Loading...
HomeMy WebLinkAboutCT 13-03; ROBERTSON RANCH WEST VILLAGE; FINAL SOILS REPORT; 2016-06-28 2420 Grand Avenue, Suite F2 • Vista • CA 92081 • (760) 599-7000 • Fax (760) 599-7007 LGC Valley, Inc. Geotechnical Consulting AS-GRADED REPORT OF MASS GRADING, PLANNING AREAS PA-1 THROUGH PA-3, PA-5, PA-6, PA-9, PA-10, PA-13 AND PA-23A THROUH PA-23C, ROBERTSON RANCH, CARSLBAD TRACT NO.13-03, CARLSBAD, CALIFORNIA Project No. 133023-03 Dated: June 28, 2016 Prepared For: Toll Brothers 725 Town and Country Road, Suite 200 Orange, California 92868 2420 Grand Avenue, Suite F2 • Vista • CA 92081 • (760) 599-7000 • Fax (760) 599-7007 LGC Valley, Inc. Geotechnical Consulting June 28, 2016 Project No. 133023-03 Mr. Kevin Brickley Toll Brothers 725 Town and Country Road, Suite 200 Orange, California 92868 Subject: As-Graded Report of Mass Grading, Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, California In accordance with your request and authorization, LGC Valley, Inc. (LGC) has provided geotechnical services during the mass grading operations for Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C of the Robertson Ranch project (Carlsbad Tract No. 13-03) located within the City of Carlsbad, California. Planning Areas PA-1 and PA-23A through PA-23C are open space areas; PA-2 is the site of a future community facility; while PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13 are single-family residential developments. Planning Areas PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13 consist of a total of 308 single-family residential lots; 34 Home Owner Association (HOA) lots comprising landscape areas, storm water retention basins, and community recreational areas; streets; slopes; and associated improvements. The accompanying as-graded report of mass grading summarizes our observations, field and laboratory test results, and the geotechnical conditions encountered during grading of the subject site. The mass grading operations for Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C of the Robertson Ranch project were performed in general accordance with previously published project geotechnical reports (Appendix A), geotechnical recommendations made during the course of grading, and the City of Carlsbad grading requirements. It is our professional opinion that the subject site is suitable for its intended use provided the recommendations included herein and in the project geotechnical reports are incorporated into the fine/precise-grading, design, and construction of the proposed development and associated improvements. As of the date of this report, the mass grading operations of the subject site are essentially complete. If you have any questions regarding our report, please contact this office. We appreciate this opportunity to be of service. Respectfully Submitted, LGC Valley, Inc. Randall Wagner, CEG 1612 Basil Hattar, GE 2734 Senior Project Geologist Principal Engineer RKW/BIH Distribution: (6) Addressee ~-1 /-f ~----j _ Project No. 133023-03 Page i June 28, 2016 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ......................................................................................................................................... 1 1.1 Project Description ........................................................................................................................... 1 2.0 SUMMARY OF MASS-GRADING OPERATIONS .................................................................................... 4 2.1 Site Preparation and Removals ......................................................................................................... 4 2.2 Saturated Alluvial Mitigation ........................................................................................................... 5 2.3 Stability Fills ..................................................................................................................................... 5 2.4 Subdrain Installation......................................................................................................................... 6 2.5 Fill Slope Keys .................................................................................................................................. 7 2.6 Cut/Fill Transition Conditions .......................................................................................................... 7 2.7 Overexcavation of Cut Lots ............................................................................................................... 7 2.8 Toxaphene Impacted Soil Removal and Burial .................................................................................. 8 2.9 Fill Placement and Compaction ........................................................................................................ 9 2.10 Laboratory Testing ............................................................................................................................ 9 2.11 Field Density Testing ...................................................................................................................... 10 2.12 Graded Slopes ................................................................................................................................. 10 2.13 Settlement Monuments .................................................................................................................... 10 2.14 Verdura Retaining Walls ................................................................................................................. 11 2.15 Animal Crossing on Gage Drive ..................................................................................................... 11 3.0 ENGINEERING GEOLOGIC SUMMARY .............................................................................................. 13 3.1 As-Graded Geologic Conditions ..................................................................................................... 13 3.2 Geologic Units ................................................................................................................................ 13 3.3 Geologic Structure .......................................................................................................................... 15 3.4 Faulting and Seismicity ................................................................................................................... 15 3.4.1 On-Site Faulting ............................................................................................................... 16 3.5 Ground Water ................................................................................................................................. 18 4.0 CONCLUSIONS ......................................................................................................................................... 19 4.1 General ........................................................................................................................................... 19 4.2 Summary of Conclusions ................................................................................................................ 19 5.0 RECOMMENDATIONS ............................................................................................................................ 22 5.1 Earthwork ....................................................................................................................................... 22 5.2 Site Preparation ............................................................................................................................. 22 5.3 PA-2 Future Work .......................................................................................................................... 22 5.4 Excavations .................................................................................................................................... 22 5.5 Fill Placement and Compaction ..................................................................................................... 23 5.6 Foundation Recommendations ....................................................................................................... 23 5.7 Subdrain Outlet Maintenance ........................................................................................................ 24 5.8 Control of Surface Water and Drainage ........................................................................................ 24 6.0 LIMITATIONS ........................................................................................................................................... 25 Project No. 033024-01 Page ii June 28, 2004 LIST OF TABLES, ILLUSTRATIONS, AND APPENDICES Figures and Plates Figure 1 - Site Location Map (Page 2) Plates 1A through 1F - As-Graded Geotechnical Map (Rear-of-Text) Plates 2A through 2F - Field Density Test Location Map (Rear-of-Text) Appendices Appendix A - References Appendix B - Laboratory Testing Procedures and Test Results Appendix C - Summary of Field Density Test Results Project No. 133023-03 Page 1 June 28, 2016 1.0 INTRODUCTION In accordance with your request and authorization, LGC Valley, Inc. (LGC) has provided geotechnical services during the mass grading operations for Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C of the Robertson Ranch project (Carlsbad Tract No. 13-03) located within the City of Carlsbad, California. This as-graded report of mass grading summarizes our observations, field and laboratory test results, and the geotechnical conditions encountered during grading of the subject site. Planning Areas PA-4, PA-7, PA-8, and PA-11 of Robertson Ranch were graded at the same time as the remainder of the site but are not included in this report. The results of our geotechnical observation and testing services, as well as, our conclusions and recommendations concerning the as-graded conditions of PA-4, PA-7, PA-8, and PA-11 of Robertson Ranch have or will be presented under separate cover. The mass grading operations for Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C of the Robertson Ranch project were performed in general accordance with previously published project geotechnical reports (Appendix A), geotechnical recommendations made during the course of grading, and the City of Carlsbad grading requirements. As of this date, the mass grading operations for the subject areas are essentially complete. The Rough Grading Plans for the Robertson Ranch project, prepared by O’Day Consultants (O’Day, 2014a), were utilized as a base map to present the as-graded geotechnical conditions and approximate locations of the field density tests. The As-graded Geotechnical Map (Plates 1A through 1F) and the Field Density Test Location Map (Plates 2A through 2F) are presented in the pocket at the rear of the text. 1.1 Project Description The Robertson Ranch development is approximately 211 acres in size and is located on the north side of El Camino Real between Tamarack Avenue on the west and Cannon Road on the east in the northeastern portion of the City of Carlsbad, California. The irregular-shaped site is bounded by El Camino Real on the south, Tamarack Avenue on the northwest, existing residential developments on the north and east, and by Cannon Road on the southeast. The proposed Robertson Ranch development consists of a number of Planning Areas including PA-1 through PA-11, PA-13, and PA-23A through PA-23C. Based on our understanding, PA-1 and PA-23A through PA-23C are designated open spaces areas; PA-2 will be a future community facility; PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13 are single-family residential communities; PA-4 will be a community center and pool complex; PA-7 and PA-8 will be a multi-family residential development with an assisted-living senior housing center; and PA-11 will be a retail/commercial site. Toll Brothers/Robertson RanchProject Name BIH/RKW June 28, 2016 not to scale Eng. / Geol. Date Scale Project No.133023-03 Approximate Site Location Figure 1 Site Location Map Robertson Ranch City of Carlsbad, California Site :carcrr Gt ~cl'! Ct F(JI..L( l?e21 st Ridg,e AJi ,=ook Project No. 133023-03 Page 3 June 28, 2016 Development of Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C of the Robertson Ranch project includes: 1) 308 single-family residential lots (Lots 1 through 23 of Planning Area PA-13; Lots 25 through 60 of Planning Area PA-5; Lot 63 through 149 of Planning Area PA-3; Lots 158 through 244 of Planning Area PA-6; Lots 252 through 298 of Planning Area PA-9; and Lots 299 through 326 of Planning Area PA-10); 2) 34 HOA lots consisting of landscape areas; storm water retention basins (Lots 24, 61, 62, 150 through 153, 155, 157, 246 through 251, 328, and 329); and community recreational areas (Lots 154, 156, 245, and 330); 3) Associated streets (West Ranch Street, Gage Drive, Robertson Road, Wadsworth Street, Wellspring Street, Borden Court, Crespi Court, Kentner Court, Chase Court, Portola Court, Nelson Court, La Paz Court, Trailblazer Way, and a portion of Glasgow Drive and Edinburgh Drive); 4) Manufactured fill and cut slopes around the perimeter of the lots and streets; 5) A sheet-graded pad for a future community facility on Planning Area PA-2; and, 6) Undeveloped open space areas within Planning Areas PA-1 and PA-23A through PA-23C. We anticipate the site construction to consist of residential structures, driveways, underground utility services, retaining walls, concrete flatwork, landscaping, etc. We understand the residential structures will be up to two-stories in height and have slab-on- grade with wood-frame and stucco construction. Project No. 133023-03 Page 4 June 28, 2016 2.0 SUMMARY OF MASS-GRADING OPERATIONS Mass grading of the subject site began on September 15, 2014 and was essentially completed as of May 15, 2015. The grading operations were performed under the observation and testing services of LGC Valley, Inc. Our field technicians were onsite on a full-time basis during the grading operations while our field and project geologists were on-site on a periodic basis. The mass-grading operations included: 1) Removal and off-site disposal of vegetation and miscellaneous debris; 2) The removal of potentially compressible soils including alluvium, colluvium, topsoil, undocumented fill, and weathered soils to competent terrace deposits or formational material; 3) Overexcavation of cut/fill transition conditions within the limits of the residential lots; 4) Overexcavation of buried cut/fill transition conditions such that the resulting fill differential beneath the proposed building pads was less than a 3:1 (maximum fill thickness to the minimum fill thickness); 5) Overexcavation of cut lots due to expansive soils lots and/or very dense moderately cemented sandstone; 6) The excavation of stability fill keys; 7) Preparation of areas to receive fill; 8) The placement of subdrains in the canyon bottoms and along the heel of the stability fill keys; 9) Installation of stabilization fabric and rock layer over left-in-place saturated alluvium; 10) The placement of compacted fill soils and excavation of cut creating the lots, streets, sheet- graded pads and adjacent slopes; and 11) Installation of settlement monuments in deep fill areas (considered to be fills greater than 40 feet below design finish grades). The mass-grading operations consisted of the excavation of up to approximately 50 feet of cut and placement of a maximum thickness of approximately 75 feet of fill. The as-graded geotechnical conditions are presented on the As-Graded Geotechnical Map (Plates 1A through 1F). 2.1 Site Preparation and Removals Prior to grading, the site was cleared of light vegetation, trash, prior farming debris, and other miscellaneous debris and the material was disposed of at an offsite facility. Undocumented fill, topsoil, alluvium, colluvium, weathered terrace soils, and formational material were removed to competent material (i.e. dense unweathered terrace or formational material). Remedial removals on site, below the existing ground surface, generally ranged from approximately 3 to 15 feet with a maximum depth of remedial removal of up to approximately 40 feet associated with the main north-south trending canyons in the southwestern and southeastern portions of PA-7 and in the central portion of PA-8. Following the remedial removals or overexcavations, areas to receive fill were scarified approximately 6- to 12-inches; moisture-conditioned, as needed, to obtain a near-optimum Project No. 133023-03 Page 5 June 28, 2016 moisture content; and compacted to a minimum 90 percent relative compaction (for fills of approximately 40 feet or less from design grades) or 93 percent relative compaction (for engineered fill below approximately 40 feet from design finish grades). Compaction was determined by ASTM Test Method D6938 (i.e. the nuclear gauge method). 2.2 Saturated Alluvial Mitigation Based on geologic mapping and observations made during the remedial grading removals within Planning Area PA-2 and in the northwestern portion of Robertson Road (between approximate Station Number 10+50 and 12+25), shallow groundwater was encountered at an approximate depth of 5 to 6 feet below the existing ground surface within the alluvial soils. This ground water condition is assumed to be a perched ground water within the lower section of the on-site alluvial soils. Recommendations were made to remove the alluvial soils to within 1 to 2 feet of the groundwater elevation, install a stabilization fabric (i.e. Mirafi 600x) along the removal bottom and then place sandy compacted fill to the design grades (LGC, 2015). In areas where standing water was present or where significant pumping and rutting occurred, a 1- to 2- foot thick rock layer was placed in the removal bottom prior to the placement of the stabilization fabric. The rock layer consisted of 6-inch minus rock with sand. The approximate locations of the rock layer and stabilization fabric include the west side of Robertson Road between Station 10+65 and 12+85; and the north-central and northeast side of PA-2. The approximate locations of the stabilization fabric include the east side of Robertson Road between Station 10+65 and 12+30, the west side of Robertson Road between Station 12+85 and 14+00, and the southeast side of PA-2. 2.3 Stability Fills Stability fills were constructed to stabilize the exposed blocky claystone/siltstone and/or adverse (i.e. out-of-slope) geologic conditions present within the Santiago Formation. The stability fill keys were excavated to a width ranging from 15 to 25 feet and a minimum depth of 3 to 5 feet below the toe-of-slope. The keyway bottom was angled at least 2 percent into-the- slope. The stability fill front cuts were excavated near vertical while the backcuts were excavated at an approximate 2:1 or 1:1 (horizontal to vertical) slope inclination. Subdrains were places along the heel of the stability fill keys and are discussed in Section 2.4. Stability fills were excavated along the proposed slope on; 1) the northeast sides of Lots 68 through 70 of PA-3; 2) the north sides of Lots 92 through 95 of PA-3; 3) south of Lots 135 through 145, 156, and 157 of PA-3; 4) the northwest sides of Lots 158 through 163 and 245 of PA-6; 5) the northwest sides of Lots 170 through 182 of PA-6; 6) southeast of Lots 185 through 193 of PA-6; 7) southeast and east of Lots 198 through 210 of PA-6; 8) the west side of Lots 212 through 223 of PA-6; 9) the north side of Lots 252 through 264, 277 through 281, and 282 through 286 of PA-9; 10) the north side of Lots 300, 301 and 328, 302 through 307 and 329, 317 through 319, and 320 through 323 of PA-10; 11) the east side of Robertson Road between approximate Station No. 15+75 to 18+00 in PA-1; and 12) the north side of PA-11. The Project No. 133023-03 Page 6 June 28, 2016 approximate locations of the stability fill keys are presented on the As-graded Geotechnical Map (Plates 1A through 1F). The stability fill keys recommended in the project preliminary geotechnical report (LGC, 2014a) on the north sides of Lots 82 through 87 and 150; Lots 88 through 91 and 151; Lots 107 through 110 and 152; Lots 111 through 114 and 153; Lots 127 through 130 and 154; and Lots 131 through 134 and 155 were not constructed during the mass grading operations. Instead, the slopes on these lots were completely overexcavated removing the proposed cut and replacing the slopes with compacted fill. The overexcavation extended to a depth of at least 5 feet below the proposed toe-of-slope with a removal bottom angled no steeper than a 3:1 (horizontal to vertical). 2.4 Subdrain Installation Canyon and stability fill subdrains were installed under the observation of a representative of LGC in general accordance with the approved geotechnical report (LGC, 2014a) and geotechnical recommendations made during the course of the mass grading operations. After the potentially compressible material in the canyons were removed to competent material or when compacted fill was placed over competent material to obtain flow to a suitable outlet location, a subdrain was installed along the canyon bottom. The canyon subdrains consisted of a 6-inch diameter perforated pipe surrounded by a minimum of 9-cubic feet (per linear foot) of crushed 3/4-inch gravel wrapped in Mirafi 140N filter fabric. Canyon subdrains were installed in the western canyon along the east side of PA-3; in the small canyon in the middle of PA-7; the main canyon in PA-5 through PA-8; the upper end of the south canyon in PA-11; and in the two small canyons in the southeast portion of PA-10. In addition to the canyon subdrains, subdrains were also installed along the bottom backside of the stability fill keys. The stability fill subdrains consisted of a 4-inch diameter perforated pipe surrounded by a minimum of 3-cubic feet (per linear foot) of clean 3/4-inch gravel wrapped in Mirafi 140N filter fabric. Stability fill key subdrains were installed in each of the keys mentioned in Section 2.3. The canyon and stability fill subdrains were placed with a minimum 1-percent fall (2-percent or greater where possible) to a suitable outlet location. The locations of the subdrains placed during the mass-grading operations for the project were surveyed by the project civil engineer. The subdrain locations are presented on the As-graded Geotechnical Map (Plates 1A through 1F). As indicated on the as-graded geotechnical map, three (3) canyon subdrains and five (5) stability fill subdrains were ultimately outletted into adjacent storm drain structures or the storm drain pipe. Four of these outletted subdrains are located on the north side of El Camino Real (on the south side of Planning Area PA-3) and four are located along Gage Drive in Planning Areas PA-9 and PA-10. Project No. 133023-03 Page 7 June 28, 2016 2.5 Fill Slope Keys Prior to the placement of fill slopes that were planned above natural and/or cut areas on the site, a fill slope key was constructed. The fill slope keys were excavated at least 2 feet into competent soil along the toe-of-slope and constructed approximately 15 feet wide with the key bottom angled a minimum of 2 percent into-the-slope. Fill slope keys constructed on site during the mass grading operations included the slopes: 1) northwest of Lots 63, 71, and 82 of PA-3; 2) east of Lots 226 through 243 of PA-6; 3) west of Lots 252, 265, 276, and 288 of PA-9 and Lots 299, 308, 317, and 325 of PA-10; 4) east of Edinburgh Drive, Lots 275, 287, and 298 of PA-9 and Lots 307, 316, 324, and 330 of PA-10; and 5) the west side of Robertson Road approximately from Station 14+00 to 15+90 west of PA-3. 2.6 Cut/Fill Transition Conditions The cut portion of lots that exposed the cut/fill transition was overexcavated a minimum of 5 feet below finish pad grade. Overexcavation of the building pad was performed to mitigate the transitional condition and related adverse effects of differential settlement that can result due to this underlying condition. The limits of the overexcavations were made at least 5 feet outside the anticipated building limits (or building footprint). To reduce the potential of a perched ground water condition within the transition lots, the pads were overexcavated with a minimum 1-percent fall in the overexcavation bottom toward the fill. During the mass grading operations, remedial grading was also performed so that the fill differential beneath the proposed building pads was less than a 3:1 (maximum fill thickness to the minimum fill thickness). Lots that were overexcavated due to a cut/fill transition condition include Lots 29 through 32, 48, and 54 of PA-5; Lots 63, 68, 69, 71, 72, 77, 82, 88, 100, 112, 124, 133, and 135 through 145 of PA-3; Lots 164, 165, 169 through 171, 189, 198 through 207, and 226 through 244 of PA-6; Lots 252, 253, 266 through 269, 275, 277 through 279, 287, 294, and 295 of PA-9; and Lots 300, 301, 305 through 307, 309 through 312, 317, 318, and 323 of PA-10. 2.7 Overexcavation of Cut Lots During the mass grading of the Robertson Ranch project, the overexcavation of cut lots was performed in order to mitigate potential adverse conditions including: 1) well-cemented sandstone beds (or concretion layers) and very dense or hard Santiago Formation at or near finish grade which could create difficulties during future excavations on the lots; and 2) potential highly expansive soils at finish grade that would require significant post-tension foundation designs. The cut lots that contained these conditions were overexcavated a minimum of 5 feet below finish pad grade and replaced with compacted fill. In order to minimize potential ponded ground water conditions on the overexcavation bottom, the lots were overexcavated with a minimum fall of 1- to 2-percent toward the front of the lot or deeper fill area. Project No. 133023-03 Page 8 June 28, 2016 Lots overexcavated due to well-cemented sandstone or dense Santiago Formation included Lots 39 through 47 and 60 of PA-5; and Lots 158 through 163, 183, 184, 212, and 213 of PA-6. Lots overexcavated due to expansive clayey soils included Lots 64 through 67, 70, 73 through 76, 83 through 87, 92 through 99, 105 through 111, 115 through 123, and 127 through 132 of PA-3; Lots 180 through 182 of PA-6; Lots 254 through 264, 270 through 274, 280 through 286, 292, 293 of PA-9; and Lots 319 through 322 of PA-10. 2.8 Toxaphene Impacted Soil Removal and Burial Previous studies by GeoSoils (GeoSoils, 2007b, 2007c, 2010a, 2010b, 2010c, and 2011b), indicated that approximately 95,000 cubic yards of pesticide impacted soils were present on the site and that these soils needed to be remediated during the mass grading operations. The County of San Diego Department of Environmental Health (DEH) was the review and approval agency and the case opened in March 2011 as “Rancho Costera, El Camino Real and Tamarack, Carlsbad”; DEH File No. H39768-001. Documents related to the case can be found on the web site “Geotracker” using the case file number on the advanced search page of the site. The site can be found at “geotracker.waterboards.ca.gov”. Based on the approved site Property Mitigation Plan (PMP), the proposed mitigation measures included the excavation of the toxaphene impacted soil and placement of the soils within the on-site street right-of-ways in planned fill areas (Havasu Consulting, 2014). The approved PMP presented a remediation approach to remove the toxaphene impacted soil where concentrations existed at or above 460 μg/kg (i.e. the threshold value requiring remediation) within the property. The PMP also presented an approach designed to place the toxaphene impacted soils in designated areas within the street right-of-ways of the site at depths greater than 12 feet below the finish surface of the street or 2 feet below the deepest utility (if the utility line was greater than 10 feet in depth). Based on the highest anticipated groundwater elevation of approximately 45 feet mean sea level (MSL), no impacted soil was to be placed below an elevation of 50 feet MSL, thereby providing a minimum soil cap of 5 feet above the highest anticipated groundwater elevation. A marker material was to be placed over the final level of toxaphene-impacted soil to identify the location of the impacted soil. Based on soil sampling results from previous subsurface investigations (Havasu Consulting, 2014), soils to depths from 0 to 4 feet below the ground surface were expected to be impacted above the site clean-up level. Nine (9) designated areas (i.e. Areas A through I) on the site were identified by GeoSoils as being impacted with toxaphene. Remedial excavation work commenced on September 29, 2014 and was completed by November 7, 2014. The remediation operations typically consisted of: 1) one dozer and a water truck ripping and moisture-conditioning the impacted soil removal areas prior to removal; 2) three to six scrapers excavating the impacted soil and hauling it to the burial areas; and 3) the same dozer and/or a second dozer, the same water truck and the scrapers mixing the soil, adding additional water, and compacting the soil to the project geotechnical recommendation of 90 percent relative compaction. Observation and field density testing of the compacted soil was performed by a senior field technician from LGC (Havasu, Consulting, 2016). Project No. 133023-03 Page 9 June 28, 2016 The excavated impacted soils were placed in three burial areas on the site in the south and central portions of the site and included a portion of West Ranch Street; Robertson Road; Wellspring Street; and Nelson Court. Upon completion of the burial areas, the tops and upper sides of the impacted soil was covered with a dark gray filter fabric. Prior to the placement of the impacted soil and after the fabric was placed, the burial areas were surveyed by the project civil engineer. The approximate limits of the burial locations are shown on the As-Graded Geotechnical Map (Plates 1A through 1F). A comprehensive discussion of the toxaphene impacted soil remediation operations is presented in the report entitled “Final Remedial Summary Report”, dated March 31, 2016 (Havasu Consulting, 2016). Upon the completion of the impacted soil removals in the nine removal areas, random verification/confirmation sampling was performed. The test results demonstrated that: 1) the toxaphene levels at the base of the removal excavations were non-detected or below the threshold values requiring remediation; and 2) that the toxaphene-impacted soil was removed. Subsequent to the grading of the site in the areas of the previously impacted soil and burial areas, 15 random post-grading soil samples were obtained and tested for toxaphene. The test results indicated the samples did not detect any toxaphene (Havasu Consulting, 2016). 