employer’s sole
discretion. Teleworking is not an employee benefit intended to be available to the entire
organization. As such, no employee is entitled to, or guaranteed the opportunity to,
telework. Either party may terminate Employee’s participation in the program, with or without cause, upon reasonable notice, in writing, to the other party. Employer will not
be held responsible for costs, damages or losses resulting from cessation of
participation in the teleworking program. This Agreement is not a contract of
employment and may not be construed as such.
Salary, Job Responsibilities, Benefits – Salary, job responsibilities, and benefits will
not change because of involvement in the program, except as they might have changed
had Employee stayed in the office full-time, e.g., regular salary reviews will occur as
scheduled, and Employee will be entitled to any company-wide benefits changes that
may be implemented. Employee agrees to comply with all existing job requirements as now are in effect in the office.
Work hours, Overtime, Vacation - Work hours are not expected to change during the
program. In the event that overtime is anticipated, this must be discussed and approved
in advance with the manager, just as any overtime scheduling would normally have to be approved.
Work Schedule - The schedule for work performed at home is subject to negotiation
with, and approval by, Employee’s manager. The manager may require that Employee
work certain "core hours" and be accessible by telephone during those hours.
City of Carlsbad Energy Roadmap Appendix E-5
Equipment - Employer may provide the necessary computer, modem, software, and other equipment needed for teleworking. All of these items remain the property of the company and must be returned to the company upon request. The computer, modem,
software, and any other equipment or supplies provided by Employer are provided for
use on company assignments. Other household members or anyone else should not
use the equipment and software. Company-owned software may not be duplicated except as formally authorized. Employer will be responsible for insurance and maintenance of all company-provided materials.
Employee may use personal equipment for teleworking purposes. In such cases,
Employee will be responsible for the maintenance and insurance required for the equipment.
Workspace - Employee agrees to designate a workspace within Employee’s remote
work location for placement and installation of equipment to be used while teleworking.
Employee agrees to maintain this workspace in a safe condition, free from hazards and other dangers to Employee and equipment. Employer must approve the site chosen as Employee’s remote workspace. Employee is expected to submit three photos of the
home workspace to management prior to implementation.
Any company materials taken home should be kept in the designated work area at home and not be made accessible to others.
In the event that legal action is required to regain possession of company-owned
equipment, software, or supplies, Employee agrees to pay all costs incurred by
Employer, including attorney’s fees, should Employer prevail.
Office Supplies - Office supplies will be provided by Employer as needed. Employee’s
out-of-pocket expenses for other supplies will not be reimbursed unless by prior
approval of Employee’s manager.
Worker’s Compensation - Employer will be responsible for any work-related injuries under our state's Workers Compensation laws, but this liability is limited to injuries
resulting directly from work and only if the injury occurs in the designated work area.
Any claims will be handled according to the normal procedure for Worker's
Compensation claims.
Liability for Injuries - Employee understands that the Employee remains liable for
injuries to third persons and/or members of Employee’s family on Employee’s premises.
Employee agrees to defend, indemnify and hold harmless Employer, its affiliates,
employees, contractors and agents, from and against any and all claims, demands or liability (including any related losses, costs, expenses, and attorney fees) resulting from, or arising in connection with, any injury to persons (including death) or damage to
property caused, directly or indirectly, by the services provided herein by Employee or
City of Carlsbad Energy Roadmap Appendix E-6
by Employee’s willful misconduct, negligent acts or omissions in the performance of the Employee’s duties and obligations under this Agreement, except where such claims,
demands, or liability arise solely from the gross negligence or willful misconduct of the
Employer.
Dependent Care - Teleworking is not a substitute for dependent care. Teleworkers will not be available during company core hours to provide dependent care.
Income Tax - It will be the Employee’s responsibility to determine any income tax
implications of maintaining a home office area. Employer will not provide tax guidance nor will Employer assume any additional tax liabilities. Employees are encouraged to consult with a qualified tax professional to discuss income tax implications.
Evaluation - Employee agrees to participate in all studies, inquiries, reports and
analyses relating to this program. Employee remains obligated to comply with all of Employer’s rules, practices,
instructions and this Agreement. Employee understands that violation of any of the
above may result in preclusion from teleworking.
I have read and understand this agreement and accept its conditions.
EMPLOYEE __________________________ DATE ______
EMPLOYEE MANAGER __________________________ DATE ______ PROGRAM DIRECTOR __________________________ DATE ______
City of Carlsbad Energy Roadmap Appendix E-7
Teleworker’s Assignment is completed to define the specifics of teleworking such as frequency, type of work to be completed, the number of times the employee should
communicate with the office, etc. The Assignment is completed by the teleworker and
the telemanager.
Sample
Teleworker’s Assignment
Teleworking, or working from another location such as home or an office close to home,
is an assignment that the company may choose to make available to some employees
when a mutually beneficial situation exists.
Teleworking is not an employee benefit, but rather an alternative method of meeting the
needs of the company. Employees do not have a ”right” to telework. The arrangement
can be terminated by either the employee or the company at any time.
Conditions for teleworking agreed upon by the teleworker and his/her supervisor:
1. The employee agrees to work at the following location:
2. The employee will telework ___________days per week.
3. The employee’s work hours will be from _____a.m. to ______p.m.
4. The following are the assignments to be worked on by the employee at the
remote location, with expected delivery dates:
5. The following equipment will be used by the employee at the remote location:
6. The employee agrees to call the central office to get his/her messages at least
________ times per day.
7. The employee agrees to get all supplies needed for teleworking from the
company office. Reimbursement for out-of-pocket expenses for supplies will need prior supervisory approval.
City of Carlsbad Energy Roadmap Appendix E-8
8. Additional conditions agreed upon by the telemanager and teleworker are as
follows:
I have reviewed the teleworker’s assignment with _________________________prior
to his/her participation in the company’s teleworking program.
________________________________________________________________________
Date Supervisor Name Signature
The above material has been discussed with me. ______________________________________________________________________
__
Date Employee Name Signature
City of Carlsbad Energy Roadmap Appendix E-9
Sample iCommute Triptracker Program Reports
The following pages contain sample output report tables from the iCommute Triptracker program.
