HomeMy WebLinkAbout2021-02-16; City Council; ; Acceptance of Bids, Award of Contract to Hazard Construction Company, and Authorization of Additional Appropriation for Construction of the El Camino Real Bridge ImprovemMeeting Date: Feb. 16, 2021
To: Mayor and City Council
From: Scott Chadwick, City Manager
Staff Contact: Brandon Miles, Associate Engineer
Brandon.Miles@carlsbadca.gov, 760-602-2745
Subject: Acceptance of Bids, Award of Contract to Hazard Construction Company,
and Authorization of Additional Appropriation for Construction of the El
Camino Real Bridge Improvements at Cannon Road Project, Phase I
District: 2
Recommended Action
Adopt a resolution to:
•Accept bids and award a contract to Hazard Construction Company for construction of
the El Camino Real Bridge Improvements at Cannon Road Phase I, Capital Improvement
Program Project nos. 6042 and 6056, in an amount not to exceed $1,819,988
•Authorize additional appropriation in an amount not to exceed $512,000 for the project
Executive Summary
In keeping with the General Plan mobility element and the City of Carlsbad’s community values,
the project will enhance pedestrian mobility at the intersection of El Camino Real and Cannon
Road by widening a narrow sidewalk, installing a new pedestrian bridge on the east side of the
Agua Hedionda Creek bridge and removing the two existing overhead poles on the east side of
the Agua Hedionda Creek bridge. The location map is provided as Exhibit 2.
On Oct. 6, 2020, the City Council approved the plans and specifications and authorized
advertising the project for construction bids (Resolution No. 2020-197). It was then advertised
using the city’s formal bidding procedures. On Dec. 8, 2020, staff received 10 construction bids,
and the lowest responsive and responsible bidder was Hazard Construction Company, with a
bid of $1,819,988.
Carlsbad Municipal Code Sections 3.28.080(C) and 3.28.080(I)(6) require the City Council’s
approval for all formally bid contracts when the value exceeds $200,000, making the project
subject to this requirement.
Staff recommends acceptance of bids and award of the construction contract to Hazard
Construction Company for Phase I of the project, in an amount not to exceed $1,819,988. Staff
also requests that the City Council authorize additional appropriation of $512,000 from the Gas
Tax Fund for the project.
Feb. 16, 2021 Item #6 Page 1 of 7
Discussion
Phase I of the project will improve connectivity and safety for pedestrians on this segment of El
Camino Real, generally running north and south in this location. The Agua Hedionda Creek
bridge located on El Camino Real, south of Cannon Road, was constructed in 1971 and is 108
feet wide and 112 long. Currently, a narrow sidewalk exists on the west side of the bridge,
which will be widened from 4 to 6 feet to meet the current design standards and enhance
pedestrian mobility. No pedestrian access is currently available on the east side of the bridge.
As part of the project, a separate pedestrian bridge will be installed on the east side of the
bridge to provide pedestrian connectivity between Cannon Road and the east side of El Camino
Real.
The project’s scope for Phase I also includes removing the two existing overhead poles on the
east side of the Agua Hedionda Creek bridge. It will improve pedestrian mobility and public
safety, consistent with the city’s community values.
However, Phase I of the project is not intended to address any of the vehicular deficiencies that
were determined by the City Council in connection with the city’s Growth Management Plan
Monitoring Report for fiscal year 2017-18.
Hazard Construction Company’s bid meets the requirements of the bidding documents. The
bidder is also deemed responsible because it submitted a list of similar projects to show their
capability and qualification to perform the specified work. The construction contract contains
general performance standards and references technical specifications, which if not met, allow
the city to withhold payment. The contract also includes a one-year warranty period from
notice of completion.
