CARLSBAD MUNICIPAL WATER DISTRICT -AGENDA BILL - ’ -
APPROVING AND AUTHORIZING
EXECUTION OF AN AGREEMENT FOR PRELIMINARY AND
FINAL ENGINEERING DESIGN SERVICES FOR EL FUERTE
RECOMMENDED ACTION:
BOARI?$F DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT: Adopt Resolution No. approving and authorizing execution of an agreement for preliminary and final engineering design services for El Fuerte 30-Inch Water Transmission Main, CMWD Project 2000-I 01, Contract No. 38161.
ITEM EXPLANATION:
This project involves preliminary and final design services for a 30-Inch water transmission main from the southerly boundary of the Ranch0 Carrillo subdivision to Al % a Road in El Fuerte Street as shown on Exhibit 1. The master plan for the potable water system i entified the need to install this 304nch pipeline in El Fuerte Street.
The Department of Public Works-Utility Engineering Division requested proposals for the preliminary and final design from Dan Boyle Engineering, Dokken Engineering, and Rick Engineering. The Utility Engineering staff reviewed the proposals and recommends that Dokken Engineering be selected as having the most responsive proposal.
ENVIRONMENTAL REVIEW:
This project is categorically exempt from the environmental review process under the provisions of the California Environmental Quality Act (CEQA), Section 153’OZj~i A Notice of Exemption will be filed by the Planning Director prior to the Notice to Proceed.
FISCAL IMPACT:
WATER FUND ENGINEERING DESIGN SERVICES FOR EL FUERTE,
30 -INCH WATER TRANSMISSION MAIN
Engineering Design Cost $48,495
Engineering Field Services During Design $4,800
Engineering Services Contingencies $6,705
TOTAL ESTIMATED DESIGN COSTS $60,000
Estimated Construction Cost $500,000
Inspection, Administration and Construction Contingency $140,000
TOTAL ESTIMATED PROJECT COSTS $700,000
Reimbursement to Continental Residential, Inc., for Extension in Ranch0 Carrillo $255,425
Future Extension from Ranch0 Carrillo to Poinsettia Lane $380.325
Appropriation Available as of December 30, 1999 $1,335,750
ADDITIONAL APPROPRIATION -O-
EXHIBITS:
1.
2.
Location Map.
Professional Services Agreement between Dokken Engineering and Carlsbad Municipal Water District.
3. Board of Directors of the Carlsbad Municipal Water District: Resolution No. 1o78 approving and authorizing execution of an agreement for preliminary and final engineering design services for El Fuerte 30-Inch Water Transmission Main, CMWD Project 2000-I 01, Contract No. 38161.
4
t
LOCATKIN MAP
I RANCH0 CARRILLO SUBDMSION BOUNDARY
EL FUERTE 30’ TRANSMISSION
Project Nm-w
EL FUERTE 30-INCH TRANSMISSIUN MAIN
CONTRACT Exhibit
No, 38161 Not
1
1 -
EXHIBIT 3
RESOLUTION NO. 10’8
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
CARLSBAD MUNICIPAL WATER DISTRICT FOR APPROVING AND
AUTHORIZING EXECUTION OF AN AGREEMENT FOR PRELIMINARY AND FINAL ENGINEERING DESIGN SERVICES FOR EL FUERTE 30-INCH WATER TRANSMISSION MAIN, CMWD PROJECT 2000-I 01. CONTRACT NO. 38161.
WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of Carlsbad,
, California, has determined it necessary and in the public interest to enter into an agreement on
s file in the City Clerks Office between Dokken Engineering and the Cartsbad Municipal Water
g District, CMWD Project No. 2000-101, Contract No. 38161; and
10 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of Carlsbad,
,, California, approves and authorizes the execution of an agreement for engineering design
12 services for a 30-inch potable water transmission main; and
13 WHEREAS, the Department of Public Works - Utility Engineering Division requested
14 multiple proposals for the transmission main design; and
15 WHEREAS, the Department of Public Works - Utility Engineering staff recommends that
1s the proposal received from Dokken Engineering be selected as most responsive and competent;
17 and
16 WHEREAS, the proposal amount of $48,495 for Design, $4,800 for engineering services
19 during construction, plus $6,705 for engineering services contingencies, is available in funds
20 appropriated in the 199912000 Budget for the El Fuerte Water Line.
