HomeMy WebLinkAboutPD 14-01; La Costa Valley Middle School; SWPP; 2014-07-01 (2)APPENDIX C
SUBMITTED PERMIT REGISTRATION DOCUMENTS
Cl
PRD INSTRUCTIONS
ATTACHMENT B
ATTACHMENT B
PERMIT REGISTRATION DOCUMENTS (PRDs) TO COMPLY WITH THE TERMS
OF THE GENERAL PERMIT TO DISCHARGE STORM WATER
ASSOCIATED WITH CONSTRUCTION ACTIVITY
GENERAL INSTRUCTIONS
A. All Linear Construcfion Projects shall comply with the PRD requirements in
Attachment A.2 of this Order.
B. Who Must Submit
Discharges of storm water associated with construction that results in the
disturbance of one acre or more of land must apply for coverage under the
General Construction Storm Water Permit (General Permit). Any construction
acfivity that is a part of a larger common plan of development or sale must also
be permitted, regardless of size. (For example, if 0.5 acre of a 20-acre
subdivision is disturbed by the construction acfivities of discharger A and the
remaining 19.5 acres is to be developed by discharger B, discharger A must
obtain a General Storm Water Permit for the 0.5 acre project).
Other discharges from construction activifies that are covered under this General
Permit can be found in the General Permit Secfion II.B.
It is the LRP's responsibility to obtain coverage under this General Permit by
electronically submitfing complete PRDs (Permit Registrafion Documents).
In all cases, the proper procedures for submitting the PRDs must be completed
before construction can commence.
C. Construction Activity Not Covered By This General Permit
Discharges from construction that are not covered under this General Permit can
be found in the General Permit Secfions II.A &B..
D. Annual Fees and Fee Calculation
Annual fees are calculated based upon the total area of land to be disturbed not
the total size ofthe acreage owned. However, the calculation includes all acres
to be disturbed during the duration of the project. For example, if 10 acres are
scheduled to be disturbed the first year and 10 in each subsequent year for 5
years, the annual fees would be based upon 50 acres of disturbance. The State
Water Board will evaluate adding acreage to an existing Permit Waste Discharge
Identificafion (WDID) number on a case-by-case basis. In general, any acreage
to be considered must be configuous to the permitted land area and the exisfing
2009-0009-DWQ 1 September 2,2009
ATTACHMENT B
SWPPP must be appropriate for the construction activity and topography of the
acreage under considerafion. As acreage is built out and stabilized or sold, the
Change of Informafion (COI) form enables the applicant to remove those acres
from inclusion in the annual fee calculafion. Checks should be made payable to:
State Water Board.
The Annual fees are established through regulations adopted by the State Water
Board. The total annual fee is the current base fee plus applicable surcharges for
all construction sites submitting an NOI, based on the total acreage to be
disturbed during the life of the project. Annual fees are subject to change by
regulafion.
Dischargers that apply for and satisfy the Small Construction Erosivity Wavier
requirements shall pay a fee of $200.00 plus an applicable surcharge, see the
General Permit Secfion II.B.7.
E. When to Apply
LRP's proposing to conduct construcfion acfivities subject to this General Permit
must submit their PRDs prior to the commencement of construction activity.
F. Requirements for Completing Permit Registration Documents (PRDs)
All dischargers required to comply with this General Permit shall electronically
submit the required PRDs for their type of construction as defined below.
G. Standard PRD Requirements (All Dischargers)
1. Notice of Intent
2. Risk Assessment (Standard or Site-Specific)
3. Site Map
4. SWPPP
5. Annual Fee
6. Certification
H. Additional PRD Requirements Related to Construction Type
1. Discharger in unincorporated areas of the State (not covered under an
adopted Phase I or II SUSMP requirements) and that are not a linear project
shall also submit a completed:
a. Post-Construcfion Water Balance Calculator (Appendix 2).
2. Dischargers who are proposing to implement ATS shall submit:
a. Complete ATS Plan in accordance with Attachment F at least 14 days
prior to the planned operation of the ATS and a paper copy shall be
available onsite during ATS operafion.
2009-0009-DWQ 2 September 2,2009
ATTACHMENT B
b. Certification proof that design done by a professional in accordance with
Attachment F.
3. Dischargers who are proposing an alternate Risk Justification:
a. Particle Size Analysis.
I. Exceptions to Standard PRD Requirements
Construcfion sites with an R value less than 5 as determined in the Risk
Assessment are not required to submit a SWPPP.
J. Description of PRDs
1. Notice of Intent (NOI)
2. Site Map(s) Includes:
a. The project's surrounding area (vicinity)
b. Site layout
c. Construction site boundaries
d. Drainage areas
e. Discharge locafions
f. Sampling locafions
g. Areas of soil disturbance (temporary or permanent)
h. Active areas of soil disturbance (cut or fill)
i. Locations of all runoff BMPs
j. Locations of all erosion control BMPs
k. Locations of all sediment control BMPs
I. ATS locafion (if applicable)
m. Locations of sensitive habitats, watercourses, or other features which are
not to be disturbed
n. Locations of all post-construction BMPs
o. Locations of storage areas for waste, vehicles, service, loading/unloading
of materials, access (entrance/exits) points to construction site, fueling,
and water storage, water transfer for dust control and compaction
practices
3. SWPPPs
A site-specific SWPPP shall be developed by each discharger and shall be
submitted with the PRDs.
4. Risk Assessment
All dischargers shall use the Risk Assessment procedure as describe in the
General Permit Appendix 1.
a. The Standard Risk Assessment includes utilization of the following:
i. Receiving water Risk Assessment interactive map
2009-0009-DWQ 3 September 2,2009
ATTACHMENT B
i. EPA Rainfall Erosivity Factor Calculator Website
ii. Sediment Risk interactive map
V. Sediment sensitive water bodies list
b. The Site-Specific Risk Assessment includes the completion of the hand
calculated R value Risk Calculator
5. Post-Construction Water Balance Calculator
All dischargers subject to this requirement shall complete the Water Balance
Calculator (in Appendix 2) in accordance with the instrucfions.
6. ATS Design Document and Certification
All dischargers using ATS must submit electronically their system design (as
well as any supporting documentation) and proof that the system was
designed by a qualified ATS design professional (See Attachment F).
To obtain coverage under the General Permit PRDs must be included and completed.
If any ofthe required items are missing, the PRD submittal is considered incomplete
and will be rejected. Upon receipt of a complete PRD submittal, the State Water Board
will process the applicafion package in the order received and assign a (WDID) number.
Quesfions?
If you have any quesfions on complefing the PRDs please email
stormwater(a)waterboards.ca.qov or call (866) 563-3107.
2009-0009-DWQ September 2, 2009
C2
NOI
state Water Resources Control Board
NOTICE OF INTENT
GENERAL PERMIT TO DISCHARGE STORM WATER
ASSOCIATED WITH CONSTRUCTION ACTIVITY
(WQ ORDER No. 2009-0009-DWQ)
WDID: 9 37C371732
Property Owner Information
Name: San Dieguito Union High School District
Address: 710 Encinitas Blvd
Address 2:
City/State/Zip: Encinitas CA 92024
Contractor/Developer Informafion
Name: San Dieguito Union High School District
Address: 710 Encinitas Blvd
Address 2:
City/State/Zip: Encinitas CA 92024
Construction Site Information
Site Name: La Costa Valley
Address: 2275 Calle Barcelona
City/State/Zip: Carlsbad CA 92009
County: San Diego
Latitude: 33.07378 Longitude: -117.25558
Total Size of Construction Area: 28.03
Total Area to be Disturbed: 28.03
Risk Values
R: 41.68 K: 0.2 LS: 2.26
Type of Construction: 'Other: School District
Receiving Water: San Marcos Creek
Qualified SWPPP Developer: Emma Smith
RWQCB Jurisdiction: Region 9 - San Dlego
Phone: 619-516-1990
Certification
Name russell thomton
Title: Chief Facilities Officer
Risk Level: *-evei2
Type: other
Contact Name: russell thomton
Title:
Phone #: 760-753-6491
Email: russ.thornton(@sduhsd.net
Contact Name: russell thomton
Title:
Phone #: 760-753-6491
Email: russ.thornton(@sduhsd.net
Contact Name: Russell Thornton
Title: Chief Facilities Officer
Site Phone #: 760-753-6491
Email: russ.thorntonigsduhsd.net
Construction Start: February 02, 2015
Complete Grading:
Final Stabilization: September 15, 2015
Beneficial Uses/303(d): No
Certification*: 20121
Email: r9_stormwater(gwaterboards.ca.gov
Date: December 02, 2014
C3
RISK ASSESSMENT
(SEDIMENT AND RECEIVING WATER RISK DETERMINATION)
n: Sediment Risk Factor Worksheet Entry
A) R Factor
Analyses of data indicated that when factors other than rainfall are held constant, soil loss is directly proportional to a
rainfall factor composed of total storm kinetic energy (E) times the maximum 30-min intensity (130) (Wischmeier and
Smith, 1958). The numerical value of R is the average annual sum of EI30 for storm events during a rainfall record of a
least 22 years. "Isoerodent" maps were developed based on R values calculated for more than 1000 locations in the
Western U.S. Refer to the link below to determine the R factor for the project site.
http://cfpub.epa.qov/npdes/stormwater/LEW/lewCalculator.cfm
R Factor Value 41.68
B) K Factor (weighted average, by area, for all site soils)
The soil-erodibility factor K represents: (1) susceptibility of soil or surface material to erosion, (2) transportability of the
sediment, and (3) the amount and rate of runoff given a particular rainfall input, as measured under a standard conditio i.
Fine-textured soils that are high in clay have low K values (about 0.05 to 0.15) because the particles are resistant to
detachment. Coarse-textured soils, such as sandy soils, also have low K values (about 0.05 to 0.2) because of high
infiltration resulting in low runoff even though these particles are easily detached. Medium-textured soils, such as a silt
loam, have moderate K values (about 0.25 to 0.45) because they are moderately susceptible to particle detachment an i
they produce runoff at moderate rates. Soils having a high silt content are especially susceptible to erosion and have hi jh
K values, which can exceed 0.45 and can be as large as 0.65. Silt-size particles are easily detached and tend to crust,
producing high rates and large volumes of runoff. Use Site-specific data must be submitted.
Site-specific K factor guidance
K Factor Value 0.2
10 C) LS Factor (weighted average, by area, for all slopes)
11
12
13
IT
The effect of topography on erosion is accounted for by the LS factor, which combines the effects of a hillslope-length
factor, L, and a hillslope-gradient factor, S. Generally speaking, as hillslope length and/or hillslope gradient increase, sc
loss increases. As hillslope length increases, total soil loss and soil loss per unit area increase due to the progressive
accumulation of runoff in the downslope direction. As the hillslope gradient increases, the velocity and erosivity of runof'
increases. Use the LS table located in separate tab of this spreadsheet to determine LS factors. Estimate the weighted
LS for the site prior to construction.
LS Table
LS Factor Value 2.26
15 Watershed Erosion Estimate (=RxKxLS) in tons/acre 18.83936
16
17
18
19
20
Site Sediment Risk Factor
Low Sediment Risk: < 15 tons/acre
Medium Sediment Risk: >=15 and <75 tons/acr< Medium
High Sediment Risk: >= 75 tons/acre
iReceiving Water (RW) Risk Factor Worksheet Entry Score
A. Watershed Characteristics yes/no
A.1. Does the disturbed area discharge (either directly or indirectly) to 303(d)-listed
waterbody impaired by sediment? For help with impaired waterbodies please check the
attached worksheet or visit the link below:
2006 Approved Sediment-impared WBs Worksheet
No Low http://www.waterboards.ca.aov/water issues/Droarams/tmdl/303d lists2006 epa.shtml No Low
OR
No Low
A.2. Does the disturbed area discharge to a waterbody with designated beneficial uses c
SPAWN & COLD & MIGRATORY?
http://www.ice.ucdavis.edu/aeowbs/asD/wbause.asD
No Low
Combined Risk Level Matrix
Se(jiment Risk
Q)
D
C
>
O
CD
Low
High
Low Medium High
Level 1 Level 2
Level 2 Level 3
Project Sediment Risk:
Project RW Risk:
Project Combined Risk:
IVIedium
Low
A rail u««^swm http://water.epa.gov/polwaste/npdes/stormwater/LEW-Resufts.cfm
Water: Stormwater
You are here: Water»Pollution Prevention & Control »Pemniltina (NPDES> '•Stormwater >»LEW Results
LEW Results
Rainfall Erosivity Factor Calculator for Small Construction Sites
Facility Information
Start Date: 12/13/2014
End Date: 01/27/2016
Latitude: 33.0737
Longitude: -117.2555
Erosivity Index Calculator Results
AN EROSIVriY INDEX VALUE OF 41.68 HAS BEEN DETERMINED FOR THE CONSTRUCTION PERIOD OF 12/13/2014 - 01/27/2016.
A rain^ll erosivity factor of 5.0 or greater has been calculated for your site and period of construction. You do NOT qualify for a waiver from NPDES permitting
requirements.
Start Over
C4
SITE MAP (INCLUDING VICINITY MAP)
SHEET TITLE
SITE PLAN
VII VICINfTY MAP
I APPENDIX T
! 04 ^-
PS FUSCOE
6390 Grwmwith Drive, Su»e T70
Son Di.„a, Calll»nia9,122
.1858 554 1500 ° fa. 858,507 03 m
D
(0 <
Q
C5
SIGNED CERTIFICATION STATEMENT / FEE STATEMENT &
WDID RECEIPT
APPENDIX D
SUBMIHED CHANGES TO PRDs / COIs
(DUE TO CHANGE IN OWNERSHIP OR ACREAGE)
APPENDIX E
SWPPP AMENDMENT LOG & AMENDMENTS
SWPPP AMENDMENTS
This SWPPP shall be amended:
• Whenever there is a change in construction or operafions which may affect the
discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm
system, (MS4); or
• If any conditions of the Permits is violated or the general objecfive of reducing or
eliminafing pollutants in storm water discharges has not been achieved. Ifthe RWQCB
determines that a permit violation has occurred, the SWPPP shall be amended and
implemented within 14 calendar days after notification by the RWQCB;
• Annually, prior to the defined rainy season, when required by the project's Special
Provisions; and
• When deemed necessary by the Engineer of Record, Qualified SWPPP Practitioner
(QSP), or the Qualified SWPPP Developer (QSD).
The following item will be included in each amendment:
Who requested the amendment
The location of the proposed change
The reason for the change
The original BMP proposed, if any
The new BMP proposed
Amendment
No. Date Description Preparer
Amendment
No. Date Description Preparer
APPENDIX F
ANNUAL REPORTING REQUIREMENTS
Order
XVI. ANNUAL REPORTING REQUIREMENTS
A. All dischargers shall prepare and electronically submit an Annual Report
no later than September 1 of each year.
B. The discharger shall certify each Annual Report in accordance with the
Special Provisions.
C. The discharger shall retain an electronic or paper copy of each Annual
Report for a minimum ofthree years after the date the annual report is
filed.
D. The discharger shall include storm water monitoring informafion in the
Annual Report consisfing of:
1. a summary and evaluafion of all sampling and analysis results,
including copies of laboratory reports;
2. the analyfical method(s), method reporting unit(s), and method
detecfion limit(s) of each analyfical parameter (analyfical results that
are less than the method detection limit shall be reported as "less than
the method detection limit");
3. a summary of all corrective actions taken during the compliance year;
4. identification of any compliance activities or corrective acfions that
were not implemented;
5. a summary of all violafions of the General Permit;
6. the names of individual(s) who performed the facility inspections,
sampling, visual observafion (inspections), and/or measurements;
7. the date, place, fime of facility inspections, sampling, visual
observafion (inspecfions), and/or measurements, including
precipitation (rain gauge); and
8. the visual observafion and sample collection excepfion records and
reports specified in Attachments C, D, and E.
E. The discharger shall provide training informafion in the Annual Report
consisfing of:
1. documentation of all training for individuals responsible for all acfivities
associated with compliance with this General Permit;
2009-0009-DWQ 40 September 02,2009
Order
documentation of all training for individuals responsible for BMP
installafion, inspection, maintenance, and repair; and
documentafion of all training for individuals responsible for overseeing,
revising, and amending the SWPPP.
2009-0009-DWQ 41 September 02,2009
ANNUAL REPORT
Order No. 2009-0009-DWQ Section XVI requires that oil dischargers prepare and submit an Annual
Report no later than September 1 each year. The Annual Report confains a summary of all storm
water monitoring information, compliance actions, training documentafion, and other information
pertaining to permit compliance from the reporting year (July 1 through June 30).
The reports ore prepored and submitted electronically via SMARTS and certified by the Legally
Responsible Person (LRP) in accordance with the Permit Special Provisions. In addition, a paper copy
of each Annual Report shall be retained for a minimum of three (3) years offer the report is filed.
Though fhe report information is entered and submitted electronically through SMARTS, below is a
summary of fhe questions and information required to be entered as port of the Annual Report.
A. SITE OWNER INFORMATION
B. SITE INFORMATION
C. STORM WATER POLLUTION PREVENTION PL^N (SWPPP)
C. I. Hos o SWPPP been prepared by a Quolified SWPPP Developer (QSD) for the construcfion
project?
C.2. Does the SWPPP include a Construction Site Monitoring Program (CSMP) section/element?
C. 3. Are fhese documents kept onsite?
D. GOOD SITE MANAGEMENT "i.e. HOUSEKEEPING"
D.L Were required good site monagement "i.e.housekeeping" measures for construction materials
implemented on-site in accordance wifh CGP and SWPPP?
D.l .0. Was an inventor/ of the products used and/or expected to be used conducted?
D.2 Were required good site management "i.e.housekeeping" measures for wosfe monogemenf
implemented on-site in accordance with CGP and SWPPP?
D.2.a. Is there a spill response and implementation element of the SWPPP?
D.3. Were required good site management "i.e.housekeeping" measures for vehicle storage and
maintenance implemented on-site in accordance wifh CGP and SWPPP?
D.4. Were required good site management "i.e.housekeeping" measures for landscape materials
implemented on-site in accordance with CGP and SWPPP?
D.5. Wos o list of potential pollutant sources developed?
D.6. Were good site monogemenf "house/ceeping" meosures to contro/ air deposition of sife
materials and from sife operations implemented on-site?
E. NON-STORM WATER MANAGEMENT
E. I. Were meosures fo control all non-storm wafer discharges during construction implemented?
E.2. Were vehicles washed in such a manner as to prevent non-storm wafer discharges fo surface
wafers or to MS4 drainage systems?
E. 3. Were streets cleaned in such a manner as fo prevent unauthorized non-storm wafer discharges
from reaching surface waters or MS4 drainage systems?
F. EROSION CONTROLS
F. J. Were required erosion controls implemented on-site in accordance wifh CGP and SWPPP?
G. SEDIMENT CONTROLS
G. ?. Were required sediment controls implemented on-site in accordance with CGP and SWPPP?
G. 2. Were immediate access roads inspected on a daily basis?
H. RUN-ON AND RUN-OFF CONTROLS
H. J. Was all sife run-on and run-off effectively managed?
H. 2. Did Risk level 2 and 3 dischargers monitor and report run-on from surrounding areas if there
was reason fo believe run-on may have contributed fo an NAL or NEL exceedance?
I. RAIN EVENT ACTION PL^N (REAP)
1.1. Were REAPs developed 48 hours prior to all likely precipitafion events (50% or greater
probability of producing precipitation)?
1.2. Did fhe REAPs developed meet the minimum criteria listed in fhe CGP?
J. INSPECTION, MAINTENANCE AND REPAIR
J. 1. Were all site inspecfions, maintenance, and repairs performed or supervised by a Qualified
SWPPP Pracfitioner (QSP)?
J.2. Were site inspections conducted weekly and af least once each 24-hour period during
extended storm events?
J.3. Were post rain evenf inspections conducted?
J.4. Do your inspecfion forms/ checklists meet fhe minimum criferia listed in the CGP?
J.5. During any site inspection was BMP maintenance or repairs required? (if YES, provide
information)
J.6. If BMP maintenance/repair or design change was needed, did implementation begin within 72
hours?
K. VISUAL MONITORING
K.l. Within 2 business days (48 hours) affer each qualified rain event, were visual inspecfions
conducted in compliance wifh the CGP?
K.2. Were all storm water discharges fhaf occurred from storage or containment systems visually
observed prior fo discharge?
K.3. Were the fime, date, and rain gauge reading recorded for each qualifying rain event?
K.4. Within 2 business days (48 hours) prior fo each predicted rain evenf, were visual inspecfions
conducted in compliance with fhe CGP ?
K.B. Are all visual inspection records retained on-site?
L. WATER QUALITY SAMPLING AND ANALYSIS
L. 1. How many qualifying storm events (producing precipitafion of 0.5 inch or more at the time of
discharge) occurred fhis past reporfing year?
L.2. How mony qualifying storm events (producing precipitafion of 0.5 inch or more at the time of
discharge) were sampled?
L.3. For fhe sampled events, did you collect three samples, at minimum (representative of fhe flow
and characteristics) each day of discharge per qualified event?
L.4. Were grab samples analyzed for pH and/or turbidity? (Analytical data must be entered in fhe
RAW DATA fab in SMARTS)?
L.5. Were Acfive Treatment System (ATS) effluent samples taken? (Applies to projects thaf deployed
ATS)
M. NON-STORM WATER DISCHARGE MONITORING
A4. J. Were all drainage areas monitored for authorized/ unauthorized non-storm wafer discharges
quarterly?
M.2. Did visual observations indicate any authorized/ unauthonzed non-storm water discharges?
(Complete Form 2)
M.3. Were effluent samples taken of fhe authorized/ unauthorized non-storm wafer discharge?
(Analyfical data must be entered in the RAW DATA fab in SMARTS)
M.4. Were the effluent samples sent fo a laboratory certified for such analyses by fhe State
Department of fiealth Services?
M.5. Were unauthorized non-storm wafer discharges eliminated?
N. NON-VISIBLE POLLUTANT MONITORING
N. 1. Were any breaches, malfunctions, leakages, or spills obsen/ed during a visual inspection?
N.2. How many potential discharges of non-visible pollutants were idenfified?
N.3. For each discharge evenf (of non-visible pollutants), were samples collected in compliance with
the CGP? (Analytical data must be entered in the RAW DATA tab in SMARTS)
N.4. For each discharge event was a comparison sample collected (uncontaminated sample that
did not come info contact with fhe pollutant)? (Analytical data must be entered in fhe RAW
DATA tab in SMARTS)
O. WATERSHED MONITORING
0.1. Are you parf of a qualified regional watershed-based monitoring program approved by fhe
Regional Water Board?
P. RECORDS
P. I. Are all records of all storm water monitoring informafion retained on-site?
Q. NAL EXCEEDANCES
Q. 1. Were any Numeric Acfion Levels (NALs) exceeded?
Q.2. Were corrective acfions taken to address the NAL exceedances? (if YES, provide informafion)
Q.3. Were analyfical results from any/all NAL exceedances submitted electronically to the Sfafe
Water Board no later than 10 days affer fhe conclusion of the storm evenf?
Q.4. Were any NAL Exceedance Reports submitted to the Regional Wafer Board?
R. (NOT APPLICABLE)
S. (NOT APPLICABLE)
T. TRAINING
T. J. Was a Qualified SWPPP Pracfitioner (QSP) in reasonable charge of SWPPP implementafion?
T.2. Were all individuals conducting BMP installation, inspection, maintenance and repairs trained
appropriately?
T.3. Are complete training records kept on-site and available upon request?
U. AUTHORIZED NON-STORM WATER DISCHARGES (NSWD) DISCHARGED
U. I. Were ony authorized NSWDs discharged obsen/ed from July-September?
li.2. Were any authorized NSWDs discharged observed from October-December?
U.3. Were ony authorized NSWDs discharged obsen/ed from January-March?
U.4. Were any authorized NSWDs discharged obsen/ed from Apn7-June?
If YES fo any of the above, provide information below (Form 2).
Date/Time of observafion
Discharge type (Authorized or Unauthorized)
Source and locafion of NSWD
Name of NSWD
Describe NSWD characteristics (of the NSWD source)
Describe NSWD characteristics (of the NSWD droinage area and discharge location)
Describe any revised or new BMPs and provide their implementation date.
V. UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWD) DISCHARGED
V. ]. Were ony unauthorized NSWDs discharged observed from July-September?
V.2. Were any unauthorized NSWDs discharged obsen/ed from October-December?
V.3. Were any unauthorized NSWDs discharged observed from January-March?
V.4. Were any unauthorized NSWDs discharged observed from April-June?
If YES to any of the above, provide informafion below (Form 2).
Dote/Time of observation
Discharge type (Authorized or Unauthorized)
Source and location of NSWD
Nome of NSWD
Describe NSWD characteristics (of the NSWD source)
Describe NSWD characteristics (of the NSWD drainage area and discharge location)
Describe any revised or new BMPs ond provide their implementafion dote.
FORMS
Please enter a general summary of any BMP deficiencies idenfified for each quorter and the corrective
actions taken. Maximum up to 1000 characters.
• July-September Quarter
• October-December Quarter
• Jonuory-Morch Quarter
• April-June Quarter
DAILY AVERAGES SUMMARY
Data Summary for the Daily Averages of fhe Ad Hoc Reports associated with fhis Annual Report.
AHACHMENTS
Attach current documents related to fhe SWARM Reports.
CERTIFICATION
APPENDIX G
RUNOFF COEFFICIENT &
RUN-ONCOMPUTATION SHEETS
Computation Sheet for Determining Runoff Coefficients
Total Site Area = 28 (A)
Existing Site Conditions
Impervious Site Area^ = ^1 (B)
Impervious Site Area Runoff Coefficient ^ '^ = 0.95 (C)
Pervious Site Area^ = 27.99 (D)
Pervious Site Area Runoff Coefficient'' = OJ (E)
(BXC)+(DXE)
Existing Site Area Runoff Coefficient = ^ (F)
Proposed Site Conditions (after construction)
Impervious Site Area^ = 4^6 (G)
Impen/ious Site Area Runoff Coefl'icient ^' = 0.95 (H)
Pen/ious Site Area^ = 23.4 (I)
Pervious Site Area Runoff Coefficient" = OJ (J)
(GXH) + (IXJ) , ^
Proposed Site Area Runoff Coefficient ^—- = ^ ^4 (•^)
1. Includes paved areas, areas covered by buildings, and other impervious surfaces.
2. Use 0.95 unless lower or higher runoff coefficient can be verified.
3. Includes areas of vegetation, most unpaved or uncovered soil surfaces, and other pervious
areas.
4. See the table on the following page for typical C values.
Computation Sheet for Determining Run-on Discharges
storm water flows from adjacent off-site areas (referred to as "run-on") will be collected by
existing and proposed brow ditches and directed to storm drain facilities. Details are
provided in the Hydrology Study by Fuscoe Engineering, Inc. Copies ofthe Hydrology Maps
for exisfing and proposed condifions are included in Appendix B.
Figure 819.2A
Runoff Coefficients for Undeveloped Areas
Watershed Types
Extreme High Normal Low
Relief .28 -.35
Steep, rugged terrain
with average slopes
above 30%
.20 -.28
Hilly, with average
slopes ofl Oto 30%
.14-.20
Rolling, with average
slopes of 5 to 10%
.08 -.14
Relatively flat land,
with average slopes
ofOto5%
Soil
Infiltration .12-.16
No effective soil
cover, either rock or
thin soil mantle of
negligible
infiltration capacity
.08 -.12
Slow to take up
water, clay or
shallow loam soils of
low infiltration
capacity, imperfectly
or poorly drained
.06 -.08
Normal; well drained
light or medium
textured soils, sandy
loams, silt and silt
loams
.04 -.06
High; deep sand or
other soil that takes
up water readily,
very light well
drained soils
Vegetal
Cover .12-.16
No effective plant
cover, bare or very
sparse cover
.08 -.12
Poor to fair; clean
cultivation crops, or
poor natural cover,
less than 20% of
drainage area over
good cover
.06 -.08
Fair to good; about
50% of area in good
grassland or wood-
land, not more than
50% of area in
cultivated crops
.04 -.06
Good to excellent;
about 90% of
drainage area in
good grassland,
woodland or
equivalent cover.
Surface
Storage .10-.12
Negligible surface
depression few and
shallow;
drainageways steep
and small, no
marshes
.08 -.10
Low; well defined
system of small
drainageways; no
ponds or marshes
.06 -.08
Normal;
considerable surface
depression storage;
lakes and pond
marshes
.04 -.06
High; surface stor-
age, high; drainage
system not sharply
defmed; large flood
plain storage or large
number of ponds or
marshes.
Given An undeveloped watershed consisting of; Solution;
1) rolling terrain with average slopes of 5%, Relief
2) clay type soils, Soil Inflitration
3) good grassland area, and Vegetal Cover
4) normal surface depressions. Surface Storage
Find The runoff coefficient, C, for the above watershed.
0.14
0.08
0.04
0.06
C= 0.32
Table 819.2B
Runoff Coefficients for
Developed Areas
Type of Drainage Area Runoff
Coefficient
Business:
Downtown areas 0.70-0.95
Neighborhood areas 0.50-0.70
Residential:
Single-family areas 0.30-0.50
Multi-units, detached 0.40-0.60
Multi-units, attached 0.60-0.75
Suburban 0.25 -0.40
Apartment dwelling areas 0.50-0.70
Industrial:
Light areas 0.50-0.80
Heavy areas 0.60-0.90
Parks, cemeteries: 0.10-0.25
Playgrounds: 0.20-0.40
Railroad yard areas: 0.20-0.40
Unimproved areas: 0.10-0.30
Lawns:
Sandy soil, flat, 2% 0.05-0.10
Sandy soil, average, 2-7% 0.10-0.15
Sandy soil, steep, 7% 0.15-0.20
Heavy soil, flat, 2% 0.13-0.17
Heavy soil, average, 2-7% 0.18 -0.25
Heavy soil, steep, 7% 0.25 -0.35
Streets:
Asphaltic 0.70-0.95
Concrete 0.80-0.95
Brick 0.70-0.85
Drives and walks 0.75 -0.85
Roofs: 0.75 -0.95
APPENDIX H
CONSTRUCTION ACTIVITY SCHEDULE &
BMP IMPLEMENTATION SCHEDULE
BhA? IMPLE/V^ENTATION SCHEDULE
GRADING & LAND DEVELOP/vyENT PHASE
Project Nome: La Costa Valley Site Improvements
Adivities Associated vnth Phase: (check all that apply)
^ Demolition • Surveying • Rock Crushing
^ Excavation Finish Grade • Blasting
1^ Rough Grade • Soil Amendment(s): • Soils Testing
^ Erosion & Sediment Control Equip. Maintenance/Fueling • Other:
^ ClearingA'egetation Removal Material Delivery & Storage
BMP Deployment: (check all that apply)
Erosion Control BMPs:
V EC-1 Scheduling / EC-7 Geotextiles & Mats EC-13 Reserved
EC-2 Protect Existing Vegetation EC-8 Wood Mulching EC-1 4 Compost Blankets
EC-3 Hydraulic Mulch* EC-9 Earth Dikes & Drainage EC-1 5 Soil Preparation/ EC-3 Hydraulic Mulch*
Swales Roughening
/ EC-4 Hydroseeding* EC-10 Velocity Dissipation EC-1 6 Non-Vegetative
^ EC-5 Soil Binders* EC-11 Slope Drains Stabilization
EC-6 Strav^ Mulch* EC-1 2 Streambank Stabilization
Sediment Control BMPs:
^ SE-1 Silt Fence / SE-6 Gravel Bag Berm SE-11 ATS
SE-2 Sediment Basin / SE-7 Street Sweeping/Vacuuming SE-1 2 Temporary Silt Dike
SE-3 Sediment Trap / SE-8 Sandbag Barrier SE-1 3 Compost Socks & Berms
^ SE-4 Check Dam SE-9 Straw Bale Barrier SE-14 Biofilter Bags
^ SE-5 Fiber Rolls / SE-10 Storm Drain Inlet Protection
Trackina Control & Wind Erosion Control BMPs:
^ TC-1 Stabilized Entrance/Exit TC-2 Stabilized Roadway TC-3 Entrance/Outlet Tire Wash
•/ WE-1 Wind Erosion Control
Non-Storm Wciter Manaaement BMPs:
NS-1 Water Conservation NS-7 Potable Water/Irrigation NS-12 Concrete Curing
NS-2 Dewatering Operations NS-8 Vehicle & Equip. Cleaning / NS-13 Concrete Finishing
>^ NS-3 Paving & Grinding NS-9 Vehicle & Equip. Fueling NS-14 Material Use Over Water
NS-4 Temp. Stream Crossing NS-10 Vehicle & Equip. Maint. NS-1 5 Demo Adi. to Water
NS-5 Clear Water Diversion NS-ll Pile Driving Operations NS-1 6 Temporary Batch Plants
•/' NS-6 Illicit Connection/Discharge
Materials & Waste Manaaement BMPs:
WM-1 Material Delivery/Storage / WM-5 Solid Waste Management / WM-8 Concrete Waste Mgmt.
•/' WM-2 Material Use WM-6 Hazardous Waste Mgmt. / WM-9 Sanitary/Septic Waste
/ WM-3 Stockpile Management WM-7 Contaminated Soil / WM-10 Liquid Waste
•/ WM-4 Spill Prevention & Control Management Management
Nofe: Refer to the SWPPP Exhibits/Erosion Control Plans for BMP locations by construction phase. Not all minimum requirements may be
applicable to every project.
* The Contractor shall select one of the five measures or a combination thereof to stabilize inactive areos (areas of construction activity that
have been disturbed but are not currently being worked on and are not scheduled to be re-disturbed for at least 1 4 days)
^ Minimum BMP
B/sAP l/vyPLE/WENTATION SCHEDULE
STREETS & UTILITIES
Project Name: La Costa Valley Site Improvements
Adivities Associated with Phase: (check ail that apply)
Finish Grade
Utility Install: Water/Sewer/Gas
Storm Drain Installation
Curb/Gutter Concrete Pour
Masonry/Retaining Walls
Paving Operations •
Material Delivery & Storage
Equip. Maintenance/Fueling
Other:
BMP Deployment: (check all that apply)
Erosion Control BMPs:
•/^ EC-1 Scheduling EC-7 Geotextiles & Mats EC-13 Reserved
EC-2 Protect Existing Vegetation EC-8 Wood Mulching EC-14 Compost Blankets
EC-3 Hydraulic Mulch* EC-9 Earth Dikes & Drainage EC-15 Soil Preparation/ EC-3 Hydraulic Mulch*
Swales Roughening
EC-4 Hydroseeding* EC-10 Velocity Dissipation EC-1 6 Non-Vegetative
y EC-5 Soil Binders* EC-11 Slope Drains Stabilization
EC-6 Straw Mulch* EC-1 2 Streambank Stabilization
Sediment Control BMPs:
^ SE-1 Silt Fence SE-6 Gravel Bag Berm SE-11 ATS
SE-2 Sediment Basin / SE-7 Street SweepingA'acuuming SE-12 Temporary Silt Dike
SE-3 Sediment Trap / SE-8 Sandbag Barrier SE-13 Compost Socks & Berms
^ SE-4 Check Dam SE-9 Straw Bale Barrier SE-14 Biofilter Bags
/ SE-5 Fiber Rolls SE-10 Storm Drain Inlet Protection
Trackina Control & Wind Erosion Control BMPs:
TC-1 Stabilized Entrance/Exit TC-2 Stabilized Roadway TC-3 Entrance/Outlet Tire Wash
y WE-1 Wind Erosion Control
Non-Storm Wciter Manaaement BMPs:
•/ NS-1 Water Consen/ation NS-7 Potable Water/Irrigation NS-12 Concrete Curing
NS-2 Dewatering Operations v" NS-8 Vehicle & Equip. Cleaning NS-13 Concrete Finishing
NS-3 Paving & Grinding NS-9 Vehicle & Equip. Fueling NS-1 4 Material Use Over Water
NS-4 Temp. Stream Crossing NS-10 Vehicle & Equip. Mainf NS-1 5 Demo Adj. to Water
NS-5 Clear Water Diversion NS-11 Pile Driving Operations NS-1 6 Temporary Batch Plants
•/ NS-6 Illicit Connection/Discharge
Materials & Waste Manaaement BMPs:
WM-1 Material Delivery/Storage / WM-5 Solid Waste Management WM-8 Concrete Waste Mgmt.
-/ WM-2 Material Use / WM-6 Hazardous Waste Mgmt. WM-9 Sanitary/Septic Waste
^ WM-3 Stockpile Management WM-7 Contaminated Soil WM-10 Liquid Waste
•/" WM-4 Spill Prevention & Control Management Management
Note: Refer to the SWPPP Exhibits/Erosion Control Plans for BMP locations by construction phase. Not all minimum requirements may be
applicable to every project.
y Minimum BMP
BAAP l/V^PLE/yyENTATION SCHEDULE
VERTICAL CONSTRUCTION
Projed Nome: La Costa Valley Site Improvements
Adivities Assodated with Phase: (check all that apply)
K Framing Kl Electrical Kl Painting
K Masonry Kl Plumbing Kl Stucco
Kl Drywall/lnterior Walls Kl HVAC Kl Tile
IXI Exterior Siding K Insulation Kl Landscaping & Irrigation
1^ Flooring Kl Roofing Kl Equip. Maintenance/Fueling
1^ Carpentry Kl Concrete Forms/Foundations • Other:
BMP Deployment: (check all that apply)
Erosion Control BMPs:
EC-1 Scheduling EC-7 Geotextiles & Mats EC-13 Reserved
EC-2 Protect Existing Vegetation EC-8 Wood Mulching EC-1 4 Compost Blankets
EC-3 Hydraulic Mulch* EC-9 Earth Dikes & Drainage EC-1 5 Soil Preparation/
Swales Roughening
EC-4 Hydroseeding* EC-10 Velocity Dissipation EC-1 6 Non-Vegetative
^ EC-5 Soil Binders* EC-11 Slope Drains Stabilization
EC-6 Straw Mulch* EC-1 2 Streambank Stabilization
Sediment Control BMPs:
^ SE-1 Silt Fence SE-6 Gravel Bag Berm SE-11 ATS
SE-2 Sediment Basin SE-7 Street Sweeping/Vacuuming SE-1 2 Temporary Silt Dike
SE-3 Sediment Trap / SE-8 Sandbag Barrier SE-1 3 Compost Socks & Berms
^ SE-4 Check Dam SE-9 Straw Bale Barrier SE-14 Biofilter Bags
^ SE-5 Fiber Rolls SE-10 Storm Drain Inlet Protection
Trackina Control & Wind Erosion Control BMPs:
^ TC-1 Stabilized Entrance/Exit
•/
TC-2 Stabilized Roadway V' TC-3 Entrance/Outlet Tire Wash
^ WE-1 Wind Erosion Control
Non-Storm Water Manaaement BMPs:
•/ NS-1 Water Conservation NS-7 Potable Water/Irrigation V' NS-12 Concrete Curing
NS-2 Dewatering Operations / NS-8 Vehicle & Equip. Cleaning / NS-13 Concrete Finishing
V NS-3 Paving & Grinding
•/
NS-9 Vehicle & Equip. Fueling NS-1 4 Material Use Over Water
NS-4 Temp. Stream Crossing / NS-10 Vehicle & Equip. Maint. NS-1 5 Demo Adj. to Water
NS-5 Clear Water Diversion NS-1 1 Pile Driving Operations NS-1 6 Temporary Batch Plants
NS-6 Illicit Connection/Discharge
Materials & Waste Manaaement BMPs:
WM-1 Material Delivery/Storage WM-5 Solid Waste Management / WM-8 Concrete Waste Mgmt.
^ WM-2 Material Use WM-6 Hazardous Waste Mgmt. / WM-9 Sanitary/Septic Waste
V WM-3 Stockpile Management WM-7 Contaminated Soil v' WM-10 Liquid Waste
•/ WM-4 Spill Prevention & Control Management Management
Note: Refer to the SWPPP Exhibits/Erosion Control Plans for BMP locations by construction phase. Not all minimum requirements may be
applicable to every project.
Minimum BMP
B/V^P l/V^PLE/V^ENTATION SCHEDULE
FINAL LANDSCAPING & SITE STABILIZATION
Projed Nome: Lo Costa Valley Site Improvements
Activities Associated with Phase: (check al that apply)
K Stabilization ED Drainage Inlet Stencils Kl Storage Yard/Material Removal
Kl Landscape Installation K Irrigation System Testing K Erosion & Sediment Control BMP
• Vegetation Establishment \Z\ Inlet Filtration Removal
• Permanent Water Quality Features • Other:
BMP Deployment: (check all that apply)
Erosion Control BMPs:
•/ EC-1 Scheduling EC-7 Geotextiles & Mats EC-13 Reserved
EC-2 Protect Existing Vegetation EC-8 Wood Mulching EC-14 Compost Blankets
EC-3 Hydraulic Mulch* EC-9 Earth Dikes & Drainage EC-1 5 Soil Preparation/
Swales Roughening
^^ EC-4 Hydroseeding* EC-10 Velocity Dissipation EC-1 6 Non-Vegetative
^ EC-5 Soil Binders* EC-11 Slope Drains Stabilization
EC-6 Straw Mulch* EC-12 Streambank Stabilization
Sediment Control BMPs:
V SE-1 Silt Fence SE-6 Gravel Bag Berm SE-11 ATS
SE-2 Sediment Basin / SE-7 Street Sweeping/Vacuuming SE-12 Temporary Silt Dike
SE-3 Sediment Trap
•/
SE-8 Sandbag Barrier SE-1 3 Compost Socks & Berms
^ SE-4 Check Dam SE-9 Straw Bale Barrier SE-14 Biofilter Bags
^ SE-5 Fiber Rolls / SE-10 Storm Drain Inlet Protection
Trackina Controls Wind Erosion Control BMPs:
^ TC-1 Stabilized Entrance/Exit TC-2 Stabilized Roadway TC-3 Entrance/Outlet Tire Wash
WE-1 Wind Erosion Control
Non-Storm Water Manaaement BMPs:
y NS-1 Water Conservation NS-7 Potable Water/Irrigation v' NS-12 Concrete Curing
NS-2 Dewatering Operations
•/
NS-8 Vehicle & Equip. Cleaning ,/ NS-13 Concrete Finishing
V NS-3 Paving & Grinding NS-9 Vehicle & Equip. Fueling NS-14 Material Use Over Water
NS-4 Temp. Stream Crossing NS-10 Vehicle & Equip. Maint. NS-15 Demo Adj. to Water
NS-5 Clear Water Diversion NS-1 1 Pile Driving Operations NS-1 6 Temporary Batch Plants
^ NS-6 Illicit Connection/Discharge
Materials & Waste Manaaement BMPs:
WM-1 Material Delivery/Storage WM-5 Solid Waste Management / WM-8 Concrete Waste Mgmt.
^ WM-2 Material Use WM-6 Hazardous Waste Mgmt. / WM-9 Sanitary/Septic Waste
•/ WM-3 Stockpile Management WM-7 Contaminated Soil / WM-10 Liquid Waste
^ WM-4 Spill Prevention & Control Management Management
Note: Refer to the SWPPP Exhibits/Erosion Control Plans for BMP locations by construction phase. Not all minimum requirements may be
applicable to every project.
V Minimum BMP
m? I/V^PLE/V^ENTATION SCHEDULE
INACTIVE SITE
Projed Name: La Cosfa Valley Site Improvements
Adivities Associated with Phase: (check all that apply)
Routine Site Inspection
Erosion/Sediment Control Device Installation
Erosion/Sediment Control Device Maintenance •
Street Sweeping
Trash Removal
Other:
BMP D^loyment: (dieck all that apply)
Erosion Control BMPs:
EC-1 Scheduling EC-7 Geotextiles & Mats EC-13 Reserved
EC-2 Protect Existing Vegetation EC-8 Wood Mulching EC-14 Compost Blankets
EC-3 Hydraulic Mulch* EC-9 Earth Dikes & Drainage EC-15 Soil Preparation/
Swales Roughening
•/^ EC-4 Hydroseeding* / EC-10 Velocity Dissipation EC-1 6 Non-Vegetative
^ EC-5 Soil Binders* EC-11 Slope Drains Stabilization
EC-6 Straw Mulch* EC-1 2 Streambank Stabilization
Sediment Control BMPs:
^ SE-1 Silt Fence / SE-6 Gravel Bag Berm SE-11 ATS
SE-2 Sediment Basin SE-7 Street Sweeping/Vacuuming SE-12 Temporary Silt Dike
SE-3 Sediment Trap SE-8 Sandbag Barrier SE-1 3 Compost Socks & Berms
^ SE-4 Check Dam SE-9 Straw Bale Barrier SE-14 Biofilter Bags
y SE-5 Fiber Rolls SE-10 Storm Drain Inlet Protection
Trackina Controls Wind Erosion Control BMPs:
^ TC-1 Stabilized Entrance/Exit / TC-2 Stabilized Roadway TC-3 Entrance/Outlet Tire Wash
^ WE-1 Wind Erosion Control
Non-Storm Water Manaaement BMPs:
^ NS-1 Water Conservation NS-7 Potable Water/Irrigation NS-12 Concrete Curing
NS-2 Dewatering Operations NS-8 Vehicle & Equip. Cleaning NS-13 Concrete Finishing
NS-3 Paving & Grinding NS-9 Vehicle & Equip. Fueling NS-1 4 Material Use Over Water
NS-4 Temp. Stream Crossing NS-10 Vehicle & Equip. Maint. NS-1 5 Demo Adj. to Water
NS-5 Clear Water Diversion NS-11 Pile Driving Operations NS-16 Temporary Batch Plants
V NS-6 Illicit Connection/Discharge
Materials & Waste Manaaement BMPs:
WM-1 Material Delivery/Storage sT WM-5 Solid Waste Management WM-8 Concrete Waste Mgmt.
WM-2 Material Use / WM-6 Hazardous Waste Mgmt. WM-9 Sanitary/Septic Waste
WM-3 Stockpile Management WM-7 Contaminated Soil WM-10 Liquid Waste
•/" WM-4 Spill Prevention & Control Management Management
Note: Refer to the SWPPP Exhibits/Erosion Control Plans for BMP locations by construction phase. Not all minimum requirements may be
applicable to every project.
v^ Minimum BMP
* The Contractor shall select one of the five measures or a combination thereof to stabilize inactive areas (areas of construction activity that
have been disturbed but are not currently being worked on and are not scheduled to be re-disturbed for at least 14 days)
APPENDIX I
CASQA BMP HANDBOOK FACT SHEETS
Scheduling EC-1
Description and Purpose
Scheduling is the development of a written plan that includes
sequencing of construction activities and the implementation of
BMPs such as erosion control and sediment control while
taking local climate (rainfall, vvind, etc.) into consideration.
