HomeMy WebLinkAboutEIR 05-05; PONTO BEACHFRONT VILLAGE VISION PLAN; Environmental Impact Report (EIR)(Final-Part 1); 2007-08-01
PONTO BEACHFRONT VILLAGE VISION PLAN
FINAL
ENVIRONMENTAL IMPACT REPORT
SCH# 2007031141
EIR 05-05/GPA 05-04/LCPA 05-01/DI 05-01
Prepared For:
City of Carlsbad
Planning Department
1635 Faraday Avenue
Carlsbad, California 92008
Contact: Christer Westman, Project Manager
(760) 602-4614
Prepared By:
RBF Consulting
9755 Clairemont Mesa Boulevard, Suite 100
San Diego, California 92124
(858) 614-5000
FAX (858) 614-5001
RBF JN 25-101951.001
August 2007
READER’S GUIDE
Ponto Beachfront Village Vision Plan Reader’s Guide
Draft: April 2007; Final: August 2007 Page 1
Reader’s Guide to the Final EIR
For the Ponto Beachfront Village Vision Plan
Public Review and Comment Period
The Draft Environmental Impact Report (EIR) was circulated for public review from April
12, 2007 to May 29, 2007 (a 45-day review period). A total of 52 comment letters were
received by the City of Carlsbad, Planning Department within the review period. The
Responses to Comments document is included with the Final Environmental Impact Report
(Final EIR). The EIR is available for review at the City of Carlsbad, Planning Department
located at 1635 Faraday Avenue, Carlsbad, California 92008.
REVISIONS TO THE DRAFT EIR
Based on comments received during the public review period changes were made to the text
of the EIR. A new alternative was added to Section 6.8 of the EIR. This alternative was
added to address comments regarding additional open space in the southern portion of the
vision plan area. In addition to the new project alternative, changes were made to Sections
5.2, 5.4, 5.5, 5.6, and 5.11 of the Draft EIR. These changes include revisions and updates to
mitigation measures based on comments received from the Wildlife Agencies (Section 5.2)
and comments from the public. A mitigation measure was deleted from Section 5.4 because
evidence in the record demonstrates that it is unnecessary. Mitigation measures were added
to Section 5.5 based on public comments to reduce noise. Additional discussion was added
to Section 5.6 to provide additional detail on how traffic mitigation would be implemented.
An additional mitigation measure was added to clarify how traffic impacts would be
mitigated. Additional discussion was added to Section 5.11 to amplify the discussion of
offsite land uses.
Other changes to the draft EIR include revisions to some mitigation measures to make the
measures more specific and to identify the specific timing of the measure. Other minor
changes were made in various chapters throughout the document to clarify wording or to
correct typographical errors. Of the technical studies prepared for the Draft EIR, only minor
changes to the technical traffic study were necessary based on comments from the public
design. Changes included evaluating additional cumulative projects, and preparing a freeway
analysis as requested by Caltrans.
All technical reports and related documents are available for review at the City of Carlsbad,
Planning Department located at 1635 Faraday Avenue, Carlsbad, California 92008.
INTRODUCTION TO THE FINAL EIR
This document is a Final Environmental Impact Report (Final EIR), which reviews and
analyzes the potential environmental impacts that could result from implementation of the
proposed Ponto Beachfront Village Vision Plan. In accordance with the California
Environmental Quality Act (CEQA) Guidelines Section 15002, an EIR is the public
document used by the approving governmental agency to analyze significant environmental
effects of a proposed project, to identify the project alternatives, and to disclose possible
ways to reduce or avoid the possible environmental damage. The EIR itself does not control
READER’S GUIDE
Ponto Beachfront Village Vision Plan Reader’s Guide
Draft: April 2007; Final: August 2007 Page 2
the way in which a project can be developed or constructed; rather, the governmental agency
must respond to the information contained in the EIR by one or more of the seven methods
outlined in Section 15002(h) of the CEQA Guidelines, which include:
1. Changing the proposed project;
2. Imposing conditions on the approval of the project;
3. Adopting plans or ordinances to control a broader class of projects to avoid
the adverse changes;
4. Choosing an alternative way to meet the same need;
5. Disapproving the project;
6. Finding that changes in, or alterations to, the project are not feasible;
7. Finding that the unavoidable significant environmental damage is acceptable,
as provided in Section 15093 of the CEQA Guidelines.
Responses to Comments
The Response To Comments includes all comments received on environmental issues raised
during the public review process for the Draft EIR and the City’s responses to comments.
The Response To Comments are located in the beginning of the Final EIR. Each comment
received is assigned a comment number, and its corresponding response is assigned the same
number. On each page, each response is located in the column adjacent to the comment to
which it responds.
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-1 August 2007
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC AGENCIES
THAT COMMENTED ON THE DRAFT ENVIRONMENTAL IMPACT
REPORT
A draft version of this Environmental Impact Report (DEIR) was circulated for public review
from April 12, 2007 to May 29, 2007 (a 45-day review period). The following is a list of the
names and addresses of persons, organizations, and public agencies that submitted comments
to the City of Carlsbad for consideration:
NAME ADDRESS
Federal Agencies
1. US Fish and Wildlife Service (USFWS) Carlsbad Fish and Wildlife Office
6010 Hidden Valley Road
Carlsbad, California 92009
State Agencies
2. CA Department of Fish and Game (CDFG) South Coast Region
(Submitted concurrently with USFWS) 4949 Viewridge Avenue
San Diego, California 92123
3. CA Department of Parks and Recreation San Diego Coast District
4477 Pacific Highway
San Diego, California 92110
4. CA Department of Transportation District 11
4050 Taylor Street, M.S. 240
San Diego, California 92110
5. Native American Heritage Commission 915 Capitol Mall, Room 364
Sacramento, California 95814
6. Public Utilities Commission 320 West 4th Street, Suite 500
Los Angeles, California 90013
County, City, and Other Local Agencies
7. City of Encinitas 505 South Vulcan Avenue
Encinitas, California 92024-3633
8. San Diego Association of Governments 401 B Street, Suite 800
San Diego, California 92101-4231
9. San Diego County Archaeological Society, Inc. P.O. Box 81106
San Diego, California 92138-1106
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-2 August 2007
10. San Diego Gas and Electric (SDG&E) Land Planning & Natural Resources
8315 Century Park Court
San Diego, California 92123
11. San Luis Rey Band of Mission Indians 1889 Sunset Drive
Vista, California 92081
Organizations
12. Batiquitos Lagoon Foundation P.O. Box 130491
Carlsbad, California 92013-0491
13. Leucadia-Encinitas Highway 101 Main Street Association
320 North Coast Highway 101
Encinitas, California 92024
14. San Pacifico Area “A” Association 9610 Waples Street
San Diego, California 92121-2992
15. Surfrider Foundation – San Diego County Chapter
P.O. Box 1511
Solana Beach, California 92075
Individuals
16. Bob Lipsey
(Comments from B. Lipsey sent care of: Worden Williams, 462 Stevens Avenue, Suite 102,
Solana Beach, California 92075)
17. Phillip S. Rosenberg 501 Halsing Court
Carlsbad, California 92011
18. Craig K. Beam Jackson/DeMarco/Tidus/Peterson/Peckenpaugh
Westlake Village Office
2815 Townsgate Road, Suite 200
Westlake Village, California 91361
(Comments from C. Beam sent care of: Howes, Weiler and Associates, 5927 Balfour
Court, Suite 202, Carlsbad, California, 92008)
19. Bill Hofman Hofman Planning and Engineering
5900 Pasteur Court, Suite 150
Carlsbad, California 92008
20. Daniel W. Downing 6580 Red Knot Street
Carlsbad, California 92011
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-3 August 2007
21. Victor E. Ramirez Victor E. Ramirez & Associates
P.O. Box 1255
Solana Beach, California 92075
22. Renata Breisacher Mulry P.O. Box 130215