21 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad
22 Municipal Water District, as follows:
23 1. That the above recitations are true and correct.
24 2. That the proposal by Dokken Engineering in the amount of $53,295 for design and
25 engineering services of the 30-inch transmission main be accepted and approved.
\4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That the President, as the Representative of the Carlsbad Municipal Water
District, is authorized and directed to execute an agreement between Dokken Engineering and
the Carlsbad Municipal Water District for the engineering design services for the El Fuerte
30-inch Transmission Main, CMWD Project No. 2000-I 01; Contract No. 38161.
PASSED, APPROVED AND ADOPTED at a special meeting of the Board of Directors of
the Carlsbad Municipal Water District held on the 4th day of April 1 2000by
the following vote, to wit:
AYES: Board Members Lewis, Hall, Finnila, Nygaard, Kulchin.
NOES: None.
F
AT-TEST:
&-Lb*%
LORRAINE M. WOOD, Secretary (SEAL)
AGREEMENT
THIS AGREEMENT is made and entered into as of the day
of@&? , 2000, by and between the CARLSBAD MUNICIPAL WATER
DISTRICT, a Public Agency organized under the Municipal Water Act of 1911, and a
Subsidiary District of the City of Carlsbad, hereinafter referred to as “District” and DOKKEN
ENGINEERING, a California corporation hereinafter referred to as “Contractor.”
RECITALS
District requires the services of a design services engineering Contractor to provide
the necessary design and optional construction engineering support services for the Plans,
Specifications, and Estimates for the El Fuerte Street Transmission Main Extension; CMWD
Project No. 2000-101; and Contractor possesses the necessary skills and qualifications to
provide the services required by District;
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
contained herein, District and Contractor agree as follows:
1. CONTRACTOR’S OBLIGATIONS
See attached Exhibit “A”, attached hereto and made a part hereof.
2. DISTRICT OBLIGATIONS
The District shall provide existing as-built water pipeline drawings for El Fuette Drive
and Alga Road.
3. PROGRESS AND COMPLETION
The work under this contract will begin within ten (10) days after receipt of notification
to proceed by the District and be completed within 120 [we&ing/calendar] days of that date.
Extensions of time may be granted if requested by the Contractor and agreed to in writing by
1 Rev. 02/l 5/00
the Deputy City Engineer or designee. The Deputy City Engineer or designee will give
allowance for documented and substantiated unforeseeable and unavoidable delays not
caused by a lack of foresight on the part of the Contractor, or delays caused by District
inaction or other agencies’ lack of timely action.
4. FEES TO BE PAID TO CONTRACTOR
The total fee payable for the services to be performed shall be $48,495 for
engineering design cost, $4,800 for engineering services during design, plus $6,705 for
engineering services contingencies. No other compensation for services will be allowed
except those items covered by supplemental agreements per Paragraph 8, “Changes in
Work.” The District reserves the right to withhold a ten percent (10%) retention until the
project has been accepted by the District.
5. DURATION OF CONTRACT
This agreement shall extend for a period of one (1) year from date thereof. The
contract may be extended by the Executive Manager for two additional one (I) year periods
or parts thereof, based upon a review of satisfactory performance and the District’s needs.
The parties shall prepare extensions in writing indicating effective date and length of the
extended contract.
PAYMENT OF FEES
Payment of approved items on the invoice shall be mailed to the Contractor within 30
days of receipt of the invoice.
7. FINAL SUBMISSIONS
Within 120 calendar days after the Notice to Proceed Contractor shall deliver to the
District the following items: 100 % of the Final Design Drawings
100 % of the Technical Specifications
2 Rev. 02/15/00
a. CHANGES IN WORK
If in the course of the contract, changes seen merited by the Contractor or the District,
and informal consultations with the other party indicate that a change in the conditions of the
contract is warranted, the Contractor or the District may request a change in contract. Such
changes shall be processed by the District in the following manner: A letter outlining the
required changes shall be forwarded to the District by Contractor to inform them of the
proposed changes along with a statement of estimated changes in charges or time schedule.
A Standard Amendment to Agreement shall be prepared by the District and approved by the
District according to the procedures described in Carlsbad Municipal Code Section 3.28.172.