Phase II of the project, which is currently in the design phase will improve traffic flow for
northbound El Camino Real. Phase II will realign the existing median near the Cannon Road
intersection and restripe northbound El Camino Real to provide an additional northbound
through lane (total of three through lanes) and an enhanced dedicated bike lane. The project
will maintain the existing left- and right-turn only lanes onto Cannon Road. The current
engineer’s estimate for construction of Phase II is $325,000. Staff will return to the City Council
for approval of Phase II at a future meeting.
Fiscal Analysis
Sufficient funds are not available and additional funding is being requested. Current funding for
the project was appropriated from traffic impact fees and infrastructure maintenance and
repair funds. based on the construction contract, expected Phase II construction, construction
management and inspection, and staff support, an additional funding appropriation in an
amount of $512,000 from the Gas Tax Fund is required to complete the project.
The available funds and estimated construction costs for the project are shown in the following
table:
Feb. 16, 2021 Item #6 Page 2 of 7
El Camino Real Bridge Improvements at Cannon Road,
Capital Improvement Project Nos. 6042 and 6056
Appropriations to date $3,746,000
Expenditures and encumbrances $1,450,000
Total available funding $2,296,000
Remaining project costs
Construction contract Phase I (Hazard Construction Company) $1,819,988
Construction contingency Phase I (estimated) $273,000
Construction management and inspection Phase I (estimated) $350,000
Construction support Phase I (consultant) $40,000
Construction (Phase II engineer’s estimate and contingency) $325,000
Total estimated construction costs $2,807,98
Remaining balance ($511,988)
Additional appropriation needed $512,000
Carlsbad Municipal Code sections 3.28.040(C)(5) and 3.28.090(B) authorize the city manager or
designee to approve change orders in an amount equal to the contingency set at the time of
project award, which is $273,000 for this project.
Next Steps
Once contract documents are fully executed, staff will issue a purchase order, schedule a pre-
construction meeting with Hazard Construction Company and issue a notice to proceed for
construction of the project, which is expected to commence in spring 2021.
The duration of the construction contract is 185 working days, not including rain days and
delays from change orders that may extend the contract duration. Upon successful completion
of the project, which is expected to be in fall 2021, a notice of completion to release bonds will
be recorded.
Environmental Evaluation (CEQA)
The project is exempt from the California Environmental Quality Act under CEQA Guidelines
Section 15301 - Existing Facilities under subsection (c), which covers existing highways and
streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities, and subsection
(d), which cover the restoration or rehabilitation of deteriorated or damaged structures,
facilities, or mechanical equipment to meet current standards of public health and safety.
Public Notification
Public notice of this item was posted in keeping with the Ralph M. Brown Act and it was
available for public viewing and review at least 72 hours before the scheduled meeting date.
Prior to start of construction, the public will be notified of construction activities using methods
such as signage, email, website and other city communication channels. The construction
Feb. 16, 2021 Item #6 Page 3 of 7
contractor will also be required to notify the public of construction activities via changeable
message signs, door hangers, letters to residents and/or “NO PARKING” signs, as applicable.
