HomeMy WebLinkAboutPD 312; Donahoe Residence - Althea Lane; Hydrology Report; 1989-06-23SDE 3644
JUNE 23, 1989 0176 .MIS ENGINEERING DEPT. LIBRARY
City of Carlsbad 2075 LaS Palmas Drive Carisbad, CA 92009-4859
HYDROLOGY & HYDRAULIC CALCULATIONS
FOR
THE DONAHOE RESIDENCES
LmGP- UkJG
DESCRIPTION: PARCELS 3 & 4 OF P.M. 12016
CITY OF CARLSBAD PERMIT NO.
DRAWING NO. 299-8 & 299-9
ENGINEER OF WORK
4, &&& >,BjgkLJtd
R.C.8. #284'1;19
SDE 3644 PAGE 2
PARCELS 3 & 4, P.M. 12016 HYDROLOGY STUDY
DRAWING NO. 299-8 & 9
I. ASSUMPTIONS
BASED UPON A SITE INVESTIGATION, IT IS MY DETERMINATION THAT AN OVERALL HYDROLOGY STUDY WOULD BE THE MOST EFFICIENT WAY
MANUAL" WAS EMPLOYED, BASED ON THE FOLLOWING CRITERIA: TO ANALYZE THESE PROPERTIES. THE COUNTY "DESIGN & PROCEDURE
-SOIL TYPE - GROUP D (WORST CASE)
-LAND USE - SINGLE FAMILY RESIDENTIAL
c=o .55
11. DESCRIPTION OF LAND & HISTORY
THE MAJORITY OF THE DRAINAGE BASIN CONSISTS OF GENTLY ROLL- ING TERRAIN WITH A MIXTURE OF BOTH OLDER AND NEWER HOMES. THE VEGETATION SEEMS TO BE CONSISTENT WITH SOUTHERN CALIFOR- NIA, ie, SCRUBS, GRASS LAWNS, MIXTURE OF IMPERIOUS SURFACES TREES ETC.
111. EXPLANATIONS OF CALCULATIONS
THE DRAINAGE BASIN IN QUESTION WAS DIVIDED INTO SUB-
WATERSHEDS. THESE WATERSHEDS WERE DETERMINED WITH CON- SIDERATION GIVEN TO THE TOPOGRAPHY OF THE AREA AND THE
ARIES FOR THE WATERSHEDS NOT LYING ON EXISTING STREETS CROSS THE TOPOGRAPHICAL LINES AT RIGHT ANGLES.
THE DRAINAGE BASIN HAS BEEN DIVIDED INTO FIVE MAIN SECTIONS
LATE THE APPROPRIATE TC, TIME OF CONCENTRATION AND Q FLOW FOR THE AREA.
PRESENSE OF STREETS AND "GUTTER'' FLOW. (NOTE THAT BOUND-
A-E. SECTION A HAS BEEN SUBDIVIDED INTO SIX AREAS TO CALCU-
ALL CALCULATIONS TO FIND TC AND Q FOR AREAS A1 - A6 -E WERE DONE IN FOLLOWING MANNER. THE RESULTS ARE PRESENTED IN TABULAR FORM.
SDE 3644 PAGE 3 JUNE 23, 1989
EXAMPLE: AREA AC
AREA (A2) = 2.4 Ac DELTA H = MAX HEIGHT - MIN HEIGHT
= 320' - 245'
= 75'
OVERLAND LENGTH = DISTANCE FROM MAX HEIGHT TO MIN HEIGHT
L = 650'
% SLOPE = DELTA H/L (100%)
= 75'/650' (100%) = 11.5%
USE URBAN DRAINAGE CHART WITH % SLOPE ABOVE AND OVERLAND LENGTH
TO FIND OVERLAND TRAVEL TIME
USE INTENSITY-DURATION DESIGN CHART WITH DURATION, T TO FIND IN-
TENSITY.
I = 3.4 IN/HR
USE RATIONAL METHOD Q = CIA WHERE C = 0.55
QlOO = 0.55 X 3.4 X 2.4 = 4.5 cfs
CHECK FOR GUTTER FLOW AND GUTTER FLOW APPLIES FOR THIS AREA.