Such Amendment to Agreement shall not render ineffective or invalidate unaffected portions
of the agreement.
9. COVENANTS AGAINST CONTINGENT FEES
The Contractor warrants that their firm has not employed or retained any company or
person, other than a bona fide employee working for the Contractor, to solicit or secure this
agreement, and that Contractor has not paid or agreed to pay any company or person, other
than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any
other consideration contingent upon, or resulting from, the award of making of this
agreement. For breach or violation of this warranty, the District shall have the right to annul
this agreement without liability, or, in its discretion, to deduct from the agreement price or
consideration, or otherwise recover, the full amount of such fee, commission, percentage,
brokerage fees, gift, or contingent fee.
10. NONDISCRIMINATION CLAUSE
The Contractor shall comply with the state and federal laws regarding
nondiscrimination.
3 Rev. 02/15/00
11. TERMINATION OF CONTRACT
In the event of the Contractor’s failure to prosecute, deliver, or perform the work as
provided for in this contract, the Executive Manager may terminate this contract for
nonperformance by notifying the Contractor by certified mail of the termination of the
Contractor. The Contractor, thereupon, has five (5) working days to deliver said documents
owned by the District and all work in progress to the Deputy City Engineer. The Deputy City
Engineer shall make a determination of fact based upon the documents delivered to District
of the percentage of work which the Contractor has performed which is usable and of worth
to the District in having the contract completed. Based upon that finding as reported to the
Executive Manager, the Manager shall determine the final payment of the contract.
This agreement may be terminated by either party upon tendering thirty (30) days
written notice to the other party. In the event of such suspension or termination, upon
request of the District, the Contractor shall assemble the work product and put same in order
for filing and closing and deliver said product to District. In the event of termination, the
Contractor shall be paid for work performed to the termination date; however, the total shall
not exceed the lump sum fee payable under paragraph 4. The Executive Manager shall
make the final determination as to the portions of tasks completed and the compensation to
be made.
12. CLAIMS AND LAWSUITS
The Contractor agrees that any contract claim submitted to the District must be
asserted as part of the contract process as set forth in this agreement and not in anticipation
of litigation or in conjunction with litigation. The Contractor acknowledges that if a false claim
is submitted to the District, it may be considered fraud and the Contractor may be subject to
criminal prosecution. The Contractor acknowledges that California Government Codes
sections 12650 et seq., the False Claims Act, provides for civil penalties where a person
4 Rev. 02/l 5/00
knowingly submits a false claim to a public entity. These provisions include false claims
made with deliberate ignorance of the false information or in reckless disregard of the truth or
falsity of information. If the Carlsbad Municipal Water District seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including
attorney’s fees. The Contractor acknowledges that the filing of a false claim may subject the
Contractor to an administrative debarment proceeding wherein the Contractor may be
prevented to act as a Contractor on any public work or improvement for a period of up to five
years. The Contractor acknowledges debarment by another jurisdiction is grounds for the
Board of Directors to disqualify the Contractor from the selection process.
E* (initial) ini ia
The provisions of Carlsbad Municipal Code sections 3.32.025, 3.32.026, 3.32.027 and
3.32.028 pertaining to false claims are incorporated herein by reference. d!k (initial) * tnr i
13. JURISDICTION
Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego
County, California.
14. STATUS OF THE CONTRACTOR
The Contractor shall perform the services provided for herein in Contractor’s own way
as an independent Contractor and in pursuit of Contractor’s independent calling, and not as
an employee of the District. Contractor shall be under control of the District only as to the
result to be accomplished, but shall consult with the District as provided for in request for
5 Rev. 02/15/00
-
proposal. The persons used by the Contractor to provide services under this agreement
shall not be considered employees of the District for any purposes whatsoever.
The Contractor is an independent Contractor of the District. The payment made to the
Contractor pursuant to the contract shall be the full and complete compensation to which the
Contractor is entitled. The District shall not make any federal or state tax withholding on
behalf of the Contractor or its employees or subcontractors. The District shall not be required
to pay any workers’ compensation insurance or unemployment contributions on behalf of the
Contractor or its employees or subcontractors. The Contractor agrees to indemnify the
District and the City of Carlsbad within 30 days for any tax, retirement contribution, social
security, overtime payment, unemployment payment or workers’ compensation payment
which the District and the City of Carlsbad may be required to make on behalf of the
Contractor or any employee or subcontractor of the Contractor for work done under this
agreement or such indemnification amount may be deducted by the District and the City of
Carlsbad from any balance owing to the Contractor.