Carlsbad, California 92013
23. Roy Skaff 527 Meridian Way
Carlsbad, California 92009
24. Dale E. Ordas 300 Carlsbad Village Drive
Suite 108A #324
Carlsbad, California 92008
25. C.G. Powell cgpowell@hotmail.com
26. Bill Lambert bill_jeannelambert@yahoo.com
27. Peggy Crowley idelmargo@yahoo.com
28. Gary Powell 7405 Neptune Drive
Carlsbad, California 92011
29. Elizabeth Kruidenier 3005 Cadencia Street
Carlsbad, California 92009
30. Michael Burner 7017 Leeward Street
Carlsbad, California 92011
31. Herb Patterson 518 Southbridge Court
Encinitas, California 92024
32. Ron and Lorraine Gordon rlgordie@roadrunner.com
33. Paul Klukas pklukas@planningsystems.com
34. Barbara and Steven Oetting 529 Stern Way
Carlsbad, California 92011
35. Robert A. Rosenthal P.O. Box 965
Solana Beach, California 92076
36. Willliam Kloetzer, PhD wkloetzer@sbcglbal.net
37. Colin Huntemer 2349 Caringa Way, #1
Carlsbad, California 92009
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-4 August 2007
38. erdag@sbcglobal.net
39. Duane Stucki duanestucki@yahoo.com
40. Ole Barre 437 J Street, Suite 207
San Diego, California 92101
41. Valerie Cowan 7366 Escallonia Court
Carlsbad, California 92011
42. Julie Gengo P.O. Box 217
Cardiff by the Sea, California 92007
43. Diane O’Connell w.oconnell@sbcglobal.net
44. Elaine and Michael Shady ivshadylady@roadrunner.com
45. Rick and Trish Revier rickandtrishrevier@yahoo.com
46. Christina Bennett Christina.Bennett@sduhsd.net
47. Greg Thomsen 7155 Linden Terrace
Carlsbad, California 92011
48. Ann and Bob Mueller annmueller@sbcglobal.net
49. Bill Reynolds 734 La Mirada Avenue
Encinitas, California 92024
50. Debra Henry djhenry007@hotmail.com
51. Mike Crowley 521 Stern Way
Carlsbad, California 92011
52. Steven and Lori Varga 134 Windvane Lane
Carlsbad, California 92011
53. Daniel Bruton 7040 Whitewater Street
Carlsbad, California 92011
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-5 August 2007
Table of Contents
Ponto Beachfront Village Vision Plan Final EIR – Response to Comments
Letter Page
Letter A, Joint Letter From US Fish and Wildlife Service and CA Dept. of Fish and Game
...............................................................................................................................RTC-9
Letter B, CA Department of Transportation, District 11........................................RTC-18
Letter C, CA Public Utilities Commission ............................................................RTC-20
Letter D, CA Dept. of Parks and Recreation, San Diego Coast District .................RTC-21
Letter E, Native American Heritage Commission .................................................RTC-25
Letter F, San Luis Rey Band of Mission Indians ...................................................RTC-29
Letter G, San Diego County Archaeological Society ............................................RTC-30
Letter H, San Diego Association of Governments (SANDAG).............................RTC-32
Letter I, City of Encinitas .....................................................................................RTC-34
Letter J, San Diego Gas and Electric (SDG&E)....................................................RTC-39
Letter K, Leucadia-Encinitas Highway 101 Main Street Association ....................RTC-42
Letter L, Worden Williams, APC (for Bob Lipsey)...............................................RTC-43
Letter M, Phillip S. Rosenberg .............................................................................RTC-74
Letter N, Surfrider Foundation, San Diego Chapter ..............................................RTC-79
Letter O, Batiquitos Lagoon Foundation...............................................................RTC-84
Letter P, Howes, Weiler and Associates (on behalf of Craig K. Beam).................RTC-90
Letter Q, San Pacifico Area A Association ...........................................................RTC-94
Letter R, Bill Hofman, Hofman Planning and Engineering ...................................RTC-99
Letter S, Daniel W. Downing .............................................................................RTC-106
Letter T, Victor E. Ramirez and Associates ........................................................RTC-110
Letter U, Renata Breisacher Mulry .....................................................................RTC-112
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-6 August 2007
Letter V, Roy and Rosalie Skaff..........................................................................RTC-114
Letter W, Dale E. Ordas ......................................................................................RTC-115
Letter X, cgpowell@hotmail.com........................................................................RTC-120
Letter Y, Bill and Jeanne Lambert .......................................................................RTC-122
Letter Z, Peggy Crowley .....................................................................................RTC-123
Letter AA, Gary Powell.......................................................................................RTC-128
Letter BB, Liz Kruidenier....................................................................................RTC-129
Letter CC, Michael Burner ..................................................................................RTC-130
Letter DD, Herb Patterson...................................................................................RTC-132
Letter EE, Ron and Lorraine Gordon...................................................................RTC-140
Letter FF, Paul Klukas ........................................................................................RTC-141
Letter GG, Barbara and Steve Oetting .................................................................RTC-142
Letter HH, Robert A. Rosenthal ..........................................................................RTC-144
Letter II, William Kloetzer, PhD .........................................................................RTC-146
Letter JJ, Colin Huntemer....................................................................................RTC-147
Letter KK, erdag@sbcglobal.net .........................................................................RTC-148
Letter LL, Duane Stucki......................................................................................RTC-150
Letter MM, Ole Barre..........................................................................................RTC-151
Letter NN, Valerie Cowan...................................................................................RTC-152
Letter OO, Julie Gengo .......................................................................................RTC-154
Letter PP, Diane O’Connell.................................................................................RTC-155
Letter QQ, Elaine and Michael Shady .................................................................RTC-156
Letter RR, Rick and Trish Revier ........................................................................RTC-157
Letter SS, Christina Bennett ................................................................................RTC-158
Letter TT, Greg Thomsen....................................................................................RTC-159
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-7 August 2007
Letter UU, Ann and Bob Mueller .......................................................................RTC-162
Letter VV, Bill Reynolds ....................................................................................RTC-163
Letter WW, Debra Henry ...................................................................................RTC-164
Letter XX, Michael Crowley ..............................................................................RTC-166
Letter YY, Steven and Lori Varga ......................................................................RTC-167
Letter ZZ, Daniel Bruton ....................................................................................RTC-168
LIST OF PERSONS, ORGANIZATIONS, AND PUBLIC
AGENCIES THAT COMMENTED ON THE EIR
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR Page RTC-8 August 2007
THIS PAGE INTENTIONALLY LEFT BLANK.