The purpose is to reduce the amount and duration of soil
exposed to erosion by wind, rain, runoff, and vehicle tracking,
and to perform the construction activities and control practices
in accordance with the planned schedule.
Suitable Applications
Proper sequencing of construction activities to reduce erosion
potential should be incorporated into the schedule of every
construction project especially dviring rainy season. Use of
other, more costiy yet less effective, erosion and sediment
control BMPs may often be reduced through proper
construction sequencing.
Limitations
• Environmental constraints such as nesting season
prohibitions reduce the full capabilities of this BMP.
Implementation
• Avoid rainy periods. Schedule major grading operations
during dry months when practical. Allow enough time
before rainfall begins to stabilize the soil with vegetation or
physical means or to install sediment trapping devices.
• Plan the project and develop a schedule showing each phase
Categories
EC Erosion Control
SE Sediment Control m
TC Tracking Control
WE Wind Erosion Control
NS hton-Stonnwater NS Management Control
WM Waste Management and WM Materials Pollution Control
Legend:
0 Primary Objective
M Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
Potential Alternatives
None
CAUKMtNIA tTOKMHATCJI
QLAIIIV ASSOCI*! lO.S
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Scheduling EC-1
of construction. Clearly show how the rainy season relates to soil disturbing and re-
stabilization activities. Incorporate the construction schedule into the SWPPP.
• Include on the schedule, details on the rainy season implementation and deployment of:
Erosion control BMPs
Sediment control BMPs
- Tracking control BMPs
Wind erosion control BMPs
Non-stormwater BMPs
- Waste management and materials pollution control BMPs
• Include dates for activities that may require non-stormwater discharges such as dewatering,
sawcutting, grinding, drilling, boring, crushing, blasting, painting, hydro-demolition, mortar
mixing, pavement cleaning, etc.
• Work out the sequencing and timetable for the start and completion of each item such as site
clearing and grubbing, grading, excavation, paving, foundation pouring utilities installation,
etc., to minimize the active construction area during the rainy season.
- Sequence trenching activities so that most open portions are closed before new
trenching begins.
- Incorporate staged seeding and re-vegetation of graded slopes as work progresses.
- Schedule establishment of permanent vegetation during appropriate planting time for
specified vegetation.
• Non-active areas should be stabilized as soon as practical after the cessation of soil
disturbing activities or one day prior to the onset of precipitation.
• Monitor the weather forecast for rainfall.
• When rainfall is predicted, adjust the construction schedule to allow the implementation of
soil stabilization and sediment treatment controls on all disturbed areas prior to the onset of
ram.
• Be prepared year round to deploy erosion control and sediment control BMPs. Erosion may
be caused during dry seasons by vm-seasonal rainfall, wind, and vehicle tracking. Keep the
site stabilized year round, and retain and maintain rainy season sediment trapping devices
in operational condition.
• Apply permanent erosion control to areas deemed substantially complete during the
project's defined seeding vdndow.
Costs
Construction scheduling to reduce erosion may increase other construction costs due to reduced
economies of scale in performing site grading. The cost effectiveness of scheduling techniques
should be compared with the other less effective erosion and sedimentation controls to achieve a
cost effective balance.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Scheduling EC-1
Inspection and Maintenance
• Verify that work is progressing in accordance with the schedule. If progress deviates, take
corrective actions.
• Amend the schedule when changes are warranted.
• Amend the schedule prior to the rainy season to show updated information on the
deployment and implementation of construction site BMPs.
References
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of Califomia Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities Developing Pollution Prevention Plans and
Best Management Practices (EPA 832-R-92-005), U.S. Environmental Protection Agency, Office
of Water, September 1992.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Velocity Dissipation Devices EC-10
Description and Purpose
Outlet protection is a physical device composed of rock, grouted
riprap, or concrete rubble, which is placed at the outiet of a pipe
or channel to prevent scour of the soil caused by concentrated,
high velocity flows.
Suitable Applications
Whenever discharge velocities and energies at the outlets of
culverts, conduits, or channels are sufficient to erode the next
downstream reach. This includes temporary diversion
structures to divert runon during construction.
• These devices may be used at the following locations:
Outlets of pipes, drains, culverts, slope drains, diversion
ditches, swales, conduits, or channels.
- Outlets located at the bottom of mild to steep slopes.
- Discharge outlets that carry continuous flows of water.
- Outlets subject to short, intense flows of water, such as
flash floods.
Points where lined conveyances discharge to unlined
conveyances
Limitations
• Large storms or high flows can wash away the rock outlet
protection and leave the area susceptible to erosion.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Controi
0
NS
WM
Legend:
0 Primary Objective
IS Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
None
\i IttJKNUSHmMWAim
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 5
Velocity Dissipation Devices EC-10
• Sediment captured by the rock outlet protection may be difficult to remove without
removing the rock.
• Outlet protection may negatively impact the channel habitat.
• Grouted riprap may break up in areas of freeze and thaw.
• If there is not adequate drainage, and water builds up behind grouted riprap, it may cause
the grouted riprap to break up due to the resulting hydrostatic pressure.
• Sediment accumulation, scour depressions, and/or persistent non-stormwater discharges
can result in areas of standing water suitable for mosquito production in velocit>' dissipation
devices.
Implementation
Genera?
Outlet protection is needed where discharge velocities and energies at the outlets of culverts,
conduits or channels are sufficient to erode the immediate downstream reach. This practice
protects the outlet from developing small eroded pools (plange pools), and protects against gully
erosion resulting from scouring at a culvert mouth.
Design and Layout
As with most channel design projects, depth of flow, roughness, gradient, side slopes, discharge
rate, and velocity should be considered in the outlet design. Compliance to local and state
regulations should also be considered while working in environmentally sensitive streambeds.
General recommendations for rock size and length of outlet protection mat are shown in the
rock outlet protection figure in this BMP and should be considered minimums. The apron
length and rock size gradation are determined using a combination of the discharge pipe
diameter and estimate discharge rate: Select the longest apron length and largest rock size
suggested by the pipe size and discharge rate. Where flows are conveyed in open channels such
as ditches and swales, use the estimated discharge rate for selecting the apron length and rock
size. Flows should be same as the culvert or channel design flow but never the less than the
peak 5 year flow for temporary structures planned for one rainy season, or the lo year peak flow
for temporary structures planned for two or three rainy seasons.
• There are many types of energy dissipaters, with rock being the one that is represented in
the attached figure.
• Best results are obtained when sound, durable, and angular rock is used.
• Install riprap, grouted riprap, or concrete apron at selected outlet. Riprap aprons are best
suited for temporary' use during construction. Grouted or wired tied rock riprap can
minimize maintenance requirements.
• Rock outlet protection is usually less expensive and easier to install than concrete aprons or
energj' dissipaters. It also serves to trap sediment and reduce flow velocities.
• Carefully place riprap to avoid damaging the filter fabric.
November 2009 California Stormwater BMP Handbook 2 of 5
Construction
www.casqa.org
Velocity Dissipation Devices EC-10
- Stone 4 in. to 6 in. may be carefully dumped onto filter fabric from a height not to exceed
12 in.
- Stone 8 in. to 12 in. must be hand placed onto filter fabric, or the filter fabric may be
covered vvith 4 in. of gravel and the 8 in. to 12 in. rock may be dumped from a height not
to exceed 16 in.
- Stone greater than 12 in. shall only be dumped onto filter fabric protected with a layer of
gravel with a thickness equal to one half the DJQ rock size, and the dump height limited to
twice the depth of the gravel protection layer thickness.
• For proper operation of apron: Align apron with receiving stream and keep straight
throughout its length. If a curve is needed to fit site conditions, place it in upper section of
apron.
• Outlets on slopes steeper than 10 percent should have additional protection.
Costs
Costs are low if material is readily available. If material is imported, costs will be higher.
Average installed cost is $150 per device.
Inspection and Maintenance
• Inspect BMPs prior to forecast rain, daily during extended rain events, after rain events,
weekly during the rainy season, and at two-week intervals during the non-rainy season.
• Inspect BMPs subjected to non-stormwater discharges daily while non-stormwater
discharges occur. Minimize areas of standing water by removing sediment blockages and
filling scour depressions.
• Inspect apron for displacement of the riprap and damage to the underlying fabric. Repair
fabric and replace riprap that has washed away. If riprap continues to wash away, consider
using larger material.
• Inspect for scour beneath the riprap and around the outlet. Repair damage to slopes or
underlying filter fabric immediately.
• Temporary devices should be completely removed as soon as the surrounding drainage area
has been stabilized or at the completion of construction.
References
County of Sacramento Improvement Standards, Sacramento County, May 1989.
Erosion and Sediment Control Handbook, S.J. Goldman, K. Jackson, T.A. Bursztynsky, P.E.,
McGraw Hill Book Company, 1986.
Handbook of Steel Drainage & Highway Construction, American Iron and Steel Institute, 1983.
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995.
November 2009 California Stormwater BMP Handbook 3 of 5
Construction
www.casqa.org
Velocity Dissipation Devices EC-10
Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University' of
California Division of Agriculture and Natural Resources, Publication 8125. On-line: http://
anrcatalog.ucdavis.edu/pdf/8125.pdf
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
state of California Department of Transportation (Caltrans), November 2000.
Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75.
Washington State Department of Ecology, February 1992.
Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of
Management Practices, Tahoe Regional Planning Agency, November 1988.
November 2009 California Stormwater BMP Handbook 4 of 5
Construction
www.casqa.org
Velocity Dissipation Devices EC-10
3 do %
-LAN vlEv^
'+0.. \rn\n
=>;pe Cutlet to wel
,—-^ey i'" D
'"e:;on-i-'^e''dec lo
f" ^ ~ i K A A
Pipe Diameter
inches
Discharge
ft3/s
Apron Length, La
ft
Rip Rap D50 Diameter
Min
inches
5 10 4
12
10 13 6
10 10 6
20 l6 8
18
30 23 12
40 26 16
30 16 8
40 26 8
24 26 50 26 12
60 30 16
For larger or higher flows consult a Registered CiWl Engineer
Source: USDA - SCS
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
5 of 5
Hydroseeding EC-4
Description and Purpose
Hydroseeding typically consists of applying a mixture of a
hydraulic mulch, seed, fertilizer, and stabilizing emulsion with
a hydraulic mulcher, to temporarily protect exposed soils from
erosion by water and wind. Hydraulic seeding, or
hydroseeding, is simply the method by which temporary or
permanent seed is applied to the soil surface.
Suitable Applications
Hydroseeding is suitable for disturbed areas requiring
temporary protection until permanent stabilization is
established, for disturbed areas that will be re-disturbed
following an extended period of inactivity, or to apply
permanent stabilization measures. Hydroseeding without
mulch or other cover (e.g. EC-7, Erosion Control Blanket) is not
a stand-alone erosion control BMP and should be combined
vvith additional measures until vegetation establishment.
Typical applications for hydroseeding include:
• Disturbed soil/graded areas where permanent stabilization
or continued earthwork is not anticipated prior to seed
germination.
• Cleared and graded areas exposed to seasonal rains or
temporary irrigation.
• Areas not subject to heavy wear by construction equipment
or high traffic.
Categories
EC Erosion Control 0
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control IH
NS Non-Stormwater
Management Control
WM Waste Management and
Materials Pollution Control
Legend:
0 Primary Category
IEI Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
EC-3 Hydraulic Mulch
EC-5 Soil Binders
EC-6 Straw Mulch
EC-7 Geotextiles and Mats
EC-8 Wood Mulching
EC-14 Compost Blanket
EC-16 Non-Vegetallve Stabilization
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Hydroseeding EC-4
Limitations
• Availability of hydroseeding equipment may be limited just prior to the rainy season and
prior to storms due to high demand.
• Hydraulic seed should be applied with hydraulic mulch or a stand-alone hydroseed
application should be followed by one of the following:
- Straw mulch (see Straw Mulch EC-6)
- Rolled erosion control products (see Geotextile and Mats EC-7)
- Application of Compost Blanket (see Compost Blanket EC-14)
Hydraulic seed may be used alone only on small flat surfaces when there is sufficient time in
the season to ensure adequate vegetation establishment and coverage to provide adequate
erosion control.
• Hydraulic seed without mulch does not provide immediate erosion control.
• Temporary seeding may not be appropriate for steep slopes (i.e., slopes readily prone to rill
erosion or without sudfficient topsoil).
• Temporary seeding may not be appropriate in dry periods without supplemental irrigation.
• Temporary vegetation may have to be removed before permanent vegetation is applied.
• Temporary vegetation may not be appropriate for short term inactivity (i.e. less than 3-6
months).
Implementation
In order to select appropriate hydraulic seed mbctures, an evaluation of site conditions should be
performed vdth respect to:
- Soil conditions - Maintenance requirements
- Site topography and exposure (sim/wind) - Sensitive adjacent areas
- Season and climate - Water availability
- Vegetation types - Plans for pennanent vegetation
The local office ofthe U.S.D.A. Natural Resources Conservation Service (NRCS) is an excellent
source of information on appropriate seed mixes.
The following steps should be followed for implementation:
• Where appropriate or feasible, soil should be prepared to receive the seed by disking or
otherwise scarifying (See EC-15, Soil Preparation) the surface to eliminate crust, improve air
and water infiltration and create a more favorable environment for germination and grovrth.
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Hydroseeding EC-4
• Avoid use of hydraulic seed in areas where the BMP would be incompatible with future
earthwork activities.
• Hydraulic seed can be applied using a mtdtiple step or one step process.
- In a multiple step process, hydraulic seed is applied first, followed by mulch or a Rolled
Erosion Control Product (RECP).
In the one step process, hydraulic seed is applied with hydraulic mulch in a hydraulic
matrix. When the one step process is tised to apply the mixture of fiber, seed, etc., the
seed rate should be increased to compensate for all seeds not having direct contact with
the soil.
• All hydraulically seeded areas should have mulch, or alternate erosion control cover to keep
seeds in place and to moderate soil moisture and temperature until the seeds germinate and
grow.
• All seeds should be in conformance witii the Califomia State Seed Law of tbe Department of
Agriculture. Each seed bag should be delivered to the site sealed and clearly marked as to
species, purity, percent germination, dealer's guarantee, and dates of test. The container
should be labeled to clearly reflect the amount of Pure live Seed (PLS) contained. All
legume seed should be pellet inoculated. Inoculant sources should be species specific and
should be applied at a rate of 2 lb of inoculant per 100 lb seed.
• Commercial fertilizer should confonn to the requirements of the Califomia Food and
Agricultiural Code, which can be found at
http://www.leginf0.ca.g0v/.html/fac_table_0f_c0ntents.html. Fertilizer should be pelleted
or granular form.
• Follow up applications should be made as needed to cover areas of poor coverage or
germination/vegetation establishment and to maintain adequate soil protection.
• Avoid over spray onto roads, sidewalks, drainage channels, existing vegetation, etc.
• Additional guidance on the comparison and selection of temporary slope stabilization
methods is provided in Appendix F of the Handbook.
Costs
Average cost for installation and maintenance may vary from as low as $1,900 per acre for flat
slopes and stable soils, to $4,000 per acre for moderate to steep slopes and/or erosive soils.
Cost of seed mixtiures vary based on types of required vegetation.
BMP Installed
Cost per Acre
Hydraulic Seed $l,9OO-$4.0OO
Source: Caltrans Soil Stabilization BMP Research for Erosion and Sediment Controls, July
2007
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Hydroseeding EC-4
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to for«»sted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Areas where erosion is evident should be repaired and BMPs re-applied as soon as possible.
Care should be exercised to minimize the damage to protected areas while making repairs, as
any area damaged will require re-application of BMPs.
• Where seeds fail to germinate, or th^ germinate and die, the area must be re-seeded,
fertilized, and mulched within the planting season, using not less than half the original
application rates.
• Irrigation ^stems, if applicable, should be inspected daily while in use to identify system
malfunctions and line breaks. When Une breaks are detected, the system must be shut down
immediately and breaks repaired before the system is put back into operation.
• Irrigation systems should be inspected for romplete coverage and adjusted as needed to
maintain complete coverage.
References
Soil Stabilization BMP Research for Erosion and Sediment Controls: Cost Survey Technical
Memorandum, State of California Department of Transportation (Caltrans), July 2007.
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of Califomia Department of Transportation (Caltrans), March 2003.
Guidance Document: Soil Stabilization for Temporary Slopes, State of Califomia Department of
Transportation (Caltrans), November 1999.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
Soil Binders EC-5
Description and Purpose
Soil binding consists of application and maintenance of a soil
stabilizer to exposed soil surfaces. Soil binders are materials
applied to the soil surface to temporarily prevent water and
wind induced erosion of exposed soils on construction sites.
Suitable Applications
Soil binders are typically applied to disturbed areas requiring
temporary protection. Because soil binders, when used as a
stand-alone practice, can often be incorporated into the soil,
they are a good alternative to mulches in areas where grading
activities will soon resume. Soil binders are commonly used in
the following areas:
• Rough graded soils that will be inactive for a short period of
time
• Soil stockpiles
• Temporary haul roads prior to placement of crushed rock
• Compacted soil road base
• Construction staging, materials storage, and layout areas
Limitations
• Soil binders are temporary in nature and may need
reapplication.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
Non-Stormwater
0
IEI
NS Management Control
^ Waste Management and
Materials Pollution Control
Legend:
0 Primary Category
@ Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
EC-3 Hydraulic Mulch
EC-4 Hydroseeding
EC-6 Straw Mulch
EC-7 Geotextiles and Mats
EC-8 Wood Mulching
CAI IKIKMA SIORMHAII K
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 8
Soil Binders EC-5
• Soil binders require a minimiun curing time until fijlly effective, as prescribed by the
manufacturer. Curing time may be 24 hours or longer. Soil binders may need reapplication
after a storm event.
• Soil binders will generally experience spot failures during heavy rainfall events. If runoff
penetrates the soil at the top of a slope treated with a soil binder, it is likely that the runoff
vdll undercut the stabilized soil layer and discharge at a point further down slope.
• Plant-material-based soil binders do not generaUy hold up to pedestrian or vehicular traffic
across treated areas as well as polymeric emulsion blends or cementitious-based binders.
• Soil binders may not sufficiently penetrate compacted soils.
• Some soil binders are soil texture specific in terms of their effectiveness. For example,
polyacrylamides (PAMs) work very well on silt and clayey soUs but their performance
decreases dramatically in sandy soils.
• Some soil binders may not perform well with low relative himiidity. Under rainy conditions,
some agents may become slippery or leach out of the soil
• Soil binders may not cure if low temperatures occur within 24 hours of application.
• The water quality impacts of some chemical soil binders are relatively unknown and some
may have water quality impacts due to their chemical makeup.
Implementation
General Considerations
• Soil binders should confonn to local municipality specifications and requirements.
• Site soil types will dictate appropriate soil binders to be used.
• A soil binder must be environmentally benign (non-toxic to plant and animal life), easy to
apply, easy to maintain, economical, and should not stain paved or painted surfaces. Soil
binders should not pollute stormwater when cured. Obtain a Material Safety Data Sheet
(MSDS) from the manufacturer to ensure non-toxicity.
• Stormwater runoff from PAM treated soils shouid pass through one of the following
sediment control BMP prior to discharging to surface waters.
- When the total drainage area is greater than or equal to 5 acres, PAM treated areas
should drain to a sediment basin.
- Areas less than 5 acres should drain to sediment control BMPs, such as a sediment trap,
or a series of check dams. The total number of check dams used should be maximized to
achieve the greatest amount of settlement of sediment prior to discharging from the site.
Each check dam should be spaced evenly in the drainage channel through which
stormwater flovre are discharged off site.
• Performance of soil binders depends on temperature, himiidity, and traffic across treated
areas.
November 2009 California Stormwater BMP Handbook 2 of 8
Constructton
www.casqa.org
Soil Binders EC-5
• Avoid over spray onto roads, sidewalks, drainage channels, existing vegetation, etc.
• Additional guidance on the comparison and selection of temporary slope stabilization
methods is provided in Appendix F of the Handbook.
Selecting a Soil Binder
Properties of common soil binders used for erosion control are provided on Table i at the end of
this Fact Sheet. Use Table i to select an appropriate soil binder. Refer to WE-i, Wind Erosion
Control, for dust control soil binders.
Factors to consider when selecting a soil binder include the following:
• Suitability to situation - Consider where the soil binder will be applied, if it needs a high
resistance to leaching or abrasion, and whether it needs to be compatible with any existing
vegetation. Determine the length of time soil stabilization will be needed, and if the soil
binder will be placed in an area where it will degrade rapidly. In general, slope steepness is
not a discriminating factor for the listed soil binders.
• Soil types and surface materials - Fines and moisture content are key properties of surface
materials. Consider a soil binder's ability to penetrate, likelihood of leaching, and ability to
form a surface crust on the surface materials.
• Frequency of application - The frequency of application is related to the functional longevity
ofthe binder, which can be affected by subgrade conditions, surface type, climate, and
maintenance schedule.
• Frequent applications could lead to high costs. Application frequency may be minimized if
the soil binder has good penetration, low evaporation, and good longevity. Consider also
that frequent application will require frequent equipment clean up.
Phmt-Material'Based (Short Lived, <6 months) Blisters
Guar: Guar is a non-toxic, biodegradable, natural galactomannan-based hydrocoUoid treated
with dispersant agents for easy field mbdng. It should be mixed with water at the rate of ii to 15
lb per 1,000 gallons. Recommended minimum application rates are as follows:
Application Rates for Guar Soil Stabilizer
Slope (H:V): Flat 4:1 3:1 2:1 1:1
lb/acre: 40 45 50 60 70
Psyllium: Psyllium is composed of the finely ground muciloid coating of plantago seeds that is
applied as a dry powder or in a wet slurry to the surface of the soil. It dries to form a firm but
rewettable membrane that binds soil particles together, but permits germination and growth of
seed. Psyllium requires 12 to 18 hours diying time. Application rates should be from 80 to 200
lb/acre, with enough water in solution to allow for a uniform slurry flow.
Starch: Starch is non-ionic, cold water soluble (pre-gelatinized) granular cornstarch. The
material is mixed wdth water and applied at the rate of 150 lb/acre. Approximate drying time is
9 to 12 hours.
November 2009 Califomia Stormwater BMP Handbook
Construction
www.casqa.org
3 of 8
Soil Binders EC-5
Plant-Material-Based (Long Lived, 6-12 months) Binders
Pitch and Rosin Emulsion: Generally, a non-ionic pitch and rcwin emulsion has a minimum
solids content of 48%. The rosin should be a minimum of 26% of the total solids rontent. The
soU stabilizer should be non-corrosive, water dilutable emulsion that upon application cures to a
water insoluble binding and cementing agent. For soil erosion control applications, the
emulsion is diluted and should be applied as follows:
• For clayey soil: 5 parts water to 1 part emulsion
• For sandy soil: 10 parts water to 1 part emulsion
AppUcation can be by water truck or hydraulic seeder with the emulsion and product mucture
appUed at the rate specified by the manufacturer.
Polymeric Emulsion Blend Binders
AcrvUc Copolymers and Polymers: Polymeric soil stabiUzers should (K)nsist of a Uquid or soUd
polymer or copolymer writh an acryUc base that contains a minimum of 5596 solids. The
polymeric compound should be handled and muced in a manner that wiU not cause foaming or
should contain an anti-foaming agent. The polymeric emulsion should not exceed its shelf life
or expiration date; manufacturers should provide the expiration date. Polymeric soil stabilizer
should be readily miscible in water, non-injurious to seed or animal life, non-flammable, should
provide surface soil stabilization for various soil types without totally inhibiting water
infiltration, and should not re-emulsify when cured. The appUed compound typically requires
12 to 24 hours drying time. Liquid copolymer should be diluted at a rate of 10 parts water to 1
part polymer and the mixture applied to soil at a rate of 1,175 gallons/acre.
Liquid Pohnmers of Methacrvlates and Acrvlates: This material (insists of a tackifier/sealer that
is a liquid polymer of methacrylates and acrylates. It is an aqueous 100% acrylic emulsion blend
of 40% soUds by volume that is free from styrene, acetate, vinyl, ethoj^lated surfactants or
siUcates. For soil stabilization applications, it is diluted with water in accordance with the
manufacturer's recommendations, and applied with a hydrauUc seeder at the rate of 20
gallons/acre. Drying time is 12 to 18 hours after appUcation.
Copolymers of Sodium Acrvlates and Acrvlamides: These materials are non-toxic, dry powders
that are copolymers of sodium acrylate and acrylamide. They are mixed with water and applied
to the soil surface for erosion control at rates that are determined by slope gradient:
slope Gradient
(H:V) lb/acr«
Flat to 5:1 3.0 - 50
5:1 to 3:1 5.0 -10.0
2:1 to 1:1 10.0 - 20.0
Polv-Acrvlamide fPAMI and Copolymer of Acrvlamide; Unear copolymer poiyacrylamide for
use as a soil binder is packag^ as a dry flowable solid, as a Uquid. Refer to the manufacturer's
rea)mmendation for dilution and application rates as they vary based on Uquid or diy form, site
conditions and cUmate.
• Limitations specific to PAM are as follows:
November 2009 Califbrnia Stormwater BMP Handbook
Construction
www.casqa.org
4 of 8
Soil Binders EC-5
- Do not use PAM on a slope that flows into a water body without passing through a
sediment trap or sediment basin.
- The specific PAM copolymer formulation must be anionic. Cationic PAM should not be
used in any application because of known aquatic toxicity problems. Only the highest
drinking water grade PAM, certified for compUance with ANSI/NSF Standard 60 for
drinking water treatment, should be used for soil appUcations.
- PAM designated for erosion and sediment confrol should be "water soluble" or "linear"
or "non-cross linked".
- PAM should not be used as a stand-alone BMP to protect against water-based erosion.
When combined with mulch, its effectiveness increases dramatically.
Hvdro-Colloid Polymers: Hydro-Colloid Polymers are various combinations of dry flowable
poly-acrylamides, copolymers and hydro-colloid polymers that are mixed with water and
appUed to the soil surface at rates of 55 to 60 lb/acre. Drying times are o to 4 hours.
Cementitious-Based Binders
Gypsum: This is a formulated gypsum based product that readily mixes with water and mulch
to form a thin protective crust on the soil surface. It is composed of high purity gypsum that is
ground, calcined and processed into calcium sulfate hemihydrate with a minimum purity of
86%. It is mixed in a hydraulic seeder and applied at rates 4,000 to 12,000 lb/acre. Drying
time is 4 to 8 hours.
Applying Soil Binders
After selecting an appropriate soil binder, the imfreated soil surface must be prepared before
applying the soil binder. The untreated soil surface must contain sufficient moisture to assist
the agent in achieving unifonn distribution. In general, the following steps should be followed:
• FoUow manufacturer's written recommendations for application rates, pre-wetting of
application area, and cleaning of equipment after use.
• Prior to application, roughen embankment and fiU areas.
• Consider the drying time for the selected soil binder and apply with sufficient time before
anticipated rainfaU. Soil binders should not be appUed during or immediately before
rainfaU.
• Avoid over spray onto roads, sidewalks, drainage channels, sound walls, existing vegetation,
etc.
• Soil binders should not be applied to ft^zen soil, areas with standing water, under freezing
or rainy conditions, or when the temperature is below 40''F during the curing period.
• More than one treatment is often necessary, although the second treatment may be diluted
or have a lower application rate.
• GeneraUy, soil binders require a minimum curing time of 24 hours before they are fully
effective. Refer to manufacturer's instmctions for specific cure time.
November 2009 California Stormwater BMP Handbook 5 of 8
Construction
www.casqa.org
Soil Binders EC-5
• For liquid agents:
- Crown or slope ground to avoid ponding.
- Uniformly pre-wet ground at 0.03 to 0.3 gal/yd» or according to manufacturer's
recommendations.
- Apply solution under pressure. Overlap solution 6 to 12 in.
- Allow treated area to cure for the time recommended by the manufacturer; typically at
least 24 hours.
- Apply second treatment before first treatment becomes ineffective, using 50%
appUcation rate.
- In low humidities, reactivate chemicals by re-wetting with water at 0.1 to 0.2 gal/yd".
Costs
Costs vary according to the soil stabUizer selected for implementation. The following are
approximate installed costs:
Soil Binder Cost per Acre
(2000)'
Estimated Cost
per Acre
Plant-Material-Based (Short Lived) Binders $700-$9OO $770-$990
Flant-Material-Based (Long Lived) Binders $1,200-$1,500 $l,320-$i,650
Polymeric Emulsion Blend Binders $700 -$1,500 $770-$i,650
Cementitious-Based Binders $800-$l,200 $88o-$i,350
1. Source: Erosion Control Pilot Study Report, Caltrans, June 2000.
2.2009 costs reflect a 10% escalation over year 2000 costs. Escalation based on informal
survey of industry trends. Note: Expected cost increase is offeet by competitive economic
conditions.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Pennit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Areas where erosion is evident should be repaired and BMPs re-appUed as soon as possible.
Care should be exercised to minimize the damage to protected areas while making repairs, as
any area damaged vnll require re-application of BMPs.
• Reapply the selected soU binder as needed to maintain effectiveness.
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
6 of 8
Soil Binders EC-5
Table 1 Properties of Soil Binders for Erosion Control
Evaluation Criteria
Binder Type
Evaluation Criteria Plant Material
Based (Short
Lived)
Plant Material
Based (Long
Lived)
Potymeric
Emulsion Blends
Cementitious-
Based Binders
Relative Cost Low Moderate to
High Low to High Low to Moderate
Resistance to Leaching High High Low to Moderate Moderate
Resistance to Abrasion Moderate Low Moderate to High Moderate to High
Longevity Short to Medium Medium Medium to Long Medium
Minimum Curing Time
before Rain 9 to 18 hours 19 to 24 hours 0 to 24 hours 4 to 8 hours
Compatibility with
Existing Vegetation Good Poor Poor Poor
Mode of Degradation Biodegradable Biodegradable
Photodegradable/
Chemically
Degradable
Photodegradable/
Chemically
Degradable
Labor Intensive No No No No
Specialized Application
Equipment
Water Truck or
Hydraulic
Mulcher
Water Truck or
Hydraulic
Mulcher
Water Truck or
Hydraulic Mulcher
Water Truck or
Hydraulic Mulcher
Liquid/Powder Powder Liquid liquid/Powder Powder
Surface Crusting Yes, but dissolves
on rewetting Yes Yes, but dissolves on
rewetting Yes
dean Up Water Water Water Water
Erosion Control
Application Rate Varies Varies <" Varies 4,000 to 12,000
lbs/acre
(1) See Implementetion fbr spediic rates.
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
7 of 8
Soil Binders EC-5
References
Erosion Ck)ntrol Pilot Study Report, State of Califomia Department of Transportation
(Caltrans), June 2000.
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Govemments, May 1995.
Sedimentation and Erosion Control, An Inventory of Current Practices Draft, US EPA, i^ril
1990.
Stormwater Quality Handbooks Constmction Site Best Management Practices (BMPs) Manual,
State of CaUfomia Department of Transportation (Calfrans), March 2003.
Guidance Document: Soil Stabilization for Temporary Slopes, State of C^aliforaia Department of
Transportation (Caltrans), November 1999.
Stormwater Management for Constmction Activities, Developing PoUution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 8 of 8
Construction
www.casqa.org
Geotextiles and Mats EC-7
Description and Purpose
Mattings, or Rolled Erosion Control Products (RECPs), can be
made of natural or synthetic materials or a combination of the
two. RECPs are used to cover the soil surface to reduce erosion
from rainfall impact, hold soil in place, and absorb and hold
moisture near the soil surface. AdditionaUy, RECPs may be
used to stabilize soils until vegetation is established or to
reinforce non-woody surface vegetation.
Suitable Applications
RECPs are typically applied on slopes where erosion hazard is
high and vegetation will be slow to establish. Mattings are also
used on stream banks, swales and other drainage channels
where moving water at velocities between 3 ft/s and 6 ft/s are
likely to cause scour and wash out new vegetation, and in areas
where the soil surface is disturbed and where existing
vegetation has been removed. RECPs may also be used when
seeding cannot occur (e.g., late season construction and/or the
arrival of an early rain season). RECPs should be considered
when the soils are fine grained and potentially erosive. RECPs
should be considered in the foUowing situations.
• Steep slopes, generally steeper than 3:1 (H: V)
• Slopes where the erosion potential is high
• Slopes and disturbed soils where mulch must be anchored
• Disturbed areas where plants are slow to develop
Categories
EC Erosion Control a
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control g)
NS Non-Stontiwater NS Management Control
WM Waste Management and WM Materials Pollulion Control
Legend:
0 Primary Category
Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
EC-3 Hydraulic Mulch
EC-4 Hydroseeding
CAIIIORMA STORMWAnil
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
lof 12
Geotextiles and Mats EC-7
• Channels with flows exceeding 3.3 ft/s
• Channels to be vegetated
• StockpUes
• Slopes adjacent to water bodies
Limitations
• RECP instaUed costs are generally higher than other erosion control BMPs, Umiting their use
to areas where other BMPs are ineffective (e,g. channels, steep slopes).
• RECPs may delay seed germination, due to reduction in soU temperature,
• RECPs are generally not suitable for excessively rocky sites or areas where the final
vegetation wiU be mowed (since staples and netting can catch in mowers). If a staple or pin
cannot be driven into the soil because the tmderlying sofl is too hard or rocky, then an
alternative BMP should be selected.
• If used for temporary erosion control, RECPs should be removed and disposed of prior to
appUcation of permanent soil stabilization measures.
• The use of plastic should be Umited to covering stockpUes or very small graded areas for
short periods of time (such as through one imminent storm event) until more
environmentaUy friendly measures, such as seeding and mulching, may be instaHed.
- Plastic sheeting is easily vandalized, easily tom, photodegradable, and must be
disposed of at a landfiU.
- Plastic sheeting results in 100% runoff, which may cause serious erosion
problems in the areas receiving the increased flow,
• RECPs may have Umitations based on soU tyrpe, slope gradient, or channel flow rate; consult
the manufacturer for proper selection.
• Not suitable for areas that have foot traffic (tripping hazard) - e.g., pad areas aroimd
buildings under constmction.
• RECPs that incorporate a plastic netting (e.g. sfraw blanket typically uses a plastic netting to
hold the straw in place) may not be suitable near known wildUfe habitat. WildUfe can
become trapped in the plastic netting.
• REC^Ps may have Umitations in extremely windy climates. However, when RECPs are
properly frenched at the top and bottom and stapled in accordance with the manufacturer's
recommendations, problems with wind can be minimized.
November 2009 California Stormwater BMP Handbook 2 of 12
Construction www.casqa.org
Geotextiles and Mats EC-7
Implementation
Material Selection
• Natural RECPs have been found to be effective where re-vegetation wiU be provided by re-
seeding. The choice of material should be based on the size of area, side slopes, surface
conditions such as hardness, moisture, weed growth, and availabiUty of materials,
• Additional guidance on the comparison and selection of temporary slope stabilization
methods is provided in Appendix F of the Handbook.
• The following natural and synthetic RECPs are commonly used:
Geotextiles
• Material can be a woven or a non-woven polypropylene fabric with minimum thickness of
0.06 m., minimum width of 12 ft and should have minimum tensUe strength of 150 lbs
(warp), 80 lbs (fill) m conformance with the requirements in ASTM Designation: D 4632.
The permittivity ofthe fabric should be approximately 0.07 sec* in confonnance with the
requirements in ASTM Designation: D4491. The fabric should have an ultraviolet (UV)
StabiUty of 70 percent in conformance witii the requirements in ASTM designation: D4355.
Geotextile blankets must be secured in place with wire staples or sandbags and by keying
into tops of slopes to prevent infilfration of surface waters under geotextile. Staples should
be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in.
crown.
Geotextiles may be reused if ihey are suitable for the use intended.
Plastic Covers
m Generally plastic sheeting should only be used as stockpile covering or for very smaU graded
areas for short periods of time (such as through one imminent storm event). If plastic
sheeting must be used, choose a plastic that wiU withstand photo degradation.
• Plastic sheeting should have a minimum thickness of 6 mils, and must be keyed in at the top
of slope (when used as a temporary slope protection) and firmly held in place with sandbags
or other weights placed no more than 10 ft apart. Seams are typically taped or weighted
down their entire length, and there should be at least a 12 in. to 24 in. overlap of aU seams.
Edges should be embedded a minimum of 6 in, in soil (when used as a temporary slope
protection).
• All sheeting must be inspected periodicaUy after instaUation and after significant rainstorms
to check for erosion, undermining, and anchorage failure. Any failures must be repaired
immediately. If washout or breakages occur, the material should be re-installed after
repairing the damage to the slope,
JSrosion Control Blankets/Mats
m Biodegradable RECPs are fypically composed of jute fibers, curled wood fibere, sfraw,
coconut fiber, or a combination of these materials. In order for an RECP to be considered
100% biodegradable, the netting, sewing or adhesive system that holds the biod^radable
mulch fibers together must also be biodegradable. See typical installation details at the end
ofthis fact sheet
November 2009 California Stormwater BMP Handbook 3 of 12
ConstrucUon www.casqa.org
Geotextiles and Mats EC-7
- Jute is a natural fiber that is made into a yam that is loosely woven into a biodegradable
mesh. The performance of jute as a stand-alone REC!P is low. Most other RECTs
outperform jute as a temporary erosion control product and therefore jute is not
commonly used. It is designed to be used in conjunction wdth vegetation. The material
is supplied in rolled strips, which should be secured to the soil with U-shaped staples or
stakes in accordance with manufacturers' recommendations.
- Excelsior (curled wood fiber) blanket material should consist of machine produced
mats of curled wood excelsior with 80 percent of the fiber 6 m. or longer. "Ilie excelsior
blanket should be of consistent thickness. The wood fiber must be evenly distributed
over the entire area ofthe blanket. The top surface ofthe blanket should be covered with
a photodegradable extmded plastic mesh. The blanket should be smolder resistant
without the use of chemical additives and should be non-toxic and non-injurious to plant
and animal life. Excelsior blankets should be fumished in rolled strips, a minimum of 48
in. wide, and should have an average wei^t of 0.8 lb/yd», ±10 percent, at the time of
manufacture. Excelsior blankets must be sanired in place with wire staples. Staples
should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs
and 2 in. crown.
- Straw blanket should be machine produced mats of straw with a lightweight
biodegradable netting top layer. The straw should be attached to the netting with
biodegradable thread or glue strips. The straw blanket should be of consistent thickness.
The sfraw should be evenly distributed over the entire area of the blanket Sfraw blanket
should be fiimished in roUed strips a minimum of 6.5 ft wide, a minhnum of 80 ft long
and a minimum of 0.5 lb/yd». Straw blankets must be secured m place with wire staples.
Staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8
in. l^s and 2 in. crown.
- Wood fiber blanket is composed of biodegradable fiber mulch with extmded plastic
netting held together with adhesives. The material is designed to enhance re-vegetation.
The material is fiimished in roUed strips, which must be secured to the ground with U-
shaped staples or stakes in accordance with manufacturers' recommendations.
- Coconut fiber blanket should be a machine produced mat of 100 percent coconut
fiber with biodegradable netting on the top and bottom. The coconut fiber should be
attadied to the netting with biodegradable thread or glue strips. The coconut fiber
blanket should be of consistent thickness. The coconut fiber should be evenly distributed
over the entire area ofthe blanket Coconut fiber blanket should be furnished in rolled
strips with a minimum of 6.5 ft wide, a minimum of 80 ft. long and a minimum of 0.5
lb/yd*. Coconut fiber blankets must be secured in place with wire staples. Staples
should be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs
and 2 in. crown.
• Coconut fiber mesh is a thin permeable membrane made from coconut or com fiber
that is spun into a yam and woven into a biodegradable mat It is designed to be used m
conjunction with vegetation and typicaUy has longevity of several years. The material is
suppUed in rolled strips, which must be secured to the soU with U-shaped staples or
stakes in accordance witii manufacturers' recommendations.
November 2009 California Stormwater BMP Handbook 4 of 12
Construction
www.casqa.org
Geotextiles and Mats EC-7
- straw coconut fiber blanket should be machine produced mats of 70 percent straw
and 30 percent coconut fiber with a biodegradable netting top layer and a biodegradable
bottom net The straw and coconut fiber should be attached to the netting with
biodegradable thread or glue strips. The sfraw coconut fiber blanket should be of
consistent thickness. The straw and coconut fiber should be evenly distributed over the
entire area of the blanket Sfraw coconut fiber blanket should be fumished in roUed
strips a minimum of 6,5 ft wide, a minimum of 80 ft long and a mmimum of 0.5 lb/yd*.
Straw coconut fiber blankets must be secured in place with wire staples. Staples should
be made of minimum 11 gauge steel wire and should be U-shaped with 8 in. legs and 2 in.
crown.
Non-biodegradable RECPs are typically composed of polypropylene, polyethylene, nylon or
other synthetic fibers. In some cases, a combination of biodegradable and synthetic fibers is
used to constmct the RECP. Netting used to hold these fibers together is typicaUy non-
biodegradable as well
- Plastic netting is a Ughtweight biaxiaUy oriented netting designed for securing loose
mulches Uke straw or paper to soil surfaces to ^tablish vegetation. The netting is
photodegradable. The netting is supplied in roUed strips, which must be secured with U-
shaped staples or stakes in accordance with manufacturers' recommendations.
- Plastic mesh is an open weave geotextile that is composed of an extmded synthetic
fiba* woven into a mesh with an opening size of less than ¥4 in. It is used with re-
vegetation or may be used to secure loose fiber such as straw to the ground. The material
is supplied in rolled strips, which must be secured to the soU with U-shaped staples or
stakes in accordance with manufacturers' recommendations.
- Synthetic fiber with netting is a mat that is composed of durable synthetic fibers
treated to resist chemicals and ultraviolet light The mat is a dense, three dimensional
mesh of synthetic (typicaUy polyolefin) fibers stitched between two polypropjdene nets.
The mats are designed to be re-vegetated and provide a permanent composite system of
soil, roots, and geomatrix. The material is fumished in rolled strips, which must be
secured vnth U-shaped staples or stakes in accordance with manufacturers'
recommendations.
- Bonded ^^thetic fibers consist of a three dimensional geomatrix nylon (or other
synthetic) matting. Typically it has more than 90 percent open area, which faciUtates
root growth. It's tough root reinforcing system anchors vegetation and protects against
hydraulic lift and shear forces created by high volume discharges. It can be instaUed
over prepared soil, foUowed by seeding into the mat. Once vegetated, it becomes an
invisible composite system of soil, roots, and geomatrix. The material is furnished in
roUed strips tikat must be secured with U-shaped staples or stakes in accordance with
manufacturers' recommendations.
- Combination synthetic and biodegradable RECPs consist of biodegradable fibers,
such as wood fiber or coconut fiber, with a heavy polypropylene net stitched to the top
and a high strength continuous filament geomatrix or net stitched to the bottom. The
material is designed to enhance re-vegetation. The material is fiimished in rolled strips,
November 2009 California Stormwater BMP Handbook 5 of 12
Construction
www.casqa.org
Geotextiles and Mats EC-7
which must be secured with U-shaped staples or stakes in accordance with
manufacturers' recommendations.
Site Preparation
• Proper soil preparation is essential to ensure complete contact of the RECP with the soU. SoU
Roughening is not recommended in areas where RECPs wiU be instaUed.
• Grade and shape the area of instaUation.
• Remove all rocks, clods, vegetation or other obstmctions so that the instaUed blankets or
mats wfll have complete, direct contact vnth the soil.
• Prepare seedbed by loosening 2 to 3 in, of topsoil.
Seeding/PUmting
Seed the area before blanket installation for erosion control and re-vegetation. Seeding after
mat instaUation is often specified for turf reinforcement application. When seeding prior to
blanket installation, aU areas disturbed during blanket instaUation must be re-seeded. Where
sofl fiUing is specified for turf reinforcement mats (TRMs), seed the matting and the entire
disturbed area after installation and prior to filUng the mat with soU.
Fertilize and seed in accordance with seeding specifications or other fypes of landscaping plans.
The protective matting can be laid over areas where grass has been planted and the seedUngs
have emerged. Where vines or other ground covers are to be planteai, lay the protective matting
first and then plant through matting according to design of planting.
Check Slots
Check slots shaU be instaUed as required by the manufacturer.
Laying and Securing Matting
m Before laying the matting, aU check slots should be instaUed and the seedbed should be
firiable, made free fi^m clods, rocks, and roots. The surface should be compacted and
finished according to the requirements ofthe manufacturer's recommendations.
• Mechanical or manual lay down equipment should be capable of handling fuU rolls of fabric
and laying the fabric smoothly without wrinkles or folds. The equipment should meet the
fabric manufacturer's recommendations or equivalent standards.
Anchoring
m U-shaped wire staples, metal geotextile stake pins, or triangular wooden stakes can be used
to anchor mats and blankets to the ground surface.
• Wire staples should be made of minimum 11 gauge steel wire and should be U-shaped with 8
in. legs and 2 in, crown,
• Metal stake pins should be 0.188 in, diameter steel with a 1.5 in, steel washer at the head of
the pin, and 8 in. in length,
• Wire staples and metal stakes should be driven flush to the soU surface.
November 2009 California Stormwater BMP Handbook 6 of 12
Constructton
www.casqa.org
#
Geotextiles and Mats EC-7
Installation on Slopes
InstaUation should be m accordance with the manufacturer's recommendations. In general,
these wiU be as foUowrs:
• Begin at the top of the slope and anchor the blanket in a 6 in, deep by 6 in, wide trench.
Backfill trench and tamp earth firmly.
• UnroU blanket down slope in the direction of water flow.
• Overlap the edges of adjacent paraUel roUs 2 to 3 in. and staple every 3 ft (or greater, per
manufacturer's specifications).
• When blankets must be spliced, place blantets end over end (shingle sfyle) vnth 6 in.
overlap. Staple through overlapped area, approximately 12 m. apart
• Lay blankets loosely and maintain direct contact with the sofl. Do not stretch.
• Staple blankets sufficiently to anchor blanket and maintain contact with the soil. Staples
should be placed down the center and staggered with the staples placed along the edges.
Steep slopes, 1:1 (H:V) to 2:1 (H:V), require a minhnum of 2 staples/yd^*. Moderate slopes,
2:i (H:V) to 3:1 (H:V), require a minimum ofi V2 staples/yd*. Check manufacturer's
specifications to determine if a higher densify staple pattem is required.
Installation in Channels
InstaUation should be in accordance with the manufacturer's recommendations. In general,
these wiU be as foUows:
• Dig initial anchor trench 12 in. deep and 6 m. wide across the channel at the lower end of the
project area.
• Excavate intermittent check slots, 6 in. deep and 6 in. wide across the channel at 25 to 30 ft
intervals along the channels.