Table 1, General Alternative Transportation Program Report, is a sample report that summarizes all user
trips from the beginning of the year through to August 16, 2011. This report details how many trips were
taken by each transportation mode. Non Single Occupancy Vehicle (SOV) trips include walking, biking,
public transit, motorcycle/scooter, or trips in a vehicle with more than one person.
Table 1: General Alternative Transportation Program Report
1/1/2011 through 8/16/2011
New users 5135
Non SOV Miles Logged 16677624
Bike trips 30712
Carpool trips 22909
COASTER trips 8197
Compressed Work Week trips 631
Did Not Work trips 13023
Drive Alone trips 22201
Motorcycle/Scooter trips 2098
Other trips 613
Other Transit trips 8551
Premium Express Bus trips 4696
Telework trips 1942
Vanpool trips 389973
Walk trips 6067
Table 2, Savings from Non-SOV Trips, displays the total carbon dioxide (CO2), gallons of gasoline, and
dollars saved by choosing an alternative form of transportation.
Table 2: Savings from Non-SOV Trips
Savings Total
Carbon Dioxide 11,545,223
Gasoline 575,288
Monetary savings 7,474,064
City of Carlsbad Energy Roadmap Appendix E-10
Table 3, Ridematch Statistics, provides data regarding the use of the Ridematcher service in iCommute.
Ridematcher is a service to aid users in finding commute partners based on their home and work
locations. The number searches performed indicates how many people are using the Ridematcher
program. When a request is sent, that indicates that a user found someone to potentially commute
with.
Table 3: Ridematch Statistics
Ridematch Actions Total
Ridematch search performed 3,598
Ridematch search with no result 478
Ridematch requests sent 1,280
(Results based on all time)
City of Carlsbad Energy Roadmap Appendix E-11
APPENDIX F:
SAMPLE SMART GROWTH POLICIES AND RESOURCES
The following measures were identified based on their ability to reduce vehicle trips, petroleum
consumption, or energy use. When considering implementation of these measures, it is recommended
that local officials evaluate the economic, social, and environmental implications – in addition to energy
savings – for their individual situation and community. The resources for Smart Growth include a
description of the California Environmental Quality Act (CEQA) streamlining provisions from
Senate Bill 375 (SB 375) as well as the site descriptions for the areas of Carlsbad identified in the
SANDAG Smart Growth Concept Map.
Sample Policy Measures
Smart Growth and Transit Oriented Development
1.1 Implement the following existing/planned and potential smart growth opportunity areas as
identified by the city on the SANDAG Smart Growth Concept Map.
1.2 Identify additional planned or potential smart growth opportunity areas within the city as feasible.
1.3 Coordinate with regional agencies, including SANDAG and North County Transit District (NCTD),
and neighboring jurisdictions to plan for and accommodate alternate travel modes to driving
alone.
1.4 Encourage a variety of uses that offer many choices for people to live, work, and recreate in a core
area.
1.5 Promote adaptive reuse, infill, and/or redevelopment of vacant or underutilized sites such as
through provision of incentives.
1.6 Consider integrating supporting retail uses into existing residential and employment
developments, for example through plan updates and zoning amendments.
1.7 Provide incentives and zoning regulations to promote mixed-use, higher intensity employment
uses and residential density, near existing and planned transit nodes and smart growth areas, such
as increased lot coverage and floor area ratio requirements, height limits, and/or expedited
approval processes.
1.8 Continue allowing accessory units in single family residential areas where appropriate.
1.9 Promote a compact, transit-oriented distribution of land uses with convenient access to a mixture
of uses and destinations, and at densities appropriate to the unique character, context, and
characteristics of each community.
1.10 Establish land use policies that support multimodal transportation systems and connection of
travel modes to each other.
1.11 Create multimodal transportation centers that provide integrated access to a variety of
transportation facilities and services.
1.12 Continue to review development projects in consideration of transit needs and access.
1.13 Require new development at transit nodes and along transit corridors to meet planning and
design standards to generate, attract, and facilitate transit ridership as a condition of approval.
1.14 Locate larger retail, employment, medical, educational and government land uses near arterial
and major collector streets served by public transit. Conversely, work to provide or enhance
transit service to these types of land uses.
City of Carlsbad Energy Roadmap Appendix F-1
1.15 Prioritize new growth in existing developed areas that have adequate levels of transit and
neighborhood services.
1.16 Inventory infill development sites. Plan, zone, and provide incentives for new development and
renovation of existing uses in identified infill areas.
1.17 Encourage or provide incentives for new housing and mixed-use developments to be built to the
Leadership in Energy and Environmental Design® (LEED) for Neighborhood Development standard
or its equivalent.1
1.18 Provide expedited application processing, as feasible, for development projects that meet
community-established energy-efficiency standards or goals.
Public Infrastructure Investments
1.19 Coordinate public investments for transportation, parks, open space, water, sewer, and other
infrastructure in a manner that supports smart growth development.
1.20 Prioritize new or infill residential development in areas with adequate levels of existing or planned
public facilities, such as parks, fire stations, and public transit service.
1.21 Support investments to provide high-performance broadband connectivity throughout the
community to enable e-commerce and teleworking.
1.22 Convert streetlights, outdoor lighting, water pumps, water treatment, and other energy intensive
operations to more energy-efficient technologies.
Community Design
1.23 Establish “complete streets” policies that make roadways safe, attractive, and comfortable for all
users, including pedestrians, bicyclists and public transit users, as well as automobiles.
1.24 Design, site, and orient new development to facilitate pedestrian, bicycle, and transit access.
1.25 Establish a walkable, interconnected street network.
1.26 Plan and permit networks of neighborhood-scaled streets (generally two or four lanes) with high
levels of connectivity and short block lengths.
1.27 Reduce the potential for higher than average temperatures and increasing air conditioning-related
energy demand associated with the Urban Heat Island Effect by using strategies such as increasing
tree and vegetative cover, installing green or reflective rooftops, and using cool pavements. The
term cool pavements refers to paving materials that reflect more solar energy, enhance water
evaporation, or have been otherwise modified to remain cooler than conventional pavements.
1.28 Install transportation infrastructure and make urban design improvements that promote walking
and biking and increase access to public transit in smart growth areas.
1.29 Provide sidewalks and bicycling facilities along with measures like bulb outs, lighting, landscaping,
street furniture, secure bicycle parking, and well-marked crossings at intersections.