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR i August 2007
TABLE OF CONTENTS
LIST OF ACRONYMS .......................................................................................................x
1.0 INTRODUCTION ...............................................................................................1-1
1.1 Intended Uses of EIR .................................................................................1-1
1.2 Project Background....................................................................................1-2
1.2.1 History of Project............................................................................1-2
1.2.2 Notice of Preparation and Scoping Meetings...................................1-3
1.3 Structure of the EIR....................................................................................1-4
2.0 EXECUTIVE SUMMARY..................................................................................2-1
2.1 Project Location .........................................................................................2-1
2.2 Project Description Summary.....................................................................2-1
2.2.1 Proposed Land Uses .......................................................................2-1
2.2.2 Community Amenities....................................................................2-2
2.2.3 Infrastructure ..................................................................................2-3
2.2.4 Project Access and Roadway Improvements...................................2-3
2.3 Environmental Impacts...............................................................................2-3
2.4 Potential Areas of Controversy...................................................................2-4
2.5 Issues To Be Resolved by the Decision-Making Body................................2-5
2.6 Alternatives to the Proposed Project ...........................................................2-5
2.6.1 No Development Alternative ..........................................................2-5
2.6.2 No Project Alternative ....................................................................2-5
2.6.3 Increased Residential Use Alternative.............................................2-6
2.6.4 Increased Residential Use / Open Space Alternative .......................2-6
2.6.5 Increased Townhomes / Single-Family Detached Alternative..........2-6
2.6.6 Increased Townhomes / Visitor Use Alternative .............................2-7
2.6.7 Increased Recreational Amenities / Green Space Alternative ..........2-7
2.6.78 Carlsbad Boulevard Realignment Alternatives ...............................2-78
3.0 PROJECT DESCRIPTION.................................................................................3-1
3.1 Site Location and Description.....................................................................3-1
3.2 Project Description.....................................................................................3-2
3.2.1 Vision Plan Land Use Summary .....................................................3-3
3.2.2 Supporting Public Services and Utilities .........................................3-4
3.2.3 Vehicular Circulation and Roadway Improvements ........................3-6
3.2.4 Pedestrian and Bicycle Circulation..................................................3-9
3.2.5 Conceptual Grading Plan ...............................................................3-10
3.2.6 Phasing ......................................................................................3-1011
3.2.7 Technical, Economic, and Environmental Characteristics ..............3-11
3.2.8 Project Goals and Objectives .........................................................3-12
3.2.9 Discretionary Actions and Approvals by the City of Carlsbad and
Other Agencies ..............................................................................3-13
3.2.10 Discretionary Actions and Approvals by Other Agencies...........3-1314
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR ii August 2007
3.3 Consistency of Project With Applicable Regional and General Plans ........3-14
3.4 Existing Development Applications within the Ponto Development Area..3-14
3.4.1 Hilton Carlsbad Beach Resort....................................................3-1415
3.4.2 Dale Schreiber Ponto Resort ......................................................3-1516
3.4.3 Carlsbad Coast Mixed-Use Residential ......................................3-1516
3.4.4 Carlsbad Coast Hotel and Timeshare .........................................3-1617
4.0 ENVIRONMENTAL SETTING..........................................................................4-1
4.1 Existing Conditions.....................................................................................4-1
4.1.1 Regional Setting ..............................................................................4-1
4.1.2 Local Setting ...................................................................................4-1
4.1.3 Regulatory Status ............................................................................4-3
5.0 ENVIRONMENTAL IMPACT ANALYSIS
AND MITIGATION MEASURES.......................................................................5-1
5.1 Air Quality...............................................................................................5.1-1
5.1.1 Existing Conditions ......................................................................5.1-1
5.1.2 Thresholds for Determining Significance..................................5.1-911
5.1.3 Environmental Impact ............................................................5.1-1012
5.1.4 Mitigation Measures...............................................................5.1-1618
5.1.5 Impact After Mitigation..........................................................5.1-1821
5.2 Biological Resources................................................................................5.2-1
5.2.1 Existing Conditions ......................................................................5.2-1
5.2.2 Thresholds for Determining Significance................................5.2-1011
5.2.3 Environmental Impact ................................................................5.2-11
5.2.4 Mitigation Measures...............................................................5.2-1617
5.2.5 Impact After Mitigation..........................................................5.2-1821
5.3 Cultural Resources ...................................................................................5.3-1
5.3.1 Existing Conditions ......................................................................5.3-1
5.3.2 Thresholds for Determining Significance......................................5.3-3
5.3.3 Environmental Impact ..................................................................5.3-4
5.3.4 Mitigation Measures.....................................................................5.3-6
5.3.5 Impact After Mitigation................................................................5.3-8
5.4 Hazards and Hazardous Materials ............................................................5.4-1
5.4.1 Existing Conditions ......................................................................5.4-1
5.4.2 Thresholds for Determining Significance......................................5.4-6
5.4.3 Environmental Impact ..................................................................5.4-7
5.4.4 Mitigation Measures.....................................................................5.4-9
5.4.5 Impact After Mitigation..........................................................5.4-1213
5.5 Noise .......................................................................................................5.5-1
5.5.1 Existing Conditions ......................................................................5.5-1
5.5.2 Thresholds for Determining Significance......................................5.5-6
5.5.3 Environmental Impact ..................................................................5.5-7
5.5.4 Mitigation Measures...............................................................5.5-1213
5.5.5 Impact After Mitigation..........................................................5.5-1415
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR iii August 2007
5.6 Traffic and Circulation .............................................................................5.6-1
5.6.1 Existing Conditions ....................................................................5.6-12
5.6.2 Thresholds for Determining Significance ......................................5.6-5
5.6.3 Environmental Impact...................................................................5.6-6
5.6.4 Mitigation Measures ...................................................................5.6-12
5.6.5 Impact After Mitigation ..........................................................5.6-1315
5.7 Visual Aesthetics and Grading..................................................................5.7-1
5.7.1 Existing Conditions ......................................................................5.7-1
5.7.2 Thresholds for Determining Significance ......................................5.7-4