• Cut longitudinal channel anchor trenches 4 in, deep and 4 in. wide along each side of the
installation to bury edges of matting, whenever possible extend matting 2 to 3 in. above the
crest of the channel side slopes,
• Beginning at the downstream end and in the center of the channel, place the initial end of
the first roU m the anchor trench and secure with fastening devices at 12 in, intervals. Note:
matting wiU initiaUy be upside down in anchor trench. ^
• In the same manner, position adjacent roUs in anchor trench, overlapping the preceding roH
aminimum of sin.
• Secure these initial ends of mats with anchors at 12 in. intervals, backfiU and compact soU.
• UnroU center strip of matting upstream. Stop at next check slot or terminal anchor trench.
UnroU adjacent mats upsfream in simUar fashion, maintaining a 3 in. overlap.
November 2009 Califomia Stermwater BMP Handbook 7 of 12
Construction
www.casqa.org
Geotextiles and Mats EC-7
• Fold and secure aU rolls of matting snugly into all transverse check slots. Lay mat in the
bottom of the slot then fold back against itself. Anchor through both layers of mat at 12 in,
intervals, tiien backfiU and compact soU. Continue roUmg aU mat widths upstream to the
next check slot or terminal anchor trench.
• Altemate method for non-critical installations: Place two rows of anchors on 6 in. centers at
25 to 30 ft. intervals m lieu of excavated check slots,
• Staple shingled lap spliced ends a minimum of 12 in. apart on 12 in. intervals,
• Place edges of outside mats in previously excavated longitudinal slots; anchor using
prescribed staple pattern, bacfcSU, and compact soiL
• Anchor, fill, and compact upsfream end of mat in a 12 in. by 6 in. terminal trench,
> Secure mat to ground surface using U-shaped wfre staples, geotextile pins, or wooden stakes.
• Seed and fiU turf reinforcement matting with sofl, if specified.
Soil Pilling (ifspecifiedfor tiafreij\forcentent mat CPRM))
Installation should be in accordance with the manufacturer's recommendations. Typical
installation guideUnes are as foUows:
• After seeding, spread and lightly rake V2-3/4 inches of fine topsoU into the TRM apertures to
completely fiU TRM thickness. Use backside of rake or other flat implement
• Altematively, if allowed by product specifications, spread topsoU using Ughtweight loader,
backhoe, or other power equipment Avoid sharp tums with equipment,
• Always consult the manufacturer's recommendations for instaUation,
• Do not drive tracked or heavy equipment over mat,
• Avoid any fraffic over matting if loose or wet soil conditions exist.
• Use shovels, rakes, or brooms for fine grading and touch up.
• Smooth out soU fiUing just exposing top netting of mat
Temporary Soil Stabilization Removal
m Temporary soU stabilization removed from the site of the work must be disposed of if
necessary.
Costs
Installed costs can be relatively high compared to other BMPs. Approximate costs for installed
materials are shown below:
November 2009 California Stormwater BMP Handbook 8 of 12
Construction
www.casqa.org
Geotextiles and Mats EC-7
Rolled Erosion Control Products Installed Cost per
Acre (2000)*
Estimated Cost
per Acre (2009)*
Biodegradable
Jute Mesh $6,000-$7,000 $6,6oo-$7,700
Biodegradable
Curled Wood Fiber $8,ooo-$io,50o $8,8oo-$ii,05o
Biodegradable
Straw $8,ooo-$io,50o $8,8oo-$u,050
Biodegradable Wood Fiber $8,ooo-$io,50o $8,8oo-$u,050 Biodegradable
Coconut Fiber $i3,ooo-$i4,ooo $i4,30o-$i5,400
Biodegradable
Coconut Fiber Mesh $30,ooo-$33,ooo $33.0oo-$36,30o
Biodegradable
Straw Coconut Fiber $10,000-$12,000 $U,000-$13,200
Non-Biodegradable
Plastic Netting $2,000-$2,200 $2,200-$2,220
Non-Biodegradable
Plastic Mesh $3,ooo-$3,SOO $3,300-$3,850
Non-Biodegradable Synthetic Fiber with Netting $34,ooo-$40,ooo $37^oo-$44,ooo Non-Biodegradable
Bonded ^thetic Fibers $45,ooo-$55,ooo $49.500-$6o,5oo
Non-Biodegradable
Combination with Biodegradable $30,ooo-$36,ooo $33.ooo-$39.6oo
1. Source: Erosion Control PUot StudyRepoit, Caltrans, June 2000.
2. aoo9 costs reflect a 10% escalation over year 2000 costs. Escalation based on infonnal survey of industty trends. Kote:
Expected cost inaease is of^t by competitive economic conditions.
Inspection and! Maintenance
• RECPs must be inspected in accordance with General Permit requirements for the
associated project type and risk leveL It is recommended that at a minimum, BMPs be
inspected weekly, prior to forecasted rain events, daily during extended rain events, and
after the conclusion of rain events.
> Areas where erosion is evident shaU be repaired and BMPs reapplied as soon as possible.
Care should be exercised to minimize the damage to protected areas while making repaii^, as
any area damaged will require reapplication of BMPs.
• If washout or breakage occurs, re-mstaU the material after repairing the damage to the slope
or channel.
• Make sure matting is uniformly in contact with the sofl,
• Check that aU the lap joints are secure,
• Check that staples are flush with tbe ground.
References
Erosion and Sediment Confrol Manual, Oregon Department of Environmental Qualify, February
2005
Erosion CJontrol Pilot Study Report, State of Califomia Department of Transportation
(Caltrans), June 2000,
Guides for Erosion and Sediment CJonfrols m CaUfomia, USDA Soils Conservation Service,
January 1991,
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
9 of 12
Geotextiles and Mats EC-7
National Managonent Measures to Control Nonpoint Source PoUution from Urt>an Areas,
United States Envfronmental Protection Agency, 2002.
Stormwater QuaUfy Handbooks Constraction Site Best Management Practices (BMPs) Manual,
State of cialifomia Department of Transportation (Caltrans), March 2003.
Guidance Document: SoU StabUization for Temporary Slopes, State of CaUfomia Department of
Transportation (Caltrans), November 1999.
Stonnwater Management ofthe Puget Sound Basin, Technical Manual, Publication #91-75.
Washington State Department of Ecology, Febmary 1992.
Water QuaUty Management Plan for The Lake Tahoe Region, Volume II, Handbook of
Management Practices, Tahoe Regional Planning Agency, November 1988.
November 2009 California Stormwater BMP Handbook 10 of 12
Constructton
www.casqa.org
e Geotextiles and Mats EC-7
•6" X 6" anchor trencti
Mots/blankets stiould
be installed vertically
downslope.
ISOMETRIC VIEW Fa^b^r^L'
TYPICAL SLOPE ' '^^^^ ^typicoi i
SOIL STABLIZATION
FITS
NOTES:
_Non-^woven
eotextile fitter
nder
treotment.
WET SLOPE LINING
NTS
1. Slope surfoce stioll be free of rocks, clods, sticks
and gross. Mots/blonkets sholl have good soil contoct.
2. Loy blankets loosely ond stoke or staple to nnaintoin
direct contoct with the soil. Do not stretch.
3. Install per monufocturer's recommendotions
TYPICAL INSTALLATION DETAIL
November 2009 California Stormwater BMP Handbook
construction
www.casqa.org
11 of 12
Geotextiles and Mats EC-7
INITIAL CHANNEL ANCHOR TRENCH
NTS
Stoke ot 3' to
5' intervals
TERMINAL SLOPE AND CHANNEL
ANCHOR TRENCH
NTS
Check slot at 25'-30' intervals
ISOMETRIC VIEW
NTS
r4" X 4"
onchor shoe
INTERMITTENT CHECK SLOT LONGITUDINAL ANCHOR TRENCH
NTS NTS
NOTES:
1. Check slots to be constructed per monufocturers specifications.
2. Stoking or stapling loyout per monufocturers specifications.
3. Install per manufacturer's recommendations
TYPICAL INSTALLATION DETAIL
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
12 of 12
Silt Fence SE-1
Description and Purpose
A silt fence is made of a woven geotextile that has been
entrenched, attached to supporting poles, and sometimes
backed by a plastic or wire mesh for support. The silt fence
detains sediment-laden water, promoting sedimentation
behind the fence.
Suitable Applications
Silt fences are suitable for perimeter control, placed below
areas where sheet flows discharge from the site. They could
also be used as interior controls belovv disturbed areas where
runoff may occur in the form of sheet and rill erosion and
around inlets within disturbed areas (SE-io). Silt fences are
generally ineffective in locations where the flow is concentrated
and are only applicable for sheet or overland flows. Silt fences
are most effective when used in combination with erosion
controls. Suitable applications include:
• Along the perimeter of a project.
• Below the toe or down slope of exposed and erodible slopes.
• Along streams and channels.
• Around temporarv' spoil areas and stockpiles.
• Around inlets.
• Below other small cleared areas.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stonnwater
Management Control
Waste Management and
Materials Pollution Control
0
Legend:
0 Primary Category
IS Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-5 Fiber Rolls
SE-6 Gravel Bag Berm
SE-8 Sandbag Bamer
SE-10 Storm Drain Inlet Protection
SE-14 Biofilter Bags
CASQA
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 8
Silt Fence SE-1
Limitations
• Do not use in streams, channels, drain inlets, or anywhere flow is concentrated.
• Do not use in locations where ponded water may cause a flooding hazard. Runoff tv picalh'
ponds temporarily on the upstream side of silt fence.
• Do not use silt fence to divert water flows or place across any contour line. Fences not
constmcted on a lev el contour, or fences used to divert flow will concentrate flows resulting
in additional erosion and possibly overtopping or failure of the silt fence.
• Improperly installed fences are subject to failure from undercutting, overtopping, or
collapsing.
• Not effective unless trenched and keyed in.
• Not intended for use as mid-slope protection on slopes greater than 4:1 (H:V).
• Do not use on slopes subject to creeping, slumping, or landslides.
Implementation
General
A silt fence is a temporary- sediment barrier consisting of woven geotextile stretched across and
attached to supporting posts, trenched-in, and, depending upon the strength of fabric used,
supported v\ith plastic or wire mesh fence. Silt fences trap sediment by intercepting and
detaining small amounts of sediment-laden mnoff from disturbed areas in order to promote
sedimentation behind the fence.
The following layout and installation guidance can improve performance and shouid be
followed:
• Use principally in areas where sheet flow occurs.
• Install along a level contour, so vvater does not pond more than 1.5 ft at any point along the
silt fence.
• The maximum length of slope draining to any point along the silt fence should be 200 ft or
less.
a The maximum slope perpendicular to the fence line should be i:i.
• Provide sufticient room for mnoff to pond behind the fence and to aUow sediment removal
equipment to pass between the silt fence and toes of slopes or other obstructions. About
1200 ft2 of ponding area should be provided for every acre draining to the fence.
• Turn the ends of the filter fence uphill to prevent stormwater from flowing around the fence.
• Leave an undisturbed or stabilized area immediately down slope from the fence where
feasible.
November 2009 California Stormwater BMP Handbook 2 of 8
Construction
www.casqa.org
Silt Fence SE-1
• Silt fences should remain in place until the disturbed area is permanently stabilized, after
which, the silt fence should be removed and properiy disposed.
• Silt fence should be used in combination with erosion source controls up slope in order to
provide the most effective sediment control.
• Be aware of local regulations regarding the t>pe and installation requirements of silt fence,
which may differ from those presented in this fact sheet.
Design and Layout
The fence should be supported by a plastic or wire mesh if the fabric selected does not have
sufficient strength and bursting strength characteristics for the planned application (as
recommended by the fabric manufacturer). Woven geotextile material should contain ultraviolet
inhibitors and stabilizers to provide a minimum of six months of expected usable construction
life at a temperature range of o °F to 120 °F.
• Layout in accordance with attached figures.
• For slopes steeper than 2:1 (H:V) and that contain a high number of rocks or large dirt clods
that tend to dislodge, it may be necessary to install additional protection immediately
adjacent to the bottom ofthe slope, prior to installing siU fence. Additional protection may
be a chain link fence or a cable fence.
• For slopes adjacent to sensitive receiving waters or Environmentally Sensitive Areas (ESAs),
silt fence should be used in conjunction v\ith erosion control BMPs.
Standard os. Heavy Duty Silt Fence
Standard SUt Fence
m Generally applicable in cases where the slope of area draining to the silt fence is 4:1
(H:V) or'less.
• Used for shorter durations, t>T3ically 5 months or less
• Area draining to fence produces moderate sediment loads.
Heavy Duty Silt Fence
• Use is generally limited to 8 months or less.
• Area draining to fence produces moderate sediment loads.
• Heavy duty silt fence usually has 1 or more of the following characteristics, not
possessed by standard silt fence.
o Fence fabric has higher tensile strength.
o Fabric is reinforced with wire backing or additional support.
o Posts are spaced closer than pre-manufactured, standard silt fence products.
o Posts are metal (steel or aluminum)
Materials
Standard Silt Fence
• Sih fence material should be woven geotextile with a minimum width of 36 in. and a
minimum tensile strength of 100 lb force. The fabric should conform to the requirements in
ASTM designation D4632 and should have an integral reinforcement layer. The
November 2009 California Stormwater BMP Handbook 3 of 8
Construction
www.casqa.org
Silt Fence SE-1
reinforcement layer should be a polypropylene, or equivalent, net provided by the
manufacturer. The permittivity of the fabric should be between o.i sec ' and 0.15 sec ' in
conformance with the requirements in ASTM designation D4491-
• Wood stakes should be commercial quality lumber of the size and shape shown:i on the plans.
Each stake should be free from decay, splits or cracks longer than the thickness of the stake
or other defects that would weaken the stakes and cause the stakes to be stmcturally
unsuitable.
• Staples used to fasten the fence fabric to the stakes should be not less than 1.75 in. long and
should be fabricated from 15 gauge or heavier wire. The wire used to fasten the tops ofthe
stakes together when joining two sections of fence should be 9 gauge or heavier wire.
Galvanizing of the fastening wire will not be required.
Heav^'-Dutv Silt Fence
• Some silt fence has a wire backing to provide additional support, and there are products that
may use prefabricated plastic holders for the silt fence and use metal posts or bar
reinforcement instead of wood stakes. If bar reinforcement is used in lieu of wood stakes,
use number four or greater bar. Provide end protection for any exposed bar reinforcement
for health and safety purposes.
Installation Guidelines - Traditional Method
Silt fences are to be constructed on a level contour. Sufficient area should exist behind the fence
for ponding to occur without flooding or overtopping the fence.
• A trench should be excavated approximately 6 in. wide and 6 in. deep along the line of the
proposed silt fence (trenches should not be excavated wider or deeper than necessary for
proper silt fence installation).
• Bottom of the sUt fence should be keyed-in a minimum of 12 in.
• Posts should be spaced a maximum of 6 ft apart and driven securely into the ground a
minimum of 18 in. or 12 in. below the bottom ofthe trench.
• When standard strength geotextile is used, a plastic or wire mesh support fence should be
fastened securely to the upslope side of posts using heavy-duty wire staples at least 1 in.
long. The mesh should extend into the trench.
• When extra-strength geotextile and closer post spacing are used, the mesh support fence
may be eliminated.
• Woven geotextile should be purchased in a long roll, then cut to the length of the barrier.
When joints are necessar>', geotextile should be spliced together only at a support post, with
a minimum 6 in. overlap and both ends securely fastened to the post.
• The trench should be backfilled vsith native material and compacted.
• Construct silt fences with a setback of at least 3 ft from the toe of a slope. Where, due to
specific site conditions, a 3 ft setback is not available, the silt fence may be constmcted at the
November 2009 California Stormwater BMP Handbook 4 of 8
Construction
www.casqa.org
Silt Fence SE-1
toe ofthe slope, but should be constmcted as far from the toe of the slope as practicable. SiU
fences close to the toe ofthe slope will be less effective and more difficult to maintain.
• Construct the length of each reach so that the change in base elevation along the reach does
not exceed 1/3 the height of the barrier; in no case should the reach exceed 500 ft.
• Cross barriers should be a minimum of '/a and a maximum of V2 the height of the linear
barrier.
• See typical installation details at the end of this fact sheet.
Installation Guidelines - Static Slicing Method
m Static Slicing is defined as insertion of a narrow blade pulled behind a tractor, similar to a
plow blade, at least 10 inches into the soil while at the same time puHing silt geotextile fabric
into the ground through the opening created by the blade to the depth of the blade. Once the
gerotextile is installed, the soil is compacted using tractor tires.
• This method will not work with pre-fabricated, wire backed silt fence.
• Benefits:
o Ease of instaUation (most often done with a 2 person crew). In addition,
installation using static slicing has been found to be more efficient on slopes, in
rocky soils, and in saturated soils.
o Minimal soil disturbance.
o Greater level of compaction along fence, leading to higher performance (i.e.
greater sediment retention).
o Uniform installation.
o Less susceptible to undercutting/undermining.
Costs
• It should be noted that costs var>' greatly across regions due to available supplies and labor
costs.
• Average annual cost for installation using the traditional silt fence installation method
(assumes 6 month useful life) is $7 per linear foot based on vendor research. Range of cost
is $3.50 - $9.10 per linear foot.
• In tests, the slicing method required 0.33 man hours per 100 linear feet, while the trenched
based systems required as much as 1.01 man hours per linear foot.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Repair undercut silt fences.
November 2009 California Stormwater BMP Handbook 5 of 8
Construction
www.casqa.org
Silt Fence SE-1
• Repair or replace split, torn, slumping, or weathered fabric. The lifespan of silt fence fabric
is generally 5 to 8 months.
• Silt fences that are damaged and become unsuitable for the intended purpose should bc
removed from the site of work, disposed, and replaced with new silt fence barriers.
• Sediment that accumulates in the BMP should be periodically removed in order to maintain
BMP effectiveness. Sediment should be removed when the sediment accumulation reaches
one-third ofthe barrier height.
• Silt fences should be left in place until the upstream area is permanently stabilized. Until
then, the silt fence should be inspected and maintained regularly.
• Remove silt fence when upgradient areas are stabilized. Fill and compact post holes and
anchor trench, remove sediment accumulation, grade fence alignment to blend with adjacent
ground, and stabilize disturbed area.
References
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995-
National Management Measures to Control Nonpoint Source Pollution from Urban Areas,
United States Environmental Protection Agency, 2002.
Proposed Guidance Specifving Management Measures for Sources of Nonpoint Pollution in
Coastal Waters, Work Group-Working Paper, USEPA, April 1992.
Sedimentation and Erosion Control Practices, and Inventory of Current Practices (Draft),
UESPA, 1990.
Southeastern Wisconsin Regional Planning Commission (SWRPC). Costs of Urban Nonpoint
Source Water Pollution Control Measures. Technical Report No. 31. Southeastern Wisconsin
Regional Planning Commission, Waukesha, WI. 1991
Stormwater Quality' Handbooks - Constmction Site Best Management Practices (BMPs) Manual.
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Management Manual for The Puget Sound Basin, Washington State Department of
Ecology, Public Review Draft, 1991-
U.S. Environmental Protection Agency (USEPA). Stormwater Management for Industrial
Activities: Developing Pollution Prevention Plans and Best Management Practices. U.S.
Environmental Protection Agency, Office of Water, Washington, DC, 1992.
Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of
Management Practices, Tahoe Regional Planning Agencj', November i988.Soil Stabilization
BMP Research for Erosion and Sediment Controls: Cost Survey Technical Memorandum, State
of California Department of Transportation (CaUrans), July 2007.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, Februarv
2005.
November 2009 California Stormwater BMP Handbook 6 of 8
Construction
www.casqa.org
o <
3 cr
o o
vo
C'ow barrlor ;Se« nole 10)
Mm reach - SOO' fSw ncte I'i
Optlortof mointRnance
LEGEND
Tomp»<3 btx* flu
Slope fflrection
DInictInn nt Anw
VT lo« of alope
Crods fc«rr?«r-
•n
3
O
End detal
Qi
I § 3
n " S
Ql ^ cu
a n 2
b o 01
cr o o
o
00
). Const-uct ttw ienqtti of wx* reach >o t->al (he ct-enge h tKoe
elevatlor eons the reoch does not eiceeti }/Z the height of the linear borrier. in no cose ifidl the reach tength exceec 500
2- The lost B'-O* of fence thoU bc iLmed stope.
3. Stoke enrenslors ore nom*wl
4. Uimensicft "nay vary to f^t netd condllion.
5 Stokes sholl Be spaced ot 8'-C* mo«nuir and eholl be
posttloned on dowrstreom ^de of fence.
6. Stekee lo overlap ord renee fobric to told enuna eeeh stoke
one full tum. Seeure fobr^ to stoke with 4 staples.
7. Stakes atiul be fkivun ti'qItUy logether lo prevent putenlTiJ
fow-through of sedinent ot }»nt. The taps of the stoSies shdl Be secured with wire.
B. For end etofce. fenoe fabric atwll be folded o'aund t*o atoices
ore full turf' 0-K: secured wtlh 4 stoplee
0 M'<nk-ium 4 strptes per etc^e. O'menilons showi ore tysicttf
'0 Cross boitters snpli be o mni-mur of 1/3 ond a meitlmjn of 1/2 the
height of tt>e Ibeor borrier.
11. Mointenonce cpenlnqs shot be constructed In c monner lo ensure
sedirrenl fomalns beland tUl fence.
12 Joining sedions «iai not be pioced cl eump locetions.
13 SoKSiag rows and loyers shall be offxe- to elkrl^le goes.
'4 Add 3-4 Dojs to cross borrier on aownyodient side sf sM lenes cs
needed to prevent byooss o- undermrln; one ae oHowcble boeed on
site IWi'ts of dtstu-bonca.
See tlote 14
,— SU fence
^y-To. of •iope
CROSS BARRIER OETAIL
See 'H)te 10
<5-C^0N C-C 0)
m
I
z o <
(B 3 cr
(B
-1
IV) o o to
9
I n g l§ I
•9 Q. 2
IB JT -I
b 9 w
X
01
a cr o o
CD
O
(Sec f^ote 4)
X 'J~ WoDd .it<ik«
(See notes ..^ * f,)
apfoii A
Si C UOH A A
IJCTAIi A
Tohr't. setttod A
(Scf notes a / i 12)
G....lti:L!l9^...iJL[Aikl!fill Vitw]
7x7 wood ^tol<e
ENO SfAKl Ot TAIL (roP VltW)
( Nu 01 i Ai;,
fomped back fti)
Stope dlrectton
1 r 1/16" '""=|]
diomplei —
SrA(=l l, or I All.
(sti: Non; 9)
* - Stoke
y
.1 \.
pIMiONAL MA!^lI(^M^JC! (.W'lNiNG OCi AIL
ISi i NOIL in
(A
Tl
(D
3
O
m
Check Dams SE-4
Description and Purpose
A check dam is a small barrier constructed of rock, gravel bags,
sandbags, fiber rolls, or other proprietar>' products, placed
across a constructed swale or drainage ditch. Check dams
reduce the effective slope of the channel, thereby reducing
scour and channel erosion by reducing flow velocity and
increasing residence time within the channel, allowing
sediment to settle.
Suitable Appiications
Check dams may be appropriate in the following situations:
• To promote sedimentation behind the dam.
• To prevent erosion by reducing the velocity of channel flow
in small intermittent channels and temporarv' swales.
• In small open channels that drain lo acres or less.
• In steep channels where stormwater runoff velocities
exceed 5 ft/s.
• During the establishment of grass linings in drainage
ditches or channels.
• In temporary ditches where the short length of service does
not warrant establishment of erosion-resistant linings.
• To act as a grade control structure.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
0
Legend:
0 Primary Category
111 Secondary Category
Targeted Constituents
Sediment
Nutrients
Trasti
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-5 Fiber Rolls
SE-6 Gravel Bag Berm
SE-8 Sandbag Barner
SE-14 Biofilter Bags
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 7
Check Dams SE-4
Limitations
• Not to be used in live streams or in channels v\ith extended base flows.
• Not appropriate in channels that drain areas greater than lo acres.
• Not appropriate in channels that are already grass-lined unless erosion potential or
sediment-laden flow is expected, as installation may damage vegetation.
• Require extensive maintenance follov%ing high velocity flows.
• Promotes sediment trapping which can be re-suspended during subsequent storms or
removal of the check dam.
• Do not construct check dams with straw bales or silt fence.
•
Water suitable for mosquito production may stand behind check dams, particularly if
subjected to daily non-stormwater discharges.
Implementation
GeneraZ
Check dams reduce the effective slope and create small pools in swales and ditches that drain lo
acres or less. Using check dams to reduce channel slope reduces the velocity of stormwater
flows, thus reducing erosion of the swale or ditch and promoting sedimentation. Thus, check
dams are dual-purpose and serve an important role as erosion controls as well as as sediment
controls. Note that use of 1-2 isolated check dams for sedimentation will likely result in little net
removal of sediment because of the small detention time and probable scour during longer
storms. Using a series of check dams will generally increase their effectiveness. A sediment trap
(SE-3) may be placed immediately upstream of the check dam to increase sediment removal
efficienc)'.
Design and Layout
Check dams work by decreasing the effective slope in ditches and swales. An important
consequence of the reduced slope is a reduction in capacity of the ditch or swale. This reduction
in capacity should be considered when using this BMP, as reduced capacity can result in
overtopping of the ditch or swale and resultant consequences. In some cases, .such as a
"permanent" ditch or swale being constructed early and used as a "temporary'" convevance for
construction flows, the ditch or swale may have sufficient capacity such that the temporarv'
reduction in capacity due to check dams is acceptable. When check dams reduce capacities
beyond acceptable limits, either:
• Don't use check dams. Consider alternativ e BMPs, or.
• Increase the size of the ditch or swale to restore capacity.
Maximum slope and velocity reduction is achieved when the toe of the upstream dam is at the
same elevation as the top of the downstream dam (see "Spacing Between Check Dams" detail at
the end of this fact sheet). The center section of the dam should be lower than the edge sections
(at least 6 inches), acting as a spillway, so that the check dam will direct flows to the center of
November 2009 California Stormwater BMP Handbook 2 of 7
Construction
www.casqa.org
Check Dams SE-4
the ditch or swale (see "T>'pical Rock Check Dam" detail at the end of this fact sheet). Bv'pass or
side-cutting can occur if a sufficient spillway is not provided in the center ofthe dam.
Check dams are usually constructed of rock, gravel bags, sandbags, and fiber rolls. A number of
products can also be used as check dams (e.g. HDPE check dams, temporary silt dikes (SE-12)),
and some of these products can be removed and reused. Check dams can also be constructed of
logs or lumber, and have the advantage of a longer lifespan when compared to gravel bags,
sandbags, and fiber rolls. Check dams should not be constructed from straw bales or silt fences,
since concentrated flows quickly wash out these materials.
Rock check dams are usually constructed of 8 to 12 in. rock. The rock is placed either by hand or
mechanically, but never just dumped into the channel. The dam should completely span the
ditch or swale to prevent washout. The rock used should be large enough to stay in place given
the expected design flow through the channel. It is recommended that abutments be extended
18 in. into the channel bank. Rock can be graded such that smaller diameter rock (e.g. 2-4 in) is
located on the upstream side of larger rock (holding the smaller rock in place); increasing
residence time.
Log check dams are usually constructed of 4 to 6 in. diameter logs, installed vertically. The logs
should be embedded into the .soil at least 18 in. Logs can be bolted or wired to vertical support
logs that have been driven or buried into the soil.
See fiber rolls, SE-5, for installation of fiber roll check dams.
Gravel bag and sand bag check dams are constructed by stacking bags across the ditch or swale,
shaped as shown in the drawings at the end of this fact sheet (see "Graved Bag Check Dam" detail
at the end of this fact sheet).
Manufactured products, such as temporarv' silt dikes (SE-12), should be installed in accordance
with the manufacturer's instructions. Installation t>T)ically requires anchoring or trenching of
products, as well as regular maintenance to remove accumulated sediment and debris.
If grass is planted to stabilize the ditch or swale, the check dam should be removed vvhen the
grass has matured (unless the slope of the swales is greater than 4%).
The following guidance should be followed for the design and layout of check dams:
• Install the first check dam approximately 16 ft from the outfall device and at regular
inten-als based on slope gradient and soil type.
• Check dams should bc placed at a distance and height to allow smal! pools to form between
each check dam.
• For multiple check dam installation, backwater from a downstream check dam should reach
the toes of the upstream check dam.
• A sediment trap provided immediately upstream of the check dam will help capture
sediment. Due to the potential for this sediment to be resuspended in subsequent storms,
the sediment trap should be cleaned following each storm event.
November 2009 California Stormwater BMP Handbook 3 of 7
Construction
www.casqa.org
Check Dams SE-4
• High flows (t>'pically a 2-year storm or larger) should safely flow over the check dam without
an increase in upstream flooding or damage to the check dam.
• Where grass is used to line ditches, check dams should be removed when grass has matured
sufficiently to protect the ditch or swale.
Materials
• Rock used for check dams should typically be 8-12 in rock and be sufficiently sized to stay in
place given expected design flows in the channel. Smaller diameter rock (e.g. 2 to 4 in) can
be placed on the upstream side of larger rock to increase residence time.
• Gravel bags used for check dams should conform to the requirements of SE-6, Gravel Bag
Berms.
• Sandbags used for check dams should conform to SE-8, Sandbag Barrier.
• Fiber rolls used for check dams should conform to SE-5, Fiber Rolls.
• Temporary silt dikes used for check dams should conform to SE-12, Temporar>' Silt Dikes.
InstaHation
• Rock should be placed individually by hand or by mechanical methods (no dumping of rock)
to achieve complete ditch or swale coverage.
• Tightly abut bags and stack according to detail shown in the figure at the end of this section
(pyramid approach). Gravel bags and sandbags should not be stacked any higher than 3 ft.
• Upper rows or gravel and sand bags shall overlap joints in lower rows.
• Fiber rolls should be trenched in, backfilled, and firmly staked in place.
• Install along a level contour.
• HDPE check dams, temporarj' silt dikes, and other manufactured products should be u.sed
and installed per manufacturer specifications.
Costs
Cost consists of labor costs if materials are readily available (such as gravel on-site). If material
must be imported, costs vsill increase. For other material and installation costs, see SE-5, SE-6,
SE-8, SE-12. and SE-14.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the a.ssociated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Replace missing rock, bags, rolls, etc. Replace bags or rolls that have degraded or have
become damaged.
November 2009 California Stormwater BMP Handbook 4 of 7
Construction
www.casqa.org
Check Dams SE-4
• If the check dam is used as a sediment capture device, sediment that accumulates behind the
BMP should be periodically removed in order to maintain BMP effectiveness. Sediment
should be removed when the sediment accumulation reaches one-third of the barrier height.
• If the check dam is used as a grade control structure, sediment removal is not required as
long as the system continues to control the grade.
• Inspect areas behind check dams for pools of standing water, especially if subjected to daily
non-stormwater discharges.
• Remove accumulated sediment prior to permanent seeding or soil stabilization.
• Remove check dam and accumulated sediment when check dams are no longer needed.
References
Draft - Sedimentation and Erosion Control, and Inventor}' of Current Practices, USEPA, April
1990.
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual.
State of California Department of Transportation (CaUrans), March 2003.
Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #9i-75r
Washington State Department of Ecology, February 1992.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, Februaiy
2005.
Metzger, M.E. 2004. Managing mosquitoes in stormwater treatment devices. University of
California Division of Agriculture and Natural Resources, Publication 8125. On-line: http://
anrcatalog.ucdavis.edu/pdf/8125.pdf
November 2009 California Stormwater BMP Handbook 5 of 7
Construction
www.casqa.org
Check Dams SE-4
L. VA^iON
B" io 12"
d^oTeter rock
'VP, KOCK CHECK '": A K / T I ^ ^- •
K CK DAM
D SCALL
^ VL AM LL_E A M'MX
NOT TO SCAl
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
6 of 7
Check Dams SE-4
THE DISTANCE SUCH THAT POINTS 'A' AND
'B' ARE OF EOUAL ELEVATION.
SPACING BETWEEN CHECK DAMS
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
7 of 7
Fiber Rolls SE-5
Description and Purpose
A fiber roll consists of straw, coir, or other biodegradable
materials bound into a tight tubular roll wnrapped by netting,
vvhich can be photodegradable or natural. Additionally, gravel
core fiber rolls are available, which contain an imbedded ballast
material such as gravel or sand for additional weight when
staking the rolls are not feasible (such as use as inlet
protection). When fiber rolls are placed at the toe and on the
face of slopes along the contours, they intercept runoff, reduce
its flow velocity, release the runoff as sheet flow, and provide
removal of sediment from the runoff (through sedimentation).
By interrupting the length of a slope, fiber rolls can also reduce
sheet and rill erosion until vegetation is established.
Suitable Appiications
Fiber rolls may be suitable:
• Along the toe, top, face, and at grade breaks of exposed and
erodible slopes to shorten slope length and spread runoff as
sheet flow.
• At the end of a downward slope where it transitions to a
steeper slope.
• Along the perimeter of a project.
• As check dams in unlined ditches vsith minimal grade.
• Down-slope of exposed soil areas.
• At operational storm drains as a form of inlet protection.
Categories
EC Erosion Control H
SE Sediment Control 0
TC Tracking Control
WE Wind Eroston Control
NS Non-Stormwater
Management Control
WM Waste Management and
Materials Pollufion Control
Legend:
0 Primary Category
@ Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-1 Silt Fence
SE-6 Gravel Bag Berm
SE-8 Sandbag Bamer
SE-14 Biofilter Bags
t AtlHJRM\*.TilsMW.\Tft4
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 5
Fiber Rolls SE-5
• Around temporary stockpiles.
Limitations
• Fiber rolls are not effective unless trenched in and staked.
• Not intended for use in high flow situations.
• Difficult to move once saturated.
• If not properly staked and trenched in. fiber rolls could be transported by high flows.
• Fiber rolls have a very limited sediment capture zone.
• Fiber rolls should not be used on slopes subject to creep, slumping, or landslide.
• Rolls typically function for 12-24 months depending upon local conditions.
Implementation
Fiber RoU Materials
m Fiber rolls should be prefabricated.
• Fiber rolls may come manufactured containing polyacrjiamide (PAM), a flocculating agent
within the roll. Fiber rolls impregnated with PAM provide additional sediment removal
capabilities and should be used in areas with fine, clayey or silty soils to provide additional
sediment removal capabilities. Monitoring may be required for these installations.
• Fiber rolls are made from weed free rice straw, flax, or a similar agricultural material bound
into a tight tubular roll by netting.
• T^-pical fiber rolls vary in diameter from 9 in. to 20 in. Larger diameter rolls are available as
well.
Installation
m Locate fiber rolls on level contours spaced as follows:
Slope inclination of 4:1 (H:V) or flatter: Fiber rolls should be placed at a maximum
interval of 20 ft.
Slope inclination between 4:1 and 2:1 (H:V): Fiber Rolls should be placed at a maximum
interval of 15 ft. (a closer spacing is more effective).
Slope inclination 2:1 (H:VO or greater: Fiber Rolls should be placed at a maximum
interval of 10 ft. (a closer spacing is more effective).
• Prepare the slope before beginning installation.
• Dig small trenches across the slope on the contour. The trench depth should be V4 to 1/3 of
the thickness of the roll, and the width should equal the roll diameter, in order to provide
area to backfill the trench.
November 2009 California Stormwater BMP Handbook 2 of 5
Construction
www.casqa.org
Fiber Rolls SE-5
• It is critical that rolls are installed perpendicular to water movement, and parallel to the
slope contour.
• Start building trenches and installing rolls from the bottom of the slope and work up.
• It is recommended that pilot holes be driven through the fiber roll. Use a straight bar to
drive holes through the roll and into the soi! for the wooden stakes.
• Turn the ends of the fiber roll up slope to prevent runoff from going around the roll.
• Stake fiber rolls into the trench.
- Drive stakes at the end of each fiber roll and spaced 4 ft maximum on center.
- Use wood stakes with a nominal classification of 0.75 by 0.75 in- and minimum length of
24 in.
• If more than one fiber roll is placed in a row, the rolls should be overiapped, not abutted.
• See t>'pical fiber roll installation details at the end of this fact sheet.
Removal
m Fiber rolls can be left in place or removed depending on the type of fiber roll and application
(temporary vs. permanent installation). T>'pically, fiber rolls encased v%ith plastic netting are
used for a temporary application because the netting does not biodegrade. Fiber rolls used in
a permanent application are tj'pically encased with a biodegradeable material and are left in
place. Removal of a fiber roll used in a permanent application can result in greater
disturbance.
• Temporary installations should only be removed when up gradient areas are stabilized per
General Permit requirements, and/or pollutant sources no longer present a hazard. But, they
should also be removed before vegetation becomes too mature so that the removal process
does not disturb more soil and vegetation than is necessar>'.
Costs
Material costs for regular fiber rolls range from $20 - S30 per 25 ft roll.
Material costs for PAM impregnated fiber rolls range between 7.00-89-00 per linear foot, based
upon vendor research.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Repair or replace split, torn, unraveling, or slumping fiber rolls.
• If the fiber roll is used as a sediment capture device, or as an erosion control device to
maintain sheet flows, sediment that accumulates in the BMP should be periodically removed
November 2009 California Stormwater BMP Handbook 3 of 5
Construction
www.casqa.org
Fiber Rolls SE-5
in order to maintain BMP effectiveness. Sediment should be removed when sediment
accumulation reaches one-third the designated sediment storage depth.
• If fiber rolls are used for erosion control, such as in a check dam, sediment removal should
not be required as long as the system continues to control the grade. Sediment control
BMPs will likely be required in conjunction v\ith this type of application.
• Repair any rills or gullies promptly.
References
Stormwater Quality' Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of Califomia Department of Transportation (Caltrans), March 2003.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, Februarv'
2005.
November 2009 California Stormwater BMP Handbook 4 of 5
Construction
www.casqa.org
Fiber Rolls SE-5
•r-stoH f'Der- rc 1
cio«a a >e»e' conto-f
Vertical spccina
'neos...''ea sioi^g the
face o5 tbe siope
verges Detweeri
•0' ar^a 20'
ser io!t neor
sioDe where 't I'cnsltom
I'ntn 0 Sleep*' s-ope
N.l.S.
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
Sof 5
Gravel Bag Berm SE-6
Description and Purpose
A gravel bag berm is a series of gravel-filled bags placed on a
level contour to intercept sheet flows. Gravel bags pond sheet
flow runoff, allowing sediment to settle out, and release runoff
slowly as sheet flow, preventing erosion.
Suitable Applications
Gravel bag berms may be suitable:
• As a linear sediment contro! measure:
- Below the toe of slopes and erodible slopes
- As sediment traps at culvert/pipe outlets
- Below other small cleared areas
- Along the perimeter of a site
Down slope of exposed soil areas
- Around temporarv' stockpiles and spoil areas
- Parallel to a roadway to keep sediment off paved areas
- Along streams and channels
• As a linear erosion control measure:
- Along the face and at grade breaks of exposed and erodible
slopes to shorten slope length and spread runoff as sheet
flow.
Categories
EC Erosion Control 11
SE Sediment Control 0
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater
Management Control
WM Waste Management and
Materids Pollution Control
Legend:
0 Primary Category
(El Secondary Category
Targeted Constituents
Sediment
Nutrients
Trasti
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-1 Silt Fence
SE-5 Fiber Roll
SE-8 Sandbag Bamer
SE-14 Biofllter Bags
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Gravel Bag Berm SE-6
- At the top of slopes to divert runoff away from disturbed slopes.
- As chevTons (small check dams) across mildly sloped construction roads. For use check
dam use in channels, see SE-4, Check Dams.
Limitations
• Gravel berms may be difficult to remove.
• Removal problems limit their usefulness in landscaped areas.
• Gravel bag berm may not be appropriate for drainage areas greater than 5 acres.
• Runoff will pond upstream of the berm, possibly causing flooding if sufficient space does not
exist.
• Degraded gravel bags may rupture when removed, spilling contents.
• Installation can be labor intensive.
• Durability of gravel bags is somewhat limited and bags may need to be replaced when
installation is required for longer than 6 months.
• Easily damaged by construction equipment.
• When used to detain concentrated flows, maintenance requirements increase.
Implementation
Genera/
A gravel bag berm consists of a row of open graded gravel-filled bags placed on a level contour.
When appropriately placed, a gravel bag berm intercepts and slows sheet flow runoff, causing
temporary' ponding. The temporary ponding allows sediment to settle. The open graded gravel
in the bags is porous, which allows the ponded runoff to flow slowly through the bags, releasing
the runoff as sheet flows. Gravel bag berms also interrupt the slope length and thereby reduce
erosion by reducing the tendency of sheet flows to concentrate into rivulets, which erode rills,
and ultimately gullies, into disturbed, sloped soils. Gravel bag berms are similar to sand bag
barriers, but are more porous. Generally, gravel bag berms should be used in conjunction with
temporar>' soil stabilization controls up slope to provide effective erosion and sediment control.
Design and Layout
• Locate gravel bag berms on level contours.
• When used for slope interruption, the following slope/sheet flow length combinations apply:
- Slope inclination of 4:1 (H:V) or flatter: Gravel bags should be placed at a maximum
interval of 20 ft, with the first row near the slope toe.
- Slope inclination between 4:1 and 2:1 (H:V): Gravel bags should be placed at a
maximum intei-val of 15 fl. (a closer spacing is more effective), with the first row near the
slope toe.
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Gravel Bag Berm SE-6
Slope inclination 2:1 (H:\0 or greater: Gravel bags should be placed at a maximum
interval of 10 ft. (a closer spacing is more effective), with the first row near the slope toe.
• Turn the ends of the gravel bag barriers up slope to prevent runoff from going around the
berm.
• Allow sufficient space up slope from the gravel bag berm to allow ponding, and to provide
room for sediment storage.
• For installation near the toe of the slope, gravel bag barriers should be set back from the
slope toe to facilitate cleaning. Where specific site conditions do not allow for a set-back, the
gravel bag barrier may be constructed on the toe of the slope. To prevent flows behind the
barrier, bags can be placed perpendicular to a berm to serve as cross barriers.
• Drainage area should not exceed 5 acres.
• In Non-Traffic Areas:
- Height = 18 in. maximum
- Top width = 24 in. minimum for three or more layer construction
- Top width = 12 in. minimum for one or two layer construction
- Side slopes = 2:1 (H:V) or flatter
• In Construction Traffic Areas:
Height = 12 in. maximum
- Top width = 24 in. minimum for three or more layer construction.
- Top width = 12 in. minimum for one or two layer construction.
- Side slopes = 2:1 (H:V) or flatter.
• Butt ends of bags tightly.
• On multiple row, or multiple layer construction, overlap butt joints of adjacent row and row-
beneath.
• Use a pyramid approach when stacking bags.
Materiak
• Bag Material: Bags should be woven pol>'propylene, polyethylene or polyamide fabric or
buriap, minimum unit weight of 4 ounces/yd^ Mullen burst strength exceeding 300 Ib/in^ in
conformance with the requirements in ASTM designation D3786, and ultraviolet stability
exceeding 70% in conformance with the requirements in ASTM designation D4355.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Gravel Bag Berm SE-6
• Bag Sixe: Each gravel-filled bag should have a length of 18 in., width of 12 in., thickness of
3 in., and mass of approximately 33 lbs. Bag dimensions are nominal, and may var>' based
on locally available materials.
• FiM Material: Fill material should be 0.5 to 1 in. crushed rock, clean and free from clay,
organic matter, and other deleterious material, or other suitable open graded, non-cohesive,
porous gravel.
Costs
Material costs for gravel bags are average and are dependent upon material availability. S2.50-
3.00 per filled gravel bag is standard based upon vendor research.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Gravel bags exposed to sunlight will need to be replaced every' two to three months due to
degrading of the bags.
• Reshape or replace gravel bags as needed.
• Repair washouts or other damage as needed.
• Sediment that accumulates in the BMP should be periodically removed in order to maintain
BMP effectiveness. Sediment should be removed when the sediment accumulation reaches
one-third of the barrier height.
• Remove gravel bag berms when no longer needed and recycle gravel fill whenever possible
and properly dispose of bag material. Remove sediment accumulation and clean, re-grade,
and stabilize the area.
References
Handbook of Steel Drainage and Highway Construction, American Iron and Steel Institute,
1983.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual.
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Pollution Plan Handbook, First Edition, State of California, Department of
Transportation Division of New Technology, Materials and Research, October 1992.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, Februarv'
2005.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
street Sweeping and Vacuuming SE-7
Description and Purpose
Street sweeping and vacuuming includes use of self-propelled
and walk-behind equipment to remove sediment from streets
and roadways, and to clean paved surfaces in preparation for
final paving. Sweeping and vacuuming prevents sediment from
the project site from entering storm drains or receiving waters.
Suitable Applications
Sweeping and vacuuming are suitable anywhere sediment is
tracked from the project site onto public or private paved
streets and roads, typically at points of egress. Sweeping and
vacuuming are also applicable during preparation of paved
surfaces for final paving.
Limitations
Sweeping and vacuuming may not be effective when sediment
is wet or when tracked soil is caked (caked soil may need to be
scraped loose).
Implementation
• Controlling the number of points where vehicles can leave
the site will allow sweeping and vacuuming efforts to be
focused, and perhaps save money.
• Inspect potential sediment tracking locations daily.
• Visible sediment tracking should be swept or vacuumed on
a daily basis.
• Do not use kick brooms or sweeper attachments. These
tend to spread the dirt rather than remove it.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
il
0
Legend:
0 Primary Objective
IEI Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
Potential Alternatives
None
'4-
t AHinK.MA-^HrKMrtAMH
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 2
street Sweeping and Vacuuming SE-7
• If not mixed with debris or trash, consider incorporating the removed sediment back into
the project
Costs
Rental rates for self-propelled sweepers var>' depending on hopper size and duration of rental.
Expect rental rates from $58/hour (3 yds hopper) to $88/hour (9 yda hopper), plus operator
costs. Hourly production rates vary with the amount of area to be swept and amount of
sediment. Match the hopper size to the area and expect sediment load to minimize time spent
dumping.
Inspection and Maintenance
• Inspect BMPs prior to forecast rain, daily during extended rain events, after rain events,
weekly during the rainy season, and at two-week intervals during the non-rainy season.
• When actively in use, points of ingress and egress must be inspected daily.
• When tracked or spilled sediment is observed outside the construction limits, it must be
removed at least daily. More frequent removal, even continuous removal, may be required
in some jurisdictions.
• Be careful not to sweep up any unknown substance or any object that may be potentially
hazardous.
• Adjust brooms frequently; maximize efficiency of sweeping operations.
• After sweeping is finished, properly dispose of sweeper wastes at an approved dumpsite.
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Calfrans), November 2000.