The Contractor shall be aware of the requirements of the Immigration Reform and
Control Act of 1986 and shall comply with those requirements, including, but not limited to,
verifying the eligibility for employment of all agents, employees, subcontractors and
Consultants that are included in this agreement.
15. CONFORMITY TO LEGAL REQUIREMENTS
The Contractor shall cause all drawings and specifications to conform to all applicable
requirements of law: federal, state and local. Contractor shall provide all necessary
supporting documents, to be filed with any agencies whose approval is necessary.
The District will provide copies of the approved plans to any other agencies.
6 Rev. 02/15/00
16. OWNERSHIP OF DOCUMENTS
All plans, studies, sketches, drawings, reports, and specifications as herein required
are the property of the District, whether the work for which they are made be executed or not.
In the event this contract is terminated, all documents, plans, specifications, drawings,
reports, and studies shall be delivered forthwith to the District. Contractor shall have the right
to make one (1) copy of the plans for its records.
17. REPRODUCTION RIGHTS
The Contractor agrees that all copyrights which arise from creation of the work
pursuant to this contract shall be vested in District and hereby agrees to relinquish all claims
to such copyrights in favor of District.
ia. HOLD HARMLESS AGREEMENT
Contractor agrees to indemnify and hold harmless the “District” and the “City” and their
officers, officials, employees and volunteers from any and against all claims, damages,
losses and expenses including attorney fees arising out of the performance of the work
described herein caused in whole or in part by any willful misconduct or negligent act or
omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any
of them or anyone for whose acts any of them may be liable.
19. ASSIGNMENT OF CONTRACT
The Contractor shall not assign this contract or any part thereof or any monies due
thereunder without the prior written consent of the District.
20. SUBCONTRACTING
If the Contractor shall subcontract any of the work to be performed under this contract
by the Contractor, Contractor shall be fully responsible the District for the acts and omissions
of Contractor’s subcontractor and of the persons either directly or indirectly employed by the
subcontractor, as Contractor is for the acts and omissions of persons directly or indirectly
7 Rev. 02/15/00
employed by Contractor. ,Nothing contained in this contract shall create any contractual
relationship between any subcontractor of Contractor and the District. The Contractor shall
bind every subcontractor and every subcontractor of a subcontractor by the terms of this
contract applicable to Contractor’s work unless specifically noted to the contrary in the
subcontract in question approved in writing by the District.
21. PROHIBITED INTEREST
No official of the District who is authorized in such capacity on behalf of the District to
negotiate, make, accept, or approve, or take part in negotiating, making, accepting, or
approving of this agreement, shall become directly or indirectly interested personally in this
contract or in any part thereof. No officer or employee of the District who is authorized in
such capacity and on behalf of the District to exercise any executive, supervisory, or similar
functions in connection with the performance of this contract shall become directly or
indirectly interested personally in this contract or any part thereof.
22. VERBAL AGREEMENT OR CONVERSATION
No verbal agreement or conversation with any officer, agent, or employee of the
District, either before, during or after the execution of this contract, shall affect or modify any
of the terms or obligations herein contained nor entitle the Contractor to any additional
payment whatsoever under the terms of this contract.
23. SUCCESSORS OR ASSIGNS
Subject to the provisions of Paragraph 18, “Hold Harmless Agreement,” all terms,
conditions, and provisions hereof shall inure to and shall bind each of the parties hereto, and
each of their respective heirs, executors, administrators, successors, and assigns.
24. EFFECTIVE DATE
This agreement shall be effective on and from the day and year first written above.
8 Rev. 02/15/00
25. CONFLICT OF INTEREST
The District has determined, using the guidelines of the Political Reform Act and the
District’s conflict of interest code, that the Contractor will not be required to file a conflict of
interest statement as a requirement of this agreement. However, Contractor hereby
acknowledges that Contractor has the legal responsibility for complying with the Political
Reform Act and nothing in this agreement releases Contractor from this responsibility.
