HomeMy WebLinkAbout6608; Northwest Quadrant Drainage Improvements; Northwest Quadrant Storm Drain Project Crest; 2008-03-01NORTHWEST QUADRANT STORM DRAIN PROJECT
CREST DRIVE
CITY OF CARLSBAD
HYDROLOGY ANALYSIS
Prepared by:
Harris & Associates
750 B street, Suite 1800
San Diego, CA 92101
(619) 236-1778
MARCH 2008
NORTHWEST QUADRANT STORM DRAIN PROJECT
CREST DRIVE
CITY OF CARLSBAD
HYDROLOGY ANALYSIS
Prepared under the supervision of:
Robert Sutherlin Jr.
Project Manager
R.C.E 38819
IVIARCH 2008
Table of Contents
A. Purpose 1
B. Existing Drainage Facilities I
C. Hydrology Analysis I
D. Proposed Improvements 1
Appendices
o 100-year Hydrology
Enclosure
o Hydrology Map
m
m
m
A. Purpose
The purpose of the Northwest Quadrant project is to improve drainage at three locations with the city of
Carlsbad. This report focuses on the improvements needed for Crest Drive. The project limit is on Crest
Drive from Buena Vista Avenue north approximately 1750' to a high point in the roadway profile.
In accordance with our scope of services, we have performed a hydrologic analysis to address drainage
issues and provide recommendations for a possible storm drain.
B. Existing Drainage Facilities
Crest Drive is located several miles east of Highway 5 along Buena Vista Avenue. The street has been
maintained in a rural type condition without any sidewalks and only rolled curb and gutter on the eastern
roadway edge. The existing drainage facilities along Crest Drive handle mainly nuisance flows. Existing
facilities consist of several individual 15" x 15" grates located in fi-ont of residences along the western
side of the street with small 6" PVC outiet pipes that have been installed to drain eastward across the
street and outlet down a natural slope. The largest of these inlets is a 24" x 24" grate located at a sump
approximately 825' north of Buena Vista Avenue (shown on the map near node 4). Flow from this sump
inlet is piped beneath the roadway and into a gunite ditch that flows down the hillside and then north in a
second PCC ditch, ultimately draining to Monroe Street. The PCC ditch is on private property and is not
maintained by the city.
C Hydrology Analysis (Refer to the Hydrology Map)
The project area watershed is encompasses 8 V2 lots that front Crest Drive. These lots total about 3.9
acres and during a 100-year storm event will generate approximately 6.4 cubic feet per second (CFS)
runoff Assumptions made are type "D" soil and single family development for 2.9 dwelling units/acre.
D. Proposed Improvements
h is proposed to construct a second inlet on the east side of the roadway at the sump to capture runoff on
this side of the street. The two sump inlets will be connected, with the outlet pipe being directed south
along Crest Drive. The proposed storm drain will eliminate flow from being directed into the existing
ditch from this area. The outiet pipe will flow south until it nears Buena Vista Avenue, where it will be
turned eastward down the slope and connect to the existing 42" storm drain system in Monroe Street to
the east. As per city's direction, no hydraulics will be performed on the existing system in Monroe Street
as the storm flows reach this system anyway via the existing ditch.
100-year Hydrology
San Diego County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2005 Version 7.5
Rational method hydrology program based on
San Diego County Flood Control Division 2003 hydrology manual
Rational Hydrology Study Date: 01/23/08
NW Quadrant Storm Drainage Project
Crest Hydrology
"NWCREST" 1/22/08
********* Hydrology Study Control Information **********
Program License Serial Number 6032
Rational hydrology study storm event year is 100.0
English (in-lb) input data Units used
Map data precipitation entered:
6 hour, precipitation(inches) = 2.500
24 hour precipitation{inches) = 4.300
P6/P24 = 58.1%
San Diego hydrology manual 'C values used
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.000 to Point/Station 2.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[LOW DENSITY RESIDENTIAL ]
(2.9 DU/A or Less )
Impervious value, Ai = 0.250
Sub-Area C Value = 0.490
Initial subarea total flow distance = 180.000(Ft.)
Highest elevation = 198.000(Ft.)