2.9 Fill Placement and Compaction After processing the areas to receive fill, native soil was generally spread in approximately 8- inch loose lifts, moisture-conditioned as needed to attain near-optimum moisture content, and compacted to at least 90 or 93 percent of the maximum dry density determined in accordance with ASTM Test Method D1557. Fill soils less than 40 feet below the design finish grades were compacted to a minimum 90 percent relative compaction while fill soils greater than 40 feet below the design finish grades were compacted to a minimum 93 percent relative compaction. Compaction was achieved by use of heavy-duty construction equipment. Areas of fill in which either field density tests indicated less than 90 or 93 percent relative compaction or the soils exhibited nonuniformity and/or showed an inadequate or excessive moisture content, were reworked, recompacted, and retested until a minimum 90 or 93 percent relative compaction and near-optimum moisture content was achieved. 2.10 Laboratory Testing Maximum dry density tests of representative on-site soils were performed (by others during the previous investigation and by LGC during the current mass-grading operations) in general accordance with ASTM Test Method D1557. Representative expansion potential, soluble sulfate content, and corrosion suite tests were performed on representative samples of the finish grade soils on the residential lots. The test results indicate the representative finish grade soils have: 1) a very low to high expansion potential (per U.B.C. Standard No. 18-I-B); 2) a negligible to severe soluble sulfate content per ACI criteria (ACI 318R-08 Table 4.3.1); 3) are moderately to severely corrosive to buried metals based on the minimum soil resistivity values; and 4) are corrosive to buried Project No. 133023-03 Page 10 June 28, 2016 metals and reinforcing steel in concrete based on the chloride concentrations. The laboratory test procedures and laboratory test results are presented in Appendix B. 2.11 Field Density Testing Field density testing was performed using the Nuclear-Gauge Method (ASTM Test Method D6938). The approximate test locations are shown on the Field Density Test Location Map (Plate 2). The results of the field density tests are summarized in Appendix C. The field density testing was performed in general accordance with the applicable ASTM standards and the current standard of care in the industry. In-situ soil density testing is intended to verify the effectiveness of the earthmoving operation in general and is performed on a spot-check basis; as such, some variations in relative compaction should be expected from the results documented herein. 2.12 Graded Slopes Manufactured fill and cut slopes within the subject area were surveyed by the civil engineer and constructed with slope inclinations of 2:1 (horizontal to vertical) or flatter. Permanent graded fill slopes within the subject area range from less than 5 to approximately 90 feet in height. Permanent cut slopes are approximately 5 to 10 feet in height or less. The on-site fill and cut slopes are considered grossly and surficially stable from a geotechnical standpoint (under normal irrigation/precipitation patterns) provided the project geotechnical recommendations are incorporated into the fine-grading, post-grading, construction, and post-construction phases of site development. 2.13 Settlement Monuments The compacted fills within Robertson Ranch range from 0 to approximately 75 feet in depth. A total of seven settlement monuments were installed/constructed at representative locations in the deep fill areas in general accordance with the project geotechnical report (LGC, 2014a), following the completion of the majority of fill placement operations in the deep fill areas. However, five of these settlement monuments were placed within deep fill areas of PA-7 and PA-8. The settlement monuments were installed in deep fill areas ranging from 50 to 75 feet in thickness. The approximate location of the settlement monuments are shown on the As-Graded Geotechnical Map (Plates 1A through 1F). The settlement monuments were surveyed by O’Day Consultants. Based on the settlement monument readings to date of the two monuments in Planning Area PA-6 and in Gage Drive between Planning Areas PA-6 and PA-10 (i.e. Settlement Monuments #6 and #7), settlement of the fills has been minimal. Based on almost 14 months of survey readings, the settlement of the deep fill in the vicinity of Settlement Monument #6 is less than 1/10-inch of Project No. 133023-03 Page 11 June 28, 2016 settlement. In the vicinity of Settlement Monument #7, the deep fill has settled about 1/2- inch over a five (5) month period. The accuracy of the settlement survey readings is +/- 1/4-inch. As a result, it is our professional opinion that the primary and secondary consolidation of deep fills is within acceptable limits. 2.14 Verdura Retaining Walls During the mass grading operations, a number of Verdura mechanically-stabilized retaining walls were constructed on the site. Prior to the construction of the retaining wall, the footing excavation and soil conditions was observed by a LGC representative and found to be in general accordance with the design parameters and recommendations assumed in the project geotechnical report and retaining wall design parameters (LGC, 2014, 2014c, and 2015j). In addition, a backdrain was placed along the back bottom side of the retaining wall key and outletted at the slope face below the wall. Field density testing was also performed during the backfill operations of the retaining walls. The field density test results indicated that the backfill soils were compacted to a minimum 90 percent relative compaction (based on ASTM Test Method D1557). The field density test results are presented in Appendix C. Verdura retaining walls were constructed at the following locations: 1) above and below the trail on the southwest and south sides of Lot 92 of PA-3; 2) in the middle of the large south- facing slope on the south sides of Lots 135 through 145, 156, and 157 of PA-3; 3) in the middle of the east-facing slope east of Lots 240 through 243 of PA-6; 4) on the northwest side of the trail adjacent to Lot 34 of PA-5; and 5) on the northwest side of the trail adjacent to Lot 36 of PA-5. 2.15 Animal Crossing on Gage Drive As part of the development of the Robertson Ranch project, an animal crossing was proposed along the bottom of the canyon that a portion of Gage Drive crossed between Planning Areas PA-6 and PA-10. As designed and built, the structure consists of a 18-foot diameter, 3-gauge (0.249-inches) thick galvanized Contech “Multi-Plate” Corrugated Metal Pipe Structure with a design life of at least 100 years. The structure has an approximately 6-foot fall from the northwest to southeast ends of the pipe (i.e. a fall of approximately 2.5 percent). The structure is approximately 225 feet in length with cast-in-place concrete headwalls at both ends and has up to 30 to 35 feet of compacted fill placed over the top of the structure. The upstream and downstream headwalls are approximately 36 and 27 feet in height, respectively. Grading and construction of the structure was started on June 29, 2015 and essentially completed by November 2015. Prior to the construction of the structure, all of the alluvium was removed beneath the proposed structure and replaced with sandy fill soils compacted to either 93 percent relative compaction for the fill soils greater than 40 feet in depth or 90 percent relative compaction for fill soils less than 40 feet from the design finish grade elevation. Project No. 133023-03 Page 12 June 28, 2016 A 2-foot thick layer of select material (i.e. ‘rock dust’ consisting of sand-sized rock chips) was placed below the bottom of the pipe as a bedding layer. The bottom of this select material layer was angled approximately 2-percent from west to east. Along the east side of the animal crossing alignment, a subdrain consisting of a 4-inch diameter perforated pipe with 4-cubic feet of crushed rock (per linear foot) and surrounded by a Mirafi 140N filter fabric was placed and outletted into the rock riprap on the downhill (or southeast side) of the animal crossing. The subdrain has a fall of approximately 2.5 percent. After the multi-plate corrugated metal pipe was bolted together, the concrete headwalls on both side of the structure were constructed and allowed to cure. After the curing period, a 2-foot thick layer of the ‘rock dust’ was placed and compacted around the pipe. At the same time, an additional 4-foot wide/thick layer of the select on-site sandy soils was placed outside of the ‘rock dust’ layer until the pipe was completely covered with a 6-foot thick layer of select material. Finally, on-site sandy soil was placed over the pipe until the design street subgrade or slope face was achieved. Based on the animal crossing design (LGC, 2015e), the bottom inside 4 feet of the corrugated pipe was coated with a 50-mil thick bituminous material. A perforated 4-inch diameter subdrain pipe inside a filter fabric sock was placed along the bottom of the pipe. The upper end of the subdrain was capped, while the lower end was outletted beyond the downhill side of the animal crossing structure. Two 2-foot tall cutoff walls were placed inside the corrugated pipe to minimize erosion of the select material inside the pipe. Three (3) feet of stabilized material was then placed inside the pipe for the animals to walk across. Project No. 133023-03 Page 13 June 28, 2016 3.0 ENGINEERING GEOLOGIC SUMMARY 3.1 As-Graded Geologic Conditions The geologic or geotechnical conditions encountered during the mass grading of the site were essentially as anticipated; however, the alluvium in the lower portions of the main tributary canyons along the north side of El Camino Real were significantly deeper than anticipated based on data from the project preliminary geotechnical investigations (Appendix A). In addition, the questionable landslide previously mapped in the northeastern portion of the site was not encountered during the mass grading operations; but was observed to consist of formational material dipping the opposite direction than the typical bedding on the remainder of the site. Finally, a shallow perched groundwater condition was present in the area of Planning Area PA-2 that precluded complete removal of the saturated alluvial soils. Instead of the complete removal of the alluvium, a stabilization fabric underlain in places with a layer of rock was placed on top of the saturated alluvium prior to the placement of fill. A comprehensive summary of the geologic conditions (including geologic units, geologic structure, and faulting) is presented below. 3.2 Geologic Units The geologic units encountered during the mass grading operations consisted of documented and undocumented fill, topsoil, colluvium, alluvium, terrace deposits and the Santiago Formation. Due to the potentially compressible nature of the desiccated documented fill, undocumented fill, topsoil, colluvium, alluvium, and weathered formational material, these soils were removed to competent material during the mass grading operations. The as-graded geologic units encountered during the grading operations are discussed (youngest to oldest) below. The approximate limits of the mapped geologic units is presented on the As-Graded Geotechnical Map (Plates 1A through 1F). 1) Documented Fill Previous grading of a portion of Planning Areas PA-9, PA-11, PA-13, PA-23C, and the widening of the north side of El Camino Real west of Cannon Road has created a number of fill areas along the southern portion and northeast corner of the site. These fills generally consisted of clayey to silty sands and sandy clays derived from native soils and were found to be moderately to well compacted and damp to moist. Prior to the placement of fill in these areas, the dry and desiccated upper 1 to 3 feet of the documented fill was removed to competent material. 2) Undocumented Fill Undocumented fill soils were observed in a number of places on the site. The undocumented fills were generally associated with the grading of the onsite dirt roads, retention basins, and prior farming activities. These fill soils ranged from less than 1 to Project No. 133023-03 Page 14 June 28, 2016 approximately 10 feet in depth, and generally consist of dry to damp, loose or soft, sand and sandy clay. All existing undocumented fill located within the limits of grading were removed to competent formational material. 3) Topsoil A relatively thin veneer of topsoil was removed from the higher elevations of the site. The topsoil, as encountered, consisted predominantly of a dark brown, damp to moist, loose, sandy clay and minor clayey to silty sand. The topsoil was generally massive, porous, and contained scattered roots and organics. Topsoil removal thicknesses were on the order of 1 to 4 feet thick. During the grading operations, the topsoil was observed to have been removed within the limits of grading. 4) Alluvium and Colluvium Alluvium and colluvium was encountered during the mass grading operations in the canyons and on the lower portion of the hillsides on the site. The alluvium and colluvium typically consisted of light brown to dark brown, damp to moist, silty fine sands, sandy clays and clayey sands derived from the terrace deposits and the formational material and were found to be low to highly expansive, porous, and contained scattered organics. Removals of up to approximately 40 feet in depth (typical removals were on the order of less than 10 to 15 feet) were made within the alluvial soils present in the main tributary canyons in the southern portion of the site along the north side of El Camino Real within Planning Areas PA-2, PA-3, PA-6 through PA-8, PA-11, and PA-23A through PA-23C. Removals of the colluvium, on the order of 2 to 6 feet, were made on the middle and lower portions of the hillsides on the site. 5) Terrace Deposits Terrace or older alluvial flood-plain deposits were encountered in the south-central and southeastern portion of the site within Planning Areas PA-7, PA-8, PA-11, PA-13, and PA- 23C. As encountered, these soils consisted of silty fine to medium sand, clean sands, and sandy to silty clays with minor gravels. The nature of the contact between the terrace deposits and formational material, where observed, was a relatively sharp contact with a near horizontal orientation. Along the northern contact, east of PA-7, the terrace deposits appeared to be deposited against a river bank with a moderately steep contact up to 5 to 10 feet in height. 6) Santiago Formation The Tertiary-aged Santiago Formation, as encountered during the mass grading operations, consisted primarily of massively bedded sandstones to cross-bedded silty sandstones and generally consisted of pale gray, pale brown and pale orange brown (where iron-oxidized stained), damp to moist, dense to very dense, silty very fine to medium grained sandstone. Several of these sandstone beds are friable to well-cemented fossiliferous sandstone beds. Minor beds of claystones/siltstones were present in the lower elevations of the formation Project No. 133023-03 Page 15 June 28, 2016 and were generally olive-green to gray (unweathered) and orange brown (where oxidized), damp to moist, stiff to hard, moderately weathered, and occasionally fractured and moderately sheared. 3.3 Geologic Structure The general structure of the formational material appears to be slightly dipping less than 15 to 20 degrees to the west/southwest. Based on our geologic mapping during the mass grading operations, bedding within the Santiago Formation in the western portion of the site mostly trends northwest-southeast with dips typically between 6 and 16 degrees to the southwest. In the central portion of the site, the bedding becomes somewhat variable with most bedding striking northwest-southeast with dips typically 2 to 18 degrees to the southwest and northeast. However, some of the bedding in this area trends northeast-southwest with dips of 4 to 12 degrees to the southeast. In the northeastern portion of the site, geologic mapping during grading encountered an anticline with an axis generally in a north-south direction. Bedding on the west side of the anticline generally trended northwest-southeast dipping 5 to 15 degrees to the southwest while bedding on the east side of the anticline largely trended northeast-southwest dipping 5 to 15 degrees to the southeast. Locally, cross bedding was observed with dips steeper than 20 to 25 degrees. Geologic mapping of the terrace deposits indicated that the deposits were massive to indistinctly bedded. Where bedding was observed, it generally trended east-west to northeast-southwest dipping 2 to 14 degrees to the north-northwest. Jointing on-site was observed to be very variable, but predominantly trended subparallel to the existing slopes. Jointing dips were found to be generally moderately to steeply dipping. Jointing was mainly encountered in the upper portion of the bedrock becoming less pronounced with depth. Randomly oriented shears were encountered in the Santiago Formation claystone and siltstone units. Numerous wide, diffuse zones of shearing, as well as more well-defined zones, were encountered in the bedrock, and are thought to be the result of regional tectonic shearing of the relatively stiff and unyielding siltstone and claystone. 3.4 Faulting and Seismicity The southern California region has long been recognized as being seismically active. The seismic activity results from a number of active faults that cross the region, all of which are related to the San Andreas transform system, a broad zone of right lateral faults that extend from Baja California to Cape Mendocino. The numerous faults in Southern California include active, potentially active, and inactive faults. The definitions of fault activity terms used here are based on those developed for the Alquist-Priolo Special Studies Zone Act of 1972 (Bryant and Hart, 2007). Project No. 133023-03 Page 16 June 28, 2016 Active faults are those faults that have had surface displacement within Holocene time (approximately the last 11,000 years) and/or have been included within an Alquist-Priolo Special Studies Zone. Faults are considered potentially active if they show evidence of surface displacement since the beginning of Quaternary time (about two million years ago), but not since Holocene time. Inactive faults are those that have not had surface movement since the beginning of Quaternary time. The site is not within a currently established Alquist-Priolo Earthquake Fault Zone for fault rupture hazard (formerly Special Studies Zones for fault rupture hazard). Based on a review of geologic literature, no active faults are known to occur beneath or in the general vicinity of the project site. Accordingly, it appears that there is little probability of surface rupture due to faulting beneath the site. There are, however, several faults located in sufficiently close proximity that movement associated with them could cause significant ground motion at the site. Although active faulting is not present within the site, faults relative to the off-shore step-over of the Rose Canyon-Newport-Inglewood fault zone to the west and uplift of the Cretaceous sedimentary units to the south and southeast are known to exist in general vicinity of the site. Regional active faults that occur within the San Diego area includes the off-shore Rose Canyon-Newport Inglewood fault zone to the west, the Elsinore, San Jacinto, and San Andreas faults to the east, and the Coronado Bank and San Diego Trough faults offshore to the southwest. The local Rose Canyon fault zone trends north-northwest through San Diego Bay and downtown San Diego, crosses offshore at La Jolla Cove and continues northward off the coast of North San Diego County. The closest known active faults to the site are the Rose Canyon fault zone located 3.7 miles (6.0 kilometers) to the west; the Coronado Bank fault zone located 20 miles (32 kilometers) to the southwest, and the Elsinore fault zone located approximately 21 miles(34 kilometers) to the northeast (LGC, 2014a). 3.4.1 On-Site Faulting Geologic mapping during the mass grading operations encountered five essentially north-south trending faults/fault zones across the site. In general, the faults/fault zones were approximately 800 to 1000 feet apart. With the exception of the eastern-most fault zone, all of the other faults/fault zones were encountered in the Santiago Formation and appeared to die out toward the south. Based on our geologic analysis during the mass grading operations and review of the applicable geotechnical reports referenced in Appendix A, it is our professional opinion that the faults encountered on the site are not active; and therefore are not a constraint to development. Each of the encountered faults/fault zones is discussed below. Fault Zone in Western PA-3: Three minor inactive faults were geologically mapped in the back-cut of the stability fill on the south side of Lots 135 through 145 of PA-3. The faults generally trended in a northwest-southeast to north-south direction. This fault zone consists of two main fault strands with the western fault downside to the west while the eastern fault is downside to the east. The western fault generally trends Project No. 133023-03 Page 17 June 28, 2016 N15°W to N15°E dipping 80 to 88 degrees to the northeast while the eastern strand trends N5°W to N30°W dipping 50 to 60 degrees to the northeast. The third mapped fault is steeply dipping and appears to die out to the north and south. A couple of marker beds are offset and minor drag folding on the beds indicates the relative movement is right-lateral. Fault Zone in Western PA-5 and PA-6: The next fault zone to the east consists of one main fault and three shorter faults geologically mapped in the stability fill back-cut in the vicinity of Lots 52 through 57 of PA-5 and Lots 170 through 177 of PA-6. All of the faults encountered generally trended N20°W to N35°W dipping 70 to 80 degrees to the southwest and appeared to die out to the south. The main fault had an offset of approximately 3 feet while the other faults had minor offsets of 6-inches or less. Fault Zone in Eastern PA-5 and PA-6: The central fault zone was encountered along the west side of Lots 212 through 218 of PA-6, the lots to the north in PA-6 and northward through Lots 45 and 46 of PA-5. This fault zone consisted of three minor faults with two of them being in-echelon. The in-echelon faults generally trended N5°W to N15°W; however, the northern strand dipped 50 to 60 degrees to the northeast while the southern fault dipped 75 to 85 degrees to the southwest. The sense of movement of these faults was down to the west. Fault Zone in PA-9 and PA-10: This fault zone was encountered running in a north south direction through the middle of PA-9 and PA-10. Two subparallel faults were geologically mapped in the southern and middle portions of the zone while at the north end the two faults appeared to die out and become a series of possible step-over faults. The two main faults generally trended N3°E to N16°E dipping 60 to 85 degrees to the west. The sense of movement of the western fault was down to the east while the eastern fault was down to the west. The possible step-over faults trended N5°W to N35°W dipping 55 to 70 degrees to the southwest and all were down to the west. A short discontinuous fault was also mapped to the east with the same general trend and dip but was down to the east. Fault Zone in PA-13: The eastern fault zone was encountered during the grading of PA- 12 and PA-13 in the southeast portion of Robertson Ranch by GeoSoils in 2008 (GeoSoils, 2008). The fault was exposed within the western portion of the sheet-graded pad and found to only offset Pleistocene-aged terrace deposits. The fault was observed to be sinuous, generally trended N30°E to N50°E, and was moderately dipping (45 to 55 degrees) mainly to the west. The fault was found to die out in the cut slope along the northeast side of PA-13 and could not be traced through the southern portion of the sheet-graded pad of PA-12. Based on geologic mapping and research by GeoSoils, it was concluded by them that the fault was pre-Holocene in age and therefore not an active fault (GeoSoils, 2008). The approximate 30-foot wide fault zone with multiple fault splays across the zone, previously mapped at the southeast corner of PA-6 during the preliminary geotechnical investigation (LGC, 2014a), was very difficult to map both towards the north and south Project No. 133023-03 Page 18 June 28, 2016 during the mass grading operations. Based on the trend of the zone and location relative to the fault zones mapped to the northwest and northeast, this fault zone is likely a step over feature from one zone to the other. 3.5 Ground Water Groundwater was encountered in the alluvium during some of the previous geotechnical investigations at an approximate elevation of 45 feet msl. However, during the mass grading operations only perched ground water was encountered in the alluvial soils within the main drainage on the west side of the site and Planning Area PA-2 and in the drainage southeast of Planning Area PA-6. With the exception of Planning Area PA-2 and the west end of Robertson Road at Tamarack Avenue, all of the alluvial soils were completely removed to competent formational material during the mass grading operations and subdrains installed in the canyon bottoms. Consequently, groundwater conditions should not be a constraint to development. However, since saturated alluvium and a shallow ground water condition is present within Planning Area PA-2, the current groundwater condition should be evaluated as part of future site design and construction of PA-2. It should also be noted that no groundwater or seepage conditions were observed during the mass grading operations within the single-family residential planning areas. However, unanticipated seepage conditions may occur after the completion of grading and establishment of site irrigation and landscaping. If these conditions should occur, steps to mitigate the seepage should be made on a case-by-case basis. Based on the site-specific as-graded geotechnical conditions and our geotechnical analysis during site grading, LGC analyzed potential ground water conditions that may have resulted in ground water seepage and appropriate recommendations, if necessary, have been made. Project No. 133023-03 Page 19 June 28, 2016 4.0 CONCLUSIONS 4.1 General The mass-grading of Robertson Ranch Planning Areas PA-1 through PA-3, PA-5, PA-6, PA- 9, PA-10, PA-13, and PA-23A through PA-23C located within the City of Carlsbad, California was performed in general accordance with the project geotechnical report (LGC, 2014a), geotechnical recommendations made during the course of grading, and the City of Carlsbad grading requirements. It is our professional opinion that the subject site is suitable for the intended use provided the recommendations of the applicable referenced geotechnical reports (LGC, 2014 through 2016j) or those provided at the completion of the future fine grading are incorporated into the design and construction; and that proper landscaping, irrigation, and maintenance programs are implemented. The following is a summary of our conclusions concerning the mass-grading of Planning Areas PA-1 through PA-3, PA-5, PA- 6, PA-9, PA-10, PA-13, and PA-23A through PA-23C. 4.2 Summary of Conclusions  Mass-grading of Robertson Ranch Planning Areas PA-1 through PA-3, PA-5, PA-6, PA-9, PA-10, PA-13, and PA-23A through PA-23C is essentially complete.  Geotechnical conditions encountered during the mass-grading operation were generally as anticipated; with the exception of saturated alluvium in the western portion of the site (see Section 2.2 of this report) and deeper than anticipated alluvial removals in the south-central portion (see Section 3.2[4]).  The geologic units encountered during the mass-grading of the site consisted of undocumented fill soils, topsoil, colluvium, alluvium, terrace deposits, and the Santiago Formation.  Unsuitable undocumented fill soils, desiccated older fill soils, topsoil, colluvium, alluvium, and weathered terrace deposits and formational material were removed to competent formational material within the limits of grading.  Landslides or surficial slope failures were not encountered during the grading operations. No evidence of active faulting was encountered during the site mass-grading operations. However, a number of minor faults and fault zones were encountered across the site. Based on our geologic analysis, it is our professional opinion that the faults encountered on the site are not active; and therefore, are not a constraint to development.  