Loading...
HomeMy WebLinkAbout1801 ARTEMISIA CT; ; CBRA2020-0170; PermitBuilding Permit Finaled (City of Carlsbad Residential Associated Permit Print Date: 02/19/2021 Job Address: 1801 ARTEMISIA CT, CARLSBAD, CA 92011 Permit Type: BLDG-Associated Permit Residential Work Class: Parcel#: 2150530151 Track#: Valuation: $283,557.32 Lot#: Occupancy Group: #of Dwelling Units: 1 Project#: Plan#: Condo CT140010 113 DEV14060 Bedrooms: 4 Construction Type:VB Bathrooms: 3.0 Project Title: POINSETTIA 61 Orig. Plan Check#: PC2020-0009 Plan Check#: PC2020-0029 Permit No: CBRA2020-0170 Status: Applied: Issued: Fina led Close Out: Inspector: Final Inspection: Closed -Finaled 08/17/2020 08/31/2020 CRenf 02/19/2021 Description: POINSETTIA 61 (TREVISO): PHASE 12 // LOT 113 // PLAN 1 // 1,755 SF LIV// 425 SF GARAGE// 69 SF PATIO Applicant: LENNAR COMMUNITIES INC ALAN CHIK 25 ENTERPRISE, # 400 ALISO VIEJO, CA 92656-2708 (949) 204-4628 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) COMMUNITY FACILITIES DISTRICT (CFO) FEE -RES ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PARK IN-LIEU FEES SF DETACHED & DUPLEX: SW PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -inside CFO SB1473 GREEN BUILDING STATE STANDARDS FEE SEWER BENEFIT AREA FEES -J SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG TRAFFIC IMPACT Residential Condo w/in CFD Total Fees: $23,718.64 Total Payments To Date: Building Division $23,718.64 Contractor: LENNAR HOMES OF CALIFORNIA INC 15131 ALTON PKWY, # UNIT 365 IRVINE, CA 92618-2385 (949) 349-8214 Balance Due: AMOUNT $1,279.20 $823.80 $3,617.04 $66.00 $175.00 $92.00 $5,728.00 $182.00 $5,160.74 $12.00 $2,078.00 $982.00 $36.86 $246.00 $3,240.00 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f ! www.carlsbadca.gov Permit Type: BLDG-Associated Perrriit Residenti; Work Class· Condo Status: Closed -Finaled Application Date: 08/17/2020 Owner: 1ssuc Date: 08/31/2020 Subdivision: Expiration Date: 06/01/2021 IVR Number: 28073 Address: 1801 ARTEMISIA CT CARLSBAD, CA 92011 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 11/23/2020 11/30/2020 02/02/2021 02/19/2021 11/23/2020 BLDG-84 Rough Combo(14,24,34,44) 144494-2020 Checklist !tern BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS 11/30/2020 BLDG-82 Drywall, 144921-2020 Exterior Lath, Gas Test, Hot Mop CheckHst 1tem BLDG-Building Deficiency BLDG-17 Interior Lath-Drywall BLDG-18 Exterior Lath and Drywall BLDG-23 Gas-Test-Repairs COMMENTS 02/02/2021 BLDG-Eloctrlc Motor Release 149653-2021 Checklist Item COMMENTS Passed Paul Burnette Passed Peter Dreibelbis Passed Chris Renfro BLDG-Building Deficiency Face Time inspection completed on 2/2/2021 02/19/2021 BLDG-Final lnspoctlon Checklist !tern 150912-2021 COMMENTS BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Passed Peter Dreibelbis Friday, February 19, 2021 Complete Passed Yes Yes Yes Yes Yes Complete Passed '.\J,,) N,· l~r, f\lu Complete Passed Yes Complete Passed CJ ~ .. ' N" f\J, Page 2 of 2 Building Permit Inspection History Finaled (City of Carlsbad Permit Type: BLDG-Associated Permit Resident;, Application Date: 08/17/2020 Owner· Work C!~1ss Condo Issue Date: 08/31/2020 SL1bdivision: Status Closed -Finaled Expiration Date· 06/01/2021 Address: 1801 ARTEMISIA CT IVR Number: 28073 CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 09/02/2020 09/02/2020 BLDG-21 137255-2020 Passed Chris Renfro Complete Underg ro und/U nde rf lo or Plumbing Checklist !torn COMMENTS Passe(! BLDG-Building Deficiency Yes BLDG•22 Sewer/Water 137257-2020 Passed Chris Renfro Complete Service Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 09/17/2020 09/17/2020 BLDG-11 138592-2020 Passed Chris Renfro Complete Foundatlon/Ftg/Plers (Robar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-12 Steel/Bond 138593-2020 Passed Chris Renfro Complete Beam Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 10/0512020 10/05/2020 BLDG-14 140075-2020 Partial Pass Paul Burnette Reinspoction Incomplete Frame/Steel/Bolting/We lding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 10/23/2020 10/23/2020 BLDG-15 Roof/ReRoof 141884-2020 Passed Peter Dreibelbis Complete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 11/09/2020 11/09/2020 BLDG-83 Roof Shooting, 143232-2020 Passed Paul Burnette Complete Exterior Shear (13,15) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-13 Shear Panels-HO (Ok Ye'.;; to wrap) BLDG-15 Roof Yes Sheathing-Reroof Friday, February 19, 2021 Page 1 of 2 .l Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 (562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026 SWIT Job No. Date/ ./ REGISTERED INSPECTOR/AC! TECHNICIAN DAILY REPORT 11:<5 /"'t1 q /.