1.30 Make reductions in energy consumption and related criteria such as vehicle miles traveled a high
priority in evaluation of development projects, plans, policies, and programs.
1 The LEED for Neighborhood Development Rating System integrates the principles of smart growth, new urbanism, and green
building into the first national system for neighborhood design. LEED certification provides independent, third-party verification
that a development's location and design meet accepted high levels of environmentally responsible, sustainable development.
LEED® for Neighborhood Development is a collaboration among the United States Green Building Council, Congress for the New
Urbanism, and the Natural Resources Defense Council. For more information, visit usgbc.org/DisplayPage.aspx?CMSPageID=148
City of Carlsbad Energy Roadmap Appendix F-2
Resources Available for Smart Growth
SB 375 and CEQA Streamlining
Definition of Residential/Mixed Use Residential Project:
A project that is consistent with the general use designation, density, building intensity, and applicable
policies for the project area in either an accepted (by ARB) SCS or APS. Additionally, the project would
have at least 75 percent of the total building square footage of the project consist of residential uses or
would be a Transit Priority Project (TPP).
Definition of a TPP:
a) Contain at least 50 percent residential use, based on total building square footage and, if the project
contains between 26 percent and 50 percent nonresidential uses, a floor area ratio of not less than
0.75
b) Provide a minimum net density of at least 20 dwelling units per acre
c) Be within one-half mile of a major transit stop or high-quality transit corridor included in a regional
transportation plan
Types of CEQA relief:
• Full exemption: If a TPP complies with all environmental, land use, and affordable housing criteria
described in SB 375, the project can be determined by a local jurisdiction to be a Sustainable
Communities Project and receives full CEQA exemption.
• Sustainable Communities Environmental Assessment (SCEA): The SCEA is applicable to a TPP and is
similar to a mitigated negative declaration.
• Streamlined CEQA analysis: a residential/mixed use residential project, as defined above, would not
be required to repeat growth inducing impacts analyses or the discussion of how cars and light
trucks could increase greenhouse gas emissions. If an Environmental Impact Report (EIR) were being
prepared, the alternatives section would not be required to include a reduced density alternative to
reduce greenhouse gas emissions. If an EIR were prepared for a TPP, the document would not need
to include an analysis of cumulative impacts, or of greenhouse gas emissions from cars and light
duty trucks. In addition, project alternatives need not address reduced density or off-site location
alternatives.
Carlsbad’s Potential and Existing Smart Growth Areas
The following table provides site descriptions for each smart growth area identified in the City of
Carlsbad on the SANDAG Smart Growth Concept Map. The San Diego Regional Comprehensive Plan
(RCP) identified seven categories of smart growth place types. The place types include: the Metropolitan
Center, Urban Centers, Town Centers, Community Centers, Rural Villages, Mixed-Use Transit Corridors,
and Special Use Centers. The RCP established land use and transportation targets for each of these areas
(listed below). If the areas meet the minimum land use and transit service targets identified for their
place type, they are identified as "Existing/Planned" smart growth areas. If they do not meet the targets,
but have future potential, they are identified as "Potential" smart growth areas. Grant funding is
available from SANDAG for cities to conduct planning and infrastructure improvements at their smart
growth opportunity areas.
City of Carlsbad Energy Roadmap Appendix F-3
Additional information on the Smart Growth Concept Map, the land use and transportation targets,
incentives for smart growth, and other information, is available on the SANDAG website at
sandag.org/smartgrowth.
Land Use and Transportation Targets
Each smart growth place type is associated with certain housing and employment density targets and
transit service thresholds, and can qualify as either "Existing/Planned" or "Potential," depending upon
whether it meets the thresholds specified in the RCP. The minimum land use and transit targets are
listed below. Areas must meet both the land use and the transit service targets to qualify as
Existing/Planned.
Smart Growth Place Type
Minimum
Residential
Target
Minimum
Employment
Target
Minimum Transit Service Characteristics
Metropolitan Center 75 du/ac 80 emp/ac Commuter Rail/Bus Rapid Transit (BRT)
Urban Center 40 du/ac 50 emp/ac Light Rail/Rapid Bus
Town Center 20 du/ac 30 emp/ac Light Rail/Rapid Bus*
Community Center 20 du/ac N/A High-Frequency Local Bus within Transit Priority Areas
Rural Village 10.9 du/ac N/A N/A
Special Use Center Optional 45 emp/ac Light Rail/Rapid Bus
Mixed-Use Transit Corridor 25 du/ac N/A High-Frequency Local Bus
Notes: du/ac = dwelling units per acre; emp/ac = employees per acre; N/A = Not applicable.
City of Carlsbad Energy Roadmap Appendix F-4
Location
Existing/Planned
or Potential (and
reason for Potential)
RCP
Place Type Land Use Description Transit Service Description
per 2030 RTP and 2006 RTIP
CB-1 Carlsbad Village COASTER Station including Village Redevelopment and Barrio areas at Grand Avenue and State Street
Existing/Planned Town Center This smart growth opportunity area consists of (1) the Carlsbad Village
Redevelopment Master Plan (Village MP) area at approximately 200 acres;
and (2) the City’s Barrio at approximately 128 acres. The Carlsbad Village
COASTER Station, which provides commuter rail service, is located in the
heart of the Carlsbad redevelopment area at Grand Avenue and State
Street. The Village MP allows residential development up to 35 units per
acre in the core village area with special emphasis around the COASTER
station. Mixed residential/retail development also is encouraged. Under
Carlsbad’s growth management plan, 1,000 dwelling units of development
have been allocated to the Village MP area. The City has recently approved
revisions to the development standards for this area to increase flexibility for
mixed-use, parking, and higher-density residential development.
Additionally included in the smart growth opportunity area is the Barrio - an
area for which the City is in the process of considering land use changes as
part of the comprehensive General Plan update program. Objectives for the
Barrio area include providing high-density residential and mixed-use located
within convenient walking distance to transit stops. Potential land use
changes may include provisions for high-density residential and mixed-use
development (up to 30 dwelling units/acre), which is similar to existing
allowances in the Village MP area.
Existing development in the Village MP and Barrio areas include low-rise
building types. The areas are currently served with commuter rail
transportation service and the potential exists (unconstrained revenue
scenario) for the provision of rapid bus service.
