HomeMy WebLinkAbout2011-06-21; City Council; 20589 PART3; 2010 UPDATE SD COUNTY HAZARD MITIGATION PLANSECTIONFIVE Coals. Objectives and Actions SECTION 5 GOALS, OBJECTIVES AND ACTIONS 5.1 OVERVIEW After each participating jurisdiction reviewed the Risk Assessment (Section 4), jurisdictional leads met with their individual Local Planning Groups (LPG) to identify appropriate jurisdictional-level goals, objectives, and mitigation action items. This section of the Plan incorporates 1) mitigation goals and objectives, 2) mitigation actions and priorities, 3) an implementation plan, and 4) documentation of the mitigation planning process for each of the twenty one (21) participating jurisdictions. Each of these steps is described as follows. Develop Mitigation Goals and Objectives Each jurisdiction reviewed hazard profile and loss estimation information presented in Section 4 and utilized this as a basis for developing mitigation goals and objectives. Mitigation goals are defined as general guidelines explaining what each jurisdiction wants to achieve in terms of hazard and loss prevention. Goal statements are typically long-range, policy-oriented statements representing jurisdiction-wide visions. Objectives are statements that detail how each jurisdiction's goals will be achieved, and typically define strategies or implementation steps to attain identified goals. Other important inputs to the development of jurisdiction-level goals and objectives include performing reviews of existing local plans, policy documents, and regulations for consistency and complementary goals, as well as soliciting input from the public. Identify and Prioritize Mitigation Actions Mitigation actions that address the goals and objectives developed in the previous step were identified, evaluated, and prioritized. These actions form the core of the mitigation plan. Jurisdictions conducted a capabilities assessment, reviewing existing local plans, policies and regulations for any other capabilities relevant to hazard mitigation planning. An analysis of their capability to carry out these implementation measures with an eye toward hazard and loss prevention was conducted. The capabilities assessment required an inventory of each jurisdiction's legal, administrative, fiscal and technical capacities to support hazard mitigation planning. After completion of the capabilities assessment, each jurisdiction evaluated and prioritized their proposed mitigations. As part of this process, each city and the County reviewed the actions detailed in the 2005 plan to see if they were completed, had been dropped due to issues such as lack of political support or lack of funding or were on-going and should be continued in the new plan. The status of each jurisdiction's action items is detailed in Appendix D. Each participant used their local planning group to evaluate alternative mitigation actions by considering the STAPLES implications of each action item. The stalling point was a review of the mitigation actions listed in the original 2005 plan. The Local planning groups, comprised of individuals from the various jurisdictional departments, brought their experience and knowledge of the region, the jurisdiction and local constraints to assist in the evaluation of the hazards. They reviewed the mitigations strategies, goals and objectives in the 2005 plan and determined whether to keep them or not. They then developed new actions 5-1 SECTIBNFIVE Goals, Objectives and Actions as necessary. Individual LPG membership is discussed in each jurisdictions section of this chapter. The STAPLEE criteria is a tool used to assist communities in deciding which actions to include in their implementation strategy. The criteria are designed to account for a wide range of factors that affect the appropriateness of an action. Each jurisdiction evaluated the following criteria and considerations: • Social: Community acceptance, public support, adverse affects on population segments, health/welfare/safety impacts, and financial effects • Technical: Technical feasibility, long term effectiveness, and secondary impacts • Administrative: Staff, funding, and maintenance capabilities • Political: Political support, local champion, and public support • Legal: State authority, existing local authority, and potential opposition • Economic: Benefits, costs, and availability of outside funding • Environmental: impact on environment and endangered species, local regulations and California Environmental Quality Act (CEQA)/National Environmental Policy Act (NEPA) considerations. In addition to using the STAPLEE criteria, each jurisdiction also considered the following: ease of implementation; multi-objective actions; time for implementation and post-disaster mitigation feasibility. Utilizing the above information, each community ranked the possible action items on a prioritization scale of high, medium, and low. A High ranking indicated that the hazard has a high probability of occurrence and/or a severe impact on the community. The Medium ranking indicated a moderate potential for occurrence or impact. Those hazards with a low probability of occurrence but with a potentially high impact were also ranked as medium. The Low ranking indicates that the potential for the event to occur is remote and/or the impact of the event is minimal to the community. Only those hazards that received a high or moderate ranking were considered in the mitigation planning process. Many of these hazards were ranked differently by individual jurisdictions. For example, tsunamis received a relatively high ranking among coastal jurisdictions while inland jurisdictions did not consider them for mitigation action. All jurisdictions rated wildfire high (based on the firestorms of 2003 and 2007). Hooding and Earthquake (based on the known faults within the County) were also rated high by all participants. Table 5.X-1 Summary of Potential Hazard-Related Exposure/Loss formed the initial ranking basis for the individual participants. The hazards selected by each jurisdiction for mitigation actions are included in their section of this Chapter. In all cases the actions selected are prioritized based on the benefit of the action compared to the cost (in terms of funding, staff time, time to complete) of conducting that action. Those actions that will provide the most benefits in the least amount of time with available resources were selected as the highest priorities. That is not to say the other actions are not considered important. It merely indicates that we set out to complete what we could with current resources. The other actions will be completed as additional resources become available. There were nine Goals established by the HMWG. They are listed below (in the order of importance assigned by the jurisdictions): 5-2 SECTIONFIVE Goals, Objectives and Actions 1. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to geologic hazards (includes Earthquakes, landslides, liquefaction, etc.). 2. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to structure fire/wildfire 3. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to flooding/dam failure. 4. Increase public understanding and support for effective hazard mitigation. 5. Improve hazard mitigation coordination and communication with federal, State, local and tribal governments. 6. Promote disaster resistant existing and future development. 7. Build and support local capacity and commitment to continuously become less vulnerable to hazards. 8. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to Coastal erosion/coastal bluff failure/storm surge/Tsunami. 9. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to severe weather. Each jurisdiction then identified and prioritized actions. They listed those with the highest short to medium term priorities. Not all jurisdictions included all the goals. Some jurisdictions included unique goals (such as minimizing losses by prompt resumption of City operations and restoration of City services). Others split the goals into multiple ones (i.e., some have a separate earthquake goal as opposed to a geologic hazard goal). An implementation schedule, funding source and coordinating individual or agency are identified for each prioritized action item. Each jurisdiction prepared a strategy for implementing the mitigation actions identified in the previous step. The implementation strategies identify who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the strategies will be completed. In combination, the goals, objectives, actions and implementation strategies form the body of each jurisdiction's Plan. The following subsections present individual Plans for each of the ] 9 jurisdictions as well as the Fire Protection District. The STAPLEE forms for each jurisdiction's top three priority actions can be found in Appendix E. 5-3 SECTIONFIVE Coals, Objectives and Actions 5.2 REGIONAL CONSIDERATIONS The Risk Assessment (Section 4) indicates that each participating jurisdiction is susceptible to a variety of potentially serious hazards in the region. This had been recognized and formally addressed as early as the 1960s. At that time all of the cities and the County formed a Joint Powers Agreement which established the Unified San Diego County Emergency Services Organization (Organization) and the Unified Disaster Council (UDC) which is the policy making group of the Organization. It also created the Office of Disaster Preparedness (now OES). which is staff to the Organization. The Organization's approach to emergency planning has been comprehensive, i.e., planned for and prepared to respond to all hazards: natural disasters, man-made emergencies, and war-related emergencies, utilizing the State of California's Standardized Emergency Management System (SEMS), the National Incident Management System (NEMS) as well as a coordinated Incident Command System. OES is the agency charged with developing and maintaining the San Diego County Operational Area Emergency Plan, which is considered a preparedness document. The Disaster Mitigation Act of 2000 requires that in addition to having emergency response and emergency preparedness documents, regions should develop and maintain a document outlining measures that can be taken before a hazard event occurs that would help minimize the damage to life and property. The UDC assigned OES the role of coordinating the development of the Plan as a multi-jurisdictional plan. The Plan includes specific goals, objectives, and mitigation action items each of the participating jurisdictions developed that will help minimize the effects of the specified hazards that potentially affect their jurisdiction. Some overall goals and objectives shared some commonalities (including promoting disaster-resistant future development; increasing public understanding, support, and demand for effective hazard mitigation; building and supporting local capacity and commitment to continuously becoming less vulnerable to hazards; and improving coordination and communication with federal, state, local and tribal governments). However, the specific hazards and degree of risk vary greatly between the different jurisdictions; and the mix of other goals and objectives, and most action items are unique to each jurisdiction. Consequently, the goals, objectives and action items in this Plan are presented by individual jurisdiction and special district. It is also envisioned that these mitigation actions will be implement on a jurisdiction-by- jurisdiction basis. However, UDC and OES will provide general oversight to this process to help reduce duplication of efforts between jurisdictions as appropriate, and to spearhead coordination of initiatives and action items that could be accomplished more efficiently on a regional level. 5-4 SMTIONFIVE Goals, Objectives and Actions 5.3 CITY OF CARLSBAD The City of Carlsbad (Carlsbad) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Carlsbad summarized in Table 5.3-1. See Section 4.0 for additional details. Table 53-1 Summary of Potential Hazard-Related Exposure/Loss in Carlsbad Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Flood (Loss) 100 Year 500 Year Rain-Induced Landslide High Risk Moderate Risk Tsunami Wildfire / Structure Fire Extreme Very High High Moderate Exposed Population 14 4,113 104,707* 6,906 6,996 455 57 1,165 0 3,219 9,255 76,454 Residential Number of Residential Buildings 8 1,951 43,723* 3,045 3,086 204 30 535 0 1,294 4,298 31,464 Potential Exposure/Loss for Residential Buildings (x$1,000) 2,252 549,207 12,308,025* 857,168 868,709 57,426 8,445 150,603 0 364,261 1,209,887 8,857,116 Commercial Number of Commercial Buildings 0 49 1,559* 102 104 2 0 23 0 33 72 1,229 Potential Exposure/Loss for Commercial Buildings (x$1,000) 0 219,603 6,986,970* 457,133 466,097 8,963 0 103,079 0 147,896 322,682 5,508,009 ,. Critical Facilities Number of Critical Facilities 0 12 239** 27 27 0 0 6 0 7 22 143 Potential Exposure for Critical Facilities (x$1,000) 0 1,775 677,570** 2,169 2,169 0 0 386 0 104,195 3,027 457,793 Represents best available data at this time. Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Carlsbad 5-5 SECTIONFIVE Coals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Carlsbad LPG as their top five. A brief rational for including each of these is included. • Earthquake: The potential for loss of life, injuries, and damage to property, as well as disruption of services, is significant. • Structural Fire/Wildfire: The potential of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities can be significant. • Hazardous Materials: One major freeway and one major railway pass through the community. The community also hosts several fixed facilities that utilize hazardous materials. • Dam Failure: There are several dammed reservoirs located within the community. • Flooding: There are several areas of the community, which are near natural creek crossings and channels, as well as lagoons. 5.3.1 Capabilities Assessment The City of Carlsbad local planning group (LPG) for emergency planning is the Carlsbad Emergency Management Administrative Team (CEMAT). The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Carlsbad's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.3.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Carlsbad and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Carlsbad, as shown in Table 5.3-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Carlsbad 5-6 SECTIONFIVE Goals, Objectives and Actions Table 53-2 City of Carlsbad: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professionalfs) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y Y N Y Y Department/Agency and Position Community and Economic Development, Housing and Neighborhood Development, Parks and Recreation Programs Community and Economic Development Community and Economic Development, Fire Prevention, Asset Management and Environmental Programs Utilities, Community and Economic Development Community and Economic Development CEMAT, Fire Prevention GIS Staff in IT City Manager (EOC Director or Designee) Various Departments throughout City of Carlsbad The legal and regulatory capabilities of Carlsbad are shown in Table 5.3-3, which presents the existing ordinances and codes that affect the physical or built environment of Carlsbad. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Carlsbad 5-7 SECTIONFIVE Goals, Objectives and Actions Table 53-3 City of Carlsbad: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan I. A post-disaster recovery ordinance M. Real estate disclosure requirements N. Habitat Management Plan 0. Master Drainage, Sewer, Water, & Reclaimed Water P. Redevelopment Master Plan Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Does State Prohibit? (Y/N) N N N N N N N N N N N N N N 5.3.1.2 Fiscal Resources Table 5.3-4 shows specific financial and budgetary tools available to Carlsbad such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Carlsbad 5-8 SECTION 1 I \ 1 Goals, Objectives and Actions Table 53-4 City of Carlsbad: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use Yes/No Yes Yes Limited (Voter Approval) Yes Yes Limited (Voter Approval) Limited (Voter Approval) Yes Yes 5.3.2 Goals, Objectives and Actions Listed below are Carlsbad's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Carlsbad LPG. The original Carlsbad LPG members were Michele Masterson, Joe Garuba and Kurt Musser. Once developed, City staff presented them to the City of Carlsbad City Council for their approval. Public meetings were held throughout the County to present these preliminary goals, objectives and actions to citizens and to receive public input. At these meetings, specific consideration was given to hazard identification/profiles and the vulnerability assessment results. The following sections present the hazard-related goals, objectives and actions as prepared by Carlsbad's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.3.2.1 Goals The City of Carlsbad has developed the following 7 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 6 and 7). City of Carlsbad 5-9 SICTIONFIVE Goals, Objectives and Actions Goal 1. Increase public understanding and support for effective hazard mitigation. Goal 2. Build and maintain local capacity and commitment to hazard mitigation goals. Goal 3. Reduce the possibility of damage and losses to existing assets, including people, facilities and infrastructure due to flooding/dam failure. Goal 4. Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to earthquakes. Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to structural fire/wildfire. Goal 6. Reduce the possibility of damage and losses to existing assets, including people, facilities and infrastructure due to hazardous materials-related hazards Goal 7. Reduce the possibility of damage and losses to existing assets, including people, facilities and infrastructure due to manmade hazards where appropriate. 5.3.2.2 Objectives and Actions The City of Carlsbad developed the following broad list of objectives and actions to assist in the implementation of each of their five identified goals. The City of Carlsbad developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.3.2.3 Goal 1: Increase public understanding and support for effective hazard mitigation. Objective 1 A Action 1.A.1 Action 1 A2 Action 1.A.3 Objective IB. Action 1.B.1 : Educate the public to increase awareness of hazards and opportunities for mitigation actions. Carlsbad Emergency Management Administrative Team (CEMAT) develop hazard mitigation public awareness strategies. Publicize and encourage the adoption of appropriate hazard mitigation actions. Provide information to the public on the City website and through public education opportunities. Promote partnerships between the state, counties, and local jurisdictions and agencies to identify, prioritize, and implement mitigation actions. Continue to participate in regional hazard mitigation activities as a member of the San Diego County Unified Disaster Council. City of Carlsbad 5-10 SECTION 1 IVE Goals, Objectives and Actions Goal 1: Increase public understanding and support for effective hazard mitigation. Objective IB: Promote partnerships between the state, counties, and local jurisdictions and agencies to identify, prioritize, and implement mitigation actions (continued). Action 1 .B.2 Support public sector symposiums and public education opportunities. Objective 1C: Work with Clmmber of Commerce, businesses and other local agencies to promote hazard mitigation in the local community. Action 1 .C.1 Increase awareness and knowledge of hazard mitigation principles and practices. Action 1 .C.2 Encourage businesses to develop and implement hazard mitigation actions. Action 1 .C.3 Support private sector symposiums and public education opportunities. Goal 2: Build and maintain local capacity and commitment to hazard mitigation goals. Objective 2 A: Action 2.A.1 Objective 2 £: Action 2.B.1 Objective 2. C: Action 2.C.1 Increase awareness and knowledge of hazard mitigation principles and practice among local officials. CEMAT liaison with city departments to increase awareness and knowledge of hazard mitigation plan, principles and goals, Implement actions associated with hazard mitigation plan. CEMAT coordinate and monitor action plan milestones. Continue GIS mapping of potential hazard areas. Update GIS mapping as appropriate. Goal 3: Reduce the possibility of damage and losses to existing assets, including people, facilities and infrastructure due to flooding/dam failure. Objective 3 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to flooding/dam failure. Action 3.A.1 Update inundation maps every 10 years. Action 3.A.2 Review and compare existing flood control standards, zoning and building requirements. Action 3.A.3 Review and update policies that discourage growth in flood-prone areas. City of Carlsbad 5-11 SECTS ON I IVE Goals, Objectives and Actions Goal 3: Reduce the possibility of damage and losses to existing assets, including people, facilities and infrastructure due to flooding/dam failure (continued). Objective 3 A: Action 3.A.4 Action 3.A.5 Action 3.A.6 Objective 3. B: Action 3.B.1 Action 3.B.2 Action 3.B.3 Objective 3.C: Action 3.C.1 Action 3.C.2 Objective 3.D. Action 3.D.1 Develop a comprehensive approach to reducing the possibility of damage and losses due to flooding/dam failure (continued). Review and update city-wide Evacuation Plan. Periodically exercise flooding/dam failure response actions. Update flooding/dam failure response actions in Emergency Operations Plan (EOP). Protect existing assets with the highest relative vulnerability to the effects of a flooding ( 1 00 y ear floodplain)/ dam failure. Identify hazard-prone structures and areas. Maintain Storm Water System. Maintain materials for building water barriers. Coordinate with and support existing efforts to mitigate dam failure (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Incorporate and maintain valuable wetlands in open space preservation programs. Review and revise, if necessary, sediment and erosion control regulations. Protect floodplains from inappropriate development. Plan and zone for open space, recreational, agricultural, or other low-intensity uses within floodway fringes. Goal 4: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to earthquakes. Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to earthquakes. Action 4.A.1 Update earthquake response actions in Emergency Operations Plan (EOP). Action 4.A.2 Continue periodic updates of local building codes, public works construction codes, zoning and grading ordinances to reflect legislative changes. Action 4.A.3 Review and update city-wide Evacuation Plan. Action 4.A.4 Periodically exercise earthquake response actions. City of Carlsbad 5-12 SECTION H \ I Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to earthquakes, (continued) Objective 4.B: Protect existing assets with the highest relative vulnerability to the effects of earthquakes . Action 4.B.1 CEMAT review local vulnerability to ground motion, landslides and liquefaction impacts on facilities and infrastructure. Objective 4.C: Coordinate with and support existing efforts to mitigate earthquake hazard Action 4.C. 1 Identify projects for pre-disaster mitigation funding. Action 4.C.2 Collaborate with Federal, State and local agencies' mapping efforts Objective 4.D: Community Outreach Action 4.D.1 Encourage participation in state-wide earthquake preparedness exercises.. Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to structural fire/wildfire. Objectives A: Develop a comprehensive approach to reducing the possibility of damage and losses due to structural fire/wildfire. Action 5.A.1 Update structural fire/wildfire response actions in Emergency Operations Plan (EOP). Action 5.A.2 Review and update city-wide Evacuation Plan. Action 5.A.3 Periodically exercise structural fire/wildfire response actions. Action 5.A.4 Participate in amendments to Fire Protection programs, policies, and requirements; ref. Section IV.F. City Landscape Manual. Action 5.A.5 Continue with Hosp Grove trimming and replanting efforts. Action 5.A.6 Continue to provide for annual vegetation management/maintenance, as necessary, in Hosp Grove defensible space. Action 5.A.7 Provide fire public education materials as requested or needed. Objectives J3: Coordinate with and support existing efforts to mitigate structural fire/wildfire. Action 5.B.1 Continue to maintain the City's weed abatement ordinance to facilitate the removal of annual weeds/vegetation or habitat. City of Carlsbad 5-13 SECTION I I \ I Goals. Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to structural fire/wildfire (continued). Objectives£: Coordinate with and support existing efforts to mitigate structural fire/wildfire (continued). Action 5.B.2 Provide increased vegetation management oversight to developments or HOA's bordering on open space or in Very High Fire Hazard Severity Zones. Objectives .C: Maintain GIS mapping to best reflect potential vulnerability of assets from structural fire/wildfire. Action 5.C.1 GIS maintain mapped fire risk areas. Objectives.D: Maintain adequate emergency response capability. Action 5.D.1 Continue to evaluate service level impacts and needs as part of City Council goals, Standards of Cover reviews, and Annual Operating Budget and Capital Improvement Program. 5.3.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Carlsbad Emergency Management Administrative Team (CEMAT) develop hazard mitigation public awareness strategies. Coordinating Individual/Organization: CEMAT Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #2: Continue with Hosp Grove trimming and replanting efforts. Coordinating Individual/Organization: Parks and Recreation Planning Potential Funding Source: Grant Funding and General Fund City of Carlsbad 5-14 SECTIONFIVE Goals, Objectives and Actions Implementation Timeline: Fiscal Year 2010-2014 Action Item #3: Participate in amendments to Fire Protection programs, policies, and requirements; ref. Section IV.F.. City Landscape Design Manual. Coordinating Individual/Organization: Community Development Planning Potential Funding Source: General Fund Implementation Timeline: Fiscal Year 2010-2014 Action Item #4: Continue to maintain the City's weed abatement ordinance to facilitate the removal of annual weeds/vegetation or habitat. Coordinating Individual/Organization: Fire Prevention Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #5: Provide increased vegetation management oversight to developments or HOA's bordering on open space or in Very High Fire Hazard Severity Zones. Coordinating Individual/Organization: Fire Prevention Potential Funding Source: General Fund Implementation Timeline: Fiscal Year 2010 - 2014 Action Item #6: Investigate feasibility of maintaining hazardous materials business plans in Mobile Data Computer. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: FY 2010-2014 Action Item #7: Continue periodic updates of local building codes, public works construction codes, zoning and grading ordinances to reflect legislative changes. Coordinating Individual/Organization: Fire Department Community and Economic Development Potential Funding Source: General Fund Implementation Timeline: FY 2010-2014 Action Item #8: GIS develop layer depicting location of business required to have hazardous materials business plans. Coordinating Individual/Organization: GIS Potential Funding Source: General Fund Implementation Timeline: FY 2010-2014 Action Item #9: Update hazardous material business plan library. Coordinating Individual/Organization: Fire Prevention City of Carlsbad 5-15 SECTIONFIVE Coals, Objectives and Actions Potential Funding Source: General Fund Implementation Timeline: FY 2010-2014 Action Item #10: Provide information to the public on the City website and through public education opportunities. Coordinating Individual/Organization: CEMAT Potential Funding Source: General Fund Implementation Timeline: FY 2010-2014 City of Carlsbad 5-16 SWTIOMFIVE Goals, Objectives and Actions 5.4 CITY OF CHULA VISTA The City of Chula Vista (Chula Vista) reviewed a set of jurisdictional-level hazard maps, including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Chula Vista, as summarized in Table 5.4-1. See Section 4.0 for additional details. Table 5.4-1 Summary of Potential Hazard-Related Exposure/Loss in Chula Vista Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 8,635 232,095* Residential Number of Residential Buildings 0 2,973 77,457* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 836,900 21,804,146* Commercial Number of Commercial Buildings 0 190 2,184* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 851,523 9,788,033* Critical Facilities Number of Critical Facilities 0 45 0** Potential Exposure for Critical Facilities (x$1,000) 0 218,126 0** Flood (Loss) 100 Year 500 Year 5,947 25,564 2,395 9,180 674,193 2,584,170 153 405 685,700 1,815,089 29 56 107,324 140,497 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 2 83 0 1 26 0 282 7,319 0 1 1 0 4,482 4,482 0 0 2 0 0 20,192 Wildfire / Structure Fire Extreme Very High High Moderate 17 9,048 3,840 169,128 5 2,795 1,224 57,512 1,408 786,793 344,556 16,189,628 0 3 18 1,963 0 13,445 80,671 8,797,577 0 4 4 215 0 1,001 1,195 922,638 Represents best available data at this time. Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Chula Vista 5-17 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Chula Vista LPG as their top five hazards. A brief rational for including each of these is included. • Wildfire/Structure Fire: Due to the proximity of wildlands and natural and naturalized open spaces within steep canyon areas in and near urbanized areas developed prior to the enactment of the City's Urban-Wildland interface Code in 2000, combined with the probability of a wildland fire occurring in a given year, wildland/structure fires present the greatest hazard to the City of Chula Vista. • Geologic (Earthquake, Landslide, Liquefaction): Due to its relative distance from the closest known active earthquake fault (Rose Canyon Fault), the City of Chula Vista is at low to moderate risk to damage from earthquakes, except in its northwestern most regions. The landslide threat is focused in the older developed areas around steep canyon slopes of known slide potential. The threat of liquefaction is relatively low; however, the alluvial areas of the Sweetwater and Otay Rivers and the Telegraph Canyon Channel are subject to liquefaction in both developed and undeveloped areas. • Hazardous Materials Release/Rail Disaster Spills: There are a number of hazardous materials in large quantities in a few stationary locations within the City of Chula Vista, as well as a mobile hazard sources. These hazardous materials although well contained, exist primarily west of Interstate 805 and have the potential to expose thousands of citizens to various degrees of hazard. • Floods/Dam Inundation: Significant portions of the southerly, northerly, and westerly- developed areas of the City of Chula Vista are within FEMA-mapped 100-year floodplains. However, the threat of flood hazard is relatively low due to the City's emphasis on identifying and prioritizing for improvement a number of undersized and inadequate storm drains and drainage channels since the late 1960's, the low probability of the occurrence of flood- producing storms in any given year, and the requirement that new development includes flood- detention and flood control facilities. In addition, due to the fact that the City of Chula Vista is downstream of two major dams - the Savage (Lower Otay) Dam and the Sweetwater Dam - the possibility of dam inundation in and adjacent to the Sweetwater and Otay River Channels exists, although the likelihood of failure of these dams is considered relatively small due to their construction. • Other Manmade Hazards (Airplane Crashes): The City of Chula Vista is within the flight paths of Lindbergh Field, Brown Field, Tijuana Airport, Ream Field, and North Island Naval Station. The possibility of an airplane crash on take-off or approach from any of these facilities is relatively low, but the cumulative hazard from all of these facilities is significant. City of Chula Vista 5-18 SECTIOMFIVE Goals. Objectives and Actions 5.4.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Chula Vista's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.4.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Chula Vista and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Chula Vista, as shown in Table 5.4-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • Chula Vista City Council/Redevelopment Agency Provides vision and direction in building and nurturing a progressive and cohesive community, which values its diversity, respects its citizens, honors its legacy, and embraces the opportunities of the future. Provides vision, adopts policies and regulations, and approves funding requests/budgets over all aspects of City government • Chula Vista City Manager's Office Provides the leadership and supervision that, in turn, implements the policies and decisions of the Chula Vista City Council, thereby ensuring the delivery of services to the community. Manages City staff, implements City Council decisions and policies over all aspects of City government, and assures the delivery of a wide range of services to the community. • Chula Vista Finance Department Assists the City Council and City Manager in maintaining public confidence in the fiscal integrity of the City by accounting for, controlling and reporting on the City's resources in accordance with sound public financial management practices. Assures all aspects of City financing, funding, and expenditures are within legal, prescribed guidelines and regulations. Tracks and audits expenditures. City of Chula Vista 5-19 SECTIONFIVE Coals, Objectives and Actions • City of Chula Vista Development Services Department Guides the physical development of the City through the implementation of the General Plan and Building Codes and is committed to enhancing the quality of life in the community by planning for sound infrastructure and public services, protecting of the environment, and promoting high quality social and economic growth. Regulates land uses and land development in accordance with plans, policies, and regulations adopted by the City Council. Enforces local, State, and federal requirements for land development, building construction, and specific uses. Recommends additions and revisions to existing ordinances, plans, and policies when necessary. Enhances the quality of life for the Chula Vista community by proactively planning and facilitating environmentally and socially sound economic development, revitalization and affordable housing opportunities. Regulates land uses and land development in accordance with plans, policies, and regulations adopted by the City Council and Redevelopment Agency within redevelopment areas. Recommends additions and revisions to existing ordinances, plans, and policies with respect to redevelopment areas. Implements and enforces programs, plans, policies, and regulations over land development and redevelopment in order to assure adequate and maintainable infrastructure. Mutual aid with certified building inspectors and engineers for damage assessment following a disaster • City of Chula Vista Public Works Department Provides a variety of engineering services including the review and inspection of privately constructed public facilities, infrastructure, and subdivisions; design and inspection of publicly funded infrastructure improvements; management and monitoring of existing and projected traffic conditions throughout the City; preparation of the City's long-term Capital Improvement Program and management of the City's sewer and storm drain systems. Engineering also provides fiscal management for the City's Open Space Maintenance Districts Assessments, Community Facility Districts, and Development Impact Fees. Maintains the basic infrastructure needed for the City to exist and thrive. These basic facilities include streets, curbs, gutters, sidewalks, wastewater systems, storm water systems, street trees, parks and open space areas, and street signage and striping. The department also maintains the City's vehicle fleet and all City communication equipment, particularly used by Police and Fire. Implements a wide range of programs, plans, and policies necessary to assure delivery of basic services to the citizens of Chula Vista and maintains the City's infrastructure. The Department of Public Works Operations is a first responder in natural and manmade emergencies. City of Chula Vista 5-20 SEBTIONFIVE Goals, Objectives and Actions • City of Chula Vista Police Department Protects the community through the enforcement of laws and the analysis/reduction/ elimination of risks and. in times of emergency, provides for the orderly and rapid implementation of emergency plans. Implements and/or enforces programs, plans, ordinances, and policies of the City over a wide range of activities related to law enforcement. The Police Department is a first responder in natural and manmade emergencies. • City of Chula Vista Fire Department Serves and safeguards the community through a professional, efficient and effective system of services, which protect life, environment, and property. Implements programs, policies, and regulations over a wide range to reduce the loss of life, environment, and property. The Fire Department is a first responder in natural and manmade emergencies. • City of Chula Vista Management & Information Services Department Assists all departments with their technological needs and develops, implements, operates, and maintains hardware and software systems in order to support and improve the operational efficiency and effectiveness of City departments. The department is comprised of four functional areas - Operations & Telecommunications, Systems Administration & Security, Microcomputer and LAN Support, and GIS & Applications Support. City of Chula Vista 5-21 SECTIOMFIVE Goals, Objectives and Actions Table 5.4-2 City of Chula Vista: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS H. Scientists familiar with the hazards of the community I. Emergency Coordinator J. Grant writers K. Personnel skilled in identifying, accessing and bringing to bear, both public and private economic recovery- related resources Y/N Y Y Y Y Y Y Y N Y Y Y Department/Agency and Position Development Services and Public Works Departments Development Services and Public Works Departments Development Services and Public Works Departments City Engineer and Building Official Public Works Department Development Services, Police, Fire, Management & Information Systems, and Public Works Departments. Information Technology Department City uses Consultant Scientists, as needed and as resources are available Fire Department-Tom Leonard, Emergency Services Coordinator All Departments Development Services and Finance Departments The legal and regulatory capabilities of Chula Vista are shown in Table 5.4-3 which presents the existing ordinances and codes that affect the physical or built environment of Chula Vista. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Chula Vista 5-22 SECTIOMFIVE Goals, Objectives and Actions Table 5.4-3 City of Chula Vista: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. T. U. Building code Zoning ordinance Subdivision ordinance or regulations Special puipose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) Growth management ordinances (also called "smart growth" or anti-sprawl programs) Site plan review requirements General or comprehensive plan A capital improvements plan An economic development plan An emergency response plan A post-disaster recovery plan A post-disaster recovery ordinance Real estate disclosure requirements Shake Roof Retrofit Program Water Conservation Ordinance Clearing of Brush (Fuels) from City Property National Pollutant Discharge Elimination System (NPDES) Land Development Ordinance California Building Code California Reference Standards Code California Mechanical Code Local Authority (Y/N) Y y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Does State Prohibit (Y/N) N N N N N N N N N N N N N N N N N N N N N City of Chula Vista 5-23 SICTIONFIVE Goals, Objectives and Actions Table 5.4-3 (cont.) City of Chula Vista: Legal and Regulatory Capability V. California Electrical Code W. California Plumbing Code X. California Fire Code Y. California Statutes 2 1000-21 178: Public Resources Code, Division 1 3 - Environmental Quality Z. Urban-Wildland Interface Code AA. Floodplain Regulations BB . Zoning and Specific Plans CC. Specific Plans DD. Precise Plan EE. Modified District FF. Sectional Planning Area (SPA) GG. SPA Amendment HH. Supplemental SPA II. Land Use Overlay JJ. Modification of Urban-Wildland Interface Requirements KK. Consolidated Annual Plan - CDBG and HOME Programs LL. Redevelopment Plans - Bay front, Town Centre I, Town Centre II, Otay Valley and Southwest Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N N N N N N N N N N N N N N N N N 5.4.12 Fiscal Resources Table 5.4-4 shows specific financial and budgetary tools available to Chula Vista such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Chula Vista 5-24 SECTBONFIVE Goals, Objectives and Actions Table 5.4-4 City of Chula Vista: Fiscal Capability Financial Resources A. Community Development Block Grants (CDBG) B . Capital improvements project funding C. Authority to levy taxes for specific purposes D. Fees for water, sewer, gas, or electric service E. Impact fees for homebuyers or developers for new developments/homes F. Incur debt through general obligation bonds G. Incur debt through special tax and revenue bonds H. Incur debt through private activity bonds I. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes, as resources are available and to the extent the funds are used to benefit eligible census tracts Yes, as resources are available Yes, but requires Proposition 218 Voter Approval (2/3 of all voters, simple majority of property owners). Voter approval highly unlikely in most cases. Yes, Sewer Fees only. City does not own or operate other utilities Yes, as resources are available Yes. as resources are available Yes. as resources are available Yes. Certificates of Participation only in redevelopment areas, but there are severe restrictions on usage and eligible projects. Yes 5.4.2 Goals, Objectives and Actions Listed below are Chula Vista's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities Once developed, City staff presented submitted the plan the CalEMA and FEMA for approval. Once approved by FEMA the plan will be taken to City Council for adoption. City of Chula Vista 5-25 SECTIBNFIVE Goals. Objectives and Actions Public comments were solicited by the County Office of Emergency Services to present these goals, objectives and actions to citizens and to receive public input. Specific consideration was given to hazard identification/profiles and the vulnerability assessment results. The following sections present the hazard- related goals, objectives and actions as prepared by the City of Chula Vista' in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.42.1 Goals The City of Chula Vista has developed the following 10 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 9 and 10). Goal 1. Promote disaster-resistant existing and future development Goal 2. Increase public understanding, support and demand for effective hazard mitigation Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards Goal 4. Improve coordination and communication with federal, state and local governments Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to: Goal 5. Floods Goal 6. Wildfires/Structure Fires Goal 7. Dam Failure Goal 8. Geologic Hazards Goal 9. Unauthorized Hazardous Materials Release (See Attachment A) Goal 10. Other Manmade Hazards (See Attachment A) 5.4.22 Objectives and Actions The City of Chula Vista developed the following broad list of objectives and actions to assist in the implementation of each of their 10 identified goals. The City of Chula Vista developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.4.2.3. City of Chula Vista 5-26 SECTIONFIVE Goals, Objectives and Actions Goal 1: Promote disaster resistant existing and future development. Objective ] A: Encourage and facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Action 1 .A.I Review the City's General Plan periodically and update the appropriate elements, as necessary, as resources are available. Action 1 A.2 Identify new hazardous occupancies as they are permitted or created and establish database for same, as resources are available. Action 1 A3 Update the City's zoning ordinance periodically and address development in hazard areas and minimize zoning ambiguities, as resources are available. Action 1 .A.4 Periodically revisit the City's hazard mitigation-related ordinances to identify areas where improvements could be made, as resources are available. Action 1 A.5 Utilize hazard overlays to identify hazard-prone areas, as resources are available. Action 1 .A.6 Establish buffer zones for development near hazard-prone areas, as resources are available. Action 1A .7 Prohibit development in extreme hazard areas that cannot be adequately mitigated and set aside for open space, as resources are available. Action 1 .A.8 Identify land uses appropriate to specific hazard areas, as resources are available. Objective 1J3: Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas. Action 1.B.1 Action 1.B.2 Action 1.B.3 Action 1.B.4 Action 1 .B.5 Action 1.B.6 Action 1.B.7 Adopt local building codes to address local building issues in hazard areas, as resources are available. Amend the Zoning and Subdivision Ordinances, as required, to implement the appropriate policies of the General Plan, as resources are available. Actively participate in the State- and Nation-wide building code development groups to ensure that development issues in hazard areas are properly addressed, as resources are available. Amend the Fire Code and Building Code, as necessary, to be consistent with the appropriate policies of the General Plan, as resources are available. Identify and improve buildings to mitigate hazards through elevation, retaining walls, dikes and flood diverting measures, relocating electrical outlets to higher elevations, increasing fire resistance, etc, as resources are available. Identify and provide fire mitigation measures in buildings with hazardous materials, add ventilation systems to minimize explosions, as required, and add control areas, as resources are available. Develop hazard-specific code requirements and/or technical opinions for each type of hazard area, as resources are available. City of Chula Vista 5-27 SECTIONI IYI Goals, OMectlves and Acdons Goal 1: Promote disaster resistant existing and future development (continued). Objective 1.B: Action 1.B.8 Action 1.B.9 Action 1.B.10 Objective 1 .C: Action I.C.I Action l.C. 2 Action l.C .3 Action l.C .4 Action l.C .5 Action l.C .6 Action l.C .7 Action 1 .C.8 Objective 1 J). Action 1.D.1 Action 1.D.2 Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas (continued). Develop standardized processes for evaluating proposed developments within hazard areas, as resources are available. Require site-specific studies to evaluate specific hazards in hazard-prone areas and identify alternative site design criteria to mitigate hazards to the maximum extent possible, as resources are available. Establish minimum structure setbacks adjacent to hazard areas, with respect to hazard specific code, as resources are available. Encourage consistent enforcement of general plans, zoning ordinances, and building codes. Periodically review General Plan, Zoning Ordinance, Fire Codes, Subdivision Ordinance, and Building Codes for consistency, as resources are available. Maintain ongoing training for development staff on development procedures and zoning and building code interpretation, as resources are available. Continue to provide a hazmit compliance review any time a permit is obtained for any improvement on new and existing hazardous occupancies, as resources are available. Develop and implement specialized training on an on-going basis for Development Services staff for each type of hazard area, as resources are available. Provide an inspection program, both public and private, and issue certificates of compliance to ensure maintenance of compliance to hazmit-related codes, as resources are available. Follow development procedures to ensure development is consistent with the General Plan. Provide educational sessions for owners of hazardous occupancies and encourage a maintenance program, as resources are available. Develop standard processes for evaluating/approving proposed development in hazard areas, as resources are available. Discourage future development that exacerbates hazardous conditions. Improve zoning ordinance to limit future development of hazardous areas, as resources are available. Apply for State/Federal grants/funds for the acquisition of developable land for open space development. City of Chula Vista 5-28 SICTMNFIVE Goals, Objectives and Actions Goal 1: Promote disaster resistant existing and future development (continued). Objective 1 .D: Action 1.D.3 Action 1.D.4 Action 1.D.5 Action 1 JD.6 Action 1.D.7 Objective 1 E: Action 1.E.1 Action 1.E.2 Action 1.E.3 Action 1 .E.4 Objective 1.F: Action I.F.I Action 1 .F.2 Action 1 JF.3 Discourage future development that exacerbates hazardous conditions (continued). Take a proactive approach to fire code/building code compliance inspections with respect to concentration of hazardous material in one area or location, as resources are available. Set aside or zone extreme hazard areas for open space uses, as resources are available. Evaluate the potential benefits of establishing buffer/transition zoning for each type of hazard area, as resources are available. Educate the public regarding hazardous locations, operations, buildings, etc., as resources are available. Where feasible, encourage the development of infrastructure to assist in the hardening of hazard exposure zones, as resources are available. Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. Use hazard overlays to identify hazard-prone new development, as resources are available. Utilize staff consultant expertise in evaluating technical studies/data, as resources are available. Update databases/Geographic Information System (GIS), with particular attention to maintaining hazard overlay layers. Require electronic submittals of all reports and data in electronic form. Require engineering studies to evaluate specific hazards in hazard-prone areas and identify alternative site design criteria to mitigate hazards to the maximum extent possible, as resources are available. Actively pursue grant funding for city wide hazard mitigation. Keep a look out for hazard mitigation funding, from state and nation-wide sources, and to inform the proper department head when potential grant funding is identified. Apply for hazard mitigation grant funding, as it becomes available. Identify target hazard mitigation projects to minimize delay when grant funding is available. City of Chula Vista 5-29 SECTIOMFIVE Coals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Action 2. A.I Action 2. A .2 Action 2. A .3 Action 2. A. 4 Action 2. A .5 Objective 2 £: Action 2. B.I Action 2.B. 2 Action 2.B. 3 Objective 2. C: Action 2. C.I Objective 2. D: Action 2. D.I Action 2.D.2 Action 2.D.3 Educate the public to increase awareness of hazards and opportunities for mitigation actions. Provide information pamphlets to be distributed to the public at information booths at street fairs, community meetings, etc., as resources are available. Continually provide Chula Vista citizens with Community Emergency Response Team training opportunities to increase public awareness of hazards and response to hazards, as resources are available. Provide a public information program on geologic and firestorm hazards and safety, as resources are available. Provide training at Town Hall Meetings or other public gatherings, as resources are available. Provide discussion, on City's home web page, regarding the dangers and repercussions of human activity within and adjacent to hazard zones and what our citizens can do to minimize/mitigate these dangers, as resources are available. Promote partnerships bet\veen the state, counties, and local governments to identify, prioritize, and implement mitigation actions. Identify state and federal hazard mitigation funds/programs for public and private entities. Continue to participate in the San Diego County Multi-Hazard Mitigation Plan process. Contact neighboring cities and counties to create shared programs and have periodic meetings to share information and open channels of communication, as resources are available. Promote hazard mitigation in the business community. Coordinate hazard mitigation education/ training with routine inspections of businesses utilizing code enforcement and fire prevention inspections, as resources are available. Monitor and publicize the effectiveness of mitigation actions implemented. Create a program to report and monitor the mitigation implementation, as resources are available. Provide newsletters or Internet sites to publicize the information gathered through the monitoring program, as resources are available. Provide specific outreach to citizens with special needs, as funding becomes available. City of Chula Vista 5-30 SICTIOMFIVE Goals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation (continued). Objective 2.E: Discourage activities that exacerbate hazardous conditions. Action 2.E.I Promote an increased level of security of facilities storing hazardous materials. Action 2.E.2 Ensure land uses that do not conform to this Plan are not permitted. Action 2.E.3 In the event non-conforming land uses are damaged or destroyed in a disaster, ensure that reconstruction is consistent with Chula Vista Municipal Code, Chapter 19.64. Action 2.E.4 Provide guidelines in the usage of hazardous materials specifically in approved locations, as resources are available. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practices among state, and local officials. Action 3.A.I Establish the means to share information and innovations in various areas of hazard mitigation, as resources are available. Action 3.A.2 Coordinate hazard mitigation activities with local utilities, water suppliers, and critical facilities within the City of Chula Vista, as resources are available. Objective 3.B: Seek technical assistance from State and Federal agencies in refining and implementing hazard mitigation plans. Action 3.B.I Seek State and Federal funding for implementation of the City's hazard mitigation plan. Action 3.B.2 Request periodic County Office of Emergency Services (OES), CalEMA, and FEMA review of the City's hazard mitigation plan for recommendations for plan refinements and for potential funding sources. Objective 3.C: Assure adequate infrastructure is in-place for emergencies. Action 3.C.I Promote the establishment and maintenance of: safe and effective evacuation routes; ample peak-load water supply; adequate road widths; and, safe clearances around buildings, as resources are available. Action 3.C.2 Explore viable public and private mutual aid resource alternatives. Action 3.C.3 Identify public and private resources available for various types of emergencies, including materials, equipment, debris removal/recycling, etc. Action 3.C.4 Establish emergency purchasing authority with local businesses, suppliers, disposal sites, and material recyclers, as resources are available. City of Chula Vista 5-31 S1CTIONFIVE Goals, Objectives and Actions Goal 4: Improve hazard mitigation coordination and communication with federal, state and local governments. Objective 4 A: Action 4. A.I Action 4. A .2 Objective 4.B: Action 4. B.I Action 4.B. 2 Action 4.B. 3 Objective 4.C: Action 4. C.I Action4.C.2 Establish and maintain close working relationships with state agencies and other local governments. Attend multi-agency hazard mitigation planning meetings that deal with other local governments and County, State, and Federal entities, as resources are available. Promote mutual aid agreements and interagency dialogue related to hazard mitigation planning, as resources are available. Encourage other organizations to incorporate hazard mitigation activities. Encourage businesses and industrial operations in embracing hazard mitigation as a daily activity, as resources are available. Promote hazard mitigation as a viable way of doing business for governmental entities, industry, businesses and the general public, as resources are available. Where applicable, discuss hazard mitigation plan activities with fellow municipal government workers within professional membership groups at group activities, as resources are available. Improve the State's capability and efficiency at administering pre- and post-disaster mitigation. Establish standard G1S projects that contain all spatial data likely to be needed in an Emergency Operations Center and make these projects available to all local, regional and State governments, as resources are available. Safeguard the projects by storing in multiple locations. Promote the sharing of these projects and data with other agencies. Support regional planning efforts for hazard mitigation and disaster recovery planning. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to floods. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 5.A.1 Encourage the establishment or maintenance of adequate open space adjacent to watercourses, as resources are available. Action 5.A.2 Prevent deposit of fill or construction within any floodway, as resources are available. Action 5.A.3 Update Drainage Element of the General Plan based upon actual developed conditions (General Plan, GMOC Section), as resources are available. City of Chula Vista 5-32 SECTIONI IYI Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to floods (continued). Objective 5 A: Action 5. A .4 Action 5 .A .5 Objective 5.B: Action 5. B.I Action 5.B. 2 Action 5.B. 3 Objective 5.C: Action 5. C.I Action 5.C. 2 Action 5.C. 3 Objective 5.D. Action 5. D.I Action 5.D. 2 Develop a comprehensive approach to reducing the possibility of damage and losses due to floods (continued). Continue to review applications for new development within the City in compliance with the California Environmental Quality Act (CEQA) provisions set forth by the State of California, thereby requiring individualized studies for flood hazards on an as-needed basis and establishing mitigation measures for the development project before construction begins. Monitor and enforce compliance with CEQA-mandated mitigation measures during development and construction, as the project requires. Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Continue to require flood control improvements of new development where flooding is already a problem (existing ordinances). Update Drainage Element of the General Plan based upon actual developed conditions (General Plan, GMOC Section), as resources are available. Discourage the disruption of natural flowage patterns and encourage the maximum use of natural and naturalized drainage ways in new development (General Plan drainage and flood control policies), as resources are available. Minimize repetitive losses caused by flooding. Maintain databases of property flooding and damage to further identify and define local hazard areas and to monitor floodplain management, as resources are available. Implement drainage improvements with an emphasis on improving downstream facilities before improving upstream facilities, unless upstream mitigation (such as detention or retention basins) is provided, as resources are available. Identify State and Federal funding sources available to either purchase or flood-proof existing structures/facilities in flood-prone areas. Request assistance from State and Federal governments, as necessary, to enable the City to maintain compliance with the National Flood insurance Program (NF1P) requirements. Periodically review City compliance with NFIP requirements, as resources are available. Submit Letters of Map Revision (LOMRs)/ Letters of M^ap Amendment (LOM As) to FEMA within a prescribed period of time upon completion of drainage improvements or flood-proofing. City of Chula Vista 5-33 SECTIONFIVE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to floods (continued). Objective 5.D: Request assistance from State and Federal governments, as necessary, to enable the City to maintain compliance with the National Flood insurance Program (NFIP) requirements (continued). Action 5.D.3 Update Flood layers in GIS upon FEMA approval of LOMRs/LOMAs. Objective 5.E: Identify data limitations needed to provide information about relative vulnerability of assets from floods (e.g., Q3 /digital floodplain maps) Action 5.E.I Update General Plan drainage policies using current data based upon actual, developed conditions and proposed development conditions, as resources are available. Action 5.E.2 Utilize empirical data to further define flood hazard models, as resources are available. Goal 6: Redi part own Objective 6 A: Action 6. A.I Action 6 A. 2 Action 6. A .3 Objective 6.B: Action 6. B.I Action 6.B. 2 uce the possibility of damage and losses to existing assets, icularly people, critical facilities/infrastructure, and publicly ed facilities, due to wildfires and structural fires. Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Ensure the open space around structures is sufficient to promote fire safety, as resources are available. Ensure the space separating buildings is consistent with the standards of fire-safety practices, as resources are available. Continue to review applications for new development within the City in compliance with the California Environmental Quality Act (CEQA) provisions set forth by the State of California, thereby requiring individualized studies (i.e. Fire Protection Plans) for wildfire on an as-needed basis and establishing mitigation measures for the development project before construction begins. Prevent the loss of life in wildland fires. Develop and promote public education programs, including Fire Safe Councils, in wildland fire safety and survival for all residents adjacent to wildland areas, as resources are available. Develop and publicize evacuation plans and routes in areas threatened by wildland fires, as resources are available. City of Chula Vista 5-34 SICTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to wildfires and structural fires (continued). Objective 6.B: Prevent the loss of life in wildland fires (continued). Action 6.B .3 Add a Fire Educational Officer to the Fire Department's budget to implement Action 6.B.I and ensure that the position is filled and has adequate resources, as resources are available. Action 6.B.4 Manage open space preserves in a manner that minimizes fuel loads, through actions such as hand clearing and other appropriate means, as resources are available. Action 6.B.5 Add a Fire Prevention Technician to the Fire department's budget to perform fire department open space and weed abatement inspections in support of goal six and ensure that the position is filled and has adequate resources, as resources are available. Objective 6.C: Prevent the ignition of structures by wildland fires. Action 6.C.I Incorporate fire-resistant building materials and construction methods in new development adjacent to wildland and open space areas in accordance with adopted fire, building, wildland-urban interface codes, fire protection plans and community wildfire protection plan, as resources are available. Action 6.C.2 Ensure defensible fire-fighting space is afforded adjacent to wildland and open space areas in new developments, as resources are available. Objective 6.D: Prevent wildland-caused structural conflagration. Action 6.D.1 Pursue State and Federal funding for the elimination of combustible roofs and siding on existing homes and structures. Action 6.D.2 Adopt an ordinance requiring "Class A-rated"' roofs and siding on all new and remodeled structures. Action 6.D.3 Require non-combustible window assemblies and double-pane glass in all new and remodeled structures facing a wildland, as resources are available. Action 6.D.4 Adopt an ordinance requiring residential dwelling fire sprinkler systems adjacent to fire hazard areas. Objective 6.E: Prevent the encroachment of wildland fire upon the community. Action 6.E.I Require a "greenbelt" or other defensible zone, as topography dictates, along the easterly edge of the easterly city limits, as resources are available. Action 6.E.2 Improve and ensure adequate access to wildland areas and adequate water supply for firefighters, as resources are available. Action 6.E.3 Increase budget to the Public Works Open Space Maintenance for brush clearing, as resources are available. City of Chula Vista 5-35 SECTIONFI YE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to wildfires and structural fires (continued). Objective 6.F: Investigate the possibility of doing further Community Vegetation Management Analysis. Action 6.F.1 Prepare a Community Wildfire Protection Plan, as resources are available. Action 6.F.2 Investigate the possibility of adopting a final Community Wildfire Protection Plan and ensure the enforcement thereof, as resources are available. Action 6.F.3 Apply for grant funds to finance individual structure and property hazard analysis/ assessments throughout wildland-urban interface areas, as grants are available. Objective 6.G: Identify data needed to provide information related to wildland fires (e.g., a comprehensive database of California wildfires, a California wildfire risk model, and relative vulnerability of assets). Action 6 G.I Develop GIS layer(s) showing history and frequency of major wildland fire events, as resources are available. Include additional layers showing canyon names, acreage, fire department access points and evacuation routes. Action 6 G.2 Continue working with regional (SDREGIN) and federal agencies to establish procedures that will enable the City to acquire near real-time data on wildland fire extents to improve EOC response to an emergency. Establish a GIS project model that readily incorporates such data to reduce the amount of time required to produce field maps, as resources are available. Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to dam failure. Objective 7 A: Develop a comprehensive approach for reducing the possibility of damage and losses due to dam failure. Action 7.A.1 Promote low intensity, non-residential land uses in dam inundation zones for future development. Action 7.A.2 Continue to review applications for new development within the City in compliance with the California Environmental Quality Act (CEQA) provisions set forth by the State of California, thereby requiring individualized studies for flood hazards on an as-needed basis and establishing mitigation measures for the development project before construction begins. Action 7.A.3 Monitor and enforce compliance with CEQA mandated mitigation measures during development and construction, as the development project requires. City of Chula Vista 5-36 SECTIONFI YE Coals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to dam failure (continued). Objective 7 A: Develop a comprehensive approach for reducing the possibility of damage and losses due to dam failure (continued). Action 7.A.4 Review current dam failure information/data for clarity and accuracy, as resources are available. Action 7.A.5 Review current evacuation plans for accuracy and practicality and publicize these plans, as resources are available. Action 7 .A .6 Obtain and review State-mandated annual dam assessment reports. Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of dam failure. Action 7.B.] Identify and prioritize critical facilities within dam inundation zones, as resources are available. Action 7.B.2 Identify vulnerable populations within dam inundation areas, as resources are available. Action 7.B.3 Identify Federal and State funding to minimize/mitigate dam inundation hazards to critical facilities and vulnerable populations. Objective 7.C: Identify data needed to provide information about the relative vulnerability of assets from dam failure. Action 7.C.I Revise plans/data periodically to adequately represent existing conditions/ vulnerable populations, as resources are available. Action 7.C.2 Conduct survey of assets within dam inundation areas and assign attribute data to a GIS layer (daytime vs. nighttime population, ease of evacuation, proximity to safety zones, etc.); Assign vulnerability rankings to each asset; Create GIS project with dam inundation and asset layers available for query and display, all as resources are available. Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to geological hazards. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 8.A.1 Ensure the space separating buildings is consistent with standards of fire-safety practices, as resources are available. City of Chula Vista 5-37 SICTIONFIVE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to geological hazards (continued). Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards (continued). Action 8.A.2 Ensure the structural characteristics of soil and requirements contained in building codes determine the type of construction allowed, as resources are available. Action 8 A3 Ensure areas of development do not include hazard areas such as ancient landslides, unstable soils, or active fault zones unless mitigated, as resources are available. Action 8.A.4 Ensure no lands are subdivided, developed or filled in the absence of supportable, professional evidence that the proposed subdivision, development, or landfill would be geologically safe, as resources are available. Action 8.A.5 Continue to review applications for new development within the City in compliance with the California Environmental Quality Act (CEQA) provisions set forth by the State of California, thereby requiring individualized studies for geological hazards on an as-needed basis and establishing mitigation measures for the development project before construction begins. Action 8.A.6 Monitor and enforce compliance with CEQA mandated mitigation measures during development and construction, as the development project requires. Objective 8£: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Action 8.B.1 Wherever feasible, land uses and buildings that are determined to be unsafe from geologic hazards shall be mitigated, discontinued, removed, or relocated, as resources are available. Action 8.B.2 Establish a long-range, comprehensive plan for the elimination or mitigation of existing hazardous land use conditions and public facilities, as resources are available. Action 8.B.3 Seek State and Federal funding to mitigate existing geologic hazards. Objective 8.C: Coordinate with and support existing efforts to mitigate geological hazards (e.g., California Geological Survey, US Geological Survey). Action 8.C.1 Update GIS seismic data regularly to reflect new data from the California Geological Survey and the US Geological Survey, as resources are available. Action 8.C.2 The City's seismic safety practices and measures shall be coordinated with the San Diego Association of Governments (SANDAG), the County of San Diego, and other cities in the County, as resources are available. City of Chula Vista 5-38 SICTIOMFIVE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and publicly owned facilities, due to geological hazards (continued). Objective 8.D: Identify data needed to provide information about the relative vulnerability of assets from earthquakes (e.g., data on structure/building types, reinforcements, etc.). Action 8.D.I Ensure the seismic safety practices and measures of the City of Chula Vista are based upon special land regulations and land management zones, such as "seismic hazards management zones" that require additional general and local geologic information and the synthesis of seismic safety, as resources are available. Action 8.D.2 Update existing geologic hazard information based upon up-to-date findings, such as Preliminary and Final As-Graded Soils Reports for Land Development, as resources are available. Action 8.D.3 Survey buildings most susceptible to failure and identify daytime and nighttime populations and create G1S project to permit rapid data display and query, as resources are available. Objective 8.E: Assure that emergency service facilities and public buildings are not constructed in hazard areas. Action 8.E.I Since damages can often be prevented or mitigated by effective governmental and emergency services, ensure that emergency facilities, public buildings, and communication and transportation centers are not established in close proximity to fault traces, as resources are available. Action 8.E.2 Establish minimum criteria using all available hazard information in the selection of appropriate sites for emergency service facilities and public buildings, as resources are available. 5.42.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed weighing STAPLEE criteria The Disaster Mitigation Act of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: City of Chula Vista 5-39 SECTIONFIVE Goals, Objectives and actions Action Item #1: Establish standard GIS projects that contain all spatial data likely to be needed in an Emergency Operations Center and make these projects available to all local, regional and State governments, as resources are available. Safeguard the projects by storing in multiple locations. Promote the sharing of these projects and data with other agencies. Coordinating Individual/Organization: All Team Members (Inter-Departmental) Potential Funding Source: General Fund Implementation Timeline: 1-3 Years Action Item #2: Ensure new land uses that do not conform to this Plan are not permitted. Coordinating Individual/Organization: Development Services Department Potential Funding Source: Development Fees, General Fund Implementation Timeline: 1-5 Years Action Item #3: Develop and promote public education programs, including Fire Safe Councils, in wildland fire safety and survival for all residents adjacent to wildland areas, as resources are available. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: 1 -3 Years Action Item #4: Prepare a Community Wildfire Protection Plan, as resources are available. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: 1 -3 Years Action Item #5: Explore viable public and private mutual aid resource alternatives. Coordinating Individual/Organization: All Team Members (Inter-Departmental) Potential Funding Source: Solid Waste Fees, Solid Waste Grants, General Fund Implementation Timeline: 1-3 Years Action Item #6: Continue to participate in the San Diego County Multi-Hazard Mitigation Plan process. Coordinating Individual/Organization: Interdepartmental Responsibility Potential Funding Source: General Fund, HMGP funding Implementation Timeline: 5 Years City of Chula Vista 5-40 SECTIONFIVE Goals, Objectives and Actions Action Item #7: Continue to review applications for new development within the City in compliance with the California Environmental Quality Act (CEQA) provisions set forth by the State of California, thereby requiring individualized studies for flood hazards on an as-needed basis and establishing mitigation measures for the development project before construction begins. Coordinating Individual/Organization: Development Services Department Potential Funding Source: General Fund, Development Fees Implementation Timeline: 5 Years Action Item #8: Continually provide citizens with Community Emergency Response Team training opportunities to increase public awareness of hazards and response to hazards, as resources are available. Coordinating Individual/Organization: Fire Department Potential Funding Source: State Homeland Security Grant Program, General Fund Implementation Timeline: 5 Years Action Item #9: Continue to require structural flood control improvements of new development where flooding is already a problem (existing ordinances). Coordinating Individual/Organization: City Engineer Potential Funding Source: General Fund, Developer Fees Implementation Timeline: 5 Years Action Item #10: The Fire Department, via its Fire Prevention Bureau, will continue to cooperate with the County Department of Environmental Health in promoting the safe handling of hazardous chemicals in compliance with the Unified Fire Code and applicable Hazardous Materials Regulations. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: 5 Years City of Chula Vista 5-41 SECTIONFI YE Goals, Objectives and Actions This page intentionally left blank City of Chula Vista 5-42 SECTIONFIVE Goals, Objectives and Actions 5.5 CITY OF CORONADO The City of Coronado (Coronado) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Coronado summarized in Table 5.5-1. See Section 4.0 for additional details. Table 55-1 Summary of Potential Hazard-Related Exposure/Loss in Coronado Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 580 0 23,009* Residential Number of Residential Buildings 261 0 9,541* Potential Exposure/Loss for Residential Buildings (x$1,000) 73,472 0 2,685,792* Commercial Number of Commercial Buildings 1 0 470* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 4,482 0 2,106,399* Critical Facilities Number of Critical Facilities 0 0 37** Potential Exposure for Critical Facilities (x$1,000) 0 0 123,222** Flood (Loss) 100 Year 500 Year 2,853 3,868 1,227 1,715 345,401 482,773 30 46 134,451 206,158 4 4 2,198 2,198 Rain-Induced Landslide High Risk 0 Moderate Risk 0 Tsunami 8,523 0 0 3,367 0 0 947,811 0 0 98 0 0 439,207 0 0 23 0 0 7,227 Wildfire / Structure Fire Extreme 0 Very High 19 High 0 Moderate 18,868 0 0 0 8,097 0 0 0 2,279,306 0 0 0 428 0 0 0 1,918,168 0 0 0 31 0 0 0 125,204 Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Coronado 5-43 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Coronado LPG as their top four. A brief rational for including each of these is included. • Earthquake: The potential for loss of life, injuries, and damage to property, as well as disruption of services, is significant. • Coastal Storms/Flooding: Jurisdiction is surrounded by water. Coastal storms and flooding have potential to cause losses. • Tsunami: Jurisdiction is surrounded by water. There has been a history of tsunami effects felt in the region. • Manmade Hazards: The community hosts several sites/assets within and surrounding the jurisdiction that may be at risk for potential manmade hazards. 5.5.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Coronado's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.5.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Coronado and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Coronado, as shown in Table 5.5-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Coronado 5-44 SICTIONFIVE Goals, Objectives and Actions Table 55-2 City of Coronado: Administrative and Technical Capacity Staff/Personnel Resources A. Pianner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y N N N Y Y N Y N Department/Agency and Position Community Development/ Associate Planner Community Development/Senior Building Inspector Fire/Division Chief; Community Development/Senior Planner; Engineering/Principal Engineer; Public Services/Services Supervisor Public Services, Technicians Police and Fire Chiefs The legal and regulatory capabilities of Coronado are shown in Table 5.5-3, which presents the existing ordinances and codes that affect the physical or built environment of Coronado. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Coronado 5-45 SECTIBNFIVE Goals, Objectives and Actions Table 5.5-3 City of Coronado: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y N Y Y Y N Y Y Y Y Does State Prohibit? (Y/N) N N N N N N N N N N N N N 5.5.1.2 Fiscal Resources Table 5.5-4 shows specific financial and budgetary tools available to Coronado such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Coronado 5-46 SICTIONFIVE Goals, Objectives and Actions Table 5.5-4 City of Coronado: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. Community Deveiopment Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas J, K. Other -SAN DAG Grant Other - Other Grants Accessible or Eligible to Use (Yes/No) Yes - Eligible in certain circumstances Yes - With Council approval Yes - With 2/3 voter approval Yes - For sewer only No Yes - With 2/3 voter approval Yes - With 2/3 voter approval No Yes No Yes 5.5.2 Goals, Objectives and Actions Listed below are Coronado's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition. City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works participated in the Coronado LPG. These members include: • John Traylor, Director of Fire Services • Ed Hadfield, Fire Division Chief • Ed Walter, Community Development Senior Planner • Scott Huth, Public Services Supervisor Once developed, City staff submitted the plan to Cal EMA and FEMA for approval. Once the plan is approved it will be submitted to the City Council for adoption. City of Coronado 5-47 SECTIOHFIVE Goals, Objectives and Actions The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by Coronado's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.5.2.1 Goals The City of Coronado has developed the following 11 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 10 and 11). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding, support, and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to": Goal 5. Floods Goal 6. Urban Conflagrations Goal 7. Severe Weather Goal 8. Dam Failure Goal 9. Geological Hazards Goal 10. Extremely Hazardous Materials Releases Goal 11. Other Manmade Hazards 5.5.2.2 Objectives and Actions The City of Coronado developed the following broad list of objectives and actions to assist in the implementation of each of their 11 identified goals. The City of Coronado developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.5.2.3 City of Coronado 5-48 SECTIONFI YE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development. Objective 1 A: Maintain and update the general plans and zoning ordinances to limit development in hazard areas. Action 1 A1 Continue to enforce existing general plan policies to limit development in hazard zones. Objective 1 .B: Maintain and update building codes that protect renovated existing assets and new development in hazard areas. Action 1.B.1 Continue to adopt building codes on a regular basis Objective 1 .C: Encourage consistent enforcement of general plans, zoning ordinances, and building codes. Action 1 .C.1 Educate people responsible for enforcing codes Objective ID: Discourage future development that exacerbates hazardous conditions. Action 1 .D. 1 Educate the public on known hazards Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2 A 1 Conduct Community Emergency Response Team Training Action 2 A 2 Release pertinent information through an Emergency Preparedness newsletter Action 2 A 3 Conduct Learn Not to Burn Classes in local schools Action 2 A 4 Release public education information on local cable TV. Objective 2.B: Promote partnerships between the state, county and local governments to identify, prioritize, and implement mitigation actions. ... _ R . Participate in Hazard Mitigation programsMciion Z,D. i At' 2 B 2 Participate in the Unified Disaster Council Objective 2.C: Promote hazard mitigation in the business community. Action 2.C. 1 Conduct Fire Company Inspections Action 2 C 2 Require fire sprinkler systems in all occupancies except R3s City of Coronado 5-49 SECTIONFI YE Goals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation, (continued) Objective 2.C: Promote hazard mitigation in the business community (continued). Action 2.C.3 Provide Community Emergency Response Team training to the business community Objective 2.D: Monitor and publicize the effectiveness of mitigation actions implemented. Action 2.D.1 Publish an Emergency Preparedness Newsletter quarterly Action 2.D.2 Release information to the public through the media Action 2.D.3 ^e'aY useful information through the Coronado Currents Newsletter Objective 2.E: Discourage activities that exacerbate hazardous conditions. Action 2.E.1 Conduct community education through newsletters, media releases and community forums Action 2 E 2 Enforcement of actions that are in violation of Federal, State or local laws or codes Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.1 Conduct EOC training and drills Objective 3.B: Develop model hazard mitigation plan. Action 3.B.1 Participate in Hazard Mitigation Work Group Objective 3.C: Provide web-based information regarding hazard mitigation on City web site. Action 3.C.1 Provide current information on emergency preparedness on City web-site Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 4.A.1 Work with the UDC at County OES City of Coronado 5-50 SECTIONFI YE Goafs, Objectives and Actions Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments, (continued) Objective 4.B: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation . Action 4.B.1 Provide NIMS/SEMS/ICS training for City personnel Action 4.B.2 Conduct EOC drills Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 5.A.1 Investigate methods to enhance survivability in low-lying areas Action 5.A.2 Purchase/maintain equipment for water removal in area prone to flooding Action 5.A.3 Maintain infrastructure in known flood areas Action 5.A.4 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Periodically review City compliance with NFIP requirements, as resources become available. Objective 5.B: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 5.B.1 Make contacts and develop a network during EOC exercises Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to urban conflagrations. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to urban conflagrations. Action 6.A.1 Provide additional staffing and apparatus Action 6.A.2 Coordinate mutual/automatic aid agreements Action 6.A.3 Develop and enhance existing sprinkler ordinance Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of urban conflagrations. Action 6.B.1 Develop and enhance existing sprinkler ordinance Action 6.B.2 Coordinate mutual/automatic aid agreements City of Coronado 5-51 SECTIONFI YE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to urban conflagrations. Action 6.B.3 Provide additional staffing and apparatus Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to severe weather (e.g., El Nino storms/, thunderstorms, lightening, tsunamis, and extreme temperatures). Objective 7A: Develop a comprehensive approach to reducing the possibility of damage and losses due to severe weather. Action 7.A.1 Provide public education through Community Emergency Response Team training Objective IS: Protect existing assets with the highest relative vulnerability to the effects of weather. Action 7.B.1 Maintain the infrastructure responsible for moving water Action 7.B.2 Maintain equipment for moving water during a storm Objective 7.C: Coordinate with and support existing efforts to mitigate severe weather (e.g.. National Weather Service). Action 7.C.1 Include the NWS and the NOAA in our EOC Drills Objective ID: Minimize losses due to Tsunamis Action 7.D.1 Become a Tsunami Ready City Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to dam failure. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 8.A.1 This action items for Goal 7 also apply to these objectives. Objective 8J3: Protect existing assets with the highest relative vulnerability to the. effects of dam failure. Action 8.B.1 This action items for Goal 7 also apply to these objectives. City of Coronado 5-52 SECTIONFIYE Coals, Objectives and Actions Goal 9: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards. Objective 9 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 9.A.1 Maintain construction in fault zones Action 9.A.2 Ensure all development in fault zones avoids or withstands geological hazards Objective 9.B: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Action 9.B.1 Confirm building standards for new and existing buildings for geological hazards Objective 9.C: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from earthquakes (e.g., data on structure/building types, reinforcements, etc.). 5.5.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 9 prioritized mitigation actions as well as an implementation strategy for each are: Action Item # 1: Increase and enhance EOC Operations Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Fire Department Budget Implementation Timeline: On-going - Completed through training Action Item # 2: Continue to support and maintain Community emergency Response Team (CERT) Program Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Fire Department Budget Implementation Timeline: On-going City of Coronado 5-53 SECTIONFIVE Goals, Objectives and Actions Action Item # 3: Continue to develop pre-incident plan to mitigate hazards and maximize response Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Fire Department Budget Implementation Timeline: January 2010 - December 2014 Action Item # 4: Continue to participate in the Multi-Jurisdiction Hazard Mitigation Plan planning process. Implement as much of the plan as practical Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Emergency Preparedness Department Budget Implementation Timeline: January 2010 - December 2014 Action Item # 5: Use an the City Website to educate the public Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Fire Department Budget Implementation Timeline: On-going Action Item # 6: NIMS/SEMS/ICS training for city personnel Coordinating Individual/Organization: Fire Department Potential Funding Source: Coronado Fire Department Budget Implementation Timeline: On-going Action Item # 7: Participate in the Regional Exercise and Training Program Coordinating Individual/Organization: Fire Department Potential Funding Source: Grant Funds Implementation Timeline: Annual, on-going Action Item # 8: Update Emergency Preparedness guidelines for the City of Coronado Coordinating Individual/Organization: Fire Department Potential Funding Source: Funding sources not identified at this time Implementation Timeline: During 2010 and on a regular basis afterwards Action Item # 9: Become a Tsunami Ready City Coordinating Individual/Organization: Fire Department Potential Funding Source: Funding sources not identified at this time Implementation Timeline: January 2010 - December 2011 City of Coronado 5-54 SMTIONFIVE Goals, Objectives and Actions 5.6 CITY OF DEL MAR The City of Del Mar (Del Mar) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Del Mar summarized in Table 5.6-1. See Section 4.0 for additional details. Table 5.6-1 Summary of Potential Hazard-Related Exposure/Loss in Del Mar Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 17 1,139 4,591* Residential Number of Residentia I Buildings 10 612 2,537* Potential Exposure/Los sfor Residential Buildings (x$1,000) 2,815 172,278 714,166* Commercial Number of Commercial Buildings 0 47 220* Potential Exposure/Los sfor Commercial Buildings (x$1,000) 0 210,640 985,974* Critical Facilities Number of Critical Facilities 0 13 24** Potential Exposur efor Critical Facilities (x$1,000) 0 2,579 8,968** Flood (Loss) 100 Year 500 Year 813 1,062 435 567 122,453 159,611 42 47 188,231 210,640 7 8 578 2,578 Rain-Induced Landslide High Risk Moderate Risk 0 0 Tsunami | 1,023 0 0 542 0 0 152,573 0 0 35 0 0 156,860 0 0 6 0 0 2,385 Wildfire / Structure Fire Extreme Very High High Moderate 0 7 16 3,332 0 5 9 1,836 0 1,408 2,534 516,834 0 0 1 178 0 0 4,482 797,743 0 0 0 20 0 0 0 8,965 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Del Mar 5-55 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Del Mar LPG as their top five. A brief rational for including each of these is included. • Coastal Storm/Erosion - Constant and historical. • Wildfire - Periodic Santa Ana conditions and fuel loads. • Landslide - Coupled with above and earthquake/tsunami. • Earthquake - Proximity to local faults. • Tsunami - Proximity to Pacific Ocean. 5.6.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Del Mar's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.6.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Del Mar and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Del Mar, as shown in Table 5.6-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or rnanmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Del Mar 5-56 SECTIONFIVE Goals, Objectives and Actions Table 5.6-2 City of Del Mar: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y N Y Y Y Y N Department/Agency and Position Planning & Community Development Engineering (RBF Consulting) and Building (Esgil Corporation) Planning & Community Development, Fire and Public Works Planning & Community Development Engineering (RBF Consulting) Planning & Community Development, Fire, Public Works & Community Services SANDAG & Engineering (RBF Consultants) Consultants Fire Department - Director of Public Safety (Fire Chief) The legal and regulatory capabilities of Del Mar are shown in Table 5.6-3, which presents the existing ordinances and codes that affect the physical or built environment of Del Mar. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Del Mar 5-57 SICTIONFIVE Goals, Objectives and Actions Table 5.6-3 City of Del Mar: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. Local Coastal Plan 1. A capital improvements plan J. An economic development plan K. An emergency response plan L. A post-disaster recovery plan M. A post-disaster recovery ordinance N. Real estate disclosure requirements Local Authority - (Y/N) Y Y Y Y Y Y Y Y Y N Y N N Y Does State Prohibit (Y/N) N N N N N N N N N N N N N N 5.6.1.2 Fiscal Resources Table 5.6-4 shows specific financial and budgetary tools available to Del Mai' such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, clean water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Del Mar 5-58 SECTIONFIVE Goals, Objectives and Actions Table 5.6-4 City of Del Mar: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H, Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas J. K. Other -SANDAG Grant Other - Other Grants Accessible or Eligible to Use (Yes/No) Y Y Y - Vote required Y N Y Y - Vote required N N N N 5.6.2 Goals, Objectives and Actions Listed below are Del Mar's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works participated in the Del Mar LPG. These members include: • Pat Vergne, Community Services Director • Mark Muir, Fire Chief • Robert Scott, Fire Marshall • David Scherer, Public Works Director • Adam Birnbaum, Planning Manager • Richard Lucera, Development Review Manager, RBF Consulting City of Del Mar 5-59 SECTIONFIVE Goals, Objectives and Actions Once developed, City staff submitted the final plan to the State of California and the Federal Emergency Management Agency (FEMA) for approval. Once approved by FEMA, the plan will be taken to the Del Mar City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by Del Mar's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.6.2.1 Goals The City of Del Mar has developed the following five Goals for their Hazard Mitigation Plan (See Attachment A for Goal 6). Goal 1. Promote public understanding, support and demand for hazard mitigation. Goal 2. Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Goal 3. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to floods. Goal 4. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to wildfires. Goal 5. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to costal erosion and geological hazards. 5.6.2.2 Objectives and Actions The City of Del Mar developed the following broad list of objectives and actions to assist in the implementation of each of their 6 identified goals. The City of Del Mar developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.6.2.3. Goal 1: Promote public understanding, support and demand for hazard mitigation. Objective 1 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 1 .A.1 Institutionalize hazard mitigation into City's planning efforts City of Del Mar 5-60 SECTIONFI YE Goals, Objectives and Actions Goal 1: Promote public understanding, support and demand for hazard mitigation (continued). Objective 1 A: Action 1 .A.2 Objective 1 .B: Action 1.B.1 Action 1.B.2 Objective 1 .C: Action 1.C.1 Action 1.C.2 Objective ID: Action 1.D.1 Action 1.D.2 Objective 1 E: Action 1.E.1 Action 1.E.2 Educate the public to increase awareness of hazards and opportunities for mitigation actions (continued). Public workshops to discuss particular hazards and related mitigation measures Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Coordinate with regional efforts to share resources and knowledge Streamline policies to eliminate conflicts and duplication of effort Promote hazard mitigation in the business community. Use the Del Mar Village association as a conduit for information Explore opportunities to work with public/private partnerships Monitor and publicize the effectiveness of mitigation actions implemented locally. Utilize City web page, press releases and public meetings Train and review with staff implemented programs as part of regular training Discourage activities that exacerbate hazardous conditions. Make hazard mitigation part of the planning and approval process Continued Code Enforcement activities targeting these conditions Goal 2: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 2 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 2.A.1 Maintain partnerships in mitigation and disaster planning Action 2.A.2 Explore opportunities for additional funding through cooperative efforts Objective 2.B: Encourage other organizations to incorporate hazard mitigation activities. Action 2.B.1 Work with business and environmental community to understand importance of hazard mitigation planning. Objective 2.C: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation. Action 2.C. 1 Find additional training opportunities for staff City of Del Mar 5-61 SiCTKONFIYE Coals, Objectives and Actions Goal 2: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments (continued). Objective 2.C: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation (continued). Action 2.C.2 Continue participation in the regional Training and Exercise Program Action 2.C.3 Make this institutional for the staff Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods. Objective 3 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 3.A.1 Clear identification of potential flood prone areas Action 3.A.2 Promote monitoring and maintenance of flood control channels Action 3.A.3 Develop pre-incident action plans for affected areas Action 3.A.4 Complete the Flood Hazard Mitigation Plan Action 3.A.5 Investigate the feasibility of moving the Public Works Yard to a site outside of the flood zone. Objective 3£: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 3.B.1 Streamline policies to eliminate conflicts and duplication of effort Action 3.B.2 Enforce regulatory measures related to development within 100-year flood plain. Periodically review the City's compliance with NFIP regulations, as resources become available Objective 3.C: Minimize repetitive losses caused by flooding Action 3.C.1 Restrict ability to re-build unless mitigation measures to avoid repeats are taken Objective 3D: Address identified data limitations regarding the lack of information about relative vulnerability of 'assets from floods Action 3.D.1 Work with regional agencies, (OES, UDC, SanGIS) to accurately map affected areas Action 3.D.2 Share and train with acquired information with all city department's and personnel Action 3.D.3 Continue to coordinate with neighboring jurisdictions on joint training opportunities between staffs City of Del Mar 5-62 SECTIONFIVE Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires. Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Action 4.A.1 Continue to annually review and update wildland pre-plans for firefighting forces Action 4.A.2 Continue to maximize utilization of outside firefighting equipment and staff resources Action 4.A.3 Continue to implement Fire Code enhancements for wildiand-urban interface Objective 4.B: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., County or San Diego & State of California). Action 4.B.1 Continue to implement mitigation measures to enhance protection of homes along Crest Canyon and the urban/wildland interface. Action 4.B.2 Work in conjunction and cooperation with City of San Diego to achieve mitigation efforts Action 4.B.3 Coordinate with other agencies to ensure consistency among standards Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to coastal erosion and geological hazards. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 5.A.1 Continue to explore strategies and opportunities for sand replenishment Action 5.A.2 Implement the certified local coastal program Action 5.A.3 Continue efforts to relocate the train tracks off the coastal bluff region Action 5.A.4 Implement the plans to retrofit the first of three coastal highway bridges while pursuing funding for the retrofitting of the other two Action 5.A.5 Monitor existing protective measures to assure continued improvement and effectiveness in addressing the effects of geological hazards, local land mass and infrastructure Objective 5.B: Protect existing assets with the highest relative vulnerability to the effects of geological Jmzards. Action 5.B.1 Continue administration of local coastal program to address bluff protection measures Action 5.B.2 Monitor existing protective measures taken to assure their continued effectiveness City of Del Mar 5-63 SECTIONFIVE Goals, Objectives and Actions 5.6.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Priority Action #1: Complete the Flood hazard Mitigation Plan Coordinating Individual/Organization: Planning & Community Development, Fire Department, and Assistant City Manager Potential Funding Source: FEMA Grant Implementation Timeline: January 2010 to December 2011 Priority Action #2: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Continue efforts to relocate the train tracks off the coastal bluff region. Implement plans to retrofit the first of three coastal highway bridges while pursuing funding for the retrofitting of the remaining two. Monitor existing protective measures to assure continued improvement and effectiveness in addressing the effects of geological hazards local land mass and infrastructure. Coordinating Individual/Organization: Planning & Community Development Potential Funding Source: General Fund, Grants and Private Funding Implementation Timeline: On-going Priority Action #3: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., County of San Diego & State of California). Implement mitigation measures to enhance protection of homes along and in the Crest Canyon area and the wild- land/urban interface. Work in conjunction and cooperation with the applicable regulatory governmental agencies. Coordinate with other agencies to ensure consistency among standards. Coordinating Individual/Organization: Fire Department and Planning & Community Development Potential Funding Source: General Fund and Grants Implementation Timeline: On-going City of Del Mar 5-64 SEBTIBNFIVE Goals, Objectives and Actions Priority Action #4: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Annually review and update wildland pre-plans for firefighting forces. Maximize utilization of outside firefighting equipment and staff resources. Implement Fire Code enhancements for wildland-urban interface. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: On-going Priority Action #5: Develop a comprehensive approach to reducing the possibility of damage and losses due to other manmade hazards. Coordinate with other agencies on training and planning for terrorist related activities. Maintain communications links with regards to threat assessments and dissemination of information. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grants Implementation Timeline: On-going Priority Action #6: Address identified data limitations regarding the lack of information about relative vulnerability of assets from floods. Work with regional agencies, (OES, SanGIS) to accurately map affected areas. Share and train with acquired information with all city department's and personnel. Coordinate with neighboring jurisdictions on joint training opportunities between staffs. Coordinating Individual/Organization: Public Works, Planning & Community Development, and Fire and Lifeguard Departments Potential Funding Source: General Fund Implementation Timeline: On-going Priority Action #7: Protect existing assets with the highest relative vulnerability to the effects of other manmade hazards. Evaluate access levels to public facilities restrict access where necessary. Evaluate infrastructure and facilities for additional security measures as required. Coordinating Individual/Organization: Fire Chief & Director of Community Services Potential Funding Source: General Fund and Grants Implementation Timeline: On-going Priority Action #8: Monitor and publicize the effectiveness of mitigation actions implemented locally. Utilize City newsletter, press releases and public meetings. Train and review with staff implemented programs as part of regular training. Coordinating Individual/Organization: Assistant City Manager/Fire Chief Potential Funding Source: General Fund City of Del Mar 5-65 SECTIOKFIVE Goals, Objectives and Actions Implementation Timeline: On-going Priority Action #9: Discourage activities that exacerbate hazardous conditions. Make hazard mitigation part of the planning and approval process. Step up Code Enforcement activities targeting these conditions. Coordinating Individual/Organization: Planning & Community Development & Code Enforcement Potential Funding Source: General Fund Implementation Timeline: On-going Priority Action #10: Improve the City's capability and efficiency at administering pre-and post- disaster mitigation. Find additional training opportunities for staff. Continue participation in the regional Training and Exercise Program. Make this institutional for the staff. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grants Implementation Timeline: On-going City of Del Mar 5-66 SECTIONFIVE Goals, Objectives and Actions 5.7 CITY OF EL CAJON The City of El Cajon (El Cajon) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for El Cajon summarized in Table 5.7-1. See Section 4.0 for additional details. Table 5.7-1 Summary of Potential Hazard-Related Exposure/Loss in El Cajon Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 0 98,205* Residential Number of Residential Buildings 0 0 35,656* Potential Exposure/Loss for Residential Buildings (x$1,000) 0 0 10,037,164* Commercial Commercial 0 0 1,360* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 0 6,095,112* Critical Facilities Number of Critical Facilities 0 0 0** Potential Exposure for Critical Facilities (x$1,000) 0 0 0** Flood (Loss) 100 Year 500 Year 1,870 17,608 657 6,457 184,946 1,817,646 36 278 161,341 1,245,913 10 40 5,387 332,510 Rain-Induced Landslide High Risk Moderate Risk Tsunami 35 39 0 22 13 0 6,193 3,660 0 0 1 0 0 4,482 0 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 97 118 97,629 0 36 42 35,464 0 10,134 11,823 9,983,116 0 2 3 1,348 0 8,963 13,445 6,041,332 0 1 1 171 0 3 3 900,242 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of El Cajon 5-67 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the El Cajon LPG as their top six. A brief rational for including each of these is included. • Hazardous Materials: A major transportation corridor exists which includes two major freeways. The City also houses several facilities that utilize significant amounts of hazardous materials. • Wildland Fire: A wildlancl/urban interface exists in significant amounts in canyon rims with high value residential sites. • Earthquake: Numerous high density high rise facilities exist with potential loss of life, injuries and damage to property, as well as disruption of services which affects the City as well as surrounding jurisdictions. • Landslide: Known previous landslide areas due to soil composition. • Flooding: Some minor flood prone areas in the City. • Terrorism or Other Manmade Events: Current and future projections for terrorism cause concerns regarding the population, community assets and city infrastructure. 5.7.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides El Cajon's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.7.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in El Cajon and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of El Cajon, as shown in Table 5.7-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of El Cajon Department of Community Development Building Division-Building Code: Plan checks and building inspections. Planning Division-Zoning Ordinance: Limitations on the locations of certain land uses and the need for public hearings. City of El Cajon 5-68 SECTIOHFIVE Goals, Objectives and Actions Planning Division-Subdivision Ordinance: Regulations may be considered an impediment timely mitigation. Planning Division-Site Plan Review (Site Development Plan - SDP): The SDP process avoids unnecessary delays and involves no public hearings, so it can expedite projects that. Planning Division-General Plan (GP): The GP would become a factor in a mitigation plan if it were deemed necessary to permanently change land uses. Planning Division-Capital Improvement Plans (CIP): The CIP must be reviewed by the Planning Commission and found to be in conformance with the General Plan City of El Cajon Public Works Department Subdivision Ordinance: Subdivision regulations are primarily state mandated, but locally implemented. Capital Improvement Plans (CIP): Some capital improvement projects will also mitigate related hazards. City of El Cajon Finance Department Capital Improvement Plans (CIP): Some capital improvement projects will also mitigate related hazards. Redevelopment Agency (RA) Economic Development Plans (EDP) City of El Cajon Fire Department Emergency Response Plans Table 5.7-2 City of El Cajon: Administrative and Technical Capacity Staff/Personnel Resources A. Pianner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y N Y Y Department/Agency and Position Public Works and Community Development Public Works and Community Development Engineers and Planning Don't Know Public Works and Engineering Fire. Police Public Works Fire Department Fire, Police, Community Development City of El Cajon 5-69 SECTIONFIVE Goals, Objectives and Actions The legal and regulatory capabilities of El Cajon are shown in Table 5.7-3, which presents the existing ordinances and codes that affect the physical or built environment of El Cajon. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. Table 5.7-3 City of El Cajon: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N N Does State Prohibit? (Y/N) N N N N N N N N N N N N N 5.7.1.2 Fiscal Resources Table 5.7-4 shows specific financial and budgetary tools available to El Cajon such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of El Cajon 5-70 SICTIONFIVE Goals, Objectives and Actions Table 5.7-4 City of El Cajon: Fiscal Capability Financial Resources A.Community Development Block Grants (CDBG) B. Capital improvements project funding C. D. E. F. G. H. 1. J, K. Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Other -SANDAG Grant Other - Other Grants Accessible or Eligible to Use (Yes/No) Qualified - Income Requirements Yes Limited Yes Yes Yes Yes UK Yes Yes Yes 5.7.2 Goals, Objectives and Actions Listed below are El Cajon's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition. City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the El Cajon LPG. The primary El Cajon LPG members were: • Rick Sitta, Deputy Chief • Ted Kakuris, Battalion Chief Once developed, City staff submitted the final plan to the State of California and the Federal Emergency Management Agency (FEMA) for approval. Once approved by FEMA, the plan will be taken to the El Cajon City Council for adoption. City of El Cajon 5-71 SECTIONFIVE Goals, Objectives and Actions The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by El Cajon's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.7.2.1 Goals The City of El Cajon has developed the following 10 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 9 and 10). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding, support and demand for effective hazard mitigation. GoalS. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal 5. Floods Goal 6. Wildfires Goal 7. Severe Weather (e.g., El Nino Storms, thunderstorms, lightening, tsunamis, and extreme temperatures) Goal 8. Geological Hazards Goal 9. Hazardous Materials (See Attachment A) Goal 10. Other Manmade Hazards (See Attachment A) 5.7.2.2 Objectives and Actions The City of El Cajon developed the following broad list of objectives and actions to assist in the implementation of each of their 10 identified goals. The City of El Cajon developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.7.2.3. City of El Cajon 5-72 SECTIONFI YE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development. Objective 1 A: Encourage and facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Action 1 A1 Update the safety element of the General Plan every five (5) years. Objective 1.B: Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas. Action 1 .B.1 Adopt and continue to update various uniform codes that pertain to safety issues. Objective 1 .C: Discourage future development that exacerbates hazardous conditions. Action 1 .C.1 Maintain a mapping system. Action 1 .C.2 Require an Environmental Impact Report to identify degree of risk. Action 1.C.3 Recommend mitigation to eliminate risks. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Use established media including web page, newsletter and City correspondence. Action 2.A.2 Include in public education activities. Action 2.A.3 Inform the public regarding hazard mitigation. Objective 2.B: Promote partnerships benveen the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Action 2. B.1 Continue Unified Disaster Council membership. Action 2.B.2 Promote regional planning with surrounding jurisdictions. Objective 2.C: Promote hazard mitigation in the business community. Action 2. C.1 Provide public education to area service groups. Action 2. C.2 Continue to include hazard mitigation in business license renewal documents. City of El Cajon 5-73 SECTIOMFIVE Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practices among City employees. Action 3.A.1 Train employees in potential hazards. Objective 3.B: Explore developing a web-based Hazard Mitigation Planning System and provide technical assistance. Action 3.B.1 Include on the City website with methods for hazard reporting. Objective 3.C: Develop a new Emergency Operations Center (EOC)for the City Action 3.C.1 Design and construct a new Emergency Operations Center for the City of El Cajon to conduct command, control and communications activities in response to emergencies and disasters. Action 3.C.2 Equip the new EOC Action 3.C.3 Train staff to operate the new EOC utilizing the National Incident Management System (NIMS), the Standardized Emergency Management System (SEMS) and the Incident Management System (ICS). Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A. Action 4.A.1 Objective 4.B. Action 4.B.1 Establish and maintain closer working relationships with state agencies, local and tribal governments. Operate the City's Emergency Operation Center following the National Incident Management System (NiMS), the Standardized Emergency Management System (SEMS) and Incident Command System (ICS). Improve the City's capability and efficiency at administering pre- and post-disaster mitigation . Participate in the development and execution of Emergency Operations Center (EOC) table top and functional disaster exercises. City of El Cajon 5-74 SICTIOMFIVE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods. Objective 5 A: Action 5.A.1 Action 5.A.2 Action 5.A.3 Action 5.A.4 Action 5.A.5 Objective 5.B: Action 5.B.1 Action 5.B.2 Action 5.B.3 Action 5.B.4 Action 5.B.5 Objective 5.C: Action 5.C.1 Action 5.C.2 Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Continue to ensure finish floor elevations of new development are at least above the 100 year flood plain. Continue to require drainage studies for major projects to ensure adequate measures are incorporated and that they do not adversely affect downstream or other surrounding properties. Continue to periodically evaluate drainage fees to ensure new development pays their fair share of offsite improvements. Continue to limit uses in floodways to those tolerant of occasional flooding. Continue to design new critical facilities to minimize potential flood damage. Such facilities include those that provide emergency response like hospitals, fire stations, police stations, civil defense headquarters, utility lifelines, and ambulance services. Such facilities also include those that do not provide emergency response but attract large numbers of people, such as schools, theaters, and other public assembly facilities with capacities greater than 100 people. Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Continue to maintain flood control channels and storm drains, in accordance with habitat preservation policies, through periodic dredging, repair, de-silting, and clearing to prevent any loss in their effective use. Continue to identify and prioritize flood control projects. Continue to pursue available grant funds for flood control projects. Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Bring the Flood Hazard Mitigation Plan prepared by the City and approved by FEMA to the City Council for adoption. Minimize repetitive losses caused by flooding. Continue preventative maintenance and inspection of floodway structures, storm drains, etc. consistent with applicable standards. Continue to improve drainage courses in an environmentally sensitive manner to eliminate repetitive events. City of El Cajon 5-75 SECTIONFI YE Coals, Objectives and Actions Goal 6: Redi part owm Objective 6 A: Action 6.A.1 Action 6.A.2 Action 6.A.3 Objective 6.B: Action 6.B.1 Objective 6.C: Action 6.C.1 Objective 6.D: Action 6.D.1 nee the possibility of damage and losses to existing assets, icularly people, critical facilities/infrastructure, and City- ed facilities, due to wildfires. Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Continue to require the application of California Fire Code pertaining to Fire Protection Plans {FPP). The FPP will provide for 100' of vegetation management (per CA Government Code 51 182 and the MOU between the U.S. Fish and Wildlife Service, Calif. Department of Fish and Game, CDF, and the San Diego County Fire Chiefs Association) around all new structures or require equivalent construction methods as determined by a technical fire analysis. Continue to ensure that street widths, paving, and grades can accommodate emergency vehicles. Also continue to require 30' of vegetation management on all street segments without improved lots. Continue to require fire resistant construction materials in all areas. Protect existing assets with the highest relative vulnerability to the effects of wildfires. Continue to maintain the City's weed abatement ordinance. Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management). Continue to participate in the California Fire Master Mutual Aid Agreement, the San Diego County Fire Master Mutual Aid Agreement, and the Heartland Zone Automatic Aid Agreement. Maintain adequate emergency response capabilities. Continue to evaluate service level impacts and needs as part of the review of major projects. City of El Cajon 5-76 SECTION! IVE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to severe weather (e.g., El Nino storms/, thunderstorms, lightening, tsunamis, and extreme temperatures). Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to severe weather. Action 7.A.1 Continue to perform preventative maintenance and inspection of buildings/structures that utilize roof drain inlets, piping and substructures. Action 7.A.2 Continue to ensure that existing and new storm drain and street capacities are adequate to manage a 100 year flood event. Action 7.A.3 Continue to ensure that new construction projects include surface drainage management that will preserve the integrity of the facility and public infrastructure. Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of weather. Action 7.B.1 Continue to provide barricades to identify flooded areas. Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 8.A.1 Continue to require soil reports and implement its recommendations for projects in identified areas where liquefaction or other soil issues exist. Action 8.A.2 Continue to review all new construction to ensure conformance with seismic requirements specified in the California Building Code. Action 8.A.3 Continue to require a preliminary soil report and a report of satisfactory placement of fill prepared by a licensed civil engineer for all buildings and structures supported on fill. Action 8.A.4 Continue to require a preliminary soil report for a buildings and structures supported on natural ground unless the foundations have been designed in accordance with Table No. 18-1 -A of the Building Code. City of El Cajon 5-77 SECTION 1 IVE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards (continued). Objective 8.B: Protect existing assets with the highest relative vulnerability to the effects of dam failure. Action 8.B.1 Continue to require seismic retrofits for major renovations in accordance with Historic and Building Code provisions. Action 8.B.2 Continue to utilize the California Building Code for Building Conservation for non- historic buildings. 5.7.