SDE 3644 PAGE 4 JUNE 23, 1989
GUTTER FLOW:
DELTA H = MAX STREET HEIGHT - MIN STREET HEIGHT = USE ELEVATION @ INLET FOR MIN STREET HEIGHT
= 40'
= 245'- 205'
GUTTER LENGTH = 1100'
% STREET SLOPE = DELTA H/L (100%) = 40/1100 (100%)
= 3.6%
USE QlOO = 4.5 cfs (FROM OVERLAND PART), THE GUTTER AND ROADWAY
FIND THE VELOCITY OF Q.
DISCHARGE - VELOCITY CHART INCLUDED AND THE % STREET SLOPE TO
v = 4.4 fps
TIME = DISTANCE/VELOCITY
= 1100'/4.4 fps
= (244 SEC) / 60
= 4 MIN.
Tc = Toverland + Tgutter
= 15 MIN. + 4 MIN. = 19 MIN.
IC = 2.9 IN/HR
QlOO = CIA
= 0.55 X 2.9 X 2.4 QlOO = 3.8 cfs
,-
... ..
" L
oc N c n n- 0 4 m uo 9 (umu "C
6-but Precipitation (inches) '. .. 0lnoY)oyI 0 uf 0 Y)
!
L.UD USE
Undeveluped
Residenrial:
Rum 1
RUSOFF COEFFICIENTS (RATIONAL XETHOD)
Coefficient, C
Soil Group (1)
Single Family .JO .a; .50 .33 ”
!lulti-Units .45 .50 .60 . TO
?lobile Homes (2) .45 . 50 . 55 .65
80% Impervious Commercial (2)
Industrial (2)
90% Impervious
SOTES:
. 70 .i5 .a0 ,> - . a3
. so .35 . 90 . P5
(1) Obtain soil group from maps on file with the Departnent of Sanitarid:I and Flood Control.
(2) Where actual conditions deviate significantly from the tabulated
C, may be revised by multiplying 80% or 90% by the ratio of acvJa?
imperviousness values of 30% or 908, the values given for coefficiez:
imperviousness to the tabulated imperviousness. However, in no cssc
commercial property on D soil group.
shnll the final coefficient be less than 0.50. For example: Cor.s:der
Actual imperviousness . = 50%
Tabulated imperviovsness = SO?
Revised C = X 0.85 0.55 -€6 I.
. ." ... ....... *"". ... . _. . .. , .-._ .. ..
. -. .
,-
. . . .. . . . .. ..
..
..
. ..
SDE 3644
JUNE 23, 1989 PAGE 5
HYDRAULIC CALCULATIONS
PARCEL 3, P.M. 12016
DRAWING NO. 299-8
I. ASSUMPTIONS
THE FLOW ONTO THIS PROPERTY IS VIA AN EXISTING 18" CMP CUL-
VERT SYSTEM AND URBAN OVERLAND FLOW. THE FIRST CALCULATIONS
WILL BE TO CHECK THE CAPACITY OF THE EXISTING GRATED INLETS ON PARK DRIVE.
~ ~
11. CALCULATIONS
INLET A: = CAPACITY OF "G-1" INLET (BUREA OF PUBLIC ROADS) P = 2(A + B)
= 2(3 + 1i25)
= 8.5 FT.
QlOO @ A = 44.5 cfs
% SLOPE = 3.8% (SLOPE OF PARK DRIVE (COLORED GREY))
FROM "GUTTER AND ROADWAY DISCHARGE CHART"
DEPTH = .4 FEET
FROM THE "CAPACITY OF GRATE INLET IN SUMP"
Qcap = (.75) (8.5) = 6.4 cfs
SDE 3644
PAGE 6
JUNE 23, 1989
INLET B
P = 8.5 FEET- AS ABOVE
Qb = 5.7 cfs
% SLOPE = 3.870 ( FROM GUTTER AND ROADWAY DISCHARGE CHART )
DEPTH = .32 FT FROM "CAPACITY OF GRATE INLET IN SUMP CHART"
Qcap = (.52) (8.5) = 4.4 cfs
= Qcap = 4.4 cfs
OUTFLOW OF EXISTING 18" CMP
Q TOTAL = QcapA i QcapB + Qc
= 6.4 + 4.4 + 6.4
= 17.2
THE QlOO OF 17.2 Cf6 ENTERS THE PROPOSED CONCRETE LINED BROW
DITCH AS SHOWN ON PLAN. SEE COMPUTER ANALYSIS FOR KIN SLOPE OF
BROW DITCH. USE QTOTAL = 17.2 cfs.