Minor perched ground water seepage conditions were encountered during the remedial grading operations within the north-south trending canyon beneath Gage Drive between PA-6 and PA-10; but is not considered a constraint to development.  Placement of a 1- to 2-foot thick rock layer and/or a Mirafi 600x stabilization fabric was installed in areas of PA-2 and the northwest portion of Robertson Road having a shallow ground water condition and saturated alluvium. Project No. 133023-03 Page 20 June 28, 2016  Since saturated alluvium and a shallow ground water condition are present within Planning Area PA-2, the current groundwater condition should be evaluated as part of the future site design and construction of PA-2.  Stability fills were constructed to improve the gross stability of the cut slopes exposing fractured and blocky formational material and/or adverse geologic conditions on the site. The stability fill keys were excavated in accordance with the project geotechnical recommendations.  Subdrains were placed in the canyon bottoms and along the heel of the stability fill keys. The subdrains were outletted into suitable storm drain facilities or near the toe-of-slope of the stability fill slopes.  The cut portion of the cut/fill transition conditions present within the limits of Lots 29 through 32, 48, and 54 of PA-5; Lots 63, 68, 69, 71, 72, 77, 82, 88, 100, 112, 124, 133, and 135 through 145 of PA-3; Lots 164, 165, 169 through 171, 189, 198 through 207, and 226 through 244 of PA-6; Lots 252, 253, 266 through 269, 275, 277 through 279, 287, 294, and 295 of PA-9; and Lots 300, 301, 305 through 307, 309 through 312, 317, 318, and 323 of PA-10 were overexcavated a minimum of 5 feet beneath the finish grade surface and to a distance of at least 10 feet outside the planned building limits.  Overexcavation of Lots 64 through 67, 70, 73 through 76, 83 through 87, 92 through 99, 105 through 111, 115 through 123, and 127 through 132 of PA-3; Lots 180 through 182 of PA-6; Lots 254 through 264, 270 through 274, 280 through 286, 292, 293 of PA-9; and Lots 319 through 322 of PA-10 was performed in order to mitigate potential adverse conditions due to expansive soils. The entire portion of the cut lots were overexcavated a minimum of 5 feet below finish pad grade and replaced with compacted fill having a lower expansion potential.  Overexcavation of some of the cut lots was performed in order to mitigate the potential adverse condition of well-cemented sandstone beds (or concretion layers) and very dense or hard Santiago Formation at or near finish grade which could create difficulties during future excavations on the lots. Lots overexcavated due to well-cemented sandstone or dense Santiago Formation included Lots 39 through 47 and 60 of PA-5; and Lots 158 through 163, 183, 184, 212, and 213 of PA-6.  Toxaphene impacted soil present on the site was completely removed and buried within the street right-of-ways of the site at depths greater than 12 feet below the finish surface of the street or 2 feet below the deepest utility if the utility line was greater than 10 feet in depth. The burial areas included a portion of West Ranch Street, Robertson Road, Wellspring Street, and Nelson Court. Subsequent to the grading of the site in the areas of the previously impacted soil and burial areas, 15 random post-grading soil samples were obtained and tested for toxaphene. The test results indicated the samples did not detect any toxaphene  During the mass-grading operations, remedial grading was performed so that the fill differential beneath the proposed building pads was less than a 3:1 (maximum fill thickness to the minimum fill thickness).  Fill soils were derived from on-site soils. Where tested, the fill soils within the site were compacted at least a 90 or 93 percent relative compaction (based on ASTM Test Method D1557) and near-optimum moisture content in accordance with the recommendations of Project No. 133023-03 Page 21 June 28, 2016 the project geotechnical report (LGC, 2014a) and the requirements of the City of Carlsbad. Fill soils less than 40 feet below the design finish grades were compacted to a minimum 90 percent relative compaction while fill soils greater than 40 feet below the design finish grades were compacted to a minimum 93 percent relative compaction. A summary of the results of the field density tests is presented in Appendix C.  To mitigate post-construction settlement, deep fills (i.e. areas were the fill soils are generally deeper than approximately 40 feet below the finish grade elevations of the sheet-graded pads) were placed at a minimum relative compaction of 93 percent relative compaction. Deep fill areas are present on Lots 192 through 194 and Gage Drive between PA-6 and PA-10.  Due to the dense nature of the on-site soils, it is our professional opinion that the liquefaction hazard at the site is considered low.  Representative testing of the finish grade soils on the building pads of the subject lots indicated that: 1) Lots 25 through 59 of PA-5; Lots 61 through 67 of PA-3; and lots 172 through 188, 206 through 213, and 226 through 251 of PA-6 have a very low expansion potential; 2) Lots 71 through 91 of PA-3; Lots 96 through 104, 106 through 110, 127 through 130, and 135 through 145 of PA-3; and Lots 158 through 171, 189 through 199, and 214 through 225 of PA-6 have a low expansion potential; 3) Lots 13 through 23 of PA-13; Lot 60 of PA-5; Lots 68, 69, 70, 92 through 95, 105, 111 through 126, 131 through 134, and 146 through 149 of PA-3; Lots 200 through 205 of PA-6; Lots 252 through 299 of PA-9; and Lots 300 through 326 of PA-10 have a medium expansion potential; and 4) Lots 1 through 12 and 24 of PA-13 have a high expansion potential. The test results are presented in Appendix B.  The potential for soluble sulfate attack on concrete in contact with the finish grade soils of the subject lots is considered negligible to severe based on ACI Criteria (ACI 318R-08 Table 4.3.1). The soluble sulfate content test results are included in Appendix B.  Laboratory testing of representative soil samples indicated that the near surface soils are corrosive to severely corrosive to buried metals. The laboratory test results are presented in Appendix B.  It is our professional opinion that the slopes of the development are considered to be grossly and surficially stable, as constructed, under normal irrigation/precipitation patterns, provided the recommendations in the project geotechnical reports are incorporated into the post-grading, construction, and post-construction phases of site development.  Based on the settlement monument readings to date of the two monuments in Planning Area PA-6 and in Gage Drive between Planning Areas PA-6 and PA-10 (i.e. Settlement Monuments #6 and #7), settlement of the fills has been minimal. As a result, it is our professional opinion that the primary and secondary consolidation of deep fills is within acceptable limits.  The installation of the animal crossing was performed in general accordance with the project geotechnical recommendations (LGC, 2015e) and pipe manufacture’s specifications (Sheets 45 through 51 of the Robertson Ranch Grading Plans (O’Day, 2015). Project No. 133023-03 Page 22 June 28, 2016 5.0 RECOMMENDATIONS 5.1 Earthwork We anticipate that future earthwork at the site will consist of site preparation, fine-grading, utility trench excavation and backfill, retaining wall backfill, and street/driveway and parking area pavement section preparation and compaction. We recommend that the earthwork on site be performed in accordance with the geotechnical recommendations presented in the project preliminary geotechnical report (LGC, 2014a), recommendations provided after the completion of the fine-grading operations, and the City of Carlsbad grading requirements. 5.2 Site Preparation During future grading, the areas to receive structural fill or engineered structures should be cleared of surface obstructions, potentially compressible material (such as desiccated fill soils or weathered formational material), and stripped of vegetation. Vegetation and debris should be removed and properly disposed of off-site. Holes resulting from removal of buried obstructions that extend below finish site grades should be replaced with suitable compacted fill material. Areas to receive fill and/or other surface improvements should be scarified to a minimum depth of 12 inches, brought to optimum moisture condition, and recompacted to at least 90 percent relative compaction (based on ASTM Test Method D1557). If the length of time between the completion of grading and the construction of the development is longer than six months, we recommend that the building pads be evaluated by the geotechnical consultant and, if needed, the finish grade soils on the building pads should be scarified a minimum of 12 inches, moisture-conditioned to optimum moisture- content and recompacted to a minimum 90 percent relative compaction (based on ASTM Test Method D1557). 5.3 PA-2 Future Work A site-specific geotechnical evaluation should be performed once site development plans are available. Since saturated alluvium and a shallow ground water condition are present within Planning Area PA-2, the current groundwater condition should be evaluated as part of the future site design and construction. 5.4 Excavations Excavations of the on-site materials may generally be accomplished with conventional heavy-duty earthwork equipment. It is not anticipated that blasting will be required or that significant quantities of oversized rock (i.e. rock with maximum dimensions greater than 8 inches) will be generated during future grading. However, localized cemented zones within the cut areas may Project No. 133023-03 Page 23 June 28, 2016 be encountered on the site that may require heavy ripping and/or removal. If oversized rock is encountered, it should be placed in accordance with the project geotechnical recommendations (LGC, 2014a), hauled offsite, or placed in non-structural or landscape areas. Temporary excavations maybe cut vertically up to five feet. Excavations over five feet should be slot-cut, shored, or cut to a 1:1 (horizontal to vertical) slope gradient. Surface water should be diverted away from the exposed cut, and not be allowed to pond on top of the excavations. Temporary cuts should not be left open for extended periods. Planned temporary conditions should be reviewed by the geotechnical consultant in order to reduce the potential for sidewall failure. The geotechnical consultant may provide recommendations for controlling the length of sidewall exposed. 5.5 Fill Placement and Compaction The on-site soils are generally suitable for use as compacted fill provided they are free of organic material, debris, and rock fragments larger than 8 inches in maximum dimension. We do not recommend that high or very high expansive soils be utilized as fill for the building pads or as retaining wall backfill. Fill soils should be brought to 2-percent over the optimum moisture content and compacted in uniform lifts to at least 90 percent relative compaction based on the laboratory maximum dry density (ASTM Test Method D1557). The optimum lift thickness required to produce a uniformly compacted fill will depend on the type and size of compaction equipment used. In general, fill should be placed in lifts not exceeding 8 inches in compacted thickness. Placement and compaction of fill should be performed in general accordance with current City of Carlsbad grading ordinances, sound construction practices, and the project geotechnical recommendations. If import soils are to be used as fill, the soils should be: 1) essentially free from organic matter and other deleterious substances; 2) contain no materials over 6 inches in maximum dimension; 3) have a very low to low expansion potential (i.e. an Expansion Index ranging from 0 to 50); and 4) have a negligible sulfate content. Representative samples of the desired import source should be given to the Geotechnical Consultant at least 48 hours (2 working days) before importing grading begins so that its suitability can be determined and appropriate tests performed. 5.6 Foundation Recommendations The preliminary foundation design recommendations applicable to the construction of the residential structures on Planning Areas PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13 of Robertson Ranch were previously provided under separate cover (LGC, 2015a through 2016d). The previous recommendations remain appropriate for the design of the proposed structures on the applicable subject lots. Project No. 133023-03 Page 24 June 28, 2016 5.7 Subdrain Outlet Maintenance The approximate location of the subdrains and subdrain outlets constructed during the mass-grading operations are identified on the As-Graded Geotechnical Map (Plates 1A through 1F). All subdrain outlets should be periodically cleared of soil cover or other potential blockage that may have occurred since initial subdrain construction. If retaining walls are proposed along the toe-of-slope in the location of the stability fills/subdrain outlet locations, the existing subdrains should be tied into the retaining wall back-drain system and/or placed into an appropriate storm drain facility. 5.8 Control of Surface Water and Drainage Surface drainage should be carefully taken into consideration during fine-grading, landscaping, and building construction. Positive drainage of surface water away from structures is very important. No water should be allowed to pond adjacent to buildings or the top of slopes. Positive drainage may be accomplished by providing drainage away from buildings at a gradient of at least 2 percent for a distance of at least 5 feet, and further maintained by a swale of drainage path at a gradient of at least 1 percent. Where limited by 5-foot side yards, drainage should be directed away from foundations for a minimum of 3 feet and into a collective swale or pipe system. Where necessary, drainage paths may be shortened by use of area drains and collector pipes. Eave gutters also help reduce water infiltration into the subgrade soils if the downspouts are properly connected to appropriate outlets. The impact of heavy irrigation or inadequate runoff gradient can create perched water conditions, resulting in seepage or shallow groundwater conditions where previously none existed. Maintaining adequate surface drainage and controlled irrigation will significantly reduce the potential for nuisance-type moisture problems. To reduce differential earth movements (such as heaving and shrinkage due to the change in moisture content of foundation soils, which may cause distress to a structure or improvement), the moisture content of the soils surrounding the structure should be kept as relatively constant as possible. All area drain inlets should be maintained and kept clear of debris in order to function properly. Rerouting of site drainage patterns and/or installation of area drains should be performed, if necessary. A qualified civil engineer or a landscape architect should be consulted prior to rerouting of drainage. Project No. 133023-03 Page 25 June 28, 2016 6.0 LIMITATIONS Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. The samples taken and submitted for laboratory testing, the observations made, and the in-situ field testing performed are believed representative of the entire project; however, soil and geologic conditions revealed by excavation may be different from our preliminary findings. If this occurs, the changed conditions must be evaluated by the project soils engineer and geologist and design(s) adjusted as required or alternate design(s) recommended. This report is issued with the understanding that it is the responsibility of the owner, or of his/her representative, to ensure that the information and recommendations contained herein are brought to the attention of the architect and/or project engineer and incorporated into the plans, and the necessary steps are taken to see that the contractor and/or subcontractor properly implements the recommendations in the field. The contractor and/or subcontractor should notify the owner if they consider any of the recommendations presented herein to be unsafe. The findings of this report are valid as of the present date. However, changes in the conditions of a property can and do occur with the passage of time, whether they be due to natural processes or the works of man on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. PA-1 PA-23A PA-2 PA-1 PA-3 88° 83° D U D U 52° 58° U D U D 6° 7° 6° 8° 8° 8° 10° 8° 14°????????????59. 5 ' 4 7 . 5 ' 4 6 . 5 ' 45 . 5 ' 46 . 5 ' 47.0' 43.0' 40.5' 34.5' 22.0' Af Af Af Af Af Tsa Tsa Tsa Tsa Tsa Af Tsa Af Tsa Tsa Af Tsa Tsa Tsa Tsa Qal Qal Qal Tsa Qal Qal Qal Af Qt Qt Qt Qt Qt Qal Af Qal Qal Afo / Qal Afo / Qt Af Qal Qt Qal Tsa Af TsaCL TsaCL Af Qal 152 153 162 154 45 45 45 41 41 42 40 152 151.5 153 152 153 153 141 142 141 140 140.5 140 140 141 138 141 140 138 134 132 129 111 121 133 134 135 134 135 123 93 81 154 153 149 128 125 128 139 137 148 67 73 96 93 85 61 58 54 58 78 65 78 79 70 57 59 62 58 60 62 58 61 56 53.5 51.5 60.5 68.5 67.5 51.5 71 62 57 55 54 52 49.5 47.5 46.5 46.5 48 50 45 44 46 48 50 137 130 119 135 123 127 138 139 58 59 58 57 62 141.5 142 8 1 ' 7 9 ' 8 1 ' 8 4 ' 1 0 4 ' 1 0 2 ' 9 5 ' 120' 152'151' 151' 151.5' 144' 142'142.5'Outlet Tied Into 48" Storm Drain at Sta. #481+17 on June 20, 2016 45 ' As-Graded Geotechnical Map Robertson Ranch Carlsbad, California Vista, CA 92081 TEL. (760) 559-7000 FAX (760) 599-7007 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. Plate 1A SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. BIH / RKW 1" = 40' June 28, 2016 56° SM-7 Qt Af Qal Artifical Fill; placed during current grading operations Quaternary-Aged Alluvium, circled where buried Tsa Tertiary-Aged Santiago Formation, undivided, circled where buried Quaternary-Aged Terrace Deposits, circled where buried Approximate Fault Location, arrow indicates dip direction,queried where uncertain Bedding Attitude Approximate Subdrain Location; dashed arrows where perforated,solid arrows where solid; with elevations indicated Afo Artifical Fill, Older; placed during the PA-11 and PA-13 grading in 2008,along El Camino Real, and in Edinburgh Dr. in the 1980's Geologic Contact, dashed where approximate, dotted where buried Stability Fill Key or Fill Slope Key Location Tsass TsaCL Tertiary-Aged Santiago Formation, sandstone, circled where buried Tertiary-Aged Santiago Formation, claystone, circled where buried Geologic Units Geologic Symbols Approximate Anticline Axis, arrows indicate dip direction 39' Approximate Limits of Fill Approximate Location of Clayseam, dotted where buried Approximate Location of Marker Bed, dotted where buried 89 14° 56°Fault Attitude Clayseam Attitude9° Approximate Limits of Toxaphene Disposal Area Approximate Location of Stabilization Fabric underlain by Rock Blanket Approximate Location of Stabilization Fabric Legend 8004040 See Plate 1FApproximate Removal Bottom Elevation Approximate Location of Settlement Monument Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 20150 • - -11- ,1>• •► • ..... □ @ ')._ >,;' ll'8RSl I I I I I 11 KX><Xl / I I I I \ I ,--------__.-\\I ------------------------------------------------ 1 I I I I I J I I { I I I I I I I I I I I I • • • • I I I □: • • • • • ... , ......... ~ ..... ~Jt4tcl+¼~H=t=+±jj ~ ~ "~ ":-...,..~ 1• LOT 343 ~ affltffl)!/TY FACIL~l-~~ijt----j+-t~++-=li=11n • • ~~~~ .... C) ~ ~ ~ ... , ~ ~, □ '~ ~ 'Z_'-,.. ~ ~'. ,~~~~ ~'-,._~--0-;(A~~~l++nn ~ " ;"' I N ---- / I ' :,• ' . : . . , .. ( ' .· .. ,mJlL~'.'.t \ // / <I / utttrJu ~ 1Hl1---j~_t-J;'• HJ.i!--!'l'~ \~~ t~~ I go 4 I II . • I • • • I 100 .:;i • R • % \ \~ § / - LOT 344 ~ l N 1,7 1 so FT SPAC: ~ ,□ \\ \\ I I I I I I I I I \ I \ \ \ I \ I \ I \ \ ' ' ' ...... ...... // I I I iii I I iii { I I I \ \ ;', \ ' \ \ ,,/ ,I". >- \ I ~ I I / r / 1 // ~134 \ ~40 I ) /'' ,, I D I ~ D 141. . ,•,: . D ,, D LOT 82 5,149 SQ FT 1597 . •, .,;",,-:-·:=- LOT 71 5,755 SQ FT 1684 Lol5aJ □6,535 50 FT LC 6,8 I LOT 92 4,278 SQ FT 1594 LOT 93 4,160 SQ FT D LOT 136 4,107 SQ FT ,'-""" 1407 D 1590 LOT. 4 4 SQ FT LOT 95 4,160 SQ LOT /05 5,490 SO FT 146. 4 1584 LOT 106 5,772 SQ FT 1413 D I 15f8 D LOT 107 6,273 SQ FT 1411 D y;;:;__-11' D D LOT 115 4,386 SO FT 146.8 D LOT I 16 \ 4,572 SQ FT \ 1415 LOT 117 4,000 SQ FT 1477 LO 4, IL D OT 137 00 SQ FT 1403 D I LOT 154 ~ R. 14,154 so ic-c. D D FT 141.2 LOT 138 4,100 SQ FT /39.8 LOT 12- 5,121 SQ LOT 11 4,5!! SQ FT 1392 139.6 L 4,5 PA-8PA-7PA-8PA-8PA-4PA-11PA-11PA-7PA-3PA-683°DU88°22°5°2°18°12°14°5°6°11°22°4°8°4°9°5°9°7°12°2°2°8-12°13°DU84°83°DU4°16°8°14°22°16°???????71'52'63'79'106'106.5'107.5'108.5'78'70'65.7'77'134.5'135.5'136'136.5'137'136.5'135.5 '134.5' 161'154.5'154'82.5'85.0'92.2'65.8'67.4'70'75'92.5 '59.9'53.852.9'54.9'71.5'94.5'117'141.5'132'99'98.0'97'100'58'QtQtQtQtQtTsassTsassTsassTsassTsassTsassTsassAfAfAfAfAfAfAfAfQtQtQtQtQtAfAfo / QtAfo /QalAfo / QtAfo / QalTsassTsassTsassTsassTsassTsassTsassTsassTsassTsassTsassTsaTsaTsaTsaTsaAfAfAfAfAfAfAfAfAfAfAfAfAfAfAfAfAfAfQtQalQalTsaCLTsaCLAfAfTsassAfAfTsaTsaTsassTsaAfAfQtQtTsassTsass??80'120'105'94949494929296917893906563808991.594.590.582.567.556.56670827980889195947884868874777180636160466167356564326064555162654937617168816666626875746565654562604988896787838642.837.573.5584895.594959296928794879093999995929493939089878255886857897075646376735959599267869497.594.510298.510388104987986838591.5707185909594986788959687805476677689104109108104104102103108109118123127113128128127116140130145136146.511893.5120123116113.51201168810598123102.5122135858796968685113.5105.512212283851161209677.513015815679155.5157.5158.5160.5160.5121120104105111117130110124118124114111125.5124129130130162156138909876747779.5155.513313914114414612612512212112612391.515717812913013713813013112711215916017112614411512312112912011610511411410911411711211099919491104851029382107120125.51241561551601291121021291221181131059412913010110199100137138147159157157155154153.5154154155152150148156132.513213313213013813272'81.5'80'86'77'110'102'95'92'SM-4SM-3SM-2SM-1SM-5AfAfAfo/QtOutlets Tied Into 48" StormDrain Pipe at Sta. #468+95on April 13, 2016New Subdrain TiedInto Existing SubdrainOutlet Tied Into 18" StormDrain Inlet Structure onNovember 4, 2015Outlets Tied Into 48" StormDrain Pipe at Sta. #471+75on April 15, 201665'54'Tsa129135'PA-6 1" = 40' BIH / RKW PROJECT NO.133023-03Robetson Ranch PROJECT NAME DATE ENG. / GEOL. SCALEPlate 1BLGC Valley, Inc.2420 Grand Avenue, Suite F-2TEL. (760) 559-7000 FAX (760) 599-7007Vista, CA 92081As-Graded Geotechnical MapRobertson RanchCarlsbad, CaliforniaReference Plate 1A For Legend8004040See Plate 1E See Plate 1F See Plate 1CJune 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015 TREATMENT AREA 165.27 EL ~ LOT 67 6. I 114 SJ! FT D .,. ' ' ~·· .' ,;: ~ .~ I l '\ff I 160 I I "' ! I I I ~ D I 72 D LOT 77 ~ ~ LOT 88 5,485 SO FT 152.4 D LiHJ68 !0,688 SQ FT 7 D I I D LOT 5,526 SQ FT 160.3 LOT 60 8,843 SO FT 178.6 D' I LOT 182 6,968 SO FT 1572 LO; 70~ 8,001 SQ FT 158.6 D ---LOT 78 '\ 4,005 so FT \ LOT 79 162.0 tOBO 50 FT LOT 89 4,928 SQ FT 151.6 'V_603 ,□ \ \ LOT 90 4,723 SO FT 149.J ~ I LOT 80 4,080 SQ FT 158.6 LOT 81 4,400 SO FT 156.9 I 50·-+-c::□== tor 91 4,f93 SQ FT 11475 LO 151 ~ .. ,v,'-<1--rll 4,828 so ' ~ FT % TREA TMEN. > AREA t:::J· JW•-Jft,-.._ , .. •, LOT 181 6,961 SQ FT 160.6 D D LOT 205 5, !08 SQ FT a LOT 246 ~ HOA 10,026 so FT 148.Jl EL LOT 206 _ 150 ,:: 5,320 SO FT I LOT 203 5,000 SO FT 1637 LOT 204 5,000 SO FT 162.9 / / / D / )I-LOT 201 5,200 SO FT 165.6 LOT 202 5,200 SQ FT ® \---'-,f r-~'3r----15.~J-.4 ___ -i I D --====-v LOT 207 □ 5,309 SQ FT 151.4 I I I r I I LOT 208 1 5,314 SO FT ./, D D 148.8 t' C) -=f-f-+-fL---=c-::__ __ C) D D D D D D D • --• • • µ_"l • • • • \ \ '\ ~ D I 1-<'1, • • :1--,1 • • • • D D D • • • •"'--------~·'--:7"1___ __ _:::~ .. · .. : • • • • • • • • • • • • • C) 1'l D :• • • • • • • • • • • • • • • • • • • • l D D LOT 100 4,333 SO FT ~ LOT IOI 4,032 SO FT ' ' LOT 209 5,314 SO FT 146.J D I '□ ----i~ C) • • • • • • • • • • • • • I • • • LOf4..l02 1,135 s"/)q LOT 103 \ 152.4 151.5 149.3 , 1,11s so FT \ LOT 104 □ 1475 \ 4,393 SQ FT f========~!5.5io9~=:s;;z:.:::::::j ',z ~ 146.5 fc131--1--C= '=-=--=-=--~---f~_____,,~' '''1-1 ----c\h---,-__l_J ;::_=-=:::::-ri==sk=l14J_-+--I LOT I 11 5,499 SO FT 144.0 D D LOT I 12 5,061 SQ FT 14.JO " I " LOT I 13 4,958 SO FT 140.9 D LOT I 14 4,949 SQ FT 139.0 D I LOT 122 5,049 SQ FT 144.0 LOT 123 4,675 SO FT LOT 124 4,771 SQ FT LOT 125 4,777 SQ FT 1430 1409 D 140 139.0 C) LOT 726 5,077 SO FT 138.0 c::::J 1 I --= D LOT 210 5,309 SQ FT 1437 LOT 21 I 5,309 SO FT 141.2 V~-LOT 247 ~ HOAJ 129.70 EL < r----D LOT 749 4,692 SO FT 1358 V LOT 148 4,160 SO FT LOT 131 , 128 SO FT 135.8 D LOT 132 4,734 SO FT 135.2 LOT 133 4,638 SO FT 134.6 LOT 134 4,632 SO FT 134./ ' T 745 SQ FT ... 'ii .-·b • • 1355 ~OT 15& ~ REC. • I0,$3 50 ... ~ D . !=====~~---~ . • • • L 155 ~ H, 5, IOI SQ FT /28.59 EL I I \ I 134.7 LOT 147 4,329 SO FT 1332 \ D \ \ '\ LOT 146 17,082 SO FT \ 132.4 LOT 157 ~ HOA 12, !66 SQ FT 129. 00 EL D D D D D D D LOT 341 ~ REC.□ 52,117 S(} FT D • • • • • • • • • • D • • • • •• • •• •• D I t I I I r I I ¥ • • • • • •□ • • • • • • • • • • • • • • •• • • • -~-... . ~ ... • • "I I • • • 1,1 □ : I • • •• : .J, ••• • • • • • • . ' .. : I □ •• ." I .... DIC) .... -------f \\6 D •• •• •• " . "' . "' . -. • • : 11 Lff 340 ~ MUL TIFAM!L Y : 283,391 SQ FT • • • • • • • • D I I I f I I D ••• •• • D •••• • • • • • • • • • D • ----• • • • • • • • • • • • • • • • • • • • • • □· • •• • • D • • • • • C) • • • • • • •• •• • • • • • • • • □• • • • • • D D • D • • • • • • • ,,,-_ • • • • D • ,-----L-• • • • • • • • • • • • • • • --c--,l•••□ I • I : ... ,· .. □ • • ••• •• • • ' I • l • I • • l : ~ [:JI • I • I ... 'I • • • • D • • • 104.83 TC □: D • • • • • 104.00 FC • • • ·□ • • • • • •□ D • • • • □• • • • • □. • D • • • • • • • • • • • • • • • • • • • • • • I I .1 ~--J/--1/0•=t::;, >---+-• • • • • • • •• • • / \\S D D D • • • • • • • • • • • • • D--11-11 • • • • • • •• • • • •• ••• -•• • • •• • •• • D D 7 --11-11-11-.,.__✓, ,., \ 11-11 ,_ ---~ ----~ 120 -------.. I ) ____,, LOT 224 5,350 SO FT 1278 125.5 LOT 225 5,200 SQ FT 118.55 EL LOT 250 ~ HOA 5,176 SO FT < A A---/ . 11-11-_ -1. -~,,. " _,, I s LOT 242 6,008 SQ FT 130.7 LOT 243 5,299 SQ FT □ 128.6 LOT 244 5,780 SO FT 126.3 D LOT 251 ~ HOA 6.495 so FT 118.07 D D □ □ D D ------►--r ►----►----------►-----------,----;=□=;-__ -_-_-_-_-_-_---'-a1----.___--,,--_,-,.-... +-~-,-,-/-,,--,;io 11-1~--r+r-_ __:__,.-,--11--"-:__,,-. -,---1-'J_ __ :.___-----j~~__:__[=-=--=-==::~~µ:::~~,:---,, ............ , / ~ ,,_-.!J,11 __,.,__,,,,,__ 11--11----t,t--11--11 7 t • • ••• • • • • • • • • • • D C) D -----------IF=/====--=-----D D D C) D •• ••• • • C) ,,__ .,,,,,11 ,,__ ,,,. ,, __ •--._ I • ....._ I ...., --... ~ .. •-,, ,,_ t __,,--:;: ...... ·□ ·-~ .· ~......... / . ·-~ .· ---~ 'i "' ,,.. ~ .... ,,/ .. ·: ~ '~ .... ··· 1□ D • • • , o5 ···-~/ ~ .... : • •• D D D D .. ~ •• • • • • .. ~ D D •••• .. ······ ~ ~-~ •••••••• ••• • C) D • • D • • • • •• •• • LOT 339 ~ MMERC!AL 62 OSQFT D D •• D • ••••••• I D • • • • • • • • • • • • • • • • • • • • • • • • D • • • • •• • • • • • • • • • • • • D • • • • D "[_i] D --------~------------•• • •• • • • • C) • • • • • • • • • • • •• • • • • • • •• □ D • •• •• •• •• • • • • • • •• "' ~--~----►---► __ :r • • D ------D □ 100 D D I D D • • • ~-. •••• •• • • • • • • • • • • • • -~-.. /JO • • • • • • • • @ • • • • . . ,, ,, • • ....., JI ,. / II * ,,_,., -11-11 -,, __ ,.,. I I C) • • • • • • ~---"""'"---~, 47 '-':::-~-~:-:,;~~¥=---=~= 70 --4---,----------,, D 47 "--,, -,, C"IV D I, -11 , :J, /--1---££ I: I -----471 N - ----• ..t---,,~11---OE!----• • • 80----------· • • • D • --/-cc?' •~•~•:i.•.;;:•~•~ L0~5'~~~ re~--= . .. ;--,,= 11-11-lf+. CAIi' ' \ ----££ -11-' w ~f--------47 • D • • • • r D 11-11-11 • • • • • • • • • • • • • _________, . . . •.: .,~ ,·~ ······•··· ~II ).: ••• •••••• D • A •-~~;:•~••~-~~~•~•._._-_:__:~~}:~~;::___~--•~:--1 :~II-' .......,_ • •1-11 11-11-11-"y......._ ,.~ -11-11-11-11-11-'l',-'-J:••,-467 \ " W ECR["[fll1 ----i,._lJ,..----L_-----"-"1071, 122 Sq,_:F_:_t _==---==l=JJ=\~ .32 Ac. ------w w OIi-------OH ,, I * -, .o,,-11-11-II_.... II-!OO -------~ -----------~ ______ ll'-H----463 I ------' ,_,,. -C, C, -------• • • • • • • • • D PA-8 PA-8 PA-8 PA-4 PA-23A PA-5 PA-23B PA-6 PA-11 PA-6 PA-6 22° 68° 22° 5° 18° 12° 8°6° 4° 8° 4° 9° 5° 2° 13° 73° D U 77° D U 5° 78° 78° 6° 8° D U D U D U D U 67° 68° 58° 2° 12° 4° 4° 78° D U????106'106.5' 107.5' 108.5' 13 7 '135.5' 134' 136 ' 13 4 ' 13 5 ' 136 ' 13 4 . 5 ' 135.5' 136' 13 6 . 5 ' 137' 136.5' 135.5' 134.5' 82. 5 ' 85. 0 ' 92. 2 ' 15 2 . 0 ' 18 8 . 