5.7.3 Environmental Impact...................................................................5.7-5
5.7.4 Mitigation Measures ...................................................................5.7-14
5.7.5 Impact After Mitigation ..........................................................5.7-1415
5.8 Agricultural Resources .............................................................................5.8-1
5.8.1 Existing Conditions ......................................................................5.8-1
5.8.2 Thresholds for Determining Significance ......................................5.8-4
5.8.3 Environmental Impact...................................................................5.8-4
5.8.4 Mitigation Measures .....................................................................5.8-6
5.8.5 Impact After Mitigation ................................................................5.8-6
5.9 Geology and Soils ....................................................................................5.9-1
5.9.1 Existing Conditions ......................................................................5.9-1
5.9.2 Thresholds for Determining Significance ......................................5.9-5
5.9.3 Environmental Impact...................................................................5.9-6
5.9.4 Mitigation Measures .....................................................................5.9-8
5.9.5 Impact After Mitigation ................................................................5.9-9
5.10 Hydrology and Water Quality.................................................................5.10-1
5.10.1 Existing Conditions ....................................................................5.10-1
5.10.2 Thresholds for Determining Significance ....................................5.10-4
5.10.3 Environmental Impact.................................................................5.10-5
5.10.4 Mitigation Measures .................................................................5.10-10
5.10.5 Impact After Mitigation ............................................................5.10-10
5.11 Land Use and Planning...........................................................................5.11-1
5.11.1 Existing Conditions ....................................................................5.11-1
5.11.2 Thresholds for Determining Significance ....................................5.11-9
5.11.3 Environmental Impact.................................................................5.11-9
5.11.4 Mitigation Measures .............................................................5.11-1618
5.11.5 Impact After Mitigation ........................................................5.11-1618
5.12 Public Utilities and Service Systems.......................................................5.12-1
5.12.1 City Administrative Facilities .....................................................5.12-1
5.12.2 Library Facilities ........................................................................5.12-3
5.12.3 Wastewater Treatment Facilities .................................................5.12-4
5.12.4 Park Facilities .............................................................................5.12-5
5.12.5 Drainage Facilities ......................................................................5.12-7
5.12.6 Fire Service Protection Services..................................................5.12-8
5.12.7 Police Protection Services...........................................................5.12-9
5.12.8 Open Space...............................................................................5.12-10
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR iv August 2007
5.12.9 School Facilities .......................................................................5.12-11
5.12.10 Sewer Facilities .......................................................................5.12-13
5.12.11 Water Distribution Facilities ....................................................5.12-15
6.0 ALTERNATIVES TO THE PROPOSED PROJECT ........................................6-1
6.1 Rationale for Alternative Selection..............................................................6-1
6.1.1 Alternatives Considered but Rejected
from Further Detailed Analysis........................................................6-1
6.2 Analysis of the No Development Alternative...............................................6-3
6.2.1 No Development Alternative Description and Setting......................6-3
6.2.2 Comparison of the Effects of the No Development
Alternative to the Proposed Project..................................................6-4
6.2.3 Rationale for Preference of Proposed Project over
the No Development Alternative......................................................6-6
6.3 Analysis of the No Project Alternative ........................................................6-6
6.3.1 No Project Alternative Description and Setting................................6-6
6.3.2 Comparison of the Effects of the No Project Alternative
to the Proposed Project ....................................................................6-7
6.3.3 Rationale for Preference of the Proposed Project
over the No Project Alternative......................................................6-10
6.4 Analysis of the Increased Residential Use Alternative...............................6-10
6.4.1 Increased Residential Use Alternative Description and Setting ......6-10
6.4.2 Comparison of the Effects of the Increased
Residential Use Alternative to the Proposed Project.......................6-11
6.4.3 Rationale for Preference of Proposed Project
over the Increased Residential Use Alternative ..............................6-13
6.5 Analysis of the Increased Residential Use / Open Space Alternative .........6-13
6.5.1 Increased Residential Use / Open Space Alternative
Description and Setting..................................................................6-13
6.5.2 Comparison of the Effects of the Increased Residential
Use / Open Space Alternative to the Proposed Project ...................6-14
6.5.3 Rationale for Preference of Proposed Project over
the Increased Residential Use/ Open Space Alternative .................6-16
6.6 Analysis of the Increased Townhomes / Single-Family
Detached Alternative.................................................................................6-17
6.6.1 Increased Townhomes / Single-Family
Detached Alternative Description and Setting................................6-17
6.6.2 Comparison of the Effects of the Increased Townhomes / Single-
Family Detached Alternative to the Proposed Project ....................6-17
6.6.3 Rationale for Preference of Proposed Project over
the Increased Townhomes / Single-Family Detached Alternative...6-20
6.7 Analysis of the Increased Townhomes / Visitor Use Alternative................6-20
6.7.1 Description and Setting..................................................................6-20
6.7.2 Comparison of the Effects of the Increased Townhomes / Visitor
Use Alternative to the Proposed Project.........................................6-21
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR v August 2007
6.7.3 Rationale for Preference of Proposed Project
over the Increased Townhomes / Visitor Use Alternative ...............6-23
6.8 Carlsbad Boulevard Re-Alignment Alternatives ........................................6-24
6.8 Analysis of the Increased Recreational Amenities/Green Space Alternative6-24
6.8.1 Description and Setting ..................................................................6-24
6.8.2 Comparison of the Effects of the Increased Recreational
Amenities/Green Space Alternative to the Proposed Project...........6-25
6.8.3 Rationale for Preference of Proposed Project over the Increased
Recreational Amenities/Green Space Alternative...........................6-27
6.9 Carlsbad Boulevard Re-Alignment Alternatives ........................................6-27
7.0 ANALYSIS OF LONG-TERM EFFECTS .........................................................7-1
7.1 Cumulative Impacts....................................................................................7-1
7.1.1 Specific Cumulative Projects ..........................................................7-1
7.1.2 Air Quality ....................................................................................7-23
7.1.3 Biological Resources .....................................................................7-34
7.1.4 Cultural Resources.........................................................................7-45
7.1.5 Hazardous Materials and Hazards..................................................7-56
7.1.6 Noise ..............................................................................................7-6
7.1.7 Traffic and Circulation....................................................................7-6
7.1.8 Grading and Aesthetics ..................................................................7-89
7.1.9 Agricultural Resources...................................................................7-89
7.1.10 Geology and Soils...........................................................................7-9