Existing Commuter Rail (COASTER)
Planned Rapid Bus (to be phased in by 2030)
Planned High-Frequency Local Bus (to be phased in by 2020)
CB-2 Plaza Camino Real
at State Route 78 (SR 78) and
El Camino Real
Potential
(Requires land use and transit changes)
Town Center The City is processing applications submitted by Westfield representatives to
redevelop the existing Plaza Camino Real Mall located at the southwest
corner of the intersection of El Camino Real and SR 78. Potential
development could add anywhere from 200 to 400 multi-family residential
units and additional retail square footage to the 1.1 million square feet of
retail floor space existing within the mall. Development would occur
adjacent to the retail structures on the city-owned parking lot area, and
could include transportation improvements, such as a relocation of the
existing transit station. This smart growth opportunity area is currently
served with high-frequency local transportation service, and two existing
rapid bus transit stations are located in the eastern portion of the
opportunity area. Additional light/commuter rail service exists at the El
Camino Real NCTD SPRINTER station at El Camino Real and Oceanside
Boulevard, located approximately 1½ miles north of the project site.
Planned High-Frequency
Local Bus (to be phased in by 2020)
City of Carlsbad Energy Roadmap Appendix F-5
Location
Existing/Planned
or Potential (and
reason for Potential)
RCP
Place Type Land Use Description Transit Service Description
per 2030 RTP and 2006 RTIP
CB-3 Quarry Creek Area at Marron Road and north of Tamarack Avenue
Potential (Requires land use and transit changes
Community Center The City is processing applications by McMillin Development to develop a
mixed-use project on approximately 100 acres of land at and west of the
former rock quarry located south of Marron Road and west of College
Avenue, near the Carlsbad boundary with the City of Oceanside. The
opportunity area is located approximately a quarter mile south of SR 78 and
approximately 1½ miles south of College Boulevard SPRINTER Station,
which provides light/commuter rail service from Escondido to Oceanside.
Preliminary discussions have focused on exploring a project that may
include several hundred residential units with mid- to high-densities,
together with commercial (office and/or retail) uses and possible public
gathering places. The opportunity area also is located within close proximity
to: SR 78; high frequency local transportation routes; potential rapid bus
routes (unconstrained revenue scenario); a retail shopping center containing
a Wal-Mart anchor tenant; and, institutional centers that include Tri-City
Hospital (within ¾ mile) and Mira Costa College (within 1 mile). Existing
transportation routes provide connecting service between the College
Boulevard SPRINTER Station and the Quarry Creek area. Some of the area
contains significant cultural, environmental, and habitat resources, and the
El Salto Falls have been designated as a Native American sacred site.
No Qualifying Existing or Planned Transit
CB-4 Ponto Beachfront at Avenida Encinas and Carlsbad Boulevard
Potential (Requires land use change)
Community Center This project is part of the South Carlsbad redevelopment area and consists
of a 50-acre site, located west of the San Diego Northern Railroad, south of
Poinsettia Avenue, and east of Carlsbad Boulevard and South Carlsbad
State Beach Campground. In June 2005, the City Council approved a
“vision plan” for the area with a land use mix that combines tourist-serving
uses (three hotels with time share units), a mixed-use core that provides for
town homes, live-work units, mixed residential/retail development, and a
separate townhouse area having densities up to 23 dwelling units per acre.
A light/commuter rail route exists directly east of this opportunity area and
the area with the Poinsettia COASTER Station approximately 1¼ miles to
the north.
Planned Rapid Bus (to be phased in by 2030)
Planned High-Frequency Local Bus (to be phased in by 2020)
City of Carlsbad Energy Roadmap Appendix F-6
APPENDIX G:
SAMPLE ENERGY SAVING POLICIES AND RESOURCES
The following measures were identified based on their ability to save energy, increase the use of
renewable energy, and save water. The measures reflect the goals of State agencies like the California
Energy Commission, California Public Utilities Commission, and Office of the Attorney General. When
considering implementation of these measures, it is recommended that local officials evaluate the
economic, social, and environmental implications – in addition to energy savings – for their individual
situation and community.
The second section of Appendix G addresses resources for energy savings in buildings. Resources include
the San Diego Regional Energy Partnership that local governments can participate in, as well as financing
opportunities such as rebates in Energy Upgrade California, PowerSaver Loan, Energy Efficient
Mortgages, and Property Assessed Clean Energy (PACE) programs.
Sample Policy Measures
Building Codes1
1.1 Ensure compliance and enforcement of the Title 24 energy code for residential and commercial
buildings.
1.2 Promote building energy performance beyond Title 24 energy requirements using mandatory or
voluntary mechanisms.
1.3 Work with other local jurisdictions, where feasible, to adopt region-wide standards for energy-
efficient buildings and development projects that also allow for local priorities and flexibility.
1.4 Support highly energy-efficient projects that voluntarily exceed minimum energy code
requirements through incentives such as favorable fee structures, fast-tracked permitting,
technical or financial assistance, and other innovative or locally appropriate approaches.
1.5 Increase energy code training for building code officials and builders to improve implementation
and enforcement of energy codes.
1.6 Train appropriate staff such as planners, inspectors, and plan checkers in energy-efficiency
standards and technologies to facilitate approval and inspection processes.
Existing Residential and Commercial Buildings
1.7 Establish or support building energy rating and disclosure policies that inform building owners of
their energy usage.
1.8 Promote policies that lead to energy-efficiency retrofits in existing buildings.
1.9 Promote and reward energy-efficiency efforts of local businesses.
1.10 Collaborate with local retail businesses to encourage residents to purchase energy-efficient
products.
1 For more information on green building codes for local jurisdictions, see Nonresidential Green Building Codes and Policies for
Local Jurisdictions available at sandag.org/uploads/projectid/projectid_373_12681.pdf, and Three Case Studies of Municipal
Green Buildings available at sandag.org/uploads/projectid/projectid_373_12682.pdf.
City of Carlsbad Energy Roadmap Appendix G-1
1.11 Support increased use of solar water heating in residential, pool, and commercial uses to reduce
natural gas demand. For example, through incentives or requirements for solar hot water heating
in new construction or large renovation projects.
1.12 Create or participate in financing programs such as those available through Assembly Bill 811
energy financing districts and similar PACE programs that allow residents and businesses to
overcome the high upfront costs of energy projects and improvements that reduce energy usage
in existing residential and commercial buildings.