6 ' 133.5'132.5'132' 178' 176' 174' 173' 172.5' 169' 182'?????Qt Tsass Tsass Tsass Tsass TsassTsass Tsass Tsass Tsass Tsa Af Af Af Af Af Af Tsass Tsass Tsass Tsass Tsass Tsass Tsa Af Af Af Af Af Af Af TsaCL Af Af Af Tsa TsaTsa Tsa Tsass Af Af Qal Qal Qal Tsa Tsa Tsa Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass TsassTsass Tsass Tsass Af Af Tsass Tsass Tsass Af Af Af Af Af Af Af Af Af Af Af Af Af Tsass Af Af Af Af Tsass?164' 167' Tsass 95.5 94 95 92 96 87 9399 99 89 75 6463 76 73 59 59 92 94 97.5 102 98.5 103 88 104 98 79 86 83 71 118 123 127 85 113.5 105.5 122 122 83 85 116 120 9677.5 130 158 156 79 155.5 157.5 158.5 160.5 160.5 121 120 104 105 111 117 130 110 160.5 110 124 118 124 114 111 125.5 124 129 130 130 162 164 156 138 144 162 154 90 98 76 74 77 79.5 155.5 171 149 145.5 171 156 167.5 174.5 170 179 181.5 190 187 114 150 131 154.5 164 178 185 190 197 193 187.5 133 139 144 146 126 125 123 122 121 127 129 129 125 126 123 128 175.5 172 168159 162 139 168 181 171 182 183 182 180 177 184 169 167 165 165 168 168 169 140162 168 186 189 173 170 191 195 191 196 196 199 201 200201 162 161 161 159 157 160 124 156 155 153 151 149 145 149 125 131 144 153153 156 156 167 166 155 153190 165 164 195 167 198 200 138 139 128 137 107 113 125 113 122 118 131 126 144 115 123 121 129 120 116 105 114 114 109 114 117 112 99 91 94 91 98 96 182 174 140 151 162 125 183 183 172 186 189 168 165 168 168 167 168 170 170 169 198 197 169 166 154 133 132 102 93 82 107 120 125.5 124 156 160 129 129 122 113 105 94 129 130 101 101 99100 132.5 132 133 132 132 SM-6 SM-4 SM-3 Af 129135' PA-6 BIH / RKW 1" = 40' As-Graded Geotechnical Map Robertson Ranch Carlsbad, California 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 1C SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040 See Plate 1DSee Plate 1FSee Plate 1B June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 1A For Legend T 36 6 SO FT 6.5 LOT 57 8,824 SQ FT 190.2 LOT 179 7,182 so fT 1619 / I / / / / / T 35 9,15SQFT 0.2 LOT 56 9,313 SQ fT 194.5 / 11 11 11 / ' / ~ ~-LOT 1 ,, 7,203 ' f LOT I 78 1,021 so fT 164.8 16:i / LOT 34 9,132 SQ FT 2015 LOT 55 9, !19 SQ FT 198.8 \ --- / / LOT 33 8,500 SQ FT 20i6 LOT 54 9,095 so fT 202.9 \,_ D ' / □ LOT 32 8,667 SQ fT -\ 206.2 LOT 53 8,505 so fT 2051 /)'!G fi LOT 173 // 0 ,G 1u s,s21 so rr :;; 169.2 ,,-' ,;1/ 1 LOT 174 -,I" 8,355 so fT i7 ' 168.1 L T 176 7, 48 SQ FT 166.7 LOT 175 7,949 so fT 167.5 LOT 202 5,200 SO FT LOT 201 5,200 SQ FT /656 ® LOT 203 5,000 SQ FT 1617 D LOT 200 5,200 SO FT 166.6 LOT 199 5,378 SQ FT 1676 = LOT 204 5,000 SQ fT /629 D / / /✓,, LOT 205 5,108 SQ FT a D LOT 246 ~ HOA 10,026 SQ fT 148.37 EL I I I I I V / / LOT 31 9,266 SQ fT 206.2 LOT 52 8,503 SQ FT 206.2 LOT 198 5,321 SQ fT 168.5 LOT 170 8,097 SQ FT 171.9 LOT 197 5,388 SQ FT /69.5 LOT 206 5,320 SQ FT /514 I I D D LOT 207 □ 5,309 so fT 151.4 ---= OT 208 ,314 SO FT 148.8 T 209 4 SQ FT 46.1 D -= D I I I I I r I I I f I I 210 D SQ fT --===v D D D D 0 D D D D / ""/ I\ LOT 30 9,074 SQ fT a LOT 51 9,227 SQ fT CJ I I LOT 29 8,737 SQ fT 201.9 LOT 50 9,272 so fT 20i7 LOT 28 8,752 SQ fT 198.7 I LOT 27 9,364 SQ FT l9i8 /~ 1/ LOT 26 9,439 SO FT 1922 LOT 25 9,073 SQ FT 188. 6 LOT 46 8,995 so fT 194.5 LOT 45 10,673 SQ FT 191.5 I LOT 47 I I \ LOT 49 \ 9,448 SQ fT ~ 2017 I I I I I I t, I D LOT 165 8,492 SO FT 1758 D LOT 48 8,798 SQ FT 200.4 D LOT 164 7,847 SQ FT l7!i8 8,849 SQ FT LOT 163 7.842 SQ fT 175.4 197.4 0 LOT 161 c5 LOT 162 7,770 so fT 174.4 D / / / tf LOT 159 7,373 SQ FT 171.1 LOT 160 7,814 SQ FT 1724 I LOT 44 9,059 SQ FT 188. I LOT 158 7,598 SQ fT 169.4 178.28 EL D LOT 245 ~ REC. 0 39,840 SQ FT RECREA l!ON AREA 170.0 D LOT 226 5,428 SQ FT D '\,_ LOT 184 '-1726 ~ 5,100 so fT ~ L T 183 5, 17 so fT , 7/.6 D LOT 185 ~ □ 5,100 SQ fT ~ 1716 -.. LOT 212 7.709 SQ fT 167.8 I I \~ I \ \ \ '- \ / / \ \ \ \ \ \ \ \ I / \ \ \ \ I I \ \ \ --' LOT 227 5.527 SQ FT 166.9 LOT 228 5,351 50 FT □ 16:il D LOT 229 5,411 SO FT 1611 D LOT 230 5,610 SQ fT 161. I D = 0 "' \ \ - \ \ \ \ \ D LOT 252 9,221 SQ FT 189.0 = a \ \ \ \ \ ~ \ \ -- D LOT 253 7.179SQfT 188.5 D D 1'/P LOT 265 6,461 SQ fT \ \ 188.1 D LOT 9,445 172 D \ \ ' LOT 186 5,200 50 FT 161.9 \or 346 ~ oPEi '\(; 541,433 so r: r-ilOT 168 ':----,/,451 SQ fT 1718 LOT 169 8,228 SQ fT 1728 0 LOT 167 8,544 SQ fT 174.9 LOT 194 5,200 so fT 172.J I I ~ LOT f 5,119 5, FT 17J t I I \ y 1/ \ 1/ ~i I D ' \ I ~ □ LOT 19 I 5,241 SQ FT 1751 LOT 190 5241 SQ fT l7!i1 D D I I I D D D D D ------D --I r I I t I I I t I I t \ I " //~=130•-=~~~' D ~ □ □ □ \ },------<\\ • D □ . ' \ • • □ • • • • • • -..c• -~--~ •• • µ:-J • • • • \ \ □ ~\ I •• ·····~·-· ____ --::;_·7J__ __ _::::~l • • • • 0 • • • • • • • • • • • • • • • • • • • • • \,i •• □: • • • • • • • • • • • • • • •• ••• •• • • • • • • • I • □ : ." I • • •• • • • • • • • • • • • • • □ • I • • [:JI • I • I • -:, 'f □ □ D □ LOT 187 5,200 SQ FT 1755 -.. LOT 188 ~ 5,129 SQ fT ---~ 1759 -=:,. \\ LOT 189 5,290 SQ FT 1759 D ~---\I'/,, ~,,,(, 174.7 / \ D 0 D LOT 213 5,371 SQ fT □ 158.2 ::.---" ~,,--" - / '-·• LOT 214 I \ - ' - 5,309 SQ fl l5i9 LOT 215 5,309 SQ fT 1516 LOT 216 6,295 SQ FT 149.0 150 LOT 217 5,306 SO FT \ ,. \ ~ 146.7 LOT 218 5,309 SQ fT 144.4 LOT 232 5,314 so fT □ 156.5 LOT 233 5,309 SQ FT 154.2 LO~ 5,517 so fT !45.9T£L. 4%TR~.802 LOT 234 5,781 SQ fT 149.6 ' ---"'Z D LOT 235 5,458 SO FT 146.6 y7 I \\ "'~ ' ,. \ -\\ ~ D LOT 236 5,313 SQ FT 144.2 LOT 237 5,314 SQ FT [1'11]8 D LOT 238 5,309 SQ FT 119.5 \ \ \ \ \ 0 0 0 LOT 219 5,309 SQ FT 1421 Q r 239 LOT 342 ~ MUL AM/LY 629,/28 S. D I' D D • • • , I lr"ii-+-11 • • •• ••• D D D ,. \ 7 LOT 220 5,309 so fT 139.8 \ ' " I LOT 221 5,746 SQ FT 117.4 LOT 222 6,363 so fT 134.6 LOT 223 6,1/BSQfT /JI.I LOT 224 5,350 SQ FT 127.8 ~): ~-='-----------~~ .. - l2!i5 LOT 225 5,200 so fT 118.55 £L. LOT 250 ~ HOA 5,176SQfT • -'l-11-11-'I--✓• -11 GA 11-11 11 -11--- ,. \ ,. \ < -.-.·; . '~.-. :ii,;-. ·.-.··\.;· .. _ .. ,, :-, , I 5,613 SQ FT 1172 LOT 240 5,933 so fT D /J!iO LOT 241 5,939 so'.,_-r-- /12 LOT 242 6,008 SQ FT /30.7 LOT 243 5,299 SQ FT □/286 LOT 244 5,780 SQ FT 126.1 D LOT 251 ~ HOA 6,495 SQ fT /18.07 -,_ ....,..__ -alt-~ -~□=---~ 1T -r:r□===~_Jc:J===---------~---=-i~➔:=~/20 □---------►--► ----110---1 -----►---------- -=::::;:11·--11· II * ►--,-...._ -'l--ll--11-11 . ------- ,,_,_,, ll-ll-11-11LJ•11--11 ,,,, --~ ,_.,,~ 11---,t.-L--1,___ ,,.._ . '( II-I~~ Jr □ 0 • •••• ✓✓--/ l "-...,, /'' ..........* ~ ...._,. I ~--,, I ,,...._ I ,,...._ ../../ /_.,-;; ,,...._ I ~•- "-..._, ~ t ~ •• •• ~ ~_.,,,11/ D .. ; '--,;,c,..~ •• • ••• ••• •• ••• . ,----'--• • • • • • • •• • •• ~ ~ .... · f □ • • • •• •• •• • N • •••• • • • • • • • • I -• • □ • • • • • ·•.□ •• • ~ ... · : • • • • • • : □ .· •• PA-9 PA-10 PA-23B PA-10 PA-9 PA-23C PA-23C PA-6 DU 22° 5° 5° 5° 12° 16° 5°3° 9° 13° 10° 6° 15° 6° 8° 16° 8°8° 9° 8° 4° 12° 12°8° 11° 48° 70° 73° 74° 67° 57° 77° U D U D U D D U D U D U D U D U D U ????????????132.5'132' 125' 124' 12 4 ' 125' 12 6 ' 134' 114' 98' 96.5' 14 6 ' 14 5 '14 4 . 5 ' 144' 14 4 . 5 ' 144 14 5 . 5 ' 14 6 . 5 ' 14 9 ' 135' 127.5' 107' 105' 169' 167. 5 '166' 166' 16 7 ' 16 8 . 5 182' 179. 5 ' 177. 5 ' 173' 168. 5 ' 16 7 ' 166.5' 1 3 8 . 5 ' 125' 117.5' 99' 98.0' 97' 100' 97.5' ? ? ??Tsass Tsass Tsass Tsass Tsass Tsa Af Af Af Af Tsa Tsa Tsa Tsa Tsa TsaTsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsa Tsass Tsass Tsa Tsa Tsass Af Af Af Af Af Af Af Af Af Af Af Af Af Af Af Af Af Af Af Tsa Af TsaCL TsaCL TsaCL TsaCL TsaCL Af Af Af Af Qal Qal Qal Qal Qal Af TsaAfo Afo Afo Qal Qal Af Af Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsass Qal Qal Qal 121 126 123 106 125 117 125 143 130 158 175.5 172 168159 179 178 179 162163 165 163 166 163 161 100 108 108 114 117 109 107 110 118 105 116 112 107 101122 107 108 117 121 122 123 123 117 89 83 107 112 99 110 122 123 122 123 95 97 115125124 126123 131139 120119 141 133 140 139 141 141 142 140 136 124 111 124140 126 129 134 140 140 133 143 142 142 132 132 140 141 135 134 134 135 150 152 156 160160 156 162 161 160 160 161 162 153135 148 144 152 147 155 157 161 161 154 162 162 139 168 160 161 161 162 163 163 162 162 136 136 141 139 147 140 154 151 160 157 151 165 167 168 170 171174 173 173 180180 181 181 171 182 168 138 160 167 170 169 168 172 173 175 177 178 179 180181 180 182 181 183 182 180 177 184 166 140 161 159 157 160 124 156 155 153 151 149 145 149 125 131 144 138 139 128 137 107 113 125 113 122 118 131 126 144 115 123 121 129 120 116 105 114 114 109 114 112 110 99 91 94 91 80 98 96 86 104 65 71 65 58 71 49 60 72 87 96 99 91 80 9271 79 83 73 69 60 52 40 51 71 3846 35 454862 78 182 155 145 126 161 174 140 160 174 159 160 161 151 151 162 125 158 126 144 156 141 141 144 142.5 160 145 143 143.5 146 146 142 144 142142 110 128 120 121 120 102 103 50 129 42 Af 118 120 124?180 175 167 119' 135 Tsa SM-7 Existing Subdrain Tied into New Subdrain Outlet Tied Into Storm Drain Box at Sta. #25+91 on August 14, 2015 Both Outlets Tied Into Storm Drain Cleanout at Sta. 31+75 on August 12, 2015 Outlet Tied Into Storm Drain Pipe at Sta. #25+50 on August 14, 2015 12 2 . 5 ' 123' 165. 5 ' 12% BIH / RKW 1" = 40' As-Graded Geotechnical Map Robertson Ranch Carlsbad, California 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 1D SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040See Plate 1CSee Plate 1C June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 1A For Legend # # # # f 1·__________:_ \ I \ • •• ·• ... •• "3 •• -.. j • • • D -- D .,_,,_" ........ - --- • ~ • • • • 'I--lt------11 --11-----11-11 --II • ••• 210 11-'I ~,,__.,, I-. . . . . . . ~ ,!{J(/-•••••••• : ~------ I I I I \ \ // \ \ ►---~~ \ \ \ \ \ ' ' \ \ / - ~" ~c'Y,"1-----~ ~ "' ,,--+::-...\ ~\ -+,Xt:J1 I \ LOT 253 7,1795QFT D • □: D D D D 165»-J:L 3@2._ff ''(\.,>,\ % TREATMENT AREA *~'-~, _164.97 [L. ..:.\ 1770 SF 4% -w-A/Mt:NT ARt:A \:J \ I \ \ \ \ \ \ \ " ' \ \ / \ / --\ \ I / --" OT 227 ,527 SO FT 166.9 LOT 228 5,35! SQ FT □ 165.1 D LOT 229 5,417 SO FT 163. I D LOT 230 5,610 SQ FT 161. I D Lt!D-,., 5, SSQFT I . \ D LOT 232 5,314 SO FT □ 156.5 LOT 233 5,309 SO FT 154.2 \ ' -\ --I \ \ \ \ LOT 252 9,221 SO FT 189.0 \ m 0 \ \ \ \ \ \ \ 1885 D D LOT 265 6,461 SQ FT 188.J LOT 254 6,102 SQ FT 1880 \ D LOT 266 6,355 SO FT 187.8 --- D D LOT 255 6,168 SQ FT 187.~-L --~ D LOT 267 7,965 SQ FT 187.2 D LOT 256 6,170 SQ FT 186.5 •-- // • • • • • • • • • LOT.0 268 6,368 SQ FT 186.0 • • • • • LOT •257 6. ,so:so FT 1/f,9 • • C) LOT 258 6,169 SQ FT 185.J LOT 259 6,019 SO FT 184.2 : □ D • • • I I I , D 'l--11 D LOT 269 6,200 SQ FT e=:> D ---11--1., D D LOT 270 8,263 SQ FT 184. 9 , ►------□ ----➔-- 170 D // I r i I LOT 260 5,889 SQ FT 182.2 • II D LOT 276 LOT 277 8.641 SQ FT LOT 278 8,112 SQ FT 171.0 LOT 279 8,831 SO FT 169.6 LOT 280 8,480 SQ FT 168.2 D LOT 281 8,891 SQ FT 166.5 l 9,445 SQ FT 171.7 172.2 D D D D \ \ " D LOT 288 6,102 SQ FT D 171.5 C) D D D LOT 289 7,998 SQ FT 170.J D D D LOT 299 8,683 SQ FT 148.7 D LOT 300 1,181 SQ FT 148.2 ·1 ,_.: 'I---" D D LOT 301 7,554 SQ FT 147.6 D - D LOT 291 7,532 SQ FT 166.0 " I " ' - \ LOT 328 ~ I! ::;: 9,358 SQ FT \ 142.63 EL ~ 4% TREATMENT AREA I -- \?r 346 ~ OPEN SPA"' 541,433 SQ FT 0L D \ D \ D \ D LOT 308 6,2./9 SQ FT 148.5 □ C) LOT 309 1,632 SQ FT 147.8 LOT 310 1,216 SO FT 146.8 D , ___ .--\--LO~ 5,517 SO FI \ y--- 150 r 145_g7 EL 4%TR~l02. LOT 216 6,295 SQ FT 149.0 / LOT 217 5,306 SQ FT 146.7 \ -\t ' LOT 218 5,309 SO FT 1444 LOT 219 5,309 SO FT - 142. I LOT 220 5,309 SQ FT 139.8 LOT 234 5_.187 SQ FT 149.6 D LOT 235 5,458 SQ FT 146.6 LOT 236 5.313 SQ FT 144.2 D LOT 237 5,314 SO FT [1'11]8 ,. ~AU\) ,. -\ < - D LOT 238 5,309 SQ FT 139.5 Q r 239 5,613 SQ FT 137.2 \ LOT 221 \ L \ \ \ \ I 5.146 so FT "', OT 240 /]7.4, ~--1//~i~~-:,:,~_,, 5,933 SQ FT □ _ 135.0 l ~ \~' .. J.-w11--~~ \ '---'\I;,;'::\ LOT 241 5,939S0~ .. 7 " I " I -~) LOT 222 6,363 SQ FT 134.6 LOT 223 6,118 SO FT /JI. I LOT 224 5,350 SQ FT 127.8 LOT 22125.5 5,200 SO FT 118.55 EL. \ ,. \ -11><'1 \ ,. \ J::==+:=:==3 N I 32. f1\....,____,J D D LOT 242 6,008 SQ FT IJ0.7 LOT 243 5,299 SQ FT □ 128.6 LOT 244 5,780 SO FT 126.J D LOT 251 ~ HOA 6,495 SQ FT 118.07 D □ □ • • • • • • • • • • • • • • ••• • \\ C) \\ \~ ~ --□ □ □ □ D LOT 317 1,436 SQ FT 128. I Do \ LOT 318 8,402 SQ FT 128. I D D D LOT 325 6,726 SQ FT 12 .0 104.87 EL D D LOT 319 12,270 SQ FT 127.5 D LOT 261 6,010 SQ FT 180.2 II 0 D L 271 7,/6SOFT 179.8 D D LOT 282 8.411 SQ FT 166.J C) D ~T 262 6,515 SQ FT / le, I \ LOT 263 6,651 SQ FT ID □~Ls '/ /1-/J I '/ I/ tN CT 'l---11· \ LOT 2 6,634 SQ fT D 118. -/ D D LO 283 7,18 SQ FT 66.6 , D 't--k''f'r 2 7 J 6.450 SQ FT 175.9 D ---- LOT 284 7,452 SQ FT 161.4 D P!°C Ti D LOT 274 6,293 SQ FT 1740 D -7 D LOT 285 7,460 SQ FT /6!, I D LOT 275 6,191 SQ FT 172.5 D LOT 286 7,046 SQ FT ~ D D D ! r LOT 292 7,370 SQ LOT 293 6,060 SQ FT L T 294 6, !SOFT 67.5 LOT 295 6,305 SQ FT 168. I LOT 296 6,364 SQ FT /6!,7 D LOT 287 6,493 SQ FT \ 169.4 D D LOT 297 6,256 SO FT 16 -., LOT 298 6,734 SO FT 169.9 165.8 ~ ~\ D .. ~~--k-----rL_-.-_-'-_-2J.--l--_~=--,.,..,)!!..:i.~C;:::-=I :==:=---!r---=~,;:1-~~====1-\ -~ ----<-------------- /60 D D , ,, , . , ... ~' . ... ' _·, ·; . . . . , ',:., . .;• . t ~ D 1" T 3. ~ HOA [ LOT 302 8,92 SQ FT l 7,507 SQ FT ~ 147.5 LOT 303 1,505 SQ FT 148. I 11 .59 [1. l % ~ATMENT AREA [ -.,...,::<J-i-r-.,IJ..,,,,.., D ~r-" -.,.,--r1,- K[NTN_& ., , D LOT 304 7,861 SQ FT 148.7 C) LOT 305 1,794 SQ FT 149.J LOT 306 1,536 SO FT 149.8 \ \ □ D D \ \ \ LOT 307 8.686 SO FT 150.2 D D ~D LOT JI I ,932 SQ FT 146.8 LOT 312 6,120 SO FT 147.4 LOT JIJ 6,120 SO FT 148.1 \ \ \ ift's{l!r 148.7 \( D ~------'(----t---,.'::,,~-.\--140'->-c--________ ---•---- Yf==l===i==--'□=1=1==110--D ----.::k.::: D \ \ \ \ LOT 315 6,794 SO FT 149.5 D C) LOT 316 6.226 SO FT 150.0 4 11 1.,.j I tJor,'11--l 11.J LOT 321 9,847 SQ FT LOT 322 9,865 SQ FT . :~ " . ; ,~- ~ f , • ~ ~ ;-:::-_ , LOT 320 11,205 SQ FT 127.4 D 128.0 C) _,__, LOT 330 ~ REC 17,393 SO FT · D 120 RECRt:A llON ARt:A 1288 D 128.5 CT C) LOT 323 9,827 SQ FT 129.0 D D -~. ~ i 1 1/0 I~ /'I '/ 106.67 EL. ~ _,, / IMt:NT AR£ .,c·• • // _,,___ <J . .· .. . . ~~ _JJ..~ -----= _,,-:::; <1 ~ 11.q------ 0:: \ :,...~ .. \ \ 1\ "' /,~ □ \ \;, ,, I \'-..L_ I-I -11'..I \ \ LOT 32¢' !0,114 SQ FT' 129.6 D D \ \ ~ \ \ D / / PA-23CPA-23CPA-13PA-11PA-1283°DU88°5°56°58°DU?????71'56'39'52'106'99'98.0'97'100'Afo/QtQalQalQtQtQtTsassTsassTsassAfQalQtQtQtQtQtQtQtQtAfoAfoAfoAfoAfoAfoAfAfAfAfAfAfTsaTsaTsaAfAfTsassTsassTsassTsassTsassTsassTsassQalQalQalQalQtQalQalQt??TsassAf6363.56464656566676666706868676867686765666665.567.58967.556.5667079807595929290928794879093999997.5681001081081141171091071101051121151201161051141141091171121109991949180861046571655889818879818588809081909271654528302437334960728796999180927179837369605240517138463545486278102103509942AfSM-7AfoAfoAfAfAfo/QtAfo/QtAfoQal BIH / RKW 1" = 40'As-Graded Geotechnical MapRobertson RanchCarlsbad, California2420 Grand Avenue, Suite F-2LGC Valley, Inc.TEL. (760) 559-7000 FAX (760) 599-7007Vista, CA 92081Plate 1E SCALE ENG. / GEOL. DATE PROJECT NAMERobetson Ranch133023-03 PROJECT NO.8004040See Plate 1B See Plate 1DJune 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 1A For Legend39 FT LOT 240 933 SQ FT , 1350 □ □ ~ LOT2c:>4.1 5,939 SQ 1 132 LOT 242 6,008 SQ FT /JO. 7 LOT 243 5,299 50 FT 128.6 D LOT 244 5,780 SQ FT 126.J D OT 251 ~ HOA L 5,495 so FT 1/8.07 I D ~ D □ □ I I \\ \\ C) \\ • • •••••• • □ ~· --□ □ D LOT 325 6.726 SQ FT ~ 1~ 12 ,0 LO 32v · 9,81 SQ FT 126.4 D !y * I I ' -:7.?o (; I I '-:,,. II D D ~ .I 7 f " .. , \ .. · )~ t 1~1 *',{ 330 ~ REC. LOTl7J9J SQ FT RECREATION AREA 128.8 D 120 110 ---I t--~L_J 1 /1 / ' . / .: I # \ ,>' ,I \ ,, / • ?-"' / ··-.. ~ • . <~ .. · Iv . ,, \ : I •• • •• •• .. ··□ •• ••• • I \ ..... /'' • • • • .,..1) ?, • ,,✓/ \ •• ~-~◄ ,.. / . . . . >\ /\ ...-0_.> • • • • • • • • • □ • • • • • • • • • • • • D • • • • • 'E:. • • • .. •• • • • :□ • • • • • • • • • □ •, •• •, •• •, •• •• C) □ \'I,. •• • ....,..,, I .---,,."t>-.. • • ,, -'1 \ .---,,_. \\ ~-.... • • V .,.. 'J ""'h --~-, \ii~ \ ~ __,,,.-"' iv \ _.: 1 ... --•••••• • • •,. • • ----r □ ---~ D ~ \\ i • • • • •• •. □ □ •• •• • •• □ C) • •• • • • • • • • • • • • □ □ □ ~l ~ -\ g'· • • • • • • • • • • • • • • • • • • • • • • • • ~ -C) \ \ • • • • • • • • ~ ! . I : • • • • • • • • • • • • _./ □ J ! ... ··· ," : ,, : . . ' .. ··· ,I ... . ·· ·"" ... :. □ ,,, ... .... ;,.t .. ··· . ,, . • D ::::::::: / •• ---►---. -·~ □ • ..·· • '':la........, ~ •• / : '' "'-..' ,~1 ~ .. / ·. ---~ -.___ :::::::::-· Oo. ___ .·,,./,,,./ [').,. ••••• C)'' ~/, .-•-~ ~ · : tr--.._ : ~ ~ f / ''' :. \ fl ··· ... : {, I •· •• \ //J ......... / C) I □ ,,,_,✓_I/I_// II-•• ·. ~ • 1// I □ ·. • II --.,., __ .,~ I a a \ \ N\ /, • • <S • • • • I • • • • • • • • • • • • • <S •• • • • • • • • • • • ~ • ::::::::: \ \ \ \ \ \ ;V I I I I I I 1/ ~; \ \ \ \ \ \ \ } <S OPEN PA LOT 34(,4~884 SQ n C) 2 ,.·,·· -~ :q \ 2 _ _., __ _ I / / / / I I I I I I I I I I=~ / / / / / / / ~J._ ~ f""' LOT 12 I""' 10,995 5() FT r"'' ~ .~~ ~ I 1, ,~' LOT 13 76.0 ,, □ 6586 SQ FT ' 750 (, C) LOT 14 9,105 SO FT 74.0 / LOT 15 6,145 SQ FT D LOT 17 5,003 SO FT 724 D ' I _J r I I LOT 11 5,966 SO FT 86.0 LOT 10 S,01 t SO FT LOT 18 5000 SO FT 11.9 LOT 19 5,000 SQ FT 71.4 □ ,J 855 □ LOT 9 5,000 SQ FT 850 LOT 22 11,188 SQ 720 □ ,J ' LOT 20 5.000 SO FT 70.9 LOT 21 □ 5,971 SQ FT ......_ 70.4 T f~2 14(~ FT, ,)' ,, LOT 7 5,000 SQ FT 84.0 □ LOT 23 9,708 SO FT 71.0 LOT 6 5,000 SO FT 835 □ LOT 5 5,525 SO FT 8JO □ LOT 4 5000 SO FT 825 □ HOA LOT 3 5,000 5() FT 825 □ LOT 2 5.010 5() FT ' 820 _,, 41 0 LOT I 7,279 5() FT 81.0 □ "-✓✓-\ 5% TREATMENT AREA ',,11-"""""-·_II_· __ . --~ ~----/~~;---// / □ .J/11 ---------' ,, ~ ,,/ ,J ,,/ ,,/ ,,/ / ~ 11 I \\ l~ I \\ i\~ \ ~ \ 1/ PA-7 PA-8 PA-4 PA-23A PA-5 PA-3 PA-7 PA-3 PA-3 PA-6 6° 11° 22° 4° 4° 9° 5° 9° 7° 12° 2° 13° 73° D U 77° D U 78° 78° 6° 8° 88° 83° D U D U 52° 58° U D U D U D 6° 7° 6° 8° 8° 8° 10° 16° 14° 14° 14° 7° 12° 9° 84° 83° D U 4° 16°8° 14° 22° 14° 17° 6°4° 12° 8° 14° 14° 16°???????????? ???????????78' 70' 65. 7 ' 13 4 . 5 ' 135.5' 136' 13 6 . 5 ' 137' 136.5' 135.5' 134.5' 161'154.5'154' 65. 8 ' 6 7 . 4 ' 70' 92.5' 59 . 9 ' 53. 8 52. 9 ' 51 . 9 ' 5 4 . 9 ' 7 1 . 5 ' 94. 5 ' 117' 14 1 . 5 ' 5 9 . 5 ' 4 7 . 5 ' 4 6 . 5 ' 47.0' 43.0' 40.5' 34.5' 58' 50. 5 ' Qt Qt Af Afo /Qal Afo / Qt Afo / Qal Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsa Tsa Tsa Tsa Tsa Af Af Af Af Af Af Af Af Af Af Af Af Af Qal TsaCL Af Af Tsass Tsass Tsass Tsass Tsass Tsass Tsass Tsa AfAf Af Af Af Af Af Af Af Af Af Af Af Af Af Tsa Tsa Af Tsa Tsa TsaCL TsaCL TsaCL TsaCL TsaCL Af Af Af Tsa Tsa Tsa Tsa TsaCL Tsa Tsass Qal Tsa Af Af Af TsaCL Tsa ?160' 164' 167' 8 0 ' TsaCL 120' 105' 94 78 84 86 88 74 77 71 80 63 61 60 46 61 67 35 65 64 32 60 645551 62 65 6881 66 89 87 83 86 73.5 58 48 90 95 9498 67 88 95 96 104 109 108 104 104 102 103 108109 118 123 127 113 128 128 127 116 140 130 145 136 146.5 118 93.5 120 123 116 113.5 120 116 88 105 98 123 102.5 122 135 8796 96 86 130 158 156 155.5 157.5 158.5 160.5 160.5 130 160.5 118 124 114 111 125.5 124 129 130 130 162 164 156 144 162 154 155.5 178 185 190 197 187.5 152 153 152 158 159 161 161 160 162 154 162 48 47 46 45 45 45 41 133 139 141 144 146 126 125 157 178 190 165 164 195 167 198 152 151.5 151 150 150 149 148 148.5 153 152 153 153 141 142 141 142 140 140 141 140 140.5 140 140 141 138 141 140 139 141 138 138 134 132 133 132 132 131 132 137 140 129 130 137 138 130 131 127 129 112116 131 123 132 124 130 129 111 121 133 134 135 134 135 123 93 81 95 99 68 78 154 153 149 128 125 128 163 157 162 161 139 137 159 160 160 161 162 170 148 165 171 170 170 172 171 152 151 150 159 148 149 150.5 160 137 130 119 135 123 127 138 139 197 169 166 125.5 124 156 155 160 129 112 102 129 122 118 113 105 77 53 141.5 137 138 147 170.5 159 157 157 155 154 153.5 154 154 155 152 150 148 156 132.5 132 133 132 130 138 132 163 142 7 9 ' 8 1 ' 8 4 ' 8 6 ' 8 3 ' 7 2 ' 8 1 . 5 ' 8 0 ' 8 6 ' 7 7 ' 1 1 0 ' 1 0 2 ' 9 5 ' 9 2 ' 9 8 ' 1 0 5 ' 1 0 4 ' 1 0 2 ' 9 5 ' 120' 152'151' 151' 151.5' 144' 142'142.5'SM-1 SM-5 Outlets Tied Into 48" Storm Drain Pipe at Sta. #468+95 on April 13, 2016 Outlet Tied Into 18" Storm Drain Inlet Structure on November 4, 2015 Outlet Tied Into 48" Storm Drain at Sta. #481+17 on June 20, 2016 Outlets Tied Into 48" Storm Drain Pipe at Sta. #471+75 on April 15, 2016 65' 54' Tsa 129135' PA-6 BIH / RKW 1" = 40' As-Graded Geotechnical Map Robertson Ranch Carlsbad, California 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 1F SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040See Plate 1ASee Plate 1BSee Plate 1CSee Plate 1C June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 1A For Legend / / / --- -- / LOT 345 ~ OPEN SPACE 413,227 SQ FT LOT 39 8,803 SQ FT 185.0 LOT 38 8,803 SQ FT 188.9 LOT 37 8,788 SQ FT 1928 LOT 36 9,116 SQ FT /96.5 T 35 9,J SQ FT 0.2 LOT 56 9,313 SO FT /94.5 / ,, ,, LOT 55 9,/19SQFT 198.8 LOT 54 9,095 SQ FT 2029 4 /2 LOT 173 8,521 SQ FT 169.2 LOT 53 8,505 SQ FT 205.3 LOT 52 8,503 SQ FT 206.2 LOT 170 8,097 SQ FT 171.9 LOT 16 8,228 so 1728 / LOT 57 8,824 SO FT 190.2 i a / / I 'is ,,.---1 , \ ~\~\, 138 ~40 ( ,, " \ '' ' D LO 135 4,631 FT 14/. / 11 D LOT 82 5,149 SQ FT /59.7 LOT 71 5,755 SQ FT 168.4 ' ' ·:,-:," _.,, - D LOT 72 5,009 SQ FT /618 D Lol5BJ D 6,535 so FT LOT 84 6,883 SQ FT 158.0 D D LOT 63 5,704 SQ FT 168.6 " I D~ LOT 73 5,353 SQ FT /673 D D LOT 64 4,906 SQ FT 168. I LOT 74 5,235 SQ FT 166.7 D LOT 43 13,741 SQ FT 176.2 D LOT 65 5,724 SQ FT 1673 = LOT 66 6.590 SQ FT CJ D LOT 42 14,153 SQ FT 176.6 D 4% TREA T!.IDIT AREA /65.27 EL ,,.~ -,, LOT 67 6, I !14. !fl FT D ,.-' ' I LOT 75 5,012 SQ FT 166.0 LOT 76 5,381 50 FT \ff 160 I 165. I □~- LOT 85 5,593 SQ FT ~~_±_;c□~s ~ D ,,,._,, M----11 ,435 so FT LOT 87 I /5, . 5,083 SQ FT " T 150 ~ '-'""'1,__,_.,i 1510 I 154.8 5.159 SO FT D ,.. 149.94 EL. LOT 40 I 1,087 SQ FT 181.2 LOT 41 8,773 SQ FT /113 D ,, D LOT 77 ~ ~ L~8 LOT 60 8,843 SQ FT 178. 6 LOT 59 8,193 SQ FT 1825 10,688 SQ FT I \ LOT 78 4,005 50 FT 162.0 ?1 D D LOT 1 5,526 SQ FT 160.J \ LOT 79 □" ' D LOT 182 6,968 SQ FT /512 I -~ ; LOT 70 8,001 SQ FT 158.6 ~080 so FT LOT 80 -.j_ /60. J 4,080 SQ FT ', □ t58.6 LOT 8 I 4,400 SQ FT LOT 58 8,824 SQ FT /86.3 LOT 181 6,967 SQ FT 160.6 D 760~=1:::::::;;;;;~'~,~ /56.9 I ~-'------------J '----\/_j_LJj \.~150 D LOT 179 7.182 SO FT /6.J9 LOT 1,203 /65. LOT 178 7,021 SO FT /64.8 LOT 205 5,108 SQ FT E°:J LOT 204 5,000 SO FT 162.9 LOT 246 ~ HOA J0,026 so FT 148.37 £/. LOT 206 5,320 SQ FT /5.J4 I LOT 203 5,000 50 FT 16.Jl D LOT 202 5,200 SO FT LOT 201 5,200 SQ FT 165.6 0!) D D " J 4% TREA TMEN AREA LOT 88 5,485 SQ FT /52.4 LOT 89 4,928 SQ FT 151.6 LOT 90 4,723 SQ FT -, I r oT 91 4,f93 SQ FT l 50•-----cf----.'.:□= \ -.. ~ I h \'7===:!._ V LOT 92 4,218 SQ FT 159.4 LOT 93 4,160 SQ FT ,. ,_, ,. D -_, D "A=J,< ,. D 159.0 LOT, '4 4 SQ FT LOT 95 4,160 SQ FT ' """'-'I,!,::, - D LOT 105 5,490 SQ FT 146.4 D LOT 115 4,386 SO FT 146.8 /58.4 D --.c: --~-- LOT 106 5,772 SQ FT 1473 ,. D LOT 116 4,572 SO FT 1 15f8 LOT 96 4,118 SQ FT 156.9 LOT 107<GiR 6.213 so FT LO T, 108 1477 ," 4 SO FT 1477 D D LOT 97 4,201 SQ FT 155.9 D LOT 109 5,321 SQ FT 1472. D • ,. ,, D LOT 98 4,229 SQ FT 154.9 LOT 110 5. 151 SO FT 146.6 D ,. D LOT 99 5,221 SO FT /5.J9 I OT 152 ~ ~ • J_LJJ 5,480 SQ FT 141./lELI □< ~ I " D \ 1415 LOT 117 4,000 SO FT 1477 LOT I 18 4,125 SQ FT 1477 D LOT I 19 4,315 SQ FT LOT 120 4,500 SO FT ----IL 146. 6 J ! C) D - LOT 154 ~ REC. 14. 154 so FT 141.2 D LOT 127 5,321 SO FT /39.6 D 1412 D LOT 128 5,828 SQ FT IJ8.8 - D 140 D LOT 129 5,008 SQ FT 1377 D LOT 121 5,494 SO FT /46.0 LOT 130 6,125 SO FT 1370 I " " I I I /49.3 b \1475 LO 151 ~ ~ 4'82/, so r-<,,,;---; LOT 207 □ I I I ~ ... % TREA TMEN. 5,309 SQ FT , AREA 15/.4 t::::J· ,u•--,,,.,'---11-t2ft o~=~---==~ r r l D LOT 100 4,333 SQ FT /524 D 750 D LOT 11 I 5,499 SQ FT ~ LOT 101 4,032 SO FT 15/.5 ' ' LOj,..102 4,135 s'/:;.q 149.3 '- LOT 103 4,145 SQ FT ..,_ /475 ';p ' \ ~ \ LOT 104 \ 4,393 SO FT -, 146.5 I I I /44.0 T 112 5,061 SQ FT 14.JO LOT 113 4,958 SQ FT LOT 114 4,949 SQ FT I LOT; ~j 3 ~ H 5. SQ FT LOT 122 5,049 SQ FT 144.0 D LOT 131 5,128 SQ FT 735.8 D ,, LOT 123 4,675 SQ FT 143. 0 740 LOT 132 4,734 SO FT /J5.2 I " 140.9 D LOT 124 4,77! SO FT /40.9 139.0 D LOT 125 4,771 SQ FT /J9.0 C) LOT 133 4,638 SQ FT LOT 134 134.6 4,632 SQ FT L /.J .f l EL. " ~/,WU /, LOT 126 5,077 SO FT /J8.0 c:::::J . .. LOT 208 5,314 SQ FT 148.8 LOT 209 5,314 SQ FT D I I I r I 146.J I '□ ---+A I 1/W.s, ----= D LOT 210 5,309 SQ FT 14.f 7 &t =rr==---------~--== LOT 21 I 5.309 SO FT /41.2 I I I I I I > v_~- LOT 247 ~ H~ 129.70 EL. < r- □ LOT 149 4,692 SQ FT 135.8 LOT 148 4,160 SO FT 134.7 D D D D D □ LOT 341 ~ REC.□ 52,117 SQ FT D D D I t I I I r I I '( D LOT 200 5,200 SQ FT 166.6 LOT 199 5,378 SQ FT 1676 = C) LOT 198 5,321 SQ FT 168.5 D D D 13 LOT 197 5,388 SQ FT 169.5 D C) • • • • • • D • • • • • • • • • • •□ • • • • • • • • • • • •• • • • ••• •, • • • • •• • D ••• ••• • i?i •• " . -. • • '"i • S5 . " . -• ••• D ••• ••• •• ••• •• D . . ' • •• C) ... □: • • • • 134.1 • ,.-J ••• • LOT 136 4,107 SQ FT D D D I 55 ~ /-ilfM o-r 5,101 SQ FT f28.59 £/. LOT 147 4,329 SO FT /3.J2 • l.:..-1 •• y\1 D _-I • •. • • • . t .. •• •• • • • • 140.7 OT 137 00 SO FT 140.3 LOT 138 4,100 SQ FT 139.8 D D LOT 13 4,511 SQ FT '--f----" l39.2 LOT 140 4,539 SQ FT 138.7 D LOT 141 4,229 SQ FT 1379 LOT 142 4,050 50 FT 137.2 ' ·i D L'(/r 143 □ 4,o/OOSOFT LOT/44 'S'I 'Ii ,' /J6.5 4,000 SQ FT LOT 145 ' -~ • JJ6.0 4,000 SQ FT : : '-...___.,) ~ 0 _., /35.5 ~OT /5/l ~ REC \),,~ ••• • 10,!IJSQ . D -~-~ • ---------------: efT • ' I D I I '\ LOT 146 \5, 08.2 SQ FT \ 1324 LOT 157 ~ HOA 12,166 so FT 12.9 00 EL ~ D ' ' ' ----H► "!~~~------""2.~-"~~t-=---""'( --------< -------c------.. t-------'r:f1=· v-f--------~•• ::: •' --□ ----'.\ • ~-/JO 7L__ -- 0 EE 0 , -G N ----- 47 -----D 'l 1, --11-11 473 ,,_ ,,_ ,, C4IV ----► ---.<_----- C: D _ _._ ..... . 11-11 ..t-✓ __.,,,,_-~-.--1r-11 If-II-/. -, :.J. 4 I ;----+---[£ ~1 "' __ / I L r D ~ .. CAW . ' .. • • • I • • • _-I D •••• • I _.••• D I C) ... ~ 116 ... I ~ 340 ~ MUL TIFAMIL y : V Ll=::J 283,391 so FT • I : □ I • I • • t • I I • • • D 4 7 D \ OH-------~ OH D 11S D 0 , PA-1 PA-23A PA-2 PA-1 PA-3 R102 R100/R100A R101 R98 R97 R99 R113 R96 R94 R59 R60 R64 R54 R62R71 R81 R90 R67 R82 R63 R61 R76 R66 R83 R89 R75 R65 R29 R35 R59 R32 R22 R34 R21 R40 R28 R30 R24 R27 R41 R23 R31 R33 R38 R93 R84 R58 R92 R41 R95 2115 1107 1379 1108 21161105 1094 1094A 1109 1082 10831090 1090A 1093 11102117 1380 1375 1374 1412 1424 14211417 1418 13781377 1414 13762059 20581919 2128 2126 2127 2066 2018 2129 2065 2034 19171892 1916 2033 1905 2125 1918 1944 1943 1912 1913 1911 1862 1863 1914 1834 2124 1832 1833 1840 1861 1835 1915 1573 1574 13381345 1575 1350 1509 1510 1371 2227 1344 1455 1799 1627 1800 1628 1630 1811 1293 1292 1812 1631 1286 1294 1813 12951632 1633 1289 1210 1629 1280 892 1025 1038 1032894 849 1081 875 778 2004 779A 779 2003 776 690 775 777 874 846 2005 850 845 843 844 877 893 895 891 848 847 876 1024 1037 1031 1206 1283 2141 2293 2293A 2294 2297 2414 2303 2296 2295 2415 2302 2298 2307 2413 2349 2304 2350 2308 2351 2305 2367 2321 1984 2103 1969 2180 2020 2019 2195 2073 2074 1968 1989 21041973 2159 19932194 2011 1983 2072 2105 2008 1920 2078 1972 2193 2077 2013 2080 2158 2015 1988 2071 2012 2106 1942 2010 2009 1992 2163 21922109 2101 2016 20142162 2079 2108 2102 2017 1967 2157 1987 2076 2173 2006 1981 21912007 1966 2156 19862075 2107 152 153 162 154 45 45 45 41 41 42 40 152 151.5 153 152 153 153 141 142 141 140 140.5 140 140 141 138 141 140 138 134 132 129 111 121 133 134 135 134 135 123 93 81 154 153 149 128 125 128 139 137 148 67 73 96 93 85 61 58 54 58 78 65 78 79 70 57 59 62 58 60 62 58 61 56 53.5 51.5 60.5 68.5 67.5 51.5 71 62 57 55 54 52 49.5 47.5 46.5 46.5 48 50 45 44 46 48 50 137 130 119 135 123 127 138 139 58 59 58 57 62 141.5 142 Field Density Test Location Map Robertson Ranch Carlsbad, California Vista, CA 92081 TEL. (760) 559-7000 FAX (760) 599-7007 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. Plate 2A SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. BIH / RKW 1" = 40' June 28, 2016 8004040 See Plate 2FApproximate Removal Bottom Elevation Approximate Location of Fill Legend Approximate Location of Field Density Test2456 89 Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Approximate Location of Retaining WallField Density TestR140 0 / -//- □ / I N ---- -------~ ---------------------~ - . . . ' .· .. MA h:Lld_CK J __ _ ----1--+-T ( fc=#P:""ffinl _,, ' I I ~ / I I "' I "' 4 / I I i ,,.., I LOT 344 ~ OPEN SPAC: t, 168,197 SQ FT I I \ \ ~ \ \ ~ \\ \\ "' Hir,t---, I \-/30 \_132 ~134 ,, / ,, s w~-------------------~ -- J .. ·.··•·· I i1, ~ J . ·--· f ./{. ~ "' ) LOT 135 4,631 SQ FT 141.0 ; ... / / -- D LOT 82 5,149 SQ FT 1597 LOT 11 5,755 SQ FT 1684 Lol5aJ 0 6.535 50 FT LC 6,8 I LOT 92 4,278 SQ FT 159.4 LOT 93 4,160 SQ FT D LOT 136 4,107 SQ FT 140.7 D 159.0 LOT. 4 4 SQ FT LOT 95 4,160 SQ 1584 D 15f8 D LOT 105 D 5,190 so FT LOT 106 l46. 