7.1.11 Hydrology/Water Quality ............................................................7-910
7.1.12 Land Use .......................................................................................7-10
7.1.13 Population and Housing .............................................................7-1011
7.1.14 Public Services and Utilities ......................................................7-1011
7.1.15 Recreation .....................................................................................7-11
7.2 Growth Inducing Impacts ......................................................................7-1112
7.3 Significant Irreversible Environmental Changes ....................................7-1213
7.4 Unavoidable Significant Environmental Impacts ...................................7-1213
7.5 Effects Found Not to be Significant...........................................................7-13
7.5.1 Effects Found Not to be Significant as Part of the EIR Process ......7-13
7.5.2 Effects Found Not to be Significant During the Initial Study..........7-13
8.0 REFERENCES ....................................................................................................8-1
8.1 Persons Responsible for Preparation of the EIR..........................................8-1
8.2 Persons and Organizations Contacted .........................................................8-2
8.3 Technical Reports and Supporting Documents ...........................................8-3
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR vi August 2007
LIST OF TABLES
Table S-1 Summary of Significant Environmental Impacts and Mitigation..............2-911
Table 3-1 Existing and Proposed General Plan Designations.................................3-1718
Table 3-2 Proposed Land Uses..............................................................................3-1819
Table 3-3 Comparison of Carlsbad Boulevard Re-Alignment Alternatives ............3-2122
Table 3-4 Matrix of Required Project Approvals and Permits................................3-2324
Table 5.1-1 National and California Ambient Air Quality Standards.....................5.1-1922
Table 5.1-2 Local Ambient Air Quality.................................................................5.1-2023
Table 5.1-3 Pollutant Thresholds Per SDAPCD ....................................................5.1-2124
Table 5.1-4 Federal and State Carbon Monoxide Standards...................................5.1-2124
Table 5.1-5 Year 2030 Project Operational Emissions...........................................5.1-2124
Table 5.1-6 Carbon Monoxide Levels at Surrounding Intersections.......................5.1-2225
Table 5.1-7 Existing General Plan and Proposed Project Land Use Designations ..5.1-2326
Table 5.2-1 Existing Vegetation Communities......................................................5.2-2124
Table 5.2-2 Existing Jurisdictional Areas Within the Study Area ..........................5.2-2225
Table 5.2-3 Sensitive Plant Species with Potential To Occur
Within the Study Area........................................................................5.2-2326
Table 5.2-4 Sensitive Animal Species with Potential To Occur
Within the Study Area........................................................................5.2-2730
Table 5.2-5 Impacts to Vegetation Communities...................................................5.2-3134
Table 5.2-6 Impacts to Jurisdictional Areas...........................................................5.2-3235
Table 5.2-7 Mitigation Summary for Impacts to Vegetation Communities............5.2-3336
Table 5.2-8 Mitigation Summary for Impacts to Corps Jurisdiction Areas.............5.2-3436
Table 5.2-9 Mitigation Summary for Impacts to CDFG Jurisdiction Areas............5.2-3436
Table 5.5-1 Noise Descriptors...............................................................................5.5-1517
Table 5.5-2 Noise Measurements ..........................................................................5.5-1618
Table 5.5-3 Existing Noise Levels ........................................................................5.5-1719
Table 5.5-4 Land Use Compatibility for Community Noise Environments............5.5-1921
Table 5.5-5 Typical Construction Equipment Noise Levels...................................5.5-2022
Table 5.5-6 Combined Construction Equipment Noise Levels...............................5.5-2123
Table 5.5-7 Existing and Existing Plus Project Noise Levels.................................5.5-2224
Table 5.5-8 Year 2010 Noise Levels .....................................................................5.5-2729
Table 5.5-9 Year 2030 Noise Levels .....................................................................5.5-3234
Table 5.5-10 Railroad Noise Levels........................................................................5.5-3739
Table 5.5-11 Proposed Land Uses...........................................................................5.5-3739
Table 5.6-1 Existing Conditions – Peak Hour Intersection LOS (ICU Methodology)5.6-1519
Table 5.6-2 Existing Conditions – Peak Hour Roadway Segment LOS .................5.6-1620
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR vii August 2007
Table 5.6-3 Existing General Plan Land Use Trip Generation ...............................5.6-1923
Table 5.6-4 Ponto Beachfront Village Vision Plan Forecast Traffic.......................5.6-2024
Table 5.6-5 Existing Plus Vision Plan Peak Hour Intersection LOS (ICU)............5.6-2125
Table 5.6-6 Existing Plus Vision Plan Peak Hour Roadway Segment LOS............5.6-2226
Table 5.6-7 Horizon Year (2030) Peak Hour Intersection LOS - HCM..................5.6-2630
Table 5.6-8 Horizon Year (2030) Peak Hour Roadway Segment LOS...................5.6-2832
Table 5.6-9 ILV Operation Analysis .....................................................................5.6-3337
Table 5.6-10 Recommended Mitigation Measures
for Significantly Impacted Intersections .............................................5.6-3438
Table 5.10-1 Drainage Areas.....................................................................................5.10-11
Table 5.10-2 Summary of Site Flows ........................................................................5.10-11
Table 5.10-3 Summary of 303(d) Impairments of Downstream Water Bodies ...........5.10-12
Table 5.10-4 Anticipated and Potential Pollutants by Project Type
(San Diego County, 2002a)..................................................................5.10-12
Table 5.10-5 Site Design BMP Alternatives..............................................................5.10-13
Table 5.10-6 Source Control BMP Alternatives ........................................................5.10-13
Table 5.10-7 Treatment Control BMP Selection Matrix (San Diego County, 2002a).5.10-14
Table 5.10-8 Carlsbad SUSMP Individual Project Categories ...................................5.10-14
Table 6-1 Comparison of Project Alternatives.......................................................6-2933
Table 6-2 Comparison of Carlsbad Boulevard Re-Alignment Alternatives ............6-3034
Table 7-1 Cumulative Projects ..............................................................................7-1718
Table 7-2 Cumulative Impacts To Vegetation Communities/Habitats (acres)........7-2024
Table 7-3 Near Term (2010) Peak Hour Intersection LOS – HCM ........................7-2125
Table 7-4 Near Term (2010) Peak Hour Roadway Segment LOS ..........................7-2226
LIST OF FIGURES
Figure 3-1 Regional Location of the Project ...............................................................3-25
Figure 3-2 Project Vicinity .........................................................................................3-27
Figure 3-3 South Carlsbad Coastal Redevelopment Area............................................3-29
Figure 3-4 Aerial Photograph with Topography..........................................................3-31
Figure 3-5 Ponto Beachfront Village - Land Use Themes ...........................................3-33
Figure 3-6 Existing Major Utility Lines......................................................................3-35
Figure 3-7 Proposed Carlsbad Boulevard Improvements.............................................3-37
Figure 5.2-1 City of Carlsbad HMP Designations...................................................5.2-3537
Figure 5.2-2 Vegetation - Sensitive Resources........................................................5.2-3739
Figure 5.2-3 Corps Jurisdictional Areas..................................................................5.2-3941
Figure 5.2-4 CDFG Jurisdictional Areas.................................................................5.2-4143
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR viii August 2007
Figure 5.2-5 Vegetation and Sensitive Resources - Impacts....................................5.2-4345
Figure 5.2-6 Corps Jurisdictional Areas - Impacts ..................................................5.2-4547
Figure 5.2-7 CDFG Jurisdictional Areas - Impacts .................................................5.2-4749
Figure 5.4-1 Phase I ESA - Overview Map.............................................................5.4-1315