SDE 3644 PAGE 7 JUNE 23, 1989
DIAMETER (INCHES) ... .30 MANNINGS N ....... .016
SLOPE (FT/FT) ........ 0.0100 Q (cfs) ........... 17.20
DEPTH (FT) ........... 1.26 DEPTH/DIAMETER .... 0.50
VELOCITY (fps) ....... 6.84 VELOCITY HEAD..... 0.73
AREA (Sq, Ft.) ....... 2.51
CRITICAL DEPTH....... 1.40 CRITICAL SLOPE.... 0.0073
CRITICAL VELOCITY.... 6.07 FROUDE NUMBER..... 1.20
USE SoMIN = 1.0%
AREA E QlOO = 1.8cfs
THIS FLOW IS FROM ALTHEA LN AND ENTERS PROPOSED CURB OUTLET PER IMPROVEMENT PLAN DWG. NO. 292-4
-CAPACITY OF TYPE "A" (D-25) CURB OUTLET
A = 0.75 S.F. R = 0.75/6.5 = 0.115 N = 0.014 S = .017
Qcap = 1.486 X 0.75 X 0.115 X .017= 2.43 CFS 0.014
Q cap > QlOO O.K.
SEE FOLLOWING SHEET FOR VELOCITP ANALYSIS.
PAGE 8
SDE 3644
JUNE 23, 1989
DIAMETER (INCHES) ... 30 MANNINGS N ....... .016
SLOPE (FT/FT) ........ 0.0200 Q (cfs) ........... 18.00
DEPTH (FT) ........... 1.07. DEPTH/DIAMETER.... 0.43
VELOCITY (fps) ....... 8.95 VELOCITY HEAD..... 1.24
AREA (Sq> Ft.) ....... 2.01
CRITICAL DEPTH....... 1.44 CRITICAL SLOPE.... 0.0074
CRITICAL VELOCITY.... 6.17 FROUDE NUMBER.... 1.75
AREA D QlOO = AREA A + AREA B + AREA C + AREA D ? T - CAP THROUGH PIPE
= 6.4 cfs + 4.4cfs + 6.4 cfs + 0.8 cfs
= 18.0 cfs
THIS IS THE TOTAL FLOW FROM ALL THE BROW DITCHES TO THE FINAL
ENERGY DISSIPATOR.
USE NO. 2 BACKING PER CITY OF CARLSBAD STANDARDS.
SDE 3644
PAGE 9
JUNE 23, 1989
HYDRAULIC CALCULATIONS PARCEL 4 P.M. 12016 DRAWING NO. 299-9
AREA E
DIAMETER (INCHES) ... 24 MANNINGS N ....... .016
SLOPE (FT/FT) ........ 0.0200 Q (cfs) ........... 1.80
DEPTH (FT) ........... 0.36 DEPTH/DIAMETER... . 0.18
VELOCITY (fp6) ....... 4.75 VELOCITY HEAD..... 0.35
AREA (Sq> Ft.) ....... 0.38
CRITICAL DEPTH....... 0.46 CRITICAL SLOPE.... 0.0068
CRITICAL VELOCITY.... 3.25 FROUDE NUMBER..... 1.68
SDE 3644
PAGE 10 JUNE 23, 1989
CHECK VELOCITY AND Q @ PROPOSED CURB OUTLET @ SOUTHWEST CORNER OF PROPERTY.
DIAMETER (INCHES) ... 24 MANNINGS N ....... .016
SLOPE (FT/FT) ........ 0.0150 Q (cfs) ........... 1.8
DEPTH (FT) ........... 0.30 DEPTH/DIAMETER.... 0.19
VELOCITY (fps) ....... 4.29 VELOCITY HEAD..... 0.29
AREA (Sq> Ft.) ....... .42
CRITICAL DEPTH....... .46 CRITICAL SLOPE.... 0.0068
CRITICAL VELOCITY.... 3.25 FROUDE NUMBER..... 1.46
-
BASED ON CURB OUTLET CALC FOR D.P. #3
Qcap = 2.43 > QlOO = 2 (0.9) = 1.8 CFS