Labor Surcharge and Equipment Rental Rates, State of CaUfornia Department of Transportation
(Caltrans), April 1,2002 - March 31, 2003.
November 2009 California Stormwater BMP Handbook 2 of 2
Construction
www.casqa.org
Sandbag Barrier SE-8
Description and Purpose
A sandbag barrier is a series of sand-filled bags placed on a
level contour to intercept or to divert sheet flows. Sandbag
barriers placed on a level contour pond sheet flow runoff,
allowing sediment to settle out.
Suitable Applications
Sandbag barriers may be suitable:
• As a linear sediment control measure:
- Below the toe of slopes and erodible slopes.
- As sediment traps at culvert/pipe outlets.
- Below other small cleared areas.
Along the perimeter of a site.
Down slope of exposed soil areas.
- Around temporar}' stockpiles and spoil areas.
- Parallel to a roadway to keep sediment off paved areas.
- Along streams and channels.
• As linear erosion control measure:
- Along the face and at grade breaks of exposed and erodible
slopes to shorten slope length and spread runoff as sheet
flow.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
11
0
NS
WM Materials Pollufion Control
Legend:
0 Primary Category
IE! Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-1 Silt Fence
SE-5 Fiber Rolls
SE-6 Gravel Bag Berm
SE-14 Biofllter Bags
tAIIK>nMAS7t)KMlVAIf 14
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 6
Sandbag Barrier SE-8
- At the top of slopes to divert runoff away from disturbed slopes.
- As check dams across mildly sloped construction roads.
Limitations
• It is necessary- to limit the drainage area upstream of the barrier to 5 acres.
• Sandbags are not intended to be used as filtration devices.
• Easily damaged by construction equipment.
• Degraded sandbags may rupture when removed, spilling sand.
• Sand is easily transported by runoff if bag is damaged or ruptured.
• Installation can be labor intensive.
• Durability of sandbags is somewhat limited and bags may need to be replaced when
installation is required for longer than 6 months. When used to detain concentrated flows,
maintenance requirements increase.
• Burlap should not be used for sandbags.
Implementation
Genera/
A sandbag barrier consists of a row of sand-filled bags placed on a level contour. When
appropriately placed, a sandbag barrier intercepts and slows sheet flow runoff, causing
temporary ponding. The temporary ponding allows sediment to settle. Sand-filled bags have
limited porosity, which is further limited as the fine sand tends to quickly plug with sediment,
limiting or completely blocking the rate of flow through the barrier. If a porous barrier is
desired, consider SE-i, Silt Fence, SE-5, Fiber Rolls, SE-6, Gravel Bag Berms or SE-14, Biofilter
Bags. Sandbag barriers also interrupt the slope length and thereby reduce erosion by reducing
the tendency of sheet flows to concentrate into rivulets which erode rills, and ultimately gullies,
into disturbed, sloped soils. Sandbag barriers are similar to gravel bag berms, but less porous.
Generally, sandbag barriers should be used in conjunction with temporary soil stabilization
controls up slope to provide effective erosion and sediment control.
Design and Layout
m Locate sandbag barriers on a level contour.
• When used for slope interruption, the following slope/sheet flow length combinations apply:
- Slope inclination of 4:1 (H:V) or flatter: Sandbags should be placed at a maximum
interval of 20 ft, with the first row near the slope toe.
- Slope inclination between 4:1 and 2:1 (H:V); Sandbags should be placed at a maximum
interval of 15 ft. (a closer spacing is more effective), with the first row near the slope toe.
Slope inclination 2:1 (H:V) or greater: Sandbags should be placed at a maximum interval
of 10 ft. (a closer spacing is more effective), with the first row near the slope toe.
November 2009 California Stormwater BMP Handbook 2 of 6
Construction
www.casqa.org
Sandbag Barrier SE-8
• Turn the ends of the .sandbag barrier up slope to prevent runoff from going around the
barrier,
• Allow sufficient space up slope from the barrier to allow ponding, and to provide room for
sediment storage.
• For installation near the toe of the slope, sand bag barriers should be set back from the slope
toe to facilitate cleaning. Where specific site conditions do not allow for a set-back, the sand
bag barrier may be constructed on the toe of the slope. To prevent flows behind the barrier,
bags can be placed perpendicular to a berm to serve as cross barriers.
• Drainage area should not exceed 5 acres.
• Stack sandbags at least three bags high.
• Butt ends of bags tightly.
• Overlap butt joints of row beneath vsith each successive row.
• Use a pyramid approach when stacking bags.
• In non-traffic areas
Height = 18 in. maximum
- Top width = 24 in. minimum for three or more layer construction
- Side slope = 2:1 (H:V) or flatter
• In construction traffic areas
Height = 12 in. maximum
- Top width = 24 in. minimum for three or more layer construction.
- Side slopes = 2:1 (H:V) or flatter.
• See typical sandbag barrier installation details at the end of this fact sheet.
Materials
u Sandbag Material: Sandbag should be woven polypropylene, polyethylene or polyamide
fabric, minimum unit weight of 4 ounces/yd^ Mullen burst strength exceeding 300 Ib/in^ in
conformance vvith the requirements in ASTM designation D3786, and ultraviolet stability
exceeding 70% in conformance with the requirements in ASTM designation D4355. Use of
burlap is not an acceptable substitute, as sand can more easily mobilize out of burlap.
• Sandbag Size: Each sand-filled bag should have a length of 18 in., width of 12 in.,
thickness of 3 in., and mass of approximately 33 lbs, Bag dimensions are nominal, and may
vary based on locally available materials.
November 2009 California Stormwater BMP Handbook 3 of 6
Construction
www.casqa.org
Sandbag Barrier SE-8
• Fill Material: All sandbag fill material should be non-cohesive, Class 3 (Caltrans Standard
Specification, Section 25) permeable material free from clay and deleterious material, such
as recycled concrete or asphalt..
Costs
Empty' sandbags cost S0.25 - $0.75. Average cost of fill material is $8 per yds. Additional labor
is required to fill the bags. Pre-filled sandbags are more expensive at Si.50 - S2.00 per bag.
These costs are based upon vendor research.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Sandbags exposed to sunlight vsill need to be replaced every two to three months due to
degradation of the bags.
• Reshape or replace sandbags as needed.
• Repair washouts or other damage as needed.
• Sediment that accumulates behind the BMP should be periodically removed in order to
maintain BMP effectiveness. Sediment should be removed when the sediment accumulation
reaches one-third of the barrier height.
• Remove sandbags when no longer needed and recycle sand fill whenever possible and
properly dispose of bag material. Remove sediment accumulation, and clean, re-grade, and
stabilize the area.
References
Standard Specifications for Construction of Local Streets and Roads, California Department of
Transportation (Caltrans), July 2002.
Stormwater Quality- Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February
2005.
November 2009 California Stormwater BMP Handbook 4 of 6
Construction
www.casqa.org
z o <
(B
o o
vo Mox reach ~ 5U0' { Sec note 1)
Stmdlmq tiarfir.'
Sondbaq barrier
(Sec rio'if 4)
" a s
01 01
is <= sr Q. at sr.
o.
o
To-:- '.^1 slope
8t
SANDBAG BARRllIR
Cdn-stfwcl *he ienqitH o* car*^' reocSni so M^ai the ci^nnqe in bose
eifvotion fjionq ?r!fi reocn dees not exceed V? ^'^'^ ^heiqh! ot the
iineor barrier tr* no cas<* ytuji! (he- reacfi icnqth exceed liOO'
E)imensiu" ma-y vn: y to ttt !(e'd i titfirliUo^'
Sondooy tJOffte* shot* De c rtiirnmutr> of S) ba<js rxgn
The end of the t»o^n(?f shni! tie 'urned up «;lope
Ooss Dofiiers shaH fie i'i •"•"'tn ni 1/>' arui a TiOK o* //I 'h^-' no'.qhi ol
thc fjneor borno*-
Ul
o
(TV
(A fll
3
Q.
or
IQ
fll •t
5"
m
I
00
o <
O O
to
DIRfC.llflM Of HO*
Srop** -
A /.
lot' ot
4
/ (See nofe
(•' Y • «
st cnot^ A A
fll
3
cu
fll
fll
5*
-1
a: ^ b § 5
I 01 3
a.
CT o o
SfCTiON B B
:rvx..x^-'2
O
CK<;SS tJAHNiEP or TAil ^1. ;:i!ON c ::
(A m I
00
storm Drain Inlet Protection SE-10
Description and Purpose
Storm drain inlel protection consists of a sediment filter or an
impounding area in, around or upstream of a storni drain, drop
inlet, or curb inlet. Storm drain inlet protection measuies
temporarily pond runoff before it enters the storm drain,
allowing sediment to settle. Some filter configurations also
remove sediment by filtering, but usually the ponding action
results in the greatest sediment reduction. Temporarv
geotextile storm drain inserts attach underneath storm drain
grates to capture and filter storin water.
Suitable Applications
Every storm drain inlet receiving runoff from unstabilized or
othenvise active work areas should bc protected. Inlet
protection should be used in conjunction vvith other erosion
and sediment controls to prevent sediment-laden stormw ater
and non-stormwater discharges frum entering the storm drain
system.
Limitations
• Drainage area should not exceed i acre.
• In general .straw bales should not be used as inlet
protection.
• Requires an adequate area for vvater to pond without
encroaching into portions ofthe roadway subject lo traffic.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Matenals Pollution Control
0
Legend:
0 Primary Category
@ Secondary Category
Targeted Constituents
Sediment
Nutnents
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
SE-1 Silt Fence
SE-5 Fiber Rolls
SE-6 Gravel Bag Berm
SE-8 Sandbag Bamer
SE-14 Biofllter Bags
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 10
storm Drain Inlet Protection SE-10
• Sediment removal may be inadequate to prevent sediment discharges in high flow
conditions or if runoff is heavily sediment laden. If high flow conditions are expected, use
other onsite sediment trapping techniques in conjunction with inlet protection.
• Frequent maintenance is required.
• Limit drainage area to i acre maximum. For drainage areas larger than i acre, runoff should
be routed to a sediment-trapping device designed for larger flows. See BMPs SE-2,
Sediment Basin, and SE-3, Sediment Traps.
• Excavated drop inlet sediment traps are appropriate where relatively heavy flows are
expected, and overflow capability' is needed.
Implementation
Genera/
Inlet control measures presented in this handbook should not be used for inlets draining more
than one acre. Runoff from larger disturbed areas should be first routed through SE-2,
Sediment Basin or SE-3, Sediment Trap and/or used in conjunction with other drainage control,
erosion control, and sediment control BMPs to protect the site. Different types of inlet
protection are appropriate for different applications depending on site conditions and the type
of inlet. Alternative methods are available in addition to the methods described/shown herein
such as prefabricated inlet insert devices, or gutter protection devices.
Design and Layout
Identify existing and planned storm drain inlets that have the potential to receive sediment-
laden surface runoff. Determine if storm drain inlet protection is needed and which method to
use.
• The key to successful and safe use of storm drain inlet protection devices is to know where
runoff that is directed toward the inlet to be protected will pond or be diverted as a result of
installing the protection device.
Determine the acceptable location and extent of ponding in the vicinity of the drain inlet.
The acceptable location and extent of ponding will influence the type and design of the
storm drain inlet protection device.
Determine the extent of potential runoff diversion caused by the storm drain inlet
protection device. Runoff ponded by inlet protection devices may flow around the device
and towards the next downstream inlet. In some cases, this is acceptable; in other cases,
serious erosion or downstream property damage can be caused by these diversions. The
possibility of runoff diversions will influence whether or not storm drain inlet protection
is suitable; and. if suitable, the type and design of the device.
• The location and extent of ponding, and the extent of diversion, can usually be controlled
through appropriate placement of the inlet protection device. In some cases, moving the
inlet protection device a short distance upstream of the actual inlet can provide more
efficient sediment control, limit ponding to desired areas, and prevent or control diversions.
November 2009 California Stormwater BMP Handbook 2 of 10
Construction
www.casqa.org
storm Drain Inlet Protection SE-10
• Six types of inlet protection are presented below. However, it is recognized that other
effective methods and proprietary devices exist and may be selected.
- Silt Fence: Appropriate for drainage basins with less than a 5% slope, sheet flows, and
flows under 0.5 cfs.
- Excavated Drop Inlet Sediment Trap: An excavated area around the inlet to trap
sediment (SE-3).
- Gravel bag barrier: Used to create a small sediment trap upstream of inlets on sloped,
paved streets. Appropriate for sheet flow or when concentrated flow may exceed 0.5 cfs,
and where overtopping is required to prevent flooding.
- Block and Gravel Filter: Appropriate for flows greater than 0.5 cfs.
- Temporary Geotextile Storm drain Inserts: Different products provide different features.
Refer to manufacturer details for targeted pollutants and additional feattires.
- Biofilter Bag Barrier: Used to create a small retention area upstream of inlets and can be
located on pavement or soil. Biofilter bags slowly filter runoff allovving sediment to settle
out. Appropriate for flows under 0.5 cfs.
• Select the appropriate type of inlet protection and design as referred to or as described in
this fact sheet.
• Provide area around the inlet for water to pond without flooding structures and property.
• Grates and spaces around all inlets should be sealed to prevent seepage of sediment-laden
water.
• Excavate sediment sumps (where needed) 1 to 2 ft with 2:1 side slopes around the inlet.
Installation
m DI Protection Type 1 - Silt Fence - Similar to constructing a silt fence; see BMP SE-i,
Silt Fence. Do not place fabric underneath the inlet grate since the collected sediment may
fall into the drain inlet when the fabric is removed or replaced and water flow through the
grate will be blocked resulting in flooding. See typical Type 1 installation details at the end of
this fact sheet.
1. Excavate a trench approximately 6 in. wide and 6 in. deep along the line of the silt fence
inlet protection device.
2. Place 2 in. by 2 in. wooden stakes ai ound the perimeter of the inlet a maximum of 3 ft
apart and drive them at least 18 in. into the ground or 12 in. below the bottom ofthe
trench. The stakes should be at least 48 in.
3. Lay fabric along bottom of trench, up side of trench, and then up stakes. See SE-i, Silt
Fence, for details. The maximum silt fence height around the inlet is 24 in.
4. Staple the filter fabric (for materials and specifications, see SE-i, Silt Fence) to wooden
stakes. Use heavy-duty wire staples at least 1 in. in length.
November 2009 California Stormwater BMP Handbook 3 of 10
Construction
www.casqa.org
storm Drain Inlet Protection SE-10
5. Backfill the trench with gravel or compacted earth all the way around.
DI Protection Type 2 - Excavated Drop Inlet Sediment Trap - Install filter fabric
fence in accordance with DI Protection Type 1. Size excavated trap to provide a minimum
storage capacity' calculated at the rate 67 yds/acre of drainage area. See typical Type 2
installation details at the end of this fact sheet.
DI Protection Type 3 - Gravel bag • Flow from a severe storm should not overtop the
curb. In areas of high clay and silts, use filter fabric and gravel as additional filter media.
Construct gravel bags in accordance with SE-6, Gravel Bag Berm. Gravel bags should be
used due to their high permeability. See typical Type 3 installation details at the end of this
fact sheet.
1. Construct on gently sloping street.
2. Leave room upstream of barrier for water to pond and sediment to settle.
3. Place several layers of gravel bags - overlapping the bags and packing them tightly
together.
4. Leave gap of one bag on the top row to serve as a spillway. Flow from a severe storm
(e.g., 10 year storm) should not overtop the curb.
DI Protection Type 4 - Block and Gravel Filter - Block and gravel filters are suitable
for curb inlets commonly used in residential, commercial, and industrial construction. See
typical Type 4 installation details at the end of this fact sheet.
1. Place hardware cloth or comparable v\ire mesh with 0.5 in. openings over the drop inlet
so that the wire extends a minimum of 1 ft beyond each side of the inlet structure. If
more than one strip is necessary, overlap the strips. Place woven geotextile over the wire
mesh.
2. Place concrete blocks !engthv\ise on their sides in a single row around the perimeter of
the inlet, so that the open ends face outward, not upward. The ends of adjacent blocks
should abut. The height of the barrier can be varied, depending on design needs, by
stacking combinations of blocks that are 4 in., 8 in., and 12 in. v\ide. The row of blocks
should be at least 12 in. but no greater than 24 in. high.
3. Place wire mesh over the outside vertical face (open end) of the concrete blocks to
prevent stone from being washed through the blocks. Use hardware cloth or comparable
wire mesh with 0.5 in. opening,
4. Pile washed stone against the wire mesh to the top of the blocks. Use 0.75 to 3 in.
DI Protection Type 5 - Temporary Geotextile Insert (proprietary) - Many types
of temporary inserts are available. Most inserts fit underneath the grate of a drop inlet or
inside of a curb inlet and are fastened to the outside of the grate or curb. These inserts are
removable and many can be cleaned and reused. Installation of these inserts differs
between manufacturers. Please refer to manufacturer instruction for installation of
proprietary devices.
November 2009 California Stormwater BMP Handbook 4 of 10
Construction
www.casqa.org
storm Drain Inlet Protection SE-10
• DI Protection Type 6 - Biofilter bags - Biofilter bags may be used as a substitute for
gravel bags in low-flow situations. Biofilter bags should conform to specifications detailed
in SE-14, Biofilter bags.
1. Construct in a gently sloping area.
2. Biofilter bags should be placed around inlets to intercept runoff flows.
3. All bag joints should overlap by 6 in.
4. Leave room upstream for water to pond and for sediment to settle out.
5. Stake bags to the ground as described in the following detail. Stakes may be omitted
if bags are placed on a paved surface.
Costs
• Average annual cost for installation and maintenance of DI Type 1-4 and 6 (one year useful
life) is S200 per inlet.
• Temporary- geotextile inserts are proprietary and cost v^aries by region. These inserts can
often be reused and may have greater than 1 year of use if maintained and kept undamaged.
Average cost per insert ranges from $50-75 plus installation, but costs can exceed Sioo.
This cost does not include maintenance.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Silt Fences. If the fabric becomes clogged, torn, or degrades, it should be replaced. Make
sure the stakes are securely driven in the ground and are in good shape (i.e., not bent,
cracked, or splintered, and are reasonably perpendicular to the ground). Replace damaged
stakes. At a minimum, remove the sediment behind the fabric fence when accumulation
reaches one-third the height of the fence or barrier height.
• Gravel Pikers. If the gravel becomes clogged with sediment, it should be carefully removed
from the inlet and either cleaned or replaced. Since cleaning gravel at a construction site
may be difficult, consider using the sediment-laden stone as fill material and put fresh stone
around the inlet. Inspect bags for holes, gashes, and snags, and replace bags as needed.
Check gravel bags for proper arrangement and displacement.
• Sediment that accumulates in the BMP should be periodically removed in order to maintain
BMP effectiveness. Sediment should be removed when the sediment accumulation reaches
one-third of the barrier height.
• Inspect and maintain temporary geotextile insert devices according to manufacturer's
specifications.
• Remove storm drain inlet protection once the drainage area is stabilized.
November 2009 California Stormwater BMP Handbook 5 of 10
Construction
www.casqa.org
storm Drain Inlet Protection SE-10
- Clean and regrade area around the inlet and clean the inside of the storm drain inlet, as
it should be free of sediment and debris at the time of final inspection.
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Management Manual for The Puget Sound Basin, Washington State Department of
Ecology, Public Revievv Draft, 1991.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February
2005.
November 2009 California Stormwater BMP Handbook 6 of 10
Construction
www.casqa.org
storm Drain Inlet Protection SE-10
A-A
Less thar
' oce
..y--.... X-
LLL
1 1
,—6
' over'ao c: €-f.CS
A i
-Geotexti.e xi\ar.<e{
PLAN
PROTECTION TY-E
NO' TO SCA.E
1. ryjr ,jse 'r. areas wne-'e g'oCing hos beer
Cf"i3 seed'r^g are pending,
2 Not applicable > paved creos,
5 Not apDi'coDie wif^ concentroteo fiovsis.
• etec ar.a tsnc^ sc" stnc
November 2009 California Stonnwater BMP Handbook
Construction
www.casqa.org
7 of 10
storm Drain Inlet Protection SE-10
-Stabilize orec ond
grcae uf-!fo<rri!y
S'it fence Per
Note. ^>mr;^
Remove sedirriert
De*ore reaching
Sect'Of A A M — M
Cc=-^cen trcted
fiCVt
ROCK fi:tef{use *iow
is coricen'ratec)
taqe o'
sedirrie'-^: foo
Drain inet
] Geoiexti
X Blanket
5'i' fence -^er SL
NOT "0 SCAL
Notes
1 "or jse 'r, cleared c-d gruDDea O'-'d in g^odec a-'eas
2. Srope Dcsin so tnoi longest ^"fiow areo foces longest lengt^ trop
.? -o-- concentroted fiows. shape oosln -.n 2 ' rctio with leng'"" o^'e-'tec
towofds di-'ec'ion Qt flow
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
8 of 10
storm Drain Inlet Protection SE-10
, Scriacoqs
2-Doas
CAL ^ROTFCnCN FOR iNi
'^piCAi. :'"iQN "0^ •A ' IN L N GRADE'
NCTS.
• i-'tenaeQ 'or snort-tern-- uSe.
2 Jse tc -i-iniD-t no^-stor-^ v<D:er 'lew
3 AMO* fc orcoer n-'OiitenoTe cnn c:enn.jp
•'• Sags '^us; ce 'en-.oveo o*;e' oajacct operation is ccnp^eted
5 \o; opo'i-coDie "'• areas 'A t- r. c" si ts one days witrojt 'iile' *oonc
D: ^ROTEC^'ON
November 2009 Califomia Stormwater BMP Handbook
Construction
www.casqa.org
9 of 10
storm Drain Inlet Protection SE-10
f-^crdA-are c^ott wire i~":esn
RO^ECTiON YR^ 4
NO" SCAu
•
November 2009 California Stomnwater BMP Handbook
Construction
www.casqa.org
10 of 10
stabilized Construction Entrance/Exit TC-1
Description and Purpose
A stabilized construction access is defined by a point of
entrance/exit to a construction site that is stabilized to reduce
the tracking of mud and dirt onto public roads by construction
vehicles.
Suitable Applications
Use at construction sites:
• Where dirt or mud can be tracked onto public roads.
• Adjacent to water bodies.
• Where poor soils are encountered.
• Where dust is a problem during dry weather conditions.
Limitations
• Entrances and exits require periodic top dressing with
additional stones.
• This BMP should be used in conjunction with street
sweeping on adjacent public right of way.
• Entrances and exits should be constructed on level ground
only.
• Stabilized construction entrances are rather expensive to
construct and when a wash rack is included, a sediment trap
of some kind must also be provided to collect wash water
Categories
EC Erosion Control IS
SE Sedinnent Control m
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater
Management Control
WM Waste Management and
Materials Pollution Control
Legend:
0 Primary Objective
IE! Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bactena
Oil and Grease
Organics
0
Potential Alternatives
None
t AtJKWSlASTORMWAIIR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 5
stabilized Construction Entrance/Exit TC-1
runoff.
Implementation
General
A stabilized construction entrance is a pad of aggregate underlain with filter cloth located at any
point where traffic will be entering or leaving a construction site to or from a public right of way,
street, alley, sidewalk, or parking area. The purpose of a stabilized construction entrance is to
reduce or eliminate the tracking of sediment onto public rights of way or streets. Reducing
tracking of sediments and other pollutants onto paved roads helps prevent deposftion of
sediments into local storm drains and production of airborne dust.
Where traffic will be entering or leaving the construction site, a stabilized construction entrance
should be used. NPDES permits require that appropriate measures be implemented to prevent
tracking of sediments onto paved roadways, where a significant source of sediments is derived
from mud and dirt carried out from unpaved roads and construction sites.
Stabilized construction entrances are moderately effective in removing sediment from
equipment leaving a construction site. The entrance should be built on level ground.
Advantages of the Stabilized Construction Entrance/Exit is that it does remove some sediment
from equipment and serves to channel construction traffic in and out of the site at specified
locations. Efficiency is greatly increased when a washing rack is included as part of a stabilized
construction entrance/exit.
Design and Layout
m Construct on level ground where possible.
• Select 3 to 6 in. diameter stones.
B Use minimum depth of stones of 12 in. or as recommended by soils engineer,
• Construct length of 50 ft minimum, and 30 ft minimum width.
• Rumble racks constructed of steel panels with ridges and installed in the stabilized
entrance/exit will help remove additional sediment and to keep adjacent streets clean.
• Provide ample turning radii as part of the entrance.
• Limit the points of entrance/exit to the construction site.
• Limit speed of vehicles to control dust.
• Properly grade each construction entrance/exit to prevent runoff from leaving the
construction site.
• Route runoff from stabilized entrances/exits through a sediment trapping device before
discharge.
• Design stabilized entrance/exit to support heaviest vehicles and equipment that will use it.
November 2009 California Stormwater BMP Handbook 2 of 6
Construction
www.casqa.org
stabilized Construction Entrance/Exit TC-1
• Select construction access stabilization (aggregate, asphaltic concrete, concrete) based on
longevity, required performance, and site conditions. Do not use asphalt concrete (AC)
grindings for stabilized construction access/roadway.
• If aggregate is selected, place crushed aggregate over geotextile fabric to at least 12 in. depth,
or place aggregate to a depth recommended by a geotechnical engineer. A crushed aggregate
greater than 3 in. but smaller than 6 in. should be used.
• Designate combination or single purpose entrances and exits to the construction site.
• Require that all employees, subcontractors, and suppliers utilize the stabilized construction
access.
• Implement SE-7, Street Sweeping and Vacuuming, as needed.
• All exit locations intended to be used for more than a two-week period should have stabilized
construction entrance/exit BMPs.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMPs are under way, inspect
weekly during the rainy season and of two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect local roads adjacent to the site daily. Sweep or vacuum to remove visible
accumulated sediment.
• Remove aggregate, separate and dispose of sediment if construction entrance/exit is clogged
with sediment.
• Keep all temporary roadway ditches clear.
• Check for damage and repair as needed.
• Replace gravel material when surface voids are visible.
• Remove all sediment deposited on paved roadways within 24 hours.
• Remove gravel and filter fabric at completion of construction
Costs
Average annual cost for installation and maintenance may vary from Si,200 to $4,800 each,
averaging §2,400 per entrance. Costs will increase with addition of washing rack, and sediment
trap. With wash rack, costs range from Si,200 - S6,ooo each, averaging $3,600 per entrance.
References
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995.
November 2009 California Stormwater BMP Handbook 3 of 6
Construction
www.casqa.org
stabilized Construction Entrance/Exit TC-1
National Management Measures to Control Nonpoint Source Pollution from Urban Areas,
USEPA Agency, 2002.
Proposed Guidance Specifying Management Measures for Sources of Nonpoint Pollution in
Coastal Waters, Work Group Working Paper, USEPA, April 1992.
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #91-75.
Washington State Department of Ecology, February 1992.
Virginia Erosion and Sedimentation Control Handbook, Virginia Department of Conservation
and Recreafion, Division of Soil and Water Conservation, 1991.
Guidance Specifying Management Measures for Nonpoint Pollution in Coastal Waters, EPA
840-B-9-002, USEPA, Office of Water, Washington, DC, 1993.
Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of
Management Practices, Tahoe Regional Planning Agency, November 1988.
November 2009 California Stormwater BMP Handbook 4 of 6
Construction
www.casqa.org
stabilized Construction Entrance/Exit TC-1
_Cr-i>sheo oggregote greater ihc-
/ but snocHer tnan 6"
liter fabr'c
r U-g^nci
grace
12 V^n, jniess otnerwise
soeci'ied dy d soi's engineer
SECTION 3-3
N"^S
NO^E:
Construct sedin-'ent barrier
i ono cnonnelize runoff to
sed'one^t trapping device
Vdtcn
Existing
Grdde
lerrporory pipe culver
ds needed
Min
1—
' Widtn dS
reai..irea to
cccon-'Odcte
anticiDotec
or fojr fmes the circun'i*erence
of the iorgest co'^struction vehicle tire,
whichever is greater
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
Sof 6
stabilized Construction Entrance/Exit TC-1
Crusned aggregate greater -nar 3"
Dut sn-,a:ler tr cn 6",
'--12' Vin, un ess othe'/Lse
soeci'iec by c soils engineer
SECTION B-B
TTT?
Crjshec aggregate greoter f^an 3"
.'""out sn^oier than 6".
i^orrugcteo stee' panels
/,
12" Min, unless otherwise
specified c soils engneer Filter 'aoric
SECQION _A--A ~'Nor^o scALr
NCnE.
Construct sediment DCrrier
unci channelize runo
sedinnent trapping cevice
bepirrent tropDing
device
Corrugated stee' pc-e s
A
~T IC' nnir o'
as 'equired to
I acconnoaate
onticipoted
trof'ic, whicheve'
is Greater,
Match
existing
Grace
or *Dur times tne circurrference
'.he largest construction vehicle tire,
wnichever is greoter
^LAN
""NT'S
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
6 of 6
stabilized Construction Roadway TC-2
Description and Purpose
Access roads, subdivision roads, parking areas, and other onsite
vehicle transportation routes should be stabilized immediately
after grading, and frequently maintained to prev^ent erosion and
control dust.
Suitable Appiications
This BMP should be applied for the following conditions:
• Temporary Construction Traffic:
- Phased construction projects and offsite road access
- Construction during wet weather
• Construction roadways and detour roads:
- Where mud tracking is a problem during wet weather
- Where dust is a problem during dry weather
- Adjacent to water bodies
Where poor soils are encountered
Limitations
• The roadway must be removed or paved when construction
is complete.
• Certain chemical stabilization methods may cause
stormwater or soil pollution and should not be used. See
WE-1, Wind Erosion Control.
Categories
EC Erosion Control 13
SE Sediment Control S
TC Tracking Control 13
WE Wind Erosion Control
Non-Stormwater
Management Control NS
yi_. Waste Management and
" Materials Pollution Control
Legend:
0 Primary Objective
S! Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
Potential Alternatives
None
^^^^
(-AllfORMASTORMrtAllll
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
stabilized Construction Roadway TC-2
• Management of construction traffic is subject to air quality control measures. Contact the
local air quality management agency.
• Materials will likely need to be removed prior to final project grading and stabilization.
• Use of this BMP may not be applicable to very short duration projects.
Implementation
GeneraZ
Areas that are graded for construction vehicle transport and parking purposes are especially
susceptible to erosion and dust. The exposed soil surface is continually disturbed, leaving no
opportunity for vegetative stabilization. Such areas also tend to collect and transport runoff
waters along their surfaces. During wet weather, they often become muddy quagmires that
generate significant quantities of sediment that may pollute nearby streams or be transported
offsite on the wheels of construction vehicles. Dirt roads can become so unstable during wet
weather that they are virtually unusable.
Efficient construction road stabilization not only reduces onsite erosion but also can
significantly speed onsite work, avoid instances of immobilized machinery and delivery vehicles,
and generally improve site efficiency and working conditions during adverse weather
Installation/Application Criteria
Permanent roads and parking areas should be paved as soon as possible after grading. As an
alternative where construction will be phased, the early application of gravel or chemical
stabilization may solve potential erosion and stability problems. Temporary gravel roadway
should be considered during the rainy season and on slopes greater than 5%.
Temporary roads should follow the contour of the natural terrain to the maximum extent
possible. Slope should not exceed 15%. Roadways should be carefully graded to drain
transversely. Provide drainage swales on each side of the roadway in the case of a crowned
section or one side in the case of a super elevated section. Simple gravel berms without a trench
can also be used.
Installed inlets should be protected to prevent sediment laden water from entering the storm
sewer system (SE-10, Storm Drain Inlet Protection). In addition, the following criteria should
be considered.
• Road should follow topographic contours to reduce erosion of the roadway.
• The roadway slope should not exceed 15%.
• Chemical stabilizers or water are usually required on gravel or dirt roads to prevent dust
(WE-1, Wind Erosion Control).
• Properly grade roadway to prevent runoff from leaving the construction site.
• Design stabilized access to support heaviest vehicles and equipment that will use it.
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
stabilized Construction Roadway TC-2
• Stabilize roadway using aggregate, asphalt concrete, or concrete based on longevity, required
performance, and site conditions. The use of cold mix asphalt or asphalt concrete (AC)
grindings for stabihzed construction roadway is not allowed.
• Coordinate materials with those used for stabilized construction entrance/exit points.
• If aggregate is selected, place crushed aggregate over geotextile fabric to at least 12 in. depth.
A crushed aggregate greater than 3 in. but smaller than 6 in. should be used.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, impact weekly
during the rainy season and of two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Keep all temporary roadway ditches clear.
• When no longer required, remove stabilized construction roadway and re-grade and repair
slopes.
• Periodically apply additional aggregate on gravel roads.
• Active dirt construction roads are commonly watered three or more times per day during the
dry season.
Costs
Gravel construction roads are moderately expensive, but cost is often balanced by reductions in
construction delay. No additional costs for dust control on construction roads should be
required above that needed to meet local air quality requirements.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance,
Working Group, Working Paper; USEPA, April 1992.
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995.
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
Stormwater Management of the Puget Sound Basin, Technical Manual, Publication #9ii-75.
Washington State Department of Ecology, February 1992.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
stabilized Construction Roadway TC-2
Virginia Erosion and Sedimentation Control Handbook, Virginia Department of Conservation
and Recreation, Division of Soil and Water Conservation, 1991.
Water Quality Management Plan for the Lake Tahoe Region, Volume II, Handbook of
Management Practices, Tahoe Regional Planning Agency, November 1988.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
Entrance/Outlet Tire Wash TC-3
Description and Purpose
A tire wash is an area located at stabilized construction access
points to remove sediment from tires and under carriages and
to prevent sediment from being transported onto public
roadways.
Suitable Appiications
Tire washes may be used on construction sites where dirt and
mud tracking onto public roads by construction vehicles may
occur.
Limitations
• The tire wash requires a supply of wash water.
• A turnout or doublewide exit is required to avoid having
entering vehicles drive through the wash area.
• Do not use where wet fire trucks leaving the site leave the
road dangerously slick.
Implementation
• Incorporate with a stabilized construction entrance/exit.
See TC-1, Stabilized Construcfion Entrance/Exit.
• Construct on level ground when possible, on a pad of coarse
aggregate greater than 3 in. but smaller than 6 in. A
geotextile fabric should be placed below the aggregate.
• Wash rack should be designed and
constructed/manufactured for anticipated traffic loads.
Categories
EC Erosion Control
SE Sediment Control il
TC Tracking Control 0
WE Wind Erosion Control
NS Non-Stormwater
Management Control
WM Waste Management and
Materials Pollution Control
Legend:
0 Primary Objective
S Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
TC-1 Stabilized Construction
Entrance/Exit
C .\l IKIRMA MORMV^AIt K
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Entrance/Outlet Tire Wash TC-3
• Provide a drainage ditch that will convey the runoff from the wash area to a sediment
trapping device. The drainage ditch should be of sufficient grade, width, and depth to carry
the wash runoff.
• Use hoses with automatic shutoff nozzles to prevent hoses from being left on.
• Require that all employees, subcontractors, and others that leave the site with mud caked
tires and undercarriages to use the wash facility.
• Implement SC-y, Street Sweeping and Vacuuming, as needed.
Costs
Costs are low for installation of wash rack.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While acfivities associated with the BMP are under way, inspect weekly
during the rainy season and of two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges
occur.
• Remove accumulated sediment in wash rack and/or sediment trap to maintain system
performance.
• Inspect routinely for damage and repair as needed.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollufion from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance,
Working Group, Working Paper; USEPA, April 1992.
Manual of Standards of Erosion and Sediment Control Measures, Association of Bay Area
Governments, May 1995.
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Entrance/Outlet Tire Wash TC-3
Crushed oggregote greater than
r b^t snnoller than 6"
Corrugcted steei panels
^.2' Vlin, uniess otherwise
specified by o soils enginee Filter fabric
SECTiON A-~A
NOT TO SCALE
_Crusned oggregote greoter then 3"
Out snnoiler then 6"
r-hLter fabric
1 / r- Oriainoi
^12" Min, unless otherwise
specified by c soils engineer
SECTION B-B
Ditch to corry runoff —
to 0 sediment trapping
NOTE:
Mony designs con be *ieic
tcDricdted, or fdbricdted
units may be used.
Water supply &i hose
TYPiCAL TIRE WASH
NOT TO SCALE
November 2009 Califomia Stormwater BMP Handbook
Construction
www.casqa.org
3 of 3
Wind Erosion Control WE-1
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
0
Legend:
0 Primary Category
m Secondary Category
Targeted Constituents
Description and Purpose
Wind erosion or dust control consists of applying water or other
chemical dust suppressants as necessary to prevent or alleviate
dust nuisance generated by construction activities. Covering
small stockpiles or areas is an alternative to applying water or
other dust palliatives.
California's Mediterranean climate, with a short "wet" season
and a typically long, hot "dry" season, allows the soils to
thoroughly dry out. During the dry season, construction
activities are at their peak, and disturbed and exposed areas are
increasingly subject to wind erosion, sediment tracking and
dust generated by construction equipment. Site conditions and
climate can make dust control more of an erosion problem than
water based erosion. Additionally, many local agencies,
including Air Quality Management Districts, require dust
control and/or dust control permits in order to comply with
local nuisance laws, opacity laws (visibility impairment) and the
requirements of the Clean Air Act. Wind erosion control is
required to be implemented at all construction sites greater
than 1 acre by the General Permit.
Suitable Applications
Most BMPs that provide protection against water-based erosion
will also protect against wind-based erosion and dust control
requirements required by other agencies will generally meet wind
erosion control requirements for water quality protection. Wind
erosion control BMPs are suitable during the following construction
activities:
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
EC-5 Soil Binders
CAI IIOKMA STORMMAirR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 OfS
Wind Erosion Control WE-1
• Construction vehicle traffic on unpaved roads
• Drilling and blasting activities
• Soils and debris storage piles
• Batch drop from front-end loaders
• Areas with unstabilized soil
• Final grading/site stabilization
Limitations
• Watering prevents dust only for a short period (generally less than a few hours) and should
be applied daily (or more often) to be effective.
• Over watering may cause erosion and track-out.
• Oil or oil-treated subgrade should not be used for dust control because the oil may migrate
into drainageways and/or seep into the soil.
• Chemical dust suppression agents may have potential environmental impacts. Selected
chemical dust control agents should be environmentally benign.
• Effectiveness of controls depends on soil, temperature, humidity, wind velocity and traffic.
• Chemical dust suppression agents should not be used within ioo feet of wetlands or water
bodies.
• Chemically treated subgrades may make the soil water repellant, interfering with long-term
infiltration and the vegetation/re-vegetation of the site. Some chemical dust suppressants
may be subject to freezing and may contain solvents and should be handled properly.
• In compacted areas, watering and other liquid dust control measures may wash sediment or
other constituents into the drainage system.
• If the soil surface has minimal natural moisture, the affected area may need to be pre-wetted
so that chemical dust control agents can uniformly penetrate the soil surface.
Implementation
Dust Control Practices
Dust control BMPs generally stabilize exposed surfaces and minimize activities that suspend or
track dust particles. The following table presents dust control practices that can be applied to
varying site conditions that could potentially cause dust. For heavily traveled and disturbed
areas, wet suppression (watering), chemical dust suppression, gravel asphah surfacing,
temporary gravel construction entrances, equipment wash-out areas, and haul truck covers can
be employed as dust control applications. Permanent or temporary vegetation and mulching
can be employed for areas of occasional or no construction traffic. Preventive measures include
minimizing surface areas to be disturbed, limiting onsite vehicle traffic to 15 mph or less, and
controlling the number and activity of vehicles on a site at any given time.
November 2009 California Stormwater BMP Handbook 2 of 5
Construction
www.casqa.org
Wind Erosion Control WE-1
Chemical dust suppressants include: mulch and fiber based dust palliatives (e.g. paper mulch
with gypsum binder), salts and brines (e.g. calcium chloride, magnesium chloride), non-
petroleum based organics (e.g. vegetable oil, lignosulfonate), petroleum based organics (e.g.
asphalt emulsion, dust oils, petroleum resins), synthetic polymers (e.g. polyvinyl acetate, vinyls,
acrylic), clay additives (e.g. bentonite, montimorillonite) and electrochemical products (e.g.
enzymes, ionic products).
' Silt
CcodUoa
-
Diut Control Practices
' Silt
CcodUoa
-
Pennanent
Vegetation Mulching
Wet
Suppreaakxi (Waterint)
chemical Duet
Suppression
Gravel
or Aspfcalt
Tonpsraiy Gnvel Conatraetion
Bntraneca/Ewiipnwnt
Wash Down
Syntlieti* Covers
Minimize Extent of
DiaturlMd
Area
DiMriMd
.Aruinot
XralBc
X X X X X X
X X X X X
' StotkpUH X X X X X
X X X
•f!h.iffS^tl--' • 'Oami&on -X X X
Vapmti 1
: ]to|^d«'''^'
X X X X X
** X X
Additional preventive measures include:
• Schedule construction activities to minimize exposed area (see EC-i, Scheduling).
• Quickly treat exposed soils using water, mulching, chemical dust suppressants, or
stone/gravel layering.
• Identify and stabilize key access points prior to commencement of construction,
• Minimize the impact of dust by anticipating the direction of prevailing winds.
• Restrict construction traffic to stabilized roadways within the project site, as practicable.
• Water should be applied by means of pressure-type distributors or pipelines equipped with a
spray system or hoses and nozzles that will ensure even distribution.
• All distribution equipment should be equipped with a positive means of shutoff.
• Unless water is applied by means of pipelines, at least one mobile unit should be available at
all times to apply water or dust palliative to the project.
• If reclaimed waste water is used, the sources and discharge must meet California
Department of Health Services water reclamation criteria and the Regional Water Quality
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
3 of 5
Wind Erosion Control WE-1
Control Board (RWQCB) requirements. Non-potable water should not be conveyed in tanks
or drain pipes that will be used to convey potable water and there should be no connection
between potable and non-potable supplies. Non-potable tanks, pipes, and other
conveyances should be marked, "NON-POTABLE WATER - DO NOT DRINK."
• Pave or chemically stabilize access points where unpaved traffic surfaces adjoin pav^ed roads.
• Provide covers for haul trucks transporting materiais that contribute to dust.
• Provide for rapid clean up of sediments deposited on paved roads. Furnish stabilized
construction road entrances and wheel wash areas.
• Stabilize inactive areas of construction sites using temporary vegetation or chemical
stabilization methods.
For chemical stabilization, there are many products available for chemically stabilizing gravel
roadways and stockpiles. If chemical stabilization is used, the chemicals should not create any
adverse effects on stormwater, plant life, or groundwater and should meet all applicable
regulatory requirements.
Costs
Installation costs for water and chemical dust suppression vary based on the method used and
the length of effectiveness. Annual costs may be high since some of these measures are effective
for only a few hours to a few days.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities.
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Check areas protected to ensure coverage.
• Most water-based dust control measures require frequent application, often daily or even
multiple times per day. Obtain vendor or independent information on longevity of chemical
dust suppressants.
References
Best Management Practices and Erosion Control Manual for Construction Sites, Flood Control
District of Maricopa County, Arizona, September 1992.
California Air Pollution Control Laws, California Air Resources Board, updated annually.
Construction Manual, Chapter 4, Section 10, "Dust Control"; Section 17, "Watering"; and Section
18, "Dust Palliative", California Department of Transportation (Caltrans), July 2001.
November 2009 California Stormwater BMP Handbook 4 of 5
Construction
www.casqa.org
Wind Erosion Control WE-1
Prospects for Attaining the State Ambient Air Quality Standards for Suspended Particulate
Matter (PMio), Visibility Reducing Particles, Sulfates, Lead, and Hydrogen Sulfide, California
Air Resources Board, April 1991.
Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs) Manual,
State of CaHfornia Department of Transportation (Caltrans), March 2003.
November 2009 California Stormwater BMP Handbook 5 of 5
Construction
www.casqa.org
Water Conservation Practices NS-1
Description and Purpose
Water conservation practices are activities that use water
during the construction of a project in a manner that avoids
causing erosion and the transport of pollutants offsite. These
practices can reduce or eliminate non-stormwater discharges.
Suitable Appiications
Waaler conservation practices are suitable for all construction
sites where water is used, including piped water, metered
water, trucked water, and water from a reservoir.
Limitations
• None identified.
Implementation
• Keep water equipment in good working condition.
• Stabilize water truck filling area.
• Repair water leaks promptly.
• Washing of vehicles and equipment on the construction site
is discouraged.
• Avoid using water to clean construction areas. If water
must be used for cleaning or surface preparation, surface
should be swept and vacuumed first to remove dirt. This
will minimize amount of water required.
• Direct construction water runoff to areas where it can soak
Categories
EC Erosion Control Ixl
SE Sediment Control m
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater 0 NS Management Control 0
WM Waste Management and WM Materials Pollution Control
Legend:
0 Primary Objective
SI Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
Potential Alternatives
None
C miOHNIA STORMWAIt R
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 2
Water Conservation Practices NS-1
into the ground or be collected and reused.
• Authorized non-stormwater discharges to the storm drain system, channels, or receiving
waters are acceptable with the implementation of appropriate BMPs.
• Lock water tank valves to prevent unauthorized use.
Costs
The cost is small to none compared to the benefits of conserving water.
Inspection and Maintenance
• Inspect and verify that activity based BMPs are in place prior to the commencement of
authorized non-stormwater discharges.
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
are occuring.
• Repair water equipment as needed to prevent unintended discharges.
- Water trucks
Water reservoirs (water buffalos)
Irrigation systems
Hydrant connections
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), Nov^ember 2000.
November 2009 California Stormwater BMP Handbook 2 of 2
Construction
www.casqa.org
Paving and Grinding Operations NS-3
Description and Purpose
Prevent or reduce the discharge of pollutants from paving
operations, using measures to prevent runon and runoff
pollution, properly disposing of wastes, and training employees
and subcontractors.
The General Permit incorporates Numeric Effluent Limits
(NEL) and Numeric Action Levels (NAL) for pH and turbidity'
(see Section 2 ofthis handbook to determine your project's risk
level and if you are subject to these requirements).
Many types of construction materials associated with paving
and grinding operations, including mortar, concrete, and
cement and their associated wastes have basic chemical
properties that can raise pH levels outside of the permitted
range. Additional care should be taken when managing these
materials to prevent them from coming into contact with
stormwater flows, which could lead to exceedances of the
General Permit requirements.
Suitable Applications
These procedures are implemented where paving, surfacing,
resurfacing, or sawcutting, may pollute stormwater runoff or
discharge to the storm drain system or watercourses.
Limitations
• Paving opportunities may be limited during wet weather.