Figure 5.5-1 Levels of Environmental Noise ..........................................................5.5-3941
Figure 5.5-2 Noise Measurement Locations ...........................................................5.5-4143
Figure 5.6-1 Study Intersections.............................................................................5.6-3539
Figure 5.6-2 Existing ADT Volumes......................................................................5.6-3741
Figure 5.6-3 Existing AM Level of Service ............................................................5.6-3943
Figure 5.6-4 Existing PM Level of Service.............................................................5.6-4145
Figure 5.6-5 Trip Distribution ................................................................................5.6-4347
Figure 5.6-6 Existing with Vision Plan AM Level of Service .................................5.6-4549
Figure 5.6-7 Existing with Vision Plan PM Level of Service..................................5.6-4751
Figure 5.6-8 Horizon Year (2030) ADT Volumes ..................................................5.6-4953
Figure 5.6-9 Horizon Year (2030) with Vision Plan ADT Volumes........................5.6-5155
Figure 5.6-10 Horizon Year (2030) with Vision Plan AM Level of Service..............5.6-5357
Figure 5.6-11 Horizon Year (2030) with Vision Plan PM Level of Service ..............5.6-5559
Figure 5.7-1 Gateway Locations.............................................................................5.7-1517
Figure 5.7-2 Onsite Views......................................................................................5.7-1719
Figure 5.7-3 Viewpoint Location Map....................................................................5.7-1921
Figure 5.7-4 Visual Simulation...............................................................................5.7-2123
Figure 5.7-5 Visual Simulation...............................................................................5.7-2325
Figure 5.7-6 Visual Simulation...............................................................................5.7-2527
Figure 5.7-7 Visual Simulation...............................................................................5.7-2729
Figure 5.7-8 Visual Simulation...............................................................................5.7-2931
Figure 5.8-1 Urban Land Uses - Mello II Zones 9 and 22.............................................5.8-7
Figure 5.8-2 Important Farmland Mapping Categories .................................................5.8-9
Figure 5.9-1 Regional Geology Map ..........................................................................5.9-11
Figure 5.9-2 Fault Map and Epicenters of Earthquakes...............................................5.9-13
Figure 5.10-1 Pre-Construction Hydrology Map ........................................................5.10-15
Figure 5.10-2 Post-Construction Hydrology Map .......................................................5.10-17
Figure 5.11-1 Surrounding Land Uses....................................................................5.11-1719
Figure 5.11-2 Existing General Plan Land Use.......................................................5.11-1921
Figure 5.11-3 Existing City Zoning........................................................................5.11-2123
Figure 5.12-1 Local Facilities Management Zones 9 and 22.......................................5.12-19
Figure 5.12-2 Parks Districts - LFMP Zones 9 and 22 - Southwest Quadrant..............5.12-21
Figure 5.12-3 School Districts....................................................................................5.12-23
Figure 5.12-4 Storm Drain Realignment.....................................................................5.12-25
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR ix August 2007
Figure 5.12-5 Fuel Line and Force Main Realignment................................................5.12-27
Figure 5.12-6 Backbone Sewer System - Alternative 1: Single-Gravity System.........5.12-29
Figure 5.12-7 Backbone Sewer System - Alternative 2: Two Independent Systems...5.12-31
Figure 6-1A Carlsbad Boulevard Re-alignment Alternatives .....................................6-3337
Figure 6-1B Carlsbad Boulevard Re-alignment Alternatives .....................................6-3539
Figure 6-2 Increased Residential Use Alternative ...................................................6-3741
Figure 6-3 Increased Residential Use / Open Space Alternative..............................6-3943
Figure 6-4 Increased Townhomes / Single-Family Detached Alternative ................6-4145
Figure 6-5 Increased Townhomes / Visitor Use Alternative ....................................6-4347
Figure 6-6 Increased Recreational Amenities / Green Space Alternative .....................6-49
Figure 7-1 Cumulative Projects Map ......................................................................7-2731
Figure 7-2 Near-Term (2010) ADT Volumes..........................................................7-2933
Figure 7-3 Near-Term (2010) with Vision Plan ADT Volumes...............................7-3135
Figure 7-4 Near-Term (2010) AM Level of Service................................................7-3337
Figure 7-5 Near-Term (2010) PM Level of Service ................................................7-3539
Figure 7-6 Near-Term (2010) with Vision Plan – AM Level of Service ..................7-3741
Figure 7-7 Near-Term (2010) with Vision Plan – PM Level of Service...................7-3943
TECHNICAL APPENDICES
VOLUME I
Appendix A Notice of Preparation (NOP) / Public Comments Received
Appendix B Air Quality Site Assessment (Technical Appendix)
Appendix C-1 Existing Conditions Report
Appendix C-2 Wetland Delineation Report
Appendix C-3 Biological Technical Report
Appendix D-1 Archaeological Survey
Appendix D-2 Cultural Resource Constraints Study
VOLUME II
Appendix E-1 Environmental Site Assessment – Phase I (Volume 1 of 2)
VOLUME III
Appendix E-2 Environmental Site Assessment – Phase I (Volume 2 of 2)
VOLUME IV
Appendix F Acoustical Site Assessment (Technical Appendix)
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR x August 2007
VOLUME V
Appendix G-1 Traffic Constraints Study with Appendices A-G (Volume 1 of 2)
VOLUME VI
Appendix G-1 Traffic Constraints Study Appendices H-L (Volume 2 of 2)
Appendix G-2 City of Encinitas Traffic Mitigation
City of Carlsbad Cost Estimate for La Costa Avenue
City of Encinitas Resolutions for North 101 Corridor Specific Plan
City of Encinitas Resolutions for Shoreline Resort
City of Encinitas Resolutions for Coral Cove Tentative Map
City of Encinitas Resolutions for Encinitas Beach Hotel
VOLUME VII
Appendix H Geologic Hazards Analysis
Appendix I Storm Water Mitigation Plan and Preliminary Hydrology Study
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xi August 2007
LIST OF ACRONYMS
ABSL Above Mean Sea Level
ACM’s Asbestos Containing Materials
ACOE Army Corps of Engineers
ADT Average Daily Traffic
AIA Airport Influence Area
ALUC Airport Land Use Commission
APCD Air Pollution Control District
APNs Assessor Parcel Numbers
AQIA Air Quality Impact Analysis
ASNI American National Standards Institute
AST’s Above Ground Storage Tanks
ASTM American Standards for Testing and Materials
BFSA Brian F Smith Associates
BLEP Batiquitos Lagoon Enhancement Plan
BMP Best Management Practice
BoS Board of Supervisors
CAAQS California Ambient Air Quality Standards
CalEPA California Environmental Protection Agency
Caltrans California Department of Transportation
CARB California Air Resources Board
CASQA California Storm Water Quality Association
CBC California Building Code
CCA California Coastal Act
CCAA California Clean Air Act
CCC California Coastal Commission
CDFG California Department of Fish and Game
CDP Coastal Development Permit
CEC California Energy Commission
CEQA California Environmental Quality Act
CFD Community Facilities District
CFD Carlsbad Fire Department
CHU Carlsbad Hydrologic Unit
CIP Capital Improvement Program
CLUP Comprehensive Land Use Plan
CMP Congestion Management Program
CMWD Carlsbad Municipal Water District
CNEL Community Noise Equivalent Level
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xii August 2007
CO Carbon Monoxide
CPD Carlsbad Police Department
CPSC Consumer Product Safety Commission
Cr Coastal Beaches
CSSD Carlsbad Sewer Service District
CT-Q Commercial Tourist Zone – with Qualified Development
Overlay
CUDA Current Urban Development Area
CUSD Carlsbad Unified School District
CWA Clean Water Act
c.y. Cubic yards
dB Decibel
dBA A-weighted Sound Level
d.g. Decomposed granite
DPLU Department of Planning and Land Use
DPW Department of Public Works
EDR Environmental Data Resource
EIR Environmental Impact Report
EMF Electromagnetic Fields
EOO Encina Ocean Outfall
EPA Environmental Protection Agency
ESA Environmental Site Assessment
EWA Encina Wastewater Authority
FAAQs Federal Ambient Air Quality Standards
FCAA Federal Clean Air Act
FEMA Federal Emergency and Management Administration
FHWA Federal Highway Administration
FIRM Flood Insurance Rate Maps
FMMP Farmland Mapping and Monitoring Program
