HomeMy WebLinkAbout1801 ARTEMISIA CT; ; CBRA2020-0170; PermitBuilding Permit Finaled
(City of
Carlsbad
Residential Associated Permit
Print Date: 02/19/2021
Job Address: 1801 ARTEMISIA CT, CARLSBAD, CA 92011
Permit Type: BLDG-Associated Permit Residential Work Class:
Parcel#: 2150530151 Track#:
Valuation: $283,557.32 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Project#:
Plan#:
Condo
CT140010
113
DEV14060
Bedrooms: 4 Construction Type:VB
Bathrooms: 3.0
Project Title: POINSETTIA 61
Orig. Plan Check#: PC2020-0009
Plan Check#: PC2020-0029
Permit No: CBRA2020-0170
Status:
Applied:
Issued:
Fina led Close Out:
Inspector:
Final Inspection:
Closed -Finaled
08/17/2020
08/31/2020
CRenf
02/19/2021
Description: POINSETTIA 61 (TREVISO): PHASE 12 // LOT 113 // PLAN 1 // 1,755 SF LIV// 425 SF GARAGE// 69 SF PATIO
Applicant:
LENNAR COMMUNITIES INC
ALAN CHIK
25 ENTERPRISE, # 400
ALISO VIEJO, CA 92656-2708
(949) 204-4628
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
COMMUNITY FACILITIES DISTRICT (CFO) FEE -RES
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PARK IN-LIEU FEES SF DETACHED & DUPLEX: SW
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -inside CFO
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER BENEFIT AREA FEES -J
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
TRAFFIC IMPACT Residential Condo w/in CFD
Total Fees: $23,718.64 Total Payments To Date:
Building Division
$23,718.64
Contractor:
LENNAR HOMES OF CALIFORNIA INC
15131 ALTON PKWY, # UNIT 365
IRVINE, CA 92618-2385
(949) 349-8214
Balance Due:
AMOUNT
$1,279.20
$823.80
$3,617.04
$66.00
$175.00
$92.00
$5,728.00
$182.00
$5,160.74
$12.00
$2,078.00
$982.00
$36.86
$246.00
$3,240.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f ! www.carlsbadca.gov
Permit Type: BLDG-Associated Perrriit Residenti;
Work Class· Condo
Status: Closed -Finaled
Application Date: 08/17/2020 Owner:
1ssuc Date: 08/31/2020 Subdivision:
Expiration Date: 06/01/2021
IVR Number: 28073
Address: 1801 ARTEMISIA CT
CARLSBAD, CA 92011
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
11/23/2020
11/30/2020
02/02/2021
02/19/2021
11/23/2020 BLDG-84 Rough
Combo(14,24,34,44)
144494-2020
Checklist !tern
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
11/30/2020 BLDG-82 Drywall, 144921-2020
Exterior Lath, Gas Test,
Hot Mop
CheckHst 1tem
BLDG-Building Deficiency
BLDG-17 Interior Lath-Drywall
BLDG-18 Exterior Lath and
Drywall
BLDG-23 Gas-Test-Repairs
COMMENTS
02/02/2021 BLDG-Eloctrlc Motor
Release
149653-2021
Checklist Item COMMENTS
Passed Paul Burnette
Passed Peter Dreibelbis
Passed Chris Renfro
BLDG-Building Deficiency Face Time inspection completed on
2/2/2021
02/19/2021 BLDG-Final lnspoctlon
Checklist !tern
150912-2021
COMMENTS
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Passed Peter Dreibelbis
Friday, February 19, 2021
Complete
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Passed
'.\J,,)
N,·
l~r,
f\lu
Complete
Passed
Yes
Complete
Passed
CJ
~ .. '
N"
f\J,
Page 2 of 2
Building Permit Inspection History Finaled
(City of
Carlsbad
Permit Type: BLDG-Associated Permit Resident;, Application Date: 08/17/2020 Owner·
Work C!~1ss Condo Issue Date: 08/31/2020 SL1bdivision:
Status Closed -Finaled Expiration Date· 06/01/2021 Address: 1801 ARTEMISIA CT
IVR Number: 28073 CARLSBAD, CA 92011
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
09/02/2020 09/02/2020 BLDG-21 137255-2020 Passed Chris Renfro Complete
Underg ro und/U nde rf lo
or Plumbing
Checklist !torn COMMENTS Passe(!
BLDG-Building Deficiency Yes
BLDG•22 Sewer/Water 137257-2020 Passed Chris Renfro Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
09/17/2020 09/17/2020 BLDG-11 138592-2020 Passed Chris Renfro Complete
Foundatlon/Ftg/Plers
(Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-12 Steel/Bond 138593-2020 Passed Chris Renfro Complete
Beam
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/0512020 10/05/2020 BLDG-14 140075-2020 Partial Pass Paul Burnette Reinspoction Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/23/2020 10/23/2020 BLDG-15 Roof/ReRoof 141884-2020 Passed Peter Dreibelbis Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
11/09/2020 11/09/2020 BLDG-83 Roof Shooting, 143232-2020 Passed Paul Burnette Complete
Exterior Shear (13,15)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-13 Shear Panels-HO (Ok Ye'.;;
to wrap)
BLDG-15 Roof Yes
Sheathing-Reroof
Friday, February 19, 2021 Page 1 of 2
.l
Southwest Inspection and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026
SWIT Job No. Date/ ./ REGISTERED INSPECTOR/AC! TECHNICIAN DAILY REPORT 11:<5 /"'t1 q /.( 7_,,,
TYPE OF D Reinforced Concrete □ Welding □ DINEpoxy
,
INSPECTION ~ Post Tensioned Concrete □ Fireproofing □ Wood Framing
REQUIRED Reinforced Masonry □ Asphalt D Other
Job Addres~ <-__ !"5-~-. Tract No. Phase L9~ -//~
Job Name Permit Wk: Issued By
I fl-<-""' --"""--. -,
Type of Structure S, = _f' -
Architect ' I.