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Construct, equip and train staff on the proper operation of a new Emergency Operations Center (EOC). Coordinating Individual/Organization: Police and Fire Potential Funding Source: Proposition O funds Implementation Timeline: Current to December, 2013 Action Item #2: Continue to train employees in potential hazards. Coordinating Individual/Organization: Fire Department Potential Funding Source: Fire Department Budget, other sources as needs dictate Implementation Timeline: On-going City of El Cajon 5-78 SECTIONFIVE Goals. Objectives and Actions Action Item #3: Provide public education to area service groups. Coordinating Individual/Organization: Fire Department Potential Funding Source: Fire Department Budget, other sources as needs dictate Implementation Timeline: Ongoing Action Item #4: Train city EOC staff on NIMS, SEMS and ICS. Coordinating Individual/Organization: Fire Department, Administrative Services Department Potential Funding Source: City General Fund, other sources as needs dictate. Implementation Timeline: On-going Action Item #5: Continue to include hazard mitigation information in public education activities Coordinating Individual/Organization: Fire Department Potential Funding Source: Fire Department or available grant funds Implementation Timeline: Ongoing Action Item #6: Continue to use established media including web page, newsletter, and City correspondence Coordinating Individual/Organization: Fire Department, Administrative Services Department Potential Funding Source: Fire Department, General Fund, or available grant funds Implementation Timeline: On-going Action Item #7: Continue to inform public regarding hazard mitigation activities. Coordinating Individual/Organization: Fire Department Potential Funding Source: Fire Department Implementation Timeline: On-going. Action Item #8: Maintain the hazard reporting process found on City website. Coordinating Individual/Organization: Fire Department, Administrative Services Department Potential Funding Source: General Fund, grant money as available Implementation Timeline: On-going Action Item #9: Maintain the GIS component in the City's EOC including specific site information. Coordinating Individual/Organization: Fire Department, Community Development, Administrative Services Department, Police Department Potential Funding Source: General Fund, grant money as available Implementation Timeline: On-going City of El Cajon 5-79 SECTIOHFIVE Goals, Objectives and Actions Action Item #10: Continue to utilize California Building Code for Building Conservation for non- historic buildings. Coordinating Individual/Organization: City Manager, Building Department Potential Funding Source: Grant funds as they become available Implementation Timeline: On-going City of El Cajon 5-80 SECTIONFIVE Goals, Objectives and Actions 5.8 CITY OF ENCINITAS The City of Encinitas (Encinitas) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Encinitas summarized in Table 5.8-1. See Section 4.0 for additional details. Table 5.8-1 Summary of Potential Hazard-Related Exposure/Loss in Encinitas Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 94 1,204 64,145* Residential Number of Residential Buildings 42 425 24,848* Potential Exposure/ Loss for Residential Buildings (x $1,000) 11,823 119,638 6,994,712* Commercial Number of Commercial Buildings 0 35 1,268* Potential Exposure/ Loss for Commercial Buildings (x $1,000) 0 156,860 5,682,796* Critical Facilities Number of Critical Facilities 0 28 147** Potential Exposure for Critical Facilities (x $1,000) 0 103,971 462,211** Floods (Loss) 100 Year 500 Year 653 678 234 243 65,871 68,405 22 23 98,597 103,079 10 11 100,771 100,771 Rain-Induced Landslide High Risk Moderate Risk Tsunami 24 6 388 7 1 178 1,971 282 50,107 0 0 9 0 0 40,355 0 0 5 0 0 100,193 Wildfire/ Structure Fire Extreme Very High High Moderate 5 1,267 1,159 55,064 1 424 419 21,388 282 119,356 117,949 6,020,722 0 14 18 1,103 0 62,744 80,671 4,943,315 0 2 7 126 0 193 100,576 359,235 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Encinitas 5-81 SECTIONFIVE Coals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Encinitas LPG as their top six, based on their probability and potential impact. A brief rationale for including each of these is included. • Earthquake: On November 22, 1800, a 6.5 magnitude occurred on the Rose Canyon fault offshore from Oceanside. It cracked adobe walls at the missions of San Diego de Alcala and San Juan Capistrano. Other notable local earthquakes include a magnitude 6.0 earthquake centered on the Rose Canyon or Coronado Band faults on May 27, 1862, and a magnitude 5.4 earthquake centered off the coast of Oceanside on the Coronado Bank Fault on July 13, 1986. The geographic extent of this hazard is city wide. A greater percentage of the city's population is potentially exposed to this hazard relative to other hazards, and potential losses from an earthquake would be comparatively larger in most cases. The Rose Canyon Fault lies offshore (2.5 miles west of the city at its closest point) and is capable of generating a magnitude 6.2 to 7.2 earthquake that could potentially damage dwellings and infrastructure throughout the city. A magnitude 6.9 earthquake on the Rose Canyon Fault could potentially result in a peak ground acceleration of .40 within downtown Encinitas and the Coast Highway 101 corridor. These areas of the city are more likely to suffer heavier damage and greater human losses than other parts of the city because of the presence of older buildings (including some unreinforced masonry buildings and apartments constructed prior to 1973) and higher population density. • Wildfire: A significant number of Encinitas residents live within the wildland-urban interface. The geographic extent of this hazard includes the following areas of the city, for the most part: 1) Saxony Canyon; 2) South El Camino Real/Crest Drive; and 3) Olivenhain. Properties in these and other smaller areas are susceptible to wildfire because they are situated near open space and canyons containing heavy fuel loads. Reoccurring periods of low precipitation have increased the risk of wildfires in the region. A greater percentage of the population is potentially exposed to wildfires and potential losses from this hazard are comparatively larger than those associated with a dam failure, flooding, coastal bluff failures or hazardous materials incidents. Recent wildfire events in Encinitas include the Harmony Grove Fire in 1996, which resulted in the loss of three homes and evacuation and sheltering of hundreds of residents. • Dam Failure: Geologists estimate that a magnitude 7.5 earthquake from the Elsinore Fault 11 miles east of Lake Wohlford could result in a failure of its hydraulic fill dam. The geographic extent of this hazard is limited to the persons and properties within the inundation path surrounding Escondido Creek and San Elijo Lagoon. The dam inundation path is larger than the Escondido Creek 100-year floodway and a greater number of persons and properties are exposed to this hazard compared to coastal bluff failures and flooding. Major arterials within the inundation path include El Camino Del Norte, Rancho Santa Fe Road, Manchester Avenue and Coast Highway 101. The failure of Wohlford Dam (1895) and Dixon Reservoir Dam (1970) could possibly threaten city facilities and infrastructure (San Elijo Water Reclamation Facility, Cardiff and Olivenhain sewer pump stations and the San Dieguito Water District 36" high pressure supply line) and educational facilities (Mira Costa College) located in and adjacent to the inundation path. Although exposure to loss of property is significant, the potential for loss of life is limited because of the length of time before flood wave arrival (approximately 1 Vz hours) allowing for aggressive warning and evacuation measures to be initiated by the city. City of Encinitas 5-82 SECTIONFIVE Goals, Objectives and Actions • Coastal Bluff Failures: Geographic extent of the hazard is limited primarily to the Encinitas coastal sandstone bluffs. In 2000, unstable cliffs at Beacon's Beach in Encinitas caused a landslide that killed a woman sitting on the beach. Erosion studies have been conducted for Encinitas, Solana Beach and Del Mar. Various degrees of coastal bluff erosion occur annually and coastal bluff failures have resulted in limited loss of life. As a result, negotiations with the California Coastal Commission are underway to develop a comprehensive coastal bluff policy towards coastal bluff top development. A smaller percentage of the population is exposed to this hazard relative to earthquakes, wildfires and dam failures and the potential for losses is comparatively less. • Flooding: The geographic extent of this hazard is limited to 1) Encinitas coastline, particularly "Restaurant Row" in Cardiff (south of San Elijo State Beach Campgrounds); 2) Escondido, Encinitas and Cottonwood Creeks; and 3) low-lying areas of Leucadia and Old Encinitas. The city has experienced some property-related losses resulting from localized flooding in Leucadia and coastal flooding in Cardiff, but not loss of life. Winter storms in 1997 and later in 2005- 2006 resulted in significant damage and required emergency protective measures and debris removal. The associated recovery costs (FEMA public assistance) for the 2005-06 event was over $500,000. • Hazardous Materials: One major freeway (Interstate 5), one railway and a major liquefied petroleum transmission pipeline pass through the community. This hazard is addressed in a Attachment A. 5.8.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Encinitas' fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.8.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Encinitas and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Encinitas, as shown in Table 5.8-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Encinitas 5-83 SECTIONFIVE Goals, Objectives and Actions Table 5.8-2 City of Encinitas: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS • H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y N Y Y N Y Y Department/Agency and Position Planning & Building, Engineering Planning & Building, Engineering, and Fire (Prevention) Planning & Building, Engineering, and Fire Planning & Building Contracted through Engineering on a as needed basis Fire Department, Engineering and Planning & Building GIS Division, Planning & Building Contracted as needed Fire Department All City Departments The legal and regulatory capabilities of Encinitas are shown in Table 5.8-3, which presents the existing ordinances and codes that affect the physical or built environment of Encinitas. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Encinitas 5-84 SECTIONFIVE Goals, Objectives and Actions Table 5.8-3 City of Encinitas: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) Building code Internationa] Wildland Urban Interface Code Zoning ordinance Subdivision ordinance or regulations Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, grading, wildfire ordinances, hazard setback requirements, water conservation, clean water/NPDES) Growth management ordinances (also called "smart growth" or anti-sprawl programs) Site plan review requirements Land use overlay zones (Floodplain, Hillside/Inland and Coastal Bluff) General or comprehensive plan Local Coastal Program A capital improvements plan An economic development plan An emergency response plan A post-disaster recovery plan A post-disaster recovery ordinance Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y N N Y Does State Prohibit? (Y/N) N N N N N N N N N N N N N N N 5.8.1.2 Fiscal Resources Table 5.8-4 shows specific financial and budgetary tools available to Encinitas such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric sendees; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Encinitas 5-85 SICTIONFIVE Goals, Objectives and Actions Table 5.8-4 City of Encinitas: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes Yes - Vote Required Yes Yes Yes Yes - Vote Required No Yes 5.8.2 Goals, Objectives and Actions Listed below are Encinitas' specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Encinitas LPG. The San Dieguito Water District is a subsidiary district to the City of Encinitas and its goals, objectives and actions are included in this document. The Encinitas LPG members were: • Tom Gallup, Senior Management Analyst , Fire Department • J. Alfred Dichoso, AICP, Associate Planner, Planning and Building Department • Bryce Wilson, Senior Management Analyst, Public Works Department • Blair Knoll, Associate Civil Engineer, San Dieguito Water District • Corina Jimenez, Management Analyst II, Fire Department • Chad Luttrell, GIS Analyst, GIS Division City of Encinitas 5-86 SECTIONFIVE Goals, Objectives and Actions • Michael Stauffer, Senior Management Analyst, Parks and Recreation Department • Bob McSeveney, Senior Management Analyst, City Manager's Office • Kipp Hefner, Assistant Civil Engineer, Engineering Department Once developed, City staff submitted the plan to the State of California and FEMA. Once FEMA has approved the plan it will be taken the Encinitas City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by Encinitas' LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. The Olivenhain Municipal Water District and North County Transit District have both adopted Local Multi-hazard Mitigation Plans. The goals, objectives and action items identified in the City of Encinitas' plan compliment and support those identified our partner agencies' plans. 5.8.2.1 Goals The City of Encinitas has developed the following 9 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 8 and 9). Goal 1. Promote disaster-resistant future development. Goal 2. Minimize losses by providing for the prompt resumption of city operations and restoration of city services after a disaster (post-disaster mitigation). "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to'': Goal 3. Earthquakes Goal 4. Wildfires/Structural Fires Goal 5. Dam Failure Goal 6. Coastal Bluff Failures Goal 7. Floods, Severe Weather and Tsunamis Goal 8. Hazardous Materials Releases Goal 9. Other Manmade Hazards City of Encinitas 5-87 SECTIONFIVE Goals. Objectives and Actions 5.8.2.2 Objectives and Actions The City of Encinitas developed the following broad list of objectives and actions to assist in the implementation of each of their 9 identified goals. The City of Encinitas developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.8.2.3. Goal 1: Promote disaster resistant future development. Objective 1 A: Encourage and facilitate the continuous review and updating of general plans and zoning ordinances to limit development in hazard areas. Action 1A1 Continue to rely on the Floodplain, Coastal Bluff and Hillside/Inland Bluff Overlay Zones to prevent future development or redevelopment that will represent a hazard to its owners or occupants, and which may require structural measures to prevent destruction erosion or collapse. Action 1 .A.2 Continue to establish and implement standards based on the 50- and 100-year storm, for flood control drainage improvements and the maintenance of such improvements, designed to assure adequate public safety. Action 1 A3 Continue to evaluate the effectiveness of the goals that have been developed in the City's Public Safety Element that minimize the risks associated with natural and man-made hazards. Action 1 .A.4 Except as provided in Public Safety Policy 1.1, no development or filling shall be permitted within any 100-year floodplain. Action 1 ,A.5 Setbacks, easements, and accesses, necessary to assure that emergency services can function with available equipment, shall be required and maintained. Action 1A6 In areas identified as susceptible to brush or wildfire hazard, the City shall provide for construction standards to reduce structural susceptibility and increase protection. Action 1A7 Conduct a Comprehensive General Plan Update and ensure compliance with California Government Code section 65302.6 (AB 2140). Objective 1 .B: Encourage and facilitate the adoption of building codes and construction requirements that protect renovated existing assets and new development in hazard areas. Action 1.8.1 Observe and apply measures to reduce earthquake structural risk through building and construction codes. Action 1 .B.2 New residential and commercial construction shall provide for smoke detector and automatic fire sprinkler systems to reduce the impact of development on service levels. Action 1 .B.3 The roof covering any structure regulated by the municipal code shall be a roof classification no less than a Class A Roof-Covering. City of Encinitas 5-88 SECTIOHFIVE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development (continued). Objective 1 .B: Action 1 .B.4 Objective 1 C: Action 1.C.1 Action 1.C.2 Action 1 .C.3 Action 1 .C.4 Objective ID: Action 1.D.1 Action 1 .D.2 Action 1 .D.3 Action ID. 4 Objective 1 ,E: Action 1.E.1 Encourage and facilitate the adoption of building codes and construction requirements that protect renovated existing assets and new development in hazard areas (continued). Exterior wall surfacing materials shall be of non-combustible materials. Encourage consistent enforcement of general plans, zoning ordinances, and building codes. The City will enforce the policies of the Public Safety Element of the City's General Plan which identifies the hazards faced by the City and the appropriate actions and responses needed to be taken by City departments and staff. Continue to authorize city officials to issue citations where compliance cannot be gained through traditional means, such as written notification. Continue to authorize city officials to place liens on properties that do not comply with City's weed abatement ordinance. Continue to provide a building inspection and code enforcement program to ensure compliance with codes and ordinances. Discourage future development that exacerbates hazardous conditions. Development and grading or 'filling in drainage courses, floodways and floodplains shall be prohibited except as provided by Land Use Element Policy 8.2. When flood/drainage improvements are warranted, require developers to mitigate flood hazards in those areas identified as being subject to periodic flooding prior to actual development. Continue to rely on the Floodplain, Coastal Bluff and Hillside/Inland Bluff Overlay Zones to prevent future development or redevelopment that will represent a hazard to its owners or occupants, and which may require structural measures to prevent destruction, erosion or collapse. Implement an Open Space Management Plan. Continue to require an Environmental Impact Report to identify degree of risk, when necessary. Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. The City will cooperate with and support in every way possible current Federal, State, and County agencies responsible for the enforcement of health, safety, and environmental laws to obtain Geographic Information System (CIS) data. City of Encinitas 5-89 SECTIOMFIVE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development (continued). Objective 1E: Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas (continued). Action 1 £.2 Cooperate with the enforcement of disclosure laws requiring all users, producers, and transporters of hazardous materials and wastes to clearly identify such materials at the site and to notify the appropriate local County, State and/or Federal agencies in the event of a violation. Action 1 £.3 Require engineering studies to evaluate specific hazards in hazard prone areas and identify alternative site design criteria to mitigate hazards to the maximum extent possible, as funding permits. Action 1 £.4 Update databases/Geographic Information System (GIS), with particular attention to maintaining hazard overlay layers. Require electronic submittals of plans. Objective 1 .F: Address future conditions resulting from climate change and mitigate future environmental impacts. Action 1 .F.1 Continue to promote water conservation as a means to mitigate future drought conditions (Municipal Code 23.26) Action 1 .F.2 Develop an Climate Action Plan that addresses AB32 and SB375 and continue to promote sound environmental management practices throughout all city departments and services through an annual review and update of the Environmental Action Plan. (Council Policy C025) Action 1 .F.3 Continue to require development projects comply with the California Environmental Quality Act (CEQA). Action 1 .F.4 Continue to utilize public facilities as "cool zone" sites on days when weather conditions are excessively hot. Goal 2: Minimize losses by providing for the prompt resumption of city operations and restoration of city services after a disaster (post-disaster mitigation) Objective 2 A: Prepare plans and identify resources that facilitate recovery from disasters Action 2.A.1 Develop business resumption/continuity of operations plan for city operations. Action 2.A.2 Maintain and revise as necessary standard operating procedures and checklists for recovery operations for use by the city's emergency management team with the Emergency Operations Center (EOC). City of Encinitas 5-90 SECTIONFI YE Goals, Objectives and Actions Goal 2: Minimize losses by providing for the prompt resumption of city operations and restoration of city services after a disaster (post-disaster mitigation) (continued). Objective 2.B: Provide training for city officials on managing disaster recovery operations Action 2.B.1 Continue to conduct annual disaster exercises. Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to earthquakes. Objective 3 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to earthquakes. Action 3.A.1 As funding becomes available, provide monetary and/or non-monetary incentives for property owners who voluntarily upgrade buildings to provide acceptable performance during an earthquake and adopt cost-effective mitigation techniques for both structural and non-structural elements. Action 3.A.2 Continue to conduct routine seismic safety surveys/assessments of city facilities to ensure that heavy furniture and equipment are properly secured. Action 3.A.3 Establish a task force comprised of business owners, Downtown Encinitas Mainstreet Association (DEMA) representatives and city officials to educate owners about potential safety risks of unreinforced masonry buildings and identify existing low cost options to retrofit unreinforced masonry buildings, such as tax credits and tax preference incentives available for the rehabilitation of historic buildings. Action 3.A.4 Contingent on funding from San Diego Gas and Electric, continue to underground overhead electrical lines. Objective 3.B: Protect existing assets with the highest relative vulnerability to the effects of earthquakes. Action 3.B.1 Seismically upgrade Fire Stations #1 and #2 (originally constructed in 1957 and 1960, respectively) to meet existing building codes. Action 3.B.2 Rebuild Moonlight Beach Lifeguard Tower to meet existing building codes, as part of the Moonlight Beach Master Plan. City of Encinitas 5-91 SECTIONFIVE Goals, Objectives and Actions Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to earthquakes (continued). Objective 3.B: Protect existing assets with the highest relative vulnerability to the effects of earthquakes (continued). Action 3.B.3 As funding becomes available, evaluate whether mitigation measures are necessary to protect city facilities and infrastructure from seismic events and implement reasonable mitigation measures, as necessary. Objective 3.C: Coordinate with and support existing efforts to mitigate earthquakes (e.g., California Geological Survey, US. Geological Survey). Action 3.C.1 Support the replacement of freeway bridge supports with new supports that meet current seismic standards as part of Caltrans future Interstate 5 widening project. Action 3.C.2 Support the replacement, repair or retrofitting of rail bridges in Encinitas by the North County Transit District, as funding becomes available. Action 3.C.3 Support earthquake mitigation efforts by Scripps Memorial Hospital as part of its expansion. Action 3.C.4 Encourage federal and state government to provide economic incentives for Encinitas property owners to retrofit unreinforced masonry buildings. Objective 3.D: Educate citizens about seismic risks, the potential impacts of earthquakes and opportunities for mitigation actions. Action 3.D.1 Hold a workshop for Encinitas business owners to educate them about the benefit of retrofitting buildings for improved seismic performance, as well as the possibility of reduced insurance premiums and provide them with loss prevention strategies. Action 3.D.2 Continue to develop and provide managers of mobile home parks and owners of multi-unit buildings with an earthquake mitigation and safety guide, with information on how to improve the seismic performance of mobile homes and buildings. Action 3.D.3 Continue to maintain the Community Emergency Response Team (CERT) program as a means for mitigating hazards in neighborhoods. Action 3.D.4 Increase awareness among at-risk populations of emerging earthquake mitigation technologies. Action 3.D.5 Work with Senior Commission and local care facilities to educate Encinitas seniors and providers about the benefits of earthquake mitigation practices. Action 3.D.6 Continue to utilize the Encinitas NOW! newsletter to provide residents with earthquake mitigation information. City of Encinitas 5-92 SECTIONFIVE Goals, Objectives and Actions Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to earthquakes (continued). Objective 3.E: Establish and maintain closer working relationships with federal, state agencies, heal governments and special districts. Action 3.E. 1 Work with the federal and state government to identify potential funding sources for economic and non-economic incentives for property owners to implement mitigation strategies, including but not limited to incentives for the rehabilitation of historic landmarks. Objective 3.F: Encourage other organizations to incorporate hazard mitigation activities. Action 3.F.1 Encourage the Encinitas Union School District, Cardiff Elementary School District and San Dieguito Union High School District to evaluate the seismic risk to schools within Encinitas and implement mitigation measures, if necessary. Action 3.F.2 Encourage utility companies to evaluate the seismic risk to their high-pressure transmission pipelines and encourage the development of a risk reduction strategy and the implementation of mitigation measures, such as automatic shut off valves, if necessary. Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to wildfires/structural fires. Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires/structural fires. Action 4.A.1 Continue to enforce the City's weed abatement policy. Action 4.A.2 Continue to conduct fire safety inspections to reduce the risk of wildfire/structural fire. Action 4.A.3 Continue to encourage existing property owners without fire suppression ("sprinkler") systems or a class A rated roof covering to voluntarily install them. Action 4.A.4 Evaluate existing emergency resources (i.e. brush trucks, water tenders) and, if necessary and funding is available, purchase additional resources. Action 4.A.5 Continue to offer fire extinguisher training to City employees and staff and community organizations upon request. Action 4.A.6 Update the San Dieguito Water District Master Plan with particular attention to fire system upgrades. City of Encinitas 5-93 SECTIONFI YE Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to wildfires/structural fires (continued). Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires/ structural fires (continued). Action 4.A.7 Work with Olivenhain Municipal Water District, Rancho Santa Fe Fire Protection District and Elfin Forest/Harmony Grove Fire Department to secure grant funding to add additional hydrants in wildland urban interface areas. Action 4.A.8 Maintain an Insurance Service Organization (ISO) rating of 3 or lower. Action 4.A.9 Complete installation of approximately 100 to 150 new fire hydrants in older areas of the city to meet current hydrant spacing requirements Objective 4.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires/ structural fires. Action 4.B.1 As funding becomes available, evaluate whether mitigation measures are necessary to protect city facilities and infrastructure from wildfires and implement reasonable mitigation measures, as necessary. Action 4.B.2 Continue to work with the Santa Fe Irrigation District (SFID) on implementing mitigation measures necessary to protect the R.E. Badger Filtration Plan, as funding becomes available. Action 4.B.3 Evaluate whether combustible superstructure materials were used in the construction of older road bridges in Olivenhain. Objective 4.C: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management). Action 4.C.1 Working with other fire agencies, support efforts to locate firefighting aircraft within San Diego County. Objective 4.E: Educate citizens about wildfire/ structural fire risks, the potential impacts of wildfires/ structural fires, their consequences and opportunities for mitigation actions Action 4.E.1 Conduct annual workshops that educate residents about wildfire defensible space actions and make them aware of possible reductions in insurance premiums for implementing mitigate strategies. Action 4.E.2 Hold a workshop for Encinitas business owners to educate them about the benefit of installing fire suppression systems and provide them with loss prevention strategies. Action 4.E.3 Continue to provide Community Emergency Response Team (CERT) training for volunteers to assist evacuation efforts in their neighborhoods. Improved and effective emergency responses will lead to preservation of lives and property. Action 4.E.4 Provide hazard mitigation education/training with routine inspections of businesses utilizing code enforcement and fire prevention inspections. City of Encinitas 5-94 SECTIONFI YE Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to wildfires/structural fires (continued). Objective 4.E: Educate citizens about wildfire! structural fire risks, the potential impacts of wildfires/structural fires, their consequences and opportunities for mitigation actions (continued). Action 4.E.5 Promote CalEMA's "My Hazards" interactive web site that provides recommended actions for fires. Objective 4.F: Establish and maintain closer working relationships with federal, state agencies, local governments and special districts. Action 4.F.1 Work with the federal and state government to identify potential funding sources for economic and non-economic incentives for property owners to implement mitigation strategies. Goal 5: Red part own Objective 5 A: Action 5.A.1 Objective 5.B: Action 5.B.1 Objective 5.C: Action 5.C.1 Objective 5.D. Action 5.D.1 uce the possibility of damage and losses to existing assets, icularly people, critical facilities/infrastructure, and City- ed facilities, due to dam failure. Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Conduct a functional disaster exercise involving city staff and participants from Mira Costa Community College and San Elijo JPA Protect existing assets with the highest relative vulnerability- to the effects of dam failure . As funding becomes available, evaluate whether mitigation measures are necessary to protect city facilities and infrastructure from dam failures and implement reasonable mitigation measures, as necessary. Coordinate with and support existing efforts to mitigate dam failures (e.g., US Army Corps of Engineers, US Bureau of Reclamation, San Diego County Department of Water Resources). Continue to participate in Wohlford Dam failure tabletop disaster exercises with City of Escondido. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from dam failure. Ensure that City has adequate information so that areas subject to inundation can be identified. City of Encinitas 5-95 SECTIONFI YE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to dam failure (continued). Objective 5.E: Educate citizens about dam failure risk, the potential impacts of a dam failure and opportunities for mitigation actions. Action 5.E.1 Provide residents living in the dam inundation area with preparedness and safety information in the city newsletter. Objective 5.F: Establish and maintain closer working relationships with federal, state agencies, local governments and special districts Action 5.F.1 Identify Federal and State funding to minimize/mitigate dam inundation hazards to critical facilities and vulnerable populations. Objective 5.G: Encourage other organizations to incorporate hazard mitigation activities. Action 5.G.1 Support efforts by the City of Escondido to secure mitigation funding from the State and Federal government to strengthen Wohlford Dam. Action 5.G.2 Encourage Mira Costa College to implement mitigation activities for dam failure, if necessary. Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to coastal bluff failures. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to coastal bluff failures. Action 6.A.1 Continue to develop and adopt a comprehensive plan, based on the Beach Bluff Erosion Technical Report, to address the coastal bluff recession and shoreline erosion problems in the City. Action 6.A.2 Continue to support and encourage sand replenishment on Encinitas shoreline. Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of coastal bluff failures. Action 6.B.1 Protect beach by encouraging property owners to implement mitigation measures (such as "de-watering operations) that protect coastal bluffs. City of Encinitas 5-96 SECTIOMFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to coastal bluff failures (continued). Objective 6.C: Coordinate with and support existing efforts to mitigate coastal bluff failures (e.g., California Geological Survey, US Geological Survey). Action 6.C.1 Coordinate with Army Corp of Engineers to further develop a shoreline preservation strategy. Objective 6.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from coastal bluff failures (e.g., data on structure/building types, reinforcements, etc.). Objective 6.E: Educate citizens about coastal bluff failure risk, the potential impacts of a coastal bluff failure and opportunities for mitigation actions. Action 6.E.1 Provide information on coastal bluff failures and mitigation strategies on the city's web site. Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods, severe weather and tsunamis. Objective 7A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods, severe weather and tsunamis. Action 7A.1 Establish and implement standards based on the 50- and 100-year storm, for flood control drainage improvements, and the maintenance of such improvement, designed to assure adequate public safety. Action 7A.2 Adopt a master plan for drainage and flood control. Action 7A.3 Evaluate the feasibility of realigning Coast Highway 101 to minimize repetitive losses due to coastal flooding. Action 7A.4 Complete Leucadia Drainage Project. Action 7A.5 Continue to discuss mitigation strategies for San Elijo State Beach campground with State of California Department of Parks and Recreation and Sheriffs Department. Action 7A.7 Continue to participate in the National Weather Service Storm Ready Program. City of Encinitas 5-97 SECTIONFIVE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods, severe weather and tsunamis (continued). Objective 7B: Protect existing assets with the highest relative vulnerability to the. effects offloads, severe weather and tsunamis. Action 7.B.1 As funding becomes available, evaluate whether mitigation measures are necessary to protect city facilities and infrastructure from flooding and tsunamis and implement reasonable mitigation measures, as necessary. Action 7.B.2 Rebuild Moonlight Beach Lifeguard Tower to meet existing building codes, as part of the Moonlight Beach Master Plan. Action 7.B.3 Add storm protection rip-rap on South Coast Highway 101 in Cardiff-by-the-Sea to protect the road. Action 7.B.4 Continue to provide public support by maintaining supplies of sand and sandbags for residents to mitigate flooding. Action 7.B.5 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Action 7.B.6 Continue to improve road flooding problems by constructing permanent drainage structures as approved and funded in the City's Capital Improvement Program (CIP) budget. Objective 7C: Coordinate with and support existing efforts to mitigate floods, severe weather and tsunamis (e.g., US Army Corps of Engineers, US Bureau of Reclamation, San Diego County Department of Water Resources, National Weather Service). Action 7.C.1 Working with U.S. Army Corps of Engineers, support the opening of the San Elijo Lagoon mouth as a means of mitigating floods. Action 7.C.2 Working with the National Weather Service, recruit local storm spotters. Action 7.C.3 Working with Army Corp of Engineers, continue developing a drainage maintenance program. City of Encinitas 5-98 SECTION i IVE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods, severe weather and tsunamis (continued). Objective 7D: Address identified data limitations regarding the lack of information about relative vulnerability of assets from floods (e.g., Q3 1 digital floo dplain maps for missing counties), severe weather (e.g., construction type, age, condition, compliance with current building codes, etc.), and tsunamis. Action 7.D.1 Ensure that City has adequate information so that areas subject to flood and tsunami run-up can be identified. Objective 7E: Educate citizens about flood, severe weather and tsunami risk, the potential impacts of floods, severe weather and tsunamis and opportunities for mitigation actions. Action 7.E.1 Continue to participate in the National Weather Service's Storm Ready Program and provide residents with mitigation strategies during annual winter weather workshops. Action 7.E.2 Promote the FioodSmart.gov and CalEMA's "My Hazards" interactive web site to provide residents with recommended flood mitigation actions. Objective 7F: Establish and maintain closer working relationships with federal, state agencies, local governments and special districts Action 7.F.1 Identify Federal and State funding to minimize/mitigate flood hazards to critical facilities and vulnerable populations. 5.8.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 7 prioritized mitigation actions for 2010-2015 as well as an implementation strategy for each are: City of Encinitas 5-99 SiCTIONFIVE Goals, Objectives and Actions Priority Action #1: Rebuild Fire Stations #1 and #2 (originally constructed in 1957 and 1960, respectively) to meet existing building codes (i.e. seismic, fire). Coordinating Individual/Organization: Fire Department Potential Funding Source: Fire Mitigation Fees; Lease Revenue Bonds Implementation Timeline: January 2010- 2015 Priority Action #2: Comprehensive update of the City of Encinitas General Plan and Public Safety Element Coordinating Individual/Organization: Planning & Building Department Potential Funding Source: General Fund Implementation Timeline: January 2010- 2015 Priority Action #3 Complete installation of approximately 100 to 150 new fire hydrants in older areas of the city, thus improving fire protection by meeting current hydrant spacing requirements (San Dieguito Water District Master Plan project number HP-5) Coordinating Individual/Organization: San Dieguito Water District Potential Funding Source: General Fund Implementation Timeline: January 2010- 2015 Priority Action Item #4 Leucadia Drainage Project Coordinating Individual/Organization: Engineering Department Potential Funding Source: Federal Energy and Water Grant ($1 million) and General Fund Implementation Timeline: January 2010-2015 Priority Action #5 Replace Fire Quint with 100' Aerial Platform Coordinating Individual/Organization: Fleet Maintenance Division/Fire Department Potential Funding Source: General Fund Implementation Timeline: January 2010- 2015 Priority Action Item #6 Adopt a comprehensive shoreline erosion plan, based on the Beach Bluff Erosion Technical Report Coordinating Individual/Organization: Engineering Department Potential Funding Source: General Fund Implementation Timeline: January 2010-2015 City of Encinitas 5-100 SECTIONFIVE Coals, Objectives and Actions Priority Action Item #1 Develop a continuity of operations/business resumption plan for city operations Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grant Funding Implementation Timeline: January 2010- 2015 City of Encinitas 5-101 SECTIONFIVE Goals, Objectives and Actions This page intentionally left blank City of Encinitas 5-102 SICTIONFIVE goals, Objectives and Actions 5.9 CITY OF ESCONDIDO The City of Escondido (Escondido) reviewed a set of jurisdictionai-ievel hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Escondido summarized in Table 5.9-1. See Section 4.0 for additional details. Table 5.9-1 Summary of Potential Hazard-Related Exposure/Loss in Escondido Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 47,700 143,071* Residential Number of Residential Buildings 0 14,323 47,004* Potential Exposure/Loss for Residential Buildings (x$1,000) 0 4,031,925 13,242,886* Commercial Number of Commercial Buildings 0 766 1,835* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 3,432,982 8,223,920* Critical Facilities Number of Critical Facilities 0 118 232** Potential Exposure for Critical Facilities (x$1,000) 0 751,472 1,103,815" Flood (Loss) 100 Year 500 Year 8,367 32,516 2,599 9,994 731,619 2,813,311 101 336 452,652 1,505,851 15 54 5,781 228,863 Rain-Induced Landslide High Risk Moderate Risk Tsunami 751 171 0 295 71 0 83,043 19,987 0 2 2 0 8,963 8,963 0 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 65 846 1,660 134,126 27 328 654 43,671 7,601 92,332 184,101 12,293,387 0 14 17 1,745 0 62,744 76,189 7,820,567 0 3 8 204 0 100,195 2,005 990,024 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Escondido 5-103 SECTIONFIVE Goats, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Escondido LPG as their top five. A brief rational for including each of these is included. • Wildland Fire: A significant amount of the community fringe area is wildland/urban interface and fires have been experienced in the past. • Earthquake: The potential for loss of life, injuries and damage to property, as well as disruption of services, is significant. • Hazardous Materials: Two major freeways pass through the community. The community also hosts several fixed facilities that utilize hazardous material. • Flooding or Dam Failure: The community lies in a natural river valley with a substantial portion existing within the floodplain. There are two large dammed reservoirs located above the community. • Terrorism or Other Manmade Events: Current and expected geopolitical realities create concern for the vulnerability of community assets and infrastructure. 5.9.1 Capability Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Escondido's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.9.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Escondido and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Escondido, as shown in Table 5.9-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of Escondido Building Department Coordinate adoption of building, plumbing, electrical, and mechanical codes. Develop building ordinances. Review site and building plans for compliance with building codes and ordinances. City of Escondido 5-104 SEBTIONFIVE Goals. Objectives and Actions Damage assessment of structures from multiple causes to facilitate repair and future occupancy. • City of Escondido Community Services Department Maintains city infrastructure (assets) ranging from streets to parks to buildings and vehicle fleet. Responds to city emergencies, including EOC response in disasters and assisting police and fire departments with hazardous materials clean up, traffic and perimeter control efforts, traffic accident clean up and evacuation routing. • City of Escondido Engineering Services Department Reviews engineering on private and public grading, floodways, retention basins, transportation infrastructure and structures to assure compliance with Federal, State and local ordinances on seismic and structural stability. Develops engineering ordinances and policies that help protect and preserve city infrastructure. Evaluates all circulation elements for projected traffic impacts. Determines needed infrastructure improvements, water system and water/sewer treatment capabilities. Provides response personnel for evaluation of damaged infrastructure and rescue situations. Responds as part of the City's EOC Team. Coordinates other response agencies assisting with damage assessment. • City of Escondido Fire Department Administration: Develop, implement and monitor policies, procedures, budgets, fees, automatic aid agreements, mutual aid agreements, and liaison with other city departments and outside agencies. Fire Prevention Bureau: Coordinate adoption of codes and ordinances, review site and building plans for fire code compliance, develop and present public education programs and manage the city's weed abatement program through a Community Wildland Protection Program (CWPP). Emergency Medical Services: Manage the department's advanced life support responder program, respond to medical emergencies and other calls for service, provide training and oversight for the City's Public Access Defibrillation (PAD) program and participate with other community and regional health care providers to reduce public illness and injury. Suppression Division: Maintain the department's personnel, apparatus, equipment and fire stations in a state of readiness to respond to the community's needs, develop and implement standard operating procedures for various types of emergency responses, respond to all types of emergencies, and train and interact with neighboring jurisdictions and regional agencies. Emergency Management: Coordinate the City's Disaster Preparedness Program, liaison with all City departments and divisions, as well as other public and private organizations, develop, coordinate and implement hazard-specific response plans, and maintain the operational readiness of the City's Emergency Operations Center (EOC) and other key elements. City of Escondido 5-105 SECTIBNFIVE Goals, Objectives and Actions • City of Escondido Planning Department Develop and maintain city general plan, zoning ordinances and development standards. Oversight of city development process assuring compliance with zoning and general plan, and including environmental impact reports, design review, historic preservation, landscape review, habitat conservation, floodway prohibitions and floodplain development standards. • City of Escondido Police Department Responds to safety concerns involving threats and/or damage to life or property. Acts as the enforcement entity for violations of State and local laws and ordinances. Primary emergency responders to acts of civil disobedience and public disorders and terrorism. Support personnel for emergency rescue and management. Investigative services for criminal acts that result in personal injury/death and the destruction of property. Develops and implements emergency response plans and policies, focusing on evacuation procedures and traffic control. Primary responders to acts of terrorism, focusing on suspect intervention and facility and staff protection. • City of Escondido Utilities Department Responds to city emergencies, includes EOC response in disasters and assisting police and fire departments with hazardous materials clean up, traffic and perimeter control efforts, traffic accident clean up and evacuation routing. Operates, maintains and enhances both the water distribution and sewer collection systems within the City of Escondido. Also has oversight of solid waste management. Responsible for planning and implementation associated with the following city plans: 1.1.1 Wohlford Dam Emergency Action Plan 1.1.2 Water Quality Emergency Notification Plan 1.1.3 Water Operations Emergency Response Guide 1.1.4 Water Division Emergency Response Plan 1.1.5 HARRF Chemical Spill Response Plan 1.1.6 HARRF Hazmat Business Plan 1.1.7 Sewer Overflow Response Plan 1.1.8 Sewer Overflow Prevention Plan 1.1.9 WTP Hazmat Business Plan 1.1.10 WTP Operations Plan City of Escondido 5-106 SECTIONFIVE Goals, Objectives and Actions Table 5.9-2 City of Escondido: Administrative and Technical Capacity Staff/Personnel A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y Y Y - limited Y- limited Y - limited Department/Agency and Position Planning, Community Services Utilities Engineering, Community Development Engineering, Planning Engineering, Utilities Engineering Engineering, Planning, Fire, Maintenance & Operations, Utilities Information Systems Fire The legal and regulatory capabilities of Escondido are shown in Table 5.9-3, which presents the existing ordinances and codes that affect the physical or built environment of Escondido. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Escondido 5-107 SECTIONFIVE Goals, Objectives and Actions Table 5.9-3 City of Escondido: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Fire code C. Zoning ordinance D. Subdivision ordinance or regulations E. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) F. Growth management ordinances (also called "smart growth" or anti-sprawl programs) G. Site plan review requirements H. General or comprehensive plan 1. A capital improvements plan J. An economic development plan K. An emergency response plan L. A post-disaster recovery plan M. A post-disaster recovery ordinance N. Real estate disclosure requirements 0. Other - Habitat Planning P. Other - Emergency Action Plan for Wohlford Dam Q. Other - Hazardous Material Site Plans R. Other - Drainage Master Plan Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Does State Prohibit (Y/N) N N N N N N N N N N N N N N N N N N 5.9.1.2 Fiscal Resources Table 5.9-4 shows specific financial and budgetary tools available to Escondido such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric sendees; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Escondido 5-108 SECTIONFIVE Goals, Objectives and Actions Table 5.9-4 City of Escondido: Fiscal Capability Financial Resources A. Community Development Block Grants (CDBG) B. Capital improvements project funding C. Authority to levy taxes for specific purposes D. Fees for water, sewer, gas, or electric service E. Impact fees for homebuyers or developers for new developments/homes F. Incur debt through general obligation bonds G. Incur debt through special tax and revenue bonds H. Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas J. Other -SAN DAG Grant K. Other -Other Grants Accessible or Eligible to Use (Yes/No) Qualified - Income Requirements Yes Limited Yes Yes Yes Yes No Yes Yes Yes 5.9.2 Goals, Objectives and Actions Listed below are Escondidcrs specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with OES staff to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, provided input to the Escondido LPG. The Escondido LPG members were: • Tom Albergo, Police Lieutenant • Ed Domingue, Director of Engineering Services • Dan Hildebrand, GIS Manager • Mari Hill, Interim Fire Marshal • Randy Licata, Operations Division Chief • Michael Lowry, Fire Chief • Joyce Masterson, Assistant to the City Manager City of Escondido 5-109 SECT80NFIVE Goals, Objectives and Actions • Richard O'Donnell, Deputy Director of Maintenance & Operations • Don Rawson, Emergency Management Coordinator • Barbara Redlitz, Assistant Planning Director • Kimberly Russell, Safety Administrator • Joe Russo, Building Official • Richard Walker, Deputy Utilities Manager • Jodi Vinson, Risk & Safety Manager Once developed. City staff submitted the final plan to the State of California and FEMA for approval. Once approved, the plan will be taken to the Escondido City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by Escondido's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens 5.9.2.1 Goals The City of Escondido has developed the following 10 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 9 and 10). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding, support and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. GoalS. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to floods and severe weather. Goal 6. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to wildfires. City of Escondido 5-110 SECTIBNFIVE Goals, Objectives and Actions Goal?. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to dam failure. Goal 8. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to geological hazards. Goal 9. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to extremely hazardous materials releases. Goal 10.Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to other man made hazards. 5.9.2.2 Objectives and Actions The City of Escondido developed the following broad list of objectives and actions to assist in the implementation of each of their 10 identified goals. The City of Escondido developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.1.2.3. Goal 1: Promote disaster resistant future development. Objective 1 A: Implement zoning ordinances that limit development in hazard areas. Action 1.A.1 Continue to apply slope variable density requirements and restrict development on slopes in excess of 35% and in floodways. Action 1.A.2 Continue to limit the number of units in areas beyond adopted emergency response times. Objective 1.B: Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas. Action 1.B.1 Continue to require that building pad elevations be increased for new construction and substantial modifications in Dam Failure inundation areas. (Ex. E. Valley Pkwy at Rose) Action 1.B.2 Continue to require the application of present day building codes that address earthquake design requirements. (Ex. Chapter 16 CBC, Seismic Zone, proximity to and the type of fault) Action 1.B.3 Continue to obtain U.S. Army Corps of Engineers approval of construction in flood sensitive areas. (Ex. Brookside Dev) Action 1.B.4 Continue to update the Grading Ordinance as necessary to comply with new technologies, regulations, and practices. City of Escondido 5-111 SICT10NFI YE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development (continued). Objective 1.B: Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas (continued). Action 1.B.5 Objective Action 1.C.1 Objective conditions Action 1.D.1 Continue to utilize current Standard Specifications for Public Works Construction and the Regional Amendments which encourage materials and practices that resist failure. l.C: Encourage consistent enforcement of general plans, zoning ordinances, and building codes. Continue aggressive enforcement to insure all projects are properly permitted and inspected to document compliance with all city standards. 1.D: Discourage future development that exacerbates hazardous Continue to require minimum brush clearance requirements around new construction. Goal 2: Increase public understanding, support, and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Continue to assist local mobile home parks with their community preparedness plans, including regular presentations at meetings of park residents. Action 2.A.2 Continue to offer hazard awareness and mitigation displays at bi-annual Community Street Fairs, fire station open houses, in library display cases, at health fairs, and other venues. Action 2.A.3 Continue to utilize the Community Emergency Response Team (C.E.R.T.) as a venue for teaching fire and life safety awareness and preparedness measures. Action 2.A.4 Continue to use the Fire Department website as a resource for public use to include mitigation methods for a variety of hazards. Objective 2.B: Promote partnerships bet\veen the, state, county, and local governments to identify, prioritize, and implement mitigation actions. Action 2.B.1 Continue to assist in the development, support, and promotion of a statewide juvenile fire setter coalition that will work with the State Fire Marshal's Office to reduce the incidence of juvenile-set fires in partnership with the Burn Institute. City of Escondido 5-112 SECTIONFI YE Goals, Objectives and Actions Goal 2: Increase public understanding, support, and demand for hazard mitigation (continued). Objective Action 2.B.2 Action 2.B.3 Action 2.B.4 Objective Action 2.C.1 Action 2.C.2 Objective Action 2.D.1 Objective Action 2.E.1 Action 2.E.2 Action 2.E.3 2.B: Promote partnerships benveen the state, county, and local governments to identify, prioritize, and implement mitigation actions (continued). Continue to use and expand the number of links on Fire Department website to state, county, and federal website hazard mitigation resources. Continue to maintain communications with County OES in order to address potential hazard situations from a public education perspective. Continue to maintain partnership with County OES in mitigation actions related to C.E.R.T., Disaster Service Workers Programs, and Emergency Management Preparedness Programs. 2.C: Promote hazard mitigation in the business community. Continue to utilize the fire department's fire prevention inspection program to educate business owners and managers regarding hazard mitigation. Continue to offer Fire Safety in the Workplace/Fire Extinguisher Training to businesses through a partnership with the Burn Institute. 2.D: Monitor and publicize the effectiveness of mitigation actions implemented citywide. Continue to issue media releases regarding the City's hazard mitigation efforts. 2.E: Discourage activities that exacerbate hazardous conditions. Continue the current Juvenile Fire setter Intervention Program to provide intervention for juveniles determined to have demonstrated an interest in playing with and/or setting fires through a partnership with the Burn Institute. Continue to partner with County OES in the development of Public Service Announcements related to mitigation of hazardous conditions and corrections. Continue to create and show Public Service Announcements on local government cable channel that demonstrate and encourage hazard correction. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practices among state and local officials. Action 3.A.1 Continue periodic updates of local building codes, public works construction codes, zoning and grading ordinances to reflect legislative changes. City of Escondido 5-113 SECTION FIVE Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards (continued). Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practices among state and local officials (continued). Action 3.A.2 Continue to assess and mitigate potentially significant hazards as part of the required environmental review process. Action 3.A.3 Continue to conduct Emergency Operations Center training annually. Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A. Action 4. A. 1 Action 4.A.2 Action 4.A.3 Action 4.A.4 Action 4.A.5 Objective 4.B: Action 4.B.1 Establish and maintain close working relationships with state agencies, local and tribal governments. Continue to participate in regional hazard mitigation activities as a member of the San Diego County Unified Disaster Council. Continue to provide storage of a Mobile Decontamination Unit belonging to the San Diego County Unified Disaster Council and continue training of fire department personnel in the use and operation of the Unit. Continue to maintain good working relationships with the San Diego County Water Authority and neighboring water agencies. Continue to maintain good working relationships with the American Red Cross, the Salvation Army, local churches and other agencies that provide for public assistance and training. Continue to provide storage of several disaster caches belonging to the American Red Cross. Encourage other organizations to incorporate hazard mitigation activities. Continue to assist local entities, such as the Escondido Union Elementary School District, the Escondido Union High School District, Palomar Medical Center and others, in developing plans for hazard mitigation and disaster preparedness. City of Escondido 5-114 SECTIONFI YE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and City- owned facilities, due to floods and severe weather. Objective 5 A: Ensure new development is properly located and conditioned to avoid flooding. Actions 5.A.1 Continue to ensure finish floor elevations of new development are at least one foot above the 100-year flood plain. Actions 5.A.2 Continue to require drainage studies for major projects to ensure adequate measures are incorporated and that they do not adversely affect downstream or other surrounding properties. Actions 5.A.3 Continue to periodically evaluate drainage fees to ensure new development pays their fair share for offsite improvements. Actions 5.A.4 Continue to limit uses in fioodways to those tolerant of occasional flooding, including but not limited to agriculture, outdoor recreation and natural resource areas. Actions 5.A.5 Continue to design new critical facilities to minimize potential flood damage. Such facilities include those that provide emergency response like hospitals, fire stations, police stations, civil defense headquarters, utility lifelines, ambulance services, and sewer treatment plants. Such facilities also include those that do not provide emergency response but attract large numbers of people, such as schools, theatres, and other public assembly facilities with capacities greater than 100 persons. Objective 5.5: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain and severe weather. Action 5.B.1 Continue to require Development Agreements for new projects within the North Broadway critical infrastructure deficiency areas to secure necessary flood control measures. Action 5.B.2 Continue to maintain flood control channels and storm drains, in accordance with habitat preservation policies, through periodic dredging, repair, de-silting, and clearing to prevent any loss in their effective use. Action 5.B.3 Continue to identify and prioritize flood control projects in the CIP. Action 5.B.4 Continue to pursue available grant funds for flood control projects. Action 5.B.5 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Action 5.B.6 Continue to provide public support by maintaining supplies of sand and sandbags to mitigate flooding. Action 5.B.7 Continue to provide barricades to identify flooded areas. City of Escondido 5-115 SECTIONFI YE Goals, Objectives and Actions Goal 5: Redi parti owne Objective 5.C: Action 5.C.1 Action 5.C.2 Action 5.C.3 Action 5.C.4 Objective 5.D. Action 5.D.1 Action 5.D.2 Action 5.D.3 Action 5.D.4 Objective 5.E. Action 5.E.1 ice the possibility of damage and losses to existing assets, cularly people, critical facilities/infrastructure and City- d facilities, due to floods and severe weather (continued). Minimize repetitive losses caused by flooding and severe weather. Continue preventative maintenance and inspection of floodway structures, storm drains, etc. consistent with applicable regulations. Continue to improve drainage courses in an environmentally sensitive manner to eliminate repetitive events (e.g. Reidy Creek at El Norte). Continue to work with Regional Storm Water Control Board to develop best management practices from a regional perspective. Continue to improve road flooding problems by constructing permanent drainage structures as approved and funded in the City's Capital Improvement (CIP) Budget. Develop a comprehensive approach to reducing the possibility of damage and losses due to floods and severe weather. Review the Probable Maximum Flood analyses completed for Wohlford Dam and Dixon Dam. Continue to perform preventative maintenance and inspection of buildings/structures that utilize roof drain inlets, piping and sub-structures. Continue to ensure that existing and new storm drain and street capacities are adequate to manage a 100-year flood event. Continue to ensure that new construction projects include surface drainage management that will preserve the integrity of the facility and public infrastructure. Coordinate with and support existing ejforts to mitigate severe weather (e.g., National Weather Service). Continue to participate in regional annual weather briefings. City of Escondido 5-116 SECTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires in new development. Action 6 A.1 Continue to require the application of California Fire Code Article 86, pertaining to Fire Protection Plans (FPP) in all Wildland-Urban Interface (WUI) areas. The FPP will provide for 100' of vegetation management (per CA Government Code 51182 and the MOD between the U.S. Fish and Wildlife Service, Calif. Department of Fish and Game, CALFire, and the San Diego County Fire Chiefs Association) around all new structures or require equivalent construction methods as determined by a technical fire analysis. Action 6 A.2 Continue to require secondary, emergency access and egress when streets exceed specified lengths or present other issues as identified during the project review process. Action 6 A.3 Continue to ensure that street widths, paving, and grades can accommodate emergency vehicles. Also continue to require 30' of vegetation management on all street segments without improved lots. Also continue to require enhanced construction for certain structures in all WUI areas. Action 6 A.4 Continue to require residential fire sprinklers for units outside of adopted distance and Quality of Life standard response times and WUI areas. Action 6 A.5 Continue to require defined defensible space around all habitable structures in WUI areas. Action 6 A.6 Continue to regulate and govern mitigation measures consistent with the International Wildland-Urban Interface Code, Appendix "A" and "D" of the 2006 edition. Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires. Action 6.B.1 Continue proactive enforcement of City's weed abatement ordinance to facilitate the removal of annual weeds/vegetation or habitat, placing existing properties in a fire safe condition. Action 6.B.2 Continue to ensure that all construction materials used during remodeling of structures in WUI areas are compliant with new building and fire codes for fire resistant construction including possible enhanced construction requirements for certain structures. City of Escondido 5-117 SECTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires (continued). Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires. Action 6.B.3 Continue to maintain and update existing wildland pre-fire plans for neighborhoods adjacent to WUI areas. Action 6.B.4 Ensure the City's Multiple Habitat Conservation Plan (MHCP) Sub-area Plan maintains current allowances for the removal of habitat as may be necessary to protect existing structures. Continue partnership with State Fish & Game to mitigate exposure of protected habitat areas. Objective 6.C: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management).. Action 6.C.1 Ensure the City's MHCP Sub-area Plan incorporates current fire protection measures and implement fire protection measures in Daley Ranch, consistent with the existing Conservation Agreement and the Daley Ranch Master Plan. Action 6.C.2 Continue to participate in the California Fire Master Mutual Aid Agreement, the San Diego County Fire Master Mutual Aid Agreement, and the North Zone Automatic Aid Agreement. Objective 6.D: Address identified data limitations regarding the lack of information related to wildfires (e.g., a comprehensive database of California wildfires, a California wildfire risk model, and relative vulnerability of assets). Action 6.D.1 Develop a Community Wildfire Protection Plan (CWPP) for the City's Local Responsibility Area (LRA). Objective 6.E: Maintain adequate emergency response capability. Action 6.E.1 Continue to evaluate service level impacts and needs as part of the review of major projects. Action 6.E.2 Continue to plan for additional reserve equipment and staff during emergencies to supplement potential need for additional fire resources (i.e. surge capacity). Action 6.E.3 Continue to staff and maintain Cal EMA Type 3 brush engine. City of Escondido 5-118 SECTION h IVE Coals, Objectives and Actions Goal 7: Red parti owm Objective 7 A. Action 7.A.1 Action 7.A.2 Action 7.A.3 Action 7.A.4 Action 7.A.5 Action 7.A.6 Objective 7.B: Action 7.B.1 Action 7.B.2 Action 7.B.3 Objective 7.C: Action 7.C.1 Action 7.C.2 Action 7.C.3 uce the possibility of damage and losses to existing assets, cularly people, critical facilities/infrastructure, and City- id facilities, due to dam failure. Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Continue to design new critical facilities to minimize potential damage due to dam failure. Such facilities include those that provide emergency response like hospitals, fire stations, police stations, civil defense headquarters, utility lifelines, ambulance services, and sewer treatment plants. Such facilities also include those that do not provide emergency response but attract large numbers of people, such as schools, theatres, and other public assembly facilities with capacities greater than 100 persons. Annual inspections of Wohlford Dam are conducted by the Federal Energy Regulatory Commission (FERC). Continue to gather weekly well readings at Wohlford Dam and piezometer readings at Dixon Dam. Continue to send annual reports of these readings to the State of California Division of Safety of Dams. The Probable Maximum Flood analyses have been completed for Wohlford Dam and Dixon Dam. Continue to maintain an updated Wohlford Dam Emergency Action Plan. Conducted vulnerability assessment of Wohlford Dam. Protect existing assets with the highest relative vulnerability to the effects of dam failure. A dam and reservoir inspection protocol tied to Homeland Security alerts (over and above normal maintenance inspections) has been developed. On a five-year schedule (per FERC). continue to conduct a table top drill and a functional exercise of the Wohlford Dam Emergency Action Plan. Continue to annually exercise the Wohlford Dam Emergency Action Plan telephone tree. Minimize the risk of hazards associated with dam failure. Develop timeframes and funding mechanism for the ultimate replacement or renovation of the Dixon and Wohlford dams. Continue to ensure that critical facilities and structures including emergency communication facilities are above the dam failure inundation zone. Continue to inspect the 100-year flood channel on a weekly basis to ensure integrity and unobstructed flow. City of Escondido 5-119 SECTIONFIVE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 8.A.1 Continue to require soil reports and implement its recommendations for projects in identified areas where liquefaction or other soil issues exist. Action 8.A.2 Continue to review all new construction to ensure conformance with seismic requirements specified in the California Building Code. Action 8.A.3 Continue to prohibit development in areas with slopes over 35%. Action 8.A.4 Continue to require a preliminary soil report and a report of satisfactory placement of fill prepared by a licensed civil engineer for all buildings and structures supported on fill. Action 8.A.5 Continue to require a preliminary soil report prepared by a civil engineer licensed in the State of California whenever expansive soil is present. Action 8.A.6 Continue to require a preliminary soil report for ail buildings and structures supported on natural ground unless the foundations have been designed in accordance with Table No. 1805.4.2 of the Building Code. Action 8.A.7 Continue to require that when the foundation design is based on Tables No. 1804.2 & 1805.4.2, the foundation plan must indicate the allowable soil bearing value and soil classification and must be signed by a civil engineer or architect licensed by the State of California. One and two-story buildings of Type V construction designed for an allowable soil bearing value not to exceed 1 ,000 pounds per square foot (psf) are exempt from this requirement. When the allowable foundation pressure exceeds the values of Table No. 1804.2, a preliminary soil report must be submitted with the plans. Objective 8.B: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Action 8.B.1 Continue to maintain an updated inventory of un-reinforced masonry buildings. Action 8.B.2 Continue to require seismic retrofits for major renovations in accordance with Historic and Building Code provisions. Action 8.B.3 Continue to utilize International Building Code for non-historic buildings. 5.9.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria. City of Escondido 5-120 SECTIONFIVE Goals, Objectives and Actions The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top nine prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Ensure the City's Multiple Habitat Conservation Plan (MHCP) Sub-area Plan maintains current allowances for the removal of habitat as may be necessary to protect existing structures. Coordinating Individual/Organization: Fire Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: Ongoing Action Item #2: Ensure the City's MHCP Sub-area Plan incorporates current fire protection measures and implement fire measure in Daley Ranch, consistent with the existing Conservation Agreement and the Daley Ranch Master Plan. Coordinating Individual/Organization: Fire Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: Ongoing Action Item #3: Develop a Community Wildfire Protection Plan (CWPP) that identifies all potential stakeholders, coordinates public outreach and education, and accurately assess vegetative and infrastructure hazards. Coordinating Individual/Organization: Fire Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: One to three years Action Item #4: Continue involvement in regional collaborative efforts between public and private partners in public education and disaster preparedness campaigns in High Hazard Urban Interface communities. Coordinating Individual/Organization: Fire Department Potential Funding Source: As available from private, local, state or federal resources Implementation Timeline: Ongoing Action Item #5: Develop timeframes and funding mechanism for the ultimate replacement or renovation of the Dixon and Wohlford Dams. Coordinating Individual/Organization: Utilities Department City of Escondido 5-121 SECTIONFIVE Coals, Objectives and Actions Potential Funding Source: As available from local, state or federal resources Implementation Timeline: 5-10 years Action Item #6: Encourage the use of alternate technologies for detection, neutralization, containment, disposal, and transportation. Coordinating Individual/Organization: Planning Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: Ongoing Action Item #7: Require the timely disposal of "spent'' materials. Coordinating Individual/Organization: Planning Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: Ongoing Action Item #8: Limit transportation to hours of less traffic congestion as determined necessary through the environmental and developmental review process. Coordinating Individual/Organization: Planning Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: Ongoing Action Item #9: Inspect all transports for compliance with any measures identified by the environmental or developmental review processes to mitigate a potentially significant effect. Coordinating Individual/Organization: Planning Department Potential Funding Source: As available from local, state or federal resources Implementation Timeline: 5-10 years City of Escondido 5-122 SKTIOMFIVE Goals, Objectives and Actions 5.10 CITY OF IMPERIAL BEACH The City of Imperial Beach (Imperial Beach) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Imperial Beach summarized in Table 5.10-1. See Section 4.0 for additional details. Table 5.10-1 Summary of Potential Hazard-Related Exposure/Loss in Imperial Beach Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 157 5,526 28,243* Residential Number of Residential Buildings 64 1,880 9,859* Potential Exposure/Loss for Residential Buildings (x$1,000) 18,016 529,220 2,775,309* Commercial Number of Commercial Buildings 0 42 346* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 188,231 1,550,668* Critical Facilities Number of Critical Facilities 0 6 0** Potential Exposure for Critical Facilities (x$1,000) 0 3,192 0** Flood (Loss) 100 Year 500 Year 1,206 3,408 408 1,178 114,852 331,607 14 35 62,744 156,860 1 2 0 1 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 0 5,225 0 0 2,138 0 0 601,847 0 0 97 0 0 434,725 0 0 2 0 0 1,001 Wildfire / Structure Fire Extreme Very High High Moderate 0 65 37 26,346 0 0 7 9,139 0 0 1,971 2,572,629 0 0 0 310 0 0 0 1,389,327 0 1 0 18 0 0 0 216,194 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Imperial Beach 5-123 SECT10NFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Imperial Beach LPG as their top five. A brief rational for including each of these is included. • Earthquake: Most significant as it affects the entire community and region. • Costal Storms/Erosion/Tsunami: More frequent, but historically quite localized. • Dam Failure: Possible, but low potential. • Structure Fire/Wildfire: No significant history. • Other Human Caused Hazards: No significant targets. 5.10.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Imperial Beach's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.10.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Imperial Beach and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Imperial Beach, as shown in Table 5.10-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of Imperial Beach Fire Department Emergency Plan: Describes a comprehensive emergency management system which provides for a planned response to disaster situations associated with natural disasters, terrorism, and nuclear-related incidents. Emergency Operations Manual: Identifies and outlines emergency operational procedures. Promotes uniformity of thinking, action and safety on emergency scenes. • City of Imperial Beach Building Department Coordinates adoption of building, plumbing, electrical and mechanical codes. Also develops building ordinances. City of Imperial Beach 5-124 SECTIOHFIVE Goals, Objectives and Actions Reviews site and building plans for compliance with building codes and ordinances. Performs damage assessment of structures from multiple causes to facilitate repair and determine potential occupancy. Develops and maintains city general plan, zoning ordinances and development standards. • City of Imperial Beach Planning Department Oversight of the City development process assuring compliance with zoning and the general plan. Responsible for the environmental impact reports, design review and habitat preservation. • City of Imperial Beach Public Works Department Maintains City infrastructure and assets. Also responsible for construction of City projects. Responds in support of City emergencies. Operates, maintains and enhances the City sewer system and storm water conveyance system. Responsible for administering the Jurisdictional Urban Runoff Management Plan (JURMP). Business Plan: provides policy and procedures for hazardous material maintenance and disposal. Sewer overflow response plan • City of Imperial Beach Sheriff's Department - Responds to safety concerns involving threats and/or damage to life or property. Enforces State and local laws and ordinances. Primary emergency responders to acts of civil disobedience, public disorders and acts of terrorism. Provide support personnel for emergency rescue and management. San Diego County Sheriff Emergency Operations Manuel: identifies and outlines emergency operational procedures. Promotes uniformity of thinking, action and safety on emergency scenes. City of Imperial Beach 5-125 SICTIOMFIVE Goals, Objectives and Actions Table 5.10-2 City of Imperial Beach: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y N N Y Y N Y Y Department/Agency and Position Planning, Planning Director Building, Building Official Planning, Planning Director USDA County, Land Use Public Safety, Public Safety Director Public Works UCSD, SDSU, USD Public Safety, Public Safety Director Public Safety The legal and regulatory capabilities of Imperial Beach are shown in Table 5.10-3, which presents the existing ordinances and codes that affect the physical or built environment of Imperial Beach. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Imperial Beach 5-126 SWTOWFIVE Goals, Objectives and Actions Table 5.10-3 City of Imperial Beach: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N N Does State Prohibit (Y/N) N N N N N N N N N N N N N 5.10.1.2 Fiscal Resources Table 5.10-4 shows specific financial and budgetary tools available to Imperial Beach such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Imperial Beach 5-127 SICTIONFIVE Goals, Objectives and Actions Table 5.10-4 City of Imperial Beach: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. 1. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible (Yes/No) to Use Y Y Y Y Y-Built into building fees Y Y N Y 5.10.2 Goals, Objectives and Actions Listed below are Imperial Beach's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, and Public Works provided input to the Imperial Beach LPG. The Imperial Beach LPG members were: • Leticia Hernandez, Management Analyst, Public Safety • Peter Lau, Superintendent. Public Works Once developed, City staff will submit the plan to CalEMA and FEMA for approval. Once it is approved by FEMA the plan will be taken to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input. Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. City of Imperial Beach 5-128 SECTIONFIVE Goals. Objectives and Actions This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by Imperial Beach's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.10.2.1 Goals The City of Imperial Beach has developed the following 9 Goals for their Hazard Mitigation Plan and actions for their city (See Attachment A for Goal 9). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding and support for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to become less vulnerable to hazards. Goal 4. Enhance hazard mitigation coordination and communication with Federal, State and County governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal5. Dam Failure Goal 6. Earthquakes Goal 7. Coastal Storm/Erosion/Tsunami Goal 8. Floods Goal 9. Manmade Hazards 5.10.2.2 Objectives and Actions The City of Imperial Beach developed the following broad list of objectives and actions to assist in the implementation of each of their 9 identified goals. The City of Imperial Beach developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.10.2.3. Goal 1: Promote disaster resistant future development. Objective 1 A: Facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Action 1.A.1 Update General Plan every 10 years. Action 1 A2 Attract and retain qualified, professional and experienced staff. City of Imperial Beach 5-129 SECTION 1 IVE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development (continued). Objective 1 A: Action 1 A3 Action 1 A4 Objective! £: Action 1.B.1 Action 1.B.2 Objective 1 .C Action 1.C.1 Action 1 .C.2 Objective 1 .D Action 1.D.1 Action 1 .D.2 Action 1.D.3 Action 1 .D.4 Objective 1 .E. Action 1.E.1 Action 1.E.2 Action 1.E.3 Objective 1 .F. Action 1.F.1 Action 1 .F.2 Action 1.F.3 Facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas (continued). Continue to identify high hazard areas. Continue to include hazard area maps. Facilitate the adoption of building codes that protect existing assets and restrict new development in hazard areas. Continue to review Codes every 3 years. Establish emergency review procedures for codes. Facilitate consistent enforcement of general plans, zoning ordinances, and building codes. Continue to staff enforcement personnel to a level to ensure compliance. Develop Enforcement Group to ensure coordination and standardization of permits for all departments. • Limit future development in hazardous areas. Development should be in harmony with existing topography. Development patterns should respect environmental characteristics. Clustering should be encouraged. Development should be limited in areas of known geologic hazards. Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. Continue to develop Geographic Information Systems (GIS) capabilities to identify hazards. Continue to use the developed data sets to test hazard scenarios and mitigation tools. Continue to utilize the Internet as a communication tool, as well as an educational tool. Increase public understanding, support and demand for hazard mitigation for new developments. Continue to gain public acceptance for avoidance policies in high hazard areas. Continue to publicize and adopt the appropriate hazard mitigation measures. Continue to help create demand for hazard resistant construction and site planning. City of Imperial Beach 5-130 SECTIONFI YE Goals, Objectives and Actions Goal 2: Increase public understanding and support for effective hazard mitigations Objective 2. A Action 2.A.1 Action 2.A.2 Action 2.A.3 Action 2.A.4 Action 2.A.5 Action 2.A.6 Action 2.A.7 Objective 2 JB: Action 2.B.1 Action 2.B.2 Action 2.B.3 Action 2.B.4 Objective 2.C Action 2.C.1 Action 2.C.2 Action 2.C.3 Objective 2.D Action 2.D.1 • Educate the public to increase awareness of hazards and opportunities for mitigation actions. Continue to publicize and encourage the adoption of appropriate hazard mitigation actions. Continue to provide information to the public on the City website, Newsletter, Citywide mail outs, Prevention Program and in conjunction with Special Events. Continue to heighten public awareness of hazards by using the City Publicist. Continue to gain public acceptance for avoidance policies in high hazard areas. Continue to identify hazard specific issues and needs. Continue to help create demand for hazard resistant construction and site planning. Maintain CERT program for the City. Promote partnerships bet\veen the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Develop, maintain and improve lasting partnerships. Maintain the auto aid agreement with Navy Ream Field. Support the County Fire Safe Council. Promote cooperative Vegetation Management Programs that incorporate hazard mitigation. • Promote hazard mitigation in the business community. Continue to increase awareness and knowledge of hazard mitigation principles and practices. Continue to encourage businesses to develop and implement hazard mitigation actions. Continue to identify hazard-specific issues and needs. : Monitor and publicize the effectiveness of mitigation actions implemented citywide. Use the City Website, Newsletter, etc. to publicize mitigation actions. City of Imperial Beach 5-131 SECTIONFI YE Coals, Objectives and Actions Goal 2: Increase public understanding and support for effective hazard mitigations, (continued) Objective 2 D: Action 2.D.2 Objective 2.E: Action 2.E.1 Action 2.E.2 Action 2.E.3 Monitor and publicize the effectiveness of mitigation actions implemented citywide (continued). Continue to establish budget and identify funding sources for mitigation outreach. Provide education on hazardous conditions. Continue to support public and private sector symposiums. Continue to coordinate production of brochures, informational packets and other handouts. Continue to develop partnerships with the media on hazard mitigation. Goal 3: Build and support local capacity and commitment to become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials and staff. Action 3.A.1 Continue to use Media, City Publicist and Public Safety demonstrations to increase the number of news releases. Action 3.A.2 Continue to conduct meetings with key elected officials to determine local issues and concerns. Action 3.A.3 Continue to continuously demonstrate the importance of pre-disaster mitigation planning to the City Council and other public officials. Action 3.A.4 Continue to use staff orientation, training, policy and procedures to increase awareness. Objective 3.B: Develop hazard mitigation plan and provide technical assistance to implement plan. Action 3.B.1 Continue to coordinate the development of a multi-jurisdictional plan. Action 3.B.2 Form City Working Group to update and monitor the City's portion of the plan. Objective 3.C: Limit growth and development in hazardous areas. Action 3.C.1 Continue to update GIS mapping to identify hazardous areas. Action 3.C.2 Continue to enforce trespassing regulations in high-risk areas. Action 3.C.3 Continue to update General Plan and zoning regulations to reflect hazardous areas. Action 3.C.4 Continue to support transfer of development rights in hazard prone areas. City of Imperial Beach 5-132 SECTION h I \ I Goafs, Objectives and Actions Goal 3: Build and support local capacity and commitment to become less vulnerable to hazards (continued). Objective 3.D: Continue upgrade City EOC. Action 3.D.1 Maintain the planning group to determine needs. Action 3.D.2 Continue to seek grant funding for upgrades. Goal 4: Enhance hazard mitigation coordination and communication with Federal, State and County governments. Objective 4 A: Establish and maintain closer working relationships with Federal, State and County agencies. Action 4.A.1 Continue to encourage and assist in development of multi-jurisdictional/ multi- functional training and exercises to enhance hazard mitigation. Action 4.A.2 Continue to maintain working relationships with agencies providing resources and expertise in hazard mitigation. Objective 4.B: Encourage other organizations to incorporate hazard mitigation activities. Action 4.B.1 Continue to encourage all jurisdictions to become part of the HIRT JPA. Action 4.B.2 Continue to establish and maintain lasting partnerships. Action 4.B.3 Continue to streamline policies to eliminate conflicts and duplication of effort. Objective 4.C: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation. Action 4.C.1 Maintain consistency with the State in administering recovery programs. Action 4.C.2 Continue to improve coordination with the County OES in dealing with local issues. Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to dam failure. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 5.A.1 Update inundation maps every 10 years. City of Imperial Beach 5-133 SECTION I I \ I Goals, Objectives and Actions Goal 5: Redi inclu facili Objective 5.B: Action 5.B.1 Action 5.B.2 Action 5.B.3 Action 5.B.4 Objective 5.C: Action 5.C.1 Action 5.C.2 Action 5.C.3 Objective 5.D. Action 5.D.1 Action 5.D.2 ice the possibility of damage and losses to existing assets, ding people, critical facilities/infrastructure and public ties due to dam failure, (continued) Protect existing assets with the highest relative vulnerability to the effects of a dam failure. Identify hazard-prone structures. Construct barriers around structures. Encourage structural retrofitting. Encourage participation in National Flood Insurance. Coordinate with and support existing efforts to mitigate dam failure (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Revise development ordinances to mitigate effects of development on wetland areas. Incorporate and maintain valuable wetlands in open space preservation programs. Review and revise, if necessary, sediment and erosion control regulations. Protect floodplains from inappropriate development. Strengthen existing development regulations to discourage land uses and activities that create hazards. Plan and zone for open space, recreational, agricultural, or other low-intensity uses within floodway fringes. Goal 6: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to earthquakes. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to earthquakes. Action 6.A.1 Update, adopt Building Codes to reflect current earthquake standards. Action 6.A.2 Participate in community awareness meetings. Action 6.A.3 Develop and distribute printed publications to the communities concerning hazards. City of Imperial Beach 5-134 SECTIONFI YE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to earthquakes, (continued) Objective 6.B: Action 6.B.1 Action 6.B.2 Objective 6.C: Action 6.C.1 Objective 6.D: Action 6.D.1 Action 6.D.2 Protect existing assets with the highest relative vulnerability to the effects of earthquakes . identify hazard-prone structures through GiS modeling. Build critical facilities that function after a major earthquake. Coordinate with and support existing efforts to mitigate earthquake hazards Identify projects for pre-disaster mitigation funding. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from earthquakes. Assess Citywide infrastructure with regard to earthquake risk. Encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Goal 7: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to coastal storms/erosion/tsunami. Objective 7A: Develop a comprehensive approach to reducing the possibility of damage and losses due to coastal storms/erosion. Action 7.A.1 Participate in community awareness meetings. Action 7.A.2 Develop and distribute printed publications to the community concerning hazards. Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of coastal storms! erosion. Action 7.B.1 Retrofit structures to strengthen resistance to damage. City of Imperial Beach 5-135 SECTIONFI YE Goals, Sbiectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to coastal storms/erosion/tsunami, (continued) Objective 7.B: Protect existing assets with The highest relative vulnerability to the effects of coastal storms/erosion (continued). Action 7.B.2 Encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Objective 7.C: Coordinate with and support existing efforts to mitigate severe coastal storms/ erosion. Action 7.C.1 Continue to review and update plans that would include coordination with cities, special districts and County departments. Action 7.C.2 Continue to develop and publish information sources for the public. Objective 7.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from coastal storms/ erosion. Action 7.D.1 Identify hazard-prone structures through CIS modeling. Goal 8: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to floods. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 8.A.1 Continue to review and revise existing flood control standards, zoning and building requirements. Action 8.A.2 Continue to identify flood-prone areas by using GIS. Objective 8.B: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Action 8.B.1 Continue to assure adequate funding to restore damaged facilities to 100-year flood design. Action 8.B.2 Continue to update storm water system plans and improve storm water facilities in high- risk areas. Action 8.B.3 Continue to ensure adequate evacuation time in case of major hazard event. City of Imperial Beach 5-136 SECTIONFI YE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure and public facilities due to floods, (continued) Objective 8.C: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 8.C.1 Develop a flood control strategy that ensures coordination with Federal, State and local agencies. Action 8.C.2 Improve hazard warning and response planning. Objective 8.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from flooding. Action 8.D1 Continue to encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Action 8.D.2 Continue to increase participation and improve compliance with the National Flood Insurance Program (NFIP). Periodically review the City's compliance with NFIP regulations, as resources become available. 5.10.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 9 prioritized mitigation actions as well as an implementation strategy for each are: Priority Action #1: Conduct training and exercises for all employees. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants. Implementation Timeline: On-going. Priority Action #2: Update dam inundation maps. Coordinating Individual/Organization: Public Works City of Imperial Beach 5-137 SECTIONFIVE Goals, Objectives and Actions Potential Funding Source: General Fund Implementation Timeline: March 2010 - June 2012 Priority Action #3: Provide information to the public on the City website. Newsletter, Citywide mail outs, Prevention Program and in conjunction with Special Events. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants Implementation Timeline: February 2004-December 2006. Priority Action #4: Encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants Implementation Timeline: On-going Priority Action #5: Maintain CERT program for the City. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants Implementation Timeline: On-going. Priority Action #6: Coordinate the development of a multi-jurisdictional plan. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants. Implementation Timeline: On-going. Priority Action #7: Encourage and assist in development of rnulti-jurisdictional/ multi-functional training and exercises to enhance hazard mitigation. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants. Implementation Timeline: On-going Priority Action #8: Improve hazard warning and response planning. Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants. Implementation Timeline: On-going Priority Action #9: Maintain established City Working Group to update and monitor the (hazard mitigation) plan. City of Imperial Beach 5-138 SCCTIONFIVE Goals, Objectives and Actions Coordinating Individual/Organization: Public Safety Potential Funding Source: General Fund, Grants. Implementation Timeline: On-going City of Imperial Beach 5-139 SECTIONFI YE Goals, Objectives and Actions This page intentionally left blank City of Imperial Beach 5-140 SICTIOMFIVE Goals, Objectives and Actions 5.11 CITY OF LA MESA The City of La Mesa (La Mesa) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for La Mesa summarized in Table 5.11-1. See Section 4.0 for additional details. Table 5-11-1 Summary of Potential Hazard-Related Exposure/Loss in La Mesa , Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 1,701 56,880* Residential Number of Residential Buildings 0 731 25,333* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 205,777 7,131,240* Commercial Number of Commercial Buildings 0 19 952* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 85,152 4,266,578* Critical Facilities Number of Critical Facilities 0 11 0** Potential Exposure for Critical Facilities (x$1,000) 0 395 0** Flood (Loss) 100 Year 500 Year 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 0 404 56,195 0 0 177 25,030 0 0 49,826 7,045,945 0 0 1 946 0 0 4,482 4,239,688 0 0 1 124 0 0 0 250,010 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of La Mesa 5-141 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the La Mesa LPG as their top five. • Fire • Flood • Landslide • Dam Failure • Earthquake 5.11.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides La Mesa's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.11.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in La Mesa and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of La Mesa, as shown in Table 5.11-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of La Mesa Fire Prevention Bureau Adoption of Fire Codes Review plans and sites for code compliance Weed abatement program Public education. • City of La Mesa Community Development Department (including Building) Coordinates the adoption of applicable codes Develops ordinances City of La Mesa 5-142 SECTIOHFIVE Goals, Objectives and Actions Reviews site plans for code compliance Structure assessment following damage City of La Mesa Planning and Zoning Department Maintains general plan Oversees development process with in the City City of La Mesa Engineering Department Develops and administers ordinances and policies for the City infrastructure City of La Mesa Public Works Department Table 5.11-2 City of La Mesa: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS H . Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y Y Y Y Y Department/Agency and Position Community development and Public Works Community development and Public Works Community development and Public Works Public Works Public Works All Departments Community Development and Public Works Police Department and Fire Department All Departments The legal and regulatory capabilities of La Mesa are shown in Table 5.11-3. which presents the existing ordinances and codes that affect the physical or built environment of La Mesa. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of La Mesa 5-143 SICTIONFIVE Goals, Objectives and Actions Table 5.11-3 City of La Mesa: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N Y Does State Prohibit? (Y/N) Y Y Y Y N N N N Y 5.11.1.2 Fiscal Resources Table 5.11-4 shows specific financial and budgetary tools available to La Mesa such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of La Mesa 5-144 SECTIONFI YE Goals, Objectives and Actions Table 5.11-4 City of La Mesa: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. 1. J. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Other -SAN DAG Grant Accessible or Eligible to Use (Yes/No) Y Y Y-Vote required Y Y Y-Vote required Y-Vote required UK Y Y 5.11.2 Goals, Objectives and Actions Listed below are La Mesa's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works participated in the La Mesa LPG. These members provided input to the La Mesa LPG leads: Greg McAlpine and Kathy Feilen. Once developed, City staff submitted the plan to CalEMA and FEMA for approval. Once approved by FEMA the plan will be taken to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input.. The following sections present the hazard-related goals, objectives and actions as prepared by La Mesa's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. City of La Mesa 5-145 SECTIONFIVE Coals, Objectives and Actions 5.11.2.1 Goals The City of La Mesa has developed the following 9 Goals for their Hazard Mitigation Plan (See Attachment A for Goal 9). Goal 1. Promote disaster-resistant future development Goal 2. Increase public understanding, support, and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal 5. Floods Goal 6. Wildfires Goal 7. Dam Failure Goal 8. Geological Hazards Goal 9. Extremely Hazardous Materials Releases 5.11.2.2 Objectives and Actions The City of La Mesa developed the following broad list of objectives and actions to assist in the implementation of each of their 9 identified goals. The City of La Mesa developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.11.2.3. Goal 1: Promote disaster resistant future development. Objective 1A: Encourage and facilitate the updating of general plans and ordinances to limit development in hazard areas. zoning Action 1 A1 Continue to update plans and ordinances to stay current with mitigation responsibilities. Action 1 A2 Update City's General plan City of La Mesa 5-146 SECTIONFI YE Goals, Objectives and Actions Goal 1: Promote disaster resistant future development, (continued) Objective 1 .B. Action 1.B.1 Action 1.B.2 Objective 1 .C. Action 1.C.1 Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas. Continue to require code compliance in areas such as earthquake (seismic) construction. Continue to require code compliance in weed abatement in brush areas. Encourage consistent enforcement of general plans, zoning ordinance and building codes. Continue current practice of code enforcement in all areas that require compliance. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Continue to make available information regarding hazard mitigation in the City of La Mesa through print media and the city website. Action 2.A.2 Continue to increase awareness through public contacts in City facilities and field opportunities. Objective 2.B: Promote partnerships between the state, counties, local and tribal governments to identify', prioritize, and implement mitigation actions. Action 2.B.1 Continue to use County and Cal EMA to coordinate and assist in implementation of mitigation awareness and efforts. Objective 2.C: Promote hazard mitigation in the business community. Action 2.C.1 Continue to provide information to businesses during annual fire prevention inspections. Objective 2.D: Monitor and publicize the effectiveness of mitigation actions implemented statewide. Action 2.D.1 Continue to update the city website with information regarding mitigation efforts. City of La Mesa 5-147 SECTIONFI YE Coals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among state, local and tribal officials. Action 3.A.1 Continue to be a part in the efforts of the County UDC as well as other partnerships with agencies that have a mutual interest in hazard mitigation. Action 3.A.2 Continue to conduct annual EOC drills at the city level. Action 3.A.3 Continue to participate in the regional multi-jurisdictional training and exercise program. Objective 3.B: Development model liazard mitigation plan and provide technical assistance to State agencies, local and tribal governments to prepare Jiazard mitigation plans. Action 3.B.1 At the regional level, continue to be a part of the development of the regional plan. Objective 3.C: Promote the use of volunteers in preparing the community before, during and after disasters Action 3.C.1 Continue to train residents as CERT Team members. Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 4.A.1 Continue participation at the UDC level in the region. Action 4.A.2 Maintain relationships with Helix Water including disaster drill cross participation. Action 4.A.3 Continue relationships with local service groups and other community members. Objective 4.B: Encourage other organizations to incorporate hazard mitigation plans. Action 4.B.1 Continue to provide assistance if needed to Chamber of Commerce and other local groups with an interest in hazard mitigation. Objective 4.C: Improve the State's capability and efficiency at administering pre-and post-disaster mitigation . Action 4.C.1 Continue to include the County, Cal EMA and others in the cities annual EOC drill. City of La Mesa 5-148 SECTION! IYI Coals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to floods. Objective 5. A: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Action 5.A.1 Continue to pursue grant funding for flood control projects as needed. Objective 5.B: Minimize repetitive losses caused by flooding. Action 5.B.1 Continue to maintain Alvarado Creek drainage in this flood prone area. Action 5.B.2 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Goal 6: Redi parti ownt Objective 6. A: Action 6.A.1 Action 6.A.2 Objective 6.B: Action 6.B.1 Objective 6.C: Action 6.C.1 ice the possibility of damage and losses to existing assets, cularly people, critical facilities/infrastructure, and State- id facilities, due to wildfires. Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires in new development areas. Continue to enforce fire codes involving new construction. Continue to ensure street width and turn-around regulations are met in these urban/interface areas. Protect existing assets with the highest relative vulnerability to the effects of wildfires. Continue current practice of weed abatement in all city areas that are vulnerable. Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management). Continue to participate in Zone, County and State mutual and automatic aid agreements. City of La Mesa 5-149 SECTION I I \ I Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to dam failure. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 7.A. 1 Although the Lake Murray Dam is outside city limits, monitor and cooperate with the City of San Diego to reduce the possible effects of dam failure to the City of La Mesa, Action 7.A.2 Update Dam Inundation plans Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure (continued). Action 7.A.3 Maintain communications with the City of San Diego regarding dam failure at Lake Murray. Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to geological hazards. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 8.A.1 Continue use of current California Building Code in all areas of new construction and remodel activity within the City. 5,11.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Update General Plan. Coordinating Individual/Organization: Community Development Department City of La Mesa 5-150 SECTIBNFIVE Coals, Objectives and Actions Potential Funding Source: General Fund Implementation Timeline: June 2010 through December 2012 Action Item #2: Through print media and the city website, continue to make available information regarding hazard mitigation in the City of La Mesa Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #3: Continue to use County and CalEMA to coordinate and assist in implementation of mitigation awareness and efforts. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #4: Continue current practice of weed abatement in all city areas that are vulnerable. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #5: Continue to participate in Zone, County and State mutual and automatic aid agreements. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #6: Coordinate with other agencies and departments on training and planning for terrorist activities. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and possible grants Implementation Timeline: On-going Action Item #7: Maintain communication links that disseminate intelligence information. Coordinating Individual/Organization: Police Department Potential Funding Source: General Fund Implementation Timeline: On-going City of La Mesa 5-151 SECTIOHFIVE Goals, Objectives and Actions Action Item #8: Continue use of current California Building Code in all areas of new construction and remodel activity within the City. Coordinating Individual/Organization: Community Development Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #9: Continue to conduct EOC drills at the city and regional level. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and possible grants Implementation Timeline: On-going Action Item #10: At the regional level, continue to be a part of the development of the regional plan. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and possible grants Implementation Timeline: On-going City of La Mesa 5-152 SECTIONFIVE Goals, Objectives and Actions 5.12 CITY OF LEMON GROVE The City of Lemon Grove (Lemon Grove) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Lemon Grove summarized in Table 5.12-1. See Section 4.0 for additional details. Table 5.12-1 Summary of Potential Hazard-Related Exposure/Loss in Lemon Grove Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 0 25,650* Residential Number of Residential Buildings 0 0 8,824* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 0 2,483,956* Commercial Number of Commercial Buildings 0 0 365* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 0 1,635,821* Critical Facilities Number of Critical Facilities 0 0 0** Potential Exposure for Critical Facilities (x$1,000) 0 0 0** Flood (Loss) 100 Year 500 Year 105 131 34 41 9,571 11,542 2 2 8,963 8,963 1 1 3 4 Rain-Induced Landslide High Risk Moderate Risk Tsunami 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 188 0 25,058 0 79 0 8,606 0 22,239 0 2,422,589 0 1 0 361 0 4,482 0 1,617,894 0 0 0 46 0 0 0 21,591 Represents 100-year earthquake value under three earthquake scenarios shake and landslide). ** Represents 500-year earthquake value under three earthquake scenarios shake and landslide). (shake only, shake and liquefaction, and (shake only, shake and liquefaction, and City of Lemon Grove 5-153 SECTIBNFIVE Coats, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Lemon Grove LPG as their top five. • Earthquake • Flood • Landslide • Wildfire • Dam Failure 5.12.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Lemon Grove's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.12.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Lemon Grove and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Lemon Grove, as shown in Table 5.12-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of Lemon Grove Fire Department - Includes Fire Prevention Department, Fire Plans and Subdivision Review o Plans review of compliance with State, Federal and Local ordinances. o Evaluation of water supply needs and establishing the location of current and future water supply needs. - Fire Prevention Inspections Department o Conducts scheduled inspections of new construction. o Initiate compliance Inspection of Hazardous Occupancies. City of Lemon Grove 5-154 SICTIONFIVE Goals, Objectives and Actions City of Lemon Grove Community Services Department - Streets Division: Responsible for repairing and maintaining streets, curbs, gutters, storm drain channels, street sweeping and sidewalks - Parks Division: Responsible for maintaining trees and landscaping in public right-of-way. - Sewer Division: Identify sewer spills and mediate such spills.Facilities Division: Responsible for the day-to-day operation and maintenance of City facilities. City of Lemon Grove Community Development Department - Planning: Oversees implementation of General Plan requirements and reviews projects to ensure minimal adverse impacts from flood plains, slopes, canyons and grading. - Building: Reviews proposed projects for conformance to State and local building codes City of Lemon Grove Engineering Services Department - Storm water: Reduction of urban runoff and storm water to the greatest extent possible. - Reviews project site designs and street and public improvements for proper engineering design. San Diego County Sheriff's Department - Provide law enforcement services (scene security, traffic and crowd control, and criminal investigation) at scene of a disaster. - Department policies and procedures to respond to and manage critical incidents. Table 5.12-2 City of Lemon Grove: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS Y/N Y Y Y Y Y Y Y Department/Agency and Position Community Development-Director, Senior Planner, Engineer Service-City Engineer, Associate Engineer Community Development-Director, Senior Planner, Engineer Service-City Engineer, Associate Engineer Community Development-Director, Senior Planner, Engineer Service-City Engineer, Associate Engineer Engineering services - City Engineer Engineering Services - On-call consultants Fire Department-Fire Chief Community Development Department Engineering City of Lemon Grove 5-155 SICTIOMFIVE Goals. Objectives and Actions H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers N Y Y Services City Manager City Manager-Grant Writer The legal and regulatory capabilities of Lemon Grove are shown in Table 5.12-3, which presents the existing ordinances and codes that affect the physical or built environment of Lemon Grove. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. Table 5.12-3 City of Lemon Grove: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y N Does State Prohibit? (Y/N) N N N N N N N N N N N N N 5.12.1.2 Fiscal Resources Table 5.12-4 shows specific financial and budgetary tools available to Lemon Grove such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Lemon Grove 5-156 SECTIONFI YE Goals, Objectives and Actions Table 5.12-4 City of Lemon Grove: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. 1. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Y Y N Y Y Y Y Y Y 5.12.2 Goals, Objectives and Actions Listed below are Lemon Grove's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Lemon Grove LPG. The Lemon Grove LPG members were: • Graham Mitchell, City Manager • Tim Smith, Deputy Fire Chief • Carol Dick, Director, Community Development • Pat Lund, City Engineer Once developed, City staff submitted the plan to the State of California and to FEMA for approval. Once approved by FEMA the plan will be taken to the lemon Grove City Council for adoption. City of Lemon Grove 5-157 SECTiONFIVE Goals, Objectives and Actions Public meetings were held throughout the County to present these preliminary goals, objectives and actions to citizens and to receive public input. At these meetings, specific consideration was given to hazard identification/profiles and the vulnerability assessment results. The following sections present the hazard-related goals, objectives and actions as prepared by Lemon Grove's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.12.2.1 Goals The City of Lemon Grove has developed the following 5 Goals for their Hazard Mitigation Plan. Goal 1. Promote disaster-resistant future development. Goal 2. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 3. Improve hazard mitigation coordination and communication with federal, state, and local governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal 4. Floods. GoalS. Earthquakes. 5.12.2.2 Objectives and Actions The City of Lemon Grove developed the following broad list of objectives and actions to assist in the implementation of each of their 5 identified goals. The City of Lemon Grove developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.12.2.3. Goal 1: Promote disaster-resistant future development. Objective 1 A: Facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Action 1 .A.1 Update the General Plan every as needed. Action 1A2 Attract and retain qualified, professional and experienced staff. Action 1 A3 Update Fire and Building Codes and ordinances. City of Lemon Grove 5-158 SECTIONFI YE Goals, Objectives and Actions Goal 2: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 2. A: Action 2.A.1 Action 2.A.2 Action 2.A.3 Objective2.B: Action 2.B.1 Objective 2.C. Action 2.C.1 Increase awareness and knowledge of hazard mitigation principles and practices among local officials. Continue to build and support local partnerships, such as the United Disaster Council (UDC) and Urban Area Working Group (UAWG) and the coordination of mutual aid agreements. Build a team of community volunteers to work with the community before, during and after a disaster. Continue to incorporate hazard mitigation concerns into City of Lemon Grove planning and budgetary processes. Solicit community organizations to incorporate hazard mitigation activities. Continue to communicate with local civic groups, schools and employees to encourage them to promote hazard mitigation as common safe working conditions. Increase awareness and knowledge of hazard mitigation principles and practices among local residents. Continue to publish educational information in the City newsletter and on the City's website. Goal 3: Improve hazard mitigation coordination and communication with federal, state and local governments. Objective 3 A: Establish and maintain closer working relationships with federal, state and local governments. Action 3.A.1 Continue to build and support local partnerships, such as the United Disaster Council (UDC) and Urban Area Working Group (UAWG) and the coordination of mutual aid agreements. Action 3.A.2 Continue to encourage development of standardized Emergency Operations Plans within the City of Lemon Grove that coordinate with countywide Emergency Operations Plans. Action 3.A.3 Continue to develop multi-jurisdictional multi-functional training and exercises to enhance hazard mitigation. Action 3.A.4 Continue to maintain working relationships with agencies providing resources and expertise that further hazard mitigation efforts. City of Lemon Grove 5-159 SICTIONFIVE Goals, Objectives and Actions Goal 3: Improve hazard mitigation coordination and communication with federal, state and local governments (continued). Objective 3.B: Support a coordinated permitting activities process. Action 3.B.1 Continue to utilize notification procedures for all permits that support affected agencies. Action 3.B.2 Continue to streamline policies to eliminate conflicts and duplication of effort. Action 3.B.3 Continue to exchange resources and work with other agencies. Action 3.B.4 Continue efforts towards consolidating the administration of fire resources for the Cities of Lemon Grove, La Mesa and El Cajon, Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical infrastructure and public facilities due to floods. Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 4.A.1 Review and update existing flood control standards, zoning and building requirements. Action 4.A.2 Continue policies that discourage growth in flood-prone areas. Action 4.A.3 Continue to seek pre-disaster mitigation funding. Action 4.A.4 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical infrastructure and public facilities due to earthquakes. Objective 5 A: Develop programs to limit damage and losses due to earthquakes Action 5.A.1 Continue to periodically update Building Codes to reflect current standards. Action 5.A.2 Continue to identify hazard-prone structures using CIS. Action 5.A.3 Continue to construct critical infrastructure and public facilities that will remain functional after earthquakes. City of Lemon Grove 5-160 SICTIONFIVE Goals, Objectives and Actions 5.12.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Continue to build and support local partnerships, such as the United Disaster Council (UDC) and Urban Area working Group (UAWG), and the coordination of mutual aid agreements. Coordinating Individual/Organization: Deputy Fire Chief Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #2: Continue to incorporate hazard mitigation concerns into City of Lemon Grove planning and budgetary processes. Coordinating Individual/Organization: City Manager, Finance Department Potential Funding Source: General Fund Implementation Timeline: February - March of each fiscal year Action Item #3: Continue to publish educational information in the City newsletter and on the City's website. Coordinating Individual/Organization: City Manager Department Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #4: Continue to encourage development of standardized Emergency Operations Plans within the City of Lemon Grove that coordinate with countywide Emergency Operations Plans. Coordinating Individual/Organization: Deputy Fire Chief Potential Funding Source: General Fund Implementation Timeline: On-going City of Lemon Grove 5-161 SEBTiONFIVE Goals, Objectives and Actions Action Item #5: Continue to develop multi-jurisdictional multi-functional training and exercises to enhance hazard mitigation. Coordinating Individual/Organization: Deputy Fire Chief Potential Funding Source: General Fund, Grant Funds (SHSG, UASI) Implementation Timeline: On-going Action Item #6: Continue efforts towards consolidating the administration of fire resources for the Cities of Lemon Grove, La Mesa and El Cajon Coordinating Individual/Organization: Deputy Fire Chief Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #7: Continue to review and update existing flood control standards, zoning, and building requirements. Coordinating Individual/Organization: Comm. Dev. Director Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #8: Continue policies that discourage growth in flood-prone areas. Coordinating Individual/Organization: City Manager Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #9: Update Building and Fire Codes to reflect current standards. Coordinating Individual/Organization: City Manager Potential Funding Source: General Fund Implementation Timeline: As State codes change Action Item #10: Continue to identify hazard-prone areas using GIS. Coordinating Individual/Organization: Deputy Fire Chief Potential Funding Source: General Fund Implementation Timeline: On-going City of Lemon Grove 5-162 SECTIONFIVE Goals, Objectives and Actions 5.13 CITY OF NATIONAL CITY The City of National City (National City) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, Local Planning Groups (LPGs) were supplied with exposure/loss estimates for National City summarized in Table 5.13-1. See Section 4.0 for additional details. Table 5.13-1 Summary of Potential Hazard-Related Exposure/Loss in National City Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss- Includes shaking, liquefaction and landslide components) Exposed Population 0 1,998 56,522* Residential Number of Residential Buildings 0 496 15,776* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 139,624 4,440,944* Commercial Number of Commercial Buildings 0 184 892* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 824,633 3,997,676* Critical Facilities Number of Critical Facilities 0 53 0** Potential Exposure for Critical Facilities (x$1,000) 0 31,044 0** Flood (Loss) 100 Year 500 Year 2,854 8,584 893 2,735 251,380 769,903 118 259 528,841 1,160,760 20 29 24,557 30,327 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 7 1,306 0 2 0 0 563 0 0 0 5 0 0 22,409 0 1 5 0 192 60,384 Wildfire / Structure Fire Extreme Very High High Moderate 0 0 9 55,054 0 0 2 15,749 0 0 563 4,433,344 0 0 5 881 0 0 22,409 3,948,378 0 0 1 125 0 0 192 872,901 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of National City 5-163 SECTIONFIVE Goals. Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following were identified by the National City LPG as their top hazards: • Dam Failure/Floods: Sweetwater dam failure • Earthquakes: proximity to local faults (e.g. Rose Canyon Fault); older structures; potential for loss of life, injuries, and damage to property, as well as disruption of services is significant • Hazmat Release: three freeways (i.e. 1-5,1-805, & SR-54) and railway pass through the City making it susceptible to hazardous spills, releases, or accidents; several industrial facilities in the City handle hazardous materials on a regular basis • Structure Fires: older structures • Tsunami: proximity to waterfront may affect maritime business industry 5.13.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides National City's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.13.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in National City and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of National City, as shown in Table 5.13-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of National City Fire Department Fire Prevention Emergency Rescue and Response Fire Suppression Code Enforcement Public Education City of National City 5-164 SECTIONFIVE Goals, Objectives and Actions Emergency Management Weed Abatement City of National City Development Services Department General Plan Development Standards (Building, Planning, Engineering) Development Review Process Code Enforcement Zoning Ordinances Traffic Control City of National City Police Department Enforcement Investigation Security Emergency Response Traffic Control Table 5.13-2 City of National City: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planner(s) or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y N Y Y N Y Y Department/Agency and Position Development Services Department Development Services Department Fire/Development Services Department/Police Development Services Department Fire/Development Services Department/Police Fire/Development Services Department/Police City Manager's Office/Fire/Police Fire/Development Services Department/Police City of National City 5-165 SECTMNFIVE Goals, Objectives and Actions The legal and regulatory capabilities of National City are shown in Table 5.13-3, which presents the existing ordinances and codes that affect the physical or built environment of National City. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordinances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. Table 5.13-3 City of National City: Legal and Regulatory Capability Regulatory Tools (ordinance, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodpiain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements^ G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y N Y Y Y Y Y Y N N Does State Prohibit? (Y/N) N N N N N N N N N N N N N 5.13.1.2 Fiscal Resources Table 5.13-4 shows specific financial and budgetary tools available to National City such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of National City 5-166 SECTIONFI YE Goals, Objectives and Actions Table 5.13-4 City of National City: Fiscal Capability Financial Resources A.Community Development Block Grants (CDBG) B. Capital improvements project funding C. D. E. F. G. H. 1. Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes- eligible, but limited accessibility Yes- eligible, but limited accessibility No- requires voter approval Yes- Sewer Only Yes- Parks Only No- requires voter approval No- requires voter approval No Yes- subject to Council approval 5.13.2 Goals, Objectives and Actions Listed below are National City's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, Planning, Engineering, and Redevelopment provided input to the National City LPG. The National City LPG members were: • Ray Pe (Community Development Department) • Walter Amedee (Fire Department) • Peggy Chapin (Development Services Department) • Martin Reeder (Development Services Department) • Mike Harlan (Police Department) • Din Daneshfar (Development Services Department) Once developed. City staff submitted the final plan to CalEMA and FEMA for approval. Once approved, the plan will be taken to the City Council for adoption. City of National City 5-167 SECTiONFIVE Goats, Objectives and Actions The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by the County's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.13.2.1 Goals The City of National City has developed the following 8 Goals for their Hazard Mitigation Plan (See Attachment A for Goal 8). Goal 1. Promote disaster-resistant developments for new development. Goal 2. Promote public understanding, support and demand for hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve hazard mitigation coordination and communication with federal, state and other local governments. Reduce the possibility of damage and losses of existing assets, critical facilities/infrastructure, and City-owned facilities, and particularly impacts to people, due to: Goal 5. Earthquakes Goal 6. Floods Goal?. Structural Fire/Wildfire GoalS. Tsunamis Goal 9. Manmade Hazards (See Attachment A) 5.13.2.2 Objectives and Actions The City of National City developed the following broad list objectives and actions to assist in the implementation of each of their 8 identified goals. The City of National City developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.13.2.3. City of National City 5-168 SiCTIONFI YE Goals, Objectives and Actions Goal 1: Promote disaster resistant developments for new development. Objective 1 A: Action 1.A.1 Action 1 .A.2 Objective 1.B: Action 1.B.1 Action IB. 2 Objective 1 .C: Action 1.C.1 Action 1.C.2 Objective 1 .D: Action 1.D.1 Action 1 .D.2 Objective 1 .E: Action 1.E.1 Action 1.E.2 Continue to address natural hazards in future general plan updates. Continue to update the General Plan periodically. Continue to update the Land Use Code periodically. Encourage and facilitate the adoption of building codes for new development and renovation that will protect these assets and new development in hazard areas. Adopt and implement current building and fire codes per state cycle. Continue to regularly adopt and implement existing building codes Continue to implement National City land use code and enforce building codes. Encourage and improve communications between the Development Services Department and Fire Department. Cross-train staff from Development Services Department and Fire on current relevant codes. Encourage future development that incorporates planning that will not exacerbate hazardous conditions. Review annually and update as necessary the Flood Plain Ordinance periodically. Continue to update Land Use Codes periodically. Consider appropriate zoning that will limit future development in hazard areas. Implement Geographic Information System (GIS) program citywide. Use GIS and Census data to plot hazard areas for new development. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Conduct workshops with Neighborhood Councils, Chamber of Commerce, interested groups, schools, individual homeowners, and business community on hazards that require advance preparedness. Action 2.A.2 Continue to promote disaster preparedness with the distribution of print materials or videos. City of National City 5-169 SICTIONFIVE Goals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation (continued). Objective 2. B: Action 2.B.1 Action 2.B.2 Action 2.B.3 Action 2.B.4 Objective 2.C: Action 2.C.1 Action 2.C.2 Objective 2.D: Action 2.D.1 Objective 2.E: Action 2.E.1 Action 2.E.2 Promote partnerships between the state, counties and other local governments to identify , prioritize and implement mitigation actions. Participate in workgroup activities with the County Office of Emergency Services (OES), Unified Disaster Council (UDC). Participate in workgroup activities with other municipalities. Participate in workgroup activities with SANDAG. Participate in workgroup activities with Caltrans. Promote hazard mitigation in the business community. Conduct workshops with the Chamber of Commerce, Rotary Clubs, etc. Conduct informational meetings with business owners/managers. Monitor and publicize the effectiveness of mitigation actions implemented citywide. Develop method to keep community informed of progress. Discourage building construction that exacerbates hazardous conditions. Actively implement code enforcement for building without permits. Actively implement code enforcement for hazardous occupancies in accordance with adopted codes. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.1 Update and adopt the City of National City Emergency Plan every 10 years. Action 3.A.2 Update and adopt the Hazard Mitigation Plan every 5 years. Objective. 3.B: Develop a hazard mitigation plan and provide technical assistance to implement the plan . Action 3.B.1 Work with the Fire Department, Development Services Department, Community Development Department, and Police Department to develop the hazard mitigation plan. City of National City 5-170 SECTIONFI YE Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards (continued). Objective 3.B: Develop a hazard mitigation plan and provide technical assistance to implement the plan (continued). Action 3.B.2 Implement hazard mitigation plan recommendations. Goal 4: Improve hazard mitigation coordination and communication with federal, state and other local governments. Objective 4 A: Establish and maintain closer working relationships with state agencies and other local governments. Action 4.A.1 Continue to work with the Chamber of Commerce, American Red Cross, County Office of Emergency Services (OES), Unified Disaster Council (UDC), and Federal Emergency Management Agency (FEMA) to develop mitigation plans. Action 4.A.2 Continue support/participation in regional programs to include HIRT, USAR, and MMST Objective 4.B: Encourage other organizations to incorporate hazard mitigation activities. Action 4.B.1 Hold seminars to encourage organizations to take mitigation actions. This initiative can be developed in modular format to address the information needs of a range of target groups. Action 4.B.2 Make available a copy of the completed Hazard Mitigation Plan for the public to view. Objective 4.C: Improve the City's capability and efficiency at administering pre- andpost- disaster mitigation. Action 4.C.1 Work with the Fire Department, Development Services Department, Community Development Department, and Police Department to develop hazard mitigation plan. Action 4.C.2 Maintain an Emergency Response Plan. Action 4.C.3 Schedule Emergency Response Plan Exercises. Action 4.C.4 Conduct on-going education programs to inform the community of pre-and post disaster advice. City of National City 5-171 SICTIOHFIVE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people and critical facilities/infrastructure due to earthquakes. Objective 5 A. Action 5.A.1 Action 5.A.2 Action 5.A.3 Action 5.A.4 Action 5.A.5 Action 5.A.6 Action 5.A.7 Objective 5.B. Action 5.B.1 Action 5.B.2 Action 5.B.3 Action 5.B.4 Objective 5.C. Action 5.C.1 Action 5.C.2 Develop a comprehensive approach to reducing the possibility of damage and losses due to earthquakes. Conduct workshops with Neighborhood Councils, Chamber of Commerce, individual homeowners, and business community on hazards that require advance preparedness. Recommend that the City retrofit the City Hall as funds become available. Actively pursue grant funds and other funding sources to retrofit City Hall. Maintain an Emergency Response Plan. Regularly schedule Emergency Response Plan Exercises with City staff. Maintain search and rescue equipment deployment objectives. Determine structural safety of buildings to be used for care and shelter of evacuees. Protect existing assets with the highest relative vulnerability to the effects of earthquakes Adopt and implement existing building codes. Conduct inspections of at-risk structures that conduct care for children, seniors, and other group homes. Conduct inspections of child care facilities, senior facilities, and other facilities where occupants may be severely impacted to ensure the structures are structurally safe. Conduct informational meetings with Neighborhood Councils, Chamber of Commerce, individual homeowners, and business community. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from earthquakes. Implement GIS program citywide. Use GIS and Census data to locate vulnerable buildings. City of National City 5-172 SICTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing asset particularly people and critical facilities/infrastructure due floods. Objective 6 A: Action 6.A.1 Action 6.A.2 Action 6.A.3 Action 6.A.4 Action 6.A.5 Action 6.A.6 Objective 6.B: Action 6.B.1 Action 6.B.2 Objective 6.C: Action 6.C.1 Action 6.C.2 Action 6.C.3 Objective 6.D. Action 6.D.1 Action 6.D.2 Develop a comprehensive approach to reducing the possibility damage and losses due to floods. Maintain Flood Retrofitting for Residential Structures. Maintain Storm Water System in Operable Conditions. Reduce Impervious Surfaces through implementation of a landscape ordinance encroaches previous site design. Maintain and update a city-wide Evacuation Plan. Maintain search and rescue equipment deployment objectives. s, to of that Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Protect existing assets with the highest relative vulnerability to effects of floods within the 100-year floodplain. the Maintain adequate materials to disperse to the public for installing water barriers when necessary. Construct detention basins when necessary and review new development for adequate design features. Coordinate with and support existing efforts to mitigate floods (e.g., U.S. Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Regularly participate in workgroup activities with the County. Regularly participate in workgroup activities with the Caltrans. Regularly participate in workgroup activities with the other municipalities. Minimize repetitive losses caused by flooding. Prepare and implement Best Management Practices for all new development. Schedule Flood Mitigation and recovery Interactive Exercises. City of National City 5-173 SiCTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people and critical facilities/infrastructure due to floods (continued) Objective 6.E: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from flooding. Action 6.E.1 Implement GIS program citywide. Action 6.E.2 Use GIS and Census data to locate vulnerable buildings. Action 6.E.3 Require Hydrology Studies be prepared for all new development, except single family residences. Action 6.E.4 Use Hydrological Modeling Techniques for large developments. Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people and critical facilities/infrastructure due to structural fire/wildfire. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to structural fire/wildfire. Action 7.A.1 Regularly maintain a Fire Prevention Program. Action 7.A.2 Regularly maintain a Pre-Fire Plan Program. Action 7.A.3 Regularly maintain a Fire Suppression Program. Action 7.A.4 Assess staffing levels of Fire Prevention Staff and increase as appropriate. Action 7.A.5 Develop a Housing Inspection Program and routinely conduct housing inspections of homes over 50 years old. Action 7.A.6 Conduct a Housing Outreach Program. Action 7.A.7 Maintain/update ail Arson Registrants with required registration and conditions of probation or parole. Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of structural fire/wildfire . Action 7.B.1 Maintain response times, pumping capacity and apparatus and equipment deployment objectives. Action 7.B.2 Annually assess staffing levels and ensure adequate staffing is available to meet fire suppression objectives. Action 7.B.3 Maintain standard operating procedures for fire ground operations. Action 7.B.4 Conduct annual wildland fire fighting and ICS training to ensure operational readiness. City of National City 5-174 SECTIONFI YE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people and critical facilities/infrastructure due to structural fire/wildfire (continued). Objective 7.B: Actiojn] 7.B.5 Action 7.B.6 Objective 7.C: Action 7.C.1 Action 7.C.2 Action 7.C.3 Action 7.C.4 Objective 7.D: Action 7.D.1 Action 7.D.2 Protect existing assets with the highest relative vulnerability to the effects of structural fire/wildfire (continued). Identify and work to eliminate non-fire resistant roofs. Install automatic fire detection and extinguishing systems in buildings according to adopted codes. Coordinate with and support existing efforts to mitigate structural fire/wildfire. Maintain mutual/auto aid agreements with neighboring municipalities. Maintain an inspection process to ensure buildings are constructed in accordance with adopted codes. Conduct evacuation drills in high rise buildings. Maintain/update all Arson Registrants with required registration and conditions of probation or parole. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from structural fire/wildfire. Implement CIS program citywide. Use CIS and Census data to locate vulnerable buildings. 5.13.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 9 prioritized mitigation actions as well as an implementation strategy for each are: City of National City 5-175 SECTIONFIVE Goals, Objectives and Actions Priority Action #1: Update the General Plan. Coordinating Individual/Organization: Community Development Potential Funding Source: General Fund Implementation Timeline: FY 09 - FY 11 Priority Action #2: Maintain response times, pumping capacity, and apparatus and equipment deployment objectives. Coordinating Individual/Organization: Fire Department Potential Funding Source: City General Fund, Community Development Block Grant along with other applicable funding sources. Implementation Timeline: January 2010 - December 2015 Priority Action #3: Maintain/update all Arson Registrants with required registration and conditions of probation or parole. Coordinating Individual/Organization: Police Department Potential Funding Source: General/Other Applicable Funds Implementation Timeline: January 2010 - December 2015 Priority Action #4: Work with the Regional Terrorism Threat Advisory Council (RTTAC). Coordinating Individual/Organization: Police Department Potential Funding Source: General/Other Applicable Funds Implementation Timeline: January 2010 - December 2015 Priority Action #5: Continue Maintenance of the Storm Water System in Operable Conditions Coordinating Individual/Organization: Department of Public Works/Development Services Department Potential Funding Source: CDBG, Gas Tax, Sewer System Maintenance, and General Funds Implementation Timeline: January 2010 - December 2015 Priority Action #6: Implement code enforcement for buildings without permits. Coordinating Individual/Organization: Development Services Department Potential Funding Source: Citation fees/General fund Implementation Timeline: January 2010 - December 2015 Priority Action #7: Maintain a Fire prevention Program Coordinating Individual/Organization: Fire Department Potential Funding Source: General/Other Applicable Funds Implementation Timeline: January 2010 - December 2015 City of National City 5-176 SECTIONFIVE Goals. Objectives and Actions Priority Action #8: Implement GIS Program Coordinating Individual/Organization: Development Services Department Potential Funding Source: General/Other Applicable Funds Implementation Timeline: January 2010 - December 2015 Priority Action #9: Continue to update Land Use Code periodically. Coordinating Individual/Organization: Community Development Potential Funding Source: General Fund Implementation Timeline: FY 09 - FY 11 City of National City 5-177 SECTIONFIYE Goals, Objectives and Actions This page intentionally left blank City of National City 5-178 SECTIONFIVE Goals, Objectives and Actions 5.14 CITY OF OCEANSIDE The City of Oceanside (Oceanside) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Oceanside summarized in Table 5.14-1. See Section 4.0 for additional details. Table 5.14-1 Summary of Potential Hazard-Related Exposure/Loss in Oceanside Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annuaiized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 76 33,755 179,626* Residential Number of Residential Buildings 54 11,437 64,642* Potential Exposure/ Loss for Residential Buildings (x$1,000) 15,201 3,219,516 18,196,723* Commercial Number of Commercial Buildings 3 285 1,964* Potential Exposure/Loss for Commercial Buildings (x$1,000) 13,445 1,277,285 8,802,059* Critical Facilities Number of Critical Facilities 0 56 259** Potential Exposure for Critical Facilities (x$1,000) 0 222,319 1,523,489** Flood (Loss) 100 Year 500 Year 19,007 37,323 6,715 12,878 1,890,273 3,625,157 217 368 972,529 1,649,266 57 77 220,310 332,100 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 0 2,108 0 0 1,059 0 0 298,109 0 0 46 0 0 206,158 0 0 5 0 0 578 Wildfire / Structure Fire Extreme Very High High Moderate 0 1,402 2,795 161,361 0 470 849 58,273 0 132,305 238,994 16,403,850 0 7 21 1,824 0 31,372 94,116 8,174,621 0 2 10 222 0 4 2,208 1,508,295 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Oceanside 5-179 SECTiONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Oceanside LPG as their top five. • Flooding: 25,50 & 100 year storms and vegetation clogged river/creek channels, history • Earthquake: Proximity to local faults, history • Coastal Storms/Erosion/Tsunami: Constant and historical - proximity to Pacific Ocean, history • Wildfire: Climate, location, and natural vegetation types, history • Human caused hazards: Spills, releases, accidents, criminal activity, terrorist activity, history 5.14.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Oceanside's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.14.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Oceanside and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Oceanside, as shown in Table 5.14-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of Oceanside Fire Department - Emergency Response and Rescue services - Fire Prevention Division - Development Plans Review - Fire & Life Safety Inspection - Beach Lifeguard Services - Hazardous Materials Response and Evaluation City of Oceanside 5-180 SECTIONFIVE Goals. Objectives and Actions • City of Oceanside Police Department - Police Services - Harbor PD Services - Emergency Public Notification — Evacuation Coordination • City of Oceanside Public Works Department - Low Level Hazardous Waste clean up - Streets and Sidewalks - Lighting District - Fleet Management - Harbor/Beach Maintenance - Harbor Management • City of Oceanside Administrative Services - Finance Services - Human Services - Administrative Services - Government Services - Information Technology Services • City of Oceanside Water Utilities Department - Water Services - Wastewater management - GIS Services — Storm water Control and Monitoring • City of Oceanside Development Services - Building Division - Building Inspection - Engineering Division - Planning Division • City of Oceanside Economic and Community Development Department - Property Management - Redevelopment Services City of Oceanside 5-181 SICTIONFIVE Goals, Objectives and Actions - Economic Development • Neighborhood Services - Code Enforcement - Housing Department - Parks and Recreation Division • Library Services Table 5.14-2 City of Oceanside: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F, Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J . Grant writers Y/N Y Y Y Y N Y Y N Y N Department/Agency and Position Planning & Engineering Department Engineering & Building Department Directors Planning & Engineering Department Directors Engineering Department - City Engineer Contracted as needed City of Oceanside Water Department - GIS Specialist The legal and regulatory capabilities of Oceanside are shown in Table 5.14-3, which presents the existing ordinances and codes that affect the physical or built environment of Oceanside. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special puipose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Oceanside 5-182 SICTIONFIVE Goals, Objectives and Actions Table 5.14-3 City of Oceanside: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance Local Authority (Y/NO Y Y Y Y Y Y Y Y Y Y Y N Does State Prohibit? (Y/N) N N N N N N N N N N N N 5.14.12 Fiscal Resources Table 5.14-4 shows specific financial and budgetary tools available to Oceanside such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Oceanside 5-183 SECTIONFIVE Goals, Objectives and Actions Table 5.14-4 City of Oceanside: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. 1. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Y Y Y - 2/3 Majority popular vote required Y Y Y Y - Majority popular vote required N N 5.14.2 Goals, Objectives and Actions Need note about plan update process Listed below are Oceanside's updated specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The updated goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These goals, objectives and actions were developed to represent a vision of long-term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Oceanside LPG. The Oceanside LPG update members were: Joe Urban, Emergency Preparedness Coordinator Ken Matsumoto, Division Chief Don Hadley - Deputy City Manager Joseph Arranaga - Public Works Director Lonnie Thibodeaux - Water Utilities Director George Buell - Development Services Director Michael Sherwood - Information Technologies Director City of Oceanside 5-184 SECTIONFIVE Goals, Objectives and Actions Once completed, City staff will submit the final plan to CalEMA and FEMA for approval. Once approved by FEMA the plan will be taken to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input. Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. All comments were reviewed and were incorporated into the draft plan as appropriate. The following sections present the hazard-related goals, objectives and actions as prepared by the City of Oceanside's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials and local citizens. 5.142.1 Goals The City of Oceanside has developed the following 10 Goals for their Hazard Mitigation Plan (See Attachment A for Goal 10). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding, support, and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve coordination and communication with federal, state, local and tribal governments. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to: Goal 5. Floods Goal 6. Wildfires Goal 7. Storm Surge/Coastal Erosion GoalS. Infestations/Diseases Goal 9. Geological Hazards Goal 10. Other Manmade Hazards City of Oceanside 5-185 SECTIONFIVE Goafs, Objectives and Actions 5.142.2 Objectives and Actions The City of Oceanside developed the following broad list of objectives and actions to assist in the implementation of each of their 44 12 (add man-made threats) identified goals. The City of Oceanside developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.14.2.3. Goal 1: Promote disaster-resistant future development. Objective 1 A: Action 1.A.1 Objective J.B: Action 1.B.1 Facilitate the adoption, development or updating of Building, Engineering and Fire Codes and zoning ordinances to improve resistance to hazards and control development in high-hazard areas. Adoption of most current Building, Engineering and Fire Codes Discourage the present lack of State and Federal inter- departmental cooperation that exacerbates hazardous conditions. Pursue vegetation management within river and creek channels Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Enhance public awareness of hazard mitigation efforts utilizing Oceanside's local public access channel (KOCT - Oceanside Ca.) and available print medias Action 2.A.2 Increase awareness of individual homeowners, other property owners, the business community, and others in the importance of taking proactive steps to mitigate the risk of hazards through use of the City's quarterly magazine Action 2.A.3 Promote "Personal Preparedness" by production and distribution of video and print materials through public access television and local libraries. Continued development and increase of local CERT Team members and capabilities. City of Oceanside 5-186 SECTIONFI YE Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among state, local and tribal officials. Action 3.A.1 Build and support local partnerships, such as the Unified Disaster Council (UDC) and Homeland Preparedness Coordination Council (HPCC), and the coordination of mutual aid agreements to reduce vulnerability to hazards and improve post-incident recovery Action 3.A.2 Build hazard mitigation concerns into the City's planning process Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies, local and tribal governments^ Action 4.A.1 Plan, practice, exercise, and operate the City's Emergency Operations Center (HOC) following the Standardized Emergency Management System (SEMS) and Incident Command System (ICS). Action 4.A.2 Encourage further refinement and updating of the City's Emergency Operations Plan coordinated with bordering community's emergency plans and the County-wide Emergency Operations Plan. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City of Oceanside owned facilities, due to identified hazards including flooding, earthquake, coastal storms/ erosion/ tsunami, wildfire, and human caused hazards. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to identified hazards including flooding, earthquake, coastal storm si erosion! tsunami, wildfire, and human caused hazards. Action 5.A.1 Develop an integrated communication/notification plan utilizing Geographic Information Systems (CIS) technology and the Emergency Broadcast System (EBS) including information about road closures, evacuation routes, shelters, emergency medical access and updated event information. Includes development of a countywide damage assessment team. City of Oceanside 5-187 SECTIONI IYL Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City of Oceanside owned facilities, due to identified hazards including flooding, earthquake, coastal storms/ erosion/ tsunami, wildfire, and human caused hazards (continued). Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to identified hazards including flooding, earthquake, coastal storms/ erosion/tsunami, wildfire, and human caused hazards (continued). Action 5.A.2 Replacement of Oceanside Fire Stations #1 and #7 with a modern, hazard resistant, emergency self-supported, facilities Action 5.A.3 Replace underground fuel storage tanks with above ground tanks at all City facilities Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City of Oceanside owned facilities, due to floods. Objective 6 A: Protect existing assets with the highest relative vulnerability! to the effects of floods within the 100-year flood-plain. Action 6.A.1 Seek State and Federal agency cooperation in the control and management of vegetation within local creek and river channels. Action 6.A.2 Work with State and Federal authorities regarding regulations that add local expense and time to flood control measures and maintenance activities. Action 6.A.2 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to wildfires. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Action 7.A.1 Utilize aggressive vegetation management programs to provide buffer zones between unimproved wildland and development Action 7.A.2 Adopt local building ordinances which improve building standards in urban/wildland interface areas including non-combustible fencing, boxed eaves, extruded metal window frames, Class-A non-combustible roofs and exterior wall coverings, and protected attic venting City of Oceanside 5-188 SECTIONFI YE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to severe weather (e.2., El Nino storms/, thunderstorms, lightening, tsunamis, and extreme temperatures). Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to severe weather. Action 8.A.1 Coordinate with other County agencies in the utilization of SANDAG to develop CIS- based severe weather zone mapping Goal 9: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to dam failure. Objective 9.A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 9.A.1 Work with State and Federal agencies to develop a comprehensive vegetation management plan to reduce the overall vegetative mass that currently exists within in the San Luis Rey River channel 5.14.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 5 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Pursue vegetation management within river and creek channels Coordinating Individual/Organization: Public Works Potential Funding Source: Federal Grant Implementation Timeline: 2010-2015 City of Oceanside 5-189 SECT10NFIVE Coals, Objectives and Actions Action Item #2: Replacement of Oceanside Fire Stations #1 and #7 with a modern, hazard resistant, emergency self-supported, facilities Coordinating Individual/Organization: Fire Department Potential Funding Source: City of Oceanside / Grants Implementation Timeline: 2010-2015 Action Item #3: Reduce the possibility of damage and losses of existing assets relating to the Oceanside Pier structure due to: severe weather, earthquakes, storm surge and salt-water corrosion. Coordinating Individual/Organization: City of Oceanside / County of San Diego Potential Funding Source: Grant Implementation Timeline: 2010-2015 Action Item #4: Relocation of the Haymar Sewer Truck Main due to multiple exposed areas of the current pipeline being subjected to the possibility of being washed out during storms/landslides and releasing raw sewage into the environment. Coordinating Individual/Organization: City of Oceanside / County of San Diego Potential Funding Source: Grant Implementation Timeline: 2010-015 Action Item #5: To construct anti-obstruction flood devices for each of the 5 bridges (Coast Highway, Benet, Foussat, Douglas and College) that cross the San Luis Rey River to protect against potential debris obstruction against bridge support structures due to excessive debris flow. Coordinating Individual/Organization: City of Oceanside / County of San Diego Potential Funding Source: Grant Implementation Timeline: 2010-2015 City of Oceanside 5-190 S1CTIONFIVE Goals, Objectives and Actions 5.15 CITY OF Row AY The City of Poway (Poway) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Poway summarized in Table 5.15-1. See Section 4.0 for additional details. Table 5.15-1 Summary of Potential Hazard-Related Exposure/Loss in Poway Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 0 51,126* Residential Number of Residential Buildings 0 0 196,339* Potential Exposure/ Loss for Residential Buildings (x $1,000) 0 0 4,599,429* Commercial Number of Commercial Buildings 0 0 732* Potential Exposure/ Loss for Commercial Buildings (x $1,000) 0 0 3,280,604* Critical Facilities Number of Critical Facilities 0 3 0" Potential Exposure for Critical Facilities (x $1,000) 0 6,000 0** Floods (Loss) 100 Year 500 Year 3,986 5,345 1,301 1,745 14,390 28,045 12 16 1,666 3,805 9 11 6,178 8,044 Rain-Induced Landslide High Risk Moderate Risk Tsunami 2,515 11,354 0 874 4,030 0 169,170 1,120,165 0 56 27 0 317,358 98,302 0 5 39 0 106,157 261,013 0 Wildfire/ Structure Fire Extreme Very High High Moderate 0 3,720 4,826 36,900 0 1,141 1,696 11,904 0 348,023 469,703 3,044,913 0 4 32 106 0 20,162 116,278 ^ 554,400 0 2 35 68 0 4,409 162,885 285,672 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Poway 5-191 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Poway LPG as their top five. A brief rational for including each of these is included. • Wildfire: historical data and destructive potential. • Flooding: historical data. • Manmade Hazards: are considered potential hazards. • Earthquake Damage: not from epicenter in Poway area, but because of possible damage to our electricity, water supplies, and wastewater collection system. • Landslide/Rockslide: on Poway Grade and Pomerado Road may result from earthquake or heavy rains. 5.15.1.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Poway's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.15.1.2 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Poway and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Poway, as shown in Table 5.15-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Poway 5-192 SICTIONFIVE Goals, Objectives and Actions Table 5.15-2 City of Poway: Administrative and Technical Capacity Staff/Personnel Resources A, Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G, Personnel skilled in CIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y Y Y Y Y Department/Agency and Position Development Services - Planners, Engineers Development Services - Engineers, Consultants; Safety Services - Fire Marshal Development Services - Planners, Engineers Development Services - Planner, Engineers Development Services - Consultants Development Services - Planners, Engineers Public Works - Managers; Safety Servcies - Chief Officers Administrative Services - IT Staff Development Servcies - Consultants City Manager Office - City Manager Safety Services - Chief Officers All Departments - Various Staff The legal and regulatory capabilities of Poway are shown in Table 5.15-3, which presents the existing ordinances and codes that affect the physical or built environment of Poway. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Poway 5-193 SECTIONFIVE Goals, Objectives and Actions Table 5.15-3 City of Poway: Legal and Regulatory Capability Regulatory Tools (ordinance, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y Y Does State Prohibit (Y/N) N N N N N N N N N N N N N 5.15.1.3 Fiscal Resources Table 5.15-4 shows specific financial and budgetary tools available to Poway such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Poway 5-194 SICTIONFIVE Goals, Objectives and Actions Table 5.15-4 City of Poway: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes No-requires 2/3 voter approval. Poway has special districts for LMD and Lighting. Yes for water and sewer Yes No-requires 2/3 voter approval No-requires 2/3 voter approval No Yes, subject to Council approval. 5.15.2 Goals, Objectives and Actions Listed below are Poway's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire. Police, and Public Works provided input to the Poway LPG. The Poway LPG members were: • Mark Sanchez, Safety Services • Pat Ryan, Public Works • Tom Howard, Public Works • Jim Lyon, Development Services • Jon Canavan, Safety Services Once developed. City staff will present plan to the City Manager for submission to Cal EMA and FEMA. Upon approval from FEMA, staff will present Plan to City Council for adoption. City of Poway 5-195 SECTIONFIVE Goals, Objectives and Actions Public meetings were held throughout the County to present these preliminary goals, objectives and actions to citizens and to receive public input. At these meetings, specific consideration was given to hazard identification/profiles and the vulnerability assessment results. The following sections present the hazard-related goals, objectives and actions as prepared by Poway's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.15.2.1 Goals The City of Poway has developed the following 3 Goals for their Hazard Mitigation Plan (See Attachment A for Goal 3, Objective D). Goal 1. Promote resistance to the effects of disasters upon development and infrastructure. Goal 2. Promote public understanding, support and demand for effective hazard mitigation. Goal3. Reduce the possibility of damage and losses to people, existing assets and critical facilities/infrastructure due to: a. Wildfires b. Flooding c. Geological Hazards (landslide, rockslide, earthquake) d. Manmade Hazards 5.15.2.2 Objectives and Actions The City of Poway developed the following broad list of objectives and actions to assist in the implementation of each of their 3 identified goals. The City of Poway developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.15.2.3. Goal 1: Promote resistance to the effects of disasters upon development and infrastructure. Objective 1 A: The General Plan can be updated to further promote resistance to the effects of disasters upon development and infrastructure. Action 1 .A.1 Continue to evaluate and revise General Plan policies as necessary. Action 1 .A.2 Continue to review and update FEMA maps regarding flood risk in Poway as necessary. Action 1 A3 Continue the evaluation of ways to improve the road access for emergency vehicles in remote locations. City of Poway 5-196 SECTION I IVE Goals, Objectives and Actions Goal 1: Promote resistance to the effects of disasters upon development and infrastructure, (continued) Objective I A: The General Plan can be updated to further promote resistance to the effects of disasters upon development and infrastructure (continued). Action 1 A4 Continue to update the Water Master Plan with particular attention to fire system upgrades as needed. Action 1 A5 Improve the use of technologies used in City's Emergency Operations Centers. Action 1 A6 Maintain improved wildfire defensible space strategies. Goal 2: Promote public understanding, support and demand for effective hazard mitigation. Objective 2 A: Educate the public to increase their awareness of hazards and ways to mitigate damage. Action 2.A.1 Conduct annual NIMS/SEMS/ICS review and training for appropriate City staff and the City Council. Action 2.A.2 Continue and enhance public education and outreach activities regarding disaster preparedness. Action 2.A.3 Maintain CERT program. Action 2.A.4 Partner with regional organizations focused on improved disaster preparedness. Goal 3: Reduce the possibility of damage and losses to people, existing assets, and critical facilities/ infrastructure due to: wildfires, flooding, geological hazards (landslide, rockslide, earthquake), and manmade hazards. Objective 3 A: Plan and prepare for damage and loss from wildfire. Action 3.A.1 Update maps of potential wildfire areas in Poway. Action 3.A.2 Update fire control and evacuation plans for areas near wildland vegetation. Action 3.A.3 Implement the existing safety plan developed by Safety Services for the High Valley area, including a third road into and out of the area; consider the Millards Ranch, Beeler Canyon, and Boulder Mountain areas. Action 3.A.4 Upgrade road access, surface, and grade for fire safety equipment at identified locations. City of Poway 5-197 SECTIONFIYE Goals, Objectives and Actions Goal 3: Reduce the possibility of damage and losses to people, existing assets, and critical facilities/ infrastructure due to: wildfires, flooding, geological hazards (landslide, rockslide, earthquake), and manmade hazards (continued). Objective 3 A: Plan and prepare for damage and loss from wildfire (continued). Action 3.A.5 Continue to update the Water Master Plan. Evaluate adding hydrants, creating loops, and other means to improve pressure and volume where needed. Action 3.A.6 When possible, work with SDG&E seeking replacement of wood utility poles with metal poles in areas that have high risk of wildfires. Action 3.A.7 Evaluate possible use of certain City trails as auxiliary routes in emergency. Objective 3.B: Plan and prepare far damage and loss due to flooding. Action 3.B.1 Provide sand bags to the public for the prevention of flooding damage or loss. Action 3.B.2 Implement the Drainage Master Plan and, as appropriate, evaluate channel enlargement and/or detention basins to regulate flow. Action 3.B.3 Remove sediment and silt from channels as needed, and make structural improvements in floodways to increase capacity. Action 3.B.4 Update Poway Dam Inundation Plan as needed. Action 3.B.5 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Objective 3.C: Plan and prepare for damage and loss due to geological hazards (landslide, rockslide, earthquake). Action 3.C.1 Develop an action plan to mitigate possible damage from landslide or rockslide on Poway Grade and Pomerado Road. Action 3.C.2 Continue program to improve and/or retrofit water distribution system and wastewater system to reduce the impact of earthquakes. This includes installation of seismic valves at critical water storage tanks, and creating a safe drainage corridor in the event a tank fails. Action 3.C.3 Develop the Public Works office site as a departmental operations center site for City operations, to include supplies and equipment. Action 3.C.4 Provide specialized training to staff for disaster recovery responsibilities. Action 3.C.5 Investigate funding opportunities in order to provide disaster preparedness kits to special populations (seniors and the disabled) in the community. Action 3.C.6 Evaluate the use of the Green Valley Truck Trail as an emergency response east- west corridor. City of Poway 5-198 SECTIONFIVE Goals. Objectives and fictions 5.15.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLES criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 8 prioritized mitigation actions as well as an implementation strategy for each are: Priority Action #1: Maintain improved wildfire defensible space strategies. Coordinating Individual/Organization: Safety Services & Development Services Potential Funding Source: City of Poway Implementation Timeline: Annual action. Priority Action #2: Partner with regional organizations focused on improved disaster preparedness. Coordinating Individual/Organization: Safety Services & Community Services Potential Funding Source: City of Poway Implementation Timeline: On-going. Priority Action #3: Maintain Community Emergency Response Team program. Coordinating Individual/Organization: Safety Services Potential Funding Source: City of Poway Implementation Timeline: On-going. Priority Action #4: Continue to update the Water Master Plan. Evaluate adding hydrants, creating loops, and other means to improve pressure and volume where needed. Coordinating Individual/Organization: Public Works & Development Services Potential Funding Source: City of Poway Implementation Timeline: FY 2010-2013 Priority Action #5: Develop the Public Works office site as a departmental operations center site for City operations, to include supplies and equipment. Coordinating Individual/Organization: Public Works Potential Funding Source: City of Poway City of Poway 5-199 SECTIBNFIVE Goals, Objectives and Actions Implementation Timeline: FY 2010-2011 Priority Action #6: Continue the removal of sediment and silt from channels as needed, and make structural improvements in floodways to increase capacity. Coordinating Individual/Organization: Public Works Potential Funding Source: City of Poway Implementation Timeline: On-going. Priority Action #7: Continue to evaluate and revise General Plan as necessary. Coordinating Individual/Organization: Development Services Potential Funding Source: City of Poway Implementation Timeline: FY 2011 -2012 Priority Action #8: When possible, work with SDG&E seeking replacement of wooden utility poles with metal poles in areas that have high risk of wildfires. Coordinating Individual/Organization: Safety Services &Development Services Potential Funding Source: City of Poway Implementation Timeline: FY 2011-2012 City of Poway 5-200 SECTIOMFIVE Goals, Objectives and Actions 5.16 CITY OF SAN DIEGO The City of San Diego (San Diego) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for San Diego summarized in Table 5.16-1. See Section 4.0 for additional details. Table 5.16-1 Summary of Potential Hazard-Related Exposure/Loss in San Diego Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Shaking and liquefaction components) Exposed Population 199 75,686 1,354,013* Residential Number of Residential Buildings 128 28,036 510,740* Potential Exposure/ Loss for Residential Buildings (x $1,000) 36,032 7,892,134 143,773,310* Commercial Number of Commercial Buildings 1 1,206 18,862* Potential Exposure/ Loss for Commercial Buildings (x $1,000) 4,482 5,404,930 84,533,825* Critical Facilities Number of Critical Facilities 0 444 562** Potential Exposure for Critical Facilities (x $1,000) 0 389,597 2,134,455** Floods (Loss) 100 Year 500 Year 36,042 85,289 12,191 28,438 3,431,767 8,005,297 523 1,126 2,343,929 5,046,394 200 315 1,111,278 1,440,030 Rain-Induced Landslide High Risk Moderate Risk Tsunami 137,095 10 10,294 48,049 3 6,490 13,525,794 845 1,826,935 1,072 0 393 4,804,382 0 1,761,308 152 0 68 65,478 0 1,083,347 Wildfire/ Structure Fire Extreme Very High High Moderate 21 20,153 30,997 1,251,231 0 6,990 10,710 473,008 0 1,967,685 3,014,865 133,151,752 1 208 280 17,500 4,482 932,194 1,254,876 78,429,750 5 72 75 1,821 6 10,667 16,582 7,103,948 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide City of San Diego 5-201 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards categories were identified by the San Diego LPG as its top seven. • Structure Fire/Wildfire • Coastal Storms/Erosion/Tsunami • Earthquakes • Dam Failure • Flood • Landslide • Other Manmade Hazards 5.16.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides San Diego's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.16.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in San Diego and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of San Diego, as shown in Table 5.16-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, and personnel with GIS skills. City of San Diego 5-202 SECTFONFIVE Goals, Objectives and Actions DEVELOPMENT SERVICES DEPARTMENT The Development Services Department manages the City of San Diego's land development process from concept to completion. The scope of responsibility for construction and development projects includes permit issuance; review of subdivision maps and public improvement and grading plans; compliance with land use regulations, community plans and environmental status; review of construction plans; and construction projects. Land Development Code/Environmentally Sensitive Land Regulations and Coastal Development Regulations: These sections of the Land Development Code would require permits and compliance with specific requirements for any disturbance of defined environmentally sensitive lands (habitat, wetlands, steep hillsides, coastal bluffs, etc.) or for any work done to repair or restore an area damaged by those hazards included in this plan. However, provisions are provided to allow emergency work without delay. ENGINEERING AND CAPITAL PROJECTS DEPARTMENT (E&CP) E&CP provides a full range of engineering services for the City's capital investment in various types of infrastructure and provides traffic engineering services to the community. The department is responsible for planning, design, project management, and construction management of public improvement projects; quality control and inspection of private work permitted in the right-of-way; surveying and material testing; and providing traffic operations and transportation engineering services. E&CP activities include work on various public infrastructure assets to rehabilitate, restore, improve and add to the City of San Diego's capital facilities. The Capital Improvement Program (CIP) covers a wide range of projects including: airports, bikeways, drainage and flood control facilities, libraries, parks and recreation centers, police, fire and lifeguard stations, street improvements, street lights, traffic signals, utilities undergrounding, water and sewer facilities and pipelines. Traffic engineering services include transportation system forecasting and program management, responding to traffic requests from the public, maintaining the City's traffic signal system, and traffic safety analysis. Other engineering services include quality control and inspection for private work permitted in the right of way, site grading and subdivision improvements, infrastructure asset management, CIP prioritization, and engineer functions for all City departments. ENVIRONMENTAL SERVICES DEPARTMENT The Environmental Services Department was established in 1988 to protect the environment and to provide all San Diego residents with properly disposed municipal solid waste, along with an environment free of litter and illegal dumping. The Collection Services Division has provided City refuse pickup for 90 years and curbside recycling and yard waste collection for two decades. The department pursues waste reduction and recycling, composting and environmentally-sound landfill management to meet the City of San Diego's long term waste disposal needs. In addition, Environmental City of San Diego 5-203 SEC110NFIVE Goals, Objectives and Actions Services oversees the City's management of energy, pursues innovative energy independence goals and works to advance more sustainable practices within the City organization and the community. The Ridgehaven green building, one of America's most resource efficient buildings, is home to the Environmental Services Department. Ridgehaven holds the nation's first Energy Star label for buildings awarded by the U.S. Department of Energy and the U.S. Environmental Protection Agency in 1999. Green building features include energy savings, resource conservation, a healthy workplace, and operational savings. The department continues to explore means of improving waste diversion in San Diego. Less material generated translates into an extended life for the City's Miramar Landfill, scheduled to close in 2017. The department is organized into three operational divisions: Collections Services Division provides weekly refuse and every-other-week recyclables and yard waste collection services to homes and some small businesses through the City of San Diego, and places and services street litter bins in commercial districts throughout the City. The Collection Services Division was named Fleet of the Year by Fleet Owner Magazine in 2005. Energy Sustainability and Environmental Protection Division develops and manages programs relating to energy use, sustainability, climate change and hazardous and universal waste. This division includes energy, sustainability, and environmental protection sections. Waste Reduction and Disposal Division develops and implements the City's solid waste reduction and diversion programs, directs disposal operations at the City's Miramar Landfill, manages the City's inactive landfill sites, collects landfill fees and enforces and supports the City's solid waste codes. The Miramar Landfill is the nation's first municipally-operated landfill to earn the ISO 14001 certification. This division includes waste reduction, refuse disposal, fee booth operations, franchise administration, solid waste code enforcement, and field operations. FIRE-RESCUE DEPARTMENT The Fire-Rescue Department serves the ninth largest City in the United States and the second largest City in California. San Diego Fire-Rescue is a multi-faceted organization that provides City residents with fire and life safety services including fire protection, emergency medical services, and lifeguard protection at San Diego beaches. Members of the department guarantee to the people of San Diego they we will provide dependable service in a responsible fashion, while showing care and compassion for those in need. They protect lives, property, and the environment through fire suppression, medical care, emergency medical transport, technical rescue, hazardous materials response, fire investigation, explosives disarmament, fire safety inspections, fire prevention and education programs, disaster preparedness, hazardous materials mitigation, equipment and facilities maintenance, waterway and swimmer safety, and the operation of the 911 communications center. GENERAL SERVICES DEPARTMENT City of San Diego 5-204 SECTIONFI YE Goals, Objectives and Actions The General Services Department is composed of five distinct divisions providing a range of services to the City of San Diego. The Communications Division provides primary service delivery for wireless communications technologies; engineers, installs, operates, and maintains private, metropolitan-wide, wireless voice and data communications systems and equipment; and contracts for commercially-provided wireless services. The Communications Division ensures the provision of life-line voice and data communications for emergency first responders. The Facilities Division is responsible for ensuring the facilities where library, park and recreation centers, and other government services are provided are maintained in a safe and operable manner. More than 1,600 City facilities are in constant use and require preventive maintenance, custodial service, scheduled maintenance, and, in some cases, emergency repair to keep them in full operation. The Facilities staff, which includes plumbers, painters, electricians, carpenters, locksmiths, and other skilled-trades people, provides these services to City departments. The Fleet Services Division provides all City departments with motive equipment and a full range of fleet management services. These services include acquisition, fitting, maintenance and repair, the provision of parts and fuel, body repair, painting, metal fabrication, disposal services, and other motive equipment- related support services, such as machining, equipment rental, and operator training. The Publishing Services Division provides full reproduction capability, including offset press operations, high-volume copying, and finishing services and also provides graphic design and electronic publishing services. The Division is responsible for administering the Citywide Convenience Copier Program, providing approximately 580 photocopiers to City departments. The Street Division maintains approximately 2,800 miles of streets and alleys, 5,200 miles of sidewalks, 235,000 trees, 250,000 street signs, and 50,000 street lights through three sections: Roadways/Trench Restoration, Resurfacing & Pavement Management, and Electrical/Traffic & Trees. The Roadways/Trench Restoration Section is responsible for maintaining street pavement surfaces and sidewalks. This section responds to more than 9,000 service requests and fills more than 50,000 potholes annually. In addition, under a service level agreement, crews repair damaged roadways surfaces and sidewalks associated with water and sewer work within the street right-of-way. The Resurfacing & Pavement Management Section is responsible for planning, evaluating, and executing street resurfacing contracts. The Electrical/Traffic & Trees Section is responsible for the maintenance and operations of over 1,600 traffic signals and flashing beacons and approximately 50,000 street and park lights. This section also assists with the set up of the Winter Homeless Shelters and the December Night Lights Festival at Balboa Park. OFFICE OF HOMELAND SECURITY The San Diego Office of Homeland Security (SD-OHS) oversees the City's Homeland Security, Disaster Preparedness, Emergency Management, and Recovery/Mitigation Programs. The primary focus is to ensure comprehensive emergency preparedness, training, response, recovery and mitigation services are City of San Diego 5-205 SECT10NFIVE Goals, Objectives and Actions concentrated to minimize the adverse effects to life, property, the environment and the City's economic base from natural, technological and manmade disasters. SD-OHS is responsible for securing and managing Federal Homeland Security Urban Area Security Initiative (UASI) grants for the region. These grants are intended to address the needs of high-threat, high-density urban areas to assist in building enhanced and sustainable capacity to prevent, protect against, respond to, and recover from acts of terrorism. The UASI program focuses on enhancing preparedness through regional collaboration and development of integrated regional systems. Disaster Preparedness efforts ensure the City is prepared for major disasters by coordinating planning efforts and training of City employees; assisting with the integration of the City's emergency plans in a collaborative environment both internally and externally; interfacing with county, State and federal jurisdictions; and ensuring the flow of information to the public and business community to assist in emergency preparation and response. Under the Emergency Management Program, SD-OHS maintains the City's Emergency Operations Center (EOC) and alternate EOC in a ready-to-activate status, ensures assigned staff is fully trained and capable of carrying out their responsibilities during activations, and manages the EOC during responses to multi-department and City-wide emergencies to support incident response activities and maintain City- wide response capabilities. This program oversees the opening of shelters and provision of mass care during a disaster as well as standing up the local disaster assistance centers to provide assistance to the public following a disaster. SD-OHS coordinates recovery and mitigation programs for the City by collecting timely disaster-related data and coordinating applications for state and federal grant programs related to disaster response, recovery, and mitigation. These grant programs provide a vital source of revenue to offset the costs of natural and man-made disasters. INFORMATION TECHNOLOGY DEPARTMENT The Information Technology Department provides responsive and dependable information technology services to City organizations to support fiscally sound and effective government. The department is responsible for providing the City of San Diego's Information Technology strategic direction, policies, procedures, and standards. The goals of the department are to effectively manage the delivery of City- wide technology services, guide technology decision-making to ensure consistency with the City-wide business direction, ensure a skilled, responsive, and innovative workforce that keeps current with evolving business-critical technologies, and provide a high quality customer service. PARK AND RECREATION DEPARTMENT The mission of the Park and Recreation Department is to acquire, develop, and maintain a park and recreation system which enriches the quality of life for residents and visitors alike, and preserves it for future generations. The department is responsible for overseeing nearly 40,000 acres of developed and undeveloped space, more than 340 parks including Balboa Park, Mission Trails Regional Park, and Mission Bay Park; 25 miles of shoreline from Sunset Cliffs to La Jolla; 13 pools; 3 public golf City of San Diego 5-206 SECTIBNFIVE Goals, Objectives and Actions complexes; 52 recreation centers and more. Park and recreation professionals and volunteers host hundreds of community events each year and provide safe places for thousands of children to go after school. PLANNING AND COMMUNITY INVESTMENT DEPARTMENT The mission of the City Planning & Community Investment (CPCI) Department is to create a well- planned desirable living and working environment for all San Diegans. To achieve this mission, CPCI is responsible for the development and implementation of land use and transportation policies, as well as long-range fiscal planning for public facilities. The City's General Plan is its constitution for development, expressing community vision and values while guiding future development. On March 10th, 2008, the City Council adopted the City of San Diego General Plan, a comprehensive update to the 1979 Progress Guide and General Plan. As a participating jurisdiction in the County's Multi-Jurisdictional Hazard Mitigation Plan, the City, through its General Plan, has adopted policies that guide development away from hazardous sites while utilizing hazardous mitigation and other safety measures in the provision of future developments. The policies addressing hazardous mitigation are concentrated in the Land Use, Mobility, Urban Design, and Public Facilities, Services and Safety Elements. On July 7, 2009, the City Council adopted the General Plan Action Plan, the implementation and monitoring document accompanying the General Plan. Both the General Plan and Action Plan contain policies that limit future development in hazardous areas. Because the General Plan does not address specific community zoning issues, these mitigation measures are achieved through the Community Plan Update process. The City's community plans are integral components of the General Plan, refining the broad City-wide policies to more community-specific policies which remain consistent with the General Plan. CPCFs primary responsibilities related to hazardous mitigation are implemented through the update of Community Plans. POLICE DEPARTMENT The San Diego Police Department provides law enforcement, scene and event security, evacuations, public emergency notifications, traffic and crowd control, traffic and criminal investigations, records management, permits and licensing for police regulated businesses, laboratory services, and support services. The City is represented by 9 area commands, divided into 19 service areas, policing 122 neighborhoods. The Department plans for and implements the Dam Failure Plan and the San Diego River Road Closure Plan. PUBLIC UTILITIES DEPARTMENT The Public Utilities Department is comprised of the Wastewater and Water Sections. The emphasis for the new department is to provide a streamlined, effective organization in oversight, strategic planning, and administration for the City's water storage, treatment, and delivery systems, the regional wastewater treatment and disposal services, and the Municipal Sewage System. City of San Diego 5-207 SECTIONFIVE Goals. Objectives and Actions Metropolitan Wastewater's mission is to provide the public with a safe and efficient regional sewer system that protects our ocean water quality, supplements our limited water supply, and meets federal standards, at the lowest possible cost. Through state-of-the-art facilities, water reclamation, biosolids production and cogeneration, the City is a leader in maximizing the conservation of water and energy as part of the wastewater treatment process. The City of San Diego entered the municipal water business in 1901 when the City bought the water system from a private company. More than 100 years later, San Diego's water infrastructure has become one of the most complex in the United States. San Diego operates more than 3,302 miles of water lines, 49 water pump plants, 90+ pressure zones, and more than 200 million gallons of potable water store capacity in 32 standpipes, elevated tanks, and concrete and steel reservoirs. In addition to supplying more than 280,000 metered service connections within its own incorporated boundaries, San Diego conveys and sells potable water to the City of Del Mar, the Santa Fe and San Dieguito Irrigation Districts, and the California American Water Company, which, in turn, serves the Cities of Coronado and Imperial Beach and portions of south San Diego. San Diego also maintains several emergency connections to and from neighboring water agencies, including Santa Fe Irrigation District, the Poway Municipal Water District, and Otay Water District, the California American Water Company, and the Sweetwater Authority. STORM WATER DEPARTMENT The Storm Water Pollution Prevention Program is the lead office for the City's efforts to reduce pollutants in urban runoff and storm water to the maximum extent practicable. These activities, include but are not limited to, public education, employee training, water quality monitoring, source identification, code enforcement, watershed management, and Best Management Practices development/implementation with the City of San Diego jurisdictional boundaries. The Storm Water Program represents the City on storm water and NPDES storm water permit issues before the Principal Permittee, the County Department of Environmental Health, and the Regional Water Quality Control Board. In addition, the Storm Water Program provides technical expertise and guidance to all City departments to ensure implementation and compliance with the Permit. Storm Water also prepares and transmits an annual report to the County for submittal to the Regional Board and is responsible agent that certifies the City is in compliance with all Permit requirements. The Storm Water Department has been designated as the lead in protecting and improving the water quality of rivers, creeks, bays, and the ocean in compliance with the updated Municipal Storm Water Permit and other surface water quality regulations and orders issued by the State of California. The Department's main priorities are to: (1) identify sources of pollution and abate them through the implementation of innovative and efficient public education, watershed management, storm water development regulations, monitoring, investigation, enforcement, and City-wide training programs; and (2) provide the most efficient storm drain system operation and maintenance services to San Diego's residents, businesses, and visitors. The City of San Diego has over 70,000 storm drain structures and over 800 miles of drainage pipe. The Department is responsible for inspection, maintenance, and repair of the storm drain system in the public right-of-way and in drainage easements. This includes clearing blocked drains, removing debris from City of San Diego 5-208 SWTIONFIVE Goals, Objectives and Actions storm drain structures, and cleaning and repairing damaged drainpipes. In addition, the City of San Diego maintains 84 miles of concrete and dirt drainage channels and ditches. The Department is also responsible for street sweeping which provides two primary benefits to the City. The more obvious benefit is the collection and removal of paper, leaves, and other visible debris that collects in the gutters. The debris can block storm water facilities causing localized flooding during heavy rains. An equally important, but less visible benefit is the removal of metal particles and other hazardous waste products left by passing vehicles. Although they are virtually invisible, these particles can be extremely harmful to fish and other wildlife if they reach our creeks, rivers, beaches, and bays. Street sweeping also serves as a Best Management Practice (BMP) to control and improve water quality. Motorized sweeping removes an average of 4,400 tons of debris from the street before it goes into the storm drains. The City currently has over 2,700 miles of improved streets that are included in the street sweeping program. The Department has over 278 power sweepers and 23 operators, with a support staff of truck drivers and parking enforcement officers. Table 5.16-2 City of San Diego: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Emergency manager 1. Grant writers Y/N Y Y Y Y Y Y Y Y Y Department/Agency and Position Planning and Community Investment, Development Services, Environmental Services, and Engineering and Capital Projects Engineering and Capital Projects, General Services, and Development Services. Fire-Rescue, Police, Development Services, Planning and Community Investment, Environmental Services, and Engineering and Capital Projects. Development Services, and Engineering and Capital Projects Engineering and Capital Projects, and Environmental Services Development Services Information Technology, and Engineering and Capital Projects Office of Homeland Security Financial Management, Park and Recreation and Environmental Services. The legal and regulatory capabilities of San Diego are shown in Table 5.16-3. which presents the existing ordinances and codes that affect the physical or built environment of San Diego. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, City of San Diego 5-209 SECTIONFIVE Goals, Obiecthies and Actions special puipose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. Table 5.16-3 City of San Diego: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G, General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Does State Prohibit (Y/N) N N N N N N N N N N N 5,16.1.2 Fiscal Resources Table 5.16-4 shows specific financial and budgetary tools available to San Diego such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of San Diego 5-210 SICTIONFIVE Goals, Objectives and Actions Table 5.16-4 City of San Diego: Fiscal Capability Financial Resources A.Community Development Block Grants (CDBG) B. Capital improvements project funding C. D. E. F. G. H. Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes Yes Yes Yes Yes Yes Yes 5.16.2 Goals, Objectives and Actions Listed below are San Diego's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. Representatives of numerous City departments involved in hazard mitigation planning, including Environmental Services, Fire-Rescue, General Services, Office of Homeland Security, Police, Planning and Community Investment, and Public Utilities provided input to the San Diego LPG. City of San Diego 5-211 SEGTIONFIVE Goals, Objectives and Actions The San Diego LPG members were: • John Alley • Parita Avlani • Gerry Barca • Jamal Batta • Megan Beall • Kelly Broughton • Gus Brown • Sylvia Castillo • Phyllis Chapin • Brian Fennessy • Stacy Lomedico • Michael Prinz • David Racela • Eugene Ruzzini • Marshall White • Adrienne Turner • John Valencia • Peter Wongviboosin The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The Hazard Mitigation Plan Guidelines process requires the completed plan be submitted to CalEMA and FEMA for approval prior to being taken to the City Council for adoption. The following sections present the hazard-related goals, objectives and actions as prepared by San Diego's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. City of San Diego 5-212 SECTIUNFIVE Goals. Objectives and Actions 5.16.2.1 Goals The City of San Diego has developed the following six Goals for their Hazard Mitigation Plan. Goal 1. Promote public understanding, support, and demand for hazard mitigation. Goal 2. Improve hazard mitigation coordination and communication with federal, state, local, and tribal governments. Goal 3. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to structural fire/wildfire, coastal storms/erosion/tsunami, earthquake, dam failure, flood, landslide, and other manmade hazards. Goal 4. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and State-owned facilities due to severe weather (e.g., El Nino storms, thunderstorms, lightning, tsunami, and extreme temperature). Goal 5. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure and State-owned facilities due to geological hazards. Goal 6. Reduce the high probability of damage and losses to existing assets, particularly people, critical facilities/infrastructure and State-owned facilities due to floods. 5.16.2.2 Objectives and Actions The City of San Diego developed the following broad list of objectives, and action items to assist in achieving and implementing each of its six identified hazard mitigation goals. Goal 1: Promote public understanding, support and demand for hazard mitigation. Objective 1 A: Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Action 1.A.1 Develop regional collaboration for a Geospatial Mitigation Strategy. Goal 2: Improve hazard mitigation coordination and communication with federal, state, local, and tribal governments. Objective 2 A: Establish and maintain closer working relationships with state agencies, local, and tribal governments. Action 2 A 1 Encourage development of standardized Emergency Operations Plans within the City of San Diego that coordinate with County-wide Emergency Operations Plans. City of San Diego 5-213 SECTIONFIVE Goals, Objectives and Actions Goal 2: Improve hazard mitigation coordination and communication with federal, state, local, and tribal governments (continued). Objective 2 £: Action 2.B.1 Objective 2.C: Action 2. C.I Encourage other organizations to incorporate hazard mitigation activities. Work with local chambers of commerce, trade associations, and employee unions to encourage them to promote hazard mitigation as part of safe work practices. Support the State 's efforts to improve its capability and efficiency at administering pre-and post-disaster mitigation. Participate in the development and execution of an Emergency Operations Center (EOC) and Department Operation Centers (DOC) table top and functional disaster exercises (addressing the response and recovery phases), which include Military and State representative participation. Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to structural fire/wildfire, coastal storms/erosion/tsunami, earthquake, dam failure, flood, landslide, and other man made hazards. Objective 3 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to structural fir el wildfire, coastal storms/erosion/tsunami, earthquake, dam failure, flood, landslide, and manrnade hazards. Action 3 A 1 Develop an integrated communication/notification plan, including information about road closures, evacuation routes, unified command post locations, staging areas, and shelters. Action 3 A 2 Provide to critical City of San Diego facilities backup electrical power generating systems, fuel, and necessary supplies in case of major power outages. City of San Diego 5-214 SECTIONFI YE Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to severe weather (e.g., El Nino storms/, thunderstorms, lightning, tsunami, and extreme temperatures). Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to severe weather. Action 4.A.1 Develop a regional Geospatial Model for hazard mitigation support. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to geological hazards. Objective 5 A.: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 5.A.1 Stabilize the City of San Diego's water delivery system during seismic activity to ensure rapid recovery of the water system for critical services, such as fire, drinking water, commercial and residential uses. Action 5.A.2 Develop a means of providing water for firefighting when water sendee is disrupted. Goal 6: Reduce the high probability of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to floods. Objective 6A: Develop a comprehensive approach to reducing the high probability of damage and losses due to floods. Action 6.A.1 Work with U.S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (USAGE), and other Federal, State, and local agencies to maintain the required channel cross section in the Tijuana River Valley Pilot Channel to carry flow resulting from a 25-year storm event. Action 6.A.2 Continue to participate in the National Flood Insurance Program and meet the requirements for conformance with NFIP standards City of San Diego 5-215 SECTIONFIVE Coals, Objectives and Actions 5.16.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in our jurisdiction. The Disaster Mitigation Action of 2000 (at 44CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The eleven prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1 (6.A.1): Work with U.S. Fish and Wildlife Service (USFWS), U.S. Army Corps of Engineers (USAGE), and other Federal, State, and local agencies to maintain the required channel cross section in the Tijuana River Valley Pilot Channel to carry flow resulting from a 25-year storm event. Coordinating Department/Organization: Storm Water Potential Funding Source: Operating Budget/Augmented by Grant Funding Implementation Timeline: 1-10 years Action Item #2 (5.A.1): Stabilize the City of San Diego's water delivery system during seismic activity to ensure rapid recovery of the water system for critical services, such as fire, drinking water, commercial and residential uses. Coordinating Department/Organization: Public Utilities Potential Funding Source: Grant Funded Implementation Timeline: 1-3 years Action Item #3 (5.A.2): Develop a means of providing water for firefighting when water service is disrupted. Coordinating Department/Organization: San Diego Fire Rescue & Public Utilities Potential Funding Source: Need to obtain grant funding Implementation Timeline: 1-5 years Action Item #4 (3.A.2): Provide to critical City of San Diego facilities backup electrical power generating systems, fuel, and necessary supplies in case of major power outages. Coordinating Department/Organization: Office of Homeland Security & Homeland Preparedness Coordination Council Potential Funding Source: Need to obtain grant funding City of San Diego 5-216 SECTIONFIVE Coals, Objectives and Actions Implementation Timeline: 1 -5 years Action Item #5 (3.A.1): Develop an integrated communication/notification plan, including information about road closures, evacuation routes, unified command post locations, staging areas, and shelters. Coordinating Department/Organization: Office of Homeland Security & Homeland Preparedness Coordination Council Potential Funding Source: Operating Budget Implementation Timeline: 1-3 years Action Item #6 (2.C.1): Participate in the development and execution of an Emergency Operations Center (EOC) and Department Operations Center (DOC) table top and functional disaster exercises (addressing response and recovery phases), which include Military and State of California representative participation. Coordinating Department/Organization: Office of Homeland Security & Homeland Preparedness Coordination Council Potential Funding Source: Operating Budget/Augmented by Grant Funding Implementation Timeline: 1-3 years Action Item #1 (1.A.1): Develop regional collaboration for a Geospatial Mitigation Strategy. Coordinating Department/Organization: Information Technology Potential Funding Source: Operating Budget Implementation Timeline: 1-3 years Action Item #8 (2.A.1): Encourage development of standardized Emergency Operations Plans within the City of San Diego that coordinate with County-wide Emergency Operations Plans. Coordinating Department/Organization: Office of Homeland Security & Homeland Preparedness Coordination Council Potential Funding Source: Operating Budget/Grant Funding Implementation Timeline: 1-3 years Action Item #9 (2.B.1): Work with local chambers of commerce, trade associations, and employee unions to encourage them to promote hazard mitigation as part of safe work practices. Coordinating Department/Organization: Community and Legislative Services Potential Funding Source: Operating Budget Implementation Timeline: 1-3 years City of San Diego 5-217 SECTIONFIVE Goals, Objectives and Actions Action Item #10 (4A.1): Develop a regional Geospatial Model for hazard mitigation support. Coordinating Department/Organization: Information Technology Potential Funding Source: Operating Budget Implementation Timeline: 1-3 years Action Item #11 (6.A.2): Continue to participate in the National Flood Insurance Program and meet the requirements for conformance with NFIP standards. Coordinating Department: Engineering and Capital Projects Potential Funding Source: Operating Budget Implementation Timeline: On-going City of San Diego 5-218 SKTIONFIVE Goals, Objectives and Actions 5.17 CITY OF SAN MARCOS The City of San Marcos (San Marcos) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for San Marcos summarized in Table 5.17-1. See Section 4.0 for additional details. Table 5.17-1 Summary of Potential Hazard-Related Exposure/Loss in San Marcos Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 2,481 83,149* Residential Number of Residential Buildings 0 829 27,726* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 233,364 7,804,869* Commercial Number of Commercial Buildings 0 59 812* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 264,420 3,639,140* Critical Facilities Number of Critical Facilities 0 6 116** Potential Exposure for Critical Facilities (x$1,000) 0 2,196 260,448** Flood (Loss) 100 Year 500 Year 2,377 2,609 794 875 223,511 246,313 70 77 313,719 345,091 13 14 202,589 202,781 Rain-Induced Landslide High Risk Moderate Risk Tsunami 1,441 970 0 457 286 0 128,646 80,509 0 4 0 0 17,927 0 0 1 0 0 2,000 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 2,236 11,312 60,659 0 818 3,578 20,218 0 230,267 1,007,207 5,691,367 0 8 30 735 0 35,854 134,451 3,294,050 0 1 6 99 0 1 6,196 246,244 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of San Marcos 5-219 SECTIONFIVE Goals. Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the San Marcos LPG as their top five. A brief rationale for including each of these is included. • Wildfire: Wildland interface, protected open spaces, undeveloped areas, fuel model, historical occurrences • Dam Failure/Flood: Central business district of the city is located in flood prone areas (100 year floodplain). South Lake Dam failure inundation area is in the same central business district. New development downstream from Lake San Marcos dam. Difficulty in implementing mitigation measures due to state and federal regulations. • Hazardous Materials Release: Highway 78 is a major transportation corridor. Fixed facilities located throughout the city. • Earthquake: Low risk based upon known faults and projected peak accelerations in San Marcos as a result of a Rose Canyon fault which is 12.4 miles (19.9 km) from San Marcos Civic Center. • Landslide: Low risk. 5.17.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides San Marcos' fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.17.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in San Marcos and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of San Marcos, as shown in Table 5.17-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of San Marcos Planning Department Zoning Ordinance-Chapter 20.76: Flood damage prevention-regulates development within the floodplain. City of San Marcos 5-220 SECTIBNFIVE Goals. Objectives and Actions Zoning Ordinance-Chapter 20.79: Hazardous Waste Management plan. Zoning Ordinance-Chapter 20.80 Plan review including fire comments and conditions. Slope Density Ordinance (No.78-472): Minimizes concentration of homes within fuel management zones. Administrative Capabilities: All staff planners and engineers have an understanding of land development and building systems. Planning Director and Principal Planner are members of the Planning Division Emergency Response Team • City of San Marcos Finance Department Fiscal Capabilities: Public Facility Financing Plan: Requires development to pay fees to assist in area-wide circulation improvements, drainage improvements and GIS. Community Facilities District: Police and Fire CFD fees to fund capital improvements. Redevelopment Area Funds: Tax increment funds to assist in completion of major infrastructure improvements. Developer Contributions, Traffic Safety Fund, Community Development Block Grants, General Fund, and General Grants. • City of San Marcos Fire Department SMMC 17.64.060: Prohibits above ground flammable and combustible liquids storage containers. SMMC 17.64.070: Bulk storage of LPG not allowed in commercial or residential districts. SMMC 17.64.080: Storage of explosives and blasting agents prohibited. SMMC 17.64.090: Building division will not issue a certificate of occupancy without fire department approval. SMMC 17.64.120: Road width requirements to provide for ingress/egress of emergency vehicles. SMMC 17.64.130: Fire hydrant type and number requirements SMMC 17.64.140: Fire hydrant spacing requirements SMMC 17.64.160: Ability to require water storage tanks to meet fire flow demands. SMMC 17.64.180-200: Automatic Fire Extinguishing system requirements. SMMC 17.64.240: Includes Wildland Interface Standard as adopted by the County of San Diego. SMMC 17.64.250: San Diego County Hazmat reporting requirements. SMMC 17.64.260: Prohibits sale of fireworks. SMMC 8.64.010: Gives the authority to abate weeds, shrubs and dead trees. City of San Marcos 5-221 SiCTIBNFIVE Goals, Objectives and Actions 12/9/03: 2003-1216, approved 1/13/04: 150-foot clearance required in Wildland-Urban Interface due to potential of flame lengths in excess of 78 feet. • City of San Marcos Public Works Department Storm Drain Maintenance: Storm drain inlets, outlets and channels are inspected and cleaned on an annual basis. Erosion Control: Best management practices to minimize erosion from October to April. Weed Abatement: Herbicide application to roadway shoulder to reduce ignition potential from roadway traffic. Roadway Construction Inspections: Verify grades and construction materials to reduce incorrect grades and improperly substituted materials. * City of San Marcos Engineering Department SMMC 17.32.40: Grading ordinance-hydrology, hydraulics, soils, geological studies SMMC 17.32.100:Cut and fill slopes, fill placement SMMC 17.32.130: Temporary and permanent erosion control measures SMMC 17.32.160,170: Slope stabilization Inundation Analysis: Study and mitigations needed for any development downstream of existing dams. Jurisdictional Urban Runoff Management Plan: Guidelines and requirements for sediment and erosion control. City of San Marcos 5-222 SECTIONFIVE Goals, Objectives and Actions Table 5.17-2 City of San Marcos: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or rnanmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y N Y Y N Y Y Department/Agency and Position Planning Division-Planninq Division Director, Principal Planner, Senior Planner, Associate Planners, Assistant Engineer. Engineering Division: City Engineer, Principle Civil Engineer, Senior Civil Engineer, Associate Civil Engineer, Assistant Engineer. Engineering Division- See above Building Division-Building Division Director, Senior Building Inspector, Building Inspectors. Planning Division-Planninq Division Director, Principle Planner, Senior Planner, Associate Planners, Assistant Planners. Enqineerinq Division- City Engineer, Principle Civil Engineer, Senior Civil Engineer, Associate Civil Engineer, Assistant Engineer. City Engineer Contract services available Fire Department-Fire Chief, Division Chief, Fire Marshal Information Technology Division - GIS analyst Fire Department-Fire Chief, Battalion Chief Fire Department- Analyst, Battalion Chief The legal and regulatory capabilities of San Marcos are shown in Table 5.17-3, which presents the existing ordinances and codes that affect the physical or built environment of San Marcos. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of San Marcos 5-223 SECTIONFIVE Goals, Objectives and Actions Table 5.17-3 City of San Marcos: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L, A post-disaster recovery ordinance M. Real estate disclosure requirements N. Charter City 0. Specialized brush-clearance ordinance at 1 50 feet in the WUI Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Does State Prohibit (Y/N) N N N N N N N N N N N N N N N 5.17.1.2 Fiscal Resources Table 5.17-4 shows specific financial and budgetary tools available to San Marcos such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of San Marcos 5-224 SECTIONFIVE Goals, Objectives and Actions Table 5.17-4 City of San Marcos: Fiscal Capability Financial Tools A. B. C. D. E. F, G. H. 1. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes Limited - Subject to Proposition 13 and Proposition 218. No Yes, PFF and CFD's Yes Yes No Yes 5.17.2 Goals, Objectives and Actions Listed below are San Marcos' specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Sheriff, and Public Works provided input to the San Marcos LPG. The San Marcos LPG members were: • Scott Hansen • Carl Blasdell • Karen Brindley • Jerry Backoff Once developed, City staff submitted the plan to CalEMA and FEMA for approval. Once approved, the plan will be taken to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input. Specific questions were asked and City of San Marcos 5-225 SECTIONFIVE Goals, Objectives and Actions the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by the City of San Marcos' LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.17.2.1 Goals The City of San Marcos has developed the following 10 Goals for its section of the Hazard Mitigation Plan (See Attachment A for FOUO Goal 10). Goal 1. Continue to promote disaster-resistant development. Goal 2. Promote public understanding, support and demand for hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": GoalS. Floods Goal 6. Wildfires Goal 7. Dam Failure Goal 8. Geological Hazards Goal 9. Hazardous Materials Goal 10. Other Manmade Hazards 5.17.2.2 Objectives and Actions The City of San Marcos developed the following broad list of objectives and actions to assist in the implementation of each of its 10 identified goals. The City of San Marcos developed objectives to assist in achieving its hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.17.2.3. City of San Marcos 5-226 SECTION! i VE Goals, Objectives and Actions Goal 1: Continue to promote disaster-resistant development. Objective 1 A. Action 1.A.1 Objective 1 .B. Action 1.B.1 Encourage and facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Review and update the City of San Marcos General plan as needed to limit the impacts of development in hazard prone areas. Adopt State building codes that protect renovated existing assets and new development in hazard areas. Continue to enforce existing zoning ordinances that protect new development and renovations in hazard prone areas. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.1 Update City of San Marcos Emergency Operations Plan every five years. Action 3.A.2 Review HAZMIT plan annually and update as needed. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Action 2. A. 1 Action 2.A.2 Objective 2.B: Action 2.B.1 Objective 2.C: Action 2.C.1 Educate the public to increase awareness of hazards and opportunities for mitigation actions. Provide public information brochures that discuss the hazards and mitigation actions that the public may take. Make these available through the City to the public. Maintain public education efforts to increase the awareness of the public to the threat of wildfire to the City of San Marcos. Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Coordinate dam failure inundation awareness training/information with Vallecitos Water District and the Sheriff's Department. Promote hazard mitigation in the business community. Continue to utilize the fire department's fire prevention inspection program to educate business owners and managers regarding hazard mitigation. City of San Marcos 5-227 SECTIONFI YE Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards, (continued) Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials (continued). Action 3.A.3 Review completed Hazard Mitigation Plan with City personnel. Action 3.A.4 Evaluate the fire department's readiness to respond to and mitigate hazards. Objective 3.B: Conduct annual review of available resources Action 3.B.1 Update the Fire Department Resource Directory annually Action 3.B.2 Implement geospatial database of critical infrastructure/target hazards. Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 4.A.1 Maintain membership in the San Diego UDC Action 4.A.2 Continue participation in regional programs to include HIRT, USAR, MMST, FIRESCOPE, and CERT Council. Objective 4.B: Encourage other organizations to incorporate hazard mitigation activities. Action 4.B.1 Encourage Palomar College and California State University San Marcos to develop hazard mitigation plans and disaster preparedness. Action 4.B.2 Make available a copy of the City's completed Hazard Mitigation plan for public viewing. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 5.A.1 Continue to implement development regulations and restrictions identified in the City ordinances and in accordance with FEMA requirements. Action 5.A.2 Continue to apply impact fees to new developments in order to address new drainage infrastructure needs. City of San Marcos 5-228 SICTIONFIVE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods (continued). Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods (continued). Action 5.A.3 As funding becomes available, commence drainage improvements to reduce flood risks. Action 5.A.4 Develop a comprehensive approach to reducing the possibility of damage and losses due to floods by programming a storm water management data base and mapping capability into the City's automated building permit software. Action 5.A.5 Continue imposing conditions on new developments to construct drainage improvements to reduce possibility of flooding. Action 5.A.6 Pursue State or Federal grants to finance updating of existing flood plain maps as deemed necessary. Action 5.A.7 Provide flood awareness training to City personnel. Action 5.A.8 Evaluate the fire departments readiness to respond to and mitigate flood hazards. Action 5.A.9 Continue annual storm drain maintenance program Action 5.A.10 Design new City owned critical facilities located in flood prone areas to minimize damage due to flooding Objective 5.B: Protect existing assets with the highest relative vulnerability to the effects offloads within the 100-year floodplain. Action 5.B.1 Educate property owners in the flood prone areas about ways to reduce or prevent loss due to flooding. Action 5.B.2 Provide gravel bags or other means to properties in the flood prone areas for temporary protection against flooding. Action 5.B.3 Stay vigilant in preventing illegal construction or placement of obstructions in the flood hazard zones to limit increased flooding in other areas Objective 5.C: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 5.C.1 Work to promulgate the San Marcos Creek Specific Plan and coordinate with the US Army Corps of Engineers, San Diego County Regional Water Quality Control Board, US Fish and Wildlife, and California Fish and Game to implement a plan to minimize potential impact to future development along Reaches 2,4, and 5. City of San Marcos 5-229 SECTIONFI YE Coals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods (continued). Objective 5.C: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources) (continued). Action 5.C.2 Coordinate efforts with the State Department of Transportation (Caltrans) to identify and pursue State and Federal Funding to upgrade existing drainage facilities, under crossing State Route 78 to current design standards. Action 5.C.3 As funding becomes available, implement improvement projects to upgrade drainage facilities under crossings city wide. Objective 5.D: Minimize repetitive losses caused by flooding. Action 5.D.1 Continue to require uses, which are vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of construction. Action 5.D.2 Reconstruction of any structure in the flood hazard areas shall be in accordance with the City Ordinance as well as FEMA requirements. Action 5.D.3 Deny construction permits for additions or enhancements to existing non-conforming structures in flood hazard areas. Action 5.D.4 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires. Objective 6 A: Continue the comprehensive approach to reducing the possibility' of damage and losses due to wildfires. Action 6.A.1 Continue the wildland-urban interface fire prevention public education campaign. Action 6.A.2 Continue to enforce the new 1 50-foot fuel clearance ordinance. Action 6.A.3 Require fuel modeling for all new development located in the wildland interface zone. Action 6.A.4 Continue to ensure required street widths, paving, and grades can accommodate emergency vehicles. Action 6.A.5 Increase Fire Prevention Staff as appropriate. Action 6.A.6 Procure and deploy a back-up EOC and communications vehicle. Action 6.A.7 Evaluate the fire department's readiness to respond to and mitigate wildfires. City of San Marcos 5-230 SICTIONFIVE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires (continued). Objective. 6 A: Continue the comprehensive approach to reducing the possibility of damage and losses due to wildfires (continued). Action 6.A.8 Continue to evaluate service level needs and impacts as part of the review process of major projects. Action 6.A.9 Design new City owned critical facilities located in wildfire prone areas to minimize damage due to wildfires. Action 6.A.10 Acquire and deploy a local AM radio station for emergency public information. Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires. Action 6.B.1 Develop pre-incident plans for high vulnerability areas Action 6.B.2 Ensure access and egress routes in high vulnerability areas are maintained per City Ordinance. Action 6.B.3 Review, update, and validate pre-incident plans for high vulnerability wildland-urban interface areas. Action 6.B.4 Conduct annual wildland fire fighting and ICS training to ensure operational readiness. Action 6.B.5 Continue the wildland urban interface fire prevention public education campaign. Action 6.B.6 Maintain annual weed abatement program. Action 6.B.7 Apply herbicide to roadway shoulder to reduce ignition potential from roadway traffic. Action 6.B.8 Develop map showing parcel ownership information to assist with identifying available funding for vegetation clearance. Objective 6.C: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management, CALFire). Action 6.C.1 Coordinate 6.B.1 with the CDF in SRA/LRA areas where applicable. Action 6.C.2 As communications equipment is replaced strive for interoperability with other agencies. Action 6.C.3 Continue to participate in the California Fire Master Mutual Aid Agreement, the San Diego county Fire Master Mutual Aid Agreement, and the North Zone Automatic Aid Agreement. City of San Marcos 5-231 SECTIONFI YE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to dam failure. Objective 7A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 7.A.1 Provide dam failure inundation awareness training to City and Sheriffs Department personnel. Action 7.A.2 Evaluate the fire department's readiness to respond to and mitigate dam failure hazards. Action 7.A.3 Design new City owned critical facilities located in dam failure inundation areas to minimize damage due to flooding caused by a dam failure. Action 7.A.4 Perform inundation study for Lake San Marcos Dam failure in order to implement a response plan. Goal 8: Redi part own< Objective 8 A. Action 8.A.1 Action 8.A.2 Action 8.A.3 Objective 8.B. Action 8.B.1 Action 8.B.2 lice the possibility of damage and losses to existing assets, icularly people, critical facilities/infrastructure, and City- sd facilities, due to geological hazards. Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Continue to apply the City's Grading Ordinance, which requires preparation of geologic and soils studies in preparation of grading plans. Require development in areas with geologic hazards to use appropriate construction techniques recommended by a registered engineer and set back requirements per City ordinance. Implement information technology redundancy for continuity of city operations in the event that city facilities are damaged by geological hazards. Protect existing assets with the highest relative vulnerability to the ejfects of geological hazards. Continue to require all manmade slopes to be landscaped and or re-vegetated in compliance with the City's Grading Ordinance. Require clustering of development. City of San Marcos 5-232 SECTION FIVE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards (continued). Objective 8.C: Coordinate with and support existing efforts to mitigate geological hazards (e.g., California Geological Survey, US Geological Sun'ey). Action 8.C.1 Continue to review updates to geological hazards maps and revise local ordinances as appropriate as new geological hazards are identified. Action 8.C.2 Continue to maintain USGS seismic monitoring station at Fire Station #1 . Goal 9: Reduce the possibility of losses of city government services, due to pandemic influenza. Objective 9 A: Develop a comprehensive approach to reducing the possibility of losses of public service due to pandemic influenza. Action 9.A.1 Retrain department heads in the Continuity of Operations Plan to prepare for loss of employees due to influenza. Action 9.A.2 Continue liaison with the County Health & Human Services Agency regarding pandemic procedures. Action 9.A.3 Update the city Pandemic Influenza Contingency Plan, which includes employee education in hygiene and social distancing tactics, as well as facility disinfecting procedures. 5.17.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 12 prioritized mitigation actions as well as an implementation strategy for each are: Priority Action #1: [2.A.2] Maintain public education efforts to increase the awareness of the public to the threat of wildfire to the City of San Marcos. Coordinating Individual/Organization: Fire Department City of San Marcos 5-233 SECTIBNFIVE Goals, Objectives and Actions Potential Funding Source: Grants Implementation Timeline: July 2010 - August 2014 Priority Action #2: [6.A.2] Continue to enforce the new 150-foot fuel clearance ordinance. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund, Grants Implementation Timeline: July 2010 - August 2014 Priority Action #3: [9.A3] Update the city Pandemic Influenza Contingency Plan, which includes employee education in hygiene and social distancing tactics, as well as facility disinfecting procedures. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund, Emergency Planning budget Implementation Timeline: July 2010 - August 2014 Priority Action #4: [6.B3] Review, update, and validate pre-incident plans for high vulnerability wildland-urban interface areas. Coordinating Individual/Organization: Fire Department Potential Funding Source: Grants Implementation Timeline: July 2010 - August 2014 Priority Action #5: [6.A.6] Procure and deploy a back-up EOC and communications vehicle Coordinating Individual/Organization: Fire Department Potential Funding Source: Grants Implementation Timeline: July 2010 - August 2014 Priority Action #6: [5.C.1] Work to promulgate the San Marcos Creek Specific Plan and coordinate with the US Army Corps of Engineers, San Diego County Regional Water Quality Control Board, US Fish and Wildlife, and California Fish and Game to implement a plan to minimize potential impact to future development along the Reaches 2,4, and 5. Coordinating Individual/Organization: Planning, Engineering Departments Potential Funding Source: General Fund Implementation Timeline: July 2010 - August 2014 Priority Action #7: [3.B.2] Implement geospatial database of critical infrastructure/target hazards Coordinating Individual/Organization: Fire Department/Information Technology Division City of San Marcos 5-234 SECTIONFIVE Soars, Objectives and Actions Potential Funding Source: General Fund, Grants Implementation Timeline: July 2010 - August 2014 Priority Action #8: [8.A3] Implement information technology redundancy for continuity of city operations in the event that city facilities are damaged by geological hazards. Coordinating Individual/Organization: Information Technology Division, Fire Department Potential Funding Source: General Fund, Giants Implementation Timeline: July 2010 - August 2014 Priority Action #9: [6.A.10] Acquire and deploy local AM radio station for emergency public information Coordinating Individual/Organization: Fire Department, City Communications Officer Potential Funding Source: SHSGP Grant Implementation Timeline: July 2010 - August 2014 Priority Action #10: [5.A.4] Develop a comprehensive approach to reducing the possibility of damage and losses due to floods by programming a storm water management data base and mapping capability into the City's automated building permit software. Coordinating Individual/Organization: Planning, Engineering, Building, Public Works Departments Potential Funding Source: General Fund, Grants Implementation Timeline: July 2010 - August 2014 Priority Action #11: [7.A.4] Perform inundation study for Lake San Marcos Dam failure in order to implement a response plan Coordinating Individual/Organization: Fire Department Potential Funding Source: EMPP Grant Implementation Timeline: July 2010 - August 2014 Priority Action #12: [2.A.1] Pursue state arid/or federal grants as available to assist in reducing losses due to other manmade hazards. Coordinating Individual/Organization: Battalion Chief assigned to Emergency Preparedness, Fire Department Potential Funding Source: Grants Implementation Timeline: July 2010 - August 2014 City of San Marcos 5-235 SECTION I I \ 1 Goals, Objectives and Actions This page intentionally left blank City of San Marcos 5-236 SICTIONFIVE Goals, Objectives and Actions 5.18 ClTYOFSANTEE The City of Santee (Santee) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Santee summarized in Table 5.18-1. See Section 4.0 for additional details. Table 5.18-1 Summary of Potential Hazard-Related Exposure/Loss in Santee Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 20,815 56,848* Residential Number of Residential Buildings 0 6,968 19,681* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 1,961,492 5,540,202* Commercial Number of Commercial Buildings 0 267 582* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 1,196,614 2,608,349* Critical Facilities Number of Critical Facilities 0 96 0** Potential Exposure for Critical Facilities (x$1,000) 0 128,429 0** Flood (Loss) 100 Year 500 Year 1,873 2,994 572 967 161,018 272,211 46 60 206,158 268,902 12 17 1,726 7,729 Rain-Induced Landslide High Risk Moderate Risk Tsunami 35 0 0 12 0 0 3,378 0 0 0 0 0 0 0 0 1 0 0 2,000 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 222 2,658 50,473 0 89 938 17,705 0 25,054 264,047 4,983,958 0 3 18 535 0 13,445 80,671 2,397,710 0 1 3 64 0 1 2,005 131,742 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Santee 5-237 SECTIONFIVE Goals, Objectives and fictions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Santee LPG as their top five. A brief rational for including each of these is included. • Wildfire: The northern portion of the City is undeveloped, difficult to access hilly terrain. This area and the adjacent undeveloped areas outside the City have been subject to multiple fires in the past. Most of the adjacent undeveloped areas have been set aside to remain in their natural state. • Dam Failure/Flood: The City is split by the San Diego River that has a significant flow volume and floodway/floodplain. The San Diego River watershed also has two significant dams upstream. • Earthquake: There are numerous ancient landslides within the City including some that have been reactivated and resulted in the partial or complete loss of homes. The San Diego River floodplain consists of alluvial soils that are subject to liquefaction during seismic events. Additionally, the City is within 10 miles of a significant earthquake fault. • Hazardous Materials Release: Three freeways are within the City and a major arterial within the City is designated as a federal oversized load route. Numerous industrial facilities within the City handle hazardous materials on a regular basis • Human Caused Events: Terrorism and crime can create vulnerabilities within the facilities within the City. The flight paths and landing zones of an adjacent general aviation airport and nearby military airfield pass over the City. 5.18.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Santee's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.18.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Santee and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Santee, as shown in Table 5.18-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Santee 5-238 SECTIONFIVE Goafs, Objectives and Actions • City of Santee Fire Department - Administration - Fire prevention - Emergency medical services - Suppression - Code enforcement - Emergency management • City of Santee Planning and Building Department - General Plan - Zoning ordinances - Development standards - Development review process - Building codes - Structure evaluation • City of Santee Engineering Department - Flooding - Grading - Transportation - Geotechnical review - Structural evaluation • City of Santee Public Works Department - Maintain infrastructure including buildings - Flood control - Traffic control - Emergency response • County of San Diego Sheriff Department - Enforcement - Investigation - Security - Emergency response - Traffic control City of Santee 5-239 SECTIOMFIVE Goals, Objectives and Actions Table 5.18-2 City of Santee: Administrative and Technical Capacity Staff/Personnel Resource A. Pianner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D, Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers K. Staff with FEMA Integrated Emergency Management training Y/N Y Y Y Y N Y Y Y Y Y Y Department/Agency and Position Development Services staff Development Services staff Development Services staff Development Services - City Engineer Fire staff, Development Services, Community Services Development Services staff Fire staff and Development Services staff Fire staff Development Services staff Fire staff and Development Services staff The legal and regulatory capabilities of Santee are shown in Table 5.18-3, which presents the existing ordinances and codes that affect the physical or built environment of Santee. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Santee 5-240 SICTIONFIVE Goals, Objectives and Actions Table 5.18-3 City of Santee: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y Y Y Does State Prohibit (Y/N) N N N N N N N N N N N N 5.18.1.2 Fiscal Resources Table 5.18-4 shows specific financial and budgetary tools available to Santee such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Santee 5-241 SECTION I IVE Goals, Objectives and Actions Table 5.18-4 City of San tee: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. 1. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes in qualified areas Yes Yes No Yes Yes Yes UK Yes 5.18.2 Goals, Objectives and Actions Listed below are Santee's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition. City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Santee LPG. The Santee LPG members were: • Dave Miller, Fire Division Chief - Operations • Richard Mattick, Fire Deputy Chief - Administration • Pedro Orso-Delgado, Director, Development Services • Melanie Kush, City Planner • Julie Procopio, Principal Civil Engineer • Angela Reeder, Associate Planner • Jeff Tamares, Associate Engineer City of Santee 5-242 SECT80NFIVE Goals, Objectives and Actions Once developed, City staff submitted the plan to CalEMA and FEMA for approval. Once approved city staff will take the plan to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by the City of Santee's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials and local citizens. 5.18.2.1 Goals The City of Santee has developed the following 11 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 10 and 11). Goal 1. Promote disaster-resistant future development. Goal 2. Increase public understanding, support, and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve coordination and communication with federal, state, local and tribal governments. Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State-owned facilities, due to the following: Goal 5. Floods Goal 6. Wildfires Goal 7. Severe Weather Goal 8. Infestations/Diseases Goal 9. Geological Hazards Goal 10. Extremely Hazardous Materials Releases Goal 11. Other Human Caused Hazards 5.18.2.2 Objectives and Actions The City of Santee developed the following broad list of objectives and actions to assist in the implementation of each of their 10 identified goals. The City of Santee developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.18.2.3. City of Santee 5-243 SECTIONFI YE Goals, Objectives and Actions Goal 1: Promote disaster-resistant future development. Objective 1 A: Implement and continue to update the City's General Plan and land development ordinances to limit development in hazard areas. Action 1 .A.1 Continue the development review process that requires the identification, mitigation and/or removal of all hazards for all new developments. Action 1 .A.2 Continue to review and update City ordinances as necessary to comply with new technologies, regulations and practices. Objective 1 .B: Encourage and facilitate the adoption of building codes that protect renovated existing assets and new development in hazard areas. Action 1 .B.1 Continue to monitor the updates of the currently adopted Uniform Codes. Action 1 .B.2 Continue the adoption of Uniform Codes updates as appropriate. Objective 1 .C: Encourage consistent enforcement of general plans, zoning ordinances, and building codes. Action 1 .C.1 Continue to review all building and construction plans for conformance to applicable codes. Action 1 .C.2 Continue to provide the necessary level of building and construction inspection to ensure that structures and other facilities are constructed as designed. Action 1 .C.3 Continue to pursue code enforcement to ensure that structures and properties are maintained in such a manner that hazardous conditions are not created. Objective 1.D: Discourage future development that exacerbates hazardous conditions. Action 1 .D.1 Continue to require professional studies to evaluate specific hazards in hazard- prone areas and identify alternative site design criteria for new development to mitigate hazards to the maximum extent possible, as funding is available. Action 1 .D.2 Continue to update and maintain information on known hazards to assist in the identification of hazards that may impact future development. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Continue to participate in regional public education efforts concerning natural and man-made disasters and emergencies. City of Santee 5-244 SECTIONFI YE Goals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation (continued). Objective 2 A: Action 2.A.2 Action 2.A.3 Action 2.A.4 Action 2.A.5 Objective 2 £: Action 2.B.1 Action 2.B.2 Action 2.B.3 Objective 2.C: Action 2.C.1 Action 2.C.2 Action 2.C.3 Objective 2. D: Action 2.D.1 Action 2.D.2 Educate the public to increase awareness of hazards and opportunities for mitigation actions (continued). Continue to provide Household Hazardous Waste education regarding the proper disposal of household hazardous waste. Continue to operate public awareness programs, such as the City newsletter, to help address potential safety issues for City residents. Continue to provide an educational program for kids, such as using the clown firefighter program to spread fire safety ideas at schools and city functions. Continue to maintain a visible presence at many community events providing information on department programs and safety issues. Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Continue to participate as a member of the Unified San Diego County Emergency Services Organization (ESO) which is comprised of the 18 incorporated cities within the county and the County of San Diego. Continue to maintain an automatic aid agreement with all surrounding communities. Continue to participate in mutual aid agreements with the San Diego County, State of California, California Department of Forestry and U.S. Forest Service. Promote hazard mitigation in the business community. Continue to maintain an active relationship with the Chamber of Commerce. Continue to have Fire and Development Services staff provide education materials to and perform proactive inspections of businesses for issues such as fire safety, hazardous materials storage and general housekeeping practices. Continue to include Fire and Development Services staff in the review of new business license applications. Monitor and publicize the effectiveness of mitigation actions implemented statewide. Continue to use the City newsletter to publicize the identification of hazards and the associated safety measures being implemented. Continue to use press releases to promote hazard mitigation. City of Santee 5-245 SECTIONFI YE Goals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation (continued). Objective 2.E: Discourage activities that exacerbate hazardous conditions. Action 2.E.1 Continue to pursue code enforcement to ensure that structures and properties are maintained in such a manner that hazardous conditions are not created. Action 2.E.2 Continue to update and maintain information on known hazards to assist in the identification of hazards that may impact existing structures and properties. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase the awareness and knowledge of hazard mitigation principles and practice among state and local officials. Action 3.A.1 Continue to train staff to ensure the effective management of emergency operations under the National Incident Management System (NIMS). Action 3.A.2 Continue to participate in regional emergency management trainings and exercises. Action 3.A.3 Continue to use local communication, such as the City newsletter, to raise the public awareness to hazards. Objective 3.B: Develop model hazard mitigation plan and provide technical assistance to State agencies and local governments to prepare hazard mitigation plans. Action 3.B.1 Continue to maintain policies and procedures to ensure the effective management of emergency operations under the National Incident Management System (NIMS) during emergencies that affect the City. Objective 3.C: Refine the web-based Hazard Mitigation Planning System and provide technical assistance to State agencies, local and tribal governments utilizing the system. Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies and local governments. Action 4.A.1 Continue to maintain a local emergency management organization that operates under the National Incident Management System (NIMS). City of Santee 5-246 SECTIONFI YE Goals, Objectives and Actions Goal 4: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments (continued). Objective 4. A. Action 4.A.2 Action 4.A.3 Action 4.A.4 Objective 4.B. Action 4.B.1 Action 4.B.2 Objective 4.C. Action 4.C.1 Action 4.C.2 Establish and maintain closer working relationships with state agencies and local governments (continued). Continue to participate in the San Diego County Operational Area Emergency Management that is coordinated by the San Diego County Office of Emergency Services (OES). Continue to coordinate with SD County OES as part of OES Mutual Aid Region 6 and the OES Southern Administrative Region. Continue to have local trainings and participate in regional emergency management trainings and exercises. Encourage other organizations to incorporate hazard mitigation activities. Continue to maintain a NIMS Emergency Management Plan that includes participation by the local school districts, local utility companies, regional utility companies, volunteer agencies and private agencies. Continue to invite these groups to participate in local emergency management trainings and exercises. Improve, the State 's capability and efficiency at administering pre- and post-disaster mitigation . Continue to train staff to ensure the effective management of emergency operations under the National Incident Management System (NIMS). Continue to provide mutual aid as needed by OES. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to floods. Objective 5 A: Minimize injuries, loss of life and property damage resulting from flood hazards. Action 5.A.1 The City should continue to require that site design for new development within the fioodplain considers hazard potential and minimizes of flood hazards. Action 5.A.2 All development proposed within a fioodplain area shall continue to be required by the City to utilize design and site planning techniques to ensure that structures are elevated at least one foot above the 100-year flood level. City of Santee 5-247 SECTIONFI YE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to floods (continued). Objective 5 A: Minimize injuries, loss of life and property damage resulting from flood hazards (continue). Action 5.A.3 All proposed projects which would modify the configuration of any of the three main waterways in Santee (San Diego River and Sycamore and Forester Creeks) shall continue to be required to submit a report prepared by a registered engineer that analyzes potential effects of the project downstream as well as in the local vicinity. Action 5.A.4 The City shall continue to enforce its Flood Damage Prevention Ordinance that limits the placement of structures and uses in flood prone areas, controls dredging, filling or other activities that could modify the natural floodplain and prevents construction of barriers or structures that could divert flood flows and cause upstream or downstream impacts. Objective 5.B: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Action 5.B.1 Continue to monitor and maintain all waterways and drainage facilities within the City. Action 5.B.2 Continue to monitor water levels in the City's main waterways during severe storm events. Action 5.B.3 Continue to actively pursue the improvement of drainage ways and flood control facilities through the Capital Improvements Program of the City. Objective 5.C: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation , California Department of Water Resources). Action 5.C.1 Continue to coordinate flooding issues along the San Diego River with the County and City of San Diego. Objective 5.D: Minimize repetitive losses caused by flooding. Action 5.D.1 Continue to actively pursue the improvement of drainage ways and flood control facilities so as to lessen recurrent flood problems and include such public improvements in the Capital Improvements Program for the City. Action 5.D.2 Continue to identify existing assets with the highest relative vulnerability to the effects of floods within the 1 00-year floodplains of the City's waterways. Action 5.D.3 Continue to participate in the National Flood Insurance Program. Periodically review the City's compliance with NFIP regulations, as resources become available. City of Santee 5-248 SECTIONFIVE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to floods (continued). Objective 5.E: Address identified data limitations regarding the lack of information about relative vulnerability of assets from floods (e.g., Q31 digital floodplain maps for missing counties) Action 5.E.1 Continue to require CLOMAs or LOMRs for all changes to the floodplains caused by new development. Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to wildfires. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Action 6.A.1 Continue to maintain automatic aid agreements for emergency response with all surrounding communities. Action 6.A.2 Continue to require that proposed developments be approved only after it is determined that there will be adequate water supply and pressure to maintain the required fire flow at the time of development. Action 6.A.3 Continue to require that all proposed development shall satisfy the minimum structural fire protection standards contained in the adopted edition of the Uniform Fire and Building Codes; however, where deemed appropriate the City shall enhance the minimum standards to provide optimum protection. Action 6.A.4 Continue to require fire sprinklers in all new construction identified in the Santee Municipal Code. Action 6.A.5 Continue to require that emergency access routes in all developments be adequately wide to allow the entry and maneuvering of emergency vehicles, as necessary. Action 6.A.6 Investigate permanent placement of fire fighting aircraft in San Diego East County. Action 6.A.7 Evaluate under-grounding of utilities in areas that have high risk of wildfires. Action 6.A.8 Investigate use of "controlled burns" in high-risk areas. City of Santee 5-249 SECTION FI \ 1 Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to wildfires (continued). Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires. Action 6.B.1 The City should support State legislation that would provide tax incentives to encourage the repair or demolition of structures that could be considered fire hazards. Action 6.B.2 Continue to enforce the existing weed abatement program. Action 6.B.3 Continue to ensure that all construction materials used for renovating or remodeling existing structures meet current fire and building codes. Objective 6.C: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management}. Action 6.C.1 Continue to maintain both the San Diego County and State of California Master Mutual Aid Agreements, and maintain a separate agreement with the California Department of Forestry and U.S. Forest Service. Objective 6.D: Address identified data limitations regarding the lack of information related to wildfires (e.g., a comprehensive database of California wildfires, a California wildfire risk model, and relative vulnerability of assets). Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to severe weather (e.g., El Nino storms/, thunderstorms, lightning, and extreme temperatures). Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to severe weather. Action 7.A.1 Continue to perform preventative maintenance and inspection of existing storm drains, inlets, outlets and channels. Action 7.A.2 Continue to require that drainage facilities are designed to convey the 100-year storm. Action 7.A.3 Continue to require new construction to adequately convey all drainage away from structure foundations and into improved drainage facilities. City of Santee 5-250 SECTIONFI YE Goals, Objectives and Actions Goal 7: Redi parti OWIH thun (com Objective 7.B: Action 7.B.1 Action 7.B.2 Action 7.B.3 Objective 7.C. Action 7.C.1 Objective 7.D. ice the possibility of damage and losses to existing assets, cularly people, critical facilities/infrastructure, and State- id facilities, due to severe weather (e.g., El Nino storms/, derstorms, lightning, and extreme temperatures) inued). Protect existing assets with the highest relative vulnerability to the effects of weather. Continue to provide the public access to sandbags for flood protection. Continue to provide 24 hour public works and other non-safety personnel support during emergency operations. Continue to monitor transportation infrastructure during emergencies to maintain access for emergency vehicles and to close access when necessary for safety. Coordinate with and support existing efforts to mitigate severe weather (e.g., National Weather Service). Continue to participate in regional emergency operation efforts. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from severe weather (e.g., construction type, age, condition, compliance with current building codes, etc.) Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to dam failure. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 8.A.1 Continue to work with the San Diego County OOP to maintain dam failure inundation maps. Action 8.A.2 Continue to maintain a dam failure emergency action plan. Objective 8.B: Protect existing assets with the highest relative vulnerability to the effects of dam failure. Action 8.B.1 Maintain contact with the owner agencies to monitor reservoir water levels behind dams. Action 8.B.2 Continue to include a dam failure scenario in our EOC exercises. CityofSantee 5-251 SECTIONFI YE Goals, Objectives and Actions Goal 8: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to dam failure (continued). Objective 8.C: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from dam failure. Action 8.C. 1 Maintain contact with the owner agencies to monitor dam inspections. Goal 9: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to geological hazards. Objective 9 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 9.A.1 Continue to implement the City's geologic/seismic hazards regulations and review procedures identified in the City's General Plan. Action 9.A.2 Continue to ensure that if a project is proposed in an area identified in the City's Geotechnical Seismic Hazard Study as seismically and/or geologically hazardous, the proposal shall demonstrate through appropriate geologic studies and investigations that either the unfavorable conditions do not exist in the specific area in question or that they may be avoided or mitigated through proper site planning, design and construction. Action 9.A.3 Continue a California Environmental Quality Act level review on all new projects, which requires all significant environmental effects of a proposed project, including geologic and soil conditions, be identified and discussed, and adequate mitigation for any identified significant effects. Action 9.A.4 Continue to require that all geotechnical studies of critical facilities should be performed in accordance with "Guidelines to Geologic/Seismic Reports," California Division of Mines and Geology (CDMG), Note Number 41. Objective 9.B: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Action 9.B.1 The City should continue to utilize existing and evolving geologic, geophysical and engineering knowledge to distinguish and delineate those areas that are particularly susceptible to damage from seismic and other geologic conditions. Action 9.B.2 Continue to require retrofits to existing buildings as part of major renovations, consistent with California Building Code requirements. City of Santee 5-252 SECTIONFI YE Goals, Objectives and Actions Goal 9: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and State- owned facilities, due to geological hazards (continued). Objective 9.C: Coordinate with and support existing efforts to mitigate geological hazards (e.g., California Geological Survey, US Geological Survey). Action 9.C.1 Continue to maintain a City of Santee geologic hazards map. Objective 9.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from earthquakes (e.g., data on structure/building types, reinforcements, etc.). 5.18.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: City will work to ensure that all proposed and future development satisfies the minimum structural fire protection standards contained in the adopted edition of the Uniform Fire and Building Codes. Where it is deemed appropriate, the City shall enhance the minimum standards to provide optimum protection. Coordinating Individual/Organization: Division Chief Brett Eldridge, Fire Marshal, and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee Department of Development Services adopted budget. City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 City of Santee 5-253 SEBTIONFIVE Goals, Objectives and Actions Action Item #2: The City will continue to aggressively enforce the existing weed abatement law, and modify and enhance where necessary, modifying fuel types and providing a defensible space around all structures Coordinating Individual/Organization: Division Chief Brett Eldridge, Fire Marshal, and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget. City of Santee Department of Development Services adopted budget. City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #3: City will continue to maintain active membership and participation in both the San Diego County Mutual Aid Agreement, and the State of California Master Mutual Aid Agreement, and maintain a separate agreement with the U.S. Forest Service, to ensure adequate resources are available in the City for any future anticipated wildland incidents. Coordinating Individual/Organization: Division Chief Dave Miller, Fire Department Operations Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #4: City will continue to perform preventative maintenance and inspection of existing storm drains, inlets, outlets and channels; continue to require that drainage facilities are designed to convey the 100-year storm predictions; and continue to require new construction to adequately convey all water from structures and construction sites. Coordinating Individual/Organization: Bob Stein, Public Services Manager, selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Department of Development Services adopted budget, City of Santee Community Services adopted budget, City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #5: City will continue to work with the County of San Diego Office of Emergency Services to maintain and update dam failure inundation maps; continue to maintain a dam failure action plan as part of the City's Disaster Preparedness Plan; and continue to include a dam failure scenario in City Emergency Operations Center exercises. Coordinating Individual/Organization: Division Chief Dave Miller Fire Department Operations City of Santee 5-254 SMTIOHFIVE Goals, Objectives and Actions Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #6:City will continue to implement the City's geologic/seismic hazard regulations and review related procedures identified in the City's General Plan; and continue to ensure that any proposed projects in areas identified as seismically and/or geologically hazardous, shall demonstrate through appropriate geologic studies and investigations that either the unfavorable conditions do not exist in the specific area in question or that they may be avoided and/or mitigated through proper site planning, design and construction. Coordinating Individual/Organization:Division Chief Brett Eldridge, Fire Marshal, Bob Stein, Public Services Manager, and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee Department of Community Services adopted budget, City of Santee Department of Development Services adopted budget, City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #7: Continue a California Environmental Quality Act level review on all new projects that require all significant effects of a proposed project, including geologic and soil conditions, to be identified and discussed, and identified significant effects are adequately mitigated; continue to require that all geotechnical studies of critical facilities should be performed in accordance with "Guidelines to Geologic Seismic Reports." California Division of Mines and Geology (CDMG), Notes Number 37 and "Recommended Guidelines for Determining the Maximum Credible and the Maximum Probable Earthquakes," CDMG Notes Number 43. Coordinating Individual/Organization: Division Chief Brett Eldridge, Fire Marshal, and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee Department of Development Services adopted budget, City of Santee adopted budget, General Fund Implementation Timeline: February 2010 though December 2015 Action Item #8: The City will continue to utilize existing and evolving geologic, geophysical and engineering knowledge to distinguish and delineate those areas that are particularly City of Santee 5-255 SECTIONFIVE Goals, Objectives and Actions susceptible to damage from seismic and other geologic conditions; and continue to require retrofits to existing building construction as part of any major renovations. Coordinating Individual/Organization: Division Chief Brett EJdridge, Fire Marshal, Bob Stein, Public Services Manager and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget. City of Santee Department of Development Services adopted budget, City of Santee adopted budget, General Fund, and various grant sources as they become available to the City Implementation Timeline: February 2010 though December 2015 Action Item #9: Continue to use the City's Development Review Ordinance procedures and the Uniform Fire Code to regulate and limit the manufacture, storage, and/or use of hazardous materials within the City; continue to participate as a member of the San Diego County Joint Powers Authority utilizing the Hazardous Materials Response Team to mitigate hazardous materials incidents; and continue to use the San Diego County Hazardous Waste Management Plan as the primary planning document for providing overall policy on hazardous waste management within the City. Coordinating Individual/Organization: Division Chief Brett Eldridge, Fire Marshal, Division Chief Dave Miller, Operations, and selected members of the Department of Development Services (specific project driven) Potential Funding Source: City of Santee Fire Department adopted budget, City of Santee Department of Development Services adopted budget, City of Santee adopted budget. General Fund Implementation Timeline: February 2010 though December 2015 Action Item #10: Continue to coordinate and support existing efforts to mitigate other manmade hazards within the City, cooperating and sharing information with other agencies including but not limited to the Department of Homeland Security, California Department of Public Safety, San Diego County Office of Emergency Services, San Diego County Department of Water Resources, Bureau of Reclamation, California Department of Justice, California Department of Transportation, the Federal Aviation Administration, and the Department of Defense Coordinating Individual/Organization: Division Chief Dave Miller, Fire Department Operations, Captain Patricia Duke, San Diego County Sheriffs Office, Bob Stein, Public Services Manager, and selected members of the Department of Development Services (specific project driven) City of Santee 5-256 SECTIONFIVE Goals, Objectives anil Actions Potential Funding Source: City of Santee Fire Department adopted budget. City of Santee Department of Community Services adopted budget, City of Santee Department of Development Services adopted budget, City of Santee adopted budget. General Fund, San Diego County Sheriffs Office adopted budget, and various grant sources as they become available to the City Implementation Timeline: February 2010 through December 2015 City of Santee 5-257 SEGTIONFI YE Goals, Objectives and Actions This page intentionally left blank City of Santee 5-258 SECTIONFIVE Goals, Objectives and Actions 5.19 CITY OF SOLANA BEACH The City of Solana Beach (Solana Beach) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition. LPGs were supplied with exposure/loss estimates for Solana Beach summarized in Table 5.19-1. See Section 4.0 for additional details. Table 5.19-1 Summary of Potential Hazard-Related Exposure/Loss in Solana Beach Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 402 40 13,547* Residential Number of Residential Buildings 167 17 6,512* Potential Exposure/ Loss for Residential Buildings (x$1,000) 47,011 4,786 1,833,128* Commercial Number of Commercial Buildings 2 2 322* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 8,963 8,963 1,443,107* Critical Facilities Number of Critical Facilities 0 0 46** Potential Exposure for Critical Facilities (x$1,000) 0 0 18,005** Flood (Loss) 100 Year 500 Year 1,124 1,250 574 648 161,581 182,412 13 16 58,262 71,707 1 1 192 192 Rain-Induced Landslide High Risk Moderate Risk Tsunami 0 0 324 0 0 135 0 0 38,003 0 0 3 0 0 13,445 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 0 76 50 11,413 0 33 22 5,585 0 9,290 6,193 1,572,178 0 1 1 303 0 4,482 4,482 1,357,955 0 1 0 44 0 2 0 16,002 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Solana Beach 5-259 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Solana Beach LPG as their top five. A brief rational for including each of these is included. • Coastal Storm/Erosion: constant and historical • Wildfire: climate and location • Earthquake: proximity to local faults • Landslide: coupled with above and earthquake/tsunami • Tsunami: proximity to Pacific Ocean 5.19.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Solana Beach's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.19.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Solana Beach and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Solana Beach, as shown in Table 5.19-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. City of Solana Beach 5-260 SECTIONFIVE Goals, Objectives and Actions Table 5.19-2 City of Solana Beach: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D, Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y N Y Y Y Y Y Department/Agency and Position Planning - Director of Community Development Engineering - City Engineer Planning & Engineering - Director of Community Development City/Engineer Engineering -City Engineer Engineering -City Engineer Fire Department - Director of Public Safety SAN DAG Consultants Fire Department - Director of Public Safety. City Manager - Management Analyst The legal and regulatory capabilities of Solana Beach are shown in Table 5.19-3, which presents the existing ordinances and codes that affect the physical or built environment of Solana Beach. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Solana Beach 5-261 SICTIONFIVE Goals, Objectives and Actions Table 5.19-3 City of Solana Beach: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C, Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G, General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N Y Does State Prohibit (Y/N) N N N N N N N N N N N N N 5.19.1.2 Fiscal Resources Table 5.19-4 shows specific financial and budgetary tools available to Solana Beach such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Solana Beach 5-262 SECTION f IVE Goals, Objectives and Actions Table 5.19-4 City of Solana Beach: Fiscal Capability Financial Resources A.Community Development Block Grants (CDBG) B. Capital improvements project funding C. D. E. F. G. H. Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Y Y Y-Vote Required Y N Y Y-Vote not required N Y 5.19.2 Goals, Objectives and Actions Listed below are Solana Beach's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Solana Beach LPG. The Solana Beach LPG members were: • David Ott, City Manager • Dismas Abelman, Deputy Fire Chief • Tina Christiansen, Director of Community Development • Mo Sammak, City Engineer Once developed, City staff submitted the plan to CalEMA and FEMA for approval. Once approved City Staff will take the plan to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. City of Solana Beach 5-263 5ECTIONFIVE Goals, Objectives and ft i This email address was checked daily for public input. The following sections present the hazard- ,:•„ goals, objectives and actions as prepared by the City of Solana Beach's LPG in conjunction wi: i Hazard Mitigation Working Group, locally elected officials and local citizens. 5.19.2.1 Goals The City of Solana Beach has developed the following 6 Goals for their Hazard Mitigation Plan (St.; Attachment A for Goal 6). Goal 1. Promote public understanding, support and demand for hazard mitigation. Goal 2. Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal 3. Floods Goal 4. Wildfires GoalS. Geological Hazards Goal 6. Manmade Hazards 5.19.2.2 Objectives and Actions The City of Solana Beach developed the following broad list of objectives and actions to assist in the implementation of each of their 6 identified goals. The City of Solana Beach developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.19.2.3. Goal 1: Promote public understanding, support and demand for hazard mitigation. Objective 1 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 1 .A.1 Institutionalize hazard mitigation into City's planning efforts. Action 1 .A.2 Public workshops to discuss particular hazards and related mitigation measures. City of Solana Beach 5-264 SECTION I I \ I Goals, Objectives and Actions Goal 1: Promote public understanding, support and demand for hazard mitigation (continued). Objective 1 .B: Action 1.B.1 Action 1.B.2 Objective 1 .C: Action 1.C.1 Action 1.C.2 Objective 1 .D: Action 1.D.1 Action 1.D.2 Objective 1 .E: Action 1.E.1 Action IE. 2 Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Coordinate with regional efforts to share resources and knowledge. Streamline policies to eliminate conflicts and duplication of effort. Promote hazard mitigation in the business community. Use business liaison and Chamber of Commerce as conduits for information. Explore opportunities to work with public/private partnerships. Monitor and publicize the effectiveness of mitigation actions implemented locally. Utilize City newsletter, press releases and public meetings. Train and review with staff implemented programs as part of regular training. Discourage activities that exacerbate hazardous conditions. Make hazard mitigation part of the planning and approval process. Stepped up Code Enforcement activities targeting these conditions. Goal 2: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 2 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 2.A.1 Maintain partnerships in mitigation and disaster planning. Action 2.A.2 Explore opportunities for additional funding through cooperative efforts. Objective 2.5: Encourage other organizations to incorporate hazard mitigation activities. Action 2.B.1 Work with business and environmental community to understand importance. City of Solana Beach 5-265 SECTIONFI YE Goals, Objectives and Actions Goal 2: Improve hazard mitigation coordination and communication with federal, state, local and tribal governments (continued). Objective 2.C: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation. Action 2.C.1 Find additional training opportunities for staff. Action 2.C.2 Establish training schedule for tabletop exercises. Action 2.C.3 Make this institutional for the staff. Goal 3: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods. Objective 3 A: Action 3.A.1 Action 3.A.2 Action 3.A.3 Objective 3.B: Action 3.B.1 Action 3.B.2 Action 3.B.3 Objective 3.C: Action 3.C.1 Objective 3D: Action 3.D.1 Action 3.D.2 Action 3.D.3 Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Clear identification of potential flood prone areas. Promote monitoring and maintenance of flood control channels. Develop pre-incident action plans for affected areas. Coordinate with and support existing efforts to mitigate floods (e.g., FEMA, US Army Corps of Engineers, US Bureau of Reclamation, San Diego County Department of Water Resources). Streamline policies to eliminate conflicts and duplication of effort. Enforce regulatory measures that ensure any new development within 100-year flood plain will be consistent with FEMA guidelines. Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. Minimize repetitive losses caused by flooding. Restrict ability to re-build without taking mitigation measures to avoid repeats. Address identified data limitations regarding the lack of information about relative vulnerability of assets from floods. Work with regional agencies, (OOP, SanGIS) to accurately map affected areas. Share and train with acquired information with all city department's and personnel. Coordinate with Cities of Del Mar and Encinitas and the Rancho Santa Fe Fire Protection District for joint training opportunities between staffs. City of Solana Beach 5-266 SECTIONFI YE Goals, Objectives and Actions Goal 4: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to wildfires. Objective 4 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Action 4.A.1 Annually review and update wildland pre-plans for firefighting forces. Action 4.A.2 Maximize utilization of outside firefighting equipment and staff resources Action 4.A.3 Implement Fire Code enhancements for wildland-urban interface. Objective 4.B: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., County or San Diego & State of California) Action 4.B. 1 Develop mitigation measures to enhance protection of homes along San Elijo Reserve. Action 4.B.2 Work in conjunction and cooperation with San Elijo Lagoon Conservancy to achieve mitigation efforts. Action 4.B.3 Coordinate with other agencies to ensure consistency among standards. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards. Objective 5. A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 5.A.1 Continue to explore strategies and opportunities for sand replenishment. Action 5.A.2 Finish local coastal plan development. Objective 5.B: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Action 5.B.1 Continue efforts to develop local coastal plan to address bluff protection measures. Action 5.B.2 Monitor existing protective measures taken to assure their continued effectiveness. 5.19.2.3 Prioritization and Implementation of Action Items The City of Solana Beach is vulnerable to many different types of hazards. The Wildfires of 2007 threatened the eastern border of the City and the increased threat is reflected in the plan. Other threats include long term issues such as bluff erosion and human caused threats. The complexity of these hazards coupled with the long -term implications resulted in a lower prioritization than wildfire, which is a year City of Solana Beach 5-267 SECTIBNFIVE Goals. Objectives and Actions round threat that could have an impact on a large portion of the City. The result is the prioritization of the threats to address the most likely, with a desire to mitigate all that face the City. Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria. The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 11 prioritized mitigation actions as well as an implementation strategy for each are: Action Item#l: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Continue to explore strategies and opportunities for sand replenishment. Finish development local coastal plan and/or other coastal bluff policies. Coordinating Individual/Organization: Community Development Potential Funding Source: General Fund and Grants Implementation Timeline: On-going Action Item #2: Protect existing assets with the highest relative vulnerability to the effects of geological hazards. Continue efforts to develop local coastal plan and/or other coastal bluff policies to address bluff protection measures. Monitor existing protective measures taken to assure their continued effectiveness. Coordinating Individual/Organization: Community Development Potential Funding Source: General Fund, Grants and Private Funding Implementation Timeline: On-going Action Item #3: Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., County or San Diego & State of California). Develop mitigation measures to enhance protection of homes along San Elijo Reserve. Work in conjunction and cooperation with San Elijo Lagoon Conservancy to achieve mitigation efforts. Coordinate with other agencies to ensure consistency among standards. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grants Implementation Timeline: Implemented December, 2008 Action Item #4: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Annually review and update wildland pre-plans for City of Solana Beach 5-268 SECTIONFIVE Goals, Objectives and Actions firefighting forces. Maximize utilization of outside firefighting equipment and staff resources. Implement Fire Code enhancements for wildland-urban interface. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund Implementation Timeline: Implemented 2008 Action Item #5: Inspections to verify accuracy of existing Hazard Materials databases Coordinating Individual/Organization: Dismas Abelman / Fire Department Potential Funding Source: Fire Department Budget Implementation Timeline: Completed annually Action Item #6: Develop a comprehensive approach to reducing the possibility of damage and losses due to other manmade hazards. Coordinate with other agencies on training and planning for terrorist related activities. Maintain communications links with regards to threat assessments and dissemination of information. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grants Implementation Timeline: On-going Action Item #7: Address identified data limitations regarding the lack of information about relative vulnerability of assets from floods. Work with regional agencies, (OES, SanGIS) to accurately map affected areas. Share and train with acquired information with all city department's and personnel. Coordinate with City of Del Mar, Encinitas and the Rancho Santa Fe Fire Protection Districts for joint training opportunities between staffs. Coordinating Individual/Organization: Public Works Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #8: Protect existing assets with the highest relative vulnerability to the effects of other manmade hazards. Evaluate access levels to public facilities and restrict access where necessary. Evaluate infrastructure and facilities for additional security measures as required. Coordinating Individual/Organization: Deputy City Manager Potential Funding Source: General Fund and Grants Implementation Timeline: On-going Action Item #9: Monitor and publicize the effectiveness of mitigation actions implemented locally. Utilize City newsletter, press releases and public meetings. Train and review with staff implemented programs as part of regular training. City of Solana Beach 5-269 SECTIONFIVE Coals, Objectives and Actions Coordinating Individual/Organization: Deputy City Manager Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #10: Discourage activities that exacerbate hazardous conditions. Make hazard mitigation part of the planning and approval process. Develop a checklist and inspection follow up in the flood plain, wildland urban interface and coastal bluff. Coordinating Individual/Organization: Community Development & Code Enforcement Potential Funding Source: General Fund Implementation Timeline: On-going Action Item #11: Improve the City's capability and efficiency at administering pre- and post- disaster mitigation. Find additional training opportunities for staff. Establish training schedule for tabletop exercises. Make this institutional for the staff. Coordinating Individual/Organization: Fire Department Potential Funding Source: General Fund and Grants Implementation Timeline: On-going City of Solana Beach 5-270 SICTIONFIVE Goals, Objectives and Actions 5.20 CITY OF VISTA The City of Vista (Vista) reviewed a set of jurisdictional-Ievel hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for Vista summarized in Table 5.20-1. See Section 4.0 for additional details. Table 5.20-1 Summary of Potential Hazard-Related Exposure/Loss in Vista Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss • Includes shaking, liquefaction and landslide components) Exposed Population 0 553 96,100* Residential Number of Residentia I Buildings 0 215 30,707* Potential Exposure/ Loss for Residentia I Buildings (x$1,000) 0 60,523 8,644,021* Commercial Number of Commercia I Buildings 0 16 1,163* Potential Exposure/ Loss for Commercia I Buildings (x$1,000) 0 71,707 5,212,217* Critical Facilities Number of Critical Facilities 0 4 131** Potential Exposure for Critical Facilities (x$1,000) 0 2,384 388,400** Flood (Loss) 100 Year 500 Year 1,988 4,639 635 1,553 178,753 437,170 94 144 421,280 645,365 5 14 6,005 14,202 Rain-Induced Landslide High Risk Moderate Risk Tsunami 92 11 0 32 2 0 9,008 563 0 4 0 0 17,927 0 0 0 0 0 0 0 0 Wildfire / Structure Fire Extreme Very High High Moderate 13 654 792 90,913 5 217 277 28,908 1,408 61,086 77,976 8,137,602 0 7 12 1,106 0 31,372 53,780 4,956,760 0 2 4 122 0 1,000 3,001 382,394 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). City of Vista 5-271 SECTIONFIVE Goals, Objectives and Actions After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Vista LPG as their top five. A brief rational for including each of these is included. • Wild Fire: A significant amount of the community is exposed to the potential for loss secondary to extreme fire conditions in undeveloped core and interface areas. • Earthquake: The potential exists for a large loss of life and property, as well as, prolonged disruption of governmental and commercial continuity. • Flooding: The city contains several significant floodplains and is subject to wide spread flooding. • Hazardous Materials Release: In addition to a major freeway the jurisdiction is home to a large industrial park with fixed facilities. • Terrorism or Other Manmade Events: Components of government infrastructure including a Regional Court and Jail Detention Facility, as well as, domestic threat potential are in the jurisdiction. 5.20.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides Vista's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.20.1.1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in Vista and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of Vista, as shown in Table 5.20-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • City of Vista Community Development Department Manage city development process from concept to completion. Develop and maintain the city general plan, zoning ordinances and development standards. Review construction projects to ensure compliance with land use regulations, community plans and environmental status, design review, public improvement plans and issuance of permits. Coordinate the adoption of building codes. Develop Building ordinances. City of Vista 5-272 SECTIONFIVE Goals. Objectives and Actions Review site and building plans for compliance with building codes and ordinances. Damage assessment of structures damaged by natural or man made causes. Develop, and ensure compliance with engineering ordinances for new and existing infrastructure. • City of Vista Public Works Department Maintain city infrastructure including streets, fleet vehicles, storm drain and wastewater systems. Responds in support of city emergencies and disasters including hazardous materials mitigation, traffic control. Ensure efficacy of wastewater systems including floodways. Confined Space Response. • City of Vista Fire Department Develop policies to support emergency response, hazard prevention and disaster management. Coordinate adoption of codes and ordinances in compliance with State and Local model codes. Perform site and building plan review for code compliance and loss reduction. Emergency response to all risk hazards. City of Vista 5-273 SICTIONFIVE Goals, Objectives and Actions Table 5.20-2 City of Vista: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in GIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y Y Y Y Y Y N Y Y Department/Agency and Position Community Development, Redevelopment & Housing Engineering, Community Development Engineering, Community Development Engineering, Public Works Engineering Fire Department, Engineering, Public Works Planning Department City Manager, Fire Department City Manager The legal and regulatory capabilities of Vista are shown in Table 5.20-3, which presents the existing ordinances and codes that affect the physical or built environment of Vista. Examples of legal and/or regulatory capabilities can include: the City's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. City of Vista 5-274 SECTIONFIVE Goals, Objectives and Actions Table 5.20-3 City of Vista: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (fioodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N TBD Does State Prohibit (Y/N) N N N N N N N N N N N N TBD 5.20.1.2 Fiscal Resources Table 5.20-4 shows specific financial and budgetary tools available to Vista such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. City of Vista 5-275 SECTIONFI YE Coals, Objectives and Actions Table 5.20-4 City of Vista: Fiscal Capability Financial Resources A.Community Development Block Grants (CDBG) B. Capital improvements project funding C. D. E. F. G. H. Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes Yes Yes Yes Yes Yes UK UK 5.20.2 Goals, Objectives and Actions Listed below are Vista's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the City has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the City's planning documents, codes, and ordinances. In addition, City representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous City departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the Vista LPG. The Vista LPG members were: • Rick Snider, Building Department • Eric Dennis, Building Department • Gary Fisher, Fire Department • Jeff Berg, Fire Department Once developed, City staff presented submitted them to CalEMA and FEMA for approval. Once approved, City staff will take the plan to the City Council for adoption. The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related City of Vista 5-276 SECTIONFIVE Goals, Objectives and Actions goals, objectives and actions as prepared by the City of Solatia Beach's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials and local citizens. 5.20.2.1 Goals The City of Vista has developed the following 8 Goals for their Hazard Mitigation Plan (See Attachment A for Goal 8). Goal 1. Promote disaster-resistant future development. Goal.2. Promote public understanding, support and demand for hazard mitigation. GoalS. Build and support local capacity and commitment to continuously become less vulnerable to hazards. Goal 4. Improve hazard mitigation coordination and communication with federal, state, and local governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City-owned facilities, due to": Goal 5. Floods and other forms of severe weather Goal 6. Structural Fire/Wildfires Goal 7. Geological Hazards Goal 8. Other Manmade Hazards 5.20.2.2 Objectives and Actions The City of Vista developed the following broad list of objectives and actions to assist in the implementation of each of their 8 identified goals. The City of Vista developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.20.2.3. City of Vista 5-277 SECTIONFI YE Goafs, Objectives and Actions Goal 1: Promote disaster-resistant future development. Objective 1 A: Encourage and facilitate the development or update of general plans and zoning ordinances to limit development in hazard areas. Action 1.A.1 Continue to update the Land Use, Community Facilities, and Safety Elements of the City's General Plan as needed to limit the impacts of development in hazard prone areas. Objective 1 .B: Encourage and facilitate the adoption of building codes that protect existing assets and new development in hazard areas. Action 1 .B.1 Continue the emergency review process for codes related to development in identified hazard areas. Objective 1 .C: Encourage consistent enforcement of general plans, zoning ordinances, and building codes. Action 1 .C.1 Continue to streamline permitting and plan review processes. Action 1 .C.2 Continue aggressive enforcement to ensure all projects are properly permitted and inspected to document compliance with all city standards. Objective ID: Discourage future development that exacerbates hazardous conditions. Action 1 .D.1 Continue to ensure that high fire hazard areas have adequate access for emergency vehicles. Action 1 .D.2 Continue to enforce minimum brush clearance requirements. Objective I .E: Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. Action 1 £.1 Maintain Geographic Information Systems (GIS) capabilities to identify hazards and general hazard areas. Goal 2: Promote public understanding, support and demand for hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Continue to develop and revise public education curriculum to increase awareness among the residents of the City of Vista of disasters and pre-existing hazards. Action 2.A.2 Continue to identify hazard specific issues and needs. Action 2.A.3 Continue to provide timely information on City and Department websites. City of Vista 5-278 SECTION I 1 \ I Coals, Objectives and Actions Goal 2: Promote public understanding, support and demand for hazard mitigation (continued). Objective 2.B: Action 2.B.1 Action 2.B.2 Objective 2.C: Action 2.C.1 Action 2.C.2 Promote partnerships between the state, counties, and local governments to identify , prioritize , and implement mitigation actions. Continue to promote cooperative vegetation management programs that encompass hazard mitigation in the city and unincorporated areas that threaten the city. Support regional efforts to mitigate hazards. Promote hazard mitigation in the business community. Continue to identify hazard specific issues and needs. Utilize Fire Department's Fire Prevention Inspection Program to educate business owners and managers regarding hazard mitigation as city staff become available.. Goal 3: Build and support local capacity and commitment to continuously become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.1 Continue to update the City Emergency Plan every five years. Action 3.A.2 Continue to Emergency Operations training with City Staff to highlight hazard existence, mitigation, and response. Action 3.A.3 Continue to build and support local partnerships, such as the Unified Disaster Council (UDC), and other regional efforts to become less vulnerable to identified hazards. Action 3.A.4 Continue to build a team of community volunteers to work with the community before, during, and after a disaster by maintaining the Community Emergency Response Team (CERT) Program. Goal 4: Improve hazard mitigation coordination and communication with federal, state, local governments. Objective 4 A: Establish and maintain closer working relationships with state agencies and local governments. Action 4.A.1 Continue the construction and equipping of a new City Emergency Operations Center (EOC) and Department Operations Centers (DOC) to act as command and control coordination centers during disasters. City of Vista 5-279 SECT90NFI YE Goals, Objectives and Actions Goal 4: Improve hazard mitigation coordination and communication with federal, state, local governments (continued). Objective 4 A: Establish and maintain closer working relationships with state agencies and local governments (continued). Action 4.A.2 Train employees and volunteers to operate the City EOC following the National Incident management System (NIMS), the Standardized Emergency Management System (SEMS) and the Incident Command System (ICS). Action 4.A.3 Continue to update City Emergency Operations Plans to include coordination with County Wide Operations Plans. Objective 4.B: Encourage other organizations to incorporate hazard mitigation activities. Action 4.B.1 Continue to support and assist local entities, including the chamber of commerce, local school districts, and trade associations in developing self reliant plans for hazard mitigation and post disaster continuity. Objective 4.C: Improve the City's capability and efficiency at administering pre- and post-disaster mitigation . Action 4.C.1 Continue to streamline policies to coordinate permitting activities Action 4.C.2 Establish and staff a Disaster Preparedness Division within the City as funding becomes available. Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods and other forms of severe weather. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 5.A.1 Continue to review and compare existing flood control standards, zoning and building requirements. Action 5.A.2 Continue to identify flood-prone areas utilizing GIS. Action 5.B.3 Continue to develop pre-incident action plans for flood-prone areas. Action 5.B 4 Continue to participate in the National Flood Insurance Program and requirement to review applications for conformance with NFIP standards. City of Vista 5-280 SECTIONFI YE Goals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to floods and other forms of severe weather (continued). Objective 5.B: Protect existing assets with the highest relative vulnerability to the effects offloads within the 1 00-year floodplain . Action 5.B.1 Continue to develop project proposals to reduce flooding and improve control in flood-prone areas. Action 5.B.2 Continue to seek pre-disaster mitigation funding. Action 5.B.3 Educate property owners in the flood prone areas about ways to reduce or prevent loss due to flooding. Goal 6: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to structural fire/wildfires. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to wildfires. Action 6.A.1 Using GIS capabilities, continue to identify and designate Wildland Urban Interface Zones (WUI). Action 6.A.2 Develop and maintain Weed Abatement and Fuel Modification Ordinances. Action 6.A.3 Continue to study fuel management and resource allocation to allow for maximum proactive and response capability. Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of wildfires. Action 6.B.1 Continue to enforce City Sprinkler Ordinance. Action 6.B.2 Continue to enforce standardized Defensible Space Clearance distances. Action 6.B.3 Continue to research and support fuel modification techniques including mow/disc clearing and prescriptive burns. Action 6.B.4 Continue the public education program to address fire dangers and mitigation measures. City of Vista 5-281 SECTIONFI YE Goals, Objectives and Actions Goal 6: Redi parti OWIM Objective 6.C: Action 6.C.1 Action 6.C.2 Objective 6.D. Action 6.D.1 ice the possibility of damage and losses to existing assets, cularly people, critical facilities/infrastructure, and City- id facilities, due to structural fire/wildfires (continued). Coordinate with and support existing efforts to mitigate wildfire hazards (e.g., US Forest Service, Bureau of Land Management). Coordinate with regional agencies, including CalFIRE and the US Forest Service, to minimize fire spread potential from areas outside city boundaries. Continue to support and participate in the California Fire Master Mutual Aid Agreement, the San Diego County Fire Master Mutual Aid Agreement, and the North Zone Automatic Aid Agreement. Maintain adequate emergency response capability. Continue to evaluate service level impacts and needs. Goal 7: Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and City- owned facilities, due to geological hazards. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to geological hazards. Action 7.A.1 Maintain the City's Public Education Program. Action 7.A.2 Continue to design critical facilities that will function after a major earthquake. Action 7.A.3 Identify hazard prone structures through CIS modeling. Action 7.A.4 Identify projects for pre-disaster mitigation funding. Action 7.A.5 Implement the City Government Continuity Plan. 5.20.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. City of Vista 5-282 SECTIONFIVE Goats. Objectives and Actions The top 9 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Complete construction equipping of a new City Emergency Operations Center (EOC) and Department Operations Centers to act as command and control coordination centers during disasters. Coordinating Individual/Organization: Fire Department Potential Funding Source: Operating Budget/Grants Implementation Timeline: Current - December 2010 Action Item #2: Continue efforts to train city employees and volunteers to operate the City EOC following the National Incident Management System (NEVIS), the Standardized Emergency Management System (SEMS) and the Incident Command System (ICS). Coordinating Individual/Organization: Fire Department Potential Funding Source: Operating Budget/Grants Implementation Timeline: On-going Action Item #3: Continue to build a team of community volunteers to work with the community before, during, and after a disaster by maintaining the Community Emergency Response Team (CERT) Program. Coordinating Individual/Organization: Fire Prevention/ Fire Department/Public Works Potential Funding Source: Operating Budget Implementation Timeline: On-going Action Item #4: Continue to develop public education curriculum to increase awareness of disasters and pre-existing hazards. Coordinating Individual/Organization: Fire Prevention Potential Funding Source: Operating Budget/Grants Implementation Timeline: On-going Action Item #5: Promote cooperative vegetation management programs that encompass hazard mitigation in the city and unincoiporated areas that threaten the city. Coordinating Individual/Organization: Code Compliance/Fire Prevention Potential Funding Source: Operating Budget/Grants Implementation Timeline: On-going Action Item #6: Ensure city personnel are properly equipped for emergency response and self- protection from incidents of terrorism. Coordinating Individual/Organization: Fire Department/Risk Management Potential Funding Source: Operating Budget/Grants City of Vista 5-283 SECTIONFIVE Coals, Objectives and Actions Implementation Timeline: On-going Action Item #7: Maintain Geographic Information Systems (GIS) capabilities to identify hazards and general hazard areas. Coordinating Individual/Organization: Community Development/Public Works/Information Systems Potential Funding Source: Operating Budget/Grants Implementation Timeline: On-going Action Item #8: Implement the City Government Continuity Plan. Coordinating Individual/Organization: City Manager/Fire Department Potential Funding Source: Operating Budget/Grants Implementation Timeline: June 2010-June 2011 Action Item #9: Develop project proposals to reduce flooding and improve control of storm waters in flood-prone areas. Coordinating Individual/Organization: Community Development/Public Works Potential Funding Source: Operating Budget/Grants Implementation Timeline: On-going City of Vista 5-284 SICTIONFIVE Goals, Objectives and Actions 5.21 COUNTY OF SAN DIEGO The Unincorporated portion of the County of San Diego (County) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition, LPGs were supplied with exposure/loss estimates for the County summarized in Tables 5.21-la and 5.21-lb. See Section 4.0 for additional details. Table 5.21-la Summary of Potential Hazard-Related Exposure/Loss in the County (Urban) Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 21,862 333,626* Residential Number of Residential Buildings 0 7,304 108,042* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 2,056,076 30,413,823* Commercial Number of Commercial Buildings 0 277 3,560* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 1,241,431 15,954,852* Critical Facilities Number of Critical Facilities 0 123 290** Potential Exposure for Critical Facilities (x$1,000) 0 235,356 820,725** Flood (Loss) 100 Year 500 Year 10,125 11,357 3,358 3,785 945,277 1,065,478 195 213 873,932 954,602 34 38 6,733 7,932 Rain-Induced Landslide High Risk Moderate Risk Tsunami 1,509 35,499 35 314 11,039 11 88,391 3,107,479 3,097 4 389 1 17,927 1,743,381 4,482 10 90 1 8,003 141,628 2 Wildfire / Structure Fire Extreme Very High High 2,251 41,461 8,086 628 10,036 2,504 176,782 2,825,134 704,876 23 180 76 103,079 806,706 340,609 1 99 26 4 221,802 303,171 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). County of San Diego 5-285 SICTIONFIVE Goals, Objectives and Actions Table 5 Summary of Potential Hazard-Related .2Mb Exposure/Loss in the County (Rural) Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 14,512 168,254* Residential Number of Residential Buildings 0 3,686 60,561* Potential Exposure/ Loss for Residential Buildings (x$1,000) 0 1,037,609 17,047,922* Commercial Number of Commercial Buildings 0 135 2,177* Potential Exposure/ Loss for Commercial Buildings (x$1,000) 0 605,030 9,756,661* Critical Facilities Number of Critical Facilities 0 123 1,554" Potential Exposure for Critical Facilities (x$1,000) 0 325,258 7,942,838** Flood (Loss) 100 Year 500 Year 7,276 8,950 3,661 4,426 1,030,572 1,245,919 137 151 613,993 676,737 107 117 629,073 632,665 Rain-Induced Landslide High Risk Moderate Risk Tsunami 9,130 23,197 5,154 3,573 4,188 95 1,005,800 1,178,922 26,743 93 89 0 416,798 398,871 0 35 67 5 12,657 213,940 768 Wildfire / Structure Fire Extreme Very High High Moderate 13,286 47,816 8,518 71,028 5,254 18,209 3,197 24,474 1,479,001 5,125,834 899,956 6,889,431 187 658 108 792 838,078 2,948,959 484,024 3,549,506 160 739 165 557 446,630 3,070,660 817,703 3,367,085 * Represents best available data at this time. ** Represents 500-year earthquake value under three earthquake scenarios (shake only, shake and liquefaction, and shake and landslide). After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the County LPG as their top five. • Fire • Hazardous Materials Release • Flood • Earthquake • Manmade Hazards County of San Diego 5-286 SECTIONFIVE __ Coals. Objectives and Actions 5.21.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides the County's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.21 . 1. 1 Existing Institutions, Plans, Policies and Ordinances The following is a summary of existing departments in the County and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of the County, as shown in Table 5.21-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • San Diego County Department of Planning and Land Use Maintain and protect public health, safety and well being. Preserve and enhance the quality of life for County residents by maintaining a comprehensive general plan and zoning ordinance, implementing habitat conservation programs, ensuring regulatory conformance and performing comprehensive community outreach. Planning Services Division: Provides land use and environmental review, maintains a comprehensive general plan and zoning ordinance, issues land use and building permits, and enforces building and zoning regulations. It is also responsible for long-range planning through development and implementation of a comprehensive General Plan. Development Services Division: Review site and building plans for compliance with all applicable codes. Code Enforcement enforces building, grading, zoning, brushing and clearing, junk, graffiti, signs, abandoned vehicle complaints and noise control. Resource planning in the unincorporated areas of San Diego County is to ensure efficient use and protection of environmental resources through compliance with local, state and federal environmental regulations. Coordinates damage assessment of structures from multiple causes. Provides damage assessment in the EOC & supports other agencies in assessing damae from fire. San Diego County Department of Public Works Ensure public safety through design, construction and maintenance of a safe and reliable infrastructure. County of San Diego 5-287 SECTIONFIVE Goals, Objectives and Actions Land Development Division: Provides engineering and review services for construction and development projects throughout the unincorporated areas of San Diego County. Services such as Storm-water, Flood Control, Map Processing, Cartography, Surveys, the Geographic and Land Information Systems and dealing with land development issues are the daily job of this division. The division processes more than 5,000 permits each year. Transportation Division: Roads Section is the most visible part of DPW, responding to requests for services ranging from pothole repair to tree trimming. Traffic Engineering provides traffic management and determines the need for stop signs and traffic lights. Route Locations updates the County's General Plan Circulation Element, provides transportation planning support and more. County Airports include eight unique facilities scattered throughout the area. McClellan-Palomar Airport provides commercial service to Los Angeles and Phoenix; Ramona Airport is home to the busiest aerial firefighting base in the USA; and, the County Sheriffs air force, ASTREA, is based at Gillespie Field. Engineering Services Division: The division includes Wastewater, Flood Control, Design Engineering, Environmental Services, Construction Engineering, Materials Lab, Project Management and Flood Control Engineering and Hydrology. The Director of Public Works has assigned the Deputy Director of Engineering Services as the County Engineer and Flood Control Commissioner. Management Services Division: This division provides a variety of services to department employees and the public. It includes Personnel, Financial Services, Communications, Recycling, Inactive Landfills and Management Support. Special Districts serve small areas in unincorporated areas providing a variety of services to residents in rural areas. • San Diego County Housing & Community Development Improve the quality of life in our communities - helping needy families find safe, decent and affordable housing and partnering with property owners to increase the supply and availability of affordable housing. The Department provides many valuable services to both property owners and tenants and strives to create more livable neighborhoods that residents are proud to call home. Provide a benefit to low and moderate-income persons, Prevent or eliminate slums and blight, or Meet needs having a particular urgency. Community Development Division Manager: Our key service programs improve neighborhoods by assisting low-income residents, increasing the supply of affordable, save housing and rehabilitating both business and residential properties in San Diego County. We serve the communities of: Chula Vista, Coronado, Del Mar, El Cajon, Escondido, Imperial Beach, Lemon Grove, Poway, San Marcos, Santee, Solana Beach, Vista, and the unincorporated areas of San Diego County. The Community Development Block Grant Program (CDBG) is a federal block grant program created by Congress in 1974. CDBG-funded projects must satisfy one of three national program objectives: In addition to funding housing and shelter programs, the County also allocates CDBG funds toward various community improvements in the Urban County area. Participating cities, community residents, nonprofit organizations and other county departments may submit CDBG proposals. County of San Diego 5-288 SECTIONFIVE Goals. Objectives and Actions • County of San Diego Emergency Preparedness & Disaster Medical Response Mission: To coordinate the medical/health response to disasters within the County of San Diego. Function: To protect life and property within the San Diego County Operational Area in the event of a major emergency or disaster by: 1) requesting additional outside resources to responding to medical/health related disasters; 2) coordinating all medical/health assets within the Op Area; 3) developing plans and procedures for response to a bioterrorism event; 4) developing and providing preparedness materials for the public. • Division of Emergency Medical Services Mission: Serves to coordinate the activities of pre-hospital and trauma center service providers for all residents and visitors of San Diego. Function: Its purpose is to ensure that the quality of emergency medical services, which includes 9-1-1 ambulance services, trauma care services, and non-emergency ambulance services, is of the highest quality. • County of San Diego Office of Emergency Services Mission: To coordinate San Diego County's response to disasters. Function: To protect life and property within the San Diego County Operational Area in the event of a major emergency or disaster by: 1) Alerting and notifying appropriate agencies when disaster strikes; 2) Coordinating all Agencies that respond; 3) Ensuring resources are available and mobilized in times of disaster; 4) Developing plans and procedures for response to and recovery from disasters; 5) Developing and providing preparedness materials for the public; 6) Staffing the Emergency Operations Center and 7) providing training to regional EOC staffs. • County of San Diego Sheriffs Department Mission: Provide Law Enforcement Services, including scene security, traffic control, crowd control, and crime scene investigation. Function: To provide law enforcement services within the San Diego County Operational Area. San Diego Sheriff policies, programs, plans, and manuals include: 1) Policies and Procedures Manual, 2) Law Enforcement Response to Critical Incident Manual, 3) Emergency Operations Manual, 4) Community Oriented Policing Program, 5) Citizen Emergency Response Program, as well as the State of California's Law Enforcement Guide for Emergency Operations and the State Law Enforcement Mutual Aid Plan. County of San Diego 5-289 SECTIONFIVE Goals, Objectives and Actions Table 5.21-2 County of San Diego: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS and/or HAZUS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N Y Y N N Y N Y Y Y N Department/Agency and Position Department of Planning & Land Use (DPLU)/ Lead Planner DPLU/Building Inspectors DPLU & Department of Public Works (DPW)/ Surveyor, Lead DPLU GIS Manger and DPW CIS Manager County Science Advisory Board Office of Emergency Services / Emergency Services Coordinator Departments determine their own level of service. The legal and regulatory capabilities of the County are shown in Table 5.21-3, which presents the existing ordinances and codes that affect the physical or built environment of the County. Examples of legal and/or regulatory capabilities can include: the County's building codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. County of San Diego 5-290 SECTIDNFIVE Goals, Objectives and Actions Table 5.21-3 County of San Diego: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B. Zoning ordinance C. Subdivision ordinance or regulations D. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, wildfire ordinances, hazard setback requirements) E. Growth management ordinances (also called "smart growth" or anti-sprawl programs) F. Site plan review requirements G. General or comprehensive plan H. A capital improvements plan 1. An economic development plan J. An emergency response plan K. A post-disaster recovery plan L. A post-disaster recovery ordinance M. Real estate disclosure requirements Local Authority (Y/N) Y Y Y Y Y Y Y Y Y Y N N Y Does State Prohibit (Y/N) N N N N N N N N N N 5.21.1.2 Fiscal Resources Table 5.21-4 shows specific financial and budgetary tools available to the County such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. County of San Diego 5-291 SECTIONFI YE Goals, Objectives and Actions Table 5.21-4 County of San Diego: Fiscal Capability Financial Resources A. Community Development Block Grants (CDBG) B. Capital improvements project funding C. Authority to levy taxes for specific purposes D. Fees for water, sewer, gas, or electric service E. Impact fees for homebuyers or developers for new developments/homes F. Incur debt through general obligation bonds G. Incur debt through special tax and revenue bonds H. Yes Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes UK Yes Yes Yes Yes Yes Yes Yes 5.21.2 Goals, Objectives and Actions Listed below are the County's specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the County has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the County's planning documents, codes, and ordinances. In addition, County representatives met with consultant staff and/or OES to specifically discuss these hazard-related goals, objectives and actions as they related to the overall Plan. Representatives of numerous County departments involved in hazard mitigation planning, including Fire, Police, and Public Works provided input to the County LPG. The County LPG members were: • Tom Amabile, County OES • Nick Vent, DEH • Ralph Steinhoff, County Fire Authority • Matt Turner, DPLU • Michael Robinson, DPW • Lorrie Teates, San Diego County Water Authority • Patrick Buttron, HHSA, EMS • Once developed. County staff submitted the plan to CalEMA and FEMA for approval. Once approved the plan will be taken to the Unified Disaster Council and then to the San Diego County Board of Supervisors for adoption. County of San Diego 5-292 SEBTIONFIVE Goals, Objectives and Actions The draft plan was posted on the Office of Emergency Services Website to present these preliminary goals, objectives and actions to citizens and to receive public input Specific questions were asked and the public was requested to provide comments and suggestions regarding the draft plan and the proposed mitigation actions. An email address was provided for the public to send comments and suggestions to. This email address was checked daily for public input. The following sections present the hazard-related goals, objectives and actions as prepared by the County's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials and residents. 