4 5,772 SQ FT LOT 107 6,273 SQ FT D LOT 115 4,386 SQ FT 146.8 D D LOT 137 4.100 SQ FT 140.3 1413 ,. D LOT I 16 4,572 SQ FT 147.5 1411 D ~II' D LOT 117 4,000 so FT L 0 147.7 4,IL I D LOT I 54 ~ REC. 14,154 so D FT 141.2 LOT 12 5327 so D 139.6 D LOT 138 4,100 SQ FT /39.8 D D LOT 139 4,511 SQ FT 1392 D L 4,5 PA-8PA-7PA-8PA-8PA-4PA-11PA-11PA-7PA-3PA-6R110R107R105R108R104R112R106R109R103R105R111R44R50R71R45R43R52R56R48R49R53R72R55R80R86R9R72R7R4R6R3R1R2R5R11R8R13R18R10R14R20R16119717255548598569111484111111821146111810971132113711928347371181111911006951188696123771212361184833736716715115083270311876991099707706704705119172372483111951185118610988027998001000154249232382614964344911498149738449932224543339582549036014953292434974863864987968861300815816133013131284120713121281120810348306496726698291092668674650650A6766731102827828688675678639687352289286285311287313186734532731528835334873334240431935434311301130A34940338745331831235132834428332135039491918653883203561864421A4212011992372052003802048964543833823559204082744072734942801494359257314250489236396208504271493439398456282418258281822210242381207251277235206248246252239170821A821135148244249393417259152195127A15913816116619216924719616584115611514012411673851281625065102793161461912022784402095092341571371633171499256503194153168143203147160397505193290312A313A1866127121172064221670126A1261341541501321551331451511113111611381112115311451183114711891190119411931114114414A1430431945576246234218586250906213911860271528114311156826691133112013113611401723632513614177381153759824444A482421991164040A8036A3629138314111411A141613821415330465272198582470A4704646383613473573583416374696915888714885895355344586925445456707545867537567552209139022082207220632636216419710176126136546666556674314164374154575164324114384124954964878162211521148497883405406515368792741410656409657500413364630629370527419606605631254521632253455528508522369664665680402420276414275679742363435659879658878154110091046791780129507144260603604614615525873660399524103639063552310351306365983898836516406253666267293675923655936638726345266332139213896521372136106197210239848898889718977179321595765133110961003159410899001165102210629057889061164102110637728549348858841064102085311631162106510198559599331066101811619581128112711267409951576108815779749731578899157913187879311580131973913201333159315921332880804881898104279813171472131614731474131576610071053147590713148031041105640073813841095138510547971386147972010301478104510011044105290812911486100214851028789102979510551005790147688710871043801138710081311719147715057947934361504150315021506150114877305972331028A1234718160012031645161516441654166216631537167216421614120415901244155316131589124812471653153016411671127016611538123016461643165516161673153216741516165615311520153515141534151815151540153915331459214214831460148414811482148021438697587738682148860781812214486121477828117438672133161118812145866214615171536151980780866259966177460065358059459568346281475957965258170162862770046746668281357448345939239146046148254857359161768454959054245248145148546348454361868172772876080974760268574554054152058568674674476758483776861060975781074876985278313247497707842140693725819132572693893794911211122112310608407851326857702750839105985669482069875278693575113276979981712171495499917131711117015889551343158495713421585956134015861587134116591722166017231724909890910172517269211422145114521453172117279221058936947982924132885192794811241235731732805806133513341488147113481349734721107368967167710401051128718191388127855087034624014979255238158422422A930930A1057772120511012360231023442361234523632316233923622329232723282330229122922358231323562312231423552354235223532311242024082411233223352333233123412338234023432426242524232421241824192422305339474304372376340373477338478375371374519531476479479A514575513576532537480475536533530587547517518511583538539512572546571577578226261294220265183188229231227262262A269299184446230473266215268218444263293189232185267219270442185A47226430030142819022829146830229230321444542542342642744344744147142420012216221722182219222022212318221723642342230922992301230094949494929296917893906563808991.594.590.582.567.556.56670827980889195947884868874777180636160466167356564326064555162654937617168816666626875746565654562604988896787838642.837.573.5584895.594959296928794879093999995929493939089878255886857897075646376735959599267869497.594.510298.510388104987986838591.5707185909594986788959687805476677689104109108104104102103108109118123127113128128127116140130145136146.511893.5120123116113.51201168810598123102.5122135858796968685113.5105.512212283851161209677.513015815679155.5157.5158.5160.5160.5121120104105111117130110124118124114111125.5124129130130162156138909876747779.5155.513313914114414612612512212112612391.515717812913013713813013112711215916017112614411512312112912011610511411410911411711211099919491104851029382107120125.51241561551601291121021291221181131059412913010110199100137138147159157157155154153.5154154155152150148156132.5132133132130138132129 1" = 40' BIH / RKW PROJECT NO.133023-03Robetson Ranch PROJECT NAME DATE ENG. / GEOL. SCALEPlate 2BLGC Valley, Inc.2420 Grand Avenue, Suite F-2TEL. (760) 559-7000 FAX (760) 599-7007Vista, CA 92081Field Density Test Location MapRobertson RanchCarlsbad, CaliforniaReference Plate 2A for Legend8004040See Plate 2E See Plate 2F See Plate 2CJune 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015 TREATMENT AREA 165.27 EL ~ LOT 67 6. I 114 SJ! FT D .,. ' ' ~·· .' ,;: ~ .~ I l I /60 I " I I D I 72 LiHJ68 !0,688 SQ FT I+ LOT 60 8,843 SO FT 178.6 1627 f □ LOT 69 5,526 SQ FT D LOT 182 6,968 SO FT 1572 D LOT 77 4,211 SQ FT 1632 LOT 88 5,485 SQ FT 1524 LOT 78 4,005 SO FT 1620 LOT 89 4,928 SQ FT 151.6 D 160.J LOT 70~ 8,001 SQ FT LOT 79 4,080 50 FT 160..i D LOT 90 4,723 SO FT 149 . .i LOT 80 4,080 SQ FT 158.6 158.6 D ---LOT 81 4,400 SO FT 156.9 I 50·-+-c::□== LOT 91 4,593 SQ FT 1475 LO 151 ~ .. ,v,'-<1--rll 4,828 so ' FT % TREA TMEN. > AREA t:::J· JW•-Jft,-.._ . ,.,.. ,. '' LOT 181 6,961 SQ FT 160.6 D D LOT 205 5, !08 SQ FT a LOT 246 ~ HOA 10,026 so FT 148.37 EL LOT 206 _ 150 ,:: 5,320 SO FT \---'-,f r-~'3r----15.~.i-.4 ___ --i LOT 207 □ 5,309 SQ FT 151.4 LOT 208 5,314 SO FT 148.8 LOT 204 5,000 SO FT 1629 LOT 203 5,000 SO FT 1637 D LOT 202 5,200 SQ FT 164.7 LOT 201 5,200 SQ FT 165.6 --====-v D D D , ;-: ,: :_ -1/s:c!::fr==,____-=~ f---j-f--------~ LOT 100 4,333 SO FT 152.4 D 150 D LOT IOI 4,032 SO FT 151.5 LOT 102 4,135 SO FT 149.3 LOT 103 4. 145 SO FT 1475 D LOT 104 4,393 SQ FT 146.5 ... <. D LOT 209 5,314 SQ FT 146 . .i LOT 210 5,309 SQ FT 143.7 LOT I 11 5,499 SO FT 140--f---l ,__,_,-11 LOT 21 I 5,309 SO FT 141.2 LOT I 12 5,061 SQ FT 144.0 14.JO LOT I 13 4,958 SQ FT LOT I 14 4,949 SQ FT D LOT 122 5,049 SQ FT 144.0 D LOT 131 , 128 SO FT 135.8 D T 145 SQ FT 1355 D D LOT 123 4,675 SO FT 1450 LOT 132 4,734 SO FT 135.2 " I " 140.9 D LOT 124 4,771 SQ FT 140. 9 139.0 D LOT 125 4,777 SQ FT 139.0 LOT, 153 ~ H, 5,439 SO FT 132.91 EL LOT 126 5,077 SO FT 138.0 c::::J LOT 133 4,638 SO FT LOT 134 134.6 4,632 SQ FT L 155 ~ H, 5, IOI SO FT 134./ /28.59 EL ' 5% TREATMENT AREA LOT 156 ~ REC. 10,683 SQ FT /JO • --.. -------------",f----------10 D D D V~-LOT 247 ~ HOAJ 129.70 EL < LOT 149 4,692 SO FT 1358 LOT 148 4,l60SOFT '1 134. 7 " LOT 147 4,329 SO FT 1332 D LOT 146 5,082 SO FT 132.4 D LOT 157 ~ HOA 12, !66 SQ FT 129. 00 EL D D D D "-,, -,, 11-11-\~----'-11-11-11 -11-11 I, -11-11-11 11-11-11 CAIi' C"IV --!---FE 471 47 47 47 N - ----D D D D D LOT 341 ~ REC.□ 52,117 SQ FT D D D D D --+-~-== ~1-11--11-I 11-11 ,, ----£, w D D D D D !JS D D \\6 Lff 340 ~ MULTIFAMILY 283,391 SQ FT D D D D D D D D / \\S D D , D D D D ,,ii D D D D D D D D r;::c±:::::-110•=:t::::::;, >---+-D D D D D D 104.83 TC 104.00 FC D D D D D D D D D 11-11-11 A=:::!::::r ,,-:r 11-11-11-,,.---~"'. --,, ,.~ -11-11-11-11-11-'I 4 7 OIi-------" W ECR["[fll1 ----i.--lJ,--L_---"sc-"1071, 122 Sq,_:F_:_t _==-----==l=J!==~ .32 Ac. ------w w OH D D D D D D D D D D D ,:, . :,'. :-·. ; D ,, I * D D D D D D 7 D --11-11-11-.,.__✓, 11-11 ,_ 120 LOT 222 6,363 SQ FT 134. 6 \ .. D LOT 241 5,939 SQ FT 1328 \ A--i \I LOT 242 6,008 SQ FT " I ) ____,, LOT 223 6, !!8 SQ FT I.ii.I LOT 224 5,350 SO FT 1278 125.5 LOT 225 5,200 SQ FT 118.55 EL LOT 250 ~ HOA 5,176 SQ FT < A A---/ 11-11-_ -1. -~,,. " _,, -\ I.JO. 7 D " D \!ls:1-t--~-~ I s LOT 243 5,299 SQ FT □ 128.6 LOT 244 5,780 SO FT 126.3 D LOT 251 ~ HOA 6,495 SQ FT 118.0lEL D □ □ D D D r----;=□c;-_-_---:__-_-_-_-__ __J□~--------+---~//0----,------~----------f==i--------fcci---µ--=--=-~-=--=--=-~ -:::;::11---,.,-.,;.,~/11 /I--J/·-11-II-I J __ ,,__ 11--11---1. II ., _,,, -,, ...._ --Ir-'I--11--11-----,1--11--11 / D D .,,,..,, ,,..-,, ,. D D D D D ------------D D -, II -.,,__,,_ 11-,,_.... / II * !OO ~ -~ _____ ll'-H----463 ,_ -' ,, ,r ,,__ .,,,,,11 D D D D D D D ,,_,., -11-11 -,, __ ,.,. ,_,,. D ,,__ ,,,. ,, __ •-I •-I ·-q~ ~ ,.., ,, ...._ I ------...::: ,,...._ ~~ ,,_·-----, ... ~,,,,,,: ~ r ~ D D D D D LOT 339 ~ MMERC!AL 62 OSQFT D D D D D D D 100 D D I D I I D -,,_,, D D D □ D D D -C, C, D PA-8 PA-8 PA-8 PA-4 PA-23A PA-5 PA-23B PA-6 PA-11 PA-6 PA-6 R145 R146R147 12 117 20 64 22 16 70 126A 126 134 154 150 132 155 6144 24 21 99 116 40 40A 80 36A 36 29 1411 1411A 1416 1382 1415330 465 198582 470A470 464 638361 347357 358 341 637 469 691588871488 589 535 534 458 692 544 545 670 754 586 753 756 755 2209 1390 2208 2207 2206 487 389 883 651 640 625 366626729 367 592 2139 2138 2137 2136 972 1023 1062 1164 1021 1064 1020 853 1163 11621065 1019855 1066 1018 1161 730 1234 1645 1644 1654 1662 1663 1537 1672 1642 1613 1247 1653 1530 1641 1671 1270 16611538 1230 1269 1014 1268 1246 1245 1012 1015 1004 1202 1198 1013 11991201 1249 1250 1673 1532 1674 1516 1531 1520 1535 1514 1534 15181515 1540 15391533 1459 2142 14831460 14841481 1482 1480 2143 869758 773 868 2148 860 781 812 2144 861 2147 782 811 743 867 2133 1611 1612 1881 2145 866 2146 1517 1536 1519 807 808 662 599 661 774 600 653 580 594 595 683 462814 759579652 581 701 628 627 700 467 466 682 813 574 483 459 392 391 460461 482 548 573591 617 684 549590 542 452 481 451 485463 484543 618 681 727 728 760 809 747 602 685 745 540 541 520 585 686746 744 767584837 768 610 609 757 810 748 769 838 1323 852 783 1324 749 770 784 2140 693 725819 1325 726 938 937 949 1121 1122 1123 1060 840 7851326 857 702 750 839 1059 856 694 820 698752 786 935 751 1327 697 922 1058 936 981 923 946 851 927948 1124 1235 926 1169 817 836 975 1168 1167 864 608 977 818 976 835 1166 607 1322 950 763 928 865 529 929 1329 731 732 805 806 12651872 1227 1226 1871 1529 988 1936 997 1937 1860 1528 1859 1266 1527 1858 1526 1857 1525 1856 18551524 2181 20671948 2196 1940 2182 1941 2183 1869 19322184 1894 1939 1947 2185 2186 1870 2176 1931 2175 1945 1893 1927 2153 968 987 990 966 2174 953 1946 9141521 952 993 967 1077 611 989 1197 620 986 992 619 616 10851067 1196 1068 991 1050 1938 1926 1049 1990 2021 1924 2022 1925 2083 2088 1906 2082 2089 1907 1910 20811928 1930 1886 2110 1853 2100 1908 2099 1852 18731921 1854 2070 1929 2113 1996 980 962 1997 941 983A 983 911 1999 943 979 942 1998 1922 1887 1874 978 944 2000 985 762 951 913 1523 761 964 862 1522 963863 2114 1851 2098 1909 1882 2155 1949 1267 1125 939 917 960 918 916 915 904 2154 912 994 1687 16571730 1686 1729 945 1728 1658 1006 902 902A 1232 1069 1086 1243 970 969 903 903A 1321 1078 1242 1084 1241 1070 1240 1231 1239 1071 1074 1238 1048 1075 1047 1839 1838 1072 1076 901 1233 1016 1011 925 596 601 764 961 859 858 550 870 996 2337 2069 2023 1995 1991 1994 2360 2310 2344 2361 2345 2363 2316 2339 2362 2289 2357 2359 2290 2291 2292 2358 2313 2356 2312 2314 2355 2354 2352 2353 2311 2332 2335 2341 23382340 2343 1776 1777 2042 1704 1705 1960 1709 1822 2043 1706 2044 1741 1880 1746 1775 1692 1625 2167 1626 1933 1774 1935 1489 1149 1490 1691 1934 2030 1508 1135 2031 1507 648 646 643 641A645 641642 644 647 218 444 263 293 189232 185 267 219 270 442 185A 472 264 300 301 428 190228 291 468 302 292 303 214 445 425 423 426 427 443 447 441471 424 2212 2213 2214 2215 2216 2217 2218 2219 2220 2221 2190 2336 2342 95.5 94 95 92 96 87 9399 99 89 75 6463 76 73 59 59 92 94 97.5 102 98.5 103 88 104 98 79 86 83 71 118 123 127 85 113.5 105.5 122 122 83 85 116 120 9677.5 130 158 156 79 155.5 157.5 158.5 160.5 160.5 121 120 104 105 111 117 130 110 160.5 110 124 118 124 114 111 125.5 124 129 130 130 162 164 156 138 144 162 154 90 98 76 74 77 79.5 155.5 171 149 145.5 171 156 167.5 174.5 170 179 181.5 190 187 114 150 131 154.5 164 178 185 190 197 193 187.5 133 139 144 146 126 125 123 122 121 127 129 129 125 126 123 128 175.5 172 168159 162 139 168 181 171 182 183 182 180 177 184 169 167 165 165 168 168 169 140162 168 186 189 173 170 191 195 191 196 196 199 201 200201 162 161 161 159 157 160 124 156 155 153 151 149 145 149 125 131 144 153153 156 156 167 166 155 153190 165 164 195 167 198 200 138 139 128 137 107 113 125 113 122 118 131 126 144 115 123 121 129 120 116 105 114 114 109 114 117 112 99 91 94 91 98 96 182 174 140 151 162 125 183 183 172 186 189 168 165 168 168 167 168 170 170 169 198 197 169 166 154 133 132 102 93 82 107 120 125.5 124 156 160 129 129 122 113 105 94 129 130 101 101 99100 132.5 132 133 132 132 129 BIH / RKW 1" = 40' 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 2C SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040 See Plate 2DSee Plate 2FSee Plate 2B Field Density Test Location Map Robertson Ranch Carlsbad, California June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 2A for Legend T 36 6 SQ FT 6.5 / / LOT 35 9,195 SQ FT 200.2 LOT 56 9,313 SQ fT / / LOT 34 9,132 SQ FT 2015 LOT 55 9, !19 SQ FT 198.8 \ -- / / / LOT 33 8,500 SQ FT 20i6 LOT 54 9,095 SQ fT 202.9 \,_ D ' / I / / □ LOT 32 8,667 so fT -\ 206.2 LOT 53 8,505 SQ fT 205] 194.5 ,_,._,fi LOT 173 0 ,aG1u a,s21 so rr :;; 169.2 LOT 57 8,824 SQ FT 190.2 8,355 so fT / ,/' LOT 174 1iO i7 ' 168.J G 'i~' / LOT 176 7,248 SQ FT 166.7 LOT 175 7,949 SQ fT 167.5 ~~ . LOT 177 7,203 SQ FT 1657 LOT 179 7,182 SO FT 1619 LOT 178 7,021 SQ fT 164.8 LOT 205 5,108 SQ FT a LOT 246 ~ HOA 10,026 SQ fT 148.37 EL. LOT 204 5,000 SQ fT 1629 D LOT 203 5,000 SQ FT 1617 D LOT 202 5,200 SQ FT 164.7 LOT 201 5,200 SQ FT 1656 D LOT 200 5,200 SO FT 166.6 LOT 199 5,378 SQ FT 167.6 = I I V / / LOT 31 9,266 so fT 206.2 LOT 52 8,503 SQ FT 206.2 LOT 198 5,321 so fT 168.5 LOT 170 8,097 SQ FT 171.9 LOT 197 5,388 SQ FT 169.5 1/ LOT 206 5,320 SQ FT 1514 D D LOT 207 □ 5.309 so fT 151.4 -= OT 208 ,314 SO FT 148.8 --===v -=t:11------------------------------- T 209 □ 4 SQ FT 46.J -= D 210 SQ fT D D D D D D D D N I I / ""/ I\ LOT 30 9,074 so fT 204.9 LOT 51 9,227 SO FT 206.2 LOT 29 8,737 SQ fT 201.9 LOT 50 9,272 SQ fT 20i7 LOT 167 8,544 SQ FT 174.9 i--!JOT 168 ':---,/,451 so fT 1718 LOT 169 8,228 so fT 1728 LOT 196 5,201 SQ FT 170.5 D LOT 195 5,200 SQ FT 171.4 1/ D LOT 194 5,200 so fT 172.J LOT 28 8,752 so fT 198.7 I LOT 27 9,364 SQ FT 1958 /~ 1/ LOT 26 9,439 SO FT 1922 LOT 25 9,073 SQ FT 188. 6 LOT 47 8,849 SQ FT LOT 49 9,448 so fT 2017 D LOT 165 8,492 SO FT 1758 D LOT 48 8,798 SQ FT 200.4 D LOT 164 7,847 SQ FT l7!i8 LOT 163 7,842 SQ fT 175.4 197.4 D LOT 162 7,770 SQ fT 174.4 D LOT 46 8,995 so fT 194.5 D LOT 45 10,673 SQ FT 191.5 LOT 159 7,373 SQ FT 171.J LOT 160 7,814 SQ FT LOT 161 7,878 SQ fT 1714 1724 I LOT 44 9,059 SQ FT 188. I 178.28 EL 110--_ --·I LOT 158 7,598 SQ fT 169.4 D •~ , LOT 245 ~ REC. 39,840 SQ FT RECREA l!ON AREA 170.0 D LOT 226 5,428 SQ FT 167.8 D D '\,_ LOT 184 -,,,_ 1726 ~ 5,/00 so fT ~ LOT 183 5,917 so fT 171.6 LOT 185 ~ □ 5,100 so fT ~ 1716 -.. LOT 212 7,709 so fT LOT 227 5.527 SQ FT 166.9 LOT 228 5,351 SQ FT D 16:il D LOT 229 5,411 SO FT 1611 D LOT 230 5,610 SQ fT 161. I = 0 \ -\ -\ D LOT 231 -::. 5,305 SQ FT \ D LOT 252 9,221 SQ FT 189.0 = a D LOT 253 7.l79SOfT 188.5 D D 1'/P LOT 265 6,461 so fT 188.J D LOT 9,445 172 D \ LOT 186 5,200 50 FT 161.9 158.9, ~-"""':"':1- D ..,_\ LOT 346 ~ OPE, 541,433 so r: LOT 193 5,119 SQ FT 171] D LOT 192 5,245 SQ fT 174.2 1/ D □ LOT 19 I 5,241 SQ FT 1751 LOT 190 5241 SQ fT 1757 D D -.. LOT 188 ~ 5,129 SQ fT LOT 187 5,200 SQ FT 1755 --~ 1759 -=:,. \\ LOT 189 5,290 SQ FT ~--\I'/,, ~,,,(, 1759 D LOT 342 ~ MUL AM/LY 629,128 S. D I' 174.7 D D D D -LOT 213 5,371 SQ FT □ 15.5,~.2:___s,~d1'~ ::.---" ~,,--" ,~_,, ~" LOT 214 155.9 ~\ 5,309 SQ fl -::. LOT 215 5,309 SQ fT 1516 LOT 216 6,295 SQ FT 149.0 150 LOT 217 5,306 SO FT 146.7 LOT 232 5,314 SQ fT □ 156.5 LOT 233 5,309 SQ FT 154.2 \7 LO~ 5,517 so fT !45.9T£L. ' --"'Z y7 I \\ I\,~ ' ,. 4%TR~.802 \ - LOT 234 5,781 SQ fT D \\ 149.6 LOT 235 5,458 50 FT D 146.6 LOT 236 5,313 SQ FT 144.2 LOT 237 5,314 SQ FT ~ -LOT 218 5,309 SQ FT [1'11]8 D \ 144.4 LOT 219 5,309 SQ FT 1421 LOT 220 5,309 SQ FT 139.8 \ ' LOT 221 5,746 SQ FT 137.4 D LOT 238 5,309 SQ FT 139.5 Q r 239 5,613 SQ FT 131.2 LOT 240 5,933 so fT /J!iO LOT 241 5,939 SO FT 0 D D LOT 222 6,363 so fT 134.6 1328 □ D □ D D □ □ D D 7 D □ I D //~=130•-=-- D □ D □ -11 D □ -'l-11-11-'I--✓• -::. \ GA D 11-11 D □ □ □ D □ □ □ □ □ □ " I " ] ~ ) '): " -" • 'I"---// 11 -11- LOT 223 6,//BSOfT /JI.I LOT 224 5,350 SQ FT 127.8 125.5 LOT 225 5,200 SQ fT 118.55 ff LOT 250 ~ HOA 5,/76SQfT -- < ._-.·; ,. \ -::. \ -\ D LOT 242 6,008 SQ FT -::. D \~~-~_J /J0.7 LOT 243 5,299 SQ FT □1286 LOT 244 5,780 SQ FT 126.J D LOT 251 ~ HOA 6,495 SQ fT 118. 07 EL. • '~.-. :ii,;-. ·.-.-.\.;· . __ .. ,. :-, . "' -alt-~---:::□~~ PA-9 PA-10 PA-23B PA-10 PA-9 PA-23C PA-23C PA-6 R110 R107 R105 R108 R104 R112 R106 R109 R103 R105 R111 1598 1697 17191688 1696 1676 1677 1680 1606 1715 1597 1678 15961717 1718 1229 1555 12281583 1558 1554 1582 1551A 1557 1581 1551 1591 1556 1599 1559 1552 16001203 1645 16151644 1654 1662 1663 1537 1672 1642 1200 1614 1204 1590 12441553 1613 1589 1248 1247 1653 1530 1641 1671 1270 16611538 1230 1269 1014 1268 1246 1245 1012 1015 1004 1010 996 1202 1198 1013 11991201 1249 1250 1646 1643 1655 16161673 1532 1674 1516 1656 1531 2133 1611 1612 1881 1517 1536 12651872 1227 1226 1871 1529 988 1936 997 1937 1860 1528 1859 1266 1527 1858 1526 1857 1525 1856 1855 1267 1125 939 917 960 918 916 915 904 1016 1011 925 1173 1174 1129 1131 1106 1134 1103 1104 996 1764 1763 1791 1761 1765 1762 1767 1766 1768 2266 2392 2275 2389 2395 2270 2285 2267 2394 2387 2398 2276 2271 2268 2390 2284 2396 2399 2283 22802386 2269 2393 2278 2397 2384 2279 2273 2261 2385 2262 2260 2263 2329 2327 2401 2328 2402 2330 2403 2352 2288 2406 2407 2408 2286 24162417 2405 2404 2287 2411 2410 2409 2378 2376 2377 23722365 2366 2370 2332 2335 2333 2331 2440 1258 1770 1769 1798 1254 1797 1221 1225 1848 1617 1302 2234 1618 2189 2087 2237 2160 2236 2187 1619 2188 2086 2235 20852232 2161 2084 2233 2135 1359 13582134 1620 1301 1219 1217 1216 1213 2151 19031985 1794 2152 1220 1902 19001176 2179 1891 1171 21771793 1850 2130 1218 1259 1257 2131 1255 1179 1901 2132 1890 1355 1178 1177 1849 1261 1175 1253 13542178 1351 1308 1353 1262 1796 13521172 1795 1251 1224 1256 1260 1252 2243 2244 2245 2246 2247 2241 2242 1647 2032 1684 1544 1754 1755 1545 1648 1685 1649 1757 1756 1546 1650 1605 1758 1621 154917591550 17601622 1888 1889 2040 1843 2123 2122 2121 1844 2041 1444 1785 1700 1603 1782 1602 1783 1701 1570 1784 1601 1847 1491 1470 2111 1845 2112 1846 2150 1215 1214 1212 1400 2149 2093 1370 1369 2094 1366 2095 2097 1364 1394 1356 2096 1401 1493 139218261391 1468A 1827146814921828 1469 1435 1802 1568 1803 1436 1431 1804 1399 1567 1805 1409 1566 1404 1565 1410 1698 1806 1402 1699 1432 1807 1368 1434 1405 2120 2119 1406 1309 1433 2118 2225 2238 2224 2239 2240 2226 1734 1623 1562 1753 1604 162417351561 1752 1442 1751 1443 1609 1736 1737 1543 1750 1640 1610 1733 1439 1749 1548 1681 1563 1748 1547 1438 1682 1608 1738 1564 1732 1441 1607 1747 1437 1683 1731 1408 1360 1440 2091 1306 1361 1398 1407 2090 1307 1397 2024 1310 1396 1403 2025 1362 13951825 1305 2026 13631367 2027 1357 1264 1304 1365 2028 1393 1263 2029 1776 1777 2042 1704 1705 1960 1709 1822 2043 1706 1703 1707 1778 2044 1710 1959 1829 1702 1779 2045 2046 1708 1958 1790 2047 1830 1820 1801 2048 1957 1808 1788 2049 1809 2050 1789 1823 1841 1956 1831 2051 1842 1824 1786 2052 1810 1821 2053 1787 2054 1955 1462 2165 1781 1780 1899 1898 1773 1772 1897 1896 1771 1740 1875 1876 1739 1877 17441878 1743 1742 1879 1745 1741 1880 1746 1775 1692 1883 1693 1668 1884 1694 1885 1695 1669 1980 1670 1982 2166 2060 1976 2061 1652 2062 1975 1651 2063 2064 1974 1664 2172 2171 1665 1667 2170 1666 2169 2068 2168 1625 2167 1626 2092 1979 1461 1978 1467 1450 1465 2205 1445 1977 1952 14471449 2204 14461466 1463 2203 1448 14641951 1970 1953 1971 1954 2202 1933 1774 1935 1489 1149 1490 1691 1934 2030 1508 1135 2031 1507 2212 2213 2214 2215 2216 2217 2218 2219 2220 2221 2318 2217 1223 1222 1303 1720 1180 1211 1569 121 126 123 106 125 117 125 143 130 158 175.5 172 168159 179 178 179 162163 165 163 166 163 161 100 108 108 114 117 109 107 110 118 105 116 112 107 101122 107 108 117 121 122 123 123 117 89 83 107 112 99 110 122 123 122 123 95 97 115125124 126123 131139 120119 141 133 140 139 141 141 142 140 136 124 111 124140 126 129 134 140 140 133 143 142 142 132 132 140 141 135 134 134 135 150 152 156 160160 156 162 161 160 160 161 162 153135 148 144 152 147 155 157 161 161 154 162 162 139 168 160 161 161 162 163 163 162 162 136 136 141 139 147 140 154 151 160 157 151 165 167 168 170 171174 173 173 180180 181 181 171 182 168 138 160 167 170 169 168 172 173 175 177 178 179 180181 180 182 181 183 182 180 177 184 166 140 161 159 157 160 124 156 155 153 151 149 145 149 125 131 144 138 139 128 137 107 113 125 113 122 118 131 126 144 115 123 121 129 120 116 105 114 114 109 114 112 110 99 91 94 91 80 98 96 86 104 65 71 65 58 71 49 60 72 87 96 99 91 80 9271 79 83 73 69 60 52 40 51 71 3846 35 454862 78 182 155 145 126 161 174 140 160 174 159 160 161 151 151 162 125 158 126 144 156 141 141 144 142.5 160 145 143 143.5 146 146 142 144 142142 110 128 120 121 120 102 103 50 129 42 118 120 124 180 175 167 135 BIH / RKW 1" = 40' 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 2D SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040See Plate 2CSee Plate 2C Field Density Test Location Map Robertson Ranch Carlsbad, California June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 2A for Legend j .,. D LOT 252 9,221 SQ FT 189.0 , II --11---1. '1---11 --I. ,. ·II -II--IJ---1 ~· --:l 'I--lt------11 --11-----11-11 --II m 0 D LOT 253 7,1795QFT 1885 D LOT 254 6,102 SQ FT 1880 D 1870 LOT 256 6,170 SQ FT 186.5 D LOT 257 6. 160 SQ FT 185.9 210 D LOT 258 6,169 SQ FT 185.J 11-•1-----1 lJ--.11 200 190 LOT 259 6.019 SQ FT 184.2 D D D D LOT 265 6,461 SQ FT 188.J D D LOT 276 9,445 SQ FT 172.2 D ~ --~ II LOT 266 6,355 SO FT 1878 D D LOT 277 8.641 SQ FT 171.7 D LOT 267 7,965 SQ FT 1872 D 180 LOT 278 8,712 SQ FT 171.0 •-- LOT 268 6,368 SQ FT 186.0 D LOT 279 8,831 SO FT 169.6 D D D D ---11--1., 'l--11 D LOT 269 6,200 SQ FT 1855 LOT 280 8,480 SQ FT 168.2 D D ,. -, D LOT 270 8,263 SQ FT 184. 9 LOT 281 8,891 SO FT 166.5 'I---" , r I l ·1 ,_.: , D LOT 260 5,889 SQ FT 182.2 D fl , LOT 261 6,010 SQ FT 180.2 .,. D LOT 271 7,126 SQ FT 179.8 D D LOT 282 8.417 SQ FT , l 166.J \H-l D ' :. . , ~T 262 6.515 SQ FT 178. I D 'l---11 LOT 272 6,634 SQ FT □ 178.0 D D LOT 283 1,181 SQ FT 166.6 , 11-11---11 D LOT 263 6,651 SQ FT 1756 " D LOT 273 6.450 SQ FT 1759 D LOT 284 7,452 SQ FT 161.4 D D LOT 264 6,988 SQ FT 173.J D LOT 274 6,293 SQ FT 174.0 D D LOT 285 7,460 SQ FT /6!, I 17. 165»-J:L 3@2._ff % TREATMENT AREA D LOT 275 6,191 SQ FT 172.5 D LOT 286 7,046 SQ FT 168.8 D D ,·, D LOT 287 6.493 SQ FT 169.4 D / D - ! r ' D D LOT 297 6,256 SQ FT LOT 298 6,734 SO FT OT 227 ,527 SQ FT 166.9 LOT 228 5,35! SQ FT □ 165.1 D LOT 229 5,417 SQ FT 163. I r ~ HOA JPtf AREA ('- LOT 216 6,295 SQ FT 149.0 D - 150 LOT 230 5,610 SQ FT \ D 161. I ' -\ LOT 231 5,305 SO FT ,. I 158.9 D LOT 232 5,314 SO FT □ 156.5 LOT 233 5,309 SO FT 154.2 LO~ 5,517 SO FI 145_g7 EL 4%TR~l02. LOT 234 5,187 SQ FT D 149.6 ,.--;?7' LOT 235 5,458 SQ FT 146.6 D / LOT 236 5.313 SO FT LOT 217 5,306 SQ FT 146.7 144,2 LOT 346 ~ OPEN SPAC:' 541,433 SQ FT L D LOT 237 5,314 SQ FT LOT 218 5,309 SO FT 1444 LOT 219 5,309 50 FT 142. I LOT 220 5,309 SQ FT -/J9.8 \ 7 " l " ) LOT 221 5,746 SQ FT 1374 LOT 222 6,363 SQ FT /J4.6 LOT 223 6.118 SO FT !JI. I LOT 224 5,350 SQ FT 127.8 LOT 22125.5 5,200 SO FT 118.55 EL < [1'11]8 \ D LOT 238 5,309 SO FT /J9.5 /✓ Q r 239 5,613 SQ FT 137.2 LOT 240 5,933 SQ FT D !]5.0 LOT 241 5.939 SQ FT 132.8 □ ,. \ ,;11----1 II -\ ,. \'r-e-, D LOT 242 6,008 SQ FT IJ0.7 LOT 243 5,299 SQ FT □ 128.6 LOT 244 5,780 SO FT 126.J D □ □ 1 l\~~--==~□~-i,1--+--· N LOT 251 ~ HOA 6.495 SQ FT 11a.01 n. D LOT 288 6,102 SQ FT D 171.5 D D D LOT 289 7,998 SQ FT 170.J D LOT 290 6,250 SQ FT 1679 D D LOT 291 7,532 SQ FT 166.0 -I • D ,,_--IL_\\\ D ,,_----L ___)\\ /50~ 'II 'l"'<A'°...,l.--li " LOT 292 7,370 SQ FT 165.8 LOT 293 6,060 SQ FT 166.9 -□ , '/·-11, -t ~_J 1" LOT 294 6,391 SQ FT 167.5 D LOT 295 6,305 SQ FT 168. I LOT 304 1,861 SQ FT LOT 296 6,364 SQ FT 168.7 D LOT 305 1,794 50 FT 149.J 169.J D LOT 306 1,536 SQ FT 149.8 D D LOT JO! 7,554 SQ FT I " T 529 ~ HOA [ LOT 302 150 1\-1--h---l 8,922 SQ FT l 7,507 SQ FT ~ 147.5 112.59 [L. l LOT JOJ 1,505 SQ FT 148. I 148.7 \\ \\ --□ \~ ~ D LOT 299 8,683 SQ FT 148.7 □ D LOT JOO 1,181 SQ FT 147.6 148.2 D D D LOT 308 6,2./9 SQ FT 148.5 □ D LOT JI 7 1,436 SQ FT 128.1 \ LOT J28 ~ I! ::;: 9,358 SQ FT \ 142.6] EL ~ 4% TREATMENT AREA I LOT 309 1,532 SQ FT 147.8 LOT 318 8,402 SQ FT 128. I D ~ D LOT J/0 1,216 SO FT 146.8 D LOT 319 12,270 SQ FT 127.5 . .:,., . , , !. ' > . , D D □ D LOT 325 6,726 SQ FT 127.0 104.87 EL D LOT J2'1i--i 9,814 SQ FT 126.4 , ~·· . ... ' .·, ·; . . . .:· .. : ' II II ... i ,, ;; II '% TREATMENT AREA [ D D .. ~ .. ~r-" -.,.,--r1,- K[NTN_& " D LOT JI I 6,932 SO FT 146.8 D "_,,. D LOT J/2 6. 120 SQ FT 1474 LOT 313 6,120 SQ FT 148.1 ---'iL--+---------1---140'-- LOT 320 11,205 SQ FT 127.4 D LOT 321 9,841 SO FT 128.0 ,,.--, LOT JJO ~ REC fl,393 SO FT · D 120 RECRt:A llON ARt:A 128.8 D 110 LOT 322 9,865 SQ FT 128.5 CT ,r:EL. //J% IR/600 SF 'h.TMENT AR£ D LOT J/4 6,829 SQ FT 148.7 D LOT 323 9,827 SQ FT 129.0 D D □ D D D LOT 315 6,794 SO FT 149.5 LOT 324 !0,114 SOFT 129.6 D D LOT 316 6.226 SQ FT 150.0 □ 169.9 LOT 307 8.686 SQ FT 150.2 = :;- \ •, -~· 4 I ! ~ J( o/ D PA-23CPA-23CPA-13PA-11PA-12R110R107R105R108R104R112R106R109R103R105R1111A1570171569557178568448417256755656622A565179449564180355556318217456217318154505613417589966537729510611307733310230822230612321310592863091421102123107412217610722510323316614187111932213321771247533310421194295585536378464303512110153559560552551554882241081403349411212552335312961006733610313976120973791098337952972161872232171865111329847711191100695118869612371236118471671511508327031187699109970770611607047051191723724831119511851186126A12613415415013215513314515111541271115512721113111611381139127312741117111212751156114111361157127711421159115311581145118311471189119011941133131136114816751679168916901598A159816971716171916881696167616771680160617151597167815961717171812291555122815831558155415821551A15571581155115911556159915591552160012031645161516441654166216631537167216421200161412041590124415531613158912481247165316411671127016611230101410151004101016461643165516161673153216741516165615311520153515361792176417631791176117651762176717661768225922582272228122772388239122822274226623922275238923952270228522672394238723982276227122682390228423962399228322802386226923932278239723842279227322612385226222602263232923272401232824022330240323792382238322882406240724082286241624172405240422872411241024092378237623772372236523662370233223352333233124262425242424372438243924432442244124402249225022512251A2248225322542255225212581770176917981254179712211225184813022234161821892087223721602236161921882086223520852232216120842233213513591358213416201301121912171216121321511903198517942152122019021900117621791891117121771793185012572131125511791901213218901355117811771849126111751253135421781351130813531262179613521172179512511224125612601252224322442245224622472241224222182219222022212318221712231222130322562257172011806363.56464656566676666706868676867686765666665.567.58967.556.5667079807595929290928794879093999997.5681001081081141171091071101051121151201161051141141091171121109991949180861046571655889818879818588809081909271654528302437334960728796999180927179837369605240517138463545486278102103509942245124522453245424552456 BIH / RKW 1" = 40'2420 Grand Avenue, Suite F-2LGC Valley, Inc.TEL. (760) 559-7000 FAX (760) 599-7007Vista, CA 92081Plate 2E SCALE ENG. / GEOL. DATE PROJECT NAMERobetson Ranch133023-03 PROJECT NO.8004040See Plate 1B See Plate 2DField Density Test Location MapRobertson RanchCarlsbad, CaliforniaJune 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 2A for Legend39 FT LOT 240 ,933 SQ FT 1350 □ LOT 241 5,939 SQ FT 132.8 LOT 242 6.008 SO FT ' /JO. 7 LOT 243 5,299 50 FT D 128.6 LOT 244 5,780 SQ FT 126.J D LOT 251 ~ HOA 6,495 SQ FT 118.07 EL D / □ oO '7 ,, □ □ D □ □ D □ □ □ □ □ □ D □ □ 11-11-,✓_'ll-11 □ 11--1, __ ,, • \\ \\ \\ □ ~ □ □ □ □ □ □ 0 ; \ ~o □ □ /, / ' C ~/ □ □ N □ 100 / LOT 325 6.726 SQ FT 121.0 100 . ~ ;1// ,/\ // iO / 1[] I I? " LOT 32 1 9,814 SQ FT -c?o 126.4 ,,,. II D D y LOT 330 ~ REC. J7,J9J SQ FT * RECREATION AREA 1/ 128.8 r; D D 120 110 ,r:[L LOT 347 ~ OPEN PA 1,741,884 SQ FT, 2. _., .. _ ,f, (f (f (, ,, ~ ~ /, LOT 14 9,105 SO FT 74.0 ~J._ ~ ~ f""' LOT 12 LOT 11 5,966 SO FT r"'' I""' 10,995 SQ FT ~< ~ ~ 1~1 LOT 13 6586 SQ FT ' 750 □ LOT 15 6,145 SQ FT D 1J4 LOT 16 5,391 SQ FT 12.9 76.0 LOT 17 5,003 SO FT 12.4 □ LOT 18 5,000 SQ FT 11.9 □ 86.0 LOT 10 5,01 ! SO FT 855 □ LOT 19 5,000 SQ FT 71.4 LOT 9 5,000 SQ FT 850 LOT 22 11,188 SQ FT 720 □ -.l LOT 20 LOT 8 5,000 SQ FT □ 84.5 5000 SQ FT -.l 70.9 LOT 21 □ -1 5,971 SQ FT ......