• Discharges of freshly paved surfaces may raise pH to
environmentally harmful levels and trigger permit violations.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater
Management Control 0
WM Waste Management and
Materials Pollution Control
Legend:
0 Primary Category
@ Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
Potential Alternatives
None
CA( IIORMA snjRMWATlK
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of S
Paving and Grinding Operations NS-3
Implementation
GeneraZ
• Avoid paving during the wet season when feasible.
• Reschedule paving and grinding activities if rain is forecasted.
• Train employees and sub-contractors in pollution prevention and reduction.
• Store materials away from drainage courses to prevent stormwater runon (see WM-i,
Material Delivery and Storage).
• Protect drainage courses, particularly in areas with a grade, by employing BMPs to divert
runoff or to trap and filter sediment.
• Stockpile material removed from roadways away from drain inlets, drainage ditches, and
watercourses. These materials should be stored consistent vvith WM-3, Stockpile
Management.
• Disposal of PCC (Portland cement concrete) and AC (asphalt concrete) waste should be in
conformance with WM-8, Concrete Waste Management.
Saw Cutting, Grinding, and Pavement Removal
m Shovel or vacuum saw-cut slurry and remove from site. Cover or barricade storm drains
during saw cutting to contain slurry.
• When paving involves AC, the following steps should be implemented to prevent the
discharge of grinding residue, uncompacted or loose AC, tack coats, equipment cleaners, or
unrelated paving materials:
- AC grindings, pieces, or chunks used in embankments or shoulder backing should not be
allowed to enter any storm drains or watercourses. Install inlet protection and perimeter
controls until area is stabilized (i.e. cutting, grinding or other removral activities are
complete and loose material has been properly removed and disposed of)or permanent
controls are in place. Examples of temporary perimeter controls can be found in EC-9,
Earth Dikes and Drainage Swales; SE-i, Silt Fence; SE-5, Fiber Rolls, or SE-13 Compost
Socks and Berms
- Collect and remove all broken asphalt and recycle when practical. Old or spilled asphalt
should be recycled or disposed of properly.
• Do not allow saw-cut slurry to enter storm drains or watercourses. Residue from grinding
operations should be picked up by a vacuum attachment to the grinding machine, or by
sweeping, should not be allowed to flow across the pavement, and should not be left on the
surface of the pavement. See also WT^-8, Concrete Waste Management, and WM-10. Liquid
Waste Management.
• Pavement removal activities should not be conducted in the rain.
• Collect removed pavement material by mechanical or manual methods. This material may
be recycled for use as shoulder backing or base material.
November 2009 California Stormwater BMP Handbook 2 of 5
Construction
www.casqa.org
Paving and Grinding Operations NS-3
• If removed pavement material cannot be recycled, transport the material back to an
approved storage site.
Asphaltic Concrete Paving
m If paving involves asphaltic cement concrete, follow these steps:
- Do not allow sand or gravel placed over new asphah to wash into storm drains, streets,
or creeks. Vacuum or sweep loose sand and gravel and properly dispose of this waste by
referring to WM-5, Solid Waste Management.
- Old asphah should be disposed of properly. Collect and remove all broken asphalt from
the site and recycle whenever possible.
Portland Cement Concrete Paving
m Do not wash sweepings from exposed aggregate concrete into a storm drain system. Collect
waste materials by dry methods, such as sweeping or shoveling, and return to aggregate base
stockpile or dispose of properly. Allow aggregate rinse to settle. Then, either allow rinse
water to dry in a temporary pit as described in WM-8, Concrete Waste Management, or
pump the water to the sanitary sewer if authorized by the local wastewater authority.
Sealing Operations
u During chip seal application and sweeping operations, petroleum or petroleum covered
aggregate should not be allowed to enter any storm drain or water courses. Apply temporary
perimeter controls until structure is stabilized (i.e. all sealing operations are complete and
cured and loose materials have been properly removed and disposed).
• Inlet protection (SE-10, Storm Drain Inlet Protection) should be used during application of
seal coat, tack coat, slurry seal, and fog seal.
• Seal coat, tack coat, slurry seal, or fog seal should not be applied if rainfall is predicted to
occur during the application or curing period.
Paving Equipment
• Leaks and spills from paving equipment can contain toxic levels of heavy metals and oil and
grease. Place drip pans or absorbent materials under paving equipment when not in use.
Clean up spills with absorbent materials and dispose of in accordance with the applicable
regulations. See NS-10, Vehicle and Equipment Maintenance, WM-4, Spill Prevention and
Control, and WM-10, Liquid Waste Management.
• Substances used to coat asphalt transport trucks and asphalt spreading equipment should
not contain soap and should be non-foaming and non-toxic,
• Paving equipment parked onsite should be parked over plastic to prevent soil
contamination.
• Clean asphalt coated equipment offsite whenever possible. 'When cleaning dry, hardened
asphalt from equipment, manage hardened asphalt debris as described in WM-5, Solid
Waste Management. Any cleaning onsite should follow NS-8, Vehicle and Equipment
Cleaning.
November 2009 California Stormwater BMP Handbook 3 of 5
Construction
www.casqa.org
Paving and Grinding Operations NS-3
Thermoplastic Striping
m Thermoplastic striper and pre-heater equipment shutoff valves should be inspected to
ensure that they are working properiy to prevent leaking thermoplastic from entering drain
inlets, the stormwater drainage system, or watercourses.
• Pre-heaters should be filled carefully to prevent splashing or spilling of hot thermoplastic.
Leave six inches of space at the top of the pre-heater container when filling thermoplastic to
allow room for material to move.
• Do not pre-heat, transfer, or load thermoplastic near drain inlets or watercourses.
• Clean truck beds daily of loose debris and melted thermoplastic. When possible, recycle
thermoplastic material.
Raised/Recessed Pavement Marker Application and Removal
• Do not transfer or load bituminous material near drain inlets, the stormwater drainage
system, or watercourses.
• Melting tanks should be loaded with care and not filled to beyond six inches from the top to
leave room for splashing.
• When servicing or filling melting tanks, ensure all pressure is released before removing lids
to avoid spills.
• On large-scale projects, use mechanical or manual methods to collect excess bituminous
material from the roadway after removal of markers.
Costs
• All of the above are low cost measures.
Inspection and Maintenance
• Inspect and verify that activity -based BMPs are in place prior to the commencement of
paving and grinding operations.
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Sample stormwater runoff required by the General Permit.
• Keep ample supplies of drip pans or absorbent materials onsite.
• Inspect and maintain machinery regularly to minimize leaks and drips.
References
Blueprint for a Clean Bay; Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Contro! Program,
1995.
November 2009 California Stormwater BMP Handbook 4 of 5
Construction
www.casqa.org
Paving and Grinding Operations NS-3
Hot Mix Asphalt-Paving Handbook AC 150/5370-14, Appendix I, U.S. Army Corps of Engineers,
July 1991.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February
2005.
November 2009 California Stormwater BMP Handbook 5 of 5
Construction
www, casqa.org
Illicit Connection/Discharge NS-6
/
Description and Purpose
Procedures and practices designed for construction contractors
to recognize illicit connections or illegally dumped or
discharged materials on a construction site and report
incidents.
Suitable Appiications
This best management practice (BMP) applies to all
construction projects. Illicit connection/discharge and
reporting is applicable anytime an illicit connection or
discharge is discovered or illegally dumped material is found on
the construction site.
Limitations
Illicit connections and illegal discharges or dumping, for the
purposes of this BMP, refer to discharges and dumping caused
by parties other than the contractor. If pre-existing hazardous
materials or wastes are known to exist onsite, they should be
identified in the SWTPP and handled as set forth in the SWPPP.
Implementation
Planning
• Review the SWTPP. Pre-existing areas of contamination
should be identified and documented in the SWPPP,
• Inspect site before beginning the job for evidence of illicit
connections, illegal dumping or discharges. Document any
pre-existing conditions and notify the owrner.
• Inspect site regularly during project execution for evidence
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stonnwater
Management Control
Waste Management and
Meerials Pollulion Control
Legend:
0 Primary Objective
IS Secondary Objective
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
CAUFORNIA mORMnAICR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Illicit Connection/Discharge NS-6
of illicit connections, illegal dumping or discharges.
• Observe site perimeter for evidence for potential of illicitly discharged or illegally dumped
material, which may enter the job site.
Identification of Illicit Connections and Illegal Dumping or Discharges
m General - unlabeled and unidentifiable material should be treated as hazardous.
• Solids - Look for debris, or rubbish piles. Solid waste dumping often occurs on roadways
with light traffic loads or in areas not easily visible from the traveled way.
• Liquids - signs of illegal liquid dumping or discharge can include:
Visible signs of staining or unusual colors to the pavement or surrounding adjacent
soils
Pungent odors coming from the drainage systems
Discoloration or oily substances in the water or stains and residues detained within
ditches, channels or drain boxes
Abnormal water flow during the dry weather season
• Urban Areas - Evidence of illicit connections or illegal discharges is typically detected at
storm drain outfall locations or at manholes. Signs of an illicit connection or illegal
discharge can include:
Abnormal water flow during the dry weather season
Unusual flows in sub drain systems used for dewatering
Pungent odors coming from the drainage systems
Discoloration or oily substances in the water or stains and residues detained within
ditches, channels or drain boxes
Excessive sediment deposits, particularly adjacent to or near active offsite construction
projects
• Rural Areas - Illicit connections or illegal discharges involving irrigation drainage ditches
are detected by visual inspections. Signs of an illicit discharge can include:
Abnormal water flow during the non-irrigation season
Non-standard junction structures
Broken concrete or other disturbances at or near junction structures
Reporting
Notify- the owner of any illicit connections and illegal dumping or discharge incidents at the time
of discovery. For illicit connections or discharges to the storm drain system, notify the local
stormwater management agency. For illegal dumping, notify the local law enforcement agency.
Cleanup and Removal
The responsibility for cleanup and removal of illicit or illegal dumping or discharges will vary by
location. Contact the local stormwater management agency for further information.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Illicit Connection/Discharge NS-6
Costs
Costs to look for and report illicit connections and illegal discharges and dumping are low. The
best way to avoid costs associated with illicit connections and illegal discharges and dumping is
to keep the project perimeters secure to prevent access to the site, to observe the site for vehicles
that should not be there, and to document any waste or hazardous materials that exist onsite
before taking possession ofthe site.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and at two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect the site regularly to check for any illegal dumping or discharge.
• Prohibit employees and subcontractors from disposing of non-job related debris or materials
at the construction site.
• Notify the owner of any illicit connections and illegal dumping or discharge incidents at the
time of discovery.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Stormwater Quality' Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Potable Water/Irrigation NS-7
Description and Purpose
Potable Water/Irrigation consists of practices and procedures
to manage the discharge of potential pollutants generated
during discharges from irrigation water lines, landscape
irrigation, lavm or garden watering, planned and unplanned
discharges from potable water sources, water Hne flushing, and
hydrant flushing.
Suitable Applications
Implement this BMP whenever potable water or irrigation
water discharges occur at or enter a construction site.
Limitations
None identified.
Implementation
• Direct water from offsite sources around or through a
construction site, where feasible, in a way that minimizes
contact with the construction site.
• Discharges from water line flushing should be reused for
landscaping purposes where feasible.
• Shut off the water source to broken lines, sprinlders, or
valves as soon as possible to prevent excess water flow.
• Protect downstream stormwater drainage systems and
watercourses from water pumped or bailed from trenches
excavated to repair water lines.
• Inspect irrigated areas within the construction limits for
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sedinrent Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
0
Legend:
0 Primary Objective
@ Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bactena
Oil and Grease
Organics
0
0
0
0
Potential Alternatives
None
C AUFOIX>A StOXMttATIR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 2
Potable Water/Irrigation NS-7
excess watering. Adjust watering times and schedules to ensure that the appropriate
amount of water is being used and to minimize runoff. Consider factors such as soil
structure, grade, time of year, and type of plant material in determining the proper amounts
of water for a specific area.
Costs
Cost to manage potable vvater and irrigation are low and generally considered to be a normal
part of related activities.
Inspection and Maintenance
• Inspect and verify tbat activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and at two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
occur.
• Repair broken water lines as soon as possible.
• Inspect irrigated areas regularly for signs of erosion and/or discharge.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 2 of 2
Construction
www.casqa.org
Vehicle and Equipment Cleaning NS-8
Description and Purpose
Vehicle and equipment cleaning procedures and practices
eliminate or reduce the discharge of pollutants to stormwater
from vehicle and equipment cleaning operations. Procedures
and practices include but are not limited to: using offsite
facilities; washing in designated, contained areas only;
eliminating discharges to the storm drain by infiltrating the
wash water; and training employees and subcontractors in
proper cleaning procedures.
Suitable Applications
These procedures are suitable on all construction sites where
vehicle and equipment cleaning is performed.
Limitations
Even phosphate-free, biodegradable soaps have been shown to
be toxic to fish before the soap degrades. Sending
vehicles/equipment offsite should be done in conjunction with
TC-1, Stabilized Construction Entrance/Exit.
Implementation
Other options to washing equipment onsite include contracting
with either an offsite or mobile commercial washing business.
These businesses may be better equipped to handle and dispose
of the wash waters properly. Performing this work offsite can
also be economical by eliminating the need for a separate
washing operation onsite.
If washing operations are to take place onsite, then:
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Conbt)l
0
Legend:
0 Primary Objective
\S Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
Potential Alternatives
None
< AlllUR.\IASrURAIkvA)LR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Vehicle and Equipment Cleaning NS-8
• Use phosphate-free, biodegradable soaps.
• Educate employees and subcontractors on pollution prevention measures.
• Do not permit steam cleaning onsite. Steam cleaning can generate significant pollutant
concentrates.
• Cleaning of vehicles and equipment with soap, solvents or steam should not occur on the
project site unless resulting wastes are fully contained and disposed of. Resulting wastes
should not be discharged or buried, and must be captured and recycled or disposed
according to the requirements of WM-io, Liquid Waste Management or WM-6, Hazardous
Waste Management, depending on the waste characteristics. Minimize use of solvents. Use
of diesel for vehicle and equipment cleaning is prohibited.
• All vehicles and equipment that regularly enter and leave the construction site must be
cleaned offsite.
• When vehicle and equipment washing and cleaning must occur onsite, and the operation
cannot be located within a structure or building equipped with appropriate disposal
facilities, the outside cleaning area should have the following characteristics:
- Located away from storm drain inlets, drainage facilities, or watercourses
- Paved with concrete or asphalt and bermed to contain wash waters and to prevent runon
and runoff
- Configured with a sump to allow collection and disposal of wash water
- No discharge of wash waters to storm drains or watercourses
Used only when necessary
• When cleaning vehicles and equipment with water:
- Use as little water as possible. High-pressure sprayers may use less water than a hose
and should be considered
- Use positive shutoff valve to minimize water usage
- Facility wash racks should discharge to a sanitary sewer, recycle system or other
approved discharge system and must not discharge to the storm drainage system,
watercourses, or to groundwater
Costs
Cleaning vehicles and equipment at an offsite facility may reduce overall costs for vehicle and
equipment cleaning by eliminating the need to provide similar services onsite. When onsite
cleaning is needed, the cost to establish appropriate facilities is relatively low on larger, long-
duration projects, and moderate to high on small, short-duration projects.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Vehicle and Equipment Cleaning NS-8
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and at two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
occur.
• Inspection and maintenance is minimal, although some berm repair may be necessary.
• Monitor employees and subcontractors throughout the duration of the construction project
to ensure appropriate practices are being implemented.
m Inspect sump regularly and remove liquids and sediment as needed.
• Prohibit employees and subcontractors from washing personal vehicles and equipment on
the construction site.
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Swisher, R.D. Surfactant Biodegradation, Marcel Decker Corporation, 1987.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Vehicle and Equipment Fueling NS-9
Description and Purpose
Vehicle equipment fueling procedures and practices are
designed to prevent fuel spills and leaks, and reduce or
eliminate contamination of stormwater. This can be
accomplished by using offsite facilities, fueling in designated
areas only, enclosing or covering stored fuel, implementing spill
controls, and training employees and subcontractors in proper
fueling procedures.
Suitable Applications
These procedures are suitable on all construction sites where
vehicle and equipment fueling takes place.
Limitations
Onsite vehicle and equipment fueling should only be used
where it is impractical to send vehicles and equipment offsite
for fucHng. Sending vehicles and equipment offsite should be
done in conjunction with TC-i, Stabilized Construction
Entrance/ Exit.
Implementation
• Use offsite fueling stations as much as possible. These
businesses are better equipped to handle fuel and spills
properly. Performing this work offsite can also be
economical by eliminating the need for a separate fueling
area at a site.
• Discourage "topping-off' of fuel tanks.
• Absorbent spill cleanup materials and spill kits should be
available in fueling areas and on fueling trucks, and should
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stonmwater
Management Control
Waste Management and
Materials Pollulion Control
Legend:
0 Primary Objective
HI Secondary Objective
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease 0
Organics
Potential Alternatives
None
CAUFORNIA !iTaRMVVAUR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Vehicle and Equipment Fueling NS-9
be disposed of properly after use.
• Drip pans or absorbent pads should be used during vehicle and equipment fueling, unless
the fueling is performed over an impermeable surface in a dedicated fueling area.
• Use absorbent materials on small spills. Do not hose down or bury the spill. Remove the
adsorbent materials promptly and dispose of properly.
• Avoid mobile fueling of mobile construction equipment around the site; rather, transport the
equipment to designated fueling areas. With the exception of tracked equipment such as
bulldozers and large excavators, most vehicles should be able to travel to a designated area
with little lost time.
• Train employees and subcontractors in proper fueling and cleanup procedures.
• When fueling must take place onsite, designate an area away from drainage courses to be
used. Fueling areas should be identified in the SWPPP.
• Dedicated fueling areas should be protected from stormwater runon and runoff, and should
be located at least 50 ft away from downstream drainage facilities and watercourses. Fueling
must be performed on level-grade areas.
• Protect fueling areas with berms and dikes to prevent runon, runoff, and to contain spills.
• Nozzles used in vehicle and equipment fueling should be equipped with an automatic shutoff
to control drips. Fueling operations should not be left unattended.
• Use vapor recovery nozzles to help control drips as well as air pollution where required by
Air Quality Management Districts (AQMD).
• Federal, state, and local requirements should be observed for any stationary above ground
storage tanks.
Costs
• All of the above measures are low cost except for the capital costs of above ground tanks that
meet all local environmental, zoning, and fire codes.
Inspection and Maintenance
• Vehicles and equipment should be inspected each day of use for leaks. Leaks should be
repaired immediately or problem vehicles or equipment should be removed from the project
site.
• Keep ample supplies of spill cleanup materials onsite.
• Immediately clean up spills and properly dispose of contaminated soil and cleanup
materials.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Vehicle and Equipment Fueling NS-9
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Coastal Nonpoint PoUution Control Program: Program Development and Approval Guidance,
Working Group Working Paper; USEPA, April 1992.
Stormwater QuaHty Handbooks - Construction Site Best Management Practices (BMPs) Manual.
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992-
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Vehicle & Equipment Maintenance NS-10
Description and Purpose
Prevent or reduce the contamination of stormwater resulting
from vehicle and equipment maintenance by running a "dry
and clean site". The best option would be to perform
maintenance activities at an offsite facility. If this option is not
available then work should be performed in designated areas
only, while providing cover for materials stored outside,
checking for leaks and spills, and containing and cleaning up
spills immediately. Employees and subcontractors must be
trained in proper procedures.
Suitable Applications
These procedures are suitable on all construction projects
where an onsite yard area is necessary for storage and
maintenance of heavy equipment and vehicles.
Limitations
Onsite vehicle and equipment maintenance should only be used
where it is impractical to send vehicles and equipment offsite
for maintenance and repair. Sending vehicles/equipment
offsite should be done in conjunction with TC-i, Stabilized
Construction Entrance/Exit.
Outdoor vehicle or equipment maintenance is a potentially
significant source of stormwater pollution. Activities that can
contaminate stormwater include engine repair and senice,
changing or replacement of fluids, and outdoor equipment
storage and parking (engine fluid leaks). For further
information on vehicle or equipment servicing, see NS-8,
Vehicle and Equipment Cleaning, and NS-9, Vehicle and
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
0
Legend:
0 Primary Objective
M Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
Potential Alternatives
None
CAUFORNIA KFORMWAIFR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Vehicle & Equipment Maintenance NS-10
Equipment Fueling.
Implementation
• Use offsite repair shops as much as possible. These businesses are better equipped to handle
vehicle fluids and spills properly. Performing this work offsite can also be economical by
eliminating the need for a separate maintenance area.
• If maintenance must occur onsite, use designated areas, located away from drainage courses.
Dedicated maintenance areas should be protected from stormwater runon and runoff, and
should be located at least 50 ft from downstream drainage facilities and watercourses.
• Drip pans or absorbent pads should be used during vehicle and equipment maintenance
work that involves fluids, unless the maintenance work is performed over an impermeable
surface in a dedicated maintenance area.
• Place a stockpile of spill cleanup materials where it will be readily accessible.
• All fueling trucks and fueling areas are required to have spill kits and/or use other spill
protection devices,
• Use adsorbent materials on small spills. Remove the absorbent materials promptly and
dispose of properly.
• Inspect onsite vehicles and equipment daily at startup for leaks, and repair immediately.
• Keep vehicles and equipment clean; do not allow excessive build-up of oil and grease.
• Segregate and recycle wastes, such as greases, used oil or oil filters, antifreeze, cleaning
solutions, automotive batteries, hydraulic and transmission fluids. Provide secondary
containment and covers for these materials if stored onsite.
• Train employees and subcontractors in proper maintenance and spill cleanup procedures.
• Drip pans or plastic sheeting should be placed under all vehicles and equipment placed on
docks, barges, or other structures over water bodies when the vehicle or equipment is
planned to be idle for more than 1 hour.
• For long-term projects, consider using portable tents or covers over maintenance areas if
maintenance cannot be performed offsite.
• Consider use of new, alternative greases and lubricants, such as adhesive greases, for chassis
lubrication and fifth-wheel lubrication.
• Properly dispose of used oils, fluids, lubricants, and spill cleanup materials.
• Do not place used oil in a dumpster or pour into a storm drain or watercourse.
• Properly dispose of or recycle used batteries.
• Do not bury used tires.
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Vehicle & Equipment Maintenance NS-10
• Repair leaks of fluids and oil immediately.
Listed below- is further information if you must perform vehicle or equipment maintenance
onsite.
Sqfer Altemative Products
• Consider products that are less toxic or hazardous than regular products. These products
are often sold under an "environmentally friendly" label.
• Consider use of grease substitutes for lubrication of truck fifth-wheels. Follow
manufacturers label for details on specific uses.
• Consider use of plastic friction plates on truck fifth-wheels in lieu of grease. Follovv
manufacturers label for details on specific uses.
Waste Reduction
Parts are often cleaned using solvents such as trichloroethylene, trichloroethane, or methylene
chloride. Many of these cleaners are listed in CaHfomia Toxic Rule as priority pollutants. These
materials are harmful and must not contaminate stormwater. They must be disposed of as a
hazardous waste. Reducing the number of solvents makes recycling easier and reduces
hazardous waste management costs. Often, one solvent can perform a job as well as two
different solvents. Also, if possible, eliminate or reduce the amount of hazardous materials and
waste by substituting non-hazardous or less hazardous materials. For example, replace
chlorinated organic solvents with non-chlorinated solvents. Non-chlorinated solvents like
kerosene or mineral spirits are less toxic and less expensive to dispose of properly. Check the
list of active ingredients to see whether it contains chlorinated solvents. The "chlor" term
indicates that the solvent is chlorinated. Also, try substituting a wire brush for solvents to clean
parts.
Recycling and Disposal
Separating wastes allows for easier recycling and may reduce disposal costs. Keep hazardous
wastes separate, do not mix used oil solvents, and keep chlorinated solvents (like,-
trichloroethane) separate from non-chlorinated solvents (like kerosene and mineral spirits).
Promptly transfer used fluids to the proper waste or recycling drums. Don't leave full drip pans
or other open containers lying around. Provide cover and secondary containment until these
materials can be removed from the site.
Oil filters can be recycled. Ask your oil supplier or recycler about recycling oil filters.
Do not dispose of extra paints and coatings by dumping liquid onto the ground or throwing it
into dumpsters. Allow coatings to dry or harden before disposal into covered dumpsters.
Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries,
even if you think all the acid has drained out. If you drop a battery, treat it as if it is cracked.
Put it into the containment area until you are sure it is not leaking.
Costs
All of the above are low cost measures. Higher costs are incurred to setup and maintain onsite
maintenance areas.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Vehicle & Equipment Maintenance NS-10
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and at two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
occur.
• Keep ample supplies of spill cleanup materials onsite.
• Maintain waste fluid containers in leak proof condition.
• Vehicles and equipment should be inspected on each day of use. Leaks should be repaired
immediately or the problem vehicle(s) or equipment should be removed from the project
site.
• Inspect equipment for damaged hoses and leaky gaskets routinely. Repair or replace as
needed.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program.
1995-
Coastal Nonpoint Pollution Control Program; Program Development and Approval Guidance,
Working Group, Working Paper; USEPA, April 1992.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
Concrete Curing NS-12
Description and Purpose
Concrete curing is used in the construction of structures such as
bridges, retaining walls, pump houses, large slabs, and
structured foundations. Concrete curing includes the use of
both chemical and water methods.
Concrete and its associated curing materials have basic
chemical properties that can raise the pH of water to levels
outside of the permitted range. Discharges of stormwater and
non-stormwater exposed to concrete during curing may have a
high pH and may contain chemicals, metals, and fines. The
General Permit incorporates Numeric Effluent Limits (NEL)
and Numeric Action Levels (NAL) for pH (see Section 2 of this
handbook to determine your project's risk level and if you are
subject to these requirements).
Proper procedures and care should be taken when managing
concrete curing materials to prevent them from coming into
contact with stormwater flows, which could resuk in a high pH
discharge.
Suitable Applications
Suitable applications include all projects where Portland
Cement Concrete (PCC) and concrete curing chemicals are
placed where they can be exposed to rainfall, runoff from other
areas, or where runoff from the PCC will leave the site.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater
Management Control 0
WM Waste Maiagement and
Materials Pollution Control 0
Legend:
0 Primary Category
\S Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
Potential Alternatives
None
CAUFORMA SrORMWAllR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Concrete Curing NS-12
Limitations
• Runoff contact with concrete waste can raise pH levels in the water to environmentally
harmful levels and trigger permit violations.
Implementation
Chemical Curing
m Avoid over spray of curing compounds.
• Minimize the drift by applying the curing compound close to the concrete surface. Apply an
amount of compound that covers the surface, but does not allow any runoff of the
compound.
• Use proper storage and handling techniques for concrete curing compounds. Refer to WM-
1, Material Delivery and Storage.
• Protect drain inlets prior to the application of curing compounds.
• Refer to WM-4, Spill Prevention and Control.
Water Curing for Bridge Decks, Retaining Walls, and other Structures
m Direct cure water away from inlets and watercourses to coHection areas for evaporation or
other means of removal in accordance with all applicable permits. See WM-8 Concrete
Waste Management.
• Collect cure water at the top of slopes and transport to a concrete waste management area in
a non-erosive manner. See EC-9 Earth Dikes and Drainage Swales, EC-10, Velocity
Dissipation Devices, and EC-11, Slope Drains.
• Utilize wet blankets or a similar method that maintains moisture while minimizing the use
and possible discharge of water.
Education
• Educate employees, subcontractors, and suppliers on proper concrete curing techniques to
prevent contact with discharge as described herein.
• Arrange for the QSP or the appropriately trained contractor's superintendent or
representative to oversee and enforce concrete curing procedures.
Costs
All of the above measures are generally low cost.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities.
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Concrete Curing NS-12
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
occur.
• Sample non-stormwater discharges and stormwater runoff that contacts uncured and
partially cured concrete as required by the General Permit.
• Ensure that employees and subcontractors implement appropriate measures for storage,
handHng, and use of curing compounds.
• Inspect cure containers and spraying equipment for leaks.
References
Blue Print for a Clean Bay-Construction-Related Industries: Best Management Practices for
Stormwater Pollution Prevention; Santa Clara Valley Non Point Source Pollution Control
Program, 1992.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of CaHfornia Department of Transportation (Caltrans), March 2003.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
Erosion and Sediment Control Manual, Oregon Department of Environmental Quality, February
2005.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Concrete Finisfiing NS-13
Description and Purpose
Concrete finishing methods are used for bridge deck
rehabilitation, paint removal, curing compound removal, and
final surface finish appearances. Methods include sand
blasting, shot blasting, grinding, or high pressure water
blasting. Stormwater and non-stormwater exposed to concrete
finishing by-products may have a high pH and may contain
chemicals, metals, and fines. Proper procedures and
implementation of appropriate BMPs can minimize the impact
that concrete-finishing methods may have on stormwater and
non-stormwater discharges.
The General Permit incorporates Numeric Effluent Limits
(NEL) and Numeric Action Levels (NAL) for pH (see Section 2
of this handbook to determine your project's risk level and if
you are subject to these requirements).
Concrete and its associated curing materials have basic
chemical properties that can raise pH levels outside of the
permitted range. Additional care should be taken when
managing these materials to prevent them from coming into
contact vvith stormwater flows, which could lead to exceedances
of the General Permit requirements.
Suitable Applications
These procedures apply to all construction locations where
concrete finishing operations are performed.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater
Management Control 0
WM Waste Management and
Matenals Pollutksn Control 0
Legend:
0 Primary Category
@ Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
Potential Alternatives
None
CAUFORMA STORkFMATFR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
Concrete Finishing NS-13
Limitations
• Runoff contact with concrete waste can raise pH levels in the water to environmentally
harmful levels and trigger permit violations.
Implementation
• Collect and properly dispose of water from high-pressure water blasting operations.
• Collect contaminated water from blasting operations at the top of slopes. Transport or
dispose of contaminated water while using BMPs such as those for erosion control. Refer to
EC-9, Earth Dikes and Drainage Swales, EC-io, Velocity Dissipation Devices, and EC-ii,
Slope Drains.
• Direct water from blasting operations away from inlets and watercourses to collection areas
for infiltration or other means of removal (dewatering). Refer to NS-2 Dewatering
Operations.
• Protect inlets during sandblasting operations. Refer to SE-io, Storm Drain Inlet Protection.
• Refer to WM-8, Concrete Waste Management for disposal of concrete debris.
• Minimize the drift of dust and blast material as much as possible by keeping the blasting
nozzle close to the surface.
• When blast residue contains a potentially hazardous waste, refer to WM-6, Hazardous Waste
Management.
Education
• Educate employees, subcontractors, and suppliers on proper concrete finishing techniques
to prevent contact with discharge as described herein.
• Arrange for the QSP or the appropriately trained contractor's superintendent or
representative to oversee and enforce concrete finishing procedures.
Costs
These measures are generally of low cost.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities.
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Inspect BMPs subject to non-stormwater discharges daily while non-stormwater discharges
occur.
• Sample non-stormwater discharges and stormwater runoff that contacts concrete dust and
debris as required by the General Permit.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Concrete Finishing NS-13
• Sweep or vacuum up debris from sandblasting at the end of each shift.
• At the end of each work shift, remove and contain liquid and solid waste from containment
structures, if any, and from the general work area.
• Inspect containment structures for damage prior to use and prior to onset of forecasted rain.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
ii995-
Stormwater Quality' Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Management for Construction Activities, Developing Pollution Prevention Plans
and Best Management Practices, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Material Delivery and Storage WM-1
Description and Purpose
Prevent, reduce, or eliminate the discharge of pollutants from
material delivery and storage to the stormwater system or
watercourses by minimizing the storage of hazardous materials
onsite, storing materials in watertight containers and/or a
completely enclosed designated area, installing secondary
containment, conducting regular inspections, and training
employees and subcontractors.
This best management practice covers only material delivery
and storage. For other information on materials, see WM-2,
Material Use, or WM-4, Spill Prevention and Control. For
information on wastes, see the waste management BMPs in this
section.
Suitable Applications
These procedures are suitable for use at all construction sites
with delivery and storage of the following materials:
• Soil stabilizers and binders
• Pesticides and herbicides
• Fertilizers
• Detergents
• Plaster
• Petroleum products such as fuel, oil, and grease
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollutkm Control
Legend:
EI Primary Category
Secondary Category
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oii and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
CALIFORNIA STORMWATCR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of S
Material Delivery and Storage WM-1
• Asphalt and concrete components
• Hazardous chemicals such as acids, lime, glues, adhesives, paints, solvents, and curing
compounds
• Concrete compounds
• Other materials that may be detrimental if released to the environment
Limitations
• Space limitation may preclude indoor storage.
• Storage sheds often must meet building and fire code requirements.
Implementation
The following steps should be taken to minimize risk:
• Chemicals must be stored in water tight containers with appropriate secondary containment
or in a storage shed.
• When a material storage area is located on bare soil, the area should be lined and bermed.
• Use containment pallets or other practica! and available solutions, such as storing materials
within newly constructed buildings or garages, to meet material storage requirements.
• Stack erodible landscape material on pallets and cover when not in use.
• Contain all fertilizers and other landscape materials when not in use.
• Temporary storage areas should be located away from vehicular traffic.
• Material Safety Data Sheets (MSDS) should be available on-site for all materials stored that
have the potential to effect water quality-.
• Construction site areas should be designated for material delivery and storage.
• Material delivery and storage areas should be located away from waterways, if possible.
- Avoid transport near drainage paths or watenvays.
Surround with earth berms or other appropriate containment BMP. See EC-9, Earth
Dikes and Drainage Swales.
Place in an area that will be paved.
• Storage of reactive, ignitable, or flammable liquids must comply with the fire codes of your
area. Contact the local Fire Marshal to review site materials, quantities, and proposed
storage area to determine specific requirements. See the Flammable and Combustible
Liquid Code, NFPA30.
• An up to date inventory of materials delivered and stored onsite should be kept.
November 2009 California Stormwater BMP Handbook 2 of 5
Construction
www.casqa.org
Material Delivery and Storage WM-1
• Hazardous materials storage onsite should be minimized.
• Hazardous materials should be handled as infrequently as possible.
• Keep ample spill cleanup supplies appropriate for the materials being stored. Ensure that
cleanup supplies are in a conspicuous, labeled area.
• Employees and subcontractors should be trained on the proper material delivery and storage
practices.
• Employees trained in emergency spill cleanup procedures must be present when dangerous
materials or liquid chemicals are unloaded.
• If significant residual materials remain on the ground after construction is complete,
properly remove and dispose of materials and any contaminated soil. See WM-7,
Contaminated Soil Management. If the area is to be paved, pave as soon as materials are
removed to stabilize the soil.
Material Storage Areas and Practices
m Liquids, petroleum products, and substances listed in 40 CFR Parts 110,117, or 302 should
be stored in approved containers and drums and should not be overfilled. Containers and
drums should be placed in temporary containment faciHties for storage.
• A temporary containment facility' should provide for a spill containment volume able to
contain precipitation from a 25 year storm event, plus the greater of 10% of the aggregate
volume of all containers or 100% of the capacity ofthe largest container within its boundary,
whichever is greater.
• A temporary containment facility- should be impenious to the materials stored therein for a
minimum contact time of 72 hours.
• A temporary containment facility should be maintained free of accumulated rainwater and
spills. In the event of spills or leaks, accumulated rainwater and spills should be collected
and placed into drums. These liquids should be handled as a hazardous waste unless testing
determines them to be non-hazardous. All collected liquids or non-hazardous liquids should
be sent to an approved disposal site.
• Sufficient separation should be provided between stored containers to allow for spill cleanup
and emergency response access.
• Incompatible materials, such as chlorine and ammonia, should not be stored in the same
temporary containment facility.
• Materials should be covered prior to, and during rain events.
• Materials should be stored in their original containers and the original product labels should
be maintained in place in a legible condition. Damaged or othenvise illegible labels should
be replaced immediately.
November 2009 California Stormwater BMP Handbook 3 of 5
Construction
www.casqa.org
Material Delivery and Storage WM-1
• Bagged and boxed materials should be stored on pallets and should not be allowed to
accumulate on the ground. To provide protection from wind and rain throughout the rainy
season, bagged and boxed materials should be covered during non-working days and prior to
and during rain events.
• Stockpiles should be protected in accordance with W^M-3, Stockpile Management.
• Materials should be stored Indoors within existing structures or completely enclosed storage
sheds when available.
• Proper storage instructions should be posted at all times in an open and conspicuous
location.
• An ample supply of appropriate spill clean up material should be kept near storage areas.
• Also see WM-6, Hazardous Waste Management, for storing of hazardous wastes.
Material Delivery Practices
m Keep an accurate, up-to-date inventory of material delivered and stored onsite.
• Arrange for employees trained in emergency spill cleanup procedures to be present when
dangerous materials or liquid chemicals are unloaded.
Spill Cleanup
• Contain and clean up any spill immediately.
• Properly remove and dispose of any hazardous materials or contaminated soil if significant
residual materials remain on the ground after construction is complete. See WM-7,
Contaminated Soil Management.
• See WM-4, Spill Prevention and Control, for spills of chemicals and/or hazardous materials.
• If spills or leaks of materials occur that are not contained and could discharge to surface
waters, non-visible sampling of site discharge may be required. Refer to the General Permit
or to your project specific Construction Site Monitoring Plan to determine if and where
sampling is required.
Cost
• The largest cost of implementation may be in the construction of a materials storage area
that is covered and provides secondary containment.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Keep storage areas clean and well organized, including a current list of all materials onsite.
• Inspect labels on containers for legibility and accuracy.
November 2009 California Stormwater BMP Handbook 4 of 5
Construction
www.casqa.org
Material Delivery and Storage WM-1
• Repair or replace perimeter controls, containment structures, covers, and liners as needed to
maintain proper function.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Coastal Nonpoint Pollution Control Program: Program Development and Approval Guidance,
Working Group Working Paper; USEPA, April 1992.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 5 of 5
Construction
www.casqa.org
Material Use WM-2
Description and Purpose
Prevent or reduce the discharge of pollutants to the storm drain
system or watercourses from material use by using alternative
products, minimizing hazardous material use onsite, and
training employees and subcontractors.
Suitable Applications
This BMP is suitable for use at all construction projects. These
procedures apply when the following materials are used or
prepared onsite:
• Pesticides and herbicides
• Fertilizers
• Detergents
• Petroleum products such as fuel, oil, and grease
• Asphalt and other concrete components
• Other hazardous chemicals such as acids, lime, glues,
adhesives, paints, solvents, and curing compounds
• Other materials that may be detrimental if released to the
environment
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollutron Control
Legend:
0 Primary Category
m Secondary Category
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
CAUFORMA STORMWAriK
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Material Use WM-2
Limitations
Safer alternative building and construction products may not be available or suitable in every
instance.
Implementation
The following steps should be taken to minimize risk:
• Minimize use of hazardous materials onsite.
• Follow manufacturer instructions regarding uses, protective equipment, ventilation,
flammability, and mixing of chemicals.
• Train personnel who use pesticides. The California Department of Pesticide Regulation and
county agricultural commissioners license pesticide dealers, certify pesticide applicators,
and conduct onsite inspections.
• The preferred method of termiticide application is soil injection near the existing or
proposed structure foundation/slab; however, if not feasible, soil drench application of
termiticides should follow EPA label guidelines and the following recommendations (most
of which are applicable to most pesticide applications):
• Do not treat soil that is water-saturated or frozen.
• Application shall not commence within 24-hours of a predicted precipitation event vvith
a 40% or greater probability. Weather tracking must be performed on a daily basis prior
to termiticide application and during the period of termiticide application.
• Do not allow treatment chemicals to runoff from the target area. Apply proper quantity
to prevent excess runoff. Provide containment for and divert stormwater from
application areas using berms or diversion ditches during application.
• Dry season: Do not apply within 10 feet of storm drains. Do not apply within 25 feet of
aquatic habitats (such as, but not Hmited to, lakes; reservoirs; rivers; permanent
streams; marshes or ponds; estuaries; and commercial fish farm ponds).
• Wet season: Do not apply within 50 feet of storm drains or aquatic habitats (such as, but
not limited to, lakes; reservoirs; rivers; permanent streams; marshes or ponds; estuaries;
and commercial fish farm ponds) unless a vegetative buffer is present (if so, refer to dry
season requirements).
• Do not make on-grade applications when sustained wind speeds are above 10 mph (at
application site) at nozzle end height.
• Cover treatment site prior to a rain event in order to prevent run-off of the pesticide into
non-target areas. The treated area should be limited to a size that can be backfilled
and/or covered by the end of the work shift. Backfilling or covering of the treated area
shall be done by the end of the same work shift in which the application is made.
• The applicator must either cover the soil him/herself or provide written notification of
the above requirement to the contractor on site and to the person commissioning the
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Material Use WM-2
application (if different than the contractor). If notice is provided to the contractor or the
person commissioning the application, then they are responsible under the Federal
Insecticide Fungicide, and Rodenticide Act (FIFRA) to ensure that: i) if the concrete slab
cannot be poured over the treated soil within 24 hours of application, the treated soil is
covered with a waterproof covering (such as polyethylene sheeting), and 2) the treated
soil is covered if precipitation is predicted to occur before the concrete slab is scheduled
to be poured.
Do not over-apply fertilizers, herbicides, and pesticides. Prepare only the amount needed.
Follow the recommended usage instructions. Over-application is expensive and
environmentally harmful. Unless on steep slopes, till fertilizers into the soil rather than
hydraulic application. Apply surface dressings in several smaller applications, as opposed to
one large application, to allow time for infiltration and to avoid excess material being carried
offsite by runoff. Do not apply these chemicals before predicted rainfall.
Train employees and subcontractors in proper material use.
Supply Material Safety Data Sheets (MSDS) for all materials.
Dispose of latex paint and paint cans, used brushes, rags, absorbent materials, and drop
cloths, when thoroughly dry and are no longer hazardous, with other construction debris.
Do not remove the original product label; it contains important safety' and disposal
information. Use the entire product before disposing of the container.
Mix paint indoors or in a containment area. Never clean paintbrushes or rinse paint
containers into a street, gutter, storm drain, or watercourse. Dispose of any paint thinners,
residue, and sludge(s) that cannot be recycled, as hazardous waste.
For water-based paint, clean brushes to the extent practicable, and rinse to a drain leading to
a sanitary sewer where permitted, or contain for proper disposal off site. For oil-based
paints, clean brushes to the extent practicable, and filter and reuse thinners and solvents.
Use recycled and less hazardous products when practical. Recycle residual paints, solvents,
non-treated lumber, and other materials.
Use materials only where and when needed to complete the construction activity. Use safer
alternative materials as much as possible. Reduce or eliminate use of hazardous materials
onsite when practical.
Document the location, time, chemicals appHed, and applicator's name and qualifications.
Keep an ample supply of spill clean up material near use areas. Train employees in spill
clean up procedures.
Avoid exposing applied materials to rainfall and runoff unless sufficient time has been
allowed for them to dry.
Discontinue use of erodible landscape material within 2 days prior to a forecasted rain event
and materials should be covered and/or bermed.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Material Use WM-2
• Provide containment for material use areas such as masons' areas or paint
mixing/preparation areas to prevent materials/pollutants from entering stormwater.
Costs
All of the above are low cost measures.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities.
m BMPs must be inspected in accordance with General Permit requirements for the associated
project ty-pe and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Ensure employees and subcontractors throughout the job are using appropriate practices.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Coastal Nonpoint Pollution Control Program: Program Development and Approval Guidance,
Working Group Working Paper; USEPA, April 1992.
Comments on Risk Assessments Risk Reduction Options for Cypermethrin: Docket No. OPP-
2005-0293; California Stormwater Quality Association (CASQA) letter to USEPA,
20o6.Environmental Hazard and General Labeling for Pyrethroid Non-Agricultural Outdoor
Products, EPA-HQ-OPP-2008-0331-0021; USEPA, 2008.
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of CaHfornia Department of Transportation (Cahrans), March 2003.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
stockpile Management WM-3
Description and Purpose
Stockpile management procedures and practices are designed
to reduce or eliminate air and stormwater pollution from
stockpiles of soil, soil amendments, sand, paving materials such
as Portland cement concrete (PCC) rubble, asphalt concrete
(AC), asphalt concrete rubble, aggregate base, aggregate sub
base or pre-mixed aggregate, asphalt minder (so called "cold
mix" asphalt), and pressure treated wood.
Suitable Applications
Implement in all projects that stockpile soil and other loose
materials.
Limitations
• Plastic sheeting as a stockpile protection is temporary and
hard to manage in windy conditions. Where plastic is used,
consider use of plastic tarps with nylon reinforcement
which may be more durable than standard sheeting,
• Plastic sheeting can increase runoff volume due to lack of
infiltration and potentially cause perimeter control failure.
• Plastic sheeting breaks down faster in sunlight.
• The use of Plastic materials and photodegradable plastics
should be avoided.
Implementation
Protection of stockpiles is a year-round requirement. To properly
manage stockpiles:
Categories
EC Erosion Control
SE Sediment Control m
TC Tracking Control
WE Wind Erosion Control
NS Non-Stormwater m NS Management Control m
WM Waste Management and 0 WM Materials Pollution Control 0
Legend:
0 Primary Category
m Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bactena
Oil and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
CAUFORMA STORHlVArtR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 3
stockpile Management WM-3
• On larger sites, a minimum of 50 ft separation from concentrated flows of stormwater,
drainage courses, and inlets is recommended.
• All stockpiles are required to be protected immediately if they are not scheduled to be used
within 14 days.
• Protect all stockpiles from stormwater runon using temporary perimeter sediment barriers
such as compost berms (SE-13), temporary silt dikes (SE-12), fiber rolls (SE-5), silt fences
(SE-i), sandbags (SE-8), gravel bags (SE-6), or biofiher bags (SE-14). Refer to the individual
fact sheet for each of these controls for installation information.
• Implement wind erosion control practices as appropriate on all stockpiled material. For
specific information, see WE-i, Wind Erosion Control.
• Manage stockpiles of contaminated soil in accordance with WM-7, Contaminated Soil
Management.
• Place bagged materials on pallets and under cover.
• Ensure that stockpile coverings are installed securely to protect from wind and rain.
• Some plastic covers withstand weather and sunlight better than others. Select cover
materials or methods based on anticipated duration of use.
Protection qf iVon-Acfiue Stockpiles
Non-active stockpiles ofthe identified materials should be protected further as follows:
Soil stockpiles
m Soil stockpiles should be covered or protected with soil stabilization measures and a
temporary perimeter sediment barrier at all times.
• Temporary vegetation should be considered for topsoil piles that will be stockpiled for
extended periods.
Stockpiles of Portland cement concrete rubble, asphalt concrete, asphalt concrete rubble,
aggregate base, or aggregate sub base
• Stockpiles should be covered and protected with a temporary perimeter sediment barrier at
all times.