Lowest elevation = 196.000(Ft.)
Elevation difference = 2.000(Ft.) Slope = 1.111 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 70.00 (Ft)
for the top area slope value of 1.11 %, in a development type of
2.9 DU/A or Less
In Accordance With Table 3-2
Initial Area Time of Concentration = 10.00 minutes
(for slope value of 1.00 %)
Rainfall intensity (I) = 4.212(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.490
Subarea runoff = 0.433(CFS)
Total initial stream area = 0.210(Ac.)
Process from Point/Station 2.000 to Point/Station 3.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
Top of street segment elevation = 196.000(Ft.)
End of street segment elevation = 194.000(Ft.)
Length of street segment = 215.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street {curb to crown) = 12.500(Ft.)
Distance from crown to crossfall grade break = 0.500(Ft.)
Slope from gutter to grade break (v/hz) = 0.010
Slope from grade break to crown (v/hz) = 0.010
Street flow is on [2] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.010
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 1.207(CFS)
Depth of flow = 0.222{Ft.), Average velocity = 1.391(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 7.579(Ft.)
Flow velocity = 1.39(Ft/s)
Travel time = 2.58 min. TC = 12.58 min.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[LOW DENSITY RESIDENTIAL ]
(2.9 DU/A or Less )
Impervious value, Ai = 0.250
Sub-Area C Value = 0.490
Rainfall intensity = 3.633{In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.490 CA = 0.505
Subarea runoff = 1.400(CFS) for 0.820(Ac.)
Total runoff = 1.834(CFS) Total area = 1.030(Ac.)
Street flow at end of street = 1.834(CFS)
Half street flow at end of street = 0.917(CFS)
Depth of flow = 0.243(Ft.), Average velocity = 1.495(Ft/s)
Flow width (from curb towards crown)= 9.661(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.000 to Point/Station 4.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
Top of street segment elevation = 194.000(Ft.)
End of street segment elevation = 189.000(Ft.)
Length of street segment = 222.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 12.500(Ft.)
Distance from crown to crossfall grade break = 0.500(Ft.)
Slope from gutter to grade break (v/hz) = 0.010
Slope from grade break to crown (v/hz) = 0.010
Street flow is on [2] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.010
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 2.605(CFS)
Depth of flow = 0.239(Ft.), Average velocity = 2.287(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 9.197{Ft.)
Flow velocity = 2.29(Ft/s)
Travel time = 1.62 min. TC = 14.19 min.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[LOW DENSITY RESIDENTIAL ]
(2.9 DU/A or Less )
Impervious value, Ai = 0.250
Sub-Area C Value = 0.490
Rainfall intensity = 3.361(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.490 CA = 0.965
Subarea runoff = 1.410(CFS) for 0.940(Ac.)
Total runoff = 3.244(CFS) Total area = 1.970{Ac.)
Street flow at end of street = 3.244(CFS)
Half street flow at end of street = 1.622(CFS)
Depth of flow = 0.250(Ft.), Average velocity = 2.385(Ft/s)
Flow width (from curb towards crown)= 10.329(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 5.000 to Point/Station 4 000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[LOW DENSITY RESIDENTIAL ]
{2.9 DU/A or Less )
Impervious value, Ai = 0.250
Sub-Area C Value = 0.490
Time of concentration = 14.19 min.
Rainfall intensity = 3.361{In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.4 90 CA = 1.901
Subarea runoff = 3.145(CFS) for 1.910{Ac.)
Total runoff = 6.389{CFS) Total area = 3.880(Ac.)
End of computations, total study area = 3.880 (Ac.)
LEGEND
7.97
STORM DRAIN INLET
NODE NUMBER
AREA (ACRES)
STUDY AREA DRAINAGE
BOUNDARY
FLOW PATH
EXISTING STORM DRAIN PIPE
GRAPHIC SCALE
( IN FEBT )
1 Inch - 80 1
CITY OF CARLSBAD
NORTHWEST QUADRANT STORM DRAINAGE
CREST DRIVE STORM DRAIN
HYDROLOGY MAP
DATS: 1-30-08
SCAlt: r-BO' 062-0340.04 SHEET 1 OF 1 SHEETS