_ 70.4 LOT 7 5,000 SQ FT 84.0 □ LOT 23 g 708 SQ FT 71.0 LOT 6 5,QOO SQ FT 8J5 □ LOT 5 5525 SO FT 8JO □ LOT 4 5000 SQ FT 825 □ LOT J 5,000 SQ FT 82.5 □ LOT 2 5,010 SQ FT 82.0 LOT I 7,279 SQ FT 81.0 □ LOT 24 H~,,,__ 700 19,081 SOIi:' .._,, __ ,, 70 I' I ,/ / □ -.l ,, / ,, , FT! ~ , -,, S"~-:::::41;~• ~;;•-====-'!.":::-->1,:::::_ ,✓, I L_____ ~ ~REA IMENT AREA I t; ' ~ 11----11---~ ( / -------' ,, ~ --/ ~ ,, ,,/ \ ,,/ ,,/ ~ 11 I \\ l~ I \\ i \< \~CY:: 10' \ / // / \ 1/ PA-7 PA-8 PA-4 PA-23A PA-5 PA-3 PA-7 PA-3 PA-3 PA-6 R102 R100/R100A R101 R98 R97 R99 R113 R96 R94 R60 R64 R54 R62R71 R81 R90 R67 R82 R63 R61 R76 R66 R83 R89 R75 R65 R85 R79 R70 R74 R87 R51 R68 R57 R73 R47 R69 R46R78 R88 R44 R50 R71 R45 R43 R52 R56 R48 R49 R53 R72R55 R80 R86 R32 R22 R34 R21 R40 R28 R30 R24 R27 R41 R23 R31 R33 R38 R17 R36 R26 R42 R19R25 R37 R15 R9R72R7 R4 R6R3 R1 R2 R5 R11 R8 R13 R18 R10 R14 R20 R16 R148 R149 R93 R84 R58 R92 802 799 800 1000 1542 492 3238261496 434 491 1498 1497 384 499 322 245 433395 825 490 360 1495 329 243 497 486 386 498796 886 1300 815816 1330 1313 1284 1207 1312 1281 1208 1034 830 649 672 669 829 1092 668 674 650 650A676 673 1102 827 828 688 675678 639 687 352 289 286 285 311 287 313 1867 345 327 315 288 353 348 733 342 404 319 354 343 1130 1130A 349 403387 453 318 312 351 328 344 283 321 350 394 919 1865 388 320 356 1864 421A 421 201 199 237 205 200 380 204 896 454383 382 355 920 408 274 407 273 494 280 1494 359 257 314 250 489 236396 208 504 271 493 439 398 456 282 418 281 822 210 242 381 207 251 277 206 248 397 290 312A313A 1866 792 741 410 656 409 657 500 413 364 630 629 370 527 419 665 680 402 420 276414 275 679 742 363 435659 879 658 8781541 1009 1046 791 614 615 525 873 660 399 524 729 592 593 663872 634 526 633 2139 2138 965 2137 2136 1061 972 1023 984 889 888 971 897 717 932 1595 7651331 1096 1003 1594 1089 900 1165 1022 1062905 788 906 1164 10211063 772 854 934 885 884 1064 1020 853 1163 11621065 1019855 959 933 1066 1018 1161958 1128 1127 1126 740 995 1576 1088 1577 974 973 1578 899 1579 1318 787 931 1580 1319 739 1320 1333 1593 1592 1332 880 804881 898 1042 798 1317 1472 1316 1473 1474 1315 766 1007 1053 1475 907 1314 803 1041 1056 400 738 1384 1095 1385 1054 797 1386 1479 7201030 1478 1045 1001 1044 1052 908 1291 1486 1002 1485 1028 789 1029 7951055 1005 790 1476 887 10871043 8011387 1008 1311 719 1477 1505 794 793 436 1504 1503 1502 1506 1501 1487 730 1028A 1234 718 807 808 662 852 783 1324 749 770 784 2140 693 725819 1325 726 938 937 949 1121 1122 1123 1060 840 7851326 857 702 750 839 1059 856 694 820 698752 786 935 751 1327 697 998 1712 1714 954 999 1713 1711 1170 1588 955 1343 1584957 1342 1585 956 1340 1586 1587 1341 1659 1722 1660 1723 1724 909 890 910 1725 1726 9211422 1451 1452 1453 1721 1727 922 1058 936 1962 2036 2037 1965 1964 2035 1961 20381963 1950 2039 947 982 924 1328 981 923 946 851 927948 1124 1235 926 1169 817 836 975 1168 805 806 1687 16571730 1686 1729 945 1658 1006 902 902A 1232 1069 1086 1243 970 969 903 903A 1321 1078 1242 1084 1241 1070 901 1233 1427 1428 2057 1429 2056 1430 1458 2055 1381 2115 14131107 1379 1108 21161105 1094 1094A 1109 1082 10831090 1090A 1093 11102117 1380 1375 1374 1412 1423 1424 1836 1425 1837 1426 14201419 14211417 1418 13781377 1414 1376 1835 13351334 1488 1513 1373 1372 1512 1471 1348 1349 1560 1336 1571 1347 1572 1337 1346 1573 1574 13381345 1575 1350 1509 1510 1371 1339 2227 1344 1455 1454 1456 2228 2229 2231 2223 2222 2230 1511 1457 1799 1627 1800 1628 1630 1811 1293 1292 1812 1631 1286 1294 1813 12951632 1633 1814 1289 1210 1629 1280 1638 1279 1290 1634 1815 1296 1635 1816 1297 128289210251038 1032894 849 1080 1039 1026 1081 875 778 2004 779A 779 2003 776 710 735 722 823 882 824 1033 1079 1285 1639 1209 10911027 2002 708 714 734 721 713 709 711690 775 1073 689 671 677 1040 1051 777 874 846 2005 850 1024 1037 1206 1287 18191389 1388 16371818 1288 1817 1298 1636 1299 1278 422 422A 930 930A 1057 772 1205 1101 2348 2324 2325 2347 2323 2346 2360 2310 2344 2361 2345 2363 2293 2293A 2294 2297 2414 2303 2296 2295 2415 2302 2298 2307 2413 2349 2304 2350 2308 2351 2305 23062368 2369 2315 2412 2319 2400 2322 2371 2320 2367 2321 2341 2343 647 478 375 371 374 519 531 476 479479A514575 513 576532537 480 475 536533530 587 547 517 518 511583 538 539 512 572 546 571 577 578 2001 2364 2334 2326 2342 2309 2299 2301 2300 94 78 84 86 88 74 77 71 80 63 61 60 46 61 67 35 65 64 32 60 645551 62 65 6881 66 89 87 83 86 73.5 58 48 90 95 9498 67 88 95 96 104 109 108 104 104 102 103 108109 118 123 127 113 128 128 127 116 140 130 145 136 146.5 118 93.5 120 123 116 113.5 120 116 88 105 98 123 102.5 122 135 8796 96 86 130 158 156 155.5 157.5 158.5 160.5 160.5 130 160.5 118 124 114 111 125.5 124 129 130 130 162 164 156 144 162 154 155.5 178 185 190 197 187.5 152 153 152 158 159 161 161 160 162 154 162 48 47 46 45 45 45 41 133 139 141 144 146 126 125 157 178 190 165 164 195 167 198 152 151.5 151 150 150 149 148 148.5 153 152 153 153 141 142 141 142 140 140 141 140 140.5 140 140 141 138 141 140 139 141 138 138 134 132 133 132 132 131 132 137 140 129 130 137 138 130 131 127 129 112116 131 123 132 124 130 129 111 121 133 134 135 134 135 123 93 81 95 99 68 78 154 153 149 128 125 128 163 157 162 161 139 137 159 160 160 161 162 170 148 165 171 170 170 172 171 152 151 150 159 148 149 150.5 160 137 130 119 135 123 127 138 139 197 169 166 125.5 124 156 155 160 129 112 102 129 122 118 113 105 77 53 141.5 137 138 147 170.5 159 157 157 155 154 153.5 154 154 155 152 150 148 156 132.5 132 133 132 130 138 132 163 142 129 PA-6 BIH / RKW 1" = 40' 2420 Grand Avenue, Suite F-2 LGC Valley, Inc. TEL. (760) 559-7000 FAX (760) 599-7007 Vista, CA 92081 Plate 2F SCALE ENG. / GEOL. DATE PROJECT NAME Robetson Ranch 133023-03 PROJECT NO. 8004040See Plate 2ASee Plate 2BSee Plate 2CSee Plate 2C Field Density Test Location Map Robertson Ranch Carlsbad, California June 28, 2016Base Map Obtained From Project Civil Engineer O'Day Consultants, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, 23 (A, B, C), 55 sheets, dated July 24, 2015Reference Plate 2A for Legend --- -- 138 ~40 • • 140~ I ~ ( " \ '' ' D LOT 135 4,631 SQ FT 14/.0 :.. ,,.., :,: ,, / 11 / / / / / / / LOT 345 ~ OPEN SPACE 413,227 SQ FT LOT 38 8,803 SQ FT 188.9 LOT 37 8,788 SQ FT 192.8 LOT 36 9,116 SQ FT /96.5 LOT 35 9,195 SQ FT 200.2 LOT 55 9,119SQFT 198.8 LOT 54 9,095 SQ FT 202.9 LOT 53 8,505 SQ FT 205.3 LOT 52 8,503 SQ FT 206.2 LO~! · 8,148 SQ FT LOT 170 8,097 SQ FT 171.9 # ~ 170.9 LOT 56 9,313 SO FT L_OA/1 LOT 172 8,513 SQ FT 4 170.0 LOT 92 4,218 SQ FT 159.4 D D LOT 82 5,149 SQ FT 159.7 LOT 71 5,755 SQ FT 168.4 ' ' ·:,-:," _.,, - D LOT 72 5,009 SQ FT /618 D Lol5BJ □ 6,535 SQ FT LOT 84 6,883 SQ FT 158.0 D D LOT 63 5,704 SQ FT 168.6 " I D~ LOT 73 5,353 SQ FT /613 D LOT 64 4,906 SQ FT 168. I LOT 74 5,235 SQ FT 166.7 LOT 43 13,741 SQ FT 176.2 D LOT 65 5,724 SQ FT 1673 = LOT 66 6.590 SQ FT LOT 75 5,012 SQ FT /663 D LOT 42 14,153 SQ FT 176.6 D 4% TR£A IYDIT AREA /65.27 EL ,,.~ -,, LOT 67 6, I !14. !fl FT D ,.-' ' I ff D 166.0 D LOT 76 5,381 SQ FT 165. I 160 I D r-----~~_±_;c□~s LOT 85 5,593 SQ FT /57.0 ~ D ,,,._,, M----11 ,435 so FT LOT 87 I 155.9 5,083 SQ FT " T 150 ~ '-'""'1,__,_.,i 154.8 5.159 SO FT I D ,.. 149.94 EL. " LOT 93 4,160 SQ FT /59.0 , ' LOT, 4 4 SQ FT ,. ,_, ,. D D D D -_, J 4% TREA TMEN AREA "A=.1.< ,. ' """'-'I,!,::, D LOT 41 8,773 SQ FT /113 D ,, LOT 40 I 1,087 SQ FT 181.2 L~8 10,688 SQ FT LOT 39 8,803 SQ FT /85.0 LOT 60 8,843 SQ FT /18. 6 LOT 59 8,193 SQ FT 182.5 /627 f □ I~ LOT 69 5,526 SQ FT D D LOT 182 6,968 SQ FT /51.2 D /60.J LOT 70~ ~ 8,001 SQ FT ~ 158.6 LOT 58 8,824 SQ FT /86.J LOT 57 8,824 SO FT 190.2 LOT 179 7.182 SO FT 1619 LOT 180 '-: 7,061 SQ FT '\ /629 " /94.5 LOT 178 7,021 SO FT /64.8 .-,. LOT 181 6,967 SQ FT 160.6 D LOT 205 5,108 SQ FT E°:J D LOT 77 4,271 SQ FT 1612 LOT 78 4,005 SO FT /62.0 LOT 79 4,080 SQ FT 160.J LOT 80 4,080 SQ FT /58.6 LOT 246 ~ HOA J0,026 SQ FT LOT 88 5,485 SQ FT /52.4 760 LOT 89 4,928 SQ FT 151.6 LOT 90 4,723 SQ FT /49.J b D LOT 91 4,593 SQ FT 147.5 LOT 81 4,400 SQ FT /56.9 150•-+--=□= D 148.Jl EL. LOT 206 5,320 SQ FT 1534 LO 151 ~ ~ 4'82/, SQ r-<,,.,...., LOT 207 □ ... % TREA TMEN. 5,309 SQ FT , AREA 15/.4 t::::J· ,u•--.,,,.,'---11-t9t o~=~---==~ . . •'-: ;. · . LOT 208 5,314 SQ FT 148.8 <aa u /2 LOT 173 8,521 SQ FT /69.2 ~- ,/ LOT 174 / 8,355 SQ FT 1ia -y" 168.J c<a ,/ LOT 175 •J'/ 1,949 SQ FT ;I" /67.5 .I LOT 176 7.248 SO FT /66.7 D LOT 198 5,321 SQ FT 168.5 LOT 204 5,000 SO FT /629 LOT 203 5,000 50 FT 1617 D D LOT 202 5,200 SO FT 164.7 LOT 201 5,200 SO FT /65.6 V D LOT 200 5,200 SQ FT 166.6 D LOT 199 5,378 SQ FT 1676 = D D /58.4 D LOT 95 4,160 SQ FT 1 151 s LOT 96 4,118 SQ FT 156.9 LOT 97 4,201 SQ FT LOT 98 4,229 SQ FT LOT 99 5,221 SO FT D ' ·,._. .. , ' . ' '· . 1~rr==---=---==mL_______-- LOT 209 □ 5,314 SO FT 13 D LOT 105 5,490 SO FT /46.4 D LOT 115 4,386 SO FT /46.8 D LOT 106 5,772 SO FT D 155.9 154.9 1519 147.3 LOT 107 6,213 SO FT 1477 LOT 108 5,504 SQ FT LOT 109 5,321 SO FT I 147. 7 LOT I 10 D ,. D D LOT 116 4,572 SQ FT 147.5 LOT 117 4,000 SO FT LOT 118 4,125 SO FT 147.7 D LOT 154 ~ REC. 14.154 SQ FT /41.2 1477 D LOT 127 5,327 SO FT /J9.6 D 1412 5. 151 SO FT OT /52 ~ ~ • J_LJJ 5,480 SO FT 141./lELI • D LOT 119 4,315 SQ FT /47.2 D LOT 128 5,828 SO FT /J8.8 146.6 ,. D ,, ,. D LOT 120 4,500 SO FT /46. 6 D 140 D LOT 129 5,008 SQ FT !J77 D D LOT 121 5,494 SO FT 146.0 LOT 130 6,125 SO FT /37.0 D - □< I " " I J ! ~ I " I I r l LOT 100 4,JJJ SQ FT /524 D 150 D LOT 111 5.499 SO FT LOT 101 4,032 SO FT /51.5 LOT 102 4,135 SQ FT /49.J LOT 103 4,145 SO FT /475 □ LOT 104 4,393 SO FT /46.5 140-+-.I /44.0 T 112 5,061 SQ FT /430 LOT 113 4,958 SO FT LOT 114 4,949 SQ FT LOT 122 5,049 SO FT /44.0 D LOT 131 5,128 SQ FT /J5.8 D ,, LOT 123 4,675 SQ FT /43. 0 I " 140.9 D LOT 124 4,77! SO FT /40.9 139.0 D LOT 125 4,771 SO FT /J9.0 LOT; l5J ~ H 5,439 SO FT 132.91 EL. LOT 126 5,077 SO FT /J8.0 c:::::J 740~±-~1 LOT 132 4,734 SO FT /J5.2 LOT 133 4,638 SQ FT /J4.6 LOT 134 4,632 SQ FT 134./ L D 146.J -= D LOT 210 5,309 SO FT 1437 1t=1r==~-c--==- '-.---1/z---i D LOT 211 5.309 SO FT /41.2 > v_~- LOT 247 ~ H~ 129.70 EL < r- □ LOT 149 4,692 SQ FT IJ5.8 LOT 148 4,160 SQ FT 134.7 D D D D D □ LOT 34/ ~ REC.□ 52,117 SQ FT D D D D D D LOT 197 5,388 SO FT 169.5 1/ D D D LOT 136 4, /07 SO FT D D D 155 ~ H 5,101 SQ FT f2859 EL. 5% TREA TM£NT LOT 147 4,329 SO FT /J32 D D 140.7 D LOT 137 4,100 SO FT 140.J LOT 138 4, JOO SQ FT /39.8 D LOT 139 4,511 SO FT /J9.2 D LOT 140 4,539 SO FT 138.7 D LOT 141 4,229 SQ FT IJ7.9 LOT 142 4,050 50 FT 137.2 -~- -_.' ' ·i LOT 143 4,000 SQ FT /J6.5 AREA D ' D D LOT 146 5,082 SO FT /J24 D D \ 16 L'{}J 340 ~ MUL TIFAMIL y 283,391 SO FT LOT 16 8,228 so 172.8 LOT 19 5,201 so 170.5 D D LOT 144 4,000 SQ FT /36.0 LOT 145 4,000 SQ FT /J5.5 LOT /56 ~ REC 10,683 SQ . LOT 157 ~ HOA 12,166 so D 11S D . ~ N 80 □ -• ----- •• □ -□ . - • -. D ___._______._ . 47 FT __ . • • ------. --'• --- 100 . !JO ~ . ~□~---__."cf--------10 D 'l 1, --11-11 ,,_ 473 ,,_ ,, C4IV 11-11-11-11 47 I FT /2900 £L D D D D D -90 -8-------- D 11-11-11-" _117 11-11-11 11-11-J. -11-II 11-11-11 11-11 'J.-11-11--11-'I 11-11-II 0 CAW E£ 0 0 [[ w 4 7 OH--------OH Project No. 133023-03 Page A-1 June 28, 2016 APPENDIX A References Atlantic Consultants, 2015, Corrosion Control Recommendations for Robertson Ranch Undercrossing, Reference No. AJ2015-031, dated May 21, 2015, revised July 17, 2015. American Society of Civil Engineers (ASCE), 2013, Minimum Design Loads for Buildings and Other Structures, ASCE/SEI 7-10, Third Printing, 2013. Bryant, W.A., and Hart E.W., 2007, Special Publication 42, Fault Rupture hazard Zones in California, Alquist-Priolo Earthquake Fault Zoning Act with index to earthquake fault zone maps, CGS Special Publication 42, 46 pages, dated 1997 with interim revision dated 2007. California Building Standards Commission (CBSC), 2013, California Building Code, California Code of Regulations, Title 24, Part 2, Volume 1 and 2 of 2 (based on the 2012 International Building Code). CBSC, 2013a, California Residential Building Code, California Code of Regulations, Title 24, Part 2.5, (based on the 2012 International Residential Code), 2013. CBSC, 2013b, California Green Building Standards Code, California Code of Regulations, Title 24, Part 11, 2013. Eisenberg, L.I., 1985, Pleistocene Faults and Marine terraces, Northern San Diego County: in Abbott, P.L., Ed, On the Manner of Deposition of the Eocene Strata in Northern San Diego County, San Diego Association of Geologists, Field Trip Guidebook, pp. 86-91. Eisenberg, L.I. and Abbott, P.L., 1985, Eocene Lithofacies and geologic History, northern San Diego County in Abbott, P.L., ed., On the Manner of Deposition of the Eocene Strata in Northern San Diego County: San Diego Association of Geologists, Field Trip Guidebook, pp. 19-35. GeoSoils, Inc., 2004, Updated Geotechnical Evaluation of the Robertson Ranch Property, Carlsbad, San Diego County, California, W.O. 3098-A2-SC, dated September 20, 2004. GeoSoils, Inc., 2007, Preliminary Geotechnical Evaluation, Planning Area 12 (13.44 Acres), and Planning Area 13 (6.92 Acres), Robertson Ranch West, Carlsbad, San Diego County, California 92010, City of Carlsbad Planning Department Application No. SUP 06-12/HDP 06-04, W.O. 5247-A-SC, dated January 31, 2007. GeoSoils, Inc., 2007a, Preliminary Geotechnical Evaluation Update, Planning Area 11, Robertson Ranch Corridor and Widening of El Camino Real at Cannon Road, Robertson Ranch West, Carlsbad, San Diego County, California 92010, City of Carlsbad Planning Department application no. SUP 06-12/HDP 06-04, W.O. 5247-A1 -SC, dated January 31, 2007. GeoSoils, Inc., 2007b, Updated Phase I Environmental Site Assessment and Limited Agricultural Residue Survey, Robertson Ranch West, Carlsbad, San Diego County, California 92010, W.O. E5491-SC, dated July 27, 2007. Project No. 133023-03 Page A-2 June 28, 2016 References (continued) GeoSoils, Inc., 2007c, Detailed Agricultural Residue Survey, Robertson Ranch West, Carlsbad, San Diego County, California 92010, W.O. E5491.2-SC, dated October 17, 2007. GeoSoils, Inc., 2008, Report of Mass Grading, Planning Area 12 (13.44 Acres), and Planning Area 13 (6.92 Acres), Robertson Ranch West, Carlsbad, San Diego County, California 92010, City of Carlsbad Planning Department Application No. SUP 06-12/HDP 06-04, W.O. 5247-B1-SC, dated June 5. GeoSoils, Inc., 2008a, Report of Mass Grading, Planning Area 11, Robertson Ranch Habitat Corridor and Widening of El Camino Real at Cannon Road, Robertson Ranch West, Carlsbad, San Diego County, California 92010, City of Carlsbad Planning Department Application No. SUP 06-12/HDP 06-04, W.O. 5247-B2-SC, dated July 16, 2008. GeoSoils, Inc., 2010, Updated Geotechnical Investigation for Robertson Ranch West Village, Carlsbad, San Diego County, California, W.O. 6145-A-SC, dated October 10, 2010. GeoSoils, Inc., 2010a, Update Phase I Environmental Site Assessment and Supplemental Agricultural Residue Survey, Robertson Ranch West, Carlsbad, San Diego County, California 92010, W.O. E5491.2-SC, dated October 25, 2010. GeoSoils, Inc., 2010b, Addendum to Update Phase I Environmental Site Assessment and Supplemental Agricultural Residue Survey, Robertson Ranch West, Carlsbad, San Diego County, California 92010, W.O. E6145-SC, dated November 1, 2010. GeoSoils, Inc., 2010c, Addendum No. 2, Update Phase I Environmental Site Assessment and Supplemental Agricultural Residue Survey, Robertson Ranch West, Carlsbad, San Diego County, California 92010, W.O. E6145-SC, dated December 9, 2010. GeoSoils, Inc., 2011, Work Plan for Property Mitigation Plan, Rancho Costera (formerly Robertson Ranch West), Carlsbad, San Diego County, California 92010, Voluntary Assistance Case H39768-001, W.O. E6145.1-SC, dated May 4, 2011. GeoSoils, Inc., 2011a, Supplement to the Updated Geotechnical Investigation for Rancho Costera (formerly Robertson Ranch West Village), Carlsbad, San Diego County, California, W.O. 6145-A1-SC, dated June 6, 2011. GeoSoils, Inc., 2011b, Property Mitigation Plan, Rancho Costera (formerly Robertson Ranch West), Carlsbad, San Diego County, California 92010, Voluntary Assistance Case H39768-001, W.O. E6145.1-SC, dated October 10, 2011. GeoSoils, Inc., 2012, Response to DEH Review and Addendum to “Property Mitigation Plan, Rancho Costera (formerly Robertson Ranch West), Carlsbad, San Diego County, California 92010, Voluntary Assistance Case H39768-001,” (W.O. E6145.1-SC, dated October 2011), W.O. E6145.2-SC, dated February 24, 2012. GeoSoils, Inc., 2012a, Preliminary Geotechnical Review of “Vesting Master Tentative Map for Rancho Costera,” 40-scale plans, Sheets 1 through 21, Job No. 101307, revised May 1, 2012, by O’Day Consultants, W.O. 6145-A9-SC, dated May 24, 2012. Project No. 133023-03 Page A-3 June 28, 2016 References (continued) GeoSoils, Inc., 2013, Addendum to the Updated and Supplemental Geotechnical Investigations for Rancho Costera (formerly Robertson Ranch West Village), Carlsbad, San Diego County, California, W.O. 6145-A10-SC, dated July 16, 2013. Hannan, D., 1975, Faulting in the Oceanside, Carlsbad and Vista areas, Northern San Diego County, California: in Ross, A. and Dowlens, R.J., eds., Studies on the Geology of Camp Pendleton and Western San Diego County, California: San Diego Association of Geologists, pp. 56-59. Havasu Consulting, 2014, Site Management Plan, Robertson Ranch West, Carlsbad Tract No. 13-03, Carlsbad California, dated April 28, 2014. Havasu Consulting, 2015, Interim Remedial Summary Report, Robertson Ranch, 4980 El Camino Real, Carlsbad, California, dated September 14, 2015. Havasu Consulting, 2016, Final Remedial Summary Report, Robertson Ranch, 4980 El Camino Real, Carlsbad, California, dated March 31, 2016. LGC Valley, Inc., 2014, Retaining Wall Design Parameters for the Robertson Ranch West Village Development, City of Carlsbad, California, Project No. 133023-01, dated March 24, 2014. LGC Valley, Inc., 2014a, Geotechnical and Environmental Recommendations for Robertson Ranch West, Carlsbad Tract No. 13-03, Carlsbad, California, Project Number 133023-03, dated April 29, 2014. LGC Valley, Inc., 2014b, Change of Geotechnical Consultant, Robertson Ranch West Project, Carlsbad Tract No. 13-0, Carlsbad, California, Project No. 133023-03, dated May 6, 2014. LGC Valley, Inc., 2014c, Geotechnical Review of Mechanically Stabilized Retaining Walls, Southwest Side of Robertson Ranch along El Camino Real Station No. 471+00 to 482+00, Carlsbad Tract No. 13-0, Carlsbad, California, Project No. 133023-03, dated May 27, 2014. LGC Valley, Inc., 2014d, Clarification of Lot/Building Pad Overexcavation Recommendations, Robertson Ranch, Carlsbad Tract No. 13-0, Carlsbad, California, Project No. 133023-03, dated June 16, 2014. LGC Valley, Inc., 2014e, Preliminary Geotechnical Recommendations, Proposed Animal Crossing Structure, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated July 7, 2014. LGC Valley, Inc., 2014f, Addendum Geotechnical Report to Provide Additional Foundation Recommendations for the Proposed Animal Crossing Structure, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated September 4, 2014. LGC Valley, Inc., 2015, Geotechnical Recommendations Regarding Shallow Groundwater and Saturated Alluvium, Planning Area PA-2 and Robertson Road Station Number 10+50 to 12+25 Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated March 6, 2015. Project No. 133023-03 Page A-4 June 28, 2016 References (continued) LGC Valley, Inc., 2015a, Preliminary Foundation Design for the Single-Family Residential Structures, Planning Areas PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated April 14, 2015. LGC Valley, Inc., 2015b, As-Graded Completion Letter, Lots 1 through 23, Robertson Ranch, Carlsbad Tract No. 13-03, 4980 El Camino Real, Carlsbad, California, Project No. 133023-03, dated June 9, 2015. LGC Valley, Inc., 2015c, Preliminary Review of Building Setbacks for the Proposed Residential Planning Areas 3, 5, 6, 9, 10, and 13, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated February 27, 2015, revised June 24, 2015. LGC Valley, Inc., 2015d, Deepened Footing Recommendation of Building Foundation Adjacent to Proposed Nexus eWater Recycler System, Planning Areas PA-3, PA-5, PA-6, PA-9, PA-10, and PA-13, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated July 23, 2015. LGC Valley, Inc., 2015e, Additional Geotechnical Recommendations Regarding the Construction and Backfill of the Animal Crossing Structure, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated July 30, 2015. LGC Valley, Inc., 2015f, Geotechnical Post-Tension Foundation Plan Review for The Vistas Development within Planning Area 6 (PA-6), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated August 4, 2015. LGC Valley, Inc., 2015g, Geotechnical Post-Tension Foundation Plan Review for The Ridge Development within Planning Area 3 (PA-3), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated August 4, 2015. LGC Valley, Inc., 2015h, As-Graded Report of Mass-Grading, Planning Areas PA-7 and PA-8, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated August 7, 2015. LGC Valley, Inc., 2015i, As-Graded Report of Rough-Grading, Lots 1 through 24 of PA-13, PA-3 and PA-6 Model Lot Complexes, and PA-4 Recreation Center, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated August 7, 2015 LGC Valley, Inc., 2015j, Geotechnical Review of Mechanically Stabilized Retaining Walls No. 24 and 30, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated October 8, 2015. LGC Valley, Inc., 2015k, Geotechnical Post-Tension Foundation Plan Review for The Vistas Development within Planning Area 6 (PA-6), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated October 21, 2015. Project No. 133023-03 Page A-5 June 28, 2016 References (continued) LGC Valley, Inc., 2015l, Geotechnical Post-Tension Foundation Plan Review for The Ridge Development within Planning Area 3 (PA-3), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated November 4, 2015. LGC Valley, Inc., 2015m, Geotechnical Response to the City of Carlsbad Plan Check Review Comment, Regarding Verdura Walls No. 24 and 30, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated November 9, 2015. LGC Valley, Inc., 2015n, Geotechnical Post-Tension Foundation Plan Review for The Terraces Development within Planning Areas 9 and 10 (PA-9 and PA-10), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated November 23, 2015. LGC Valley, Inc., 2015o, Presaturation Recommendations Concerning the Proposed Single-Family Residential Structures, The Ridge, Lots 63 through 149 of Planning Area PA-3, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated December 2, 2015. LGC Valley, Inc., 2015p, Presaturation Recommendations Concerning the Proposed Single-Family Residential Structures of The Vistas Development, Lots 1 through 23 of Planning Area PA-13 and Lots 158 through 244 of Planning Area PA-6, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated December 2, 2015. LGC Valley, Inc., 2015q, Presaturation Recommendations Concerning the Proposed Single-Family Residential Structures, The Terraces, Lots 252 through 326 of Planning Areas PA-9 and PA-10, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023- 06, dated December 9, 2015. LGC Valley, Inc., 2015r, Presaturation Recommendations Concerning the Proposed Single-Family Residential Structures, The Bluffs, Lots 25 through 60 of Planning Area PA-5, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated December 9, 2015. LGC Valley, Inc., 2015s, Geotechnical Post-Tension Foundation Plan Review for The Bluffs Development within Planning Area 5 (PA-5), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated December 22, 2015. LGC Valley, Inc., 2016, Updated Corrosivity Results, Planning Areas PA-5, PA-9, and PA-10, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-09, dated January 27, 2016. LGC Valley, Inc., 2016a, As-Graded Report of Rough Grading, Lots 127 through 149, Planning Area PA-3, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated January 29, 2016. LGC Valley, Inc., 2016b, Geotechnical Post-Tension Foundation Plan Review for The Terraces Development within Planning Areas 9 and 10 (PA-9 and PA-10), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-11, dated February 1, 2016. Project No. 133023-03 Page A-6 June 28, 2016 References (continued) LGC Valley, Inc., 2016c, As-Graded Report of Rough Grading, Lots 59, 60, 216 through 225, 234 through 244, 299 through 301, 308 through 310, and 320 through 324, Planning Areas PA-5, PA-6, and PA-9&10, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated February 3, 2016. LGC Valley, Inc., 2016d, Geotechnical Post-Tension Foundation Plan Review for The Bluffs Development within Planning Area 5 (PA-5), Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-06, dated February 17, 2016. LGC Valley, Inc., 2016e, As-Graded Report of Rough Grading, Lots 82 through 87, 92 through 99, 105 through 110, 115 through 121, 212 through 215 and 226 through 233, Planning Areas PA-3 and PA-6, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated March 24, 2016. LGC Valley, Inc., 2016f, Geotechnical Recommendation for the Fill Placement Operations, Planning Area PA-1, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated May 5, 2016. LGC Valley, Inc., 2016g, Geotechnical Review and Approval of the Bioretention Basin Material Submittal Sheets, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated May 5, 2016. LGC Valley, Inc., 2016h, Addendum As-Graded Completion Letter, Lots 1 through 4 of Planning Area PA-13, The Vistas, Robertson Ranch, Carlsbad Tract No. 13-03, 4980 El Camino Real, Carlsbad, California, Project No. 133023-03, dated May 25, 2016. LGC Valley, Inc., 2016i, As-Graded Completion Letter, Robertson Ranch Community Center, Planning Area PA-4, Robertson Ranch, Carlsbad Tract No. 13-03, 4980 El Camino Real, Carlsbad, California, Project No. 133023-03, dated May 26, 2016, revised . June 6, 2016. LGC Valley, Inc., 2016j, As-Graded Report of Rough Grading, Lots 25 through 32 and 44 through 52, Planning Area PA-5, Robertson Ranch, Carlsbad Tract No. 13-03, Carlsbad, California, Project No. 133023-03, dated June 6, 2016. Nexus eWater, 2015, Recycler System Standard Drawings, 9 Sheets, dated April 30, 2015. O’Day Consultants, 2013, Improvement Plans for Rancho Costera/Robertson Ranch West Village, Carlsbad Tract No. 13-03, Drawing No. 480-3, 71 Sheets, dated December 2, 2013. O’Day Consultants, 2014, Vesting Tentative Map for Carlsbad Tract No. 13-03-2, 23 Sheets, dated January 16, 2014. O’Day Consultants, 2014a, Grading Plans for Rancho Costera, Robertson Ranch West Village, Carlsbad Tract No. 13-03, Drawing No. 480-3A, 44 Sheets, dated August 25, 2014. O’Day Consultants, 2015, Grading Plans for Rancho Costera, Robertson Ranch West Village, Planning Areas 1-11, 13, &23 (A,B,C), Carlsbad Tract No. 13-03, Drawing No. 480-3A, 55Sheets, dated July 24, 2015. Project No. 133023-03 Page A-7 June 28, 2016 References (continued) O’Day Consultants, 2015a, Grading Exhibit Planning Area A-1, Robertson Ranch, 1 Sheet, dated November 13, 2015. Orie2 Engineering, 2015, Animal Crossing Headwall Plans, 4 Sheets, dated June 2, 2015. Post-Tensioning Institute, 2006, Design of Post Tensioned Slabs-On-Ground, Third Addition, Addendum 1 dated May 2007, and Addendum 2 dated May 2008, with errata February 4, 2010. Rockwell, T.K., and Lindvall, S.C., 1991, Minimum Holocene Slip Rate for the Rose Canyon Fault in San Diego, California: in Environmental Perils, San Diego Region: San Diego Association of Geologists, p. 37-46. Soil Retention Designs, Inc., 2014, Verdura Segmental Wall Plans, Rancho Costera, 6 sheets, dated May 20, 2014. Soil Retention Designs, Inc., 2014a, Verdura 40 Retaining Wall Design, Rancho Costera, Project No. 1303-006, dated May 22, 2014. Soil Retention Designs, Inc., 2015, Verdura Segmental Wall Plans, Wall No. 24 and 30, Rancho Costera, 5 sheets, dated September 11, 2015. Soil Retention Designs, Inc., 2015a, Verdura Retaining Wall Design, Rancho Costera Walls 24 & 30, Project No. 1303-006, dated September 14, 2015. Specialty Steel, 2015, Post-Tension Plans, Details, and General Notes for The Bluffs (PA-5) at Robertson Ranch, Carlsbad, California. Reference No. 4302, dated December 17, 2015. Specialty Steel, 2016, Post-Tension Plans, Details, and General Notes for The Terraces at Robertson Ranch, PA-9 and PA-10, Carlsbad, California, Reference No. 4301, dated November 20, 2015 with Delta 1 dated January 29, 2016. Suncoast Post-Tension, 2015, Post-Tension Plans, Details, and General Notes for The Vistas at Robertson Ranch, PA-6, Carlsbad, California. Project No. 15-6428, dated August 3, 2015 Delta 1 dated October 8, 2015. Suncoast Post-Tension, 2015a, Post-Tension Plans, Details, and General Notes for The Ridge at Robertson Ranch, PA-3, Carlsbad, California. Project No. 15-6429, dated Delta 1 – October 29, 2015. United States Geological Survey (USGS), 2008, “2008 National Seismic Hazard Maps – Fault Parameters” retrieved from: http://geohazards.usgs.gov/cfusion/hazfaults_search/hf_search_main.cfm Project No. 133023-03 Page A-8 June 28, 2016 References (continued) USGS, 2008a, “2008 Interactive Deaggregations (Beta),” retrieved from: https://geohazards.usgs.gov/deaggint/2008/ USGS, 2008b, California Fault Parameters for the National Seismic Hazard Maps and Working Group on California Earthquake Probabilities 2007, USGS Open-File Report: 2007-1437-A. USGS, 2013, U.S. Seismic Design Maps, retrieved from: http://geohazards.usgs.gov/designmaps/us/batch.php#csv VTN, 1985, Plans for the Improvement of Calavera Hills Estates, Carlsbad Tract No. CT 84-1, Sheets 1 and 5, Carlsbad, California, dated April 5, 1985. Project No. 133023-03 Page B-1 June 28, 2016 APPENDIX B Laboratory Testing Procedures and Test Results Maximum Density Tests: The maximum dry density and optimum moisture content of typical materials were determined in accordance with ASTM Test Method D1557. The results of these tests are presented in the table below. Sample Number Sample Description Maximum Dry Density (pcf) Optimum Moisture Content (%) 1 Gray brown sandy CLAY 117.5 16.0 2 Greenish gray silty CLAY 102.0 21.5 3 Red brown sandy CLAY 118.0 13.5 4 Dark gray brown clayey fine SAND 123.5 11.0 5 Medium brown f-m SAND 124.5 11.0 6 Light brown silty SAND 114.5 13.5 7 Olive gray clayey SILT 111.5 19.5 8 Pale gray silty fine SAND 115.5 14.5 9 Pale gray silty f-m SAND 127.5 10.5 10 Medium brown clayey SAND 128.0 10.0 11 Light brown clayey SAND 122.0 12.5 12 Pale brown fine sandy CLAY to clayey SAND 124.0 12.0 13 Pale brown fine sandy CLAY to clayey SAND 125.5 11.0 14 Light gray silty fine SAND 117.0 15.0 Project No. 133023-03 Page B-2 June 28, 2016 Laboratory Testing Procedures and Test Results (continued) Expansion Index: The expansion potential of selected samples was evaluated by the Expansion Index Test, U.B.C. Standard No. 18-2 and/or ASTM D4829. The results of these tests are presented in the table below: Sample Location Representative Lots Sample Description Expansion Index Expansion Potential Lot 4 Lots 1-12 Brown clayey SAND 108 High Lot 13 Lots 13-23 Brown clayey SAND 57 Medium Lot 24 Lot 24 Brown sandy CLAY 142 Very High Lot 27 Lots 25-28 & 44-48 Pale brown silty SAND 11 Very Low Lot 38 Lots 29-38 Pale olive brown fine SAND 15 Very Low Lot 40 Lots 39-43 Light brown silty SAND 11 Very Low Lot 50 Lots 49-54 Pale brown fine SAND 5 Very Low Lot 55 Lots 55-59 Pale brown fine SAND 11 Very Low Lot 60 Lots 60 & 68-70 Medium brown silty to clayey SAND 70 Medium Lot 66 Lots 63-67 Light brown silty SAND 15 Very Low Lot 73 Lots 71-74 & 82-84 Pale gray brown silty fine SAND 22 Low Lot 76 Lots 75, 76, &85-87 Pale gray brown silty fine SAND 40 Low Lot 78 