( 7_,,, TYPE OF D Reinforced Concrete □ Welding □ DINEpoxy , INSPECTION ~ Post Tensioned Concrete □ Fireproofing □ Wood Framing REQUIRED Reinforced Masonry □ Asphalt D Other Job Addres~ <-__ !"5-~-. Tract No. Phase L9~ -//~ Job Name Permit Wk: Issued By I fl-<-""' --"""--. -, Type of Structure S, = _f' - Architect ' I. Material Description (type, grade, source) Engineer $ r '-41,/1 (_, --"" - ----r1' .r-.<7--\..,, -'/ c:: ,, --,( ~ --/ A•<../t, Contractor 1 _ ~A.A..,._ Inspector's Name r<..,, A 'L I, .. -Subcontractor .S. (..,(A.,1,' ~r ,:;../ TESTS PERFORMED SAMPLE AIR CONC WATER TIME SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & !DENT. NO'S OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS twELD MADE H.T. BOLTS TORQUED) CHECKED ETC. -~--('"'>~-.J' --=---__ .,,. t _.., Tl'" #t o 52,, -At I f ,,_ -,...,.,~::, --"-/V'c_,/'J --n-:1 ·" I A,._,,~ r , ,r,_ • ~ . --,<, --"= .• ..r,e>v, '::. ( I/~., _:,{ -t:_ '7 ~J.) ';;;;,,'hf_ -I ;',,,_ --, I • J,1 A -01_.,. JI_.. . L. = rr--,ti:: J C> ~ #.to',. ~1/0 ,., (cl "'>c = / -;,-//a -~If ...... , . , IF-I 11 jl= {/ z._ A • lt--7 / 3 --r"v1 _:; y?~C,..)l""l'V? /4..6~ ~= -. -. -,...,_ ~1-----s. f A =-·e,_~ .A -, •-r , . -,.,; '< .> " I #'-loB I 9,z I • I IJ I' A=A C:,,oZ,.o • ,...,,, <,,S ' -· A-1/Z. "'( l\'e t,,, A \ <._ 1 A_ C<r. fl; J o""I , I ""11 "7 ' " .,, . CJII ,. 11--• '9\13 41-• <CJ/I .7 I dJo ~ "' It; l 1 l -. , 18oq d-o I(..<:. < ... IA . It-I I Z. 1 7-'J, ,-' u " ¢ -o/C..,9 {Ji Ir 3 • I 9'in . I • " ,q-, -c)I tO CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE f:J -f"l\GE OF TIMEIN TIMEOUT SAMPLES White -Office Copy • Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy 1 Survey Request No. __ _ Email to Brianf@odayconsultants.com Project Name: Lennar/ Poinsettia 61 Job No. File: 141018 Date Requested: 9/15/20 Charge to JN: 141018 Date of Survey: 9/17/20 Scope ID: Requested by: Joe Nastasi Task ID Phone No.: 949-466-9704 Work requested is charged to: _Contract _ Re-staking _ Additional Stakes Description of Work: AISLE "Q" UNITs 108-113 Form certifications Treviso Phase 11 Staking Interval: Offset: (distance & which side) Additional Notes: Attachments: Reference: Cales assigned to: Brian Faraci Project Manager: George O'Day All staking requests must be in writing using this form and be submitted a minimum of 48 hours prior to the scheduled time of work. There is a four (4) hour minimum charge for survey crew time. Any site visits less than 4 hours will be charged as extra work to fixed fee scopes of work. , ti\ GR □UP DEL T .A FIELD MEMO DATE: 09/10/2020 DAY: Thursday PROJECT NAME: Poinsettia 61 Development CLIENT: Lennar 9245 Activity Road, Suite 103 San Diego, CA 92126 Tel. (858) 536-1000 Fax (858) 536-8311 Page 1 of 1 PROJECT NUMBER: 5D412B MEMO BY: Kish ore Shivaram SUBJECT: Foundation Excavation Observation Homesite No. Address Permit No. Plan Revision/Notes 108 1821 Artemisia Court CBRA2019-0165 ,c 109 1817 Artemisia Court CBRA2019-0166 3A 110 1813 Artemisia Court CBRA2019-0167 4C 1815 Artemisia Court CBRA2019-0171 111 1821 Artemisia Court CBRA2019-0166 lC 112 1821 Artemisia Court CBRA2019-0166 2B 113 1821 Artemisia Court CBRA2019-0166 1A Reference: Gouvis Engineering {2018). Post-Tension Foundation Plans and Details for Treviso, Sheets SN-1 to SD-3 (16 Sheets), dated August 24. Geotechnical Report: Report of Geotechnical Investigation, Poinsettia 61 Development Carlsbad, California Project No. 5D411, dated November 20, 2014 The referenced PT foundation excavations (described above, pictured below) exposed competent compacted fill. The bearing conditions exposed are consistent with the conditions anticipated in the referenced geotechnical investigation report and the Post Tension (PT) Model Home Plan Review. The foundation bearing soils appear to have a low expansion potential, and are considered suitable for the support of the proposed structure. The foundation dimensions meet the minimum geotechnical depth and width requirements. The dimensions per the referenced foundation plan are to be verified by others. The PT Sfab subgrade contains numerous shallow plumbing trenches. Proper jetting techniques appear to have been used to provide consolidation. NOTE: Footings should be cleaned of loose and deleterious material prior to placing concrete. FOR GROUP DELTA INCORPORATED, BY: Kishore Shivaram --- SIGNATURE: . 'f,~~t:::~) ISO 17025 5/12/15 rev1s1on 2