Exhibits
1. City Council Resolution
2. Location map
Feb. 16, 2021 Item #6 Page 4 of 7
RESOLUTION NO. 2021-044
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ACCEPTING BIDS, AWARDING A CONTRACT TO HAZARD
CONSTRUCTION COMPANY AND AUTHORIZING ADDITIONAL
APPROPRIATION IN AN AMOUNT NOT TO EXCEED $512,000 FOR
CONSTRUCTION OF THE EL CAMINO REAL BRIDGE IMPROVEMENTS AT
CANNON ROAD PHASE I, CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT
NOS. 6042 AND 6056, IN AN AMOUNT NOT TO EXCEED $1,819,988
WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary,
desirable and in the public interest to construct El Camino Real Bridge Improvements at Cannon Road
Phase I, CIP Project Nos. 6042 and 6056 (Project); and
WHEREAS, on Oct. 6, 2020, the City Council adopted Resolution No. 2020-197 approving the
plans and specifications and authorizing advertisement for bids for construction of the Project; and
WHEREAS, on Dec. 8, 2020, staff received 10 sealed bids for the Project; and
WHEREAS, the lowest responsive and responsible bid for the Project was submitted by Hazard
Construction Company, in an amount of $1,819,988; and
WHEREAS, the current funding for the Project that has been appropriated from Traffic Impact
Fees and the Infrastructure Maintenance and Repair Fund is not sufficient to complete the Project; and
WHEREAS, additional appropriations for the Project will be appropriated from the Gas Tax Fund
in the amount of $512,000; and
WHEREAS, Carlsbad Municipal Code Sections 3.28.080(C) and 3.28.080(l)(6) require City Council
to award all formally bid contracts when the value exceeds $200,000; and therefore, the Project is
subject to this requirement; and
WHEREAS, Carlsbad Municipal Code Sections 3.28.040(C)(5) and 3.28.090(B) authorize the
City Manager or designee to approve change orders in an amount equal to the contingency set at the
time of project award, which is $273,000 for this Project; and
WHEREAS, the city planner has determined that the project is exempt from the California
Environmental Quality Act (CEQA) under CEQA Guidelines — Existing Section 15301 (c) — Existing
Facilities and Section 15301 (d) — Replacement or Reconstruction, and that no exception as set forth in
CEQA Guidelines Section 15300.2 applies.
Feb. 16, 2021 Item #6 Page 5 of 7
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1.That the above recitations are true and correct.
2.That the bid of $1,819,988 submitted by Hazard Construction Company for construction
of El Camino Real Bridge Improvements at Cannon Road Phase I, CIP Project Nos. 6042
and 6056, is accepted and the mayor is hereby authorized to execute the contract for
this Project.
3.That the deputy city manager, administrative services, is authorized and directed to
appropriate additional Gas Tax Fund in the amount of $512,000 for construction of the
Project.
4.That the City Manager or designee is hereby authorized to approve construction change
orders up to $273,000; construction management and inspection costs up to $350,000;
and construction support up to $40,000.
5.That the award of this contract is contingent upon Hazard Construction Company
executing the required contract and submitting the required bonds and insurance
policies, as described in the contract, within 20 calendar days of adoption of this
Resolution. The City Manager may grant reasonable extensions of time to execute the
contract and assemble the required bonds and insurance policies.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 16th day of February, 2021, by the following vote, to wit:
AYES: Hall, Blackburn, Acosta, Bhat-Patel, Schumacher.
NAYS: None.
ABSENT: None.
MATT HALL, Mayor
Feb. 16, 2021 Item #6 Page 6 of 7
AVECOSTALA
BLVDCARLSBAD
RD
ALGA
PALOMAR AIRPORT
RD
EL
CAMI
N
O
REALRANCHOSANTA FERD
POINS
E
T
TI
A
LANE ALICANTERDELFUERTEOLIVENHAIN RD.
M
E
L
R
O
S
E
D
R
.