Stockpiles of "cold mix"
m Cold mix stockpiles should be placed on and covered with plastic sheeting or comparable
material at all times and surrounded by a berm.
Stockpiles of fly ash, stucco, hydrated lime
• Stockpiles of materials that may raise the pH of runoff (i.e., basic materials) should be
covered with plastic and surrounded by a berm.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
stockpile Management WM-3
Stockpiles/Storage of wood (Pressure treated with chromated copper arsenate or ammoniacal
copper zinc arsenate
m Treated wood should be covered with plastic sheeting or comparable material at all times
and surrounded by a berm.
Protection of Active Stockpiles
Active stockpiles of the identified materials should be protected as follows:
• All stockpiles should be covered and protected with a temporary linear sediment barrier
prior to the onset of precipitation.
• Stockpiles of "cold mix" and treated wood, and basic materials should be placed on and
covered with plastic sheeting or comparable material and surrounded by a berm prior to the
onset of precipitation.
• The downstream perimeter of an active stockpile should be protected with a linear sediment
barrier or berm and runoff should be diverted around or away from the stockpile on the
upstream perimeter.
Costs
For cost information associated with stockpile protection refer to the individual erosion or
sediment control BMP fact sheet considered for implementation (For example, refer to SE-i Silt
Fence for installation of silt fence around the perimeter of a stockpile.)
Inspection and Maintenance
• Stockpiles must be inspected in accordance with General Permit requirements for the
associated project type and risk level. It is recommended that at a minimum, BMPs be
inspected weekly, prior to forecasted rain events, daily during extended rain events, and
after the conclusion of rain events.
• It may be necessary to inspect stockpiles covered with plastic sheeting more frequently
during certain conditions (for example, high winds or extreme heat).
• Repair and/or replace perimeter controls and cov^ers as needed to keep them functioning
properly.
• Sediment shall be removed when it reaches one-third of the barrier height.
References
Stormwater Quality' Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Spill Prevention and Control WM-4
Description and Purpose
Prevent or reduce the discharge of pollutants to drainage
systems or watercourses from leaks and spills by reducing the
chance for spills, stopping the source of spills, containing and
cleaning up spills, properly disposing of spill materials, and
training employees.
This best management practice covers only spill prevention and
control. However, WM-i, Materials Delivery and Storage, and
WM-2, Material Use, also contain useful information,
particularly on spill prevention. For information on wastes, see
the waste management BMPs in this section.
Suitable Applications
This BMP is suitable for all construction projects. Spill control
procedures are implemented anytime chemicals or hazardous
substances are stored on the construction site, including the
following materials:
• Soil stabilizers/binders
• Dust palliatives
• Herbicides
• Growth inhibitors
• Fertilizers
• Deicing/anti-icing chemicals
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Manag^nent and
Materials Pollution Controi
Legend:
0 Primary Objective
IS Secondary Objective
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Gre^
Organics
0
0
0
0
0
0
Potential Alternatives
None
CAUFORMA SFORHMATER
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 6
Spill Prevention and Control WM-4
• Fuels
• Lubricants
• Other petroleum distillates
Limitations
• In some cases it may be necessary to use a private spill cleanup company.
• This BMP applies to spills caused by the contractor and subcontractors.
• Procedures and practices presented in this BMP are general. Contractor should identify
appropriate practices for the specific materials used or stored onsite
Implementation
The following steps will help reduce the stormwater impacts of leaks and spills:
Education
• Be aware that different materials pollute in different amounts. Make sure that each
employee knows what a "significant spill" is for each material they use, and what is the
appropriate response for "significant" and "insignificant" spills.
• Educate employees and subcontractors on potential dangers to humans and the
environment from spills and leaks.
• Hold regular meetings to discuss and reinforce appropriate disposal procedures (incorporate
into regular safety meetings).
• Establish a continuing education program to indoctrinate new employees.
• Have contractor's superintendent or representative oversee and enforce proper spill
prevention and control measures.
General Measures
m To the extent that the work can be accomplished safely, spills of oil, petroleum products,
substances Hsted under 40 CFR parts 110,117, and 302, and sanitary and septic wastes
should be contained and cleaned up immediately.
• Store hazardous materials and wastes in covered containers and protect from vandalism.
• Place a stockpile of spil! cleanup materials where it will be readily accessible.
• Train employees in spill prevention and cleanup.
• Designate responsible individuals to oversee and enforce control measures.
• Spills should be covered and protected from stormwater runon during rainfall to the extent
that it doesn't compromise clean up activities.
• Do not bury or wash spills with water.
November 2009 California Stormwater BMP Handbook 2 of 6
Construction
www.casqa.org
Spill Prevention and Control WM-4
• Store and dispose of used clean up materials, contaminated materials, and recovered spill
material that is no longer suitable for the intended purpose in conformance with the
provisions in applicable BMPs.
• Do not allow water used for cleaning and decontamination to enter storm drains or
watercourses. Collect and dispose of contaminated water in accordance with WTVl-io, Liquid
Waste Management.
• Contain water overflow or minor water spillage and do not allow it to discharge into
drainage facilities or watercourses.
• Place proper storage, cleanup, and spill reporting instructions for hazardous materials
stored or used on the project site in an open, conspicuous, and accessible location.
• Keep waste storage areas clean, well organized, and equipped with ample cleanup supplies
as appropriate for the materials being stored. Perimeter controls, containment structures,
covers, and liners should be repaired or replaced as needed to maintain proper function.
Cleanup
• Clean up leaks and spills immediately.
• Use a rag for small spills on paved surfaces, a damp mop for general cleanup, and absorbent
material for larger spills. If the spilled material is hazardous, then the used cleanup
materials are also hazardous and must be sent to either a certified laundry (rags) or disposed
of as hazardous waste.
• Never hose down or bury dry material spills. Clean up as much of the material as possible
and dispose of properly. See the waste management BMPs in this section for specific
information.
Minor Spills
• Minor spills typically involve small quantities of oil, gasoline, paint, etc. which can be
controlled by the first responder at the discovery of the spill.
• Use absorbent materials on small spills rather than hosing down or burying the spill.
• Absorbent materials should be promptly removed and disposed of properly.
• Follow the practice below for a minor spill:
- Contain the spread of the spill.
Recover spilled materials.
- Clean the contaminated area and properly dispose of contaminated materials.
Semi-Sign\ficant Spills
• Serai-significant spills still can be controlled by the first responder along with the aid of
other personnel such as laborers and the foreman, etc. This response may require the
cessation of all other activities.
November 2009 California Stormwater BMP Handbook 3 of 6
Construction
www.casqa.org
Spill Prevention and Control WM-4
• Spills should be cleaned up immediately:
- Contain spread of the spiH.
- Notify the project foreman immediately.
- If the spill occurs on paved or impermeable surfaces, clean up using "dry" methods
(absorbent materials, cat litter and/or rags). Contain the spill by encircling with
absorbent materials and do not let the spill spread widely.
- If the spill occurs in dirt areas, immediately contain the spill by constructing an earthen
dike. Dig up and properly dispose of contaminated soil.
- If the spill occurs during rain, cover spill with tarps or other material to prevent
contaminating runoff.
Significant/Hazardous Spills
m For significant or hazardous spills that cannot be controlled by personnel in the immediate
vicinity, the following steps should be taken:
- Notify the local emergency response by dialing 911. In addition to 911, the contractor will
notify the proper county officials. It is the contractor's responsibility to have all
emergency phone numbers at the construction site.
- Notify the Governor's Office of Emergency Senices Warning Center, (916) 845-8911.
- For spills of federal reportable quantities, in conformance with the requirements in 40
CFR parts 110,119, and 302, the contractor should notify the National Response Center
at (800) 424-8802.
- Notification should first be made by telephone and followed up with a wTitten report.
- The services of a spills contractor or a Haz-Mat team should be obtained immediately.
Construction personnel should not attempt to clean up until the appropriate and
qualified staffs have arrived at the job site.
- Other agencies which may need to be consulted include, but are not limited to, the Fire
Department, the PubHc Works Department, the Coast Guard, the Highway Patrol, the
City/County Police Department, Department of Toxic Substances, California Division of
Oil and Gas, Cal/OSHA, etc.
Reporting
• Report significant spills to local agencies, such as the Fire Department; they can assist in
cleanup.
• Federal regulations require that any significant oil spill into a water body or onto an
adjoining shoreline be reported to the National Response Center (NRC) at 800-424-8802
(24 hours).
Use the following measures related to specific activities:
November 2009 California Stormwater BMP Handbook 4 of 6
Construction
www.casqa.org
Spill Prevention and Control WM-4
Vehicle and Equipment Maintenance
• If maintenance must occur onsite, use a designated area and a secondary containment,
located away from drainage courses, to prevent the runon of stormwater and the runoff of
spills.
• Regularly inspect onsite vehicles and equipment for leaks and repair immediately
• Check incoming vehicles and equipment (including delivery trucks, and employee and
subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or
equipment onsite.
• Always use secondary containment, such as a drain pan or drop cloth, to catch spills or leaks
when removing or changing fluids.
• Place drip pans or absorbent materials under paving equipment when not in use.
• Use absorbent materials on small spiUs rather than hosing down or burying the spill.
Remove the absorbent materials promptly and dispose of properly.
• Promptly transfer used fluids to the proper waste or recycling drums. Don't leave full drip
pans or other open containers lying around
• Oil filters disposed of in trashcans or dumpsters can leak oil and pollute stormwater. Place
the oil filter in a funnel over a waste oil-recycling drum to drain excess oil before disposal.
Oil filters can also be recycled. Ask the oil supplier or recycler about recycling oil filters.
• Store cracked batteries in a non-leaking secondary container. Do this with all cracked
batteries even if you think all the acid has drained out. If you drop a battery, treat it as if it is
cracked. Put it into the containment area until you are sure it is not leaking.
Vehicle and Equipment Fueling
m If fueling must occur onsite, use designate areas, located away from drainage courses, to
prevent the runon of stormwater and the runoff of spills.
• Discourage "topping off' of fuel tanks.
• Always use secondary containment, such as a drain pan, when fueling to catch spills/ leaks.
Costs
Prevention of leaks and spills is inexpensive. Treatment and/ or disposal of contaminated soil
or water can be quite expensive.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and of two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges
occur.
November 2009 California Stormwater BMP Handbook 5 of 6
Construction
www.casqa.org
Spill Prevention and Control WM-4
• Keep ample supplies of spill control and cleanup materials onsite, near storage, unloading,
and maintenance areas.
• Update your spiH prevention and control plan and stock cleanup materials as changes occur
in the types of chemicals onsite.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 6 of 6
Construction
www.casqa.org
Solid Waste Management WM-5
Description and Purpose
Solid waste management procedures and practices are designed
to prevent or reduce the discharge of pollutants to stormwater
from solid or construction waste by providing designated waste
collection areas and containers, arranging for regular disposal,
and training employees and subcontractors.
Suitable Applications
This BMP is suitable for construction sites where the following
wastes are generated or stored:
• Solid waste generated from trees and shrubs removed
during land clearing, demolition of existing structures
(rubble), and building construction
• Packaging materials including wood, paper, and plastic
• Scrap or surplus building materials including scrap metals,
rubber, plastic, glass pieces and masonry products
• Domestic wastes including food containers such as beverage
cans, coffee cups, paper bags, plastic wrappers, and
cigarettes
• Construction wastes including brick, mortar, timber, steel
and metal scraps, pipe and electrical cuttings, non-
hazardous equipment parts, styTofoam and other materials
used to transport and package construction materials
• Highway planting wastes, including vegetative material.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stonmwater
Management Control
Waste Maiagement and
Materials Pollutron Contd 0
Legend:
0 Primary Objective
HI Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
C AUrORMA SrORMHAl tR
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Solid Waste Management WM-5
plant containers, and packaging materials
Limitations
Temporary stockpiling of certain construction wastes may not necessitate stringent drainage
related controls during the non-rainy season or in desert areas with low rainfall.
Implementation
The following steps will help keep a clean site and reduce stormwater pollution:
• Select designated waste collection areas onsite.
• Inform trash-hauling contractors that you wiH accept only watertight dumpsters for onsite
use. Inspect dumpsters for leaks and repair any dumpster that is not watertight.
• Locate containers in a covered area or in a secondary containment.
• Provide an adequate number of containers with lids or covers that can be placed over the
container to keep rain out or to prevent loss of wastes when it is windy.
• Plan for additional containers and more frequent pickup during the demolition phase of
construction.
• Collect site trash daily, especially during rainy and windy conditions.
• Remove this solid waste promptly since erosion and sediment control devices tend to collect
litter.
• Make sure that toxic liquid wastes (used oils, solvents, and paints) and chemicals (acids,
pesticides, additives, curing compounds) are not disposed of in dumpsters designated for
construction debris.
• Do not hose out dumpsters on the construction site. Leave dumpster cleaning to the trash
hauling contractor.
• Arrange for regular waste collection before containers overflow.
• Clean up immediately if a container does spill.
• Make sure that construction waste is collected, removed, and disposed of only at authorized
disposal areas.
Education
• Have the contractor's superintendent or representative oversee and enforce proper solid
waste management procedures and practices.
• Instruct employees and subcontractors on identification of solid waste and hazardous waste.
• Educate employees and subcontractors on solid waste storage and disposal procedures.
• Hold regular meetings to discuss and reinforce disposal procedures (incorporate into regular
safety meetings).
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Solid Waste Management WM-5
• Require that employees and subcontractors follow solid waste handling and storage
procedures.
• Prohibit littering by employees, subcontractors, and visitors.
• Minimize production of solid waste materials wherever possible.
Collection, Storage, and Disposal
m Littering on the project site should be prohibited.
• To prevent clogging of the storm drainage system, litter and debris removal from drainage
grates, trash racks, and ditch lines should be a priority.
• Trash receptacles should be provided in the contractor's yard, field trailer areas, and at
locations where workers congregate for lunch and break periods.
• Litter from work areas within the construction limits of the project site should be collected
and placed in watertight dumpsters at least weekly, regardless of whether the litter was
generated by the contractor, the public, or others. Collected litter and debris should not be
placed in or next to drain inlets, stormwater drainage systems, or watercourses.
• Dumpsters of sufficient size and number should be provided to contain the solid waste
generated by the project.
• Full dumpsters should be removed from the project site and the contents should be disposed
of by the trash hauling contractor.
• Construction debris and waste should be removed from the site biweekly or more frequently
as needed.
• Construction material visible to the public should be stored or stacked in an orderly manner.
• Stormwater runon should be prevented from contacting stored solid waste through the use
of berms, dikes, or other temporary diversion structures or through the use of measures to
elevate waste from site surfaces.
• Solid waste storage areas should be located at least 50 ft from drainage facilities and
watercourses and should not be located in areas prone to flooding or ponding.
• Except during fair weather, construction and highway planting waste not stored in
watertight dumpsters should be securely covered from wind and rain by covering the waste
with tarps or plastic.
• Segregate potentially hazardous waste from non-hazardous construction site waste.
• Make sure that toxic Hquid wastes (used oils, solvents, and paints) and chemicals (acids,
pesticides, additives, curing compounds) are not disposed of in dumpsters designated for
construction debris.
• For disposal of hazardous waste, see WM-6, Hazardous Waste Management. Have
hazardous waste hauled to an appropriate disposal and/or recycling facility.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Solid Waste Management WM-5
• Salvage or recycle useful vegetation debris, packaging and surplus building materials when
practical. For example, trees and shrubs from land clearing can be used as a brush barrier,
or converted into wood chips, then used as mulch on graded areas. Wood pallets, cardboard
boxes, and construction scraps can also be recycled.
Costs
All of the above are low cost measures.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and of two-week inten'als in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges
occur
• Inspect construction waste area regularly.
• Arrange for regular waste collection.
References
Processes, Procedures and Methods to Control Pollution Resulting from All Construction
Activity, 430/9-73-007, USEPA, 1973-
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
Hazardous Waste Management WM-6
Description and Purpose
Prevent or reduce the discharge of pollutants to stormwater from
hazardous waste through proper material use, waste disposal,
and training of employees and subcontractors.
Suitable Applications
This best management practice (BMP) applies to all construction
projects. Hazardous waste management practices are
implemented on construction projects that generate waste from
the use of:
- Petroleum Products
- Concrete Curing Compounds
- Palliatives
- Septic Wastes
- Stains
- Wood Presen'atives
- Asphalt Products
- Pesticides
- Acids
- Paints
- Solvents
- Roofing Tar
Any materials deemed a hazardous waste in California,
Titie 22 Division 4.5, or listed in 40 CFR Parts 110,117,
261, or 302
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollutron Control 0
Legend:
0 Primary Objective
M Secondary Objective
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
0
0
Potential Alternatives
None
IALIFURMA S FORMWAI tK
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 6
Hazardous Waste Management WM-6
In addition, sites with existing structures may contain wastes, which must be disposed of in
accordance with federal, state, and local regulations. These wastes include:
• Sandblasting grit mixed with lead-, cadmium-, or chromium-based paints
• Asbestos
• PCBs (particularly in older transformers)
Limitations
• Hazardous waste that cannot be reused or recycled must be disposed of by a licensed
hazardous waste hauler.
• Nothing in this BMP relieves the contractor from responsibility for compHance with federal,
state, and local laws regarding storage, handling, transportation, and disposal of hazardous
wastes.
• This BMP does not cover aerially deposited lead (ADL) soils. For ADL soils refer to WM-7,
Contaminated Soil Management.
Implementation
The following steps will help reduce stormwater pollution from hazardous wastes:
Material Use
• Wastes should be stored in sealed containers constructed of a suitable material and should
be labeled as required by Title 22 CCR, Division 4.5 and 49 CFR Parts 172,173,178, and 179.
• All hazardous waste should be stored, transported, and disposed as required in Title 22 CCR,
Division 4.5 and 49 CFR 261-263.
• Waste containers should be stored in temporary containment facilities that should comply
with the following requirements:
- Temporary containment facility should provide for a spill containment volume equal to
1.5 times the volume of all containers able to contain precipitation from a 25 year storm
event, plus the greater of 10% of the aggregate volume of all containers or 100% of the
capacity' of the largest tank within its boundary, whichever is greater.
- Temporary containment facility should be impervious to the materials stored there for a
minimum contact time of 72 hours.
Temporary containment facilities should be maintained free of accumulated rainwater
and spills. In the event of spills or leaks, accumulated rainwater and spills should be
placed into drums after each rainfall. These Hquids should be handled as a hazardous
waste unless testing determines them to be non-hazardous. Non-hazardous liquids
should be sent to an approved disposal site.
Sufficient separation should be provided between stored containers to allow for spill
cleanup and emergency response access.
November 2009 California Stormwater BMP Handbook 2 of 6
Construction
www,casqa,org
Hazardous Waste Management WM-6
- Incompatible materials, such as chlorine and ammonia, should not be stored in the same
temporary containment facility.
- Throughout the rainy season, temporary containment facilities should be covered during
non-working days, and prior to rain events. Covered facilities may include use of plastic
tarps for small facilities or constructed roofs with overhangs.
• Drums should not be overfilled and wastes should not be mixed.
• Unless watertight, containers of dry waste should be stored on pallets.
• Do not over-apply herbicides and pesticides. Prepare only the amount needed. Follow the
recommended usage instructions. Over application is expensive and environmentally
harmful. Apply surface dressings in several smaller applications, as opposed to one large
application. Allow time for infiltration and avoid excess material being carried offsite by
runoff. Do not apply these chemicals just before it rains. People applying pesticides must be
certified in accordance with federal and state regulations,
• Paint brushes and equipment for water and oil based paints should be cleaned within a
contained area and should not be allowed to contaminate site soils, watercourses, or
drainage systems. Waste paints, thinners, solvents, residues, and sludges that cannot be
recycled or reused should be disposed of as hazardous waste. When thoroughly dry, latex
paint and paint cans, used brushes, rags, absorbent materials, and drop cloths should be
disposed of as solid waste.
• Do not clean out brushes or rinse paint containers into the dirt, street, gutter, storm drain,
or stream. "Paint out" brushes as much as possible. Rinse water-based paints to the
sanitary sewer. Filter and reuse thinners and solvents. Dispose of excess oil-based paints
and sludge as hazardous waste.
• The following actions should be taken with respect to temporary contaminant:
- Ensure that adequate hazardous waste storage volume is available.
- Ensure that hazardous waste collection containers are conveniently located.
Designate hazardous waste storage areas onsite away from storm drains or watercourses
and away from moving vehicles and equipment to prevent accidental spills.
Minimize production or generation of hazardous materials and hazardous waste on the
job site.
Use containment berms in fueling and maintenance areas and where the potential for
spills is high.
Segregate potentially hazardous waste from non-hazardous construction site debris.
- Keep liquid or semi-liquid hazardous waste in appropriate containers (closed drums or
similar) and under cover.
November 2009 California Stormwater BMP Handbook 3 of 6
Construction
www.casqa.org
Hazardous Waste Management WM-6
Clearly label all hazardous waste containers with the waste being stored and the date of
accumulation.
Place hazardous waste containers in secondary containment.
Do not allow potentially hazardous waste materials to accumulate on the ground.
Do not mix wastes.
Use all of the product before disposing of the container.
- Do not remove the original product label; it contains important safety and disposal
information.
Waste Recycling Disposal
• Select designated hazardous waste collection areas onsite.
• Hazardous materials and wastes should be stored in covered containers and protected from
vandalism.
• Place hazardous waste containers in secondary containment.
• Do not mix wastes, this can cause chemical reactions, making recycling impossible and
complicating disposal.
• Recycle any useful materials such as used oil or water-based paint.
• Make sure that toxic liquid wastes (used oils, solvents, and paints) and chemicals (acids,
pesticides, additives, curing compounds) are not disposed of in dumpsters designated for
construction debris.
• Arrange for regular waste collection before containers overflow.
• Make sure that hazardous waste (e.g., excess oil-based paint and sludge) is collected,
removed, and disposed of only at authorized disposal areas.
Disposal Procedures
m Waste should be disposed of by a licensed hazardous waste transporter at an authorized and
licensed disposal facility or recycling facility utilizing properly completed Uniform
Hazardous Waste Manifest forms.
• A Department of Health Senices certified laboratory should sample waste to determine the
appropriate disposal facility.
• Properly dispose of rainwater in secondary containment that may have mixed with
hazardous waste.
• Attention is directed to "Hazardous Material", "Contaminated Material", and "Aerially
Deposited Lead" of the contract documents regarding the handling and disposal of
hazardous materials.
November 2009 California Stormwater BMP Handbook 4 of 6
Construction
www.casqa.org
Hazardous Waste Management WM-6
Education
• Educate employees and subcontractors on hazardous waste storage and disposal procedures.
• Educate employees and subcontractors on potential dangers to humans and the
environment from hazardous wastes.
• Instruct employees and subcontractors on safety procedures for common construction site
hazardous wastes.
• Instruct employees and subcontractors in identification of hazardous and solid waste.
• Hold regular meetings to discuss and reinforce hazardous waste management procedures
(incorporate into regular safety meetings).
• The contractor's superintendent or representative should oversee and enforce proper
hazardous waste management procedures and practices.
• Make sure that hazardous waste is collected, removed, and disposed of only at authorized
disposal areas.
• Warning signs should be placed in areas recently treated with chemicals.
• Place a stockpile of spill cleanup materials where it will be readily accessible.
• If a container does spill, clean up immediately.
Costs
All of the above are low cost measures.
Inspection and Maintenance
m Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and of two week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges
occur
• Hazardous waste should be regularly collected.
• A foreman or construction supenisor should monitor onsite hazardous waste storage and
disposal procedures.
• Waste storage areas should be kept clean, well organized, and equipped with ample cleanup
supplies as appropriate for the materials being stored.
• Perimeter controls, containment structures, covers, and liners should be repaired or
replaced as needed to maintain proper function.
• Hazardous spills should be cleaned up and reported in conformance with the applicable
Material Safety Data Sheet (MSDS) and the instructions posted at the project site.
November 2009 California Stormwater BMP Handbook 5 of 6
Construction
www.casqa.org
Hazardous Waste Management WM-6
• The National Response Center, at (800) 424-8802, should be notified of spills of federal
reportable quantities in conformance with the requirements in 40 CFR parts 110,117, and
302. Also notify the Governors Office of Emergency Services Warning Center at (916) 845-
8911.
• A copy of the hazardous waste manifests should be provided.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source PoUution Control Program,
1995-
Processes, Procedures and Methods to Control Pollution Resuhing from All Construction
Activity, 430/9-73-007, USEPA, 1973-
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992-
November 2009 California Stormwater BMP Handbook 6 of 6
Construction
www.casqa.org
Concrete Waste Management WM-8
CONCRETE
WASHOUT
AREA
Description and Purpose
Prevent the discharge of pollutants to stormwater from
concrete waste by conducting washout onsite or offsite in a
designated area, and by employee and subcontractor training.
The General Permit incorporates Numeric Effluent Limits
(NEL) and Numeric Action Levels (NAL) for pH (see Section 2
of this handbook to determine your project's risk level and if
you are subject to these requirements).
Many types of construction materials, including mortar,
concrete, stucco, cement and block and their associated wastes
have basic chemical properties that can raise pH levels outside
of the permitted range. Additional care should be taken when
managing these materials to prevent them from coming into
contact with stormwater flows and raising pH to levels outside
the accepted range.
Suitable Applications
Concrete waste management procedures and practices are
implemented on construction projects where:
• Concrete is used as a construction material or where
concrete dust and debris result from demolition activities.
• Slurries containing portland cement concrete (PCC) are
generated, such as from saw cutting, coring, grinding,
grooving, and hydro-concrete demoHtion.
Categories
EC Erosion Control
SE Sediment Control
TC Tracking Contral
WE Wind Erosion Control
NS Non-Stormwater
Management Control H
WM Waste Management and
Materials Pollutron Control 0
Legend:
0 Primary Category
H! Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
Potential Alternatives
None
CAUFORMA SiTORMWATrK
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 7
Concrete Waste Management WM-8
• Concrete trucks and other concrete-coated equipment are washed onsite.
• Mortar-mixing stations exist.
• Stucco mixing and spraying .
• See also NS-8, Vehicle and Equipment Cleaning.
Limitations
• Offsite washout of concrete wastes may not always be possible.
• Multiple washouts may be needed to assure adequate capacity and to allow for evaporation.
Implementation
The following steps will help reduce stormwater poUution from concrete wastes:
• Incorporate requirements for concrete waste management into material supplier and
subcontractor agreements.
• Store dry and wet materials under cover, away from drainage areas. Refer to WM-i, Material
Delivery and Storage for more information.
• Avoid mixing excess amounts of concrete.
• Perform washout of concrete trucks in designated areas only, where washout will not reach
stormwater.
• Do not wash out concrete trucks into storm drains, open ditches, streets, streams or onto the
ground. Trucks should always be washed out into designated facilities.
• Do not allow excess concrete to be dumped onsite, except in designated areas.
• For onsite washout:
- On larger sites, it is recommended to locate washout areas at least 50 feet from storm
drains, open ditches, or water bodies. Do not allow runoff from this area by constructing
a temporary pit or bermed area large enough for liquid and solid waste.
- Washout wastes into the temporary washout where the concrete can set, be broken up,
and then disposed properly.
- Washout should be lined so there is no discharge into the underlying soil.
• Do not wash sweepings from exposed aggregate concrete into the street or storm drain.
Collect and return sweepings to aggregate base stockpile or dispose in the trash.
• See typical concrete washout installation details at the end of this fact sheet.
Education
• Educate employees, subcontractors, and suppliers on the concrete waste management
techniques described herein.
November 2009 California Stormwater BMP Handbook 2 of 7
Construction
www.casqa.org
Concrete Waste Management WM-8
• Arrange for contractor's superintendent or representative to oversee and enforce concrete
waste management procedures.
• Discuss the concrete management techniques described in this BMP (such as handling of
concrete waste and washout) with the ready-mix concrete supplier before any deliveries are
made.
Concrete Demolition Wastes
• Stockpile concrete demolition waste in accordance with BMP WM-3, Stockpile Management.
• Dispose of or recycle hardened concrete waste in accordance with applicable federal, state or
local regulations.
Concrete Slurry Wastes
• PCC and AC waste should not be allowed to enter storm drains or watercourses.
• PCC and AC waste should be collected and disposed of or placed in a temporary concrete
washout facility (as described in Onsite Temporary Concrete Washout Facility-, Concrete
Transit Truck Washout Procedures, below).
• A foreman or construction supenisor should monitor onsite concrete working tasks, such as
saw cutting, coring, grinding and grooving to ensure proper methods are implemented.
• Saw-cut concrete slurry should not be allowed to enter storm drains or watercourses.
Residue from grinding operations should be picked up by means of a vacuum attachment to
the grinding machine or by sweeping. Saw cutting residue should not be aUowed to flow
across the pavement and should not be left on the surface of the pavement. See also NS-3,
Paving and Grinding Operations; and WM-10, Liquid Waste Management.
• Concrete slurry residue should be disposed in a temporary washout facility (as described in
Onsite Temporary Concrete Washout Facility, Concrete Transit Truck Washout Procedures,
below) and allowed to dry. Dispose of dry slurry- residue in accordance with WM-5, Solid
Waste Management.
Onsite Temporary Concrete Washout Facility, Transit Truck Washout
Procedures
m Temporary concrete washout facilities should be located a minimum of 50 ft from storm
drain inlets, open drainage facilities, and watercourses. Each facility should be located away
from construction traffic or access areas to prevent disturbance or tracking.
• A sign should be installed adjacent to each washout facility to inform concrete equipment
operators to utilize the proper facilities,
• Temporary concrete washout facilities should be constructed abovfe grade or below grade at
the option of the contractor. Temporary concrete washout facilities should be constructed
and maintained in sufficient quantity and size to contain all liquid and concrete waste
generated by washout operations.
November 2009 California Stormwater BMP Handbook 3 of 7
Construction
www.casqa.org
Concrete Waste Management WM-8
• Temporary washout facilities should have a temporary pit or bermed areas of sufficient
volume to completely contain all liquid and waste concrete materials generated during
washout procedures.
• Temporary washout facilities should be lined to prevent discharge to the underlying ground
or surrounding area.
• Washout of concrete trucks should be performed in designated areas only.
• Only concrete from mixer truck chutes should be washed into concrete wash out.
• Concrete washout from concrete pumper bins can be washed into concrete pumper trucks
and discharged into designated washout area or properly disposed of or recycled offsite.
• Once concrete wastes are washed into the designated area and allowed to harden, the
concrete should be broken up, removed, and disposed of per WM-5, Solid Waste
Management. Dispose of or recycle hardened concrete on a regular basis.
• Temporary Concrete Washout Facility (Type Above Grade)
- Temporary concrete washout facility (type above grade) should be constructed as shown
on the detaUs at the end of this BMP, with a recommended minimum length and
minimum width of 10 ft; however, smaUer sites or jobs may only need a smaller washout
facility. With any washout, always maintain a sufficient quantity and volume to contain
all liquid and concrete waste generated by washout operations.
- Materials used to construct the washout area should conform to the provisions detailed
in their respective BMPs (e.g., SE-8 Sandbag Barrier).
- Plastic Hning material should be a minimum of 10 mil in polyethylene sheeting and
should be free of holes, tears, or other defects that compromise the impermeability ofthe
material.
- Altematively, portable removable containers can be used as above grade concrete
washouts. Also called a "roll-off'; this concrete washout facility should be properly
sealed to prevent leakage, and should be removed from the site and replaced when the
container reaches 75% capacity.
• Temporary Concrete Washout Facility (Type Below Grade)
- Temporary- concrete washout facilities (ty-pe below grade) should be constructed as
shown on the details at the end of this BMP, with a recommended minimum length and
minimum width of 10 ft. The quantity and volume should be sufficient to contain all
liquid and concrete waste generated by washout operations.
- Lath and flagging should be commercial type.
- Plastic lining material should be a minimum of 10 mil polyethylene sheeting and should
be free of holes, tears, or other defects that compromise the impermeability of the
material.
November 2009 California Stormwater BMP Handbook 4 of 7
Construction
www.casqa.org
Concrete Waste Management WM-8
- The base of a washout facility should be free of rock or debris that may damage a plastic
liner.
Removal ofTemporary Concrete Washout Facilities
• When temporary concrete washout facilities are no longer required for the work, the
hardened concrete should be removed and properly disposed or recycled in accordance with
federal, state or local regulations. Materials used to construct temporary concrete washout
facilities should be removed from the site of the work and properly disposed or recycled in
accordance with federal, state or local regulations..
• Holes, depressions or other ground disturbance caused by the removal of the temporary
concrete washout facilities should be backfilled and repaired.
Costs
All of the above are low cost measures. Roll-off concrete washout facilities can be more costly
than other measures due to removal and replacement; however, provide a cleaner alternative to
traditional washouts. The type of washout facility, size, and availability of materials will
determine the cost of the washout.
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Temporary concrete washout faciHties should be maintained to provide adequate holding
capacity with a minimum freeboard of 4 in. for above grade facilities and 12 in. for below
grade facilities. Maintaining temporary concrete washout faciHties should include removing
and disposing of hardened concrete and returning the facilities to a functional condition.
Hardened concrete materials should be removed and properly disposed or recycled in
accordance with federal, state or local regulations.
• Washout facilities must be cleaned, or new facilities must be constructed and ready for use
once the washout is 75% full.
• Inspect washout facilities for damage (e.g. torn liner, evidence of leaks, signage, etc.). Repair
al! identified damage.
References
Blueprint for a Clean Bay: Best Management Practices to Prevent Stonnwater Pollution from
Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program,
1995-
Stormwater Quality- Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000, Updated March
2003.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 5 of 7
Construction
www.casqa.org
Concrete Waste Management WM-8
LAGGING
ON ALL
S:DtiS
•"1 3ERV—\i U
IC MIL
PL.A5T!C L.iNiNG-
MiN
-"NT
i
i
u
n H /
PLAN
NOT TO SCALE
TYPE "BELOW GPADE"
-SANDBAG
•
iANDBAC
10 MIL
^LAS^'C LiNiNG-
BERV
SLC'IQN A-A
NOT "0 SCALE
10 Miu
-=LAST.C LINING
TWO-STACKED-
2 X 12 ROUGH
WOOD FRAME
MiN
K STAKE
(TYP)
-10 M
PLASTiC LINING
PLAN
NOT TO SCALE
TYPE "ABOVE GRADE"
WOOD PRAME SECURELY
FASTENED AROUND
ENTIRE PERIMETER V'/ITH
TWO STAKES
SECTiQN B-S
NOT TO "SCALE
ACTUAL LAYOUT DE'ERM^NED
IN PIELD.
2. THE CONCRETE WAShOJT S'GN
SHALL 3E INS^'ALLED W THiN
30 F', OF THE TEMPORARY
CONCRETE WASHOUT "ACi.i'^
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
6 of 7
Concrete Waste Management WM-8
10'
MiN
i I
• I
10 Mil
PlASTiC LINING PLAN
STAKE
(Tvp)
1/8" DiA.
STEE. W;RE 41
STAPLE DETAI.
NOT TO SCAuE
fvpE "ABOVE GRADE"
WITH STRAW BALES
-STRAW BA-.E
1
\ ! i CONCRETE].
I 1 WASHOU'
PLYWOOD
^8" X 2'i"
-PAIN'ED WH TP
•BLACK LE'TERS
6" HEIGHT
>r SCREWS
3'.
WOOO P0S1
3" X 3" X e'
:ONCRETE WASHOUT
SIGN DE'AL.
(OR EOU'VALENT)
STAPLES-
(2 »ER BALE) r-'O MIL
/ PLASTIC LINING
NATIVE MATERIAL
(OPT:ONAL)
WOOD OR-
METAL STAKES
(2 PER BALE)
SECTiON B-B
NOT TO SCALE
BINDING WIRE
•STRAW SALE
NOTES
1, ACTUAL LAYOU'^ DETERMINED
IN FIELD
2. THE CONCRETE WASHOU" SiGN
SHALL BE INSTALLED WITHIN
30 PT OF THE 'EMPORARY
CONCRETE WASHOUT FACILiTv
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
7 of 7
Sanitary/Septic Waste Management WM-9
Description and Purpose
Proper sanitary and septic waste management prevent the
discharge of pollutants to stormwater from sanitary and septic
waste by providing convenient, weU-maintained facilities, and
arranging for regular service and disposal.
Suitable Applications
Sanitary septic waste management practices are suitable for use
at all construction sites that use temporary or portable sanitary
and septic waste systems.
Limitations
None identified.
Implementation
Sanitary or septic wastes should be treated or disposed of in
accordance with state and local requirements. In many cases,
one contract with a local facility supplier will be all that it takes
to make sure sanitary wastes are properly disposed.
Storage and Disposal Procedures
m Temporary sanitary facilities should be located away from
drainage facilities, watercourses, and from traffic
circulation. If site conditions allow, place portable facilities
a minimum of 50 feet from drainage conveyances and
traffic areas. When subjected to high winds or risk of high
winds, temporary sanitary facilities should be secured to
prevent overturning.
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materia Pollulion Control 0
Legend:
0 Primary Category
IS Secondary Category
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
Potential Alternatives
None
CALIFORNIA STORMWAriK
November 2009 California Stormwater BMP Handbook
Construction
www,casqa,org
1 of 3
Sanitary/Septic Waste Management WM-9
• Temporary sanitary facilities must be equipped with containment to prevent discharge of
pollutants to the stormwater drainage system of the receiving water.
• Consider safety as well as environmental implications before placing temporary sanitary
faciHties.
• Wastewater should not be discharged or buried within the project site.
• Sanitary and septic systems that discharge directly into sanitary sewer systems, where
permissible, should comply with the local health agency, city, county, and sewer district
requirements.
• Only reputable, licensed sanitary and septic waste haulers should be used.
• Sanitary facilities should be located in a convenient location.
• Temporary septic systems should treat wastes to appropriate levels before discharging.
• If using an onsite disposal system (OSDS), such as a septic system, local health agency
requirements must be followed.
• Temporary sanitary facilities that discharge to the sanitary sewer system should be properly
connected to avoid illicit discharges.
• Sanitary and septic facUities should be maintained in good working order by a licensed
senice.
• Regular waste coUection by a licensed hauler should be arranged before facilities overflow.
• If a spill does occur from a temporary sanitary facUity, follow federal, state and local
regulations for containment and clean-up.
Education
• Educate employees, subcontractors, and suppliers on sanitary and septic waste storage and
disposal procedures.
• Educate employees, subcontractors, and suppliers of potential dangers to humans and the
environment from sanitary and septic wastes.
• Instruct employees, subcontractors, and suppliers in identification of sanitary and septic
waste.
• Hold regular meetings to discuss and reinforce the use of sanitary facilities (incorporate into
regular safety meetings).
• Establish a continuing education program to indoctrinate new employees.
Costs
All of the above are low cost measures.
November 2009 California Stormwater BMP Handbook 2 of 3
Construction
www.casqa.org
Sanitary/Septic Waste Management WM-9
Inspection and Maintenance
• BMPs must be inspected in accordance with General Permit requirements for the associated
project type and risk level. It is recommended that at a minimum, BMPs be inspected
weekly, prior to forecasted rain events, daily during extended rain events, and after the
conclusion of rain events.
• Arrange for regular waste collection.
• If high winds are expected, portable sanitary facilities must be secured with spikes or
weighed down to prevent over turning.
• If spills or leaks from sanitary or septic facilities occur that are not contained and discharge
from the site, non-visible sampling of site discharge may be required. Refer to the General
Permit or to your project specific Construction Site Monitoring Plan to determine if and
where sampling is required.
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), March 2003.
Stormwater Management for Construction Activities; Developing Pollution Prevention Plans
and Best Management Practice, EPA 832-R-92005; USEPA, April 1992.
November 2009 California Stormwater BMP Handbook 3 of 3
Construction
www.casqa.org
Liquid Waste Management WM-10
^^^^^
• Description and Purpose
Liquid waste management includes procedures and practices to
prevent discharge of pollutants to the storm drain system or to
watercourses as a result of the creation, collection, and disposal
of non-hazardous liquid wastes.
Suitable Applications
Liquid waste management is applicable to construction projects
that generate any of the following non-hazardous by-products,
residuals, or wastes:
• DriUing slurries and drilling fluids
• Grease-free and oil-free wastewater and rinse water
• Dredgings
• Other non-stormwater liquid discharges not permitted by
separate permits
Limitations
• Disposal of some liquid wastes may be subject to specific
laws and regulations or to requirements of other permits
secured for the construction project (e.g., NPDES permits,
Army Corps permits. Coastal Commission permits, etc.).
• Liquid waste management does not apply to dewatering
operations (NS-2 Dewatering Operations), solid waste
management (WM-5, Solid Waste Management), hazardous
wastes (WM-6, Hazardous Waste Management), or
concrete slurry residue (WM-8, Concrete Waste
Categories
EC
SE
TC
WE
NS
WM
Erosion Control
Sediment Control
Tracking Control
Wind Erosion Control
Non-Stormwater
Management Control
Waste Management and
Materials Pollution Control
Legend:
0 Primary Objective
@ Secondary Objective
0
Targeted Constituents
Sediment
Nutrients
Trash
Metals
Bacteria
Oil and Grease
Organics
0
0
0
0
0
Potential Alternatives
None
t AIIMJH.MA'.UJKMrtAIlK
November 2009 California Stormwater BMP Handbook
Construction
www.casqa.org
1 of 4
Liquid Waste Management WM-10
Management).
• Typical permitted non-stormwater discharges can include: water line flushing; landscape
irrigation; diverted stream flows; rising ground waters; uncontaminated pumped ground
water; discharges from potable water sources; foundation drains; irrigation water; springs;
water from crawl space pumps; footing drains; lawn watering; flows from riparian habitats
and wetlands; and discharges or flows from emergency fire fighting activities.
Implementation
General Practices
m Instruct employees and subcontractors how to safely differentiate between non-hazardous
liquid waste and potential or known hazardous liquid waste.
• Instruct employees, subcontractors, and suppliers that it is unacceptable for any liquid waste
to enter any storm drainage device, watenvay, or receiving water.
• Educate employees and subcontractors on liquid waste generating activities and liquid waste
storage and disposal procedures.
• Hold regular meetings to discuss and reinforce disposal procedures (incorporate into regular
safety meetings).
• Verify which non-stormwater discharges are permitted by the statewide NPDES permit;
different regions might have different requirements not outlined in this permit.
• Apply NS-8, Vehicle and Equipment Cleaning for managing wash water and rinse water
from vehicle and equipment cleaning operations.
Containing Liquid Wastes
• Drilling residue and drilling fluids should not be allowed to enter storm drains and
watercourses and should be disposed of.
• If an appropriate location is available, drilling residue and drilling fluids that are exempt
under Title 23, CCR § 2511(g) may be dried by infiltration and evaporation in a containment
facility constructed in conformance with the provisions concerning the Temporary Concrete
Washout Facilities detailed in WM-8, Concrete Waste Management.
• Liquid wastes generated as part of an operational procedure, such as water-laden dredged
material and drilling mud, should be contained and not aUowed to flow into drainage
channels or receiving waters prior to treatment.
• Liquid wastes should be contained in a controUed area such as a holding pit, sediment basin,
roll-off bin, or portable tank.
• Containment devices must be structurally sound and leak free.
• Containment devices must be of sufficient quantity or volume to completely contain the
liquid wastes generated.
November 2009 California Stormwater BMP Handbook 2 of 4
Construction
www.casqa.org
Liquid Waste Management WM-10
• Precautions should be taken to avoid spills or accidental releases of contained liquid wastes.
Apply the education measures and spill response procedures outlined in WM-4, Spill
Prevention and Control.
• Containment areas or devices should not be located where accidental release of the
contained liquid can threaten health or safety or discharge to water bodies, channels, or
storm drains.
Capturing Liquid Wastes
• Capture all liquid wastes that have the potential to affect the storm drainage system (such as
wash water and rinse vvater from cleaning walls or pavement), before they run off a surface.
• Do not allow liquid wastes to flow or discharge uncontrolled. Use temporary dikes or berms
to intercept flows and direct them to a containment area or device for capture.
• Use a sediment trap (SE-3, Sediment Trap) for capturing and treating sediment laden liquid
waste or capture in a containment device and allow sediment to settle.
Disposing of Liquid Wastes
• A typical method to handle liquid waste is to dewater the contained liquid waste, using
procedures such as described in NS-2, Dewatering Operations, and SE-2, Sediment Basin,
and dispose of resulting solids per WTVI-5, Solid Waste Management.
• Methods of disposal for some Hquid wastes may be prescribed in Water QuaHty Reports,
NPDES permits, Environmental Impact Reports, 401 or 404 permits, and local agency
discharge permits, etc. Review the SWPPP to see if disposal methods are identified.
• Liquid wastes, such as from dredged material, may require testing and certification whether
it is hazardous or not before a disposal method can be determined.
• For disposal of hazardous waste, see WM-6, Hazardous Waste Management.
• If necessary, further treat liquid wastes prior to disposal. Treatment may include, though is
not limited to, sedimentation, filtration, and chemical neutralization.
Costs
Prevention costs for Hquid waste management are minimal. Costs increase if cleanup or fines
are involved.
Inspection and Maintenance
• Inspect and verify that activity-based BMPs are in place prior to the commencement of
associated activities. While activities associated with the BMP are under way, inspect weekly
during the rainy season and of two-week intervals in the non-rainy season to verify
continued BMP implementation.
• Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges
occur.
November 2009 California Stormwater BMP Handbook 3 of 4
Construction
www.casqa.org
Liquid Waste Management WM-10
• Remove deposited solids in containment areas and capturing devices as needed and at the
completion of the task. Dispose of any solids as described in WM-5, Solid Waste
Management.
• Inspect containment areas and capturing devices and repair as needed.
References
Stormwater Quality Handbooks - Construction Site Best Management Practices (BMPs) Manual,
State of California Department of Transportation (Caltrans), November 2000.
November 2009 California Stormwater BMP Handbook 4 of 4
Construction
www.casqa.org
APPENDIX J
TRAINING DOCUMENTATION FORMS &
SAMPLE MEMORANDUM TO EMPLOYEES
TRAINING FORMS & LOGS
Storm Water Management Topic: (check as appropriate)
• Temporary Soil Stabilization • Temporary Sediment Control
• Wind Erosion Control
• Non-storm water management
• Storm Water Sampling
Specific Training Objective:
Location:
Instructor:
• Tracking Control
• Waste Management and Materials Pollution Control
Date:
Telephone:
Course Length (fiours):
Attendee Roster (attacfi additional forms if necessary)
Name Company Phone
COMMENTS:
storm Water Management Topic: (check as appropriate)
• Temporary Soil Stabilization • Temporary Sediment Control
• Wind Erosion Control • Tracking Control
• Non-Storm v\/ater management • Waste Management and Materials Pollution Control
• Storm Water Sampling
Specific Training Objective:
Location:
Instructor:
Date:
Telephione:
Course Length (hours):
Attendee Roster (attach additional forms if necessary)
Name Company Phone
COMMENTS:
MEMORANDUM TO EMPLOYEES
(May be periodically attached to payciiecks)
TO ALL EMPLOYEES:
[Client Name] supports the protection of our environment and has developed a program for this
project to reduce pollutants from entering the local waterways.