FPA Focused Planning Area
GMPC Growth Management Control Point
GMP Growth Management Plan
GPA General Plan Amendment
HAP Hazardous Air Pollutants
HCM Highway Capacity Manual
HLP Habitat Loss Permit
HMP Habitat Management Plan
HREC Historic Recognized Environmental Condition
HVAC Heating Ventilation and Air-Conditioning
ICU Intersection Capacity Utilization
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xiii August 2007
ILV Intersection Lane Vehicle Analysis
JURMP Jurisdictional Urban Runoff Management Plan
LBP Lead Based Paint
LBZ Limited Building Zone
LCP Local Coastal Program
LCPA Local Coastal Program Amendment
LESA Land Evaluation and Site Assessment Model
LFMP Local Facilities Management Plan
LFPD Lakeside Fire Protection District
LOS Level of Service
MEP Maximum Extent Practicable
MHCP Multiple Habitat Conservation Plan
MND Mitigated Negative Declaration
Mph Miles per hour
MUP Major Use Permit
NAAQS National Ambient Air Quality Standards
NAHC Native American Heritage Commission
NCCP Natural Communities Conservation Planning Program
NESHAP National Emission Standards for Hazardous Air Pollutants
NFPA National Fire Protection Association
NINA Noise Impact Notification Area
NOP Notice of Preparation
NOx Nitrogen Oxide
NPDES National Pollution Discharge Elimination System
NSDR Northern San Diego Railroad
O3 Ozone
OS Open Space
PCB Polychlorinated Biphenyls
PFF Public Facility Fees
PL Planned Community
PLDO Park Land Dedication Ordinance
PM10 Particulates of less than 10 microns in diameter
PSMP Poinsettia Shores Master Plan
RAQS Regional Air Quality Strategies
RBF RBF Consulting
REC Recognized Environmental Concern
RCFZ Rose Canyon Fault Zone
RCP Regional Comprehensive Plan
RD-M-Q Residential Density Multiple Zone with Qualified
Development Overlay
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xiv August 2007
RL Residential Low Density
RLM Residential Lower-Medium Density
RMH Residential Medium-High
RMH/TR Residential Medium-High and/or Travel/Recreation
Commercial
ROC Reactive Organic Compound
ROG Reactive Organic Gas
ROW Right-of-way
RPO Resource Protection Ordinance
RAQS Regional Air Quality Strategy
RSA Regionally Significant Arterial
RWQCB California Regional Water Quality Control Board
SANDAG San Diego Association of Governments
SANTEC/ITE San Diego Traffic Engineering Council/Institution of
Transportation Engineers
SCAB South Coast Air Basin
SCAQMD South Coast Air Quality Management District
SCCRA South Carlsbad Coastal Redevelopment Area
SCIC South Coastal Information Center
SCRR Southern California Railroad
SCS Soil Conservation Service
SDAPCD San Diego Air Pollution Control District
SDG&E San Diego Gas & Electric
SDNR San Diego Northern Railroad
SEDAB Southeast Desert Air Basin
SF Square Feet
SFHA Special Flood Hazard Area
SGC Southland Geotechnical Corporation
SDHR San Diego Hydrologic Region
SOx Sulfur Oxide
SDAPCD San Diego Air Pollution Control District
RTP Regional Transportation Plan
SUSMP Standard Urban Storm Water Mitigation Plan
SWMP Storm Water Management Plan
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TAC Toxic Air Contaminant
TAZ Traffic Analysis Zone
TIF Transportation Impact Fee
TMDL Total Maximum Daily Load
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xv August 2007
TR Travel/Recreation Commercial
TR/C Travel/ Recreation Commercial/Community Commercial
UA Unplanned Area
UBC Uniform Building Code
USACE U.S. Army Corps of Engineers
USDA United States Department of Agriculture
USFWS U.S. Fish and Wildlife Service
UST Underground Storage Tank
VOC Volatile Organic Compound
VWD Vallecitos Water District
TABLE OF CONTENTS
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR xvi August 2007
THIS PAGE INTENTIONALLY LEFT BLANK.
INTRODUCTION
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR 1-1 August 2007
1.0 INTRODUCTION
The Ponto Beachfront Village Vision Plan Area is located within the City of Carlsbad,
California, in northern San Diego County. The total Vision Plan Area is an approximately
130-acre, relatively narrow strip of land, approximately 1/8 mile wide and 1–1/2 miles long,
located between Carlsbad Boulevard to the west and the San Diego Northern Railroad
(SDNR) tracks and right-of-way to the east. Portions of the plan area extend north to
Poinsettia Lane and south to La Costa Avenue. Under the Ponto Beachfront Village Vision
Plan, the area considered viable for future development within the larger 130-acre area
consists of approximately 50 acres (hereafter referred to as the “Ponto Area”), with its
northern limit at Ponto Drive and its southern limit at the Batiquitos Lagoon. Refer to
Chapter 3.0 where Figures 3-1 and 3-2 provide a regional map and a vicinity map,
respectively. Figures 3-3 and 3-4 provide aerial views of the Ponto Area.
A portion of the Ponto Area lies within the South Carlsbad Coastal Redevelopment Area
(SCCRA), which was established by the City of Carlsbad in July 2000. To guide
redevelopment efforts within this area, the Ponto Beachfront Village Vision Plan was
developed over an approximately two-year period from 2003 to 2005. Development of the
Vision Plan and the proposed project design occurred with public input from property
owners, residents of the City of Carlsbad, and others with interest in the project. Preparers of
the Plan also met with representatives from the California Coastal Commission (CCC) and
the California State Parks Division to address potential environmental concerns with regards
to the project design.
The Vision Plan envisions a variety of uses on the 50-acre Ponto Area, which include a
mixture of travel, recreation, commercial, neighborhood commercial, and residential uses.
The properties that comprise the Ponto Area are under individual ownership and would be
developed over future years, consistent with the guidelines set forth in the Vision Plan
(which has not yet been reviewed by the City of Carlsbad Planning Commission or approved
by the City Council).
This Environmental Impact Report (EIR) is intended to evaluate potential impacts that may
result from future development of the Ponto Area. As the Vision Plan provides a general
guide for development of the area, the EIR has been prepared to assess potential impacts to
environmental resources within the development area boundaries, with consideration for all
(previously) active land development applications within the Ponto Area that were being
processed at the time preparation of an EIR was requested. Therefore, the EIR provides an
analysis of uses envisioned for the Ponto Area, as well as a general consideration for four
individual land development projects proposed within the Area to which the Vision Plan
would be applicable; refer to Section 3.4 of this EIR for a description of these projects.
1.1 Intended Uses of EIR
This document is identified as a “Program” Environmental Impact Report. Preparation of a
Program EIR is appropriate for a series of actions that can be considered as one larger
project, that have geographical relation, and as logical parts in the chain of contemplated
actions in connection with issuance of rules, regulations, or plans. This type of EIR is
intended to allow for the consideration of effects and alternatives in greater depth than would
INTRODUCTION
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR 1-2 August 2007
be practical if individual landowners were to take separate action. In addition, cumulative
impacts for an affected area can be addressed in a more cohesive manner.
This is an informational document that will inform public agency decision-makers and the
public of significant environmental effects of a project, identify possible ways to minimize
the significant effects, and describe reasonable alternatives to the project. Under the
provisions of the California Environmental Quality Act (CEQA), “the purpose of an
environmental impact report is to identify the significant effect on the environment of a
project, to identify alternatives to the project, and to indicate the manner in which those
significant effects can be mitigated or avoided” (Public Resource Code 21002.1(a)).
This EIR is not a City policy document; rather, it addresses the potential impacts of
development of the Ponto Area and analyzes project alternatives. The discretionary actions
associated with the proposed project include approval and/or adoption of the Ponto
Beachfront Village Vision Plan, as well as amendments to the City of Carlsbad General Plan
and Local Coastal Program (LCP), and the additional discretionary approvals and permits
identified in Table 3-4, as well as any other approvals or permits necessary or desirable to
implement the project at the level of the individual landowner. More specifically, this EIR
will be used by the City of Carlsbad Planning Commission in assessing potential
environmental impacts resulting from the proposed project and in making their
recommendation to the City Council on the Vision Plan, General Plan Amendment (GPA)
and LCP amendment. This EIR will also be used by the City Council in assessing impacts
and deciding whether to approve the proposed mitigation measures.