1.13 Work with San Diego Gas & Electric® (SDG&E) and organizations like the California Center for
Sustainable Energy to promote use of financial incentives to assist residential and commercial
customers improve energy-efficiency.
1.14 Enact ordinances or programs to incorporate energy-efficiency, conservation, and clean
distributed generation technologies (such as solar photovoltaic panels) in the existing building
stock, such as PACE financing programs, point-of-sale requirements for energy-efficiency audits or
improvements, or other approaches.
1.15 Encourage savings-by-design and address energy-efficient building and site design in the retrofit
or renovation of existing buildings and developments.
1.16 Promote education of community businesses and Homeowners Associations about policies,
programs, and opportunities to conduct energy assessments and audits.
New Residential and Commercial Buildings
1.17 Develop a policy to include ENERGY STAR appliances in new construction.
1.18 Exceed Title 24 energy requirements for new construction through regulations and incentives that
work toward the state’s goal of zero net energy new homes by 2020 and zero net energy
commercial buildings by 2030.
1.19 Establish approaches, such as new tools to make codes more user-friendly or opportunities for
staff education and training, to reduce the rate of noncompliance with energy code requirements
in new construction.
1.20 Give energy conservation and efficiency equal consideration with all other development criteria in
the evaluation of development projects.
1.21 Encourage passive solar design by orienting buildings to the south and providing as much
unshaded exposure as possible on the south side of buildings during winter months, from
neighboring buildings, trees, and other obstructions that create shade. Encourage shading through
tree planting and architectural techniques to minimize the need for cooling during summer
months, with the exception of southern building exposure.
Renewable Energy and Distributed Generation
1.22 Revise zoning policies and encourage the revision of homeowner association conditions,
covenants and restrictions, and similar governing documents, as feasible, to remove hindrances
and promote installation of photovoltaic or other distributed renewable energy systems. For
example, require or provide incentives such as streamlined permitting or fee waivers for new
construction to pre-wire for, or install, photovoltaic systems.
1.23 Establish financing programs using public or private sources that residents can access to install
distributed energy systems to reduce system costs and maximize energy savings.
1.24 Identify local barriers to installing distributed generation systems, including combined heat and
power systems, and identify potential solutions that could be applied consistently.
City of Carlsbad Energy Roadmap Appendix G-2
1.25 Encourage local homebuilders to participate in the New Solar Homes Partnership to install solar
photovoltaic systems on qualifying new homes.
1.26 Consider solar access in new development.
Energy and Water Conservation
1.27 Increase energy conservation through the efficient use of water in the residential and commercial
sectors through policies that prioritize the largest end users of water like landscape irrigation.
1.28 Address energy-efficiency, demand response, and clean on-site generation opportunities at water
pumping stations, water or wastewater treatment facilities, and similar government-owned or
operated facilities.
1.29 Implement water conservation and reclamation programs to reduce energy use associated with
water delivery.
1.30 Support the use of reclaimed water for irrigation.
1.31 Require installation of water conservation measures, devices, and practices for new construction
projects and major alterations to existing private buildings.
1.32 Require the replacement of energy and water intensive fixtures and appliances with more efficient
alternatives at the point of sale or change in tenancy.
1.33 Establish rebate and or incentive programs for the replacement of leaking, aging, and/or
inefficient plumbing devices and inefficient appliances with more efficient, water-saving devices
and appliances in existing commercial and residential developments.
1.34 Coordinate efforts to reduce water-related energy use with the San Diego County Water
Authority, local water districts, and other agencies.
Water Supply
1.35 Identify and support programs for residential re-use of gray water to decrease the amount of
energy needed to meet residential water needs.
1.36 Use non-potable or recycled water as feasible for irrigation of parks, playfields, schools, golf
courses and other landscape areas.
1.37 Continue to expand infrastructure for reclaimed water as feasible.
Water Conservation Education
1.38 Continue to support landscape design educational programs to help residential and commercial
customers install low water use landscaping, thereby reducing water-related energy use.
1.39 Provide public education on water conservation such as optimum timing, run-off, efficient
appliances, and behavioral changes.
1.40 Promote existing programs that city residents, businesses, and property owners can take
advantage of to realize water-related energy savings, such as water audits.
City of Carlsbad Energy Roadmap Appendix G-3
Resources Available for Energy-Saving in Buildings
Energy Upgrade California
Energy Upgrade California (EUC) serves as an umbrella to the myriad of retrofit programs, tools, and
training available. The overall statewide program is outlined here. Program aspects include:
Statewide Internet Portal
Statewide residential and commercial financing options
Utility residential and commercial building retrofit rebates
Comprehensive residential retrofit program delivery through regional partnerships in
51 counties (including San Diego), which includes:
o Marketing and outreach
o Qualified contractors
o Subsidized financing
o Workforce development
o Quality assurance
Pilot residential and commercial PACE programs
New tools for affordable housing energy retrofits
Program outreach is being developed to reduce confusion about energy efficient and renewable energy
building retrofits. The EUC program coordinates under one logo, brand, and website all retrofit outreach
and marketing by state and local government and utilities. Efforts include media buys, bill boards, utility
bill inserts, brochures, and community forums. The state’s program focus is on county-level interaction.
The California Center for Sustainable Energy (CCSE) coordinates the various efforts and incentives for
the San Diego region. For more information on EUC and building retrofit programs in general, contact
CCSE at 858-244-1177.
EUC leverages over $1.3 billion of energy program funds ranging from federal programs, utility
programs, California Energy Commission programs, State Energy Program and Energy Efficiency and
Conservation Block Grant funds from American Reinvestment and Recovery Act, to Workforce
Investment Act and local government funds.
San Diego Regional Energy Partnership (2012-2014)
Local governments in San Diego County have been successfully collaborating with each other and with
SDG&E on joint energy efficiency initiatives over the last six years as part of the Local Government
Partnership programs and as part of federal stimulus-funded activities related to energy efficiency. For
2013, these agencies have formalized this “network” through creation of the San Diego Regional Energy
Partnership (SDREP). The SDREP will be led by a “Local Government Steering Committee” with
representatives from the City of Chula Vista, City of San Diego, County of San Diego, Port of San Diego,
and SANDAG (representing jurisdictions that do not have SDG&E partnerships), in close collaboration
with SDG&E and other regional partners. SANDAG will serve to increase local governments’ awareness
about energy-saving opportunities and participation in energy efficiency programs such as EUC and
Energy Savings Assistance Program for lower income residents. To learn more and participate in any or
all of these projects, municipal staff should contact Carlsbad’s Energy Roadmap coordinator.