Lots 77-81 Light brown silty fine SAND 38 Low Lot 89 Lots 88-91 & 100-104 Light brown silty fine SAND 35 Low Lot 95 Lots 92-95 & 105 Pale gray brown silty fine SAND 42 Low Lot 108 Lots 96-99 & 106-110 Light brown silty fine SAND 34 Low Lot 123 Lots 111-114&122-126 Light to medium brown silty to clayey fine SAND 59 Medium Lot 119 Lots 115-121 Light brown silty to clayey fine SAND 52 Medium Lot 139 Lots 127-130&135-141 Light brown silty to clayey fine SAND 43 Low Lot 148 Lots 131-134&146-149 Light brown silty to clayey fine SAND 51 Medium I I I I I I Project No. 133023-03 Page B-3 June 28, 2016 Laboratory Testing Procedures and Test Results (continued) Expansion Index (continued): Sample Location Representative Lots Sample Description Expansion Index Expansion Potential Lot 145 Lots 142-145 Light brown silty to clayey fine SAND 41 Low Lot 164 Lots 158-164 Medium brown silty fine SAND 22 Low Lot 168 Lots 165-171 Light brown silty fine SAND 38 Low Lot 177 Lots 172-182 Pale brown fine SAND 13 Very Low Lot 187 Lots 183-188 Pale olive gray silty fine SAND 8 Very Low Lot 194 Lots 189-199 Light gray brown silty SAND 37 Low Lot 200 Lots 200-205 Light gray silty to clayey SAND 65 Medium Lot 208 Lots 206-211 Light gray silty SAND 16 Very Low Lot 229 Lots 226-233&212-213 Pale gray brown silty fine SAND 19 Very Low Lot 221 Lots 214-225 Pale orange brown silty SAND 34 Low Lot 240 Lots 234-244 Pale gray brown silty fine SAND 10 Very Low Lot 261 Lots 252-264 Pale olive brown silty to clayey SAND 80 Medium Lot 268 Lots 265-275 Pale olive gray silty SAND with minor clay 60 Medium Lot 284 Lots 276-287 Medium olive brown silty to clayey SAND 83 Medium Lot 290 Lots 288-291 Pale orange brown silty fine SAND 53 Medium Lot 297 Lots 292-298 Olive green sandy CLAY/clayey SAND 73 Medium Lot 302 Lots 299-307 Olive green sandy CLAY/clayey SAND 89 Medium Lot 309 Lots 308-316 Pale olive green silty to clayey SAND 86 Medium Lot 321 Lots 317-326 Medium olive brown clayey fine SAND 76 Medium I I I I I I Project No. 133023-03 Page B-4 June 28, 2016 Laboratory Testing Procedures and Test Results (continued) Corrosion Suite Tests: Soluble sulfate content, soluble chloride content, minimum resistivity and pH tests of representative soil samples were performed and presented herein. The soluble sulfate content was tested in accordance with Caltrans Test Method (CTM) 417 while the chloride content was tested in accordance with CTM 422. Minimum resistivity and pH tests were performed in general accordance with CTM 643. The electrical resistivity of a soil is a measure of its resistance to the flow of electrical current. As a results of soil’s resistivity decreases corrosivity increases. The results are presented in the table below: Sample Location Sample Description Sulfate Content (%) Chloride Content (ppm) pH Minimum Resistivity (ohms-cm) PA-13 Lot 19 Light brown silty fine SAND 0.011 270 7.82 1,200 PA-13 Lot 24 Gray brown sandy CLAY to clayey SAND 0.063 1,210 7.9 230 PA-5 Lot 27 Pale brown silty SAND 0.011 -- -- -- PA-5 Lot 38 Pale gray silty fine SAND 0.016 110 8.32 1,500 PA-5 Lot 54 Pale brown fine SAND 0.010 -- -- -- PA-5 Lot 60 Light grayish brown silty fine SAND 0.033 220 7.58 570 PA-3 Lot 73 Pale gray brown silty fine SAND 0.007 -- -- -- PA-3 Lot 89 Light brown silty fine SAND 0.021 -- -- -- PA-3 Lot 98 Light brown silty fine SAND 0.018 -- -- -- PA-3 Lot 112 Light brown silty to clayey fine SAND 0.009 -- -- -- PA-3 Lot 123 Medium brown silty clayey SAND 0.025 205 8.23 640 PA-3 Lot 142 Light brown silty to clayey fine SAND 0.038 -- -- -- PA-6 Lot 164 Medium brown silty fine SAND 0.014 -- -- -- PA-6 Lot 181 Pale brown fine SAND 0.015 -- -- -- PA-6 Lot 184 Pale olive gray silty fine SAND 0.004 -- -- -- PA-6 Lot 194 Light gray brown silty SAND 0.010 -- -- -- PA-6 Lot 201 Light gray silty to clayey SAND 0.030 -- -- -- PA-6 Lot 221 Pale yellow brown silty fine SAND 0.071 175 5.23 800 PA-9 Lot 263 Pale olive brown silty to clayey SAND 0.006 -- -- -- Project No. 133023-03 Page B-5 June 28, 2016 Laboratory Testing Procedures and Test Results (continued) Corrosion Suite Tests (continued): Sample Location Sample Description Sulfate Content (%) Chloride Content (ppm) pH Minimum Resistivity (ohms-cm) PA-9 Lot 268 Pale olive gray silty SAND with minor clay 0.025 -- -- -- PA-9 Lot 284 Medium olive brown silty to clayey SAND 0.040 -- -- -- PA-9 Lot 291 Pale orange brown silty fine SAND 0.025 -- -- PA-10 Lot 302 Olive green silty to sandy CLAY 0.056 230 7.45 360 PA-10 Lot 303 Olive green sandy CLAY/clayey SAND 0.051 -- -- -- PA-10 Lot 318 Medium olive brown clayey fine SAND 0.014 -- -- Animal Crossing IVM Escondido 3/8” DG (Import) 0.017 215 9.69 2,550 Animal Crossing IVM “Rock Dust” well-graded SAND (Import) 0.001 165 8.54 8,100 GeoSoils BA-101@15’ PA-3 ECR Slope Light gray brown silty fine SAND 0.003 100 8.4 1,100 GeoSoils TP-6 @3’ PA-9 W Side Olive gray silty SAND 0.056 910 6.6 240 Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 1 N 9/3/2014 PA-13 Lot 21 2 CF 65.0 18.5%21.5%94.6 102.0 93%90%retest on 1A 2 N 9/3/2014 PA-13 Lot 17 2 CF 67.0 13.5%21.5%96.2 102.0 94%90%retest on 2A 3 N 9/3/2014 PA-13 Lot 15 2 CF 68.0 22.6%21.5%94.2 102.0 92%90% 4 N 9/3/2014 PA-13 Lot 20 1 CF 67.0 16.8%16.0%106.1 117.5 90%90% 5 N 9/4/2014 PA-13 Lot 13 2 CF 69.0 24.3%21.5%93.6 102.0 92%90% 6 N 9/4/2014 PA-13 Lot 22 3 CF 68.0 14.6%13.5%108.3 118.0 92%90% 7 N 9/4/2014 PA-13 Lot 24 2 CF 67.0 20.3%21.5%92.8 102.0 91%90% 8 N 9/4/2014 PA-13 Lot 1 3 CF 69.0 14.1%13.5%106.8 118.0 91%90% 9 N 9/4/2014 PA-13 Lot 4 3 CF 69.0 15.4%13.5%107.8 118.0 91%90% 10 N 9/4/2014 PA-13 Lot 8 1 CF 70.0 19.4%16.0%105.8 117.5 90%90% 11 N 9/4/2014 PA-13 Lot 11 1 CF 70.0 16.3%16.0%107.8 117.5 92%90% 12 N 9/10/2014 PA-11 2 CF 96.0 21.2%21.5%93.1 102.0 91%90% 13 N 9/10/2014 PA-11 4 CF 96.0 14.2%11.0%111.2 123.5 90%90% 14 N 9/10/2014 PA-11 4 CF 96.0 12.7%11.0%108.9 123.5 88%90%retest on 14A 15 N 9/10/2014 PA-11 4 CF 96.0 11.8%11.0%115.8 123.5 94%90% 16 N 9/10/2014 PA-11 1 CF 97.0 16.8%16.0%107.1 117.5 91%90% 17 N 9/10/2014 PA-11 1 CF 97.0 18.0%16.0%108.8 117.5 93%90% 18 N 9/11/2014 PA-11 4 CF 98.0 11.9%11.0%112.9 123.5 91%90% 19 N 9/11/2014 PA-11 4 CF 98.0 9.9%11.0%115.4 123.5 93%90% 20 N 9/11/2014 PA-11 4 CF 97.0 10.8%11.0%114.8 123.5 93%90% 21 N 9/11/2014 PA-11 4 CF 97.0 11.5%11.0%114.1 123.5 92%90% 22 N 9/12/2014 PA-11 2 CF 99.0 24.2%21.5%95.7 102.0 94%90% 23 N 9/12/2014 PA-11 3 CF 99.0 9.9%13.5%106.3 118.0 90%90% 24 N 9/12/2014 PA-11 4 CF 99.0 13.4%11.0%115.6 123.5 94%90% 25 N 9/12/2014 PA-11 7 CF 98.0 19.7%19.5%104.3 111.5 94%90% 26 N 9/12/2014 PA-11 1 CF 100.0 15.6%16.0%111.8 117.5 95%90% 27 N 9/12/2014 PA-11 7 CF 100.0 21.8%19.5%103.0 111.5 92%90% 28 N 9/12/2014 PA-11 7 CF 101.0 21.3%19.5%103.3 111.5 93%90% 29 N 9/12/2014 PA-11 4 CF 84.0 11.9%11.0%118.7 123.5 96%95% 30 N 9/12/2014 PA-11 1 CF 101.0 18.3%16.0%111.8 117.5 95%90% 31 N 9/12/2014 PA-13 Lot 3 1 CF 70.0 15.6%16.0%107.7 117.5 92%90% 32 N 9/12/2014 PA-13 Lot 7 1 CF 71.0 19.7%16.0%108.7 117.5 93%90% 33 N 9/12/2014 PA-13 Lot 10 1 CF 71.0 18.8%16.0%106.9 117.5 91%90% 34 N 9/12/2014 PA-13 Lot 12 3 CF 70.0 14.9%13.5%107.1 118.0 91%90% 35 N 9/12/2014 PA-13 Lot 23 3 CF 69.0 14.0%13.5%108.6 118.0 92%90% 36 N 9/15/2014 PA-11 1 CF 86.0 18.2%16.0%109.7 117.5 93%95%retest on 36A 37 N 9/15/2014 PA-11 4 CF 93.0 11.2%11.0%114.0 123.5 92%90% 38 N 9/15/2014 PA-11 7 CF 96.0 22.8%19.5%101.2 111.5 91%90% 39 N 9/15/2014 PA-11 4 CF 92.0 12.5%11.0%111.8 123.5 91%90% 40 N 9/15/2014 PA-11 6 CF 88.0 14.9%13.5%103.7 114.5 91%95%retest on 40A 41 N 9/15/2014 PA-11 4 CF 97.0 12.8%11.0%114.0 123.5 92%90% 42 N 9/15/2014 PA-11 4 CF 99.0 13.9%11.0%115.4 123.5 93%90% 43 N 9/15/2014 PA-11 1 CF 98.0 18.7%16.0%106.3 117.5 90%90% 44 N 9/15/2014 PA-11 6 CF 90.0 8.6%13.5%109.2 114.5 95%95% 45 N 9/15/2014 PA-11 4 CF 99.0 14.8%11.0%113.9 123.5 92%90%retest of 44 46 N 9/15/2014 PA-13 Lot 23 Slope 4 CF 71.0 9.9%11.0%114.2 123.5 92%90% 47 N 9/15/2014 PA-13 Lot 22 Slope 4 CF 72.0 12.9%11.0%112.3 123.5 91%90% 48 N 9/16/2014 PA-11 5 CF 91.0 12.8%11.0%116.2 124.5 93%90% 49 N 9/16/2014 PA-11 5 CF 92.0 11.1%11.0%113.8 124.5 91%90% 50 N 9/16/2014 PA-11 5 CF 93.0 13.6%11.0%117.9 124.5 95%90% 51 N 9/16/2014 PA-13 Lot 1 4 CF 71.0 11.2%11.0%111.6 123.5 90%90% 52 N 9/16/2014 PA-13 Lot 3 4 CF 72.0 10.0%11.0%112.6 123.5 91%90% 53 N 9/16/2014 PA-13 Lot 5 6 CF 72.0 13.7%13.5%106.8 114.5 93%90% 54 N 9/16/2014 PA-11 5 CF 97.0 11.4%11.0%117.4 124.5 94%90% 55 N 9/16/2014 PA-11 1 CF 99.0 16.2%16.0%110.6 117.5 94%90% 56 N 9/16/2014 PA-11 5 CF 92.0 12.3%11.0%117.9 124.5 95%90% 57 N 9/16/2014 PA-11 4 CF 95.0 14.8%11.0%115.2 123.5 93%90% 58 N 9/16/2014 PA-11 5 CF 98.0 13.3%11.0%117.8 124.5 95%90% 59 N 9/17/2014 PA-11 4 CF 98.0 12.2%11.0%114.8 123.5 93%90% 60 N 9/17/2014 PA-11 5 CF 99.0 15.1%11.0%115.7 124.5 93%90% 61 N 9/17/2014 PA-11 1 CF 102.0 17.2%16.0%107.5 117.5 91%90% 62 N 9/17/2014 PA-11 5 CF 101.0 14.8%11.0%114.8 124.5 92%90% 63 N 9/17/2014 PA-11 5 CF 100.0 12.1%11.0%116.1 124.5 93%90% 64 N 9/17/2014 PA-11 4 CF 101.0 13.6%11.0%114.2 123.5 92%90% 65 N 9/17/2014 PA-13 Lot 11 5 CF 72.0 10.5%11.0%117.2 124.5 94%90% 66 N 9/17/2014 PA-13 Lot 7 5 CF 72.0 11.8%11.0%119.6 124.5 96%90% 67 N 9/17/2014 PA-13 Lot 2 5 CF 71.0 10.6%11.0%120.0 124.5 96%90% 68 N 9/17/2014 PA-11 1 CF 101.0 18.7%16.0%106.7 117.5 91%90% 69 N 9/17/2014 PA-11 3 CF 102.0 13.2%13.5%110.2 118.0 93%90% 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 Project No.133023-03 Page C-1 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 70 N 9/17/2014 PA-11 5 CF 103.0 11.2%11.0%116.8 124.5 94%90% 71 N 9/17/2014 PA-11 5 CF 100.0 14.6%11.0%115.5 124.5 93%90% 72 N 9/17/2014 PA-11 3 CF 100.0 15.7%13.5%110.1 118.0 93%90% 73 N 9/17/2014 PA-13 Lot 11 1 CF 73.0 15.7%16.0%105.9 117.5 90%90% 74 N 9/17/2014 PA-13 Lot 8 4 CF 73.0 11.8%11.0%111.8 123.5 91%90% 75 N 9/17/2014 PA-13 Lot 6 5 CF 73.0 9.8%11.0%115.1 124.5 92%90% 76 N 9/17/2014 PA-13 Lot 2 5 CF 72.0 12.8%11.0%112.9 124.5 91%90% 77 N 9/17/2014 PA-11 5 CF 102.0 14.1%11.0%114.3 124.5 92%90% 78 N 9/17/2014 PA-11 5 CF 102.0 14.4%11.0%113.9 124.5 91%90% 79 N 9/17/2014 PA-11 1 CF 100.0 19.0%16.0%108.2 117.5 92%90% 80 N 9/18/2014 PA-11 5 CF 100.0 16.2%11.0%115.8 124.5 93%90% 81 N 9/18/2014 PA-11 5 CF 98.0 15.9%11.0%116.3 124.5 93%90% 82 N 9/18/2014 PA-11 5 CF 100.0 11.3%11.0%118.8 124.5 95%90% 83 N 9/18/2014 PA-11 5 CF 99.0 11.7%11.0%117.9 124.5 95%90% 84 N 9/18/2014 PA-11 5 CF 101.0 13.9%11.0%114.9 124.5 92%90% 85 N 9/18/2014 PA-11 5 CF 101.0 14.2%11.0%113.7 124.5 91%90% 86 N 9/18/2014 PA-13 Lot 9 4 CF 73.0 12.6%11.0%111.7 123.5 90%90% 87 N 9/18/2014 PA-13 Lot 7 4 CF 73.0 12.2%11.0%113.1 123.5 92%90% 88 N 9/18/2014 PA-13 Lot 4 4 CF 73.0 13.0%11.0%113.8 123.5 92%90% 89 N 9/18/2014 PA-13 Lot 12 5 CF 73.0 13.5%11.0%114.0 124.5 92%90% 90 N 9/18/2014 PA-11 5 CF 103.0 14.5%11.0%112.3 124.5 90%90% 91 N 9/18/2014 PA-11 4 CF 103.0 14.8%11.0%111.9 123.5 91%90% 92 N 9/19/2014 PA-13 Lot 9 8 CF 74.0 14.8%14.5%107.2 115.5 93%90% 93 N 9/19/2014 PA-13 Lot 6 8 CF 74.0 15.8%14.5%104.9 115.5 91%90% 94 N 9/19/2014 PA-13 Lot 4 4 CF 74.0 12.8%11.0%113.5 123.5 92%90% 95 N 9/19/2014 PA-13 Lot 1 8 CF 73.0 15.5%14.5%106.8 115.5 92%90% 96 N 9/19/2014 PA-13 Lot12 Slope 3 CF 74.0 14.6%13.5%111.2 118.0 94%90% 97 N 9/19/2014 PA-13 Lot 1 3 CF 74.0 15.3%13.5%110.2 118.0 93%90% 98 N 9/22/2014 PA-11 1 CF 102.0 18.9%16.0%106.5 117.5 91%90% 99 N 9/19/2014 PA-11 5 CF 105.0 13.0%11.0%116.0 124.5 93%90% 100 N 9/19/2014 PA-13 Lot 3 4 CF 74.0 11.9%11.0%115.6 123.5 94%90% 101 N 9/22/2014 PA-13 Lot 5 4 CF 75.0 11.4%11.0%114.9 123.5 93%90% 102 N 9/22/2014 PA-13 Lot 10 4 CF 75.0 12.3%11.0%115.3 123.5 93%90% 103 N 9/22/2014 PA-13 Lot 2 4 CF 75.0 11.8%11.0%117.4 123.5 95%90% 104 N 9/22/2014 PA-13 Lot 5 4 CF 75.0 12.2%11.0%113.3 123.5 92%90% 105 N 9/22/2014 PA-13 Lot 10 4 CF 76.0 13.8%11.0%112.8 123.5 91%90% 106 N 9/23/2014 PA-13 Lot 11 4 CF 77.0 9.9%11.0%112.9 123.5 91%90% 107 N 9/23/2014 PA-13 Lot 8 3 CF 76.0 12.5%13.5%107.4 118.0 91%90% 108 N 9/23/2014 PA-13 Lot 4 4 CF 76.0 9.9%11.0%116.9 123.5 95%90% 109 N 9/23/2014 PA-13 Lot 1 4 CF 75.0 10.3%11.0%114.2 123.5 92%90% 110 N 9/23/2014 PA-13 Lot 9 4 CF 78.0 10.7%11.0%112.3 123.5 91%90% 111 N 9/23/2014 PA-13 Lot 6 4 CF 76.0 13.9%11.0%115.9 123.5 94%90% 112 N 9/23/2014 PA-13 Lot 4 4 CF 77.0 11.3%11.0%115.5 123.5 94%90% 113 N 9/23/2014 PA-13 Lot 1 3 CF 76.0 13.8%13.5%107.9 118.0 91%90% 114 N 9/24/2014 PA-11 4 FG 0.0 12.8%11.0%115.7 123.5 94%90% 115 N 9/24/2014 PA-11 4 FG 0.0 12.6%11.0%116.3 123.5 94%90% 116 N 9/24/2014 PA-11 4 FG 0.0 11.2%11.0%116.2 123.5 94%90% 117 N 9/24/2014 PA-11 5 FG 0.0 10.4%11.0%119.2 124.5 96%90% 118 N 9/24/2014 PA-11 4 FG 0.0 11.8%11.0%115.1 123.5 93%90% 119 N 9/24/2014 PA-11 4 FG 0.0 10.5%11.0%118.1 123.5 96%90% 120 N 9/24/2014 PA-13 Lot 2 4 CF 76.0 10.7%11.0%113.8 123.5 92%90% 121 N 9/24/2014 PA-13 Lot 6 4 CF 76.0 10.6%11.0%112.1 123.5 91%90% 122 N 9/24/2014 PA-13 Lot 9 3 CF 78.0 12.9%13.5%112.0 118.0 95%90% 123 N 9/24/2014 PA-13 Lot 11 4 CF 79.0 10.5%11.0%115.3 123.5 93%90% 124 N 9/24/2014 PA-13 Lot 6 3 CF 77.0 12.8%13.5%110.6 118.0 94%90% 125 N 9/24/2014 PA-13 Lot 3 3 CF 77.0 13.3%13.5%109.9 118.0 93%90% 126 N 9/25/2014 PA-11 4 CF 89.0 9.7%11.0%107.1 123.5 87%90%retest on 126A 127 N 9/25/2014 PA-7 South Slope 6 CF 39.0 16.7%13.5%105.9 114.5 92%93%retest on 127A 128 N 9/25/2014 PA-7 4 CF 45.0 14.0%11.0%116.4 123.5 94%93% 129 N 9/25/2014 PA-7 4 CF 54.0 13.2%11.0%115.4 123.5 93%93% 130 N 9/25/2014 PA-8 1 CF 58.0 18.5%16.0%110.2 117.5 94%93% 131 N 9/25/2014 PA-11 4 CF 89.0 13.3%11.0%113.1 123.5 92%90% 132 N 9/26/2014 PA-11 3 CF 94.0 4.8%13.5%100.0 118.0 85%90%Soil Removed 133 N 9/26/2014 PA-11 1 CF 92.0 20.3%16.0%106.5 117.5 91%90% 134 N 9/26/2014 PA-11 4 CF 91.0 12.0%11.0%113.3 123.5 92%90% 135 N 9/26/2014 PA-7 South Slope 3 CF 40.0 14.6%13.5%112.1 118.0 95%93% 136 N 9/26/2014 PA-11 4 CF 92.0 10.6%11.0%112.0 123.5 91%90% 137 N 9/26/2014 PA-7 9 CF 50.0 11.8%10.5%119.9 127.5 94%93% 138 N 9/26/2014 PA-7 South Slope 3 CF 41.0 13.8%13.5%113.4 118.0 96%93% 139 N 9/26/2014 PA-13 Lot 2 9 CF 28.0 12.0%10.5%120.8 127.5 95%90% Project No.133023-03 Page C-2 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 140 N 9/26/2014 PA-13 Lot 4 3 CF 79.0 16.8%13.5%110.2 118.0 93%90% 141 N 9/26/2014 PA-13 Lot 7 9 CF 79.0 11.3%10.5%114.7 127.5 90%90% 142 N 9/26/2014 PA-13 Lot 10 4 CF 80.0 12.2%11.0%112.3 123.5 91%90% 143 N 9/29/2014 PA-7 5 CF 56.0 12.7%11.0%116.7 124.5 94%93% 144 N 9/29/2014 PA-7 Northeast Slope 4 CF 59.0 14.8%11.0%115.6 123.5 94%93% 145 N 9/29/2014 PA-11 9 CF 92.0 11.7%10.5%119.1 127.5 93%90% 146 N 9/29/2014 PA-7 4 CF 48.0 14.8%11.0%114.5 123.5 93%93% 147 N 9/29/2014 PA-7 5 CF 59.0 13.9%11.0%116.0 124.5 93%93% 148 N 9/29/2014 PA-7 South Slope 3 CF 52.0 16.7%13.5%112.7 118.0 96%93% 149 N 9/29/2014 PA-7 9 CF 61.0 11.7%10.5%119.3 127.5 94%93% 150 N 9/29/2014 PA-11 9 CF 94.0 11.9%10.5%118.9 127.5 93%90% 151 N 9/29/2014 PA-11 9 CF 95.0 11.3%10.5%118.5 127.5 93%90% 152 N 9/30/2014 PA-7 South Slope 4 CF 57.0 14.9%11.0%115.4 123.5 93%93% 153 N 9/30/2014 PA-7 3 CF 62.0 16.5%13.5%112.7 118.0 96%93% 154 N 9/30/2014 PA-11 4 CF 96.0 14.3%11.0%114.9 123.5 93%90% 155 N 9/30/2014 PA-11 1 CF 97.0 19.5%16.0%106.7 117.5 91%90% 156 N 9/30/2014 PA-7 East Slope 4 CF 60.0 13.9%11.0%115.6 123.5 94%93% 157 N 9/30/2014 PA-7 9 CF 61.0 11.5%10.5%119.0 127.5 93%93% 158 N 9/30/2014 PA-7 9 CF 60.0 10.9%10.5%119.9 127.5 94%93% 159 N 9/30/2014 PA-7 South Slope 3 CF 59.0 15.7%13.5%114.1 118.0 97%93% 160 N 9/30/2014 PA-7 3 CF 62.0 14.9%13.5%111.7 118.0 95%93% 161 N 9/30/2014 PA-7 South Slope 9 CF 61.0 12.4%10.5%119.8 127.5 94%93% 162 N 9/30/2014 PA-7 East Slope 4 CF 63.0 13.1%11.0%116.2 123.5 94%93% 163 N 10/1/2014 PA-7 9 CF 66.0 12.1%10.5%119.3 127.5 94%93% 164 N 10/1/2014 PA-8 3 CF 62.0 14.0%13.5%111.0 118.0 94%93% 165 N 10/1/2014 PA-7 East Slope 9 CF 65.0 11.7%10.5%119.2 127.5 93%93% 166 N 10/1/2014 PA-7 South Slope 1 CF 65.0 18.8%16.0%109.9 117.5 94%93% 167 N 10/1/2014 PA-7 9 CF 67.0 12.5%10.5%119.0 127.5 93%93% 168 N 10/1/2014 PA-7 4 CF 66.0 11.9%11.0%116.0 123.5 94%93% 169 N 10/1/2014 PA-7 South Slope 9 CF 69.0 12.0%10.5%118.4 127.5 93%93% 170 N 10/1/2014 PA-7 South Slope 4 CF 70.0 14.1%11.0%114.9 123.5 93%93% 171 N 9/29/2014 PA-13 Lot 21 3 CF 66.0 13.4%13.5%106.9 118.0 91%90% 172 N 9/29/2014 PA-13 Lot 18 3 CF 67.0 14.8%13.5%108.1 118.0 92%90% 173 N 9/29/2014 PA-13 Lot 14 7 CF 68.0 19.4%19.5%102.9 111.5 92%90% 174 N 9/29/2014 PA-13 Lot 13 3 CF 69.0 14.2%13.5%108.0 118.0 92%90% 175 N 9/29/2014 PA-13 Lot 12 4 CF 73.0 11.8%11.0%116.5 123.5 94%90% 176 N 9/29/2014 PA-13 Lot 9 4 CF 8.0 11.2%11.0%115.7 123.5 94%90% 177 N 9/29/2014 PA-13 Lot 6 4 CF 80.0 10.5%11.0%111.7 123.5 90%90% 178 N 9/30/2014 PA-13 Lot 19 5 CF 68.0 9.9%11.0%118.2 124.5 95%90% 179 N 9/30/2014 PA-13 Lot 17 4 CF 68.0 10.7%11.0%113.0 123.5 91%90% 180 N 9/30/2014 PA-13 Lot 15 5 CF 69.0 10.2%11.0%117.5 124.5 94%90% 181 N 9/30/2014 PA-13 Lot 14 5 CF 69.0 9.3%11.0%119.0 124.5 96%90% 182 N 9/30/2014 PA-13 Lot 14 3 CF 70.0 13.1%13.5%108.9 118.0 92%90% 183 N 9/30/2014 West Ranch St Sta. 13+75 3 TX 70.0 12.7%13.5%108.3 118.0 92%90% 184 N 9/30/2014 West Ranch St Sta. 15+50 3 TX 72.0 12.4%13.5%106.6 118.0 90%90% 185 N 9/30/2014 West Ranch St Sta. 16+90 3 TX 76.0 15.4%13.5%104.2 118.0 88%90%retest on 185A 186 N 10/1/2014 PA-13 Lot 1 4 CF 69.0 11.8%11.0%111.9 123.5 91%90% 187 N 10/1/2014 PA-13 Lot 1 3 CF 67.0 13.6%13.5%107.7 118.0 91%90% 188 N 10/1/2014 West Ranch St Sta. 14+10 3 TX 73.0 14.6%13.5%109.4 118.0 93%90% 189 N 10/1/2014 West Ranch St Sta. 16+50 1 TX 77.0 17.0%16.0%106.5 117.5 91%90% 190 N 10/1/2014 West Ranch St Sta. 17+80 6 TX 81.0 15.6%13.5%105.9 114.5 92%90% 191 N 10/1/2014 PA-7 9 CF 71.0 12.9%10.5%118.7 127.5 93%93% 192 N 10/1/2014 PA-7 South Slope 3 CF 67.0 15.6%13.5%112.8 118.0 96%93% 193 N 10/1/2014 PA-7 South Slope 5 CF 71.0 11.1%11.0%116.7 124.5 94%93% 194 N 10/2/2014 PA-7 9 CF 73.0 10.9%10.5%118.4 127.5 93%93% 195 N 10/2/2014 PA-7 South Slope 1 CF 73.0 16.3%16.0%110.3 117.5 94%93% 196 N 10/2/2014 PA-7 South Slope 10 CF 75.0 10.5%10.0%118.7 128.0 93%93% 197 N 10/2/2014 PA-8 Southeast Slope 5 CF 74.0 14.5%11.0%115.5 124.5 93%93% 198 N 10/2/2014 PA-8 Southeast Slope 3 CF 74.0 15.9%13.5%112.7 118.0 96%93% 199 N 10/2/2014 PA-7 South Slope 9 CF 69.0 13.7%10.5%118.3 127.5 93%93% 200 N 10/2/2014 PA-7 South Slope 9 CF 72.0 12.1%10.5%119.6 127.5 94%93% 201 N 10/2/2014 PA-7 South Slope 8 CF 71.0 16.1%14.5%109.4 115.5 95%93% 202 N 10/2/2014 PA-7 5 CF 76.0 12.6%11.0%115.9 124.5 93%93% 203 N 10/2/2014 PA-7 5 CF 76.0 12.3%11.0%115.4 124.5 93%93% 204 N 10/2/2014 PA-7 South Slope 1 CF 77.0 20.4%16.0%106.5 117.5 91%90% 205 N 10/3/2014 PA-7 South Slope 2 CF 78.0 27.0%21.5%94.8 102.0 93%90% 206 N 10/3/2014 PA-7 South Slope 2 CF 76.0 22.0%21.5%97.6 102.0 96%93% 207 N 10/3/2014 PA-7 South Slope 7 CF 82.0 22.9%19.5%101.3 111.5 91%90% 208 N 10/3/2014 PA-7 7 CF 81.0 22.3%19.5%102.4 111.5 92%90% 209 N 10/3/2014 West Ranch St Sta.12+40 3 CF 78.0 14.7%13.5%107.5 118.0 91%90% Project No.133023-03 Page C-3 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 210 N 10/3/2014 PA-7 South Slope 8 CF 80.0 16.2%14.5%106.4 115.5 92%90% 211 N 10/1/2014 PA-13 Lot 4 4 CF 80.0 11.1%11.0%114.3 123.5 93%90% 212 N 10/1/2014 PA-13 Lot 8 4 CF 81.0 9.5%11.0%113.0 123.5 91%90% 213 N 10/1/2014 PA-13 Lot 10 3 CF 82.0 15.9%13.5%106.9 118.0 91%90% 214 N 10/1/2014 West Ranch St Sta. 18+20 3 TX 86.0 14.8%13.5%109.8 118.0 93%90% 215 N 10/1/2014 West Ranch St Sta. 16+00 1 TX 78.0 17.3%16.0%107.9 117.5 92%90% 216 N 10/2/2014 PA-13 Lot 1 4 CF 71.0 13.7%11.0%111.2 123.5 90%90% 217 N 10/2/2014 PA-13 Lot 1 4 CF 73.0 13.9%11.0%114.5 123.5 93%90% 218 N 10/2/2014 West Ranch St Sta. 16+20 3 TX 79.0 14.3%13.5%107.9 118.0 91%90% 219 N 10/2/2014 West Ranch St Sta. 16+90 3 TX 80.0 15.1%13.5%108.4 118.0 92%90% 220 N 10/2/2014 West Ranch St Sta. 13+80 4 TX 75.0 12.8%11.0%113.7 123.5 92%90% 221 N 10/2/2014 PA-13 Lot 6 3 CF 81.0 14.6%13.5%109.3 118.0 93%90% 222 N 10/2/2014 PA-13 Lot 10 5 CF 83.0 12.7%11.0%116.7 124.5 94%90% 223 N 10/2/2014 PA-13 Lot 1 5 CF 75.0 13.2%11.0%115.9 124.5 93%90% 224 N 10/2/2014 PA-13 Lot 4 4 CF 81.0 10.3%11.0%114.7 123.5 93%90% 225 N 10/2/2014 PA-13 Lot 8 6 CF 83.0 14.2%13.5%107.1 114.5 94%90% 226 N 10/3/2014 West Ranch St Sta. 13+30 3 TX 73.0 13.8%13.5%108.8 118.0 92%90% 227 N 10/3/2014 West Ranch St Sta. 14+80 3 TX 77.0 15.6%13.5%111.5 118.0 94%90% 228 N 10/3/2014 West Ranch St Sta. 17+75 3 TX 84.0 13.4%13.5%112.4 118.0 95%90% 229 N 10/3/2014 West Ranch St Sta. 14+40 6 TX 76.0 17.9%13.5%102.9 114.5 90%90% 230 N 10/3/2014 West Ranch St Sta. 15+70 3 TX 80.0 14.4%13.5%110.8 118.0 94%90% 231 N 10/3/2014 West Ranch St Sta. 14+40 3 TX 78.0 14.4%13.5%111.7 118.0 95%90% 232 N 10/3/2014 West Ranch St Sta. 16+60 3 TX 81.0 13.6%13.5%110.9 118.0 94%90% 233 N 10/6/2014 Robertson Rd Sta. 33+60 8 CF 77.0 17.2%14.5%108.8 115.5 94%90% 234 N 10/6/2014 PA-7 4 CF 84.0 12.2%11.0%114.5 123.5 93%90% 235 N 10/6/2014 PA-7 South Slope 1 CF 83.0 20.1%16.0%107.8 117.5 92%90% 236 N 10/6/2014 PA-7 4 CF 85.0 11.6%11.0%112.7 123.5 91%90% 237 N 10/6/2014 PA-7 South Slope 4 CF 79.0 12.5%11.0%111.9 123.5 91%90% 238 N 10/6/2014 PA-7 6 CF 85.0 14.4%13.5%103.0 114.5 90%90% 239 N 10/6/2014 PA-7 4 CF 86.0 11.2%11.0%110.8 123.5 90%90% 240 N 10/6/2014 PA-7 4 CF 87.0 12.1%11.0%113.6 123.5 92%90% 241 N 10/7/2014 PA-7 4 CF 87.0 15.3%11.0%114.7 123.5 93%90% 242 N 10/7/2014 PA-7 South Slope 11 CF 86.0 15.4%12.5%113.3 122.0 93%90% 243 N 10/7/2014 PA-7 South Slope 9 CF 86.0 11.4%10.5%115.5 127.5 91%90% 244 N 10/7/2014 PA-7 South Slope 9 CF 88.0 13.7%10.5%115.4 127.5 91%90% 245 N 10/7/2014 PA-7 11 CF 80.0 15.7%12.5%114.0 122.0 93%90% 246 N 10/7/2014 PA-7 South Slope 9 CF 89.0 12.4%10.5%115.9 127.5 91%90% 247 N 10/7/2014 PA-7 South Slope 4 CF 89.0 11.1%11.0%111.9 123.5 91%90% 248 N 10/7/2014 PA-7 South Slope 4 CF 89.0 12.0%11.0%111.8 123.5 91%90% 249 N 10/7/2014 PA-7 11 CF 90.0 17.1%12.5%112.7 122.0 92%90% 250 N 10/7/2014 PA-7 4 CF 91.0 14.2%11.0%113.8 123.5 92%90% 251 N 10/7/2014 PA-7 5 CF 92.0 12.2%11.0%115.3 124.5 93%90% 252 N 10/7/2014 PA-7 South Slope 5 CF 92.0 12.3%11.0%117.2 124.5 94%90% 253 N 10/8/2014 PA-7 5 CF 94.0 13.5%11.0%114.2 124.5 92%90% 254 N 10/8/2014 PA-7 5 CF 95.0 12.7%11.0%116.1 124.5 93%90% 255 N 10/8/2014 PA-7 3 CF 81.0 15.0%13.5%111.5 118.0 94%93% 256 N 10/8/2014 PA-7 11 CF 96.0 13.6%12.5%110.8 122.0 91%90% 257 N 10/8/2014 PA-7 11 CF 96.0 14.1%12.5%112.4 122.0 92%90% 258 N 10/8/2014 PA-7 9 CF 96.0 13.6%10.5%116.8 127.5 92%90% 259 N 10/8/2014 PA-7 5 CF 97.0 12.9%11.0%115.1 124.5 92%90% 260 N 10/8/2014 PA-7 Northeast Slope 5 CF 98.0 13.0%11.0%115.2 124.5 93%90% 261 N 10/6/2014 West Ranch St Sta. 13+30 3 TX 77.0 11.9%13.5%108.1 118.0 92%90% 262 N 10/6/2014 West Ranch St Sta. 14+90 4 TX 80.0 9.3%11.0%109.8 123.5 89%90%retest on 262A 263 N 10/6/2014 West Ranch St Sta. 16+45 4 TX 81.0 15.8%11.0%113.4 123.5 92%90% 264 N 10/6/2014 West Ranch St Sta. 17+50 4 TX 87.0 15.3%11.0%111.9 123.5 91%90% 265 N 10/7/2014 West Ranch St Sta. 13+70 3 TX 78.0 14.5%13.5%106.5 118.0 90%90% 266 N 10/7/2014 West Ranch St Sta. 15+90 4 TX 83.0 11.8%11.0%111.7 123.5 90%90% 267 N 10/7/2014 West Ranch St Sta. 17+20 3 TX 86.0 13.6%13.5%106.3 118.0 90%90% 268 N 10/7/2014 West Ranch St Sta. 16+10 3 TX 79.0 14.0%13.5%110.8 118.0 94%90% 269 N 10/7/2014 West Ranch St Sta. 15+30 3 TX 82.0 13.5%13.5%108.6 118.0 92%90% 270 N 10/7/2014 West Ranch St Sta. 17+45 4 TX 87.0 13.4%11.0%114.4 123.5 93%90% 271 N 10/8/2014 PA-7 9 CF 93.0 12.9%10.5%117.9 127.5 92%90% 272 N 10/8/2014 PA-8 Southeast Slope 5 CF 84.0 12.0%11.0%114.5 124.5 92%90% 273 N 10/9/2014 PA-7 4 CF 98.0 11.0%11.0%111.1 123.5 90%90% 274 N 10/9/2014 PA-7 4 CF 96.0 12.4%11.0%112.2 123.5 91%90% 275 N 10/9/2014 PA-7 9 CF 90.0 10.0%10.5%114.8 127.5 90%90% 276 N 10/9/2014 PA-7 9 CF 92.0 11.2%10.5%115.1 127.5 90%90% 277 N 10/9/2014 PA-7 South Slope 3 CF 99.0 16.0%13.5%108.8 118.0 92%90% 278 N 10/9/2014 PA-7 9 CF 99.0 11.0%10.5%115.8 127.5 91%90% 279 N 10/9/2014 PA-7 East Slope 10 CF 99.0 10.1%10.0%116.7 128.0 91%90% Project No.133023-03 Page C-4 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 280 N 10/9/2014 PA-7 4 CF 99.0 12.8%11.0%113.1 123.5 92%90% 281 N 10/9/2014 PA-7 South Slope 5 CF 99.0 10.8%11.0%115.2 124.5 93%90% 282 N 10/9/2014 PA-7 3 CF 99.0 17.1%13.5%109.7 118.0 93%90% 283 N 10/10/2014 PA-7 South Slope 7 CF 85.0 20.4%19.5%104.4 111.5 94%93% 284 N 10/10/2014 PA-7 South Slope 7 CF 86.0 24.1%19.5%103.4 111.5 93%93% 285 N 10/10/2014 PA-7 South Slope 3 CF 37.0 15.4%13.5%110.1 118.0 93%93% 286 N 10/10/2014 PA-7 South Slope 3 CF 39.0 14.7%13.5%110.3 118.0 93%93% 287 N 10/10/2014 PA-7 South Slope 5 CF 41.0 12.2%11.0%116.1 124.5 93%93% 288 N 10/10/2014 PA-7 South Slope 3 CF 43.0 13.5%13.5%112.4 118.0 95%93% 289 N 10/10/2014 PA-7 South Slope 5 CF 45.0 12.2%11.0%115.8 124.5 93%93% 290 N 10/10/2014 PA-7 South Slope 4 CF 48.0 12.5%11.0%115.0 123.5 93%93% 291 N 10/8/2014 West Ranch St Sta. 17+95 4 TX 88.0 13.7%11.0%113.5 123.5 92%90% 292 N 10/8/2014 West Ranch St Sta. 18+30 4 TX 90.0 11.8%11.0%112.2 123.5 91%90% 293 N 10/8/2014 West Ranch St Sta. 16+45 4 TX 84.0 13.5%11.0%114.2 123.5 92%90% 294 N 10/8/2014 West Ranch St Sta. 13+35 4 TX 79.0 11.4%11.0%116.6 123.5 94%90% 295 N 10/8/2014 PA-13 Lot 11 7 CF 85.0 23.1%19.5%100.7 111.5 90%90% 296 N 10/8/2014 PA-13 Lot 3 5 CF 81.0 14.3%11.0%115.5 124.5 93%90% 297 N 10/8/2014 PA-13 Lot 1 4 CF 77.0 11.3%11.0%112.6 123.5 91%90% 298 N 10/8/2014 PA-13 Lot 1 5 CF 79.0 12.0%11.0%115.4 124.5 93%90% 299 N 10/9/2014 West Ranch St Sta. 15+50 4 TX 84.0 11.2%11.0%114.9 123.5 93%90% 300 N 10/9/2014 West Ranch St Sta. 17+55 4 TX 89.0 12.4%11.0%113.4 123.5 92%90% 301 N 10/9/2014 West Ranch St Sta. 17+70 3 TX 92.0 15.0%13.5%110.3 118.0 93%90% 302 N 10/9/2014 West Ranch St Sta. 18+20 4 TX 94.0 14.1%11.0%113.3 123.5 92%90% 303 N 10/10/2014 West Ranch St Sta. 18+40 4 TX 94.0 11.9%11.0%111.8 123.5 91%90% 304 N 10/13/2014 Robertson Rd Sta. 33+70 3 TX 80.0 14.5%13.5%111.9 118.0 95%90% 305 N 10/13/2014 Robertson Rd Sta. 34+25 3 TX 81.0 14.3%13.5%111.4 118.0 94%90% 306 N 10/13/2014 PA-13 Lot 11 4 CF 84.0 12.9%11.0%113.7 123.5 92%90% 307 N 10/13/2014 PA-13 Lot 11 3 FG 0.0 14.1%13.5%110.4 118.0 94%90% 308 N 10/13/2014 PA-13 Lot 10 4 FG 0.0 9.2%11.0%116.9 123.5 95%90% 309 N 10/13/2014 PA-13 Lot 9 4 FG 0.0 10.6%11.0%118.4 123.5 96%90% 310 N 10/13/2014 PA-13 Lot 8 4 FG 0.0 9.3%11.0%112.7 123.5 91%90% 311 N 10/10/2014 PA-7 South Slope 9 CF 50.0 11.9%10.5%118.3 127.5 93%93% 312 N 10/13/2014 PA-7 South Slope 11 CF 55.0 14.9%12.5%107.6 122.0 88%93%retest on 312A 313 N 10/13/2014 PA-7 South Slope 9 CF 59.0 10.7%10.5%112.7 127.5 88%93%retest on 313A 314 N 10/13/2014 PA-7 10 CF 100.0 9.2%10.0%117.2 128.0 92%90% 315 N 10/13/2014 PA-7 South Slope 11 CF 60.0 14.0%12.5%114.2 122.0 94%90% 316 N 10/14/2014 PA-7 11 CF 101.0 15.6%12.5%115.6 122.0 95%90% 317 N 10/14/2014 PA-7 11 CF 101.0 15.2%12.5%115.7 122.0 95%90% 318 N 10/14/2014 PA-7 South Slope 11 CF 64.0 13.5%12.5%111.7 122.0 92%90% 319 N 10/14/2014 PA-7 South Slope 3 CF 65.0 15.5%13.5%110.8 118.0 94%93% 320 N 10/14/2014 PA-7 South Slope 11 CF 83.0 15.1%12.5%115.5 122.0 95%90% 321 N 10/14/2014 PA-7 South Slope 5 CF 79.0 12.4%11.0%116.7 124.5 94%90% 322 N 10/14/2014 PA-7 1 CF 85.0 17.4%16.0%110.0 117.5 94%90% 323 N 10/14/2014 PA-7 1 CF 83.0 16.2%16.0%111.4 117.5 95%90% 324 N 10/14/2014 Robertson Rd Sta. 33+00 5 TX 87.0 12.4%11.0%114.6 124.5 92%90% 325 N 10/14/2014 Robertson Rd Sta. 32+00 5 TX 84.0 11.1%11.0%112.7 124.5 91%90% 326 N 10/14/2014 PA-8 11 CF 84.0 16.4%12.5%115.2 122.0 94%90% 327 N 10/14/2014 PA-7 South Slope 4 CF 63.0 11.5%11.0%112.3 123.5 91%90% 328 N 10/14/2014 PA-7 South Slope 4 CF 63.0 12.1%11.0%113.4 123.5 92%90% 329 N 10/14/2014 PA-7 4 CF 100.0 13.9%11.0%112.8 123.5 91%90% 330 N 10/15/2014 PA-8 3 CF 86.0 14.6%13.5%112.6 118.0 95%90% 331 N 10/13/2014 PA-13 Lot 7 3 FG 0.0 12.2%13.5%110.9 118.0 94%90% 332 N 10/13/2014 PA-13 Lot 6 3 FG 0.0 12.0%13.5%112.5 118.0 95%90% 333 N 10/13/2014 PA-13 Lot 5 3 FG 0.0 12.5%13.5%113.2 118.0 96%90% 334 N 10/13/2014 PA-13 Lot 4 4 FG 0.0 11.4%11.0%116.3 123.5 94%90% 335 N 10/13/2014 PA-13 Lot 3 4 FG 0.0 9.4%11.0%118.4 123.5 96%90% 336 N 10/13/2014 PA-13 Lot 2 1 FG 0.0 18.6%16.0%111.1 117.5 95%90% 337 N 10/13/2014 PA-13 Lot 1 1 FG 0.0 17.9%16.0%109.6 117.5 93%90% 338 N 10/13/2014 Robertson Rd Sta. 32+50 3 TX 84.0 14.8%13.5%110.1 118.0 93%90% 339 N 10/13/2014 Robertson Rd Sta. 34+00 3 TX 81.0 13.8%13.5%111.8 118.0 95%90% 340 N 10/14/2014 Robertson Rd Sta. 33+25 3 TX 86.0 16.0%13.5%111.3 118.0 94%90% 341 N 10/15/2014 PA-8 5 CF 87.0 14.1%11.0%117.4 124.5 94%90% 342 N 10/15/2014 PA-7 South Slope 5 CF 70.0 12.3%11.0%117.6 124.5 94%93% 343 N 10/15/2014 PA-7 South Slope 9 CF 69.0 13.1%10.5%118.9 127.5 93%90% 344 N 10/15/2014 PA-7 South Slope 3 CF 79.0 14.1%13.5%111.2 118.0 94%90% 345 N 10/15/2014 PA-7 South Slope 3 CF 74.0 15.2%13.5%111.8 118.0 95%90% 346 N 10/15/2014 PA-8 5 CF 88.0 11.1%11.0%113.4 124.5 91%90% 347 N 10/15/2014 PA-8 5 CF 90.0 12.9%11.0%115.2 124.5 93%90% 348 N 10/15/2014 PA-7 South Slope 9 CF 71.0 10.8%10.5%117.6 127.5 92%90% 349 N 10/15/2014 PA-7 South Slope 5 CF 76.0 11.5%11.0%116.5 124.5 94%90% Project No.133023-03 Page C-5 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 350 N 10/15/2014 PA-7 South Slope 3 CF 81.0 15.8%13.5%111.6 118.0 95%90% 351 N 10/15/2014 PA-7 South Slope 3 CF 74.0 15.2%13.5%111.7 118.0 95%90% 352 N 10/15/2014 PA-7 South Slope 3 CF 72.0 14.4%13.5%112.3 118.0 95%90% 353 N 10/16/2014 PA-7 South Slope 11 CF 75.0 15.9%12.5%112.6 122.0 92%90% 354 N 10/16/2014 PA-7 South Slope 11 CF 76.0 16.0%12.5%113.0 122.0 93%90% 355 N 10/16/2014 PA-7 South Slope 9 CF 92.0 11.9%10.5%116.8 127.5 92%90% 356 N 10/16/2014 PA-7 South Slope 5 CF 88.0 14.7%11.0%115.1 124.5 92%90% 357 N 10/16/2014 PA-8 9 CF 94.0 13.8%10.5%117.2 127.5 92%90% 358 N 10/16/2014 PA-8 11 CF 95.0 13.3%12.5%115.0 122.0 94%90% 359 N 10/16/2014 PA-7 9 CF 101.0 14.1%10.5%116.3 127.5 91%90% 360 N 10/16/2014 PA-7 9 CF 100.0 13.2%10.5%117.1 127.5 92%90% 361 N 10/16/2014 PA-8 5 CF 97.0 13.7%11.0%116.1 