26. INSURANCE
The Contractor shall obtain and maintain for the duration of the contract and any and
all amendments insurance against claims for injuries to persons or damage to property which
may arise out of or in connection with performance of the work hereunder by the Contractor,
his agents, representatives, employees or subcontractors. Said insurance shall be obtained
from an insurance carrier admitted and authorized to do business in the State of California.
The insurance carrier is required to have a current Best’s Key Rating of not less that “A-:V”
and shall meet the District’s policy for insurance as stated in Resolution No. 772.
A. Coveraaes and Limits
Contractor shall maintain the types of coverages and minimum limits indicated
herein, unless a lower amount is approved by the General Counsel or Executive Manager.
1. Comprehensive General Liability Insurance. $1 ,OOO,OOO combined
single-limit per occurrence for bodily injury, personal injury and property damage. If the
submitted policies contain aggregate limits, general aggregate limits shall apply separately to
the work under this contract or the general aggregate shall be twice the required per
occurrence limit.
2. Automobile Liability (if the use of an automobile is involved for
Contractor’s work for the District). $1,000,000 combined single-limit per accident for bodily
injury and property damage.
9 Rev. 02115100
3. Worker’s Compensation and Employer’s Liability. Worker’s
Compensation limits as required by the Labor Code of the State of California and Employer's
Liability limits of $1 ,OOO,OOO per accident for bodily injury.
4. Professional Liability. Errors and omissions liability appropriate to the
contractor’s profession with limits of not less than $1 ,OOO,OOO per claim. Coverage shall be
maintained for a period of five years following the date of completion of the work.
B. Additional Provisions
Contractor shall ensure that the policies of insurance required under this
agreement contain, or are endorsed to contain, the following provisions.
1. The District and the City of Carlsbad shall be named as an additional
insured on all policies excluding Workers’ Compensation and Professional Liability.
2. The Contractor shall furnish certificates of insurance to the District before
commencement of work.
3. The Contractor shall obtain occurrence coverage, excluding Professional
Liability which shall be written as claims-made coverage.
4. This insurance shall be in force during the life of the agreement and any
extension thereof and shall not be canceled without 30 days prior written notice to the District
sent by certified mail.
5. If the Contractor fails to maintain any of the insurance coverages
required herein, then the District will have the option to declare the Contractor in breach, or
may purchase replacement insurance or pay the premiums that are due on existing policies
in order that the required coverages may be maintained. The Contractor is responsible for
any payments made by the District to obtain and maintain such insurance and the District
may collect the same from the Contractor or deduct the amount paid from any sums due the
Contractor under this agreement.
10 Rev. 02/15/00
27. RESPONSIBLE PARTIES
The name of the persons who are authorized to give written notices or receive written
notices on behalf of the District and on behalf of the Contractor in connection with the
foregoing are as follows:
For District: Title
Name
Address
For Contractor: Title
Name
Address
Architect/License Number:
28. BUSINESS LICENSE
Debutv Citv Enaineer
William E. Plummer. P.E.
1635 Faraday Avenue
Carlsbad. California 92008
Project Manager
David P. Ahles. P.E.
3914 Murphy Canvon Road, Ste.A-I 53
San Diego, California 92123
Contractor shall obtain and maintain a City of Carlsbad Business License for the
duration of the contract.
ill
Iii
Ill
Ill
Ill
Ill
11 Rev. 02l15100
29. ENTIRE AGREEMENT
This agreement together with any other written document referred to or contemplated
herein, embody the entire agreement and understanding between the parties relating to the
subject matter hereof. Neither this agreement nor any provision hereof may be amended,
modified, waived or discharged except by an instrument in writing executed by the party
against which enforcement of such amendment, waiver or discharge is sought.
Executed by Contractor this day of
CONTRACTOR:
DOKKEN ENGINEERING, a
California corporation
CARLSBAD MUNICIPAL WATER DISTRICT
By: /4tiiIQdF (sign here)
pe. l-EsvL=uy-
(print name/title)
Date:
ATTEST:
mkA-ven ~.fgmlC , c?F&,S&C~ (print name/title) v LORRAINE M. WOOD,
(Proper notarial acknowledgment of execution by Contractor must be attached.)
(Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant treasurer must sign for corporations. Otherwise, the corporation must attach a resolution certified by the secretary or assistant
secretary under corporate seal empowering that officer(s) signing to bind the corporation.)
(If signed by an individual partner, the partnership must attach a statement of partnership authorizing the
partner to execute this instrument.)
APPROVED AS TO FORM
12 Rev. 02/l 5700
STATE OF CALIFORNIA ‘I
t ss.
COUNTY o&%-wnLifik. J
fi r+-c,/q 3 d Z.%0before me,
DATE NAME AND TITLE OF OFFICER 1
personally appeared R;&\ \ NAME(S) OF SIGNER(S)
B personally known to me - OR - Cl proved to me on the basis of satisfactory evidence to be the person(s) whose
name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity
upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
-i/i.2 im!LLL
SIGNATURE OF NOTARY
Title or Type of Document
Date of Document
Signer(s) other than named above
CMWD
06/l 4/95 Rev.
--\-I.\ h
Based on our review of the information provided to Dokken Engineering from Carlsbad Municipal Water
District, site reconnaissance, review of existing improvement drawings, and our design expertise, the team has
developed a comprehensive work plan.
The following tkabik presents an oven&w of the scope tusks for pqfessional engineel$ng &sign services.
&sc~tions of the tasks and subtasks utilizes the format pmvi&d to LMhzn Engineming in or&r to aid
the reviewer.
Task 1 - PRELIMCNARY DESIGN 00 PERCENT SUBMITTALS
Sddask 1.1 - Surveys & Mapping
Survey Control: An adequate number of control points will be positioned within the project sites using
Global Positioning System (GPS) or terrestrial survey techniques. All GPS surveys will be completed in
c0nformance with Federal Geodetic Control Subcommittee (FGCS) “Geodetic Survey Standards and
Specifications for Geodetic surveys Using GPS Relative Positioning Techniques”.
Mapping: Mapping will be done in English units to a scale of ,l”=40’. Mapping will be centered along El
Fuerte Street with cross sections performed at each well monument from approximately the Pancho
Carrillo/La Costa Meadows Unit 3 boundary to the El FuerteIAlga Road intersection. Format shall be in
AutoCAD 14. _.
Output: Right of Way Engineering will deliver to Dokken Engineering an ASCII file of all survey points
collected and a hard copy of survey notes and CAD files used for design and reference. D&ken Engineering
will develompping in English units to a scale of 1”‘=40’. All traverse points will be monumented
using permanent types of markers to facilitate easy recovery during construction phase. ,
”
Subtask 1.2 - PreIiminary Alignment Studies
The preliminary alignment will be developed at a scale of 1”=40’ on CAD drawings including existing utility locations, and preliminary profile designs. This task shall include an initial project kick-off meeting and
alignment review meetings.
Outputz Exhibits illustrating the preliminary ahgmnent overlaid on topographic mapping, showing the
relationship to existing roads, utilities, and other surface features. Proposed vertical profiles will also be
shown.
Subtask 1.3 - Field Review of Project Sit&Existing Data Research and Investigation
Key members of the Dokken Engineering Team, will review the project site, take photographs for reference,
and observe existing features that could affect the project. These features are expected to include existing
roadways, bicycle and pedestrian facilities, traffic signs and traft% control devices, street lights, utility
facilities, businesses and other buildings, drainage facilities, ground contours, and existing vegetation.
Available data will be gathered from the City of Carlsbad and other public agencies. Data will consist of as-
built drawings, traffic volumes forecast by the City of Carlsbad, and various other data pertinent to the
development of the proposed project. Dokken Engineering will utilize SAF-r-DIG Utility Surveys, Inc. as our
subconsultant for the pothole of existing utilities to determine their physical size, location and elevation.
Ot~tputr The observations of each team member will be summarized and illustrated with photographs for all
team members to review. This data will be reviewed to serve as a basis for further study.
13 Fuerte Street Transmission Main Entension MDOKKEN
Task 2 - FINAL DESIGN
Subtask 2.1- Final Plans .