FARADAY
COLLEG
EBLVDVILLAGE
P
A
S
E
O
DEL
NORTEAVE
AVENIDA
ENC
IN
A
S
CANNON RDMONROESTCARLS
B
A
D
D
R
LAGOO
N
MARRON
TAMARA
C
K
AVE
RD
LAKE
CALAVERABUENAVISTA
AGUA HEDIO
N
D
A
LAGO
O
N
BATIQUITOS
A
V
I
A
R
A
PKWY
VICINITY MAP
6042& 6056
EL CAMINO REAL BRIDGE IMPROVEMENTS
POINSETT
I
A
LANE
LAGOON
PROJECT NAME
SITE
PROJECT EXHIBIT
NUMBER 2
CALLEBARCEL
O
N
A
BATI
Q
U
I
T
O
S
DRIVEARENAL RD
LEVANTE ST
LOCATION MAP
PLOTTED BY: BENJAMIN ARP PLOT DATE: 09/02/2020 PATH: S:\Benjamin_Arp\Location Map\CIP_6042\6042_PhaseI_LocationMap.dwg
AT CANNON ROAD PHASE I
Exhibit 2
Feb. 16, 2021 Item #6 Page 7 of 7
Hossein Ajideh, Engineering Manager
Brandon Miles, Associate Engineer
Feb. 16, 2021
El Camino Real Bridge Improvements at
Cannon Road, Phase I
Project Nos. 6042 & 6056
Recommended Action
Adopt a resolution to
1.Accept bids and award a contract to Hazard Construction Co. for Phase I of El Camino Real (ECR) Bridge Improvements at Cannon Road, Capital Improvement Program Project nos. 6042 and 6056, in an amount not to exceed $1,819,988; and
2.Authorize additional funding appropriation in an amount of $512,000 from Gas Tax Fund for the Project
2
Background
•April 6, 2020, Traffic and Mobility Commission voted unanimously to support staff’s recommendation to implement Phase I of Project
•Aug. 19, 2020, Planning Commission unanimously approved Phase I of Project
•Oct. 6, 2020, City Council approved plans and specifications and authorized advertising Phase I of Project for construction bids
•Dec. 8, 2020, staff received 10 bids, and the lowest bidder was Hazard Construction Company, with a bid in the amount of $1,819,988
•Keeping with General Plan and City’s community values
•This segment of ECR is missing pedestrian connectivity
•Phase I of Project will improve connectivity for pedestrians
•Bridge safety railing and sidewalk are outdated and damaged
•Overhead poles removed for safety
4
Why this project is needed?
5
Project
Location
ECR Bridge over
Agua Hedionda
Lagoon
N
Proposed Improvements
Project includes two phases to best facilitate construction of improvements
•Phase I –presented today
–improves pedestrian mobility
•Phase II –currently in design
–improves traffic flow
6
Proposed Improvements
•Phase I
–New pedestrian bridge on east side of ECR
–Replace safety bridge railing on both sides of ECR
–Widen existing sidewalk on west side of ECR
–Remove overhead poles
7
Proposed Improvements
•Phase II
–Re-align median and re-stripe northbound El Camino Real to:
•Provide a dedicated enhanced bike lane
•Provide an additional NB through lane (for a total of three lanes)
•Maintain existing left and right turn lanes onto Cannon Road
8
ECR Bridge
Improvements
Existing Conditions
ECR Bridge
Proposed Improvements
Phase I
N
Proposed Improvements
•Pedestrian bridge will not change flow of Agua Hedionda Creek
•No adverse impact to the flood plain
•Obtained Grant Deed of Easements from two HOA’s
•Obtained Temporary Construction Easements from four HOA’s
11
ECR Bridge
Improvements
Before
ECR looking north
ECR Bridge
Improvements
After
ECR looking north
ECR Bridge
Existing sidewalk
west side of ECR
Broken safety
railing
4-feet
ECR looking north
Recommended Action
Adopt a resolution to
1.Accept bids and award a contract to Hazard Construction Co. for Phase I of El Camino Real (ECR) Bridge Improvements at Cannon Road, Capital Improvement Program Project nos. 6042 and 6056, in an amount not to exceed $1,819,988; and
2.Authorize additional funding appropriation in an amount of $512,000 from Gas Tax Fund for the Project
15
Thank you
16
El Camino Real Bridge Improvements
Broken safety railing
Existing railing
west side of ECR
ECR Bridge
Existing Conditions
ECR looking north
End of sidewalk
Missing sidewalk
Remove overhead poles
ECR Bridge
Sidewalk
Improvements
Existing
sidewalk
Proposed
Sidewalk
Not to scale
Agua Hedionda
Creek
ECR
N
Broken
safety
railing
4-feet
Next Steps
–Construction of Phase I
–Return to council to bid Phase II in Summer 2021
20