Public or private improvements that are either depicted in various exhibits or described in
this Program EIR are conceptual in nature. They are subject to further design and engineering
analysis and may be modified as a result of such review. The future environmental analysis
of public or private improvements are for purposes of CEQA and shall be undertaken in
compliance with Section 15168(c) of Title 14, Chapter 3 of the California Code of
Regulations, the CEQA Guidelines.
This EIR analyzes information available at the time of preparation of the document. As
individual projects within the Ponto Area are proposed in the future, additional site-specific
technical analyses may be required to determine whether a project is within the scope of the
EIR, prepared to implement the Vision Plan, or to identify whether conditions have since
changed and additional impacts not previously identified in the EIR exist. If such conditions
exist, additional CEQA action (e.g. addendum to the EIR, supplemental EIR, etc.) may be
required to assess potential impacts and to identify appropriate mitigation measures to reduce
impacts to less than significant with individual project implementation.
1.2 Project Background
1.2.1 History of Project
As seen in Figure 3-3, a portion of the Ponto Area is within the South Carlsbad Coastal
Redevelopment Area, which was established in July 2000. The SCCRA Redevelopment Plan
gives the Carlsbad Housing and Redevelopment Commission the legal authority to use
various powers to achieve the Redevelopment Plan’s goals. In addition, the Ponto Area has
been planned for a mixture of travel, recreation, commercial, neighborhood commercial, and
residential uses, as identified in the City of Carlsbad General Plan. The Vision Plan has been
INTRODUCTION
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR 1-3 August 2007
prepared to guide redevelopment of the site consistent with the goals of the SCCRA
Redevelopment Plan, City General Plan, and other applicable plans and policies set forth in
the City’s Municipal Code.
To guide redevelopment efforts within the SCCRA, the Ponto Beachfront Village Vision
Plan was developed over an approximately two-year period from 2003 to 2005. Development
of the Plan and the proposed project design occurred with public input from property owners,
residents of the City of Carlsbad, and others with interest in the project. Preparers of the Plan
also met with representatives from the California Coastal Commission and the California
State Parks Division to address potential environmental concerns with regards to the project
design.
In conjunction with preparation of the Ponto Beachfront Village Vision Plan, an
environmental assessment was completed for the Ponto Area to identify potential impacts
resulting from development of the project site. The assessment concluded that future
development in conformance with the Vision Plan may have the potential to result in
significant environmental impacts unless mitigation measures were applied to development
in the areas of transportation/traffic, noise, biology, cultural resources and agriculture.
Appropriate mitigation measures for these impacts were incorporated into the environmental
assessment for the Vision Plan to be applied to all future development proposals in the area.
A Public Hearing was held before the City Council on June 28, 2005, to consider the Ponto
Beachfront Village Vision Plan and related actions, including approval of the Mitigated
Negative Declaration (MND) and the proposed Mitigation Monitoring and Reporting
Program, General Plan Amendment (GPA 05-04), and the Local Coastal Program
Amendment (LCPA 05-01). The item was continued to July 19, 2005, when the City Council
directed city staff to prepare a full environmental impact report to analyze the impacts of the
Ponto Beachfront Village Vision Plan, as staff noted that potential impacts to traffic, noise,
agriculture, cultural and biological resources may occur. All active applications for
development within the boundaries of the Ponto Area were subsequently placed on hold until
preparation of an EIR is completed and approved.
1.2.2 Notice of Preparation and Scoping Meetings
A Notice of Preparation (NOP) for an EIR (published on June 11, 2006), was issued for the
Ponto Beachfront Village Vision Plan (Case No. EIR 05-05). The NOP was sent to the State
Clearinghouse on June 11, 2006, for a 30-day public review period ending July 12, 2006.
The NOP was published in the local newspaper, and was forwarded to other city, state and
federal officials, public agencies, and other interested individuals as applicable.
A public scoping meeting was held on June 22, 2006 at the City of Carlsbad Faraday Center,
located at 1635 Faraday Avenue, to allow for public comment on the preparation of the Ponto
Beachfront Village Vision Plan EIR. During this meeting, the background and scope of the
Vision Plan were presented to the public by the City, and the public was invited to comment
and ask questions regarding the proposed Vision Plan and environmental impacts that may
potentially result. Written comments from the public were received during the 30-day review
period for the NOP pertaining to the scope of the EIR and environmental issues of concern
that the public desired to be addressed in the preparation of the EIR. These comments are
included in Appendix A of this EIR.
INTRODUCTION
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR 1-4 August 2007
Property Owners Workshops
Two workshops were held (August 13, 2003 and December 15, 2003) by city staff for Ponto
Area property owners to update them on the progress of the Vision Plan as it was being
prepared, to gather input on specific issues, and to hear feedback on land use alternatives.
The following objectives for development of the Ponto Area were established based on
public input received during these meetings:
Objectives:
a. Provide options for land use;
b. Increase flexibility for property owners to respond to market conditions;
c. Increase opportunities and individual decision-making for small lot property owners;
d. Continue to consider environmental factors and conditions; and,
e. Create a neighborhood and amenities that contribute to the surrounding area and City
as a whole.
1.3 Structure of the EIR
Volume I. Volume I of this EIR contains the environmental analysis prepared as the result
of a request for preparation of an EIR. The eight sections of the EIR are as follows:
Section 1.0 Introduction. This section provides an overview of the project, including
project background, legal requirements of the EIR, and a summary of the structure of
the EIR.
Section 2.0 Executive Summary. This section provides a summary of the proposed
project, potentially significant environmental impacts identified through the EIR
process, potential areas of controversy, and alternatives to the proposed project.
Section 3.0 Project Description. This section provides a detailed description of the
proposed project including project location and background, existing regulatory
environment, uses proposed, infrastructure improvements required, and project
objectives. In addition, the intended uses of the EIR are discussed, and a summary of
discretionary actions is given.
Section 4.0 Environmental Setting. This section provides an overview of the
environmental setting surrounding the project, including a summary of applicable
regulatory plans and policies and General Plan and zoning information, as well as a
summary of general climate, topography, and surrounding land uses.
Section 5.0 Environmental Impact Analysis and Mitigation Measures. This
section provides a technical analysis of the potential significant environmental
impacts resulting from implementation of the Vision Plan. Mitigation measures are
given to reduce impacts to less than significant as applicable.
Section 6.0 Alternatives to the Proposed Project. This section provides a series of
alternatives to the proposed project to identify optional development scenarios under
which potential significant impacts resulting from the proposed project may be
reduced (as compared to the proposed project).
INTRODUCTION
Ponto Beachfront Village Vision Plan EIR City of Carlsbad
Final EIR 1-5 August 2007
Section 7.0 Analysis of Long-Term Effects. This section discusses the potential
long-term effects, cumulative impacts, significant irreversible impacts, unavoidable
significant impacts, and areas where no significant impacts would occur as the result
of the proposed project.
Section 8.0. References. This section identifies the technical reports and other
documentation used in preparing the EIR analysis and identifies the persons
responsible for preparation of the EIR.
Volumes II and III. Volumes II and III of this EIR contain the technical reports upon which
the EIR analysis is based.