Material Description (type, grade, source) Engineer $ r '-41,/1 (_, --"" -
----r1' .r-.<7--\..,, -'/ c:: ,, --,( ~ --/ A•<../t, Contractor 1 _
~A.A..,._
Inspector's Name r<..,, A 'L I, .. -Subcontractor .S.
(..,(A.,1,' ~r
,:;../ TESTS PERFORMED
SAMPLE AIR CONC WATER TIME
SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & !DENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS twELD MADE H.T. BOLTS TORQUED) CHECKED ETC.
-~--('"'>~-.J' --=---__ .,,. t _.., Tl'" #t o 52,, -At I f ,,_
-,...,.,~::, --"-/V'c_,/'J --n-:1 ·" I A,._,,~ r , ,r,_ • ~ . --,<, --"=
.• ..r,e>v, '::. ( I/~., _:,{ -t:_ '7 ~J.) ';;;;,,'hf_ -I
;',,,_ --, I •
J,1 A -01_.,. JI_..
.
L. = rr--,ti:: J C> ~ #.to',. ~1/0
,.,
(cl "'>c = / -;,-//a -~If ...... , . ,
IF-I 11 jl= {/ z._ A • lt--7 / 3 --r"v1 _:; y?~C,..)l""l'V? /4..6~ ~= -. -. -,...,_
~1-----s. f A =-·e,_~ .A -, •-r , . -,.,; '< .> " I
#'-loB I 9,z I • I IJ I' A=A C:,,oZ,.o • ,...,,, <,,S ' -· A-1/Z. "'( l\'e t,,, A \ <._ 1 A_ C<r.
fl; J o""I
,
I ""11 "7 ' " .,, . CJII ,.
11--• '9\13 41-• <CJ/I .7 I dJo ~ "'
It; l 1 l -. , 18oq d-o I(..<:. < ... IA .
It-I I Z. 1 7-'J, ,-' u " ¢ -o/C..,9
{Ji Ir 3 • I 9'in . I • " ,q-, -c)I tO
CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE f:J -f"l\GE OF
TIMEIN TIMEOUT SAMPLES
White -Office Copy • Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy
1
Survey Request No. __ _
Email to Brianf@odayconsultants.com
Project Name: Lennar/ Poinsettia 61 Job No. File: 141018
Date Requested: 9/15/20 Charge to JN: 141018
Date of Survey: 9/17/20 Scope ID:
Requested by: Joe Nastasi Task ID
Phone No.: 949-466-9704
Work requested is charged to: _Contract _ Re-staking _ Additional Stakes
Description of Work:
AISLE "Q" UNITs 108-113 Form certifications Treviso Phase 11
Staking Interval: Offset: (distance & which side)
Additional Notes:
Attachments: Reference:
Cales assigned to: Brian Faraci
Project Manager: George O'Day
All staking requests must be in writing using this form and be submitted a minimum of 48 hours
prior to the scheduled time of work. There is a four (4) hour minimum charge for survey crew
time. Any site visits less than 4 hours will be charged as extra work to fixed fee scopes of work.
,
ti\ GR □UP DEL T .A
FIELD MEMO
DATE: 09/10/2020 DAY: Thursday
PROJECT NAME: Poinsettia 61 Development CLIENT: Lennar
9245 Activity Road, Suite 103
San Diego, CA 92126
Tel. (858) 536-1000
Fax (858) 536-8311
Page 1 of 1
PROJECT NUMBER: 5D412B MEMO BY: Kish ore Shivaram
SUBJECT: Foundation Excavation Observation
Homesite No. Address Permit No. Plan Revision/Notes
108 1821 Artemisia Court CBRA2019-0165 ,c
109 1817 Artemisia Court CBRA2019-0166 3A
110 1813 Artemisia Court CBRA2019-0167 4C 1815 Artemisia Court CBRA2019-0171
111 1821 Artemisia Court CBRA2019-0166 lC
112 1821 Artemisia Court CBRA2019-0166 2B
113 1821 Artemisia Court CBRA2019-0166 1A
Reference: Gouvis Engineering {2018). Post-Tension Foundation Plans and Details for Treviso, Sheets
SN-1 to SD-3 (16 Sheets), dated August 24.
Geotechnical Report: Report of Geotechnical Investigation, Poinsettia 61 Development
Carlsbad, California
Project No. 5D411, dated November 20, 2014
The referenced PT foundation excavations (described above, pictured below) exposed competent compacted fill. The
bearing conditions exposed are consistent with the conditions anticipated in the referenced geotechnical investigation
report and the Post Tension (PT) Model Home Plan Review. The foundation bearing soils appear to have a low expansion
potential, and are considered suitable for the support of the proposed structure. The foundation dimensions meet the
minimum geotechnical depth and width requirements. The dimensions per the referenced foundation plan are to be
verified by others.
The PT Sfab subgrade contains numerous shallow plumbing trenches. Proper jetting techniques appear to have been used
to provide consolidation.
NOTE: Footings should be cleaned of loose and deleterious material prior to placing concrete.
FOR GROUP DELTA INCORPORATED, BY: Kishore Shivaram ---
SIGNATURE: . 'f,~~t:::~)
ISO 17025 5/12/15 rev1s1on 2