You will be expected to abide by all requirements of the program and do your part to comply
with the program while you are working on this project by:
• Disposing of trash, rubbish, and construction debris properly.
• Reporting, to the General Contractor, leaky vehicles or equipment or other pollution
sources that may be present.
• Covering material, which may be exposed to the rain.
• Encouraging your co-workers to do the same.
Remember, we all benefit from the recreation that is provided by these waters that we are
protecting.
A copy of the storm water pollution plan developed for this site is available for your review at the
construction office.
CERTIFICATE OF TRAINING
CALIFORNIA CONSTRUCTION GENERAL PERMIT
C^ALIFIED SWPPP DEVELOPER (QSD)
AND
QUALIFIED SWPPP PRACTITIONER (QSP)
Emma SMITH
Jun 03, 2013 - Aug 30, 2015
Certificate #20121
CaHfornia Stormwater Quality Association and
California Construction General Permit Training Teanr^
The CPESC® Application Review Committee
certifies that
€mma Catlierine ^uljns;
Subscribes to the Code of Conduct and Ethics and has met the requirements
established by the CPESC Council as a
Certified Professional in Erosion
and Sediment ControF^
An EnviroCert International, Inc. Program
Certification Number: 6440 Certification Date: June 3,2011
Chair, CPESC Council
CPESC Program Manager
Tht CPESC Program loas established in 1982.
APPENDIX K
RESPONSIBLE PARTIES
RESPONSIBLE PARTIES
Project Owner:
San Dieguito Union High School District
684 Requeza Drive
Encinitas, CA 92024
760.753.6491
Russ.thornton@sduhsd.net
Russ Thornton
Executive Director of Operations
General Contractor:
Company Name:_
Address:
City, State, Zip:
Telephone:
Name and Title of Contact:,
Email Address:
Qualified SWPPP Practitioner (QSP):
Company Name:_
Address:
City, State, Zip:
Telephone:
Name and Title of QSP:
Email Address:
Phone:
APPENDiX 7:
State and Regionai Water Resources Control Board Contacts
NORTH COAST REGION (1)
5550 Sk)4ane Blvd, Ste. A
Santa Rose, CA 95403
(707) 576-2220 FAX: (707)523-0135
SAH FRANCISCO BAY REGION (2)
1515 Clay Street, Ste. 1400
Oakland, CA 94612
(510) 622-2300 FAX: (510) 622-2640
CENTRAL COAST REGION (3)
895 terovista Place, Ste 101
San LuisObi^, CA 93401
(805) 549-3147 FAX: (805) 543-0397
LOS ANGELES REGION ^
320W.4''Streel,Ste.200
Los Angeles, CA 90013
(213) 576-6600 FAX: C13) 576-6640
LAHONTAN REGION (6SLT)
2501 Lake Tahoe Blvd.
South Lake Tahoe, CA 98150
(530) 542-5400 FAX: (530) 544-2271
WCTORMLLE OFFICE (SV)
14440 Civic Drive, Ste. 200
Mdoivllie, CA 92392-2383
(760) 241SSS3 FAX: (760) 241-7308
CENTRAL VHJ.E V REGK>H (SS)
11020 Sun Center Dr.,«200
Rancho Cordova, CA 95670-6114
(916)464-3291 FAX: P16) 464-4645
FRESNO BRANCH OFFICE (SF)
1685 E St.
Fresno, CA 93706
(559) 445-5116 FAK: 1^59) 445-5910
REDBMG BRANCH OFFICE (SR)
415 Kndbrest Drive, Ste. 100
Redding, CA 96002
(530) 224-4845 FAX; (530) 224-4857
COLORADO RIVER BASM REGION (7)
73-720 Fred Waring Dr., Ste. 100
Palm Desert, CA 92260
(760) 346-7491 FAX: (760) 341-6820
SANTA ANA REGION (S)
3737 l«lain Street, Ste. SOO
Riverside, CA 92501-3339
Phone (951) 762-4130 FAX: (951) 781-6288
SAH DIEGO REGION (9)
9174 SkyPar)( Court, Ste. 100
San Dlego, C A 92123-4340
(858) 467-2952 FAX: (B58) 571-6972
STATE WATER BOARD
PO B0X1977
Sacramento, CA95812-1977
storni <mter@weteitioards£a.gov
2009-0009-DWQ September 2, 2009
APPENDIX L
CONTRACTORS & SUBCONTRACTORS
CONTRACTORS AND SUBCONTRACTORS
Project Name:
WDID:
Company Name Contact Person
Name Address Telephone ResponkbilWes
APPENDIX M
SAMPLE SUBCONTRACTOR NOTIFICATION LETTER
AND LOG
Sample Subcontractor Notification Letter
[Date]
[Subcontractor/Supplier's Name]
[Company]
[Address]
[City, State]
Dear [Subcontractor/Supplier's Name]
Please be advised that this contract is subject to the requirements and conditions ofthe
National Pollutant Discharge Elimination System (NPDES) General Construction PermiL
In short, the purpose ofthis system is to eliminate pollutants from entering into the storm drain
systems which eventually lead into our lakes, streams and oceans. Common pollutants include
oil, grease, trash, sediment, asphaltic emulsions, concrete wastes, fertilizers, and pesticides.
[Fuscoe Engineering, Inc. (example)] has developed a Storm Water Pollution Prevention Plan
(SWPPP) in accordance with state requirements.
You, as a Subcontractor/supplier are required to comply with the SWPPP and the NPDES
General and Regional Permits (if any) for all work performed on this site.
Any person or group who violates any condition of the general permit may be subject to
substantial penalties in accordance with Section 309 of the Clean Water Act and the Porter-
Cologne Water Quality Control Act. You are encouraged to advise each of your employees
working on this project of requirements and guidelines ofthe SWPPP. Periodic memorandums
attached to paychecks are often effectives means to remind employees of their responsibilities
(see Appendix 13).
In the event that any violation of the above referenced permit conditions is committed by a
representative of [Subcontractor/Supplier], the liability for any associated penalties levied
against [Client Name] becomes the responsibility ofthe [Subcontractor/Supplier].
A copy of the General Construction Activity Storm Water Permit, and the SWPPP developed for
this site is available for your review at the construction office.
Please call if you have any questions.
Sincerely,
[Name of Sender]
I hereby acknowledge receipt of this document, and agree with the terms and conditions
represented herein.
[Subcontractor/Supplier]
SUBCONTRACTOR NOTIFICATION LOG
Project Name:
WDID:
SUBCONTRACTOR
COMPANY NAME
CONTACT
NAME ADDRESS PHONE
NUMBER
PAGER/
FIELD
PHONE
DATE
NOTIFICATION
LETTER SENT
TYPE OF WORK
SUBCONTRACTOR
COMPANY NAME
CONTACT
NAME ADDRESS PHONE
NUMBER
PAGER/
FIELD
PHONE
DATE
NOTIFICATION
LETTER SENT
TYPE OF WORK
USE ADDITIONAL PAGES AS NECESSARY
APPENDIX N
SIGNIFICANT SPILL REPORTS
SIGNIFICANT SPILL REPORT
WDID:
Date of Occurrence:
Discovered by:
Location:
Material Type:
Volume
Spilled:
Cause of Spill:
Corrective
Action Taken:
Agencies
Contacted:
Signed:
Printed Name:
Title:
SIGNIFICANT SPILL REPORT
WDID:
Date of Occurrence:
Discovered by:
Location:
Material Type:
Volume
Spilled:
Cause of Spill:
Corrective
Action Taken:
Agencies
Contacted:
Signed:
Printed Name:
Title:
APPENDIX O
QUICK REFERENCE DISPOSAL ALTERNATIVES
QUICK REFERENCE — DISPOSAL ALTERNATIVES
(Adopted from Santa Clara County Nonpoint Source Solution Control Program — December 1992)
All ofthe waste products on this chart are prohibited from discharge to the storm drain system. Use this matrix to decide which altemative disposal strategies to use.
ALTERNATIVES ARE LISTED IN PRIORITY ORDER.
Key: HHW Household hazardous waste (Government-sponsored drop-off events)
POTW Publicly Owned Treatment Plant
Reg.Bd. Regional Water Quality Control Board (Oakland)
"Dispose to sanitary sewer" means dispose into sink, toilet, or sanitary sewer clean-out connection.
"Dispose as trash" means dispose in dumpsters or trash containers for pickup and/or eventual disposal in landfill.
"Dispose as hazardous waste" for business/commercial means contract with a hazardous waste hauler to remove and dispose.
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
General Construction and Paint; Street and Utility Maintenance
Excess paint (oil-based) 1. Recycle/reuse
2. Dispose as hazardous waste
1. Recycle/reuse
2. Take to HHW drop-off
Excess paint (water-based) 1. Recycle/reuse
2. Dry residue in cans, dispose as trash
3. If volume is too much to dry,
dispose as hazardous waste
1. Recycle/reuse
2. Dry residue in cans, dispose as trash
3. If volume is too much to dry,
take to HHW drop-off
Paint cleanup (oil-based) Wipe paint out of brushes, then:
1. Filter & reuse thinners, solvents
2. Dispose as hazardous waste
Wipe paint out of brushes, then:
1. Filter & reuse thinners, solvents
2. Take to HHW drop-off
Paint cleanup (water-based) Wipe paint out of brushes, then:
1. Rinse to sanitary sewer
Wipe paint out of brushes, then:
1. Rinse to sanitary sewer
Empty paint cans (dry) 1. Remove lids, dispose as trash 1. Remove lids, dispose as trash
Paint stripping (with solvent) 1. Dispose as hazardous waste 1. Take to HHW drop-off
Building exterior cleaning (high-pressure water) 1. Prevent entry into storm drain and
remove offsite
2. Wash onto dirt area, spade in
3. Collect (e.g., mop up) and
discharge to sanitary sewer POTW
Cleaning ofbuilding exteriors which have HAZARDOUS
MATERIALS (e.g., mercury, lead) in paints
1. Use dry cleaning methods
2. Contain and dispose washwater as
hazardous waste (Suggestion: dry
material first to reduce volume)
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
General Construction and Paint; Street and Utility Maintenance (cont'd)
Non-hazardous paint scraping/sand blasting 1. Dry sweep, dispose as trash 1. Dry sweep, dispose as trash
HAZARDOUS paint scraping/sand blasting (e.g., marine
paints or paints containing lead or tributyl tin)
1. Dry sweep, dispose as hazardous waste 1. Dry sweep, take to HHW drop-off
Soil from excavations during periods when storms are
forecast
1. Should not be placed in street or on
paved areas
2. Remove from site or backflll by
end of day
3. Cover with tarpaulin or surround with
hay bales, or use other runoff controls
(e.g., sandbags)
4. Place filter mat over storm drain
Note: Thoroughly sweep following removal of
dirt in all four altematives
Soil from excavations placed on paved surfaces during
period when storms are not forecast
1. Keep material out of storm conveyance
systems and thoroughly remove via
sweeping following removal of dirt
2. Surround with sandbags
Cleaning streets in construction areas 1. Dry sweep and minimize tracking of mud
2. Use silt ponds and/or similar pollutant
reduction techniques when flushing
pavement
Soil erosion, sediments 1. Cover disturbed soils, use erosion
controls and block entry to storm drain
2. Seed or plant immediately
Fresh cement, grout, and mortar 1. Use/reuse excess
2. Dispose to trash
1. Use/reuse excess
2. Dispose to trash
Washwater from concrete/mortar (etc.) cleanup 1. Wash onto dirt area, spade in
2. Pump and remove to appropriate
disposal facility
3. Settle, pump water to sanitary sewer POTW
1. Wash onto dirt area, spade in
2. Pump and remove to appropriate
disposal facility
3. Settle, pump water to sanitary sewer
Aggregate wash from driveway/patio construction 1. Wash onto dirt area, spade in
2. Pump and remove to appropriate
disposal facility
3. Settle, pump water to sanitary sewer POTW
1. Wash onto dirt area, spade in
2. Pump and remove to appropriate
disposal facility
3. Settle, pump water to sanitary sewer
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
General Construction and Paint; Street and Utility Maintenance (cont'd)
Rinsewater from concrete mixing tmcks 1. Retum tmck to yard for rinsing into
pond or dirt area
2. At constmction site, wash into settling
pond or dirt area lined with plastic and
bermed, or surrounded with sandbags
Non-hazardous constmction and demolition debris 1. Recycle/reuse (concrete, wood, etc.)
2. Dispose as trash
1. Recycle/reuse (concrete, wood, etc.)
2. Dispose as trash
Hazardous demolition and constmction debris (e.g.,
asbestos)
1. Dispose as hazardous waste 1. Do not attempt to remove yourself
Contact asbestos removal service for
safe removal and disposal
2. Very small amounts (less than 5 lbs.)
may be double-wrapped in plastic and
take to HHW drop-off
Saw-cut slurry 1. Use dry cutting technique and sweep
up residue
2. Vacuum slurry and dispose off-site
3. Block storm drain or berm with low
weir as necessary to allow most solids
to settle. Shovel out gutters; dispose
residue to dirt area, constmction yard
or landflll
Constmction dewatering
(Nonturbid, uncontaminated groundwater)
1. Recycle/Reuse
2. Discharge to storm drain
Constmction dewatering (other than nonturbid,
uncontaminated groundwater)
1. Recycle/Reuse
2. Discharge to sanitary sewer
3. As appropriate, treat prior to
discharge to storm drain
POTW
Reg. Bd.
Portable toilet waste 1. Leasing company shall dispose
to sanitary sewer at POTW POTW
Leaks from garbage dumpsters 1. Collect, contain leaking material.
Eliminate leak, keep covered, return
to leasing company for immediate repair
2. If dumpster is used for liquid waste,
use plastic liner
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
General Construction and Paint; Street and Utility Maintenance (cont'd)
Leaks from constmction debris bins 1. Ensure that bins are used for dry
nonhazardous materials only
(Suggestion: Fencing, covering helps
prevent misuse)
Dumpster cleaning water 1. Clean at dumpster owner's facility
and discharge waste through grease
interceptor to sanitary sewer
2. Clean on-site and discharge through
grease interceptor to sanitary sewer
POTW
POTW
Cleaning driveways, paved areas *
(Special Focus = Restaurant alleys. Grocery
dumpster areas)
* Note: Local drought ordinances may contain
additional restrictions
1. Sweep and dispose as trash
(Dry cleaning only)
2. For vehicle leaks, restaurant/grocery
alleys, follow this 3-step process:
a. Clean up leaks with rags or
absorbents
b. Sweep, using granular
absorbent material (cat litter)
c. Mop and dispose of mopwater to
sanitary sewer (or collect rinse-
water and pump to the sanitary
sewer)
3. Same as 2 above, but with rinsewater (2c)
(no soap) discharged to storm drain
1. Sweep and dispose as trash
(Dry cleaning only)
2. For vehicle leaks, restaurant/grocery
alleys, follow this 3-step process:
a. Clean up leaks with rags or
absorbents; dispose as hazardous
waste
b. Sweep, using granular
absorbent material (cat litter)
c. Mop and dispose of mopwater to
sanitary sewer
Steam cleaning of sidewalks, plazas *
* Note: Local drought ordinances may contain
additional restrictions
1. Collect all water and pump to sanitary
sewer
2. Follow this 3-step process:
a. Clean oil leaks with rags or
absorbents
b. Sweep (Use dry absorbent
as needed)
c. Use no soap, discharge to storm
drain
Potable water/line flushing
Hydrant testing
1. Deactivate chlorine by maximizing time
water will travel before reaching creeks
Super-chlorinated (above 1 ppm) water from line flushing 1. Discharge to sanitary sewer
2. Complete dechlorination required before
discharge to storm drain
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
Landscape/Garden Maintenance
Pesticides 1. Use up. Rinse containers. Use rinsewater
as product. Dispose rinsed containers
as trash
2. Dispose unused pesticide as hazardous
waste
1. Use up. Rinse containers. Use rinsewater
as pesticide. Dispose rinsed containers
as trash
2. Take unused pesticide to HHW drop-off
Garden clippings 1. Compost
2. Take to Landfill
1. Compost
2. Dispose as trash
Tree trimming 1. Chip if necessary, before composting
as recycling
1. Chip if necessary, before composting
as recycling
Swimming pool, spa, fountain water (emptying) 1. Do not use metal-based algicides (i.e.,
Copper Sulfate)
2. Recycle/reuse (e.g., irrigation)
3. Determine chlorine residue = 0, wait
24 hours and then discharge to storm
drain POTW
1. Do not use metal-based algicides (i.e..
Copper Sulfate)
2. Recycle/reuse (e.g., irrigation)
3. Determine chlorine residue = 0, wait
24 hours and then discharge to storm
drain
Acid or other pool/spa/fountain cleaning 1. Neutralize and discharge to sanitary sewer POTW
Swimming pool, spa filter backwash 1. Reuse for irrigation
2. Dispose on dirt area
3. Settle, dispose to sanitary sewer
1. Use for landscape irrigation
2. Dispose on dirt area
3. Settle, dispose to sanitary sewer
Vehicle Wastes
Used motor oil 1. Use secondary containment while storing,
send to recycler
1. Put out for curbside recycling pickup where
available
2. Take to Recycling Facility or auto service
facility with recycling program
3. Take to HHW events accepting motor oil
Antifreeze 1. Use secondary containment while storing,
send to recycler
1. Take to Recycling Facility
Other vehicle fluids and solvents 1. Dispose as hazardous waste I. Take to HHW event
Automobile batteries 1. Send to auto battery recycler
2. Take to Recycling Center
1. Exchange at retail outlet
2. Take to Recycling Facility or HHW
event where batteries are accepted
Motor home/constmction trailer waste 1. Use holding tank. Dispose to sanitary
sewer
1. Use holding tank, dispose to sanitary
sewer
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL
Disposal Priorities
Vehicle Wastes (cont'd)
Vehicle Washing 1. Recycle
2. Discharge to sanitary sewer, never
to storm drain
POTW
1. Take to Commercial Car Wash
2. Wash over lawn or dirt area
3. If soap is used, use a bucket for soapy
water and discharge remaining soapy 1
water to sanitary sewer
Mobile Vehicle Washing 1. Collect washwater and discharge to
sanitary sewer POTW
Vehicle leaks Follow this 3-step process:
1. Clean up leaks with rags or absorbents
2. Sweep, using granular absorbent
material (cat litter)
3. Mop and dispose of mopwater to
sanitary sewer
Other Wastes
Carpet cleaning solutions & other mobile washing
services
1. Dispose to sanitary sewer POTW 1. Dispose to sanitary sewer
Roof drains 1. If roof is contaminated with industrial
waste products, discharge to sanitary
sewer
2. If no contamination is present,
discharge to storm drain
Cooling water
Air conditioning condensate
1. Recycle/reuse
2. Discharge to sanitary sewer POTW
Pumped groundwater, infiltration/
foundation drainage (contaminated)
1. Recycle/reuse (landscaping, etc.)
2. Treat if necessary; discharge to
sanitary sewer
3. Treat and discharge to storm drain
Reg. Bd.
POTW
Reg. Bd.
Fire fighting flows If contamination is present, Fire Dept. will
attempt to prevent flow to stream or storm
drain
DISCHARGE/ACTIVITY BUSINESS/COMMERCIAL
Disposal Priorities Approval
RESIDENTIAL 1
Disposal Priorities |
Other Wastes (cont'd)
Kitchen Grease 1. Provide secondary containment, collect,
and/or send to recycler.
2. Provide secondary containment, collect,
and/or send to POTW via hauler
POTW
1. Collect, solidify, dispose as trash
Restaurant cleaning of floor mats, exhaust filters, etc. 1. Clean inside building with discharge
through grease trap to sanitary sewer
2. Clean outside in container or bermed
area with discharge to sanitary sewer
Clean-up wastewater from sewer back-up 1. Follow this procedure:
a. Block storm drain, contain, collect,
and retum spilled material to the
sanitary sewer
b. Block storm drain, rinse remaining
material to collection point, and
pump to sanitary sewer (no rinse-
water may flow to storm drain)
APPENDIX P
VISUAL INSPECTION FORMS, REPORTS &
RAIN GAUGE LOGS
VISUAL MONITORING / INSPECTIONS
All sites (Risk Levels 1, 2, and 3) are required to conduct visual monitoring (inspections). Visual
monitoring includes inspections of BMPs, inspections before and after qualifying rain events, and
inspection for non-storm water discharges. Visual inspections are required for the duration of the
project v^ith the goal of confirming that appropriately selected BMPs have been implemented, are
being maintained, and are effective in preventing potential pollutants from coming in contact v^ith
storm water
The attached forms may be utilized for documenting visual monitoring & inspections performed on the
project site. The General Permit includes the following requirements for visual monitoring:
Visual Monitorina (all Risk Levels)
• Visual monitoring for non-storm water discharges (quarterly)
o January-March
o April-June
o July-September
o October-December
• Baseline pre-rain event inspection (within 48 hours of qualifying rain events)
• BMP inspections (weekly and every 24 hours during extended storm events)
• Post-rain event inspection (within 2 business days after qualifying rain events)
The General Permit defines a qualifying roin event as one that produces y2-inch or more of
precipitation with a 48 hour or greater period between rain events.
The General Permit requires that the construction site be inspected within two days priorto a predicted
qualifying rain event, once every 24-hours during extended storm events, and within two days after a
qualifying rain event. These inspections are only required during normal business hours of the
construction site. The General Permit requires that only weather forecasts from the National
Oceanographic and Atmospheric Administration (NOAA) are used. Pre-project inspections should be
initiated after consulting NOAA for a qualifying roin event with 50% or greater proba bility of
precipitation (PoP). These forecasts can be obtained at http://www.srh.noaa.gov/.
Records must be kept of all qualifying rain event inspections, included in Appendix P. Records need to
be maintained on site and document:
Personnel performing the observations;
Observation dates (time and date);
Printed copy of the NOAA forecast
Weather conditions (including the rain gauge reading forthe qualifying rain event);
Locations observed; and
Corrective actions taken in response to observations.
If deficiencies are identified during BMP inspections, repairs or design changes to BMPs must be
initiated within 72 hours of identification and need to be completed as soon as possible. All BMP
inspections must be documented on an inspection checklist (see attached forms). The checklist should
be made site specific based on the BMPs and outfalls for each construction project, and copies of the
completed inspection forms, any corrective actions and any photographs taken shall be included in
this SWPPP (Appendix P).
Results of all visual monitoring & inspections are included as part of the Annual Report (see Section
7.9.3 and Appendix F).
If the site is Risk Level 2 or 3 and there are non-storm water discharges, then samples must be
collected and analyzed per Section 7.6.
Refer to Section 7.5 of the SWPPP for further information regarding visual monitoring requirements.
Rain Gauge Log
Site Name: WDID:
Date Time Rain Gauge Reading Read By (printed name)
Risk Level 1, 2. 3
Visual Inspection Field Log Siieet
Date and Time of Inspection: Report Date:
Inspection
Type: • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site infomiation
Construction Site Name:
Construction stage and
completed activities:
WDID;
Approximate area
of exposed site:
Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning:
(date and time)
Estimate storm
duration:
(hours)
Estimate time since last
storm:
(days or hours)
Rain gauge reading:
(inches)
Observations: If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attactied detailed BMP Inspection Checklists)
Photos Taken: Yes • No • Photo Reference IDs:
Corrective Actions identified (note if SWPPP/REAP change is needed)
Inspector Information
Inspector Name:
Signature:
Inspector Title:
Date:
Risk Lnvei 1,2, 3
Visual Inspection FiefdLog Sheet
Date and Time of Inspection: Report Date:
Inspection
Type: • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site Informatibn
Construction Site Name: WDID:
Construction stage and
completed activities:
Approximate area
of exposed site:
Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning:
(date and time)
Estimate storm
duration:
(hours)
Estimate time since last
storm:
(days or hours)
Rain gauge reading:
(inches)
Observations: If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes • No • Photo Reference IDs:
Corrective Actions identified note if SWPPP/REAP change is needed)
Inspector Information
Inspector Name:
Signature:
Inspector Title:
Date:
RiskL^v^1, Z 3
Visual InspecHon field Lt>g Sheet
Date and Time of Inspection: Report Date:
Inspection
Type: • Weekly • Before
predicted rain
• During,
rain event
• Following
qualifying rain
event
Site information
• Contained
stormwater
release
• Quarterly
non-stormwater
Construction Site Name: WDID:
Construction stage and
completed activities:
Approximate area
of exposed site:
Weather and Obsenrations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning: Estimate storm
duration:
Estimate time since last
storm:
Rain gauge reading:
(date and time) (hours) (days or hours) (inches)
Observations: If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No n
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes • No • Photo Reference IDs:
Corrective Actions identified (note if SWPPP/REAP change Is needed)
Inspector information
Inspector Name:
Signature:
Inspector Title:
Date:
Risk Level 1, 2,3
Visual Inspection Field Log Sheet
Date and Time of Inspection: Report Date:
Inspection
Type: • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site information
Construction Site Name: WDID:
Construction stage and
completed activities:
Approximate area
of exposed site:
Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning:
(date and time)
Estimate storm
duration:
(hours)
Estimate time since last
storm:
(days or hours)
Rain gauge reading:
(inches)
Observations: If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes • No • Photo Reference IDs:
Coirective Actions identified note if SWPPP/REAP change is needed)
Inspector information
Inspector Name:
Signature:
Inspector Title:
Date:
Risk Level 1, 2, 3
Visual inspection Field Log Sheet
Date and Time of Inspection:
Inspection
Type: • Weekly • Before
predicted rain
Report Date:
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site information
Construction Site Name: WDID:
Construction stage and
completed activities:
Approximate area
of exposed site:
Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning:
(date and time)
Estimate storm
duration:
(hours)
Estimate time since last
storm:
(days or hours)
Rain gauge reading:
(inches)
Obsen/ations: If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes • No • Photo Reference IDs;
Corrective Actions identified (note if SWPPP/REAP change is needed)
Inspector Information
Inspector Name;
Signature;
Inspector Title;
Date;
Risk Levell, 2, 3
Visual inspection Field Log Sheet
Date and Time of Inspection; Report Date:
Inspection
Type; • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site information
Construction Site Name; WDID;
Construction stage and
completed activities;
Approximate area
of exposed site;
Weather and Observations
Date Rain Predicted to Occur; Predicted % chance of rain;
Estimate storm beginning;
(date and time)
Estimate storm
duration;
(hours)
Estimate time since last
storm;
(days or hours)
Rain gauge reading;
(inches)
Observations; If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken; Yes • No • Photo Reference IDs:
Corrective Actions Identified (note if SWPPP/REAP change is needed)
Inspector information
Inspector Name;
Signature;
Inspector Title;
Date;
Risk Level 1, 2, 3
Visual Inspection Field Log Sheet
Date and Time of Inspection; Report Date;
Inspection
Type; • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site information
Construction Site Name;
Construction stage and
completed activities;
WDID;
Approximate area
of exposed site;
Weather and Observations
Date Rain Predicted to Occur;
Estimate storm beginning:
(date and time)
Estimate storm
duration;
(hours)
Predicted % chance of rain;
Estimate time since last
storm;
(days or hours)
Rain gauge reading;
(inches)
Observations; If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes • No •
Corrective Actions identified
Photo Reference IDs;
note if SWPPP/REAP change is needed)
Inspector Information
Inspector Name;
Signature;
Inspector Title;
Date;
Risk Level 1, 2, 3
Visual Inspection Field Log Sheet
Date and Time of Inspection; Report Date;
Inspection
Type; • Weekly • Before
predicted rain
• During
rain event
• Following
qualifying rain
event
• Contained
stormwater
release
• Quarterly
non-stormwater
Site Information
Construction Site Name; WDID;
Construction stage and
completed activities;
Approximate area
of exposed site;
Weather and Observations
Date Rain Predicted to Occur; Predicted % chance of rain;
Estimate storm beginning;
(date and time)
Estimate storm
duration;
(hours)
Estimate time since last
storm;
(days or hours)
Rain gauge reading;
(inches)
Observations; If yes identify location
Odors Yes • No •
Floating material Yes • No •
Suspended Material Yes • No •
Sheen Yes • No •
Discolorations Yes • No •
Turbidity Yes • No •
Site Inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken; Yes • No • Photo Reference IDs:
Corrective Actions identified (note if SWPPP/REAP change is needed)
Inspector information
Inspector Name;
Signature;
Inspector Title;
Date;
STORM WATER QUALITY
CONSTRUCTION SITE INSPECTION CHECKLIST
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Inspection Type
(Check Applicable)
• Prior to forecast rain • After a rain event
• 24-hr Intervals durina extended rain • Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) IVIin. Hr. Days
Approximate Rainfall
Amount (mm)
PROJECT AREA SUMMARY AND
DISTURBED SOIL AREA (DSA) SIZE
Total Proiect Area Hectare/Acres Estimate of Active DSAs Hectare/Acres
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Preservation of Existing Vegetation
Is temporary fencing provided to preserve vegetation In areas
where no construction activity is planned?
Temporary Soil Stabilization
Does the applied temporary soil stabilization provide 100%
coverage for the required areas?
Are there any non-vegetated areas that may require temporary
soil stabilization?
Temporary Linear Sediment Barriers
Are temporary linear sediment barriers properly Installed In
accordance with the details, functional and maintained?
Are cross barriers installed where necessary and properly
spaced?
Storm Drain Inlet Protection
OTHER REQUIREMENTS
Requirement res No N/A Corrective Action
Are storm drain Inlets properly protected and maintained?
Desilting Basins
Do basins provide the required retention/detention?
Stockpiles
Are all locations of temporary stockpiles, including soil, hazardous
waste, and construction materials In approved areas?
Are stockpiles protected from run-on, run-off from adjacent areas
and from winds?
Are required covers and/or perimeter controls in place?
Concentrated Flows
|Are concentrated flow paths free of visible erosion?
Tracking Control
Are all paved areas and points of ingress/egress free of visible
sediment tracking or other particulate matter?
Is dust control Implemented In conformance with Section 10 ofthe
Standard Specifications?
Dewatering Operations
Is dewatering handled In conformance with the dewatering permit
issued by the RWQCB?
Is required treatment provided for dewatering effluent?
Vehicle & Equipment Fueling, Cleaning, and Maintenance
Are vehicle and equipment fueling, cleaning and maintenance
areas clean and free of spills and leaks?
Are vehicle and equipment fueling, cleaning and maintenance
activities performed on an impermeable surface?
If no, are drip pans used?
Are dedicated fueling, cleaning, and maintenance areas located
appropriately and protected from run-on and runoff?
Is wash water contained for infiltration/ evaporation and disposed
of outside the highway right of way?
Is on-site cleaning limited to washing with water only?
Are vehicles and equipment inspected for leaks and repaired?
Waste Management & Materials Pollution Control
Are material storage areas and washout areas protected from
run-on and runoff, and located In appropriate areas?
Are all material handling and storage areas clean and stocked
with appropriate clean-up supplies?
Are liquid materials, hazardous materials, and hazardous wastes
stored in temporary containment facilities?
Are bagged and boxed materials stored on pallets?
Are hazardous materials and wastes stored in appropriate,
labeled containers?
Are proper storage, clean-up, and splll-reporting procedures for
hazardous materials and wastes posted In appropriate areas?
Are temporary containment facilities free of spills and rainwater?
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Are temporary containment facilities and bagged/boxed materials
covered?
Are temporary concrete washout facilities designated and being
used?
Are temporary concrete washout facilities functional?
Do concrete washout facilities provide sufficient volume for
planned operations?
Are concrete wastes. Including residues from cutting and grinding,
contained in off-site or in concrete washout facilities?
Are spills from mobile equipment fueling and maintenance
properly contained and cleaned up?
Is the site free of litter?
Are trash receptacles In appropriate areas, watertight, and leak
free?
Temporary Water Body Crossing or Encroachment
Are temporary water body crossings and encroachments
constructed as shown on the plans or as approved by the
engineer?
Does the project conform to the requirements of the 404 permit
and/or 1601 agreement?
Illicit Connection/Illegal Discharge Detection and Reporting
Is there any evidence of illicit discharges or Illegal dumping on the
project site?
If yes, has the Engineer been notified?
Discharge Points
Are discharge points and discharge flows free from noticeable
pollutants?
Are discharge points free of any significant erosion or sediment
transport?
SWPPP Update
Does the SWPPP reflect the activities at the construction site?
General
Are there any other potential water pollution control concerns at
the site?
Storm Water Monitoring
Does storm water discharge directly to a water body listed In the
General Permit as Impaired for sediment/sedimentation or
turbidity?
If yes, were samples for sediment/sedimentation or turbidity
collected pursuant to the sampling and analysis plan, if required,
during rain events?
Were there any BMPs not properly Implemented or breaches,
malfunctions, leakages or spills observed which could result In the
discharge of pollutants to surface waters that would not be
visually detectable in storm water?
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Were soil amendments (e.g., gypsum) used on the project?
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Ifyes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Did storm water contact stored materials or waste and run off the
construction site? (Materials not in watertight containers, etc.)
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Additional Comments/Recommendations:
Certification
Inspection performed by:
Title:
Name Signature
Date:
Inspection confirmed by:
Title:
Name Signature
Date:
A COPY OF THIS REPORT MUST BE KEPT ON-SITE IN THE SWPPP AT ALL TIMES.
STORM WATER QUALITY
CONSTRUCTION SITE INSPECTION CHECKLIST
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Inspection Type
(Check Applicable)
• Prior to forecast rain • After a rain event
• 24-hr Intervals durina extended rain • Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) Min. Hr Days
Approximate Rainfall
Amount (mm)
PROJECT AREA SUMMARY AND
DISTURBED SOIL AREA (DSA) SIZE
Total Proiect Area Hectare/Acres Estimate of Active DSAs Hectare/Acres
r OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Preservation of Existing Vegetation
Is temporary fencing provided to preserve vegetation in areas
where no construction activity Is planned?
Temporary Soil Stabilization
Does the applied temporary soil stabilization provide 100%
coverage for the required areas?
Are there any non-vegetated areas that may require temporary
soil stabilization?
Temporary Linear Sediment Barriers
Are temporary linear sediment barriers properly Installed In
accordance with the details, functional and maintained?
Are cross barriers installed where necessary and properly
spaced?
Storm Drain Inlet Protection
OTHER REQUIREMENTS
Requirement Yes No N/A Correcti>w Action
Are storm drain inlets properly protected and maintained?
Desilting Basins
Do basins provide the required retention/detention?
Stockpiles
Are all locations of temporary stockpiles, including soil, hazardous
waste, and construction materials In approved areas?
Are stockpiles protected from run-on, run-off from adjacent areas
and from winds?
Are required covers and/or perimeter controls In place?
Concentrated Flows
Are concentrated flow paths free of visible erosion?
Tracking Control
Are all paved areas and points of Ingress/egress free of visible
sediment tracking or other particulate matter?
Is dust control Implemented in conformance with Section 10 of the
Standard Specifications?
Dewatering Operations
Is dewatering handled in conformance with the dewatering permit
issued by the RWQCB?
Is required treatment provided for dewatering effluent?
Vehicle & Equipment Fueling, Cleaning, and Maintenance
Are vehicle and equipment fueling, cleaning and maintenance
areas clean and free of spills and leaks?
Are vehicle and equipment fueling, cleaning and maintenance
activities performed on an Impermeable surface?
If no, are drip pans used?
Are dedicated fueling, cleaning, and maintenance areas located
appropriately and protected from run-on and runoff?
Is wash water contained for Infiltration/ evaporation and disposed
of outside the highway right of way?
|ls on-site cleaning limited to washing with water only?
Are vehicles and equipment Inspected for leaks and repaired?
Waste Management & Materials Pollution Control
Are material storage areas and washout areas protected from
run-on and runoff, and located In appropriate areas?
Are all material handling and storage areas clean and stocked
with appropriate clean-up supplies?
Are liquid materials, hazardous materials, and hazardous wastes
stored in temporary containment facilities?
Are bagged and boxed materials stored on pallets?
Are hazardous materials and wastes stored in appropriate,
labeled containers?
Are proper storage, clean-up, and splll-reporting procedures for
hazardous materials and wastes posted in appropriate areas?
Are temporary containment facilities free of spills and rainwater? 1
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Are temporary containment facilities and bagged/boxed materials
covered?
Are temporary concrete washout facilities designated and being
used?
Are temporary concrete washout facilities functional?
Do concrete washout facilities provide sufficient volume for
planned operations?
Are concrete wastes. Including residues from cutting and grinding,
contained In off-site or In concrete washout facilities?
Are spills from mobile equipment fueling and maintenance
properly contained and cleaned up?
Is the site free of litter?
Are trash receptacles In appropriate areas, watertight, and leak
free?
Temporary Water Body Crossing or Encroachment
Are temporary water body crossings and encroachments
constructed as shown on the plans or as approved by the
engineer?
Does the project conform to the requirements of the 404 permit
and/or 1601 agreement?
Illicit Connection/Illegal Discharge Detection and Reporting
Is there any evidence of illicit discharges or Illegal dumping on the
project site?
Ifyes, has the Engineer been notified?
Discharge Points
Are discharge points and discharge flows free from noticeable
pollutants?
Are discharge points free of any significant erosion or sediment
transport?
SWPPP Update
Does the SWPPP reflect the activities at the construction site?
General
Are there any other potential water pollution control concerns at
the site?
Storm Water Monitoring
Does storm water discharge directly to a water body listed in the
General Permit as impaired for sediment/sedimentation or
turbidity?
If yes, were samples for sediment/sedimentation or turbidity
collected pursuant to the sampling and analysis plan, if required,
during rain events?
Were there any BMPs not properly implemented or breaches,
malfunctions, leakages or spills observed which could result in the
discharge of pollutants to surface waters that would not be
visually detectable In storm water?
Ifyes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Were soil amendments (e.g., gypsum) used on the project?
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Did storm water contact stored materials or waste and run off the
construction site? (Materials not in watertight containers, etc.)
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Additional Comments/Recommendations:
Certification
Inspection performed by:
Title:
Name Signature
Date:
Inspection confirmed by:
Title:
Name Signature
Date:
A COPY OF THIS REPORT MUST BE KEPT ON-SITE IN THE SWPPP AT ALL TIMES.
APPENDIX Q
RAIN EVENT ACTION PLANS (REAPs)
RAIN EVENT ACTION PLANS (REAPs)
REAPs are to be completed by the QSP when there is a forecast of a likely precipitation event in the
project area according to the National Oceanic and Atmospheric Administration (NO/\A) forecast
website (http://www.crh.noaa.aov/lot/severe/wxterms.php).
A "likely precipitation event" is any weather pattern that is forecast to have a 50% or greater chance
of precipitation in the project area. Forecasts are normally issued for 12-hour time periods. It is
recommended that the NOAA forecast be printed and saved where REAPs are required for
documentation of the forecast. Copies may be saved in Appendix Q.
REAPs are also required for project sites where construction activities are indefinitely halted or
postponed.
REAP templates are included in Appendix Q. Copies of completed REAPs shall be documented in the
SWPPP (Appendix Q) and submitted through SMARTS with the Annual Report (Appendix F).
Note: REAPs are to be prepared and implemented in addition to the pre-storm event visual inspection
requirements, described further in Section 7.5.
REAPs are not required for Risk Level 1 dischargers.
Rain Event Action Plan (REAP)
Date: WDID Number:
Date Rain Predicted to Occur: Predicted % chance of rain:
Site Information:
Site Name, City and Zip Code Project Risk Level: • Risk Level 2 • Risk Level 3
Site Stormwater Manager Information:
Name, Company, Emergency Phone Number (24/7)
Erosion and Sediment Control Contractor - Labor Force contracted for the site:
Name, Company, Emergency Phone Number (24/7)
Stormwater Sampling Agent:
Name, Company, Emergency Phone Number (24/7)
Current Phase of Construction
Check ALL the boxes below that apply to your site.
• Grading and Land Development • Vertical Construction •
• Streets and Utilities • Final Landscaping and Site •
Stabilization
Inactive Site
Other:
Activities Associated with Current Phase(s)
Check ALL the boxes below that apply to your site (some apply to all Phases).
• Demolition • Vegetation Removal • Vegetation Salvage-Harx'est
• Rough Grade • Finish Grade • Blasting
a Soil Amendment(s): • Excavation f ft) • Soils Testing
• Rock Crushing • Erosion and Sediment Control • Surveying
• Equip. Maintenance/Fueling • Material Delivery and Storage • Other:
Streets and Utilities:
• Finish Grade • Utility Install: water-sewer-gas a Paving Operations
• Equip. Maintenance/Fueling • Storm Drain Installation • Material Delivery & Storage
• Curb and Gutter/Concrete Pour • Masonry • Other:
VerticaZ Constructfon;
a Framing • Carpentry • Concrete/Forms/Foundation
• Masonry • Electrical a Painting
• Drywall/lnterior Walls • Plumbing • Stucco
• Equip. Maintenance/Fueling • HVAC • Tile
a Exterior Siding • Insulation a Landscaping & Irrigation
• Flooring • Roofing • Other:
finai Landscapina & Site Stabilization:
• Stabilization a Vegetation Establishment • E&S Control BMP Removal
• Finish Grade • Storage Yard/ Material
Removal
• Landscape Installation
• Painting and Touch-Up • Irrigation System Testing • Other:
• Drainage Inlet Stencils • Inlet Filtration • Perm. Water Quality Ponds
• Other: • Other: • Other:
Inactive Construction Site:
• E & S Control Device Installation • Routine Site Inspection • Trash Removal
• E & S Control Device Maintenance • Street Sweeping • Other:
November 2009 California Stormwater BMP Handbook j www.casqa.org C-1
Rain Event Action Plan (REAP)
Date: WDID Number:
Trades Active on Site during Current Phase(s)
Check ALL the boxes below that apply to your site
• Storm Drain Improvement a Grading Contractor • Surx'eyor- Soil Technician
• Street Improvements • Water Pipe Installation • Sanitar>' Station Provider
a Material Delivery a Sewer Pipe Installation • Electrical
a Trenching • Gas Pipe Installation a Carpentry
• Concrete Pouring • Electrical Installation • Plumbing
• Foundation a Communication Installation a Masonr>'
• Demolition • Erosion and Sediment Control • Water, Sewer, Electric
Utilities
• Material Delivery • Equipment • Rock Products
Fueling/Maintenance
• Tile Work- Flooring • Utilities, e.g., Sewer, Electric • Painters
• Drywall • Roofers • Carpenters
a HVAC installers • Stucco • Pest Control: e.g., termite
prevention
• Exterior Siding • Masons a Water Feature Installation
a Insulation a Landscapers • Utility Line Testers
a Fireproofing • Riggers a Irrigation System Installation
a Steel Systems a Utility Line Testers • Other:
Trade Contractor Information Provided
Check ALL the boxes below that apply to your site.
a Educational Material Handout • Tailgate Meetings • Training Workshop
• Contractual Language • Fines and Penalties a Signage
a Other: • Other: • Other:
Continued on next page.
November 2009 California Stormwater BMP Handbook j www.casqa.org C-2
Rain Event Action Plan (REAP)
Dateof REAP WDID Number:
Date Rain Predicted to Occur: Predicted % chance of rain:
Predicted Rain Event Triggered Actions
Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage
areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance,
and areas of active work to ensure the proper implementation of BMPs. Project-vride BMPs should be checked and cross-
referenced to the BMP progress map.
Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event
• Information & Scheduling Inform trade supervisors of predicted rain
Check scheduled activities and reschedule as needed
Alert erosion/sediment control provider
Alert sample collection contractor (if applicable)
Schedule staff for extended rain inspections (including weekends & holidays)
Check Erosion and Sediment Control (ESC) material stock
Re\aew BMP progress map
Other:
• Material storage areas Material under cover or in sheds (ex: treated woods and metals)
Perimeter control around stockpiles
Other:
Zi Waste management areas Dumpsters closed
Drain holes plugged
Recycling bins covered
Sanitary stations bermed and protected from tipping
Other:
• Trade operations Exterior operations shut down for event (e.g., no concrete pours or paving)
Soil treatments (e.g.,: fertilizer) ceased within 24 hours of event
Materials and equipment (ex: tools) properly stored and covered
Waste and debris disposed in covered dumpsters or removed from site
Trenches and excavations protected
Perimeter controls around disturbed areas
Fueling and repair areas covered and bermed
Other:
• Site ESC BMPs Adequate capacity in sediment basins and traps
Site perimeter controls in place
Catch basin and drop inlet protection in place and cleaned
Temporary erosion controls deployed
Temporary perimeter controls deployed around disturbed areas and stockpiles
Roads swept; site ingress and egress points stabilized
Other:
• Concrete rinse out area Adequate capacity for rain
Wash-out bins covered
Other:
• Spill and drips All incident spills and drips, including paint, stucco, fuel, and oil cleaned
Drip pans emptied
Other:
Continued on next page.
November 2009 California Stormwater BMP Handbook j www.casqa.org C-3
• Other / Discussion /
Diagrams
Attach a printout of the weather forecast from the NOAA website to the REAP.
I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit
by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the
possibilit}' of fine and imprisonment for knowing violations.
_Date:.
Qualifled SWPPP Practitioner (Use ink please)
November 2009 California Stormwater BMP Handbook j www.casqa.org C-4
Rain Event Action Plan (REAP)
Date: WDID Number:
Date Rain Predicted to Occur: Predicted % chance of rain:
Site Information:
Site Name, City and Zip Code Project Risk Level: • Risk Level 2 • Risk Level 3
Site Stormwater Manager Information:
Name, Company, Emergency Phone Number (24/7)
Erosion and Sediment Control Contractor - Labor Force contracted for the site:
Name, Company, Emergency Phone Number (24/7)
Stormwater Sampling Agent:
Name, Company, Emergency Phone Number (24/7)
Current Phase of Construction
Check ALL the boxes below that apply to your site.
• Grading and Land Development • Vertical Construction •
• Streets and Utilities • Final Landscaping and Site •
Stabilization
Inactive Site
Other:
Activities Associated with Current Phase(s)
Check ALL the boxes below that apply to your site (some apply to all Phases).