5.21.2.1 Goals The County of San Diego has developed the following 11 Goals for their Hazard Mitigation Plan (See Attachment A for Goals 12,13 and 14). Goal 1. Promote Disaster-resistant future development. Goal 2. Increase public understanding and support for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to become less vulnerable to hazards. Goal 4. Enhance hazard mitigation coordination and communication with federal, state, local and tribal governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure, and County-owned facilities, due to": Goal 5. Dam Failure Goal 6. Earthquakes Goal 7. Coastal Storm/Erosion/Tsunami Goal 8. Landslides Goal 9. Floods Goal 10. Structural Fire/Wildfire Goal 11. Liquefaction Goal 12. Manmade Hazards Goal 13. Nuclear Material Release Goal 14. Hazardous Materials Release County of San Diego 5-293 SICTIONFIVE Goals, Objectives and Actions 5.21.2.2 Objectives and Actions The County of San Diego developed the following broad list of objectives and actions to assist in the implementation of each of their 11 identified goals. The County of San Diego developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.21.2.3. Goal 1: Promote disaster-resistant future development. Objective I A: Action 1.A.1 Action 1 A2 Action 1 A3 Objective 1 .B: Action 1.B.1 Objective 1 ,C: Action 1.C.1 Action 1.C.2 Action 1.C.3 Objective 1 .D. Action 1.D.1 Action 1.D.2 Action 1.D.3 Action 1.D.4 Action 1.D.5 Action 1.D.6 Facilitate the development or updating of general plans and zoning ordinances to limit development in hazard areas. Update General Plan every 10 years. Attract and retain qualified, professional and experienced staff. Continue to identify high hazard areas using GiS. Facilitate the adoption of building codes that protect existing assets and restrict new development in hazard areas. Review Codes every 3 years. Facilitate consistent enforcement of general plans, zoning ordinances, and building codes. Staff enforcement personnel to a level to ensure compliance. Develop and coordinate permits for all agencies. Continue to utilize multi-agency permitting and enforcement team. Limit future development in hazardous areas Development should be in harmony with existing topography. Development patterns should respect environmental characteristics. Clustering should be encouraged. Development should be limited in areas of known geologic hazards. Development in floodplains shall be limited to protect lives and property. High fire hazard areas shall have adequate access for emergency vehicles. County of San Diego 5-294 SECTIOMFIVE Goals, Objectives and Actions Goal 1: Promote disaster-resistant future development (continued). Objective IE: Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. Action 1 £.1 Continue to utilize Geographic Information Systems (GIS) capabilities to identify hazards. Action 1 £.2 Continue to develop and update data sets that are necessary to test hazard scenarios and mitigation tools. Action 1 £.3 Continue to use the internet as a communications tool, as well as an educational tool. Objective 1 .F: Increase public understanding, support and demand for hazard mitigation for new developments. Action 1 £.1 Continue to gain public acceptance for avoidance policies in high hazard areas. Action 1 £.2 Continue public education efforts to publicize and adopt the appropriate hazard mitigation measures. Action 1 £.3 Help create demand for hazard resistant construction and site planning. Goal 2: Increase public understanding and support for effective hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Publicize and encourage the adoption of appropriate hazard mitigation actions. Action 2.A.2 Continue to provide information to the public on the County website. Action 2.A.3 Heighten public awareness of hazards by using the County Media & Public Relations Office. Action 2.A.4 Gain public acceptance for avoidance policies in high hazard areas. Action 2.A.5 Identify hazard specific issues and needs. Action 2.A.6 Help create demand for hazard resistant construction and site planning. Action 2 A 7 Promote partnerships between the state, counties, local and tribal governments to identify, prioritize and implement mitigation actions. Action 2.A.8 Support the County Fire Safe Council. County of San Diego 5-295 SECTIONFIYE Goals, Objectives and Actions Goal 2: Increase public understanding and support for effective hazard mitigation (continued). Objective 2.B: Promote partnerships between the state, counties, local and tribal governments to identify, prioritize, and implement mitigation actions. Action 2.B.1 Develop, maintain and improve lasting partnerships. Action 2.B.2 Support the County Fire Safe Council. Action 2.B.3 Promote cooperative vegetation Management Programs that incorporate hazard mitigation. Objective 2.C: Promote hazard mitigation in the business community. Action 2.C.1 Increase awareness and knowledge of hazard mitigation principles and practices. Action 2.C.2 Encourage businesses to develop and implement hazard mitigation actions. Action 2.C.3 Identify hazard-specific issues and needs. Objective 2.D: Monitor and publicize the effectiveness of mitigation actions implemented countywide. Action 2.D.1 Continue to use the County website to publicize mitigation actions. Action 2.D.2 Continue to create marketing campaigns. Action 2.D.3 Continue to determine mitigation messages to convey. Action 2.D.4 Continue to establish budget and identify funding sources for mitigation outreach. Action 2.D.5 Continue to develop and distribute brochures, CDs and other publications. Objective 2.E: Provide education on hazardous conditions. Action 2.E.1 Continue to support public and private sector symposiums. Action 2.E.2 Coordinate production of brochures, informational packets and other handouts. Action 2.E.3 Develop partnerships with the media on hazard mitigation. Goal 3: Build and support local capacity and commitment to become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.1 Use Media & Public Relations to increase the number of news releases. Action 3.A.2 Conduct meetings with key elected officials to determine local issues and concerns. County of San Diego 5-296 SECTIONFIV E Goals, Objectives and Actions Goal 3: Build and support local capacity and commitment to become less vulnerable to hazards (continued). Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A.3 Continuously demonstrate the importance of pre-disaster mitigation planning to the Board of Supervisors and other public officials. Objective 3.B: Develop hazard mitigation plan and provide technical assistance to implement plan . Action 3.B.1 Coordinate the update of the multi-jurisdictional plan. Action 3.B.2 Continue to have the County Working Group update and monitor the plan. Objective 3.C: Limit growth and development in hazardous areas. Action 3.C.1 Update GIS mapping to identify hazardous areas. Action 3.C.2 Continue to enforce trespassing regulations in high-risk areas. Action 3.C.3 Update General Plan and zoning regulations to reflect hazardous areas. Action 3.C.4 Support transfer of development rights in hazard prone areas. Objective 3.D: Management ofwildland vegetative communities to promote less hazardous conditions. Action 3.D.1 Continue to use GIS to inventory by type and vegetation age class. Action 3.D.2 Continue to define target class ranges. Action 3.D.3 Continue to develop partnerships within the communities to fix age class ranges. Goal 4: Enhance hazard mitigation coordination and communication with federal, state, local and tribal governments. Objective 4 A: Establish and maintain closer working relationships with state agencies, local and tribal governments. Action 4.A.1 Continue the program of multi-jurisdictional/ multi-functional training and exercises to enhance hazard mitigation. Action 4.A.2 Leverage resources and expertise that will further hazard mitigation efforts. Action 4.A.3 Update the multi-jurisdictional/multi-hazard mitigation plan to include tribal governments and special districts. Action 4.A.4 Maintain multi-jurisdictional/rnulti-functional training and exercises to enhance hazard mitigation. County of San Diego 5-297 SECTIONFI YE Goals, Objectives and Actions Goal 4: Enhance hazard mitigation coordination and communication with federal, state, local and tribal governments (continued). Objective 4.B: Encourage other organizations to incorporate hazard mitigation activities. Action 4.B.1 Encourage tribal governments to become part of the HIRT JPA. Action 4.B.2 Establish and maintain lasting partnerships. Action 4.B.3 Continue to streamline policies to eliminate conflicts and duplication of effort. Objective 4.C: Improve the County 's capability and efficiency at administering pre- and post-disaster mitigation. Action 4.C.1 Maintain consistency with the State in administering recovery programs. Action 4.C.2 Continue to work to establish a requirement that all hazard mitigation projects submitted to the State must be reviewed by the County. Action 4.C.3 Continue to improve coordination with the State Hazard Mitigation Office in dealing with local issues. Objective 4.D: Support a coordinated permitting activities process. Action 4.D.1 Develop notification procedures for all permits that support affected agencies. Action 4.D.2 Continue to streamline policies to eliminate conflicts and duplication of effort. Action 4.D.3 Continue to exchange resources and work with local and regional partners. Objective 4.E: Coordinate recovery activities while restoring and maintaining public sendees. Action 4. E.1 Maintain two Multi-hazard Assessment Teams (MAT). Action 4.E.2 Maintain activation and reporting procedures for the MAT. Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to dam failure. Objective 5 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure. Action 5.A.1 Update inundation maps every 10 years. Action 5.A.2 Continue to participate in community awareness meetings. Action 5.A.3 Continue to develop and distribute printed publications to the communities concerning hazards. County of San Diego 5-298 SECTION! IVE Coals, Objectives and Actions Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to dam failure (continued). Objective 5.B: Project existing assets with the highest relative vulnerability to the effects of a dam failure. Action 5.B.1 Continue to identify hazard-prone structures. Action 5.B.2 Continue to construct barriers around structures. Action 5.B.3 Encourage structural retrofitting. Objective 5.C: Coordinate with and support existing efforts to mitigate dam failure (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 5.C.1 Continue to revise development ordinances to mitigate effects of development on wetland areas. Action 5.C.2 Incorporate and maintain valuable wetlands in open space preservation programs. Action 5.C.3 Review and revise, as necessary, sediment and erosion control regulations. Objective 5.D: Protectfloodplains from inappropriate development. Action 5.D.1 Strengthen existing development regulations to discourage land uses and activities that create hazards. Action 5.D.2 Plan and zone for open space, recreational, agricultural, or other low-intensity uses within floodway fringes. Goal 6: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to earthquakes. Objective 6 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to earthquakes. Action 6.A.1 Update Building Codes to reflect current earthquake standards. Action 6.A.2 Continue to participate in community awareness meetings. Action 6.A.3 Continue to develop and distribute printed publications to the communities concerning hazards. County of San Diego 5-299 SECTIONFI YE Coals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to earthquakes (continued). Objective 6.B: Protect existing assets with the highest relative vulnerability to the effects of earthquakes . Action 6.B.1 Continue to identify hazard-prone structures through GIS modeling. Action 6.B.2 Continue to build critical facilities that function after a major earthquake. Action 6.B.3 Continue to study ground motion, landslide, and liquefaction. Objective 6.C: Coordinate with and support existing efforts to mitigate earthquake hazards. Action 6.C.1 Identify projects for pre-disaster mitigation funding. Action 6.C.2 Continue to implement an ongoing public seismic risk assessment program. Action 6.C.3 Continue to collaborate with Federal, State and local agencies' mapping efforts. Objective 6.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from earthquakes. Action 6.D.1 Continue to assess countywide utility infrastructure with regard to earthquake risk. Action 6.D.2 Develop and implement an incentive program for seismic retrofits. Action 6.D.3 Continue to encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Goal 7: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to coastal storm/erosion/tsunami. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to coastal storms/ erosion. Action 7.A.1 Continue to coordinate with coastal cities to develop a comprehensive plan. Action 7.A.2 Participate in community awareness meetings. Action 7.A.3 Develop and distribute printed publications to the communities concerning hazards. County of San Diego 5-300 SECTIONFI YE Goals, Objectives and Actions Goal 7: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to coastal storm/erosion/tsunami (continued). Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of coastal storms/erosion. Action 7.B.1 Retrofit structures to strengthen resistance to damage. Action 7.B.2 Continue to encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Action 7.B.3 Seek pre-disaster mitigation funding for coastal erosion projects. Objective 7.C: Coordinate with and support existing efforts to mitigate severe coastal storms/ erosion. Action 7.C.1 Continue to review and update plans that would include coordination with cities, special districts and county departments. Action 7.C.2 Continue to streamline policies to eliminate conflicts and duplication of effort. Action 7.C.3 Continue to develop and publish evacuation procedures to the public. Objective 7.D: Address identified data limitations regarding the lack of information about the relative vulnerability of assets from coastal storms/erosion. Action 7.D.1 Using CIS continue to identify hazard-prone structures. Action 7.D.2 Continue to incorporate information and recommendations from coastal cities into the hazard mitigation plan. Goal 8: Reduce the possibility of damage and losses to existing assets, including people, critical facilities /infrastructure, and public facilities due to landslide. Objective 8 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to landslide. Action 8.A.1 Continue to identify potential areas based upon historical data. Action 8.A.2 Continue to participate in community awareness meetings. Action 8. A.3 Continue to develop and distribute printed publications to the communities concerning hazards. County of San Diego 5-301 SECTION 1 IVE Coals, Objectives and Actions Goal 8: Redi Objective 8.B: Action 8.B.1 Action 8.B.2 Action 8.B.3 Objective 8.C: Action 8.C.1 Action 8.C.2 Action 8.C.3 Objective 8.D: Action 8.D.1 Action 8.D.2 ice the possibility of damage and losses to existing assets, including people, critical facilities /infrastructure, and public facilities due to landslide (continued). Protect existing assets with the highest relative vulnerability to the effects of landslide. Study and improve storm drains for landslide prone areas. Develop, adopt and enforce effective bldg codes and standards. Seek pre-disaster mitigation funding for landsides prevention projects. Coordinate with and support existing efforts to mitigate landslide. Continue to review and update plans that would include coordination with cities, special districts and county departments. Continue to streamline policies to eliminate conflicts and duplication of effort. Develop and publish evacuation procedures to the public. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from landslide. Identify hazard-prone structures through GIS modeling. Implement hazard awareness program. Goal 9: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to floods. Objective 9 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 9.A.1 Continue to review and compare existing flood control standards, zoning and building requirements. Action 9.A.2 Identify flood-prone areas by using GIS. Action 9.A.3 Adopt policies that discourage growth in flood-prone areas. County of San Diego 5-302 SECTIONFI YE Goals, Objectives and Actions Goal 9: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to floods (continued). Objective 9.B: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodp lain. Action 9.B.1 Assure adequate funding to restore damaged facilities to 100-year flood design. Action 9.B.2 Update storm water system plans and improve storm water facilities in high-risk areas. Action 9.B.3 Ensure adequate evacuation time in case of major hazard event. Objective 9.C: Coordinate with and support existing efforts to mitigate floods (e.g., US Army Corps of Engineers, US Bureau of Reclamation, California Department of Water Resources). Action 9.C.1 Develop a flood control strategy that ensures coordination with Federal, State and local agencies. Action 9.C.2 Improve hazard warning and response planning. Objective 9.D: Minimize repetitive losses caused by flooding. Action 9.D.1 Identify those communities that have recurring losses. Action 9.D.2 Develop project proposals to reduce flooding and improve control in flood prone areas. Action 9.D.3 Acquire properties, when feasible, on floodway to prevent development. Action 9.D.4 Seek pre-disaster mitigation funding. Objective 9.E: Address perceived data limitations regarding the lack of information about the relative vulnerability of assets from flooding. Action 9.E.1 Continue to encourage the public to prepare and maintain a 3-day preparedness kit for home and work. Action 9.E.2 Increase participation and improve compliance with the National Flood Insurance Program (NFIP). Action 9.E.3 Develop and implement hazard awareness program. County of San Diego 5-303 SECTIONFIVE Goals, Objectives and Actions Goal 10: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to structural fire/wildfire. Objective 10 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to structural fire/wildfire. Action 10.A.1 Update the County Consolidated Fire Code every three years. Action 10.A.2 Develop model Weed Abatement and Fuel Modification Ordinances. Action 10.A.3 Utilize GIS and the Internet as information tools. Action 10.A.4 Coordinate with and support existing efforts to mitigate structural fire/wildfire. Action 10.A.5 Continue to develop partnerships for a countywide vegetation management program. Objective 10.B: Protect existing assets with the highest relative vulnerability to the effects of structural fire/wildfire. Action 10.B.1 Enforce standardized Defensible Space Clearance distances. Action 10.B.2 Work with community-based groups to pilot chipping programs. Action 10.B.3 Continue to research options to provide low cost insurance to cover landowners who allow prescribed burning on their lands. Objective 10.C: Coordinate with and support existing efforts to mitigate structural fire/wildfire. Action 10.C.1 Establish a continuing wildland fire technical working group. Action 10.C.2 Continue to develop partnerships for a countywide vegetation management program. Action 10.C.3 Report annually to the Board of Supervisors on the progress of fire mitigation strategies. Action 10.D.1 Identify Urban/wildland fire interface areas. Action 10.D.2 Use GIS to map fire risk areas. Action 10.D.3 Implement public education program to address fire dangers and corrective measures. County of San Diego 5-304 SECTIONFI YE Goals, Objectives and Actions Goal 11: Reduce the possibility of damage and losses to existing assets, including people, critical facilities /infrastructure, and public facilities due to liquefaction. Objective 11 A: Protect existing assets with the highest relative vulnerability to the effects of liquefaction. Action 11A1 Identify hazard-prone structures through CIS modeling. Action 11 .A.2 Build critical facilities that function after a major earthquake. Action 11 A3 Study ground motion, landslide and liquefaction. 5.21.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top 10 prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Update Operational Area Plan Coordinating Individual/Organization: The Office of Emergency Services (OES) will work with the 18 incorporated cities to revise the Plan Potential Funding Source: FEMA Grants/ General Funds for County and Cities. Implementation Timeline: January 2010 - January 2011 Action Item #2: Continue to develop and maintain public education and outreach programs Coordinating Individual/Organization: Office of Emergency Services and Office of Media and Public Relations Potential Funding Source: General Fund/Federal or State Grants Implementation Timeline: On-going Action Item #3: Update the County Consolidated Fire Code every three years Coordinating Individual/Organization: Department of Planning and Land Use (DPLU) County of San Diego 5-305 SECTIONFIVE Goals, Objectives and Actions Potential Funding Source: General Fund/Federal or State Grants Implementation Timeline: On-going Action Item #4: Continue to streamline policies to eliminate conflicts and duplication of effort Coordinating Individual/Organization: OES will continue to work with the County Departments and the 18 incorporated cities Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: On-going Action Item #5: Publicize and encourage the adoption of appropriate hazard mitigation actions. Coordinating Individual/Organization: OES/ Media & Public Relations/Information Technology (IT) Potential Funding Source: General Fund/Federal or State grants. Implementation Timeline: On-going Action Item #6: Update Building Codes to reflect current earthquake standards. Coordinating Individual/Organization: Department of Planning and Land Use (DPLU) Potential Funding Source: General Fund/Federal or State Grants. Implementation Timeline: On-going Action Item #7: Support public and private sector symposiums Coordinating Individual/Organization: OES/appropriate County Departments/Cities Potential Funding Source: General Fund/Federal or State Grants Implementation Timeline: On-going Action Item #8: Maintain multi-jurisdictional/multi-functional training and exercises to enhance hazard mitigation Coordinating Individual/Organization: OES/appropriate county Departments/All 18 Cities Potential Funding Source: Grant Funded Implementation Timeline: On-going Action Item #9: Continue to review and update plans that would include coordination with cities, special districts and County departments Coordinating Individual/Organization: OES/appropriate county Departments/All 18 Cities Potential Funding Source: General Fund/Federal or State grants. Implementation Timeline: On-going Action Item #10: Continue to encourage the public to prepare and maintain a 3-day preparedness kit for home and work. County of San Diego 5-306 SECTIONFIVE Coals, Objectives and fictions Coordinating Individual/Organization: OES/ Media & Public Relations/IT Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: On-going County of San Diego 5-307 SECTIONFI YE Goals, Objectives and Actions This page intentionally left blank. County of San Diego 5-308 SECTIOKFIVE Goals, Objectives and Actions 5.22 RANCHO SANTA FE FIRE PROTECTION DISTRICT The Rancho Santa Fe Fire Protection District (Fire District) reviewed a set of jurisdictional-level hazard maps including detailed critical facility information and localized potential hazard exposure/loss estimates to help identify the top hazards threatening their jurisdiction. In addition. Local Planning Groups (LPG) were supplied with exposure/loss estimates for the Fire District summarized in Table 5.22-1. See Section 4.0 for additional details. Table 5.22-1 Summary of Potential Hazard-Related Exposure/Loss in Rancho Santa Fe Fire Protection District Hazard Type Coastal Storm / Erosion Dam Failure Earthquake (Annualized Loss - Includes shaking, liquefaction and landslide components) Exposed Population 0 15,384 31,908 Residential Number of Residentia I Buildings 0 622 3,561 Potential Exposure/ Loss for Residential Buildings (x $1,000) 0 719,512 3,783,427 Commercial Number of Commercial Buildings 0 81 72 Potential Exposure/ Loss for Commercial Buildings (x $1,000) 0 111,830 81,275 Critical Facilities Number of Critical Facilities 0 24 368 Potential Exposure for Critical Facilities (x $1,000) 0 32,202 7,367 Floods (Loss) 100 Year 500 Year 4,956 4,977 31 61 72,478 63,613 26 26 47,536 47,536 6 6 10,581 10,581 Rain-Induced Landslide High Risk Moderate Risk Tsunami 6 3,670 0 6 206 0 28,508 314,273 0 0 9 0 0 31,099 0 0 2 0 0 23,600 0 Wildfire/ Structure Fire Extreme Very High High Moderate 0 26,640 19,897 35,648 0 1,474 716 3,043 0 1,563,410 750,531 4,015,674 0 36 11 112 0 98,491 77,017 119,014 0 27 11 54 0 94,220 48,271 35,115 After reviewing the localized hazard maps and exposure/loss table above, the following hazards were identified by the Fire District LPG as their top five: Dam Failure, Earthquake, Flooding, Man-made and wildfire/structure. A brief rational for including each of these is included. • Earthquake: Geographic extent of this hazard is District wide. A greater percentage of the District's population is potentially more exposed to this hazard relative to other hazards below. Rancho Santa Fe Fire Protection District 5-309 SECTIONFIVE Goals, Objectives and Actions The Rose Canyon Fault lies offshore (4.5 miles west of the Fire District at its closest point) and is capable of generating an earthquake that could damage dwellings and infrastructure throughout the Fire District. The western portion of the Fire District is more likely to suffer heavier damage because of the presence of older buildings (constructed prior to 1992). • Wildfire: The seasonal climatic conditions during late summer and fall create numerous serious difficulties regarding the control and protection against fires in the Fire district. The hot, dry weather typical of this area in summer and fall, coupled with Santa Ana winds and low humidity frequently results in wildfires that threaten or could threaten residents and homes. A significant number of the Fire District residents live within the wildland-urban interface (WUI). Residential homes that abut the WUI are susceptible to wildfire because they are situated near open space and steep canyons containing highly flammable, native vegetation. Recent wildfire events in the Fire District include the Witch Creek Fire of October 2007, which resulted in the loss of 61 homes and the evacuation of all residents within the Fire District boundaries. As documented in the County's analysis of burned and saved homes within the fire perimeter, all of the destroyed homes were built prior to the 2001 WUI standard. The fact that none of the homes built after 2001 were destroyed seems to support the effectiveness of the improved building and fire codes within the Fire District. The Fire District adopted their first WUI ordinance in 2004. An independent study conducted by the Institute for Business and Home Safety concluded that older homes can be best protected from flames and embers form a wildfire by implementing appropriate ignition-resistant retrofitting construction (IBHS 2008). GIS analysis indicates that approximately 40 percent of the dwellings were built before 2000. • Dam Failure: The geographic extent of this hazard is limited to the persons and properties within the inundation path surrounding Escondido Creek, La Orilla Creek, and San Dieguito River. The dam inundation paths are larger than the respective 100-year or 500-year floodways and a greater number of people and properties are exposed to this hazard compared to flooding. Major road arterials and bridges within the inundation path include El Camino Del Norte, La Bajada, and El Apajo, and Via de la Valle (County road S6). The most significant damage to property would occur from a failure of Lake Hodges Dam, which was built in 1918. • Flooding: The geographic extent of this hazard is limited to the low-lying areas in Escondido Creek, La Orilla Creek, and San Dieguito River which are the principle streams that originate or traverse through the Fire District. These areas are susceptible to flooding because of the wide, flat floodplains surrounding riverbeds and the structures that are built in the floodplains. Flooding has occurred in the past from heavy rainfall in both Escondido Creek and San Dieguito River Valley. The most recent event occurred when rain-swollen Lake Hodges Reservoir overflowed in February 2005, sending water downstream into San Dieguito River Valley and to the Pacific Ocean in Del Mar, California. The overflow did not cause massive flooding problems. • Man-made: Spills, releases, accidents, criminal activity and terrorist activity can occur within the Fire District. More information is provided in a separate, For Official Use Only document (Attachment A). Rancho Santa Fe Fire Protection District 5-310 SECHONFIVE Coals, Objectives and Actions 5.22.1 Capabilities Assessment The LPG identified current capabilities available for implementing hazard mitigation activities. The Capability Assessment (Assessment) portion of the jurisdictional mitigation plan identifies administrative, technical, legal and fiscal capabilities. This includes a summary of departments and their responsibilities associated to hazard mitigation planning as well as codes, ordinances, and plans already in place associated to hazard mitigation planning. The second part of the Assessment provides the Fire District's fiscal capabilities that may be applicable to providing financial resources to implement identified mitigation action items. 5.22.1.1 Existing Institutions, Plans, Policies and Ordinances The main entities that are responsible for ensuring the health and public safety in the Rancho Santa Fe Fire Protection District are California Department of Forestry and Fire Protection (CALFire), the Fire District, and the County of San Diego. The following is a summary of the State, County and Fire District's departments and their responsibilities related to hazard mitigation planning and implementation, as well as existing planning documents and regulations related to mitigation efforts within the community. The administrative and technical capabilities of each entity, as shown in Table 5.22-2, provides an identification of the staff, personnel, and department resources available to implement the actions identified in the mitigation section of the Plan. Specific resources reviewed include those involving technical personnel such as planners/engineers with knowledge of land development and land management practices, engineers trained in construction practices related to building and infrastructure, planners and engineers with an understanding of natural or manmade hazards, floodplain managers, surveyors, personnel with GIS skills and scientists familiar with hazards in the community. • Rancho Santa Fe Fire Protection District The Rancho Santa Fe Fire Protection District, one of 16 Fire Protection Districts in the County of San Diego (County), was established on October 14, 1946. The Fire District is in the unincorporated area of San Diego County and covers approximately 42 square miles. It stretches between the Cities of Del Mar, Encinitas, and Solana Beach to the west and Escondido to the east. The City of San Diego forms the southern boundary of the Fire District while San Marcos and Elfin Forest are to the north. Elevation ranges from 100 to about 1200 feet above sea level. The Fire District provides services to approximately 30,000 people living in primarily residential areas with some industrial and retail. The Fire district provides structural and wildland fire protection, though wildland responsibility largely remains with CalFire, Emergency Medical Services (Basic Life Support and Advance Life Support (ALS) first-response) and rescue. The Fire District operates from four fire stations. ALS ambulance transport service is provided through County Service Area 17. Additionally, the Fire Prevention Staff are tasked with stopping fires and life safety issues before they ever stait. This takes various forms, such as code development, building and landscaping plan review, fire safety inspections, fire investigations, vegetation management and abatement and community education. Rancho Santa Fe Fire Protection District 5-311 SECT1BNFIVE Goals. Objectives and Actions • San Diego County Department of Planning and Land Use Maintain and protect public health, safety and well-being. Preserve and enhance the quality of life for County residents by maintaining a comprehensive general plan and zoning ordinance, implementing habitat conservation programs, ensuring regulatory conformance and performing comprehensive community outreach. Planning Services Division: Provides land use and environmental review, maintains a comprehensive general plan and zoning ordinance, issues land use and building permits, and enforces building and zoning regulations. It is also responsible for long-range planning through development and implementation of a comprehensive County General Plan. Development Services Division: Review site and building plans for compliance with all applicable codes. Code Enforcement enforces building, grading, zoning, brushing and clearing, junk, graffiti, signs, abandoned vehicle complaints and noise control. Resource Planning in the unincorporated areas of San Diego County is to ensure efficient use and protection of environmental resources through compliance with local, state and federal environmental regulations. Coordinates damage assessment of structures from multiple causes. Provides damage assessment in the HOC & supports other agencies in assessing damage from fire. • San Diego County Department of Public Works Ensure public safety through design, construction and maintenance of a safe and reliable infrastructure. Land Development Division: Provides engineering and review services for construction and development projects throughout the unincorporated areas of San Diego County. Services such as Stormwater, Flood Control, Map Processing, Cartography, Surveys, the Geographic and Land Information Systems and dealing with land development issues are the daily job of this division. The division processes more than 5,000 permits each year. Transportation Division: Roads Section is the most visible part of DPW, responding to requests for services ranging from pothole repair to tree trimming. Traffic Engineering provides traffic management and determines the need for stop signs and traffic lights. Route Locations updates the County's General Plan Circulation Element, provides transportation planning support and more. County Airports include eight unique facilities scattered throughout the area. McClellan-Palomar Airport provides commercial service to Los Angeles and Phoenix; Ramona Airport is home to the busiest aerial firefighting base in the USA; and, the County Sheriffs air force, ASTREA, is based at Gillespie Field. Engineering Services Division: The division includes Wastewater, Flood Control, Design Engineering, Environmental Services, Construction Engineering, Materials Lab, Project Management and Flood Control Engineering and Hydrology. The Director of Public Works has assigned the Deputy Director of Engineering Services as the County Engineer and Flood Control Commissioner. Management Services Division: This division provides a variety of services to department employees and the public. It includes Personnel, Financial Services, Communications, Recycling, Inactive Landfills and Management Support. Special Districts serve small areas in unincorporated areas providing a variety of services to residents in rural areas. Rancho Santa Fe Fire Protection District 5-312 SECTIONFIVE Goals, Objectives and Actions • San Diego County Housing & Community Development Improve the quality of life in our communities - helping needy families find safe, decent and affordable housing and partnering with property owners to increase the supply and availability of affordable housing. The Department provides many valuable services to both property owners and tenants and strives to create more livable neighborhoods that residents are proud to call home. Community Development Division Manager: Our key service programs include: improving neighborhoods by assisting low-income residents, increasing the supply of affordable, save housing and rehabilitating both business and residential properties in San Diego County. We serve the communities of: Chula Vista, Coronado, Del Mar, El Cajon, Escondido, Imperial Beach, Lemon Grove, Poway, San Marcos, Santee, Solana Beach, Vista, and the unincorporated areas of San Diego County. The Community Development Block Grant Program (CDBG) is a federal block grant program created by Congress in 1974. CDBG-funded projects must satisfy one of three national program objectives: In addition to funding housing and shelter programs, the County also allocates CDBG funds toward various community improvements in the Urban County area. Participating cities, community residents, nonprofit organizations and other county departments may submit CDBG proposals. • County of San Diego Emergency Preparedness & Disaster Medical Response Mission: To coordinate the medical/health response to disasters within the County of San Diego to disasters. Function: To protect life and property within the San Diego County Operational Area in the event of a major emergency or disaster by:l) requesting additional outside resources to respond to medical/health related disasters; 2) coordinating all medical/health assets within the Op Area; 3) developing plans and procedures for response to a bioterrorism event; 4) developing and providing preparedness materials for the public. • Division of Emergency Medical Services Mission: Serves to coordinate the activities of pre-hospital and trauma center service providers for all residents and visitors of San Diego. Function: Its purpose is to ensure that the quality of emergency medical services, which includes 9-1-1 ambulance services, trauma care services, and non-emergency ambulance services, is of the highest quality. • County of San Diego Office of Emergency Services Mission: To coordinate San Diego County's response to disasters. Function: To protect life and property within the San Diego County Operational Area in the event of a major emergency or disaster by: 1) Alerting and notifying appropriate agencies when disaster strikes; 2) Coordinating all Agencies that respond; 3) Ensuring resources are available and mobilized in times of disaster; 4) Developing plans and procedures for response Rancho Santa Fe Fire Protection District 5-313 SICTIOMFIVE Goals, Objectives and Actions to and recovery from disasters and 5) Developing and providing preparedness materials for the public. • County of San Diego Sheriff's Department Mission: Provide Law Enforcement Services, including scene security, traffic control, crowd control, and crime scene investigation. Function: To provide law enforcement services within the San Diego County Operational Area. San Diego Sheriffs policies, programs, plans, and manuals include: 1) Policies and Procedures Manual, 2) Law Enforcement Response to Critical Incident Manual, 3) Emergency Operations Manual, 4) Community Oriented Policing Program, 5) Citizen Emergency Response Program, as well as the State of California's Law Enforcement Guide for Emergency Operations and the State Law Enforcement Mutual Aid Plan. California Department of Forestry and Fire Protection CALFire is an emergency response and resource protection department that responds to more than 5,600 wildland fires that burn over 172,000 acres in the State each year. In addition, department personnel respond to more than 300,000 other emergency calls, including structure fires, automobile accidents, medical aid, swift water rescues, civil disturbance, search and rescue, floods, and earthquakes. CALFire is the State's largest fire protection organization, whose fire protection team includes extensive ground forces, supported by a variety of fire-fighting equipment. CALFire has joined with Federal and local agencies to form a statewide mutual aid system. This system insures a rapid response of emergency equipment by being able to draw on all available resources regardless of jurisdiction. CALFire is responsible for wildland fire protection within the District's State Responsibility Areas, even though the Fire District is the first responder to an incident. Table 5.22-2 Rancho Santa Fe Fire Protection District: Administrative and Technical Capacity Staff/Personnel Resources A. Planner(s) or engineer(s) with knowledge of land development and land management practices B. Engineer(s) or professional(s) trained in construction practices related to buildings and/or infrastructure C. Planners or Engineer(s) with an understanding of natural and/or manmade hazards D. Floodplain manager E. Surveyors F. Staff with education or expertise to assess the community's vulnerability to hazards G. Personnel skilled in CIS H. Scientists familiar with the hazards of the community 1. Emergency manager J. Grant writers Y/N N N N N N Y Y N Y Y Department/Agency and Position Fire Prevention Bureau/Operations Emergency Response Map Committee Fire Chief Public Relations Coordinator./Dept. Staff Rancho Santa Fe Fire Protection District 5-314 SECTIONI IYI Goals, Objectives and Actions The legal and regulatory capabilities of the Fire District are shown in Table 5.22-3, which presents the existing ordinances and codes that affect the physical or built environment of the Fire District. Examples of legal and/or regulatory capabilities can include: Fire District's Fire or WUI Ordinances and the County's building codes, health and safety codes, zoning ordinances, subdivision ordnances, special purpose ordinances, growth management ordinances, site plan review, general plans, capital improvement plans, economic development plans, emergency response plans, and real estate disclosure plans. Table 5.22-3 Rancho Santa Fe Fire Protection: Legal and Regulatory Capability Regulatory Tools (ordinances, codes, plans) A. Building code B . Fire and WUI Codes & Ordinances C. Zoning ordinance D. Subdivision ordinance or regulations E. Special purpose ordinances (floodplain management, storm water management, hillside or steep slope ordinances, hazard setback requirements) F. Growth management ordinances (also called "smart growth" or anti-sprawl programs) G. Site plan review requirements H. General or comprehensive plan I. A capital improvements plan J. An economic development plan K. An emergency response plan L. A post-disaster recovery plan M. A post-disaster recovery ordinance N. Real estate disclosure requirements Local Authority (Y/N) Y Y N N N N Y N Y N Y N N N Does State Prohibit? (Y/N) N N N N N N N N N N N N N N 5.22.1.2 Fiscal Resources Table 5.22-4 shows specific financial and budgetary tools available to the Fire District such as community development block grants; capital improvements project funding; authority to levy taxes for specific purposes; fees for water, sewer, gas, or electric services; impact fees for homebuyers or developers for new development; ability to incur debt through general obligations bonds; and withholding spending in hazard-prone areas. Rancho Santa Fe Fire Protection District 5-315 SECTIONFI YE Goals, Objectives and Actions Table 5.22-4 Rancho Santa Fe Fire Protection District: Fiscal Capability Financial Resources A. B. C. D. E. F. G. H. Community Development Block Grants (CDBG) Capital improvements project funding Authority to levy taxes for specific purposes Fees for water, sewer, gas, or electric service Impact fees for homebuyers or developers for new developments/homes Incur debt through general obligation bonds Incur debt through special tax and revenue bonds Incur debt through private activity bonds 1. Withhold spending in hazard-prone areas Accessible or Eligible to Use (Yes/No) Yes Yes Yes - Vote Required No No Yes Yes - Vote Required No No 5.22.2 Goals, Objectives and Actions Listed below are Fire District's' specific hazard mitigation goals, objectives and related potential actions. For each goal, one or more objectives have been identified that provide strategies to attain the goal. Where appropriate, the Fire District has identified a range of specific actions to achieve the objective and goal. The goals and objectives were developed by considering the risk assessment findings, localized hazard identification and loss/exposure estimates, and an analysis of the jurisdiction's current capabilities assessment. These preliminary goals, objectives and actions were developed to represent a vision of long- term hazard reduction or enhancement of capabilities. To help in further development of these goals and objectives, the LPG compiled and reviewed current jurisdictional sources including the Fire District's and County's planning documents, codes, and ordinances. In addition, Fire District representatives met with County OES to specifically discuss these hazard-related goals. The Fire District LPG members were: • Nicholas G. Pavone, Fire Chief • Tony Michel, Deputy Chief Operations • Cliff Hunter, Fire Marshal • Jim Sturtevant, Battalion Chief • Michael Gibbs, Battalion Chief • Fred Cox, Battalion Chief • Michael Scott, Urban Forester • Julie Taber, Public Relations Coordinator Rancho Santa Fe Fire Protection District 5-316 SECTIOKFIVE Goals, Objectives and Actions Once developed, the LPG staff submitted the plan to the State of California and to FEMA for approval. Once the plan is approved by FEMA it will be taken to the Fire District Board for adoption. Public meetings were held throughout the County to present these preliminary goals, objectives and actions to citizens and to receive public input. At these meetings, specific consideration was given to hazard identification/profiles and the vulnerability assessment results. The following sections present the hazard-related goals, objectives and actions as prepared by the Fire District's LPG in conjunction with the Hazard Mitigation Working Group, locally elected officials, and local citizens. 5.22,2.1 Goals The Fire District has developed the following nine Goals for their Hazard Mitigation Plan (See Attachment A for Goal 9). Goal 1. Promote safer development in hazard areas. Goal 2. Increase public understanding , support, and demand for effective hazard mitigation. Goal 3. Build and support local capacity and commitment to become less vulnerable to hazards. Goal 4. Improve coordination and communication with federal, state, and local governments. "Reduce the possibility of damage and losses to existing assets, particularly people, critical facilities/infrastructure due to": Goal 5. Dam Failure Goal 6. Earthquake Goal 7. Floods Goal 8. Wildfire Goal 9. Man-made (See Attachment A). 5.22.2.1.1 Objectives and Actions The Fire District developed the following broad list of objectives and actions to assist in the implementation of each of their nine, identified goals. The Fire District developed objectives to assist in achieving their hazard mitigation goals. For each of these objectives, specific actions were developed that would assist in their implementation. A discussion of the prioritization and implementation of the action items is provided in Section 5.22.2. Man-caused hazard goals and objectives can be found in Attachment A. Rancho Santa Fe Fire Protection District 5-317 SECT10NFI YE Goals, Objectives and Actions Goal I: Promote safer development in hazard areas. Objective 1 A: Facilitate the adoption of building and fire codes that protect existing assets and manage new development in hazard areas. Action 1 A1 Review Fire District codes and ordinances every 3 years. Action 1 .A.2 Adopt local County building codes to address local building issues in hazard areas. Action 1 A3 Actively participate in the County, State and Nation-wide building code development groups to ensure that development issues in hazard areas are properly addressed. Objective 1 .B: Facilitate consistent enforcement of general plans, zoning ordinances, and building codes. Action 1 .61 Develop standard processes for evaluating and approving proposed development in hazard areas. Action 1 .B.2 Maintain ongoing training for Fire Prevention personnel on development procedures and zoning and building code interpretation. Objective 1 .C: Address identified data limitations regarding the lack of information about new development and build-out potential in hazard areas. Action 1 .C.1 Use hazard event overlays to identify hazard-prone for new development, as funding is available. Action 1 .C.2 Update CIS databases with particular attention to maintaining hazard event overlay layers. Require electronic submittals of all reports and data in electronic form. Goal 2: Increase public understanding and support for effective hazard mitigation. Objective 2 A: Educate the public to increase awareness of hazards and opportunities for mitigation actions. Action 2.A.1 Provide information pamphlets to be distributed to the public at information booths at street fairs, community meetings, etc. Action 2.A.2 Provide information to the public on the Fire District's website. Action 2.A.3 Provide Fire District citizens with Community Emergency Response Team training opportunities to increase public awareness of hazards and response to hazards. Rancho Santa Fe Fire Protection District 5-318 SECTIONFI YE Goals, Objectives and Actions Goal 2: Increase public understanding and support for effective hazard mitigation (continued). Objective 2.B: Action 2.B.1 Action 2.B.2 Action 2.B.3 Objective 2 .C : Action 2.C.1 Action 2.C.2 Action 2.C.3 Objective 2 JD: Action 2.D.1 Objective 2. E: Action 2.E.1 Action 2.E.2 Action 2.E.3 Promote partnerships between the state, counties, local governments to identify, prioritize, and implement mitigation actions. Actively participate in the San Diego County Multi-Hazard Mitigation Plan process. Coordinate with regional efforts to share resources and knowledge. Support the local FireSafe Councils. Promote hazard mitigation in the business community. Coordinate hazard mitigation education/training with routine inspections of businesses utilizing code enforcement and fire prevention inspections, as funding is available. Encourage businesses to develop and implement hazard mitigation actions. Explore opportunities to work with public-private partnerships. Monitor and publicize the effectiveness of mitigation actions implemented district-wide . Utilize the Fire District's website, Fire Wire, press releases, and public meetings. Provide education on hazardous conditions. Support public and private sector symposiums. Coordinate production of brochures, informational packets and other handouts. Develop partnerships with the media on hazard mitigation. Goal 3: Build and support local capacity and commitment to become less vulnerable to hazards. Objective 3 A: Increase awareness and knowledge of hazard mitigation principles and practice among local officials. Action 3.A. 1 Continuously demonstrate the importance of pre-disaster mitigation planning to the Fire Board members and other public officials, such as the County Board of Supervisors. Rancho Santa Fe Fire Protection District 5-319 SECTIONFI YE Goals, Objectives and Actions Goal 4: Improve hazard mitigation coordination and communication with federal, state, and local governments. Objective 4 A: Action 4.A.1 Action 4.A.2 Objective 4.B: Action 4.B.1 Action 4.B.2 Action 4.B.3 Objective 4.C: Action 4.C.1 Establish and maintain closer working relationships with state agencies, and local governments. Continue to participate in regional hazard mitigation activities. Promote mutual aid agreements and interagency dialogue related to hazard mitigation planning Encourage other organizations to incorporate hazard mitigation activities. Work with business and environmental community to understand importance of hazard mitigation planning. Continue to assist local entities, such as School District's, Homeowner Associations, and County Sheriff in developing plans for hazard mitigation and disaster preparedness. Streamline policies to eliminate conflicts and duplication of effort. Improve the Fire District's capability and efficiency at administering pre- and post-disaster mitigation. Support regional planning efforts for hazard mitigation and disaster recovery planning. Goal 5: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to dam failure. Objective 5. A: Develop a comprehensive approach to reducing the possibility of damage and losses due to dam failure Action 5.A.1 Update GIS dam inundation maps every five years. Action 5.A.2 Participate in dam failure tabletop disaster exercises with County OES and first responders. Action 5.A.3 Work with County of San Diego OES to implement an ALERT Flood Warning System for San Dieguito and Olivenhain reservoirs. Rancho Santa Fe Fire Protection District 5-320 SECTIONFI YE Goals, Objectives and Actions Goal 6: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to geological hazards. Objective 6 A: Protecting existing Fire District assets with the highest relative vulnerability to the effects of earthquakes. Action 6.A.1 Replace Fire Station #3 to meet current building and fire codes. Objective 6.B: Educate citizens about seismic risks, the potential impacts of earthquakes and opportunities for mitigation actions. Action 6.B.1 Participate in community awareness meetings. Action 6.B.2 Develop and distribute printed publications to the communities concerning earthquakes. Action 6.B.3 Provide volunteers with CERT training opportunities to provide search and rescue activities after an earthquake, as funding is available. Action 6.B.4 Encourage the public to prepare an evacuation plan and maintain a 3-day preparedness kit for home and work. Goal 7: Reduce the possibility of damage and losses to existing assets, including people, critical facilities/infrastructure, and public facilities due to floods. Objective 7 A: Develop a comprehensive approach to reducing the possibility of damage and losses due to floods. Action 7.A.1 Update flood-prone area GIS map every five years. Action 7.A.2 Participate in flooding tabletop disaster exercises with County of San Diego OES and first responders. Objective 7.B: Protect existing assets with the highest relative vulnerability to the effects of floods within the 100-year floodplain. Action 7.B.1 Buiid new, Fire Station #3 so that it is above 200 year floodplain. Action 7.B.2 Improve hazard warning and response time. Rancho Santa Fe Fire Protection District 5-321 SECTIONFI YE Goals, Objectives and Actions Goal 8: Red inc fac Objective 8 A: Action 8.A.1 Action 8.A.2 Action 8.A.3 Action 8.A.4. Action 8.A.5. Action 8.A.6. Objective 8£: Action 8.B.1 Action 8.B.2 Action 8.B.3 Objective 8.C: Action 8.C.1 Action 8.C.2 Action 8.C.3 Objective 8D: Action 8.D.1 Action 8.D.2 ace the possibility of damage and losses to existing assets, iuding people, critical facilities/infrastructure, and public :ilities due to structural fire/wildfire. Develop a comprehensive approach to reducing the possibility of damage and losses due to structural fire/wildfire. Continue to update the Fire District's Wildland-Urban Interface Code every three years. Continue to conduct fire safety inspections to reduce the risk of wildfire/structural fire. Continue to enforce the Fire District's Vegetation Management (i.e., weed abatement) Ordinance. Continue to incorporate the Shelter-in-Place policy for new developments. . Maximize utilization of outside firefighting resources through regional relationships, agreements, and cooperative initiatives. Annually review and update wildland pre-fire plans for firefighting forces Prevent the loss of life in wildland fires . Continue to develop and promote public education programs in wildland fire safety and survival for all residents in the Fire District. Continue the CERT WUI curriculum for training of residents and workers in the Fire District. Continue to improve local community evacuation plans. Prevent the ignition of structures by wildland fires. Develop a program that incorporates cost effective ignition-resistant building materials and construction methods for retrofitting existing homes. Continue partnerships with CALFire, County of San Diego, Homeowner Associations, local FireSafe Councils, and Forest Area Safety Taskforce Working Group to plan and implement District-wide vegetation management programs as funding becomes available. Pursue State and Federal cost share grants for the elimination of combustible roofs for existing homes in the Fire District. Address identified data limitations regarding the lack of information about the relative vulnerability of assets from structural firelwildfire . Maintain and Update CIS database, annually. Establish home sales inspection with local realtors. Rancho Santa Fe Fire Protection District 5-322 SECTIONFI YE Goals, Objectives and Actions 5.22.2.3 Prioritization and Implementation of Action Items Once the comprehensive list of jurisdictional goals, objectives, and action items listed above was developed, the proposed mitigation actions were prioritized. This step resulted in a list of acceptable and realistic actions that address the hazards identified in each jurisdiction. This prioritized list of action items was formed by the LPG weighing STAPLEE criteria The Disaster Mitigation Action of 2000 (at 44 CFR Parts 201 and 206) requires the development of an action plan that not only includes prioritized actions but one that includes information on how the prioritized actions will be implemented. Implementation consists of identifying who is responsible for which action, what kind of funding mechanisms and other resources are available or will be pursued, and when the action will be completed. The top nine prioritized mitigation actions as well as an implementation strategy for each are: Action Item #1: Replace fire station #3 with a new building that complies with current building and fire codes.. Coordinating Individual/Organization: Rancho Santa Fe Fire Protection District. Potential Funding Source: General and Fire Mitigation Funds. Implementation Timeline: 2 Years Action Item #2: Update all Fire District Ordinances every three years Coordinating Individual/Organization: Fire Marshal, Rancho Santa Fe Fire Protection District. Potential Funding Source: General Fund Implementation Timeline: 3 years Action Item #3: Promote cooperative vegetation management programs that incorporate hazard mitigation. Coordinating Individual/Organization: Urban Forester, Rancho Santa Fe Fire Protection District Potential Funding Source: General Fund/Federal or State Grants/FAST/FireSafe Councils Implementation Timeline: 1 - 3 years Action Item #4: Develop a District-wide Community Wildfire Protection Plan that identifies all potential stakeholders, coordinate public outreach and education and assesses vegetative and infrastructure hazards. Rancho Santa Fe Fire Protection District 5-323 SECTIONFIVE Goals, Objectives and Actions Coordinating Individual/Organization: Urban Forester/Rancho Santa Fe Fire Protection District/FireSafe Councils/County of San Diego Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: 1-2 years Action Item #5: Educate homeowners how best to use ignition-resistant building materials and construction methods for existing homes. Coordinating Individual/Organization: Fire Prevention/Rancho Santa Fe Fire Protection District Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: 1 - 3 years Action Item #6: Review ALERT Warning Systems for residents in flood and dam inundation paths. Conduct table top exercise with County and first responders. Coordinating Individual/Organization: County of San Diego OES/Rancho Santa Fe Fire Protection District Potential Funding Source: General Fund/Federal or State grants. Implementation Timeline: 1 year Action Item #7: Develop a combustible roof replacement program. Coordinating Individual/Organization: Rancho Santa Fe Fire Protection District/County Department of Planning and Land Use Potential Funding Source: General Fund/Federal or State Grants. Implementation Timeline: 2-5 years Action Item #8: Encourage the public to prepare an evacuation plan and maintain a 3-day preparedness kit for home and work. Coordinating Individual/Organization: OES/ Media & Public Relations/CERT Volunteers Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: 1-3 years Action Item #9: Maintain and update GIS database. Coordinating Individual/Organization: Rancho Santa Fe Fire Protection District Rancho Santa Fe Fire Protection District 5-324 SECTIONFIVE Goals. Objectives and Actions Potential Funding Source: General Fund/Federal or State grants Implementation Timeline: 1 year Rancho Santa Fe Fire Protection District 5-325 SECTIONFI YE Goals, Objectives and Actions This page intentionally left blank Rancho Santa Fe Fire Protection District 5-326