Following acceptance of the preliminary design, Dokken EZngine&ing will proceed with the completion of the
final plans for the construction of the 30-&h steel waterline. Pinal plans will include 1”=40’ scaled pipeline
layout, pipeline profile, typical ttench section, existing utilities, cathodic protection test stations, connection &ails, and other construction details as necessary. All plans will be prepamd using AutoCAD release 14.0.
This scope of work task will include Project Management and Quality assurance review. Project
Management shall include an initial project kick-off meeting with monthly meetings until the project is
complete. Dokken Engineering will prepare meeting minutes for all project related meetings.
Output: Provide ten (10) sets of blueliis of plans at 90% and 100% plancheck submittals. Final s&&d
mylars - Prepare plans in ink on mylar, or other media acceptable to City, on screened topographic map using
scales of 1” = 40’ horizontal and 1” = 4’ vertical or 1” = 8’ vertical as agreed to prior to plan preparation.
Provide one set of approved final plans in digital format compatible with AutoCAD Release 14.0 or current
version in use at the time plans am prepared. Digital drawings shall be on 3 55” floppy disks or other media
approved by the City. Provide one set of mylar plans of final drawings.
Subtasks 2.2 - Cathodic Protection Design
Dokken Engineering will review corrosivity data on the existing soil as provided by Carl&ad Municipal
Water District. Dokken Engineering will provide cathodic protection system recommendations and tbe design of cathodic protection test stations.
Output: Drawings and construction details to be included in subtask 2.1 Final Plans. ’ . .
Subtasks 2.3 - Temporary Traffic Control Plans
D&ken Engineering will prepare temporary traffic control plans to accommodate the construction of a 30-
inch steel waterline within El Fuerte Street.
Output: Drawings to be included in subtask 2.1 Final Plans.
Subtaska 2.4 - Bid schedule D&en Engineering will prepare a bid schedule including mobilization, shoring protection, pipeline
construction items, quantity, unit price, and total cost.
olrtput: Microsoft “Word” file on 3 !4” floppy disk. .
Subtasks 25 - Construction Cost Estimate .- - Dokken Engineering will prepare a final construction cost estimate including quantity estimates and unit
msts.
~tput: Microsoft “Word” or “Excel” file on 3 ‘95” floppy disk.
Subtasks 2.6 - Spe&cationa D&ken Engineering will prepare project specifications and special provisions in “CSI” famat. We
understand CMWD’s desire to administer the construction of this project using their standard specifications.
~tput: Microsoft “Word” file on 3 !4” floppy disk.
Task 3 - BIDDING PHASE SERVICES
Subtasks 3.1- Pm-Bid Meeting and Addendum
JJokken Engineering will attend the Pre-Bid Meeting includiig Pre-Bid Meeting minutes, and prepare
addendum’s.
Output: Microsoft ‘Word” file on 3 54” floppy disk.
OFI’IONAL TASKS
Task 4 - CONSTRUCTION SERVICES
Subtasks 4.1- Shop Drawing Review and RFI’s
D&ken Engineeting will review up to 10 shop drawings submitted by the con-or. D&ken Engineering
will respond to all Requests for Plan Clarifications, (RJ?l) by the Contractor or the CMWD.
Output: Ten shop drawings and all RFI’s will be reviewed and retumed with comments within 5 working
days.
. .
3.’ i’ .; : , ,.., . . 5,. ,kj! n ..~ &Y: ; . . .<$ .+ >;>
( ! .:jr I. *.
km .. &. @“: ~5. 1 -i
e. @Wtte Street Transmission Main Extension
City of Carlsbad
April 11,200O
DOKKEN ENGINEERING
Attn: David P Ahles, P.E.; Project Manager
3914 Murphy Canyon Rd, Ste. A-153 San Diego, CA 92123
RE: AGREEMENT FOR PROFESSIONAL SERVICES
At the meeting of April 4,2000, the Carlsbad City Council adopted Resolution No. 1078,
approving the above referenced agreement..
Enclosed for your records is a copy of Resolution No. 1078, and a fully executed
agreement for your files.
If you have questions concerning the contract, please contact Randy Klaahsen, Associate
Engineer, at 602-2765.
Sincerely, .
Dee Ulrich
Office of the Carlsbad City Clerk
Enclosures (2)
1200 Carlsbad Village Drive - Carlsbad, CA 92008-1989 - (760) 434-2808 @