• Demolition • Vegetation Removal • Vegetation Salvage-Harvest
• Rough Grade • Finish Grade • Blasting
• Soil Amendment(s): • Excavation ( ft) • Soils Testing
• Rock Crushing • Erosion and Sediment Control • Sun'ejing
a Equip. Maintenance/Fueling • Material Delivery and Storage • Other:
Streets and Utilities:
• Finish Grade • Utility Install: water-sewer-gas a Pa\ing Operations
• Equip. Maintenance/Fueling • Storm Drain Installation • Material Delivery & Storage
• Curb and Gutter/Concrete Pour • Masonry • Other:
VerticaZ Construction:
• Framing • Carpentry • Concrete/Forms/Foundation
• Masonry • Electrical • Painting
• Drywall/lnterior Walls a Plumbing • Stucco
• Equip. Maintenance/Fueling • HVAC • Tile
• Exterior Siding • Insulation • Landscaping & Irrigation
• Flooring • Roofing • Other:
Final Landscapina & Site Stabilization:
• Stabilization • Vegetation Establishment a E&S Control BMP Removal
• Finish Grade • Storage Yard/ Material
Removal
• Landscape Installation
• Painting and Touch-Up • Irrigation System Testing • Other:
a Drainage Inlet Stencils a Inlet Filtration • Perm. Water Qualit}' Ponds
• Other: • Other: • Other:
Inactive Construction Site:
• E&S Control Device Installation • Routine Site Inspection • Trash Removal
• E&S Control Device Maintenance a Street Sweeping • Other:
November 2009 California Stormwater BMP Handbook j www.casqa.org C-1
Rain Event Action Plan (REAP)
Date: WDID Number:
Trades Active on Site during Current Phase(s)
Check ALL the boxes below that apply to your site
• Storm Drain Improvement • Grading Contractor • Sur\'eyor- Soil Technician
• Street Improvements • Water Pipe Installation • Sanitary Station Provider
• Material Delivery a Sewer Pipe Installation • Electrical
• Trenching • Gas Pipe Installation • Carpentry
• Concrete Pouring • Electrical Installation a Plumbing
a Foundation • Communication Installation a Masonry
• Demolition • Erosion and Sediment Control • Water, Sewer, Electric
Utilities
• Material Delivery • Equipment • Rock Products
Fueling/Maintenance
• Tile Work- Flooring • Utilities, e.g.. Sewer, Electric • Painters
• Drywall • Roofers • Carpenters
• HVAC installers • Stucco • Pest Control: e.g., termite
prevention
• Exterior Siding a Masons • Water Feature Installation
• Insulation • Landscapers • Utility Line Testers
• Fireproofing • Riggers • Irrigation System Installation
• Steel Systems • Utility Line Testers • Other:
Trade Contractor Information Provided
Check ALL the boxes below that apply to your site.
Educational Material Handout • Tailgate Meetings • Training Workshop
Contractual Language
Other:
• Fines and Penalties
• Other:
• Signage
• Other:
Continued on next page.
November 2009 California Stormwater BMP Handbook | www.casqa.org C-2
Rain Event Action Plan (REAP)
Date of REAP WDID Number:
Date Rain Predicted to Occur: Predicted % chance of rain:
Predicted Rain Event Triggered Actions
Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage
areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance,
and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross-
referenced to the BMP progress map.
Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event
• Information & Scheduling Inform trade supervisors of predicted rain
Check scheduled activities and reschedule as needed
Alert erosion/sediment control provider
Alert sample collection contractor (if applicable)
Schedule staff for extended rain inspections (including weekends & holidays)
Check Erosion and Sediment Control (ESC) material stock
Review BMP progress map
Other:
• Material storage areas Material under cover or in sheds (ex: treated woods and metals)
Perimeter control around stockpiles
Other:
• Waste management areas Dumpsters closed
Drain holes plugged
Recycling bins covered
Sanitary stations bermed and protected from tipping
Other:
• Trade operations Exterior operations shut down for event (e.g., no concrete pours or paving)
Soil treatments (e.g.,: fertilizer) ceased within 24 hours of event
Materials and equipment (ex: tools) properly stored and covered
Waste and debris disposed in covered dumpsters or removed from site
Trenches and excavations protected
Perimeter controls around disturbed areas
Fueling and repair areas covered and bermed
Other:
• Site ESC BMPs Adequate capacity in sediment basins and traps
Site perimeter controls in place
Catch basin and drop inlet protection in place and cleaned
Temporary erosion controls deployed
Temporary perimeter controls deployed around disturbed areas and stockpiles
Roads swept; site ingress and egress points stabilized
Other:
• Concrete nnse out area Adequate capacity for rain
Wash-out bins covered
Other:
• Spill and drips All incident spills and drips, including paint, stucco, fuel, and oil cleaned
Drip pans emptied
Other:
November 2009 California Stormwater BMP Handbook | www.casqa.org C-3
Continued on next page
• Other / Discussion /
Diagrams
Attach a printout of the weather forecast from the NOAA website to the REAP.
I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit
by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
_Date:.
Qualified SWPPP Practitioner (Use ink please)
November 2009 California Stormwater BMP Handbook | www.casqa.org C-4
APPENDIX R
GUIDANCE ON FIELD MEASUREMENTS
Guidance on Field Measurements
Source: California Stormwater Quality Association (CASQA). California Stormwater Quality
Handbook for Construction. Appendix D - Field Monitoring and Analysis Guidance. November
2009.
This section details the general practices for sampling using field meters. Before any sampling
begins it is imperative to wear proper clothing and equipment. This includes the appropriate
sampling safety equipment and powder-free nitrile gloves.
Instrument Calibration
Calibrate field meters and equipment before any sampling. Follow the calibration instructions
provided by the manufacturer with your instrument. Calibration standards should be purchased
with your instrument and repurchased as needed. The standards have limited shelf life and
should not be used beyond the expiration date.
Most pH meters require a two or three point calibration curve; therefore you will need to
purchase two or three different standard solutions. Typical solutions have pH values of 4, 7, and
10.
Turbidity measurements are also based on a two or three point curve and should include a zero
value. It is very important to make sure that the turbidity standard solution is well mixed before
meter calibration. Since turbidity standards sometimes contain suspended solids, inaccurate
calibration can result ifthe standards are not properly mixed.
Field Meter Sampling
Measurement of turbidity and pH using a field meter is very similar. Figure D-2 shows an
example of an all-in-one field meter, which among other things, records pH and turbidity. Since
methods for specific field meters vary from model to model carefully follow the instructions
provided by the manufacturer. This pictorial guide provides an outline for the methods
appropriate for an all-in-one meter.
Figure D-2 Example ofan Ali-In-One meter
Measurements In-Stream
The simplest method is to place the sensor directly into the
waterway or flow path (Figure D-3) and record the results.
This will only work if there is significant runoff with a depth
greater than six inches, which may not be the case at a
construction site. With this method, it is important to not
only to have runoff with a significant depth but to sample in
a location that is representative of the entire flow. Avoid
puddles that might have formed off of the main drainage.
Figure D-3 Measuring pH and
tiirbicllty In-stream
measurements
Measurements in a Sample Container
Most likely the sampling will take place in low flow
conditions so an intermediate container must be used.
The container should be clean and decontaminated.
Make sure to obtain a grab sample that represents site
runoff conditions.
If two or more runoff streams originating from the site
converge at one location downstream from the
construction site, then collect a grab sample at this
location.
Collect the field sample by holding the container in the
flow path (Figure D-4) until enough water is obtained to
fill the field meter's receiving container. In some cases,
small, clean cups or sampling syringes may be needed
to collect an adequate sample volume.
Next pour the grab sample into the field meter's receiving
container (Figure D-5)
Figure D-4 Collecting grab
samples
Figure D-5 Transferring
sample to field meter sample
container
Insert field meter into receiving container with the
sample water (Figure D-6). This step will differ based
on the design ofthe meter.
Figure D-6 Inserting meter
into sample container
Wait for the pH and turbidity values to stabilize before
recording the results, which may take few moments.
Complete the field logs with results and
any important information to describe the sampling
settings. Include in the documentation any apparent
odor, color, clarity, sheen, and other visual
characteristics of the water sample.
-TB
Figure D-7 Measuring pH and
turbidity In the sample
container
APPENDIX S
POLLUTANT TESTING GUIDANCE TABLE
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ^ Laboratory
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions)
Hot Asphalt
Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions)
Asphalt Emulsion Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions)
Liquid Asphalt (tack coat)
Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions) Cold Mix
Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions)
Crumb Rubber Yes - Black, solid
material Visually Observable - No Testing Required
Asphalt Products
(Sections 37, 39, 92, 93,
94, and Special Provisions)
Asphalt Concrete (Any
Type)
Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Cleaning Products
Acids No
pH
Acidity
Anions (acetic acid,
phosphoric acid, sulfuric
acid, nitric acid,
hydrogen chloride)
pH Meter
Acidity Test Kit
EPA 150.1 (pH)
Cleaning Products
Acids No
pH
Acidity
Anions (acetic acid,
phosphoric acid, sulfuric
acid, nitric acid,
hydrogen chloride)
pH Meter
Acidity Test Kit SM 231 OB (Acidity)
Cleaning Products
Acids No
pH
Acidity
Anions (acetic acid,
phosphoric acid, sulfuric
acid, nitric acid,
hydrogen chloride)
pH Meter
Acidity Test Kit
EPA 300.0 (Anion)
Cleaning Products
Bleaches No Residual Chlorine Chlorine SM 4500-CL G (Res.
Chlorine) Cleaning Products
Detergents Yes - Foam Visually Observable - No Testing Required
Cleaning Products
TSP No Phosphate Phosphate EPA 365.3 (Phosphate)
Cleaning Products
Solvents No
VOC None EPA 601/602 or
EPA 624 (VOC)
Cleaning Products
Solvents No
SVOC None EPA 625 (SVOC)
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ^ Laboratory
Portland Cement (PCC) Yes - Milky Liquid Visually Observable - No Testing Required
Masonry products No
pH pH Meter
Alkalinity or Acidity Test
Kit
EPA 150.1 (pH)
Masonry products No
Alkalinity
pH Meter
Alkalinity or Acidity Test
Kit SM 2320 (Alkalinity)
Sealant (Methyl No
Methyl Methacrylate EPA 625 (SVOC)
Methacrylate - MMA) No
Cobalt None
EPA 200.8 (Metal)
Zinc
EPA 200.8 (Metal)
Portland Concrete
Cement & Masonry
Products
(Section 27, 28, 29, 40, 41,
42,49, 50, 51, 53, 63, 65,
72, 73, 80, 81, 83, 90, and
Incinerator Bottom Ash
Bottom Ash
Steel Slag
Foundry Sand
Fly Ash
Municipal Solid Waste
No
Aluminum
Calcium
Vanadium
Zinc
Calcium Test EPA 200.8 (Metal)
EPA 200.7 (Calcium)
Special Provisions) Mortar Yes - Milky Liquid Visually Observable - No Testing Required
Concrete Rinse Water Yes - Milky Liquid Visually Observable - No Testing Required
Acidity SM2310B (Acidity)
Alkalinity
pH Meter
Alkalinity or Acidity Test
Kit
SM 2320 (Alkalinity)
Non-Pigmented Curing
Compounds No pH
pH Meter
Alkalinity or Acidity Test
Kit
EPA 150.1 (pH)
VOC
pH Meter
Alkalinity or Acidity Test
Kit EPA 601/602 or
EPA 624 (VOC)
SVOC EPA 625 (SVOC)
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ^ Laboratory
Aluminum EPA 200.8 (Metal)
Aluminum Sulfate No TDS TDS Meter
Sulfate EPA 160.1 (TDS)
Sulfate EPA 300.0 (Sulfate)
Sulfur-Elemental No Sulfate Sulfate EPA 300.0 (Sulfate)
Nitrate Nitrate EPA 300.0 (Nitrate)
Fertilizers-Inorganic No
Phosphate Phosphate EPA 365.3 (Phosphate)
Fertilizers-Inorganic No
Organic Nitrogen None EPA 351.3 (TKN)
Landscaping and Other Potassium None EPA 200.8 (Metal)
Products
(Section 20, 24, and TOC EPA 415.1 (TOC)
Special Provisions)
Fertilizers-Organic No
Nitrate
Nitrate
EPA 300.0 (Nitrate)
Fertilizers-Organic No
Organic Nitrogen
Nitrate
EPA 351.3 (TKN)
COD EPA 410.4 (COD)
Natural Earth (Sand,
Gravel, and Topsoil)
Yes - Cloudiness and
turbidity Visually Observable - No Testing Required
Herbicide Herbicide
None Check lab for specific
Pesticide
No
Pesticide
None herbicide or pesticide
Lime
No
Alkalinity pH Meter
Alkalinity or Acidity Test
Kit
SM 2320 (Alkalinity)
1
Lime
pH
pH Meter
Alkalinity or Acidity Test
Kit EPA 150.1 (pH)
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field' Laboratory
Paint Yes Visually Observable - No Testing Required
Paint Strippers No
VOC None EPA 601/602 or
EPA 624 (VOC) Paint Strippers No
SVOC None EPA 625 (SVOC)
Resins No
COD
None
EPA 410.4 (COD)
Resins No
SVOC
None
EPA 625 (SVOC)
Sealants No COD None EPA 410.4 (COD)
Painting Products
(Section 12-3.08, 20-2.32, COD EPA 410.4 (COD)
50-1.05, 59, 91, and
Special Provisions) Solvents No VOC None EPA 601/602 or
EPA 624 (VOC)
SVOC EPA 625 (SVOC)
COD EPA 410.4 (COD)
Lacquers, Varnish,
Enamels, and Turpentine No VOC None EPA 601/602 or
EPA 624 (VOC)
SVOC EPA 625 (SVOC)
Thinners No
VOC
None
EPA 601/602 or
EPA 624 (VOC) Thinners No
COD
None
EPA 410.4 (COD)
Portable Toilet Waste
Products Portable Toilet Waste Yes Visually Observable - No Testing Required
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ^ Laboratory
Aerially Deposited Lead^ No Lead None EPA 200.8 (Metal)
Contaminated Soil ^ Petroleum Yes - Rainbow Surface
Sheen and Odor Visually Observable - No Testing Required
Mining or Industrial Waste,
etc. No Contaminant Specific Contaminant Specific -
Check with laboratory
Contaminant Specific -
Check with laboratory
ILine Flushing Products Chlorinated Water No Total chlorine Chlorine SM 4500-CL G (Res.
Chlorine)
COD None EPA 410.4 (COD)
Adhesives Adhesives No Phenols Phenol EPA 420.1 (Phenol)
SVOC None EPA 625 (SVOC)
Salts (Magnesium Chloride,
Calcium Chloride, and
Natural Brines)
Chloride Chloride EPA 300.0 (Chloride)
Dust Palliative Products
(Section 18)
Salts (Magnesium Chloride,
Calcium Chloride, and
Natural Brines)
No TDS TDS Meter EPA 160.1 (TDS)
Salts (Magnesium Chloride,
Calcium Chloride, and
Natural Brines) Cations (Sodium,
Magnesium, Calcium) None EPA 200.7 (Cations)
Antifreeze and Other
Vehicle Fluids Yes - Colored Liquid Visually Observable - No Testing Required
Sulfuric Acid None EPA 300.0 (Sulfate)
Vehicle Batteries No Lead None EPA 200.8 (Metal)
pH
pH Meter
Alkalinity or Acidity Test
Kit
EPA 150.1 (pH)
Fuels, Oils, Lubricants Yes - Rainbow Surface
Sheen and Odor Visually Observable - No Testing Required
Pollutant Testing Guidance Table ^
Category Construction Site Material Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ^ Laboratory
Organic Nitrogen None EPA 351.3 (TKN)
BOD None EPA 405.1 (BOD)
COD None EPA 410.4 (COD)
Polymer/Copolymer ®' ^ No DOC None EPA 415.1 (DOC)
Nitrate Nitrate EPA 300.0 (Nitrate)
Sulfate Sulfate EPA 300.0 (Sulfate)
Nickel None EPA 200.8 (Metal)
Straw/Mulch Yes - Solids Visually Observable - No Testing Required
Lignin Sulfonate No Alkalinity Alkalinity SM 2320 (Alkalinity) Lignin Sulfonate No
TDS TDS Meter EPA 160.1 (TDS)
Soil Psyllium No COD None EPA 410.4 (COD)
Amendment/Stabilization Psyllium No
TOC
None
EPA 415.1 (TOC)
Products COD EPA 410.4 (COD)
Guar/Plant Gums No TOC None EPA 415.1 (TOC)
Nickel EPA 200.8 (Metal)
pH pH Meter, Alkalinity or
Acidity Test Kit EPA 150.1 (pH)
Calcium Calcium EPA 200.7 (Calcium)
Gypsum No Sulfate Sulfate EPA 300.0 (Sulfate) Gypsum No
Aluminum
Barium None EPA 200.8 (Metal)
Manganese
None EPA 200.8 (Metal)
Vanadium
Pollutant Testing Guidance Table ^
Category Construction Site Materia! Visually Observable? Pollutant Indicators ^ Suggested Analyses
Field ' Laboratory
Treated Wood Products
(Section 58, 80-3.01 B(2),
and Special Provisions)
Ammoniacal-Copper-Zinc-
Arsenate (ACZA)
Copper-Chromium-Arsenic
(CCA)
Ammoniacal-Copper-
Arsenate (ACA)
Copper Naphthenate
No
Arsenic
Total Chromium EPA 200.8 (Metal) Treated Wood Products
(Section 58, 80-3.01 B(2),
and Special Provisions)
Ammoniacal-Copper-Zinc-
Arsenate (ACZA)
Copper-Chromium-Arsenic
(CCA)
Ammoniacal-Copper-
Arsenate (ACA)
Copper Naphthenate
No
Total Chromium
Total Chromium EPA 200.8 (Metal) Treated Wood Products
(Section 58, 80-3.01 B(2),
and Special Provisions)
Ammoniacal-Copper-Zinc-
Arsenate (ACZA)
Copper-Chromium-Arsenic
(CCA)
Ammoniacal-Copper-
Arsenate (ACA)
Copper Naphthenate
No
Copper
Total Chromium EPA 200.8 (Metal) Treated Wood Products
(Section 58, 80-3.01 B(2),
and Special Provisions)
Ammoniacal-Copper-Zinc-
Arsenate (ACZA)
Copper-Chromium-Arsenic
(CCA)
Ammoniacal-Copper-
Arsenate (ACA)
Copper Naphthenate
No
Zinc
Total Chromium EPA 200.8 (Metal) Treated Wood Products
(Section 58, 80-3.01 B(2),
and Special Provisions)
Creosote Yes - Rainbow Surface
or Brown Suspension Visually Observable - No Testing Required
Notes:
1. 1 If specific pollutant is known, analyze only for that specific pollutant. See MSDS to verify.
2. For each construction material, test for one of the pollutant indicators. Bolded pollutant indicates lowest analysis cost or best indicator. However,
the composition of the specific construction material, if known, is the first criterion for selecting which analysis to use.
3. See www.hach.com, vww.lamotte.com, www.vsi.com and www.chemetrics.com for some of the test kits
4. If the type of inorganic fertilizer is unknown, analyze for all pollutant indicators listed.
5. Only if special handling requirements are required in the Standard Special Provisions for aerially deposited lead (ADL)
6. If used with a dye or fiber matrix, it is considered visually observable and no testing is required.
7. Based upon research conducted by Caltrans, the following copolymers/polymers do not discharge pollutants and water quality sampling and
analysis is not required: Super Tak™, M-Binder™, Fish Stik™, Pro40dc™, Fisch-Bond™, and Soil Master WR™.
ACRONYMS:
BOD - Biochemical Oxygen Demand
COD - Chemical Oxygen Demand
DOC - Dissolved Organic Carbon
EPA - Environmental Protection Agency
HACH - Worldwide company that provides advanced analytical systems and technical support for water quality testing.
SM - Standard Method
SVOC - Semi-Volatile Organic Compounds
TDS - Total Dissolved Solids
TKN - Total Kjeldahl Nitrogen
TOC - Total Organic Carbon
TSP - Tri-Sodium Phosphate
VOC - Volatile Organic Compounds
REFERENCES:
Construction Storm Water Sampling and Analysis Guidance Document, California Stormwater Quality Task Force, October 2001.
Environmental Impact of Construction and Repair Materials on Surface and Ground Waters, Report 448, National Cooperative Highway Research
Program, 2001
So/7 Stabilization for Temporary Slopes, Environmental Programs, Califomia Department of Transportation, October 1, 1999.
Statewide Storm Water IVIanagement Plan, Division of Environmental Analysis, California Department of Transportation, April 2002.
Statewide Storm Water Quality Practice Guidelines, Environmental Program, Califomia Department of Transportation, August 2000.
So;7 Stabilization for Temporary Slopes and District 7 Erosion Control Pilot Study, June 2000.
Stormwater t^onitoring Protocols, Guidance Manual, California Department of Transportation, May 2000.
SWPPPA/VPCP Preparation Manual, Caltrans Storm Water Quality Handbooks, February 2003.
APPENDIX T
STORM WATER SAMPLING FORMS
SAMPLING & ANALYSIS
Sampling & Analysis for Risk Level 2
• Effluent sampling for turbidity and pH (minimum 3 samples per day per discharge point per
qualifying rain event)
• Contained rain water (at time of discharge)
• Non-visible pollutants, spills and/or BMP failures (within first 2 hours of discharge from site)
• Other (as required by dewatering permits, RWQCB or TMDLs)
Sampling & Analysis for Risk Level 3
• Effluent sampling for turbidity and pH (minimum 3 samples per day per discharge point per
qualifying rain event)
• Suspended sediment concentration (SCC) (required only if turbidity exceeds NEL, minimum 3
samples per day per discharge point, per qualifying rain event)
• Receiving water sampling for turbidity and SCC and/or pH (if NEL is exceeded and project has
a direct discharge to receiving water, minimum 3 samples per day per discharge point, per
qualifying rain event)
• Bioassessment (if project is 30 acres or more and directly discharges to a wadeable stream,
conduct up- and down-stream of point of discharge to receiving water, conduct before start of
construction activity and after completion)
• Contained rain water (at time of discharge)
• Non-visible pollutants, spills and/or BMP failures (within first 2 hours of discharge from site)
• Other (as required by dewatering permits, RWQCB or TMDLs)
Copies of all inspection and sampling reports are to be documented in the SWPPP and included in the
Annual Report. All sampling data is required to be entered into SMARTS through the Annual Reports
and Ad Hoc Monitoring Reports interface prior to submitting the Annual Report. Refer to the SWPPP
Section 7.6 for additional sampling and monitoring requirements, and Section 7.9 for reporting
requirements and records retention. Instructions for submitting ad hoc monitoring reports are
included in Appendix U.
In the event that the storm event average of the samples exceeds an applicable NAL (see Section 7.3),
Risk Level 2 and 3 dischargers must electronically submit all storm event sampling results to the
SWRCB's SMARTS no later than 10 days after the conclusion of the storm event. (Note, however that
Risk Level 3 dischargers must submit all field data regardless of exceedance status within five days of
the storm event conclusion). In addition, the RWQCBs may request the submittal of an NAL
Exceedance Report through SMARTS. The discharger must certify each NAL Exceedance Report in
accordance with the General Permit's Special Provisions for Construction Activity.
In the event that the daily average of the samples exceed an applicable NEL (see Section 7.3), Risk
Level 3 dischargers must electronically submit a NEL Violation Report to the SWRCB's SMARTS within
24 hours of identifying the exceedance. ATS dischargers must submit an NEL Violation Report to the
SWRCB's SMARTS within 24 hours after the NEL exceedance has been identified. The discharger must
certify each NEL Violation Report in accordance with the General Permit's Special Provisions for
Construction Activity (General Permit Section IV).
Instructions for submitting ad hoc monitoring reports are included in Appendix U.
Risk Level 2
Einuent SamplIhg Reld Log Sheets
Construction Site Name: WDID:
Sampler: Date: Time Start:
Sampling Event Type: • Stormwater • Non-stormwater • Non-visible pollutant
Field Meter Calibration
pH Meter ID No./Desc.
Calibration Date/Time:
Turbidity Meter ID No./Desc:
Calibration Date/Time:
Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time
Grab Samples Collected
Discharge Location Description Sample Type Time
Additional Sampling Notes:
Time End:
Risk Level 2
EfHuent Sampling Fl^d Log Sheets
Construction Site Name: WDID:
Sampler: Date: Time Start:
Sampling Event Type: • Stormwater • Non-stormwater • Non-visible pollutant
Field Meter Calibration
pH Meter ID No./Desc:
Calibration Date/Time:
Turbidity Meter ID No./Desc.
Calibration Date/Time:
Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time
Grab Samples Collected
Discharge Location Description Sample Type Time
Additional Sampling Notes:
Time End:
SAMPLE ACTIVITY LOG
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Sampling Type
(Check Applicable)
• Prior to forecast rain • After a rain event
• 24-hr intervals durina extended rain • Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) Min. Hr. Days
Approximate Rainfall
Amount (mm)
For rainfall information: http://cdec.water.ca.aov/weather.html or http://www.wrh.noaa.qov/wrhq/nwspaae.html
SAMPLE LOG
Sample Identification Sample Location Sample Collection
Date and Time
Specific sample locations descriptions may include: 30m upstream from discharge at eastern boundary, runoff from northem waste storage area,
downgradient of inlet 57 at kilometer post 36, etc.
FIELD ANALYSIS
Yes No
Sample Identification Test Result
SAMPLE ACTIVITY LOG
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Sampling Type
(Check Applicable)
• Prior to forecast rain • After a rain event
n 24-hr intervals durinq extended rain • Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) Min. Hr. Days
Approximate Rainfall
Amount (mm)
For rainfall infomiation: http://cdec.water.ca.qov/weather.html or http://www.wrh.noaa.aov/wrha/nwspaae.html
SAMPLE LOG
Sample Identification Sample Location Sample Coliectlon
Date and Time
Specific sample locations descriptions may include: 30m upstream from discharge at eastern boundary, runoff from northern waste storage area,
downgradient of inlet 57 at kilometer post 36, etc.
FIELD ANALYSIS
Yes No
Sample Identification Test Result
SAMPLE ACTIVITY LOG
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Sampling Type
(Check Applicable)
• Prior to forecast rain • After a rain event
n 24-hr intervals durinq extended rain • Other
Season
(Check Applicable) n Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) MIn. Hr. Days
Approximate Rainfall
Amount (mm)
For rainfall information: http://cdec water ca.qov/weather.html or http://viww.wrh.noaa.qov/wrha/nwspaae.html
SAMPLE LOG
Sample Identification Sample Location Sample Collection
Date and Time
Specific sample locations descriptions may include: 30m upstream from discharge at eastern boundary, runoff from northem waste storage area,
downgradient of inlet 57 at kilometer post 36, etc.
FIELD ANALYSIS
Yes No
Sample Identification Test Result
SAMPLE ACTIVITY LOG
GENERAL INFORMATION
Project Name
WDID No.
Contractor
Arrival Time Departure Time
Weather Condition
Construction Type
Sampling Type
(Check Applicable)
• Prior to forecast rain • After a rain event
• 24-hr inten/als durina extended rain • Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last storm
(Circle Applicable Units) MIn. Hr. Days
Approximate Rainfall
Amount (mm)
For rainfall information; http://cdec.water.ca-qov/weather.html or http://www.wrh.noaa.qov/wrhq/nwspaqe.html
SAMPLE LOG
Sample Identification Sample Location Sample Collection
Date and Time
Specific sample locations descriptions may include: 30m upstream from discharge at eastern boundary, runoff from northern waste storage area,
downgradient of inlet 57 at kilometer post 36, etc.
FIELD ANALYSIS
Yes No
Sample Identification Test Result
APPENDIX U
HOW TO SUBMIT AN AD HOC REPORT FOR
CONSTRUCTION SITE MONITORING
How to Submit an Ad Hoc Report for
Construction Site Monitoring
state Water Board Order No. 2009-009-DWQ, the Construction General Permit (CGP)
is a National Pollutant Discharge Elimination System (NPDES) permit that implements
Federal regulations (40 CFR § 122.44) requiring enrollees to self-report effluent
monitoring for their covered discharges. The CGP requires some permittees to self-
report effluent monitoring information under specific circumstances. For example, if the
permittees are Risk Level or Type 2 then they are subject to Numeric Action Levels
(NALs). If the permittees are Risk Level or Type 3 then they are subject to Numeric
Effluent Limitations (NELs). All Risk Level and Type 2 and 3 CGP permittees must
report results of their sampling and analysis of effluent discharges to characterize
discharges associated with construction activity from the entire area disturbed by the
project. Risk Level and Type 1 permittees must conduct water quality monitoring of
their effluent only if non-visible pollutants are present on the project.
The CGP requires both annual (September 1 of each year) and ad hoc electronic
reporting of this information, depending on the circumstances. These instructions are
specifically for ad hoc reporting. We will produce similar instructions for annual
reporting as soon as possible.
All of this effluent monitoring information must be reported electronically through the
stormwater Multi Application & Report Tracking System (SMARTS) by the deadlines
listed below:
Risk Level/LUP
Type
Non-Visible
Monitoring
Results^
Effluent
Monitoring
Results
NAL Exceedance
Results
NEL
Exceedance
Results
1 Prior to Annual Report Submittal N/A N/A
2 Prior to Annual Report Submittal 10 days after storm
event conclusion
N/A
3 5 days after storm event conclusion
For more information on the CGP:
httD://www.waterboards.ca.gov/water issues/proqrams/stormwater/construction.shtml
If you have any questions please contact the Storm Water help desk at
smarts(gwateboards.ca.gov or 1-866-563-3107.
Up to date analytical data must be included in the SWPPP
Construction Ad Hoc Reporting -1/18/2011 revised Page 1
Instructions
Objectives
• Learn how to enter effluent monitoring data for Construction sites.
Prerequisites
• Best used in Internet Explorer.
• Data reviewed by a Qualified SWPPP Practitioner.
Logging into SMARTS
1. Open Internet Explorer and visit https://smarts.waterboards.ca.qov/
j;;^^t> NOTE: This screen provides notifications regarding system
maintenance times and/or other important information about
SMARTS.
2. Enter your User ID & Password.
SMARTS LOGIN
User ID:
Password:
Login
B^^^^ NOTE: The User ID and Password are case sensitive.
Ad Hoc Report
1. After logging in, select the menu item:
"Annual Report"
p;;;^^^ NOTE: Ad Hoc reports for monitoring data are part of the Annual
Report. At the end of the reporting year all Ad Hoc reports will be
submitted as part of the Annual Report.
Construction Ad Hoc Reporting -1/18/2011 revised Page 2
2. Select the Construction Site to begin the Ad Hoc
Report
Facility Site Name:
WDID:
Factlity'Slie Address:
City;
Region;
Reportino Period:
Report Status:
Program Type
2010-2011
Select
Seafch
Industrial Annual Reports
1 racilfly MafiH? \NDfO Hl^rt l'(>fKXl .Statu*; Roce^l Rale 1 ftl IV Hy Remand D(*;«;
Construction Annual Repons
mm ^fe Address Report Pec lod Sl.itus Rwapt Date Reinarri
|:onstfUcllcn S»e j fS34C350043 iJ'.vClOlhancJlSt 07.'Ci1.'2D10- Future
36'3D •'2011
Y
j;!^'^* NOTE: Both Construction & Industrial Annual Reports are
accessible via this search screen.
Begin a New Ad Hoc Report
Annual Reoort:
Annual Report
fiBVj Adhoc Report;
This section allocs :/OU to start a ne* adhoc report.
Event Type: Select
Event Start DateTime;
Event End DateTime:
Rain (all amount;
No.of Business days
JDate In l.ll.tCDA'm' and Time in HH24:l,ll format
;Date in t,H.i'DD''^"i'ri' and Time in HH24:t,ll format
Inches
I Start Nev» Event Report |
a. Select "Event Type"
1) Rain Event: Storm Event producing 0.50 inches of
precipitation or more.
2) Non-Storm Water Discharge Event: All other discharges.
b. Enter "Event Start Date/Time" (Time is optional)
c. Enter "Event End Date/Time" (Time is optional)
d. Enter "Rain fall amount " in inches
1) Recorded from onsite rain gauge or nearby governmental
rain gauge..
e. Enter "Number of Business Days" during rain event
1) Effluent monitoring is only required during normal site
business hours.
f. Click on "Start New Event Report"
Construction Ad Hoc Reporting -1/18/2011 revised Page 3
p;^^^ NOTE: Ad hoc reports may be saved at anytime and users can
return at a later time to complete the submittal. Ad Hoc reports
associated with this WDID are listed at bottom of the screen under
"Ad Hoc Reports"
4. General Information
Owner/Site information to verify you are working in the correct
WDID. Ifthe information needs to be updated, click on "Click here
to go to NOI screens" link,
a. Click "Next" to continue
Monitoring Location Tab
In this tab you create & maintain monitoring locations on the project
site.
a. Click the "Create a New Monitoring Location" button ifthe
appropriate monitoring location has not been created.
EventType: R-inE.EriT EuemPeriod: 10'O.i2CH0. 1[t 13 2010 EverKStatus; ln.Pr.:gress No.o( Business
days:
r*m*ial bilo Mer-1 aii;trr Raw Oata | Data Summary Dailv Averaqt?^ ' AnactimwHs I C«iMy Back lo Report l+oiiw Pa()e
MMiitoTiiKi L ocatHHi Manu' DisctwrQe {»OMit type
Efflu6tirt l.lonilonng
DescnpUoii I alttudo t wKyiixle
[Back I [Next I
t 201C' State cl Califcrnia.J
b. Enter Monitoring Location Information
fieopra* bifo i Mnn 1 or3t!f>ris Raw Data • Data Stwnmary Datly AverTiges \ Attachments | Certify j Back to Report Horn*? Page
Add ^dii Monttof Ing Location
Save Cancel
Facility
Discharge Pomt Type
Monitoring Location Name
CDF Identifier
Description
Latitude
Longitude
Accuracy
Datum
Status
Save Cancel
- Indicates required
3sd1-
Select
-^iDecimal 'liogrees onl . minimLim 5 significant diaits! 99.93993
"JL'D6dni3l clearees anl, minirnLim ; signifl':3nt digits) E'. 99.99999,
Select
Select
'.CTliE V
1) Select "Discharge Point Type" from drop down
a) Effluent Monitoring
b) Influent Monitoring
c) Internal Monitoring
d) Receiving Water Monitoring
Construction Ad Hoc Reporting -1/18/2011 revised Page 4
Enter "Monitoring Location Name"
Enter "CDF Identifier"
NOTE: For future use to link data from a MS Excel
spreadsheet template to upload all monitoring data at
one time.
Enter "Description" (not required)
NOTE: Although the "Description" field is not required,
it is recommended that a description of the monitoring
location be entered (e.g. NW corner outfall)
Enter "Latitude" in decimal degrees
Enter "Longitude" in decimal degrees
Select "Accuracy" (optional)
Select "Datum" (optional)
Select "Status"
a) Active
b) In-Active
P^I^^^'NOTE: For different rain events, monitoring locations
may not discharge so you can choose to in-activate the
monitoring location.
10) Click "Save" and repeat steps i - ix to add all
monitoring locations
11) Click "Next" to continue to Raw Data tab.
2)
3)
4)
5)
6)
7)
8)
9)
Raw Data Tab
All monitoring data will be entered in this tab
a. Select "Enter New Sample"
Clich on "Enter Nev; Sample" to enter the sampling results. To view'edil delete previously entered data, click on the Sample ID.
Enter New Sample |
Sample ID Monitonng Location Hatrte San^ile Date / ritne
Back Next
NOTE: The basic parameters and parameters specific to the
site will be populated in the table.
: Odla Sunwnary • D«ty AnKages AitatJwiiRiits | t>ilifY Ba* k to Htn>ort llwiH'Paijc
Enter the sample (taia along with measurments ilab resiAs) for the event.
Sa-^g & Stay || Sav€ 8. Add f tevv Sample )| S3-.e & Back To List ][ Delete Sample
Monitoring Location:
>EDf Totel Discharge:
Sampte Date Time: UM-DD-iTiTHHIi I.II
Qualined SVVPPP practiiionen
b. Select "Monitoring Location" from the drop down box for this
sample.
c. Enter "Sample Date/Time"
The date and time must be in the following format:
MM/DD/YYYY HH:MM. There must be a space in between the
Construction Ad Hoc Reporting -1/18/2011 revised Page 5
date and time, and the time must be in 24-hour format (e.g. to
enter March 1, 2006 at 3pm, enter 03/01/2006 15:00).
d. Enter the "Qualified SWPPP Practitioner's" name
e. Enter "% of Total Discharge"
This is the percent contribution of discharge point as compared
to the sum of all discharge points (100%). Can be area or flow
weighted.
1
1 K<"u«t Uuatrttci ifritr.
-Vl,,',-. ni>.'-ii.'jd
SU ^£OOHB v
jTiirbidllt : V inu L'B V
j| Add Additional Paranffiler |
ll Sa-.e & Slay || Sa'.e & Add Ne^A Sample 1 Ss.e & Back To List || Delete Sample
1) If a pH sample is not required, enter zero for the result.
Click "Save & Stay". A hyperlink will appear on the
right to "delete". Click the hyperlink to delete the
parameter.
Non-Visible Pollutant/Non-Storm Water Discharge Sample
2) To add additional parameters for a non-visible
pollutant discharge or non-storm water sample, click
the "Add Additional Parameter" button and enter the
additional parameters to the table.
3) Enter the Parameter Name and click "Search"
ParstnMftT SMrch
EiKor searcli crtterta
Parameter tieme
STORET riumt>er
CASriUITiMr
PCSHumb»r
} Saarch )[ Cancel | ParamstsiRflfBr^nM Liei
Coppsr
Copper
Copper
Coppw. Total Recoverable
Copper. Percent Retnoval
Copper Dl•so^l•d
Copper, Total
01119
91402
01040
01042
4) When a parameter result(s) appears, choose the
appropriate selection by clicking the "Select" hyperlink
under the "Action" column.
5) Selected parameter is added to the Raw Data table
TufblOit,
Lflpper ICHI
s«ita
S«i6;t
?fi»;i
Add AddrtwriBl Parameter
Save & Add l ie^v Sample S^^'e & Back To List
6) Enter the result for this parameter
7) If a sample result is marked as ND (non-detect), the
user must locate the MDL (Method Detection Limit) on
the laboratory report, change the Result Qualifier to
Construction Ad Hoc Reporting -1/18/2011 revised Page 6
8)
9)
"<", enter the MDL value, and then again in the MDL
column. Also, if the sample result is marked as
"TRACE" amounts detected, change the Result
Qualifier to "<", enter the most restrictive value (either
PQL or MDL), and then again in the MDL column.
If the sample result units do not match the units listed
in SMARTS, convert the result units by using the "Unit
Conversions" table. Click the "Unit Conversions"
hyperlink to view this table.
Click "Save & Stay"
10)Repeat Steps iii - ix to add additional parameters.
NOTE: The following are instructions on each "Save" button:
- "Save & Stay": Saves any changes that have
been made on the screen and will remain on the
screen.
- "Save & Add New Sample": Saves any changes
that have been made on the screen and clears
the data fields for a new sample record. This is
to be used when multiple monitoring locations
and/or samples need to be entered.
- "Save & Back to List": Saves any changes that
have been made on the screen and takes the
user back to the "Create New Event" screen.
Data Summary Tab
This tab allows users to review all data entered on the Raw Data tab.
Return to the Raw Data tab if edits are necessary
rw^ner^ tnto i Moti 1 x'^lMHis Rawtkita i.-i'.a'-'-i CefHtv I EitK'-k Kl R<>pnrt ttamp
Uortlormo 1 ix-nMan sample Date/I RTU! ftruiMKat OettKW Hettwxjl>eloct)on /VKy^iratlRi
iKIHt
iJSI't'iacniKWKM
MonLccI 1Z'01'2010 00.00 00 2z Copper Tste! =0,0535 U8l £2006 L'E John Doe Delete
McnLoci 12;Ci1.2Ci10 0CiOOOO Iz pH =3 z SU GRAB SELF John Doe Delete
MonLcd 12'01'2Ci10 00.00 00 2f Turtidfl. =22t fITU GRAB SELF John Doe Delete
i.lonLOCi 12'Ci2'2010 OO.OO'OO pH =3 SU SELF John Doe Delete
I.IOfiLocI 12'02'2Ci10 00,00 00 -z Turtiait, =27: trru GR'-B SELF John Doe p^igt^
1 B3CK 1 [TtoTl
Click "Next" when done reviewing the data,
a. Click "Back" to go to Raw Data tab.
8. Daily Average Tab
Enter the daily average for pH and/or turbidity for each business day of the
rain event. The number of days is automatically populated based on the
business days entered when starting the report.
Construction Ad Hoc Reporting -1/18/2011 revised Page 7
Gerwfaflnfni Uoo-Location'; I Raw Data i Dala Summary : f.iiv'V/i-'^tgi' Atlact^ivfnla | Catnly Bath to Report Home Pa<|0
TWs screen allows ..ou tc enter the dail; a.eraae .-alues comouted lor the pH and Tufbidlti from the sampiifig results Dro-iSed earlier Please errterthe calculated averages b, each business da,, and e.?plain tfie calculation
Businpss ()»Y fkismpss [>ay Date
NiKitN-i
|Bacl<||lle>a|
v«ix? ll ion liave pH in yo, it HIH
sample)
.'.«r3ge ol all samples la^en
-..eraae of all samples ta^•en
a.
b.
c.
d.
e.
f.
g-
Enter "Business Day Date"
Enter "pH" average
Enter "Turbidity" average
Enter "Calculation Summary"
A summary is required so Water Board staff can view what
individual samples were used to calculate the submitted
average.
Follow steps a - d for additional business days.
Click "Save" when complete.
Click "Next" to go to Attachment Tab
Attachments Tab
Scanned or electronic documents required for the SMARTS report
are attached using this tab.
General Info M<»i.Locations Raw Data Data Summanr Di^ Averages j AB,«timentP I Certtfy i Back to Report Home Page
Please f*ck on Ufiload Attachment btitton to upload the conesponding Wes Upload Attachment
Attached files: The follov/ing are the current documents related to the SWARM Repons. Click on the link to viev; them.
W^^^ NOTE: Laboratory reports are required to be attached to the
report to validate data,
a. Click "Upload Attachment"
•^"1^-5 NOTE: Separate Browser Window will pop-up. Make sure
pop-up blockers are turned off.
(Hease proviile ttie (o«owing (Jeta*s to iipfoart the cotraspondBig Bes.
Attachment FileType:
Attachment Tille:
File Oescription:
If Partial Document Part No 1 of Total Pans "I
ClicI' Browse to locate the fiie and then click Upload File
FHe Name
I Browse... jl Upload File [
File size sliouUI be less than 75nB. Those greater than 75f IB •.viM not be uploaded,
ns Office. PDF. aiKl Picture files are accepted. (PDF is reconimendedt
b. Select the appropriate "Attachment File Type" from the drop
down menu
Construction Ad Hoc Reporting -1/18/2011 revised Page 8
c.
d.
e.
g
h.
Give the file an "Attachment Title"
If necessary, enter a "File Description"
Ifthe document is large, you can upload in portions, i.e. 1 of 5,
2 of 5 etc...
Click "Browse" to locate the "File Name" on your computer.
Click "Open" to select the file.
Click "Upload" to upload the attachment to SMARTS.
Once the file has successfully uploaded, it will populate in the
Attachment table on the bottom ofthe screen.
Attached flies: Ttte following are the current documents related to the NOL Click on the link to view tiiem.
Attachment 10
1029781
mmi
File Type
S.VPPP
Laborator/ Results
File Title
Lab Results
Pan#
l'l
l'l
Fields marl ed Mth are irrandat'^r,. fields
I.
]•
Close the attachment window
Click "Next" to go to the Certify Tab
10. Certify Tab
Pi«3S6Dl« 3 moment to it.iet^ orMitf necessar ,.
Re.le^APnnl-.g Hocrepprt
Con^tlonlrtDr CMch Corr^letHt Ji^pon amH>rs to be cimtphte!
Gcemt .cursucmission
Report CenHlcatlOfi:
Vcu can no ,v certrt, this Report B,. completing ttie torm beloA:
is
I ana. under penatt;, ot laA ttial IWs document and all attachments ASre prepaftd unOei m, Clrecilon of super.lsiofi In accorcar.ce Allh a s.-siem deslsned to assure that qusliHlefl personnel properl;. gslherefl
3fia e.aluated the information suQmrtted. Eased cn m, inquir, otmt p*rscn -a persons *<t,ii manage Bie system m those persons ttit«cll, responsible for garnering the infonnanon. the infomiation sutmiBedis
to Ihs Cestotni, l-nfl>i.l6a94 ard oslleltrue. accurate and complete I arriaAarsmatrH-ws aresiBrnficsnicenaSestoi submittrng false mfomnatien. mcludlnolhe possibilit. clfine and liiipfisonineni for i-nohvtng
.lolaDons
Certifier name:
Dote:
John 01=6
12U,20ni
|_ Ceilf/ Ad Hoc Report
a. Click "Perform Completion Check"
1) Any mandatory fields without data will be displayed.
a) Correct any errors and Perform Completion
Check again
2) If no errors are found:
a) You can choose to "Review & Print the Ad Hoc
report" for your files
b) Mark the Certification Statement and click the
"Certify Ad Hoc Report."
a. If you are a Data Entry Person, notify the
Legally Responsible Person and/or
Approved Signatory to certify the Ad Hoc
Report.
11. Ad Hoc Report(s) table
Construction Ad Hoc Reporting -1/18/2011 revised Page 9
tltflij Adhoc Report:
This section ailo/rS ..onto starts nei^.- adhoc report.
Event Type: Se
Ev«m Start Date Time:
Event End Date Time;
Rain fall amount
No.of Business days
Date 10 Mtl DOrm- and Tmie in HH2- l.li foimat
Date in MI.I DOVm' and Time in HH2-: Ml format
[' Start llev. Event Report ]
Adhoc Reports
.H-ifw^ Dati- HiiiiHud !>t*'lt
R-jriE.EriT
R-iNE.'EIlT
69163- R-jrjE-BJT
10 19'2010 00:00
10.-04.'201D 00:00
i20i'':oio:io.oo
t 2D10 state of Calrtomia.i
10-2r^010 00:00
lO'ia.^oiooooo
12 02 2010 00.00
SuCmitted
SuPmitted
in-PfCBfess
Rpmand
Remand Cftlfilfi
Remand Pfi|ele
a.
c.
Ad Hoc reports that are "In-Progress" or "Submitted" are
listed in the Ad Hoc reports table.
To continue an "In-Progress" or view a "Submitted" report,
click on the "Event ID" to open the report.
"In-Progress" reports can be deleted by clicking the "delete"
link on the right.
"Submitted" reports may be remanded if changes are required
after the LRP or Approved Signatory certified the report.
Construction Ad Hoc Reporting -1/18/2011 revised Page 10
APPENDIX V
NAl/NEL EXCEEDANCE SITE EVALUATIONS &
NON-COMPLIANCE REPORTS