City of Carlsbad Energy Roadmap Appendix G-4
SDREP Goals and Objectives through 2014
1. Further develop and support regional EUC implementation and the broader existing home retrofit
market to facilitate “deep energy retrofits” (both in terms of high energy savings and untapped
markets in existing residential buildings) for member jurisdictions.
• The SDREP will support and expand the current San Diego Retrofit Advisory Committee (RAC) to
include broader stakeholder participation from local governments, community organizations,
realtors, financing institutions, and contractors.
• SDREP will conduct outreach, education, and coordination activities for the local real estate and
lending community in order to enable these key market actors to become strong advocates for
energy efficiency.
• SDREP will build on initial efforts utilizing geographic information systems (GIS) to develop an
online mapping tool that incorporates building stock, census, utility, and past EUC project data
to help inform home energy retrofits.
• SDREP will complete a review of current permitting and building plan check requirements for
EUC-type projects throughout the 19 jurisdictions within San Diego County.
• SDREP will pilot an incentive program for home energy ratings of existing homes to strategically
leverage local government processes, such as point-of-sale and permit application
opportunities.
• SDREP will work with local community colleges, economic development corporations, and
community organizations to develop hands-on home performance training opportunities for
unemployed and underemployed workers and Non-EUC contractors to expand regional
workforce training opportunities and to link to municipal affordable housing programs.
2. Further assist local governments and communities in the San Diego region with understanding and
implementing climate action strategies, especially related to energy efficiency.
• SDREP will expand the current Climate Collaborative website platform and branding to include
all local jurisdictions and highlight climate strategies that produce indirect energy savings, such
as water conservation and urban heat island mitigation programs.
• SDREP will develop joint Green Business outreach and marketing materials to recruit and
recognize local businesses voluntarily implementing energy efficiency and other sustainability
measures, and serve as a conduit for participation in utility-sponsored direct install programs.
• SDREP will complete a review of current energy codes and policies throughout the different
jurisdictions to support progress towards Zero Net Energy building goals.
3. Facilitate the sharing of technical expertise and leveraging of purchase power between local
governments to spur “deep energy retrofits” at municipal facilities across the region.
City of Carlsbad Energy Roadmap Appendix G-5
• Through a Joint Procurement Strategies Working Group, SDREP will identify shared municipal
facility retrofit opportunities across jurisdictions in the region to leverage “economies of scale”
and to assist smaller jurisdictions with implementing their first energy efficiency upgrades.
San Diego Regional RAC
The San Diego Regional RAC is a stakeholder group with a vision of a sustainable market for energy
upgrades in the San Diego region. The RAC mission is to foster communication and facilitate objective
and collaborative information sharing that improves implementation of regional energy upgrade
programs and efforts. RAC objectives are to:
1. Identify market barriers
2. Determine market needs to overcome barriers
3. Evaluate capacity to address barriers
4. Provide solutions or advice to address barriers
The RAC consists of a large stakeholder group that meets quarterly, and four committees that meet
every other month, or as needed. The four committees are: marketing, workforce development, local
government policy and research, and real estate and finance. SDREP has provided funding to support
the RAC through 2014, and municipal staff is encouraged to participate in the group.
Energy Project Financing
PACE Programs
PACE programs, also commonly referred to as Assembly Bill 811 style programs in California, can serve
as a financing mechanism to implement energy efficiency and renewable energy projects. PACE
programs allow property owners within participating regions to finance the installation of energy
improvements on their home or business and pay the amount back as a line item on their property tax
bill. Currently, PACE is available to commercial property owners.
PACE participation throughout the San Diego region varies by jurisdiction. There are four primary PACE
finance program providers, which include CaliforniaFIRST, FigTree, HERO, and Ygrene. Both residential
and commercial financing are available through these programs. Participation in available PACE
programs in the San Diego region is growing rapidly since PACE became available in 2009. Of the 19 local
jurisdictions, 18 are currently participating in at least one PACE Program. Carlsbad has CaliforniaFIRST,
FigTree, and HERO programs available in the City.
PowerSaver Loan Pilot
PowerSaver is a revised version of the Title 1 insurance program from the Federal Housing
Administration (FHA) that enables homeowners to make cost--effective, energy saving improvements to
their homes. PowerSaver will provide federal loan insurance and other incentives to participating
lenders to deliver low-cost home energy improvement loans. Homeowners will be able to borrow up to
$25,000 for a term of 15 years (up to 20 years for certain improvements) to make proven home energy
improvements based on a project list developed by FHA and the United States Department of Energy.
City of Carlsbad Energy Roadmap Appendix G-6
PowerSaver will begin as a nationwide two--year pilot program, launching in 2011. FHA is currently
seeking lenders to participate in the pilot program. In selecting participating lenders, FHA will consider
the market areas lenders propose to serve. Generally, FHA will require lenders to target market areas
that have already taken affirmative steps to expand home energy improvements, such as educating
consumers on the benefits of home energy upgrades and creating a pool of qualified contractors.
Energy Efficient Mortgages
Another financing mechanism available to residents is the Energy Efficient Mortgage (EEM). An EEM
allows new or current homeowners to finance purchase of a home (or refinance a current mortgage)
and include the value of energy saving, cost efficient improvements. EEMs can be used to purchase a
new energy efficient home or to finance new improvements to existing homes (also known as an Energy
Improvement Mortgage). Because cost-effective energy improvements can result in lower utility bills,
making more funding available for a mortgage payment, energy efficiency improvements can be directly
included in the EEM without the need to qualify for additional financing. By giving borrowers the
opportunity to finance improvements as part of a single mortgage, an EEM can also stretch the debt-to-
income qualifying ratio and enable homebuyers to qualify for a larger loan amount (and a more energy
efficient home).
EEMs are sponsored by federally insured mortgage programs and the conventional secondary mortgage
market (Fannie Mae and Freddie Mac). Several types of EEM programs are available. Eligibility for
individual EEM programs varies, but in general there is no age limit or income level required. Typically,
all programs require that a home energy rating be conducted to provide the lender with an estimate of
the “Energy Savings Value,” which includes monthly energy savings and the value of existing/planned
energy efficiency measures.
City of Carlsbad Energy Roadmap Appendix G-7
APPENDIX H:
SAMPLE CLEAN AND EFFICIENT TRANSPORTATION
POLICIES AND RESOURCES
The sample policy measures were identified based on their ability to reduce petroleum consumption,
reduce roadway congestion, reduce greenhouse gases and auto pollution, or increase lower carbon
alternative fuels. When considering implementation of these measures, it is recommended that local
officials evaluate the economic, social, and environmental implications – in addition to energy savings –
for their individual situation and community.
The clean transportation resources contain information on the San Diego Regional Plug-in Electric
Vehicle Readiness Plan, the SANDAG 2012 study on Transportation Demand Management (TDM) in the
land development process, sample TDM policies and goals from other local jurisdictions, and sample
proclamations for Rideshare Week and Rideshare Month; Walk, Ride, and Roll to School Day, and Bike to
Work Month.
Sample Policy Measures
Low-Carbon, Alternative Transportation Fuels
1.1 Promote the use of alternatives to petroleum-based transportation fuels such as natural gas and
plug-in electric vehicles by residents and businesses through strategies that facilitate the siting,
permitting, and installation of fueling and electric vehicle charging infrastructure on public and
private property.
1.2 Develop streamlined permitting requirements, standardized design guidelines, and siting criteria
for all types of electric charging stations, including single- and multi-family residential,
commercial, public property, and fast-charge stations designed to facilitate longer trips.
1.3 Implement strategies that prioritize alternative fuel vehicles on the road and for parking, such as
priority parking spaces for electric vehicles.
Traffic Congestion Reduction and Efficient Driving Conditions
1.4 Evaluate measures to reduce vehicle idling at stop signs and traffic signals to facilitate efficient
travel conditions and minimize traffic congestion.
1.5 Continue to evaluate and implement traffic calming measures and programs to, among other
benefits, reduce vehicle speeds and volumes, and increase the safety and feasibility of bicycling
and walking.
1.6 Promote transportation alternatives for special events that draw large crowds such as festivals,
games, and fairs. Alternatives could include special transit, shuttle, or ridesharing services, bicycle
valet or bicycle parking corrals, parking management or shared parking, or vehicle restrictions.
1.7 Promote and provide educational information on fuel-efficient, “eco-driving” practices such as
reduced idling, slower driving speeds, gentle acceleration, and proper tire inflation.
1.8 Implement strategies that prioritize high-occupancy vehicles on the road and for parking, including
carpools, vanpools, and public transit vehicles.
City of Carlsbad Energy Roadmap Appendix H-1
TDM
1.9 Encourage implementation of new or expanded local policies, programs, and incentives that
minimize single occupancy vehicle use during peak travel periods, such parking and trip reduction
ordinances that encourage alternative work schedules, ridesharing options like carpools and
vanpools, telecommuting, transit and biking or walking to work.
1.10 Encourage employers to institute programs that provide financial incentives for commuters to
reduce their vehicle trips and use alternative transportation modes like walking, bicycling, public
transit, vanpooling, and carpooling as alternatives to subsidized employee parking. Examples
include:
Parking Cash Out: commuters automatically given a parking space by their employer are
instead given a choice to either (1) use the parking space; or (2) receive the cash value of the
parking space if they choose to use an alternative travel mode and give up their parking space.
Travel Allowances: financial payments are provided to employees in lieu of subsidized parking.
Commuters could use the travel allowance towards the costs of alternative travel modes, and
keep the profits of switching to more cost-effective travel options.
Transit and Rideshare Benefits: free or discounted fares or rideshare vouchers provided to
employees.
Reduced Employee Parking Subsidies: commuters who drive would pay a portion of all of their
parking costs in lieu of employer payment of employee-parking costs.
Corporate Tax Benefit: under the Transportation Equity Act, Internal Revenue Service
Code 132(f), and California state law, employers are allowed to offer payroll tax savings for
transportation assistance up to $230 a month per employee for transit passes or vanpool
vouchers and $20 a month for reasonable expenses incurred by the employee for the
purchase of a bicycle and bicycle improvements, as well as repair and storage if the bicycle is
regularly used for travel between the employee's residence and place of employment.
1.11 Support efforts by SANDAG and others by initiating, or encouraging participation in, programs to
promote carpooling, vanpooling, carsharing, teleworking, and similar alternative commuting
strategies.
1.12 Work with major employers in the community to offer incentives and services to increase the use
of alternatives to single-occupancy vehicle commuting (i.e., voluntary commute trip reduction
programs).
1.13 Develop and implement agreements for commuter trip reduction programs for new
developments.
Parking
1.14 Reduce parking requirements and/or initiate parking maximums in smart growth areas.
1.15 Enact policies that separate the cost of parking spaces from residential rental or purchase costs.
1.16 Encourage and use on-street parking fees, paid parking, shared parking, and other parking
management and design measures that promote more walking, bicycling, and transit use.
1.17 Consider including variable rates and other pricing mechanisms for parking in locations where
alternative transportation modes with adequate levels of service are accessible and available.
1.18 Provide preferential parking in selected areas for designated carpools, vanpools, alternative and
other low-carbon fuel vehicles, and other vehicles that contribute to community goals for saving
energy and petroleum reduction.
1.19 Consider using parking revenues to promote alternative transportation modes.
City of Carlsbad Energy Roadmap Appendix H-2
Active Transportation
1.20 Promote walking and bicycling as safe and convenient modes of transportation.
1.21 Develop a cohesive master plan of bicycle and pedestrian routes that: identifies and closes gaps in
the network, labels major travel routes, prioritizes safety improvements, maximizes the potential
for walking and bicycling trips, and establishes strong connections to major destinations such as
commercial areas, activity centers, schools, public transit stations, and regional networks.
1.22 Encourage businesses to provide facilities that support bicycles such as secured bicycle parking,
showers, and lockers for employees who bicycle or walk to work.
1.23 Require new commercial developments to install bicycle parking facilities and other cyclist
amenities at a level commensurate with the size of the development such as the square footage
or number of employees.
1.24 Provide bicycle education programs.
1.25 Support funding of infrastructure and capital improvement projects such as streetscape
enhancements, traffic calming features, transit stop and station amenities, way-finding signage,
and pedestrian/bicycle paths and bridges.
1.26 Support or implement car and bicycle sharing programs.
Resources Available for Clean and Efficient Transportation
San Diego Regional Plug-In Electric Vehicle Readiness Plan
Adopted by the SANDAG Board of Directors in January 2014, the San Diego Regional Plug-in Electric
Vehicle (PEV) Readiness Plan was developed to support the growing market of PEVs in the San Diego
region by enabling municipalities and others to address and resolve challenges of deploying charging
infrastructure, or electric vehicle supply equipment. The Readiness Plan was shaped by input from the
San Diego Regional Electric Vehicle Infrastructure Working Group, which includes members from local
government and public agencies, the utility, electrical contractors, and other key stakeholders. The
Plan’s appendices include a number of factsheets and best practices on permitting electric vehicle
chargers, parking accessibility, types of chargers and other topics. The San Diego Regional PEV Readiness
Plan is available at: sandag.org/uploads/publicationid/publicationid_1817_17061.pdf
Integrating TDM into the Planning and Development Process – A Reference for Cities
Completed in May 2012, the SANDAG Integrating TDM into the Planning and Development Process – A
Reference for Cities (Study) identifies opportunities for local governments to proactively incorporate
TDM strategies into their planning and land development process (e.g., general plans, development
reviews, and approvals). This Study is another tool in the SANDAG Smart Growth Tool Box, and is
available for all jurisdictions on the SANDAG website:
sandag.org/index.asp?projectid=334&fuseaction=projects.detail
The Study provides a range of specific actions that can be considered at each stage of the planning and
development process and their timing for implementation including:
1. Long range planning: The application of TDM should begin with the long-range comprehensive land
use and transportation planning process. This includes planning for supportive land use and
roadway networks that are conducive to serving alternative transportation modes.
City of Carlsbad Energy Roadmap Appendix H-3
2. Implementation tools: To implement the plans through the land development process, TDM
strategies can be incorporated into specific plans, land use regulations and ordinances.
3. Site specific land-development: TDM can be implemented through transit-oriented building design,
the provision of transportation facilities and amenities to encourage alternative modes as well as
temporary measures, such as traffic maintenance during construction.
Sample TDM Plans, Goals, and Policies
1. The City of Rockville, Maryland TDM Plan (rockvillemd.gov/transportation/pdf/TDM03-21-11.pdf)
This five year strategic plan prioritizes actions for implementing a comprehensive TDM program for
the City.
2. The City of San Diego General Plan Mobility Element
(sandiego.gov/planning/genplan/pdf/generalplan/adoptedmobilityelemfv.pdf) TDM goals and
policies are provided on pages 34-35.
Sample TDM Programs and Ordinances
1. Contra Costa County TDM Ordinance (co.contracosta.ca.us/DocumentView.aspx?DID=3994)
2. City of Cambridge, Massachusetts TDM Program (cambridgema.gov/cdd/et/tdm/index.html)
3. City of South San Francisco Municipal Code Chapter 20.400 TDM
(qcode.us/codes/southsanfrancisco/index.php?topic=20)
4. City of San Diego Municipal Code Section 156.0313 – Centre City Planned District Ordinance – TDM
section pgs. 85-86. (docs.sandiego.gov/municode/MuniCodeChapter15/Ch15Art06Division03.pdf)
SANDAG TDM Resolutions
The following pages include sample proclamations that SANDAG and several local governments make in
support of local and regional TDM efforts:
• Walk, Ride, and Roll to School Day 2013 Proclamation
• Rideshare Week and Rideshare Month 2013 Proclamation
• Bike to Work Month 2013 Proclamation
City of Carlsbad Energy Roadmap Appendix H-4
City of Carlsbad Energy Roadmap Appendix H-5
City of Carlsbad Energy Roadmap Appendix H-6
City of Carlsbad Energy Roadmap Appendix H-7
Prepared through the SANDAG
Energy Roadmap Program
April 2011
This Program is a collaboration between SANDAG and San Diego Gas & Electric®
www.sandag.org/energy
City of Carlsbad
Energy Roadmap
Michael Grim
April 14, 2015
Energy Roadmap Program
•Helps lower utility bills
and GHG emissions.
•Identifies projects and
funding opportunities.
•Documents energy use
and savings annually.
•Informs climate action
planning/implementation
2
Components of Roadmap
•Saving Energy in Government Operations
–City buildings and facilities
–Green the city vehicle fleet
–Increase staff knowledge of energy efficiency
–Promote commuter benefits to city employees
3
Components of Roadmap
•Saving Energy in the Community
–Leverage planning and development authority
–Market energy efficiency to residents, schools,
and businesses
–Promote green jobs and workforce training
4
City Accomplishments
•Retrofit of streetlights and some city facilities
•Alga Norte Community Park
•15 percent hybrid city fleet and participation
in electric vehicle planning
•Participation in iCommute, Bike and Rideshare
Months
•Sustainability Guiding Principles, Draft General
Plan and Climate Action Plan
5
Key Roadmap Findings
•Energy Conservation Analysis
–Technology-neutral energy assessments
completed
–Potential savings of $76,000 annually through
improvements and rate structure changes
–SDG&E rebates/incentives and financing available
6
Key Roadmap Findings
•Fleet Analysis
–Conducted by Center for Sustainable Energy
through the San Diego Regional Clean Cities
Coalition
–Potential savings of $700 to $2,000 per vehicle
annually
–Identified incentives, payback period and GHG
reductions
7
Continuing Effort Through 2015
8
Municipal
Retrofits
Staff
Training
Community
Education
Using the Roadmap
•Resource on city website for residents and
businesses
•Utilize online tools to track energy use and
commuter impacts
•Regional collaborations:
–North Coast Energy Action Collaborative
–San Diego Regional Climate Collaborative
–Regional Energy Partnerships
9
Contributors
•City Public Works staff
•SANDAG Energy and iCommute teams
•Center for Sustainable Energy
•SDG&E Energy Efficiency and Local
Government teams
•EFM Solutions, Inc.
10
Recommendation
•City Council adopt Resolution No. 2015-091,
accepting the SANDAG Energy Roadmap for
the City of Carlsbad.
11