124.5 93%90% 362 N 10/16/2014 PA-8 4 CF 98.0 13.5%11.0%115.9 123.5 94%90% 363 N 10/16/2014 PA-7 11 CF 92.0 13.7%12.5%111.9 122.0 92%90% 364 N 10/16/2014 PA-7 4 CF 100.0 14.4%11.0%112.6 123.5 91%90% 365 N 10/16/2014 PA-8 3 CF 99.0 15.9%13.5%110.9 118.0 94%90% 366 N 10/16/2014 PA-8 11 CF 100.0 15.3%12.5%111.4 122.0 91%90% 367 N 10/17/2014 PA-8 4 CF 101.0 13.6%11.0%114.8 123.5 93%90% 368 N 10/17/2014 PA-8 4 CF 102.0 14.7%11.0%115.2 123.5 93%90% 369 N 10/17/2014 PA-7 11 CF 103.0 15.2%12.5%112.8 122.0 92%90% 370 N 10/17/2014 PA-7 11 CF 102.0 15.9%12.5%113.4 122.0 93%90% 371 N 10/14/2014 Robertson Rd Sta. 31+60 3 TX 90.0 14.0%13.5%109.6 118.0 93%90% 372 N 10/15/2014 Robertson Rd Sta. 33+60 4 TX 85.0 11.5%11.0%114.4 123.5 93%90% 373 N 10/15/2014 Robertson Rd Sta. 32+80 4 TX 87.0 12.7%11.0%114.2 123.5 92%90% 374 N 10/15/2014 Robertson Rd Sta. 30+60 4 TX 93.0 13.6%11.0%113.5 123.5 92%90% 375 N 10/15/2014 Robertson Rd Sta. 32+10 4 TX 89.0 14.8%11.0%112.2 123.5 91%90% 376 N 10/15/2014 Robertson Rd Sta. 33+20 4 TX 88.0 14.2%11.0%111.5 123.5 90%90% 377 N 10/18/2014 PA-13 Lot 12 Slope 4 SF 82.0 11.5%11.0%112.9 123.5 91%90% 378 N 10/18/2014 PA-13 Lot 23 Slope 1 SF 78.0 16.2%16.0%109.8 117.5 93%90% 379 N 10/18/2014 PA-13 Lot 24 Slope 4 SF 70.0 14.6%11.0%114.0 123.5 92%90% 380 N 10/20/2014 PA-7 South Slope 4 SF 88.0 11.6%11.0%116.9 123.5 95%90% 381 N 10/17/2014 PA-7 South Slope 4 CF 102.0 13.5%11.0%114.2 123.5 92%90% 382 N 10/17/2014 PA-7 South Slope 4 CF 100.0 14.1%11.0%115.1 123.5 93%90% 383 N 10/17/2014 PA-7 4 CF 93.0 12.7%11.0%115.2 123.5 93%90% 384 N 10/17/2014 PA-7 4 CF 94.0 11.6%11.0%114.0 123.5 92%90% 385 N 10/17/2014 PA-7 6 CF 103.0 15.1%13.5%105.4 114.5 92%90% 386 N 10/17/2014 PA-7 1 CF 102.0 18.6%16.0%107.7 117.5 92%90% 387 N 10/17/2014 PA-7 South Slope 11 CF 83.0 14.8%12.5%112.9 122.0 93%90% 388 N 10/17/2014 PA-7 South Slope 4 CF 93.0 15.9%11.0%114.6 123.5 93%90% 389 N 10/20/2014 PA-8 11 CF 103.0 11.4%12.5%110.3 122.0 90%90% 390 N 10/20/2014 PA-8 5 CF 104.0 13.0%11.0%114.7 124.5 92%90% 391 N 10/20/2014 PA-8 4 CF 77.0 14.5%11.0%115.5 123.5 94%93% 392 N 10/20/2014 PA-8 4 CF 78.0 13.9%11.0%116.1 123.5 94%93% 393 N 10/20/2014 PA-7 5 CF 105.0 13.4%11.0%116.9 124.5 94%90% 394 N 10/20/2014 PA-7 South Slope 3 CF 98.0 15.4%13.5%111.4 118.0 94%90% 395 N 10/20/2014 PA-7 11 CF 97.0 15.1%13.5%112.8 122.0 92%90% 396 N 10/20/2014 PA-7 5 CF 106.0 14.1%11.0%116.7 124.5 94%90% 397 N 10/20/2014 PA-7 4 CF 104.0 13.8%11.0%113.6 123.5 92%90% 398 N 10/20/2014 PA-7 5 CF 105.0 15.6%11.0%115.7 124.5 93%90% 399 N 10/20/2014 PA-8 4 CF 105.0 16.4%11.0%113.7 123.5 92%90% 400 N 10/20/2014 Wellspring St Sta. 29+15 4 CF 83.0 16.0%11.0%114.7 123.5 93%93% 401 N 10/20/2014 PA-7 11 CF 106.0 14.7%13.5%114.4 122.0 94%90% 402 N 10/20/2014 PA-7 5 CF 104.0 15.0%11.0%115.7 124.5 93%90% 403 N 10/21/2014 PA-7 South Slope 1 CF 86.0 16.9%16.0%111.4 117.5 95%90% 404 N 10/21/2014 PA-7 South Slope 1 CF 83.0 17.4%16.0%110.0 117.5 94%90% 405 N 10/21/2014 West Ranch Rd Sta. 14+05 9 CF 81.0 13.1%10.5%117.2 127.5 92%90% 406 N 10/21/2014 West Ranch Rd Sta. 14+30 4 CF 82.0 14.3%11.0%115.1 123.5 93%90% 407 N 10/21/2014 PA-7 8 CF 104.0 17.1%14.5%106.2 115.5 92%90% 408 N 10/21/2014 PA-7 8 CF 104.0 18.9%14.5%104.9 115.5 91%90% 409 N 10/21/2014 PA-7 4 CF 105.0 13.4%11.0%114.9 123.5 93%90% 410 N 10/21/2014 PA-7 5 CF 105.0 14.3%11.0%115.5 124.5 93%90% 411 N 10/21/2014 West Ranch St Sta. 13+85 5 CF 86.0 12.9%11.0%116.2 124.5 93%90% 412 N 10/21/2014 West Ranch St Sta. 13+60 10 CF 87.0 13.4%10.0%118.1 128.0 92%90% 413 N 10/21/2014 PA-7 5 CF 104.0 14.9%11.0%115.6 124.5 93%90% 414 N 10/21/2014 PA-7 5 CF 103.0 15.7%11.0%115.2 124.5 93%90% 415 N 10/22/2014 West Ranch St Sta. 14+25 8 CF 84.0 16.6%14.5%108.5 115.5 94%90% 416 N 10/22/2014 West Ranch St Sta. 14+35 8 CF 85.0 16.0%14.5%106.8 115.5 92%90% 417 N 10/22/2014 PA-7 1 CF 108.0 18.0%16.0%111.3 117.5 95%90% 418 N 10/22/2014 PA-7 1 CF 107.0 17.4%16.0%110.4 117.5 94%90% 419 N 10/22/2014 PA-7 1 CF 107.0 15.9%16.0%111.3 117.5 95%90% Project No.133023-03 Page C-6 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 420 N 10/22/2014 PA-7 4 CF 107.0 13.8%11.0%115.2 123.5 93%90% 421 N 10/20/2014 PA-7 South Slope 1 SF 85.0 15.2%16.0%103.0 117.5 88%90%retest on 421A 422 N 10/20/2014 PA-7 South Slope 4 SF 93.0 10.0%11.0%108.7 123.5 88%90%retest on 422A 423 N 10/20/2014 West Ranch St Sta. 18+80 3 TX 82.0 12.8%13.5%108.5 118.0 92%90% 424 N 10/20/2014 West Ranch St Sta. 19+10 3 TX 84.0 14.2%13.5%106.9 118.0 91%90% 425 N 10/21/2014 West Ranch St Sta. 18+60 4 TX 87.0 12.1%11.0%112.6 123.5 91%90% 426 N 10/21/2014 West Ranch St Sta. 18+90 3 TX 89.0 13.6%13.5%107.7 118.0 91%90% 427 N 10/21/2014 West Ranch St Sta. 18+70 7 TX 92.0 20.6%19.5%102.8 111.5 92%90% 428 N 10/21/2014 West Ranch St Sta. 17+65 3 TX 94.0 13.2%13.5%107.1 118.0 91%90% 429 N 10/21/2014 PA-13 Lot 22 3 CF 70.0 13.5%13.5%106.4 118.0 90%90% 430 N 10/21/2014 PA-13 Lot 23 1 CF 70.0 16.5%16.0%107.8 117.5 92%90% 431 N 10/22/2014 West Ranch St Sta. 14+45 11 CF 88.0 13.3%12.5%111.5 122.0 91%90% 432 N 10/22/2014 West Ranch St Sta. 13+75 5 CF 89.0 13.0%11.0%113.9 124.5 91%90% 433 N 10/22/2014 PA-7 3 CF 104.0 13.7%13.5%110.9 118.0 94%90% 434 N 10/22/2014 PA-7 11 CF 103.0 15.2%12.5%112.8 122.0 92%90% 435 N 10/22/2014 PA-7 4 CF 105.0 14.8%11.0%113.5 123.5 92%90% 436 N 10/22/2014 PA-7 8 CF 105.0 12.0%14.5%109.8 115.5 95%90% 437 N 10/22/2014 West Ranch St Sta. 14+25 8 CF 88.0 15.0%14.5%109.6 115.5 95%90% 438 N 10/22/2014 PA-7 11 CF 108.0 15.2%12.5%112.8 122.0 92%90% 438 N 10/22/2014 West Ranch St Sta. 13+80 8 CF 89.0 15.6%14.5%110.2 115.5 95%90% 440 N 10/22/2014 PA-7 4 CF 109.0 12.7%11.0%114.8 123.5 93%90% 441 N 10/21/2014 West Ranch St Sta. 19+05 4 TX 94.0 9.8%11.0%112.8 123.5 91%90% 442 N 10/21/2014 West Ranch St Sta. 17+00 4 TX 95.0 11.1%11.0%113.9 123.5 92%90% 443 N 10/22/2014 West Ranch St Sta. 18+70 3 TX 96.0 14.8%13.5%109.6 118.0 93%90% 444 N 10/22/2014 West Ranch St Sta. 16+40 4 TX 87.0 10.2%11.0%112.6 123.5 91%90% 445 N 10/22/2014 West Ranch St Sta. 18+35 4 TX 99.0 13.8%11.0%114.5 123.5 93%90% 446 N 10/22/2014 West Ranch St Sta. 15+75 3 TX 88.0 16.3%13.5%111.2 118.0 94%90% 447 N 10/22/2014 West Ranch St Sta. 18+95 4 TX 101.0 11.6%11.0%112.0 123.5 91%90% 448 N 10/24/2014 PA-13 Lot 19 2 CF 70.0 22.2%21.5%95.5 102.0 94%90% 449 N 10/24/2014 PA-13 Lot 16 2 CF 71.0 22.8%21.5%94.0 102.0 92%90% 450 N 10/24/2014 PA-13 Lot 12 4 CF 75.0 11.6%11.0%111.5 123.5 90%90% 451 N 10/23/2014 PA-8 3 CF 83.0 13.4%13.5%109.9 118.0 93%93% 452 N 10/23/2014 PA-8 4 CF 87.0 13.7%11.0%115.7 123.5 94%93% 453 N 10/23/2014 PA-7 11 CF 93.0 16.1%12.5%110.1 122.0 90%90% 454 N 10/23/2014 PA-7 4 CF 103.0 13.4%11.0%114.4 123.5 93%90% 455 N 10/23/2014 PA-7 11 CF 109.0 16.0%12.5%111.2 122.0 91%90% 456 N 10/23/2014 PA-7 11 CF 109.0 15.9%12.5%113.5 122.0 93%90% 457 N 10/23/2014 West Ranch St Sta. 14+15 1 CF 90.0 18.1%16.0%107.3 117.5 91%90% 458 N 10/23/2014 PA-8 4 CF 91.0 14.7%11.0%115.1 123.5 93%93% 459 N 10/23/2014 PA-8 3 CF 85.0 13.0%13.5%111.1 118.0 94%93% 460 N 10/24/2014 PA-8 11 CF 86.0 13.2%12.5%113.5 122.0 93%93% 461 N 10/24/2014 PA-8 4 CF 87.0 13.1%11.0%115.2 123.5 93%93% 462 N 10/24/2014 PA-8 11 CF 92.0 12.8%12.5%112.2 122.0 92%90% 463 N 10/24/2014 PA-8 11 CF 89.0 13.3%12.5%113.6 122.0 93%93% 464 N 10/24/2014 PA-8 11 CF 103.0 15.3%12.5%112.6 122.0 92%90% 465 N 10/24/2014 PA-8 11 CF 104.0 14.9%12.5%112.4 122.0 92%90% 466 N 10/24/2014 PA-8 11 CF 90.0 12.8%12.5%111.4 122.0 91%90% 467 N 10/24/2014 PA-8 11 CF 91.0 12.5%12.5%111.7 122.0 92%90% 468 N 10/24/2014 West Ranch St Sta. 17+95 3 TX 99.0 12.8%13.5%111.0 118.0 94%90% 469 N 10/24/2014 PA-8 11 CF 101.0 12.1%12.5%111.1 122.0 91%90% 470 N 10/24/2014 PA-8 4 CF 101.0 10.2%11.0%110.4 123.5 89%90%retest on 470A 471 N 10/24/2014 West Ranch St Sta. 19+00 3 TX 103.0 14.8%13.5%109.8 118.0 93%90% 472 N 10/24/2014 West Ranch St Sta. 17+20 4 TX 100.0 10.8%11.0%115.3 123.5 93%90% 473 N 10/24/2014 West Ranch St Sta. 15+85 4 TX 91.0 12.8%11.0%112.9 123.5 91%90% 474 N 10/24/2014 Robertson Rd Sta. 33+75 4 TX 87.0 12.4%11.0%111.7 123.5 90%90% 475 N 10/27/2014 Robertson Rd Sta. 28+60 4 TX 100.0 13.8%11.0%113.1 123.5 92%90% 476 N 10/27/2014 Robertson Rd Sta. 30+20 5 TX 97.0 10.6%11.0%115.0 124.5 92%90% 477 N 10/27/2014 Robertson Rd Sta. 32+70 3 TX 94.0 14.5%13.5%111.3 118.0 94%90% 478 N 10/28/2014 Robertson Rd Sta. 32+15 3 TX 96.0 14.8%13.5%110.5 118.0 94%90% 479 N 10/28/2014 Robertson Rd Sta. 30+00 5 TX 99.0 7.0%11.0%113.2 124.5 91%90%retest on 479A 480 N 10/28/2014 West Ranch St Sta. 28+70 5 TX 103.0 11.1%11.0%112.8 124.5 91%90% 481 N 10/24/2014 PA-8 11 CF 92.0 13.1%12.5%111.2 122.0 91%90% 482 N 10/24/2014 PA-8 11 CF 93.0 12.9%12.5%110.3 122.0 90%90% 483 N 10/25/2014 PA-8 11 CF 90.0 12.7%12.5%111.7 122.0 92%90% 484 N 10/25/2014 PA-8 11 CF 93.0 12.3%12.5%109.9 122.0 90%90% 485 N 10/25/2014 PA-8 11 CF 94.0 16.4%12.5%111.2 122.0 91%90% 486 N 10/25/2014 PA-7 11 CF 107.0 15.7%12.5%111.5 122.0 91%90% 487 N 10/25/2014 PA-8 11 CF 102.0 14.8%12.5%112.2 122.0 92%90% 488 N 10/25/2014 PA-8 11 CF 103.0 13.3%12.5%111.4 122.0 91%90% 489 N 10/25/2014 PA-7 11 CF 109.0 14.1%12.5%113.0 122.0 93%90% Project No.133023-03 Page C-7 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 490 N 10/25/2014 PA-7 11 CF 107.0 13.6%12.5%111.2 122.0 91%90% 491 N 10/27/2014 PA-7 11 CF 106.0 16.2%12.5%112.9 122.0 93%90% 492 N 10/27/2014 PA-7 4 CF 105.0 12.4%11.0%114.2 123.5 92%90% 493 N 10/27/2014 PA-7 4 CF 110.0 14.1%11.0%113.4 123.5 92%90% 494 N 10/27/2014 PA-7 11 CF 110.0 15.3%12.5%114.5 122.0 94%90% 495 N 10/27/2014 West Ranch St Sta. 13+45 11 CF 89.0 14.9%12.5%113.9 122.0 93%90% 496 N 10/27/2014 West Ranch St Sta. 13+35 11 CF 90.0 15.4%12.5%114.6 122.0 94%90% 497 N 10/27/2014 PA-7 10 CF 110.0 9.6%10.0%117.3 128.0 92%90% 498 N 10/27/2014 PA-7 10 CF 110.0 9.5%10.0%120.4 128.0 94%90% 499 N 10/27/2014 PA-7 5 CF 107.0 11.7%11.0%115.3 124.5 93%90% 500 N 10/27/2014 PA-7 5 CF 106.0 12.0%11.0%114.9 124.5 92%90% 501 N 10/27/2014 Roberston Rd Sta. 31+05 4 TX 97.0 11.7%11.0%114.5 123.5 93%90% 502 N 10/27/2014 Roberston Rd Sta. 33+50 5 TX 94.0 12.0%11.0%117.0 124.5 94%90% 503 N 10/27/2014 PA-7 5 CF 108.0 13.3%11.0%115.3 124.5 93%90% 504 N 10/27/2014 PA-7 11 CF 111.0 12.0%12.5%111.0 122.0 91%90% 505 N 10/28/2014 PA-7 East Slope 8 CF 88.0 16.0%14.5%107.2 115.5 93%90% 506 N 10/28/2014 PA-7 East Slope 8 CF 91.0 15.6%14.5%108.3 115.5 94%90% 507 N 10/28/2014 PA-7 11 CF 95.0 12.8%12.5%111.6 122.0 91%90% 508 N 10/28/2014 PA-7 11 CF 97.0 13.2%12.5%112.3 122.0 92%90% 509 N 10/28/2014 PA-7 East Slope 5 CF 90.0 10.8%11.0%112.0 124.5 90%90% 510 N 10/28/2014 PA-7 East Slope 4 CF 93.0 11.8%11.0%111.4 123.5 90%90% 511 N 10/28/2014 Wellspring St Sta. 29+10 4 TX 88.0 11.7%11.0%111.3 123.5 90%90% 512 N 10/28/2014 Wellspring St Sta. 28+00 10 TX 94.0 10.7%10.0%117.0 128.0 91%90% 513 N 10/29/2014 Roberston Rd Sta. 29+30 9 TX 102.0 12.9%10.5%117.1 127.5 92%90% 514 N 10/29/2014 Roberston Rd Sta. 29+80 5 TX 103.0 14.8%11.0%116.4 124.5 93%90% 515 N 10/29/2014 West Ranch St Sta. 14+75 5 CF 97.0 13.7%11.0%114.8 124.5 92%90% 516 N 10/29/2014 West Ranch St Sta. 14+35 5 CF 98.0 14.1%11.0%115.1 124.5 92%90% 517 N 10/29/2014 Wellspring St Sta. 29+35 5 TX 88.0 13.3%11.0%115.8 124.5 93%90% 518 N 10/29/2014 Wellspring St Sta. 29+20 5 TX 89.0 14.1%11.0%115.7 124.5 93%90% 519 N 10/29/2014 Roberston Rd Sta. 30+50 5 TX 101.0 11.2%11.0%114.0 124.5 92%90% 520 N 10/29/2014 PA-8 10 CF 99.0 10.2%10.0%114.9 128.0 90%90% 521 N 10/28/2014 PA-7 11 CF 97.0 13.7%12.5%110.5 122.0 91%90% 522 N 10/28/2014 PA-7 11 CF 99.0 13.1%12.5%111.8 122.0 92%90% 523 N 10/28/2014 PA-8 South Slope 11 CF 98.0 11.9%12.5%113.2 122.0 93%90% 524 N 10/28/2014 PA-8 South Slope 11 CF 100.0 12.7%12.5%112.4 122.0 92%90% 525 N 10/28/2014 PA-8 South Slope 11 CF 102.0 14.0%12.5%110.6 122.0 91%90% 526 N 10/28/2014 PA-4 South Slope 11 CF 100.0 12.9%12.5%112.1 122.0 92%90% 527 N 10/28/2014 PA-7 6 CF 100.0 15.6%13.5%108.6 114.5 95%90% 528 N 10/28/2014 PA-7 11 CF 99.0 14.1%12.5%112.3 122.0 92%90% 529 N 10/29/2014 PA-6 Lot 192 3 CF 138.0 12.8%13.5%106.9 118.0 91%90% 530 N 10/29/2014 Wellspring St Sta. 28+25 9 TX 98.0 13.0%10.5%117.1 127.5 92%90% 531 N 10/29/2014 Robertson Rd Sta. 30+15 5 TX 104.0 15.1%11.0%114.0 124.5 92%90% 532 N 10/29/2014 Robertson Rd Sta. 29+00 3 TX 105.0 14.1%13.5%111.1 118.0 94%90% 533 N 10/29/2014 Robertson Rd Sta. 28+00 9 TX 107.0 14.9%10.5%115.4 127.5 91%90% 534 N 10/30/2014 PA-8 5 CF 106.0 13.1%11.0%115.6 124.5 93%90% 535 N 10/30/2014 PA-8 5 CF 105.0 12.5%11.0%115.5 124.5 93%90% 536 N 10/30/2014 Robertson Rd Sta. 28+40 1 TX 109.0 19.5%16.0%107.6 117.5 92%90% 537 N 10/30/2014 Robertson Rd Sta. 28+80 3 TX 108.0 16.5%13.5%110.2 118.0 93%90% 538 N 10/30/2014 Wellspring St Sta. 28+85 3 TX 92.0 15.6%13.5%109.6 118.0 93%90% 539 N 10/30/2014 Robertson Rd Sta. 26+90 1 TX 96.0 17.0%16.0%109.5 117.5 93%90% 540 N 10/31/2014 PA-8 5 CF 100.0 15.1%11.0%114.5 124.5 92%90% 541 N 10/30/2014 PA-8 11 CF 99.0 14.1%12.5%110.5 122.0 91%90% 542 N 10/30/2014 PA-8 1 CF 100.0 17.5%16.0%110.0 117.5 94%90% 543 N 10/30/2014 PA-8 11 CF 101.0 14.5%12.5%112.1 122.0 92%90% 544 N 10/30/2014 PA-8 9 CF 103.0 11.5%10.5%115.4 127.5 91%90% 545 N 10/30/2014 PA-8 3 CF 104.0 16.6%13.5%109.2 118.0 93%90% 546 N 10/30/2014 Wellspring St Sta. 27+50 1 TX 101.0 19.2%16.0%107.6 117.5 92%90% 547 N 10/30/2014 Wellspring St Sta. 29+35 3 TX 90.0 16.4%13.5%110.2 118.0 93%90% 548 N 10/31/2014 PA-8 8 CF 104.0 17.8%14.5%107.8 115.5 93%90% 549 N 10/31/2014 PA-8 8 CF 100.0 17.8%14.5%108.9 115.5 94%90% 550 N 10/31/2014 PA-8 11 CF 101.0 16.6%12.5%110.4 122.0 90%90% 551 N 10/29/2014 PA-13 Lot 24 4 CF 68.0 10.7%11.0%111.8 123.5 91%90% 552 N 10/29/2014 PA-13 Lot 23 3 CF 70.0 14.9%13.5%109.2 118.0 93%90% 553 N 10/29/2014 PA-13 Lot 22 3 CF 71.0 13.8%13.5%108.3 118.0 92%90% 554 N 10/29/2014 PA-13 Lot 24 4 CF 69.0 11.3%11.0%112.5 123.5 91%90% 555 N 10/30/2014 PA-13 Lot 14 4 CF 71.0 10.3%11.0%111.7 123.5 90%90% 556 N 10/30/2014 PA-13 Lot 17 4 CF 70.0 11.0%11.0%111.1 123.5 90%90% 557 N 10/30/2014 PA-13 Lot 20 5 CF 69.0 11.3%11.0%114.3 124.5 92%90% 558 N 10/30/2014 PA-13 Lot 22 3 FG 0.0 12.5%13.5%108.4 118.0 92%90% 559 N 10/30/2014 PA-13 Lot 23 3 FG 0.0 13.1%13.5%106.5 118.0 90%90% Project No.133023-03 Page C-8 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 560 N 10/30/2014 PA-13 Lot 24 5 FG 0.0 10.4%11.0%114.2 124.5 92%90% 561 N 10/30/2014 PA-13 Lot 12 4 FG 0.0 10.0%11.0%113.6 123.5 92%90% 562 N 10/30/2014 PA-13 Lot 13 4 FG 0.0 9.5%11.0%112.8 123.5 91%90% 563 N 10/30/2014 PA-13 Lot 14 4 FG 0.0 9.9%11.0%113.1 123.5 92%90% 564 N 10/30/2014 PA-13 Lot 15 5 FG 0.0 10.8%11.0%113.0 124.5 91%90% 565 N 10/30/2014 PA-13 Lot 16 5 FG 0.0 10.7%11.0%112.6 124.5 90%90% 566 N 10/30/2014 PA-13 Lot 17 10 FG 0.0 9.2%10.0%117.6 128.0 92%90% 567 N 10/30/2014 PA-13 Lot 18 4 FG 0.0 11.1%11.0%113.8 123.5 92%90% 568 N 10/30/2014 PA-13 Lot 19 4 FG 0.0 10.7%11.0%114.9 123.5 93%90% 569 N 10/30/2014 PA-13 Lot 20 10 FG 0.0 11.4%10.0%117.3 128.0 92%90% 570 N 10/30/2014 PA-13 Lot 21 4 FG 0.0 10.8%11.0%111.2 123.5 90%90% 571 N 10/31/2014 Wellspring St Sta. 27+55 3 TX 104.0 16.4%13.5%111.3 118.0 94%90% 572 N 10/31/2014 Wellspring St Sta. 27+75 3 TX 102.0 15.9%13.5%112.3 118.0 95%90% 573 N 10/31/2014 PA-8 4 CF 105.0 14.3%11.0%114.2 123.5 92%90% 574 N 10/31/2014 PA-8 5 CF 106.0 13.4%11.0%115.1 124.5 92%90% 575 N 10/31/2014 Roberston Rd Sta. 29+40 3 TX 107.0 16.5%13.5%111.8 118.0 95%90% 576 N 10/31/2014 Roberston Rd Sta. 29+20 3 TX 107.0 15.3%13.5%112.0 118.0 95%90% 577 N 10/31/2014 Wellspring St Sta. 27+20 3 TX 109.0 15.5%13.5%110.3 118.0 93%90% 578 N 10/31/2014 Wellspring St Sta. 26+70 3 TX 112.0 14.3%13.5%112.4 118.0 95%90% 579 N 10/31/2014 PA-8 8 CF 103.0 14.0%14.5%108.8 115.5 94%90% 580 N 10/31/2014 PA-8 5 CF 104.0 10.6%11.0%113.0 123.5 91%90% 581 N 11/3/2014 PA-8 5 CF 105.0 11.5%11.0%114.1 124.5 92%90% 582 N 11/3/2014 PA-8 11 CF 104.0 15.1%12.5%112.6 122.0 92%90% 583 N 11/3/2014 Wellspring St Sta. 29+00 11 CF 85.0 15.8%12.5%109.9 122.0 90%90% 584 N 11/3/2014 PA-8 11 CF 115.0 14.1%12.5%113.8 122.0 93%90% 585 N 11/3/2014 PA-8 11 CF 103.0 14.4%12.5%110.2 122.0 90%90% 586 N 11/3/2014 West Ranch St Sta. 18+35 11 CF 105.0 16.0%12.5%110.5 122.0 91%90% 587 N 11/3/2014 Wellspring St Sta. 29+40 9 TX 88.0 13.6%10.5%116.8 127.5 92%90% 588 N 11/3/2014 PA-8 8 CF 106.0 17.6%14.5%106.2 115.5 92%90% 589 N 11/3/2014 PA-8 8 CF 107.0 15.9%14.5%104.9 115.5 91%90% 590 N 11/3/2014 PA-8 8 CF 107.0 17.4%14.5%105.1 115.5 91%90% 591 N 11/3/2014 PA-8 8 CF 108.0 17.6%14.5%109.2 115.5 95%90% 592 N 11/4/2014 PA-8 9 CF 110.0 13.9%10.5%117.7 127.5 92%90% 593 N 11/4/2014 PA-8 9 CF 109.0 14.1%10.5%116.2 127.5 91%90% 594 N 11/4/2014 PA-8 4 CF 110.0 11.2%11.0%113.6 123.5 92%90% 595 N 11/4/2014 PA-8 4 CF 109.0 13.7%11.0%113.8 123.5 92%90% 596 N 11/4/2014 PA-5 Lot 50 11 CF 184.0 11.5%12.5%107.9 122.0 88%90%Soil Removed 597 N 11/4/2014 PA-8 5 CF 110.0 14.7%11.0%115.4 124.5 93%90% 598 N 11/4/2014 PA-8 8 CF 111.0 16.6%14.5%109.4 115.5 95%90% 599 N 11/4/2014 PA-8 11 CF 110.0 12.8%12.5%111.3 122.0 91%90% 600 N 11/4/2014 PA-8 11 CF 111.0 15.0%12.5%111.0 122.0 91%90% 601 N 11/4/2014 PA-5 Lot 50 11 CF 182.0 11.9%12.5%103.4 122.0 85%90%Soil Removed 602 N 11/4/2014 PA-8 3 CF 118.0 16.7%13.5%107.5 118.0 91%90% 603 N 11/4/2014 Robertson Rd Sta. 33+90 10 CF 97.0 13.4%10.0%118.5 128.0 93%90% 604 N 11/4/2014 Robertson Rd Sta. 33+30 5 CF 98.0 12.8%11.0%115.3 124.5 93%90% 605 N 11/4/2014 Robertson Rd Sta. 32+50 5 CF 103.0 12.5%11.0%113.0 124.5 91%90% 606 N 11/4/2014 PA-7 5 CF 102.0 13.1%11.0%114.2 124.5 92%90% 607 N 11/5/2014 PA-6 Lot 194 5 CF 129.0 14.8%11.0%117.2 124.5 94%93% 608 N 11/5/2014 PA-8 North Slope 5 CF 128.0 15.5%11.0%115.3 124.5 93%93% 609 N 11/5/2014 PA-8 3 CF 118.0 13.8%13.5%109.9 118.0 93%90% 610 N 11/5/2014 PA-8 3 CF 119.0 14.1%13.5%110.4 118.0 94%90% 611 N 11/5/2014 PA-5 Lot 50 11 CF 169.0 14.4%12.5%110.3 122.0 90%90% 612 N 11/5/2014 PA-8 Southeast Slope 11 CF 98.0 14.2%12.5%113.8 122.0 93%90% 613 N 11/5/2014 Robertson Rd Sta. 34+30 11 CF 99.0 14.5%12.5%114.1 122.0 94%90% 614 N 11/5/2014 Robertson Rd Sta. 31+55 5 CF 107.0 13.1%11.0%115.6 124.5 93%90% 615 N 11/5/2014 Robertson Rd Sta. 31+20 4 CF 106.0 12.9%11.0%113.7 123.5 92%90% 616 N 11/5/2014 PA-5 Lot 50 10 CF 172.0 10.3%10.0%118.6 128.0 93%90% 617 N 11/5/2014 PA-8 11 CF 113.0 14.1%12.5%112.8 122.0 92%90% 618 N 11/5/2014 PA-8 5 CF 114.0 12.4%11.0%115.7 124.5 93%90% 619 N 11/5/2014 PA-5 Lot 51 5 CF 182.0 15.0%11.0%113.1 124.5 91%90% 620 N 11/5/2014 PA-5 Lot 51 5 CF 178.0 14.1%11.0%114.0 124.5 92%90% 621 N 11/6/2014 PA-11 9 CF 102.0 14.0%10.5%117.1 127.5 92%90% 622 N 11/6/2014 PA-11 5 CF 102.0 13.8%11.0%116.4 124.5 93%90% 623 N 11/6/2014 PA-11 10 CF 101.0 11.9%10.0%118.1 128.0 92%90% 624 N 11/6/2014 PA-11 5 CF 101.0 12.9%11.0%115.9 124.5 93%90% 625 N 11/6/2014 PA-8 9 CF 115.0 10.8%10.5%114.9 127.5 90%90% 626 N 11/6/2014 PA-8 9 CF 114.0 10.5%10.5%114.5 127.5 90%90% 627 N 11/6/2014 PA-8 11 CF 113.0 13.1%12.5%110.2 122.0 90%90% 628 N 11/6/2014 PA-8 11 CF 112.0 12.7%12.5%111.9 122.0 92%90% 629 N 11/6/2014 PA-7 5 CF 111.0 12.3%11.0%116.9 124.5 94%90% Project No.133023-03 Page C-9 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 630 N 11/6/2014 PA-7 5 CF 110.0 13.6%11.0%114.4 124.5 92%90% 631 N 11/6/2014 PA-7 5 CF 109.0 13.6%11.0%113.3 124.5 91%90% 632 N 11/6/2014 PA-7 5 CF 108.0 13.9%11.0%114.6 124.5 92%90% 633 N 11/6/2014 PA-4 9 CF 118.0 12.3%10.5%117.3 127.5 92%90% 634 N 11/6/2014 PA-4 9 CF 117.0 13.1%10.5%116.1 127.5 91%90% 635 N 11/7/2014 PA-8 5 CF 115.0 11.1%11.0%113.2 124.5 91%90% 636 N 11/7/2014 PA-8 9 CF 115.0 10.0%10.5%114.9 127.5 90%90% 637 N 11/7/2014 PA-8 10 CF 116.0 10.0%10.0%115.7 128.0 90%90% 638 N 11/7/2014 PA-8 10 CF 116.0 10.1%10.0%116.1 128.0 91%90% 639 N 11/7/2014 ECR Slope Sta. 471+65 5 CF 63.0 11.3%11.0%113.5 124.5 91%90% 640 N 11/7/2014 PA-8 11 CF 118.0 15.1%12.5%111.9 122.0 92%90% 641 N 11/6/2014 Wellspring St Sta. 15+50 8 TX 145.0 16.2%14.5%101.1 115.5 88%90%retest on 641A 642 N 11/6/2014 Wellspring St Sta. 15+80 4 TX 147.0 15.1%11.0%112.6 123.5 91%90% 643 N 11/6/2014 Wellspring St Sta. 14+80 3 TX 15.0 13.6%13.5%106.9 118.0 91%90% 644 N 11/6/2014 Wellspring St Sta. 16+40 4 TX 152.0 11.8%11.0%112.4 123.5 91%90% 645 N 11/7/2014 Wellspring St Sta. 15+50 3 TX 154.0 13.8%13.5%108.4 118.0 92%90% 646 N 11/7/2014 Wellspring St Sta. 14+70 3 TX 156.0 14.5%13.5%107.5 118.0 91%90% 647 N 11/7/2014 Wellspring St Sta. 16+80 3 TX 157.0 13.7%13.5%111.5 118.0 94%90% 648 N 11/7/2014 Wellspring St Sta. 14+40 3 TX 158.0 15.1%13.5%108.0 118.0 92%90% 649 N 11/8/2014 ECR Slope Sta. 473+50 11 CF 57.0 11.8%12.5%111.9 122.0 92%90% 650 N 11/8/2014 ECR Slope Sta. 472+60 11 CF 60.0 8.4%12.5%109.6 122.0 90%90%retest on 650A 651 N 11/7/2014 PA-8 5 CF 119.0 11.0%11.0%113.0 124.5 91%90% 652 N 11/7/2014 PA-8 5 CF 114.0 12.1%11.0%114.1 124.5 92%90% 653 N 11/7/2014 PA-8 11 CF 115.0 14.1%12.5%112.2 122.0 92%90% 654 N 11/7/2014 PA-7 4 CF 103.0 12.2%11.0%111.7 123.5 90%90% 655 N 11/8/2014 PA-7 Northeast Slope 11 CF 105.0 15.3%12.5%107.9 122.0 88%90%Soil Removed 656 N 11/8/2014 PA-7 11 CF 111.0 13.1%12.5%109.9 122.0 90%90% 657 N 11/8/2014 PA-7 4 CF 111.0 11.3%11.0%111.4 123.5 90%90% 658 N 11/8/2014 PA-7 9 CF 104.0 11.9%10.5%117.1 127.5 92%90% 659 N 11/8/2014 PA-7 9 CF 104.0 12.6%10.5%116.9 127.5 92%90% 660 N 11/8/2014 PA-8 5 CF 118.0 11.0%11.0%112.2 124.5 90%90% 661 N 11/8/2014 PA-8 9 CF 119.0 10.9%10.5%116.1 127.5 91%90% 662 N 11/8/2014 PA-8 9 CF 119.0 10.8%10.5%115.4 127.5 91%90% 663 N 11/8/2014 PA-8 5 CF 119.0 9.8%11.0%107.6 124.5 86%90%Soil Removed 664 N 11/10/2014 PA-7 9 CF 108.0 13.8%10.5%115.1 127.5 90%90% 665 N 11/10/2014 PA-7 5 CF 109.0 10.7%11.0%113.3 124.5 91%90% 666 N 11/10/2014 PA-7 10 CF 107.0 14.1%10.0%116.2 128.0 91%90% 667 N 11/10/2014 PA-7 5 CF 108.0 11.0%11.0%114.8 124.5 92%90% 668 N 11/10/2014 ECR Slope Sta. 472+70 5 CF 75.0 12.0%11.0%115.0 124.5 92%90% 669 N 11/10/2014 ECR Slope Sta. 473+00 5 CF 73.0 12.7%11.0%114.4 124.5 92%90% 670 N 11/10/2014 PA-8 5 CF 119.0 12.7%11.0%115.7 124.5 93%90% 671 N 11/8/2014 ECR Slope Sta. 473+90 11 CF 60.0 13.5%12.5%109.5 122.0 90%90% 672 N 11/8/2014 ECR Slope Sta. 473+10 11 CF 64.0 12.0%12.5%114.5 122.0 94%90% 673 N 11/8/2014 ECR Slope Sta. 472+20 11 CF 67.0 13.7%12.5%112.1 122.0 92%90% 674 N 11/8/2014 ECR Slope Sta. 472+90 11 CF 71.0 13.2%12.5%113.7 122.0 93%90% 675 N 11/8/2014 ECR Slope Sta. 471+15 11 CF 73.0 12.8%12.5%109.9 122.0 90%90% 676 N 11/10/2014 ECR Slope Sta. 472+85 4 CF 73.0 11.1%11.0%113.4 123.5 92%90% 677 N 11/10/2014 ECR Slope Sta. 474+20 4 CF 58.0 12.4%11.0%116.9 123.5 95%90% 678 N 11/10/2014 ECR Slope Sta. 471+60 11 CF 75.0 12.5%12.5%109.8 122.0 90%90% 679 N 11/10/2014 PA-7 11 CF 112.7 12.0%12.5%110.4 122.0 90%90% 680 N 11/10/2014 PA-7 5 CF 110.3 15.2%11.0%112.0 124.5 90%90% 681 N 11/10/2014 PA-8 4 CF 119.0 11.8%11.0%112.1 123.5 91%90% 682 N 11/10/2014 PA-8 4 CF 116.0 10.9%11.0%111.8 123.5 91%90% 683 N 11/10/2014 PA-8 10 CF 119.0 13.2%10.0%115.8 128.0 90%90% 684 N 11/10/2014 PA-8 4 CF 115.0 9.3%11.0%111.3 123.5 90%90% 685 N 11/11/2014 PA-8 5 CF 117.0 16.0%11.0%114.8 124.5 92%90% 686 N 11/11/2014 PA-8 11 CF 118.0 14.0%12.5%112.2 122.0 92%90% 687 N 11/12/2014 ECR Slope Sta. 472+25 8 CF 80.0 17.4%14.5%108.1 115.5 94%90% 688 N 11/12/2014 ECR Slope Sta. 471+40 5 CF 81.0 14.8%11.0%113.3 124.5 91%90% 689 N 11/12/2014 ECR Slope Sta. 473+90 5 CF 68.0 12.9%11.0%112.8 124.5 91%90% 690 N 11/13/2014 ECR Slope Sta. 477+00 6 CF 48.0 14.9%13.5%107.7 114.5 94%90% 691 N 11/12/2014 PA-8 5 CF 120.0 12.4%11.0%115.0 124.5 92%90% 692 N 11/12/2014 PA-8 4 CF 121.0 11.8%11.0%112.2 123.5 91%90% 693 N 11/12/2014 PA-8 West Slope 10 CF 138.0 12.5%10.0%118.5 128.0 93%90% 694 N 11/12/2014 PA-8 West Slope 10 CF 137.0 11.3%10.0%120.2 128.0 94%90% 695 N 11/13/2014 PA-11 3 CF 66.0 16.3%13.5%112.5 118.0 95%90% 696 N 11/13/2014 PA-11 11 CF 69.0 13.3%12.5%110.9 122.0 91%90% 697 N 11/13/2014 PA-8 West Slope 10 CF 139.0 10.9%10.0%119.5 128.0 93%90% 698 N 11/13/2014 PA-8 West Slope 10 CF 139.0 11.1%10.0%118.6 128.0 93%90% 699 N 11/13/2014 PA-11 3 CF 71.0 13.5%13.5%107.0 118.0 91%90% Project No.133023-03 Page C-10 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 700 N 11/13/2014 PA-8 5 CF 119.0 13.2%11.0%115.8 124.5 93%90% 701 N 11/13/2014 PA-8 9 CF 120.0 13.8%10.5%117.1 127.5 92%90% 702 N 11/13/2014 PA-8 West Slope 5 CF 140.0 13.5%11.0%114.0 124.5 92%90% 703 N 11/13/2014 PA-11 3 CF 73.0 15.6%13.5%111.3 118.0 94%90% 704 N 11/14/2014 PA-11 9 CF 75.0 11.2%10.5%114.9 127.5 90%90% 705 N 11/14/2014 PA-11 9 CF 76.0 11.9%10.5%114.4 127.5 90%90% 706 N 11/14/2014 PA-11 9 CF 75.0 13.4%10.5%115.9 127.5 91%90% 707 N 11/14/2014 PA-11 10 CF 77.0 13.4%10.0%119.6 128.0 93%90% 708 N 11/14/2014 ECR Slope Sta. 474+70 10 CF 66.0 13.6%10.0%119.8 128.0 94%90% 709 N 11/14/2014 ECR Slope Sta. 476+80 5 CF 57.0 13.2%11.0%114.1 124.5 92%90% 710 N 11/14/2014 ECR Slope Sta. 476+80 9 CF 52.0 13.8%10.5%115.6 127.5 91%90% 711 N 11/13/2014 ECR Slope Sta. 475+20 6 CF 50.0 15.2%13.5%105.8 114.5 92%90% 712 N 11/14/2014 PA-11 9 CF 77.0 13.6%10.5%116.4 127.5 91%90% 713 N 11/14/2014 ECR Slope Sta. 476+40 5 CF 57.0 11.0%11.0%115.9 124.5 93%90% 714 N 11/14/2014 ECR Slope Sta. 474+70 4 CF 68.0 11.7%11.0%111.9 123.5 91%90% 715 N 11/15/2014 PA-11 10 CF 78.0 10.0%10.0%116.1 128.0 91%90% 716 N 11/15/2014 PA-11 10 CF 79.0 10.0%10.0%115.6 128.0 90%90% 717 N 11/15/2014 PA-3 Lot 153 5 CF 96.0 12.1%11.0%114.4 124.5 92%90% 718 N 11/15/2014 PA-3 Lot 126 11 CF 97.0 16.4%12.5%113.6 122.0 93%90% 719 N 11/15/2014 PA-3 Lot 147 9 CF 99.0 14.1%10.5%117.9 127.5 92%90% 720 N 11/15/2014 PA-3 Lot 148 9 CF 100.0 13.5%10.5%117.1 127.5 92%90% 721 N 11/15/2014 ECR Slope Sta. 474+40 9 CF 69.0 10.0%10.5%115.0 127.5 90%90% 722 N 11/15/2014 ECR Slope Sta. 476+50 11 CF 60.0 12.6%12.5%112.1 122.0 92%90% 723 N 11/15/2014 PA-11 10 CF 78.0 12.7%10.0%117.2 128.0 92%90% 724 N 11/15/2014 PA-11 5 CF 79.0 13.5%11.0%113.0 124.5 91%90% 725 N 11/17/2014 PA-8 West Slope 11 CF 142.0 14.5%12.5%113.1 122.0 93%90% 726 N 11/17/2014 PA-8 West Slope 11 CF 143.0 14.1%12.5%112.7 122.0 92%90% 727 N 11/17/2014 PA-8 5 CF 121.0 14.1%11.0%115.4 124.5 93%90% 728 N 11/17/2014 PA-8 5 CF 122.0 13.5%11.0%115.4 124.5 93%90% 729 N 11/17/2014 PA-8 9 CF 115.0 12.9%10.5%116.7 127.5 92%90% 730 N 11/17/2014 PA-8 10 CF 116.0 11.7%10.0%119.3 128.0 93%90% 731 N 11/17/2014 PA-8 10 CF 122.0 13.1%10.0%118.1 128.0 92%90% 732 N 11/17/2014 PA-8 9 CF 123.0 12.6%10.5%117.2 127.5 92%90% 733 N 11/15/2014 PA-7 South Slope 5 CF 87.0 9.5%11.0%113.2 124.5 91%90% 734 N 11/15/2014 ECR Slope Sta. 474+50 5 CF 70.0 11.3%11.0%113.7 124.5 91%90% 735 N 11/15/2014 ECR Slope Sta. 476+70 9 CF 58.0 10.4%10.5%116.5 127.5 91%90% 736 N 11/17/2014 PA-11 5 CF 84.0 14.9%11.0%116.0 124.5 93%90% 737 N 11/17/2014 PA-11 10 CF 79.0 9.7%10.0%120.8 128.0 94%90% 738 N 11/17/2014 PA-3 Lot 149 5 CF 106.0 14.4%11.0%113.7 124.5 91%90% 739 N 11/17/2014 PA-3 Lot 114 Slope 5 CF 107.0 14.5%11.0%114.0 124.5 92%90% 740 N 11/17/2014 Nelson Ct Sta. 16+10 9 CF 112.0 14.7%10.5%116.8 127.5 92%90% 741 N 11/18/2014 PA-7 5 CF 110.0 14.2%11.0%112.8 124.5 91%90% 742 N 11/18/2014 PA-7 5 CF 108.0 13.9%11.0%113.7 124.5 91%90% 743 N 11/18/2014 PA-8 9 CF 123.5 11.9%10.5%115.5 127.5 91%90% 744 N 11/18/2014 PA-8 9 CF 125.0 11.7%10.5%115.8 127.5 91%90% 745 N 11/18/2014 PA-8 9 CF 121.0 12.5%10.5%116.8 127.5 92%90% 746 N 11/18/2014 PA-8 9 CF 123.0 14.0%10.5%114.9 127.5 90%90% 747 N 11/18/2014 PA-8 5 CF 123.5 15.2%11.0%113.3 124.5 91%90% 748 N 11/18/2014 PA-8 5 CF 120.0 14.5%11.0%112.5 124.5 90%90% 749 N 11/18/2014 PA-8 North Slope 9 CF 136.5 12.0%10.5%116.0 127.5 91%90% 750 N 11/18/2014 PA-8 West Slope 9 CF 146.0 12.1%10.5%115.0 127.5 90%90% 751 N 11/18/2014 PA-8 West Slope 11 CF 144.0 13.1%12.5%111.9 122.0 92%90% 752 N 11/18/2014 PA-8 West Slope 11 CF 144.0 11.7%12.5%110.9 122.0 91%90% 753 N 11/18/2014 West Ranch St Sta.18+70 4 CF 115.0 14.3%11.0%112.5 123.5 91%90% 754 N 11/18/2014 West Ranch St Sta.18+75 8 CF 114.0 15.1%14.5%108.3 115.5 94%90% 755 N 11/18/2014 PA-8 11 CF 113.0 14.7%12.5%112.8 122.0 92%90% 756 N 11/18/2014 PA-8 9 CF 113.0 13.2%10.5%117.2 127.5 92%90% 757 N 11/20/2014 PA-8 8 CF 124.0 16.0%14.5%110.9 115.5 96%90% 758 N 11/20/2014 PA-8 8 CF 121.0 15.8%14.5%111.1 115.5 96%90% 759 N 11/20/2014 PA-8 5 CF 121.0 12.4%11.0%113.2 124.5 91%90% 760 N 11/20/2014 PA-8 5 CF 125.0 13.7%11.0%113.7 124.5 91%90% 761 N 11/19/2014 PA-6 Lot 168 5 CF 154.0 14.8%11.0%112.2 124.5 90%90% 762 N 11/19/2014 PA-6 Lot 169 5 CF 156.0 14.3%11.0%112.8 124.5 91%90% 763 N 11/19/2014 PA-6 Lot 193 9 CF 144.0 9.5%10.5%116.4 127.5 91%90% 764 N 11/19/2014 PA-6 Lot 191 5 CF 146.0 14.7%11.0%115.1 124.5 92%90% 765 N 11/19/2014 PA-3 Lot 114 4 CF 108.0 14.1%11.0%111.2 123.5 90%90% 766 N 11/19/2014 PA-3 Lot 125 4 CF 106.0 15.0%11.0%111.9 123.5 91%90% 767 N 11/19/2014 PA-8 4 CF 136.0 14.5%11.0%112.3 123.5 91%90% 768 N 11/19/2014 PA-8 4 CF 138.0 13.9%11.0%112.6 123.5 91%90% 769 N 11/19/2014 PA-8 North Slope 4 CF 142.0 13.4%11.0%114.0 123.5 92%90% Project No.133023-03 Page C-11 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 770 N 11/19/2014 PA-8 North Slope 5 CF 145.0 14.3%11.0%114.0 124.5 92%90% 771 N 11/19/2014 PA-6 Lot 209 9 CF 118.0 13.7%10.5%117.4 127.5 92%90% 772 N 11/19/2014 PA-6 Lot 211 9 CF 120.0 13.3%10.5%116.1 127.5 91%90% 773 N 11/20/2014 PA-8 9 CF 123.0 13.1%10.5%115.5 127.5 91%90% 774 N 11/20/2014 PA-8 11 CF 123.0 15.6%12.5%110.6 122.0 91%90% 775 N 11/20/2014 ECR Slope Sta. 477+70 9 CF 53.0 12.2%10.5%115.0 127.5 90%90% 776 N 11/20/2014 ECR Slope Sta. 477+10 9 CF 61.0 12.8%10.5%118.2 127.5 93%90% 777 N 11/22/2014 ECR Slope Sta. 479+10 6 CF 51.0 13.2%13.5%108.8 114.5 95%90% 778 N 11/22/2014 ECR Slope Sta. 478+30 6 CF 53.0 12.9%13.5%109.9 114.5 96%90% 779 N 11/22/2014 ECR Slope Sta. 477+40 6 CF 58.0 9.9%13.5%106.7 114.5 93%90%retest on 779A 780 N 11/24/2014 PA-7 East Slope 10 SF 110.0 12.3%10.0%118.6 128.0 93%90% 781 N 11/20/2014 PA-8 8 CF 124.0 16.4%14.5%109.3 115.5 95%90% 782 N 11/20/2014 PA-8 8 CF 126.0 17.1%14.5%106.6 115.5 92%90% 783 N 11/20/2014 PA-8 North Slope 8 CF 143.0 15.7%14.5%110.6 115.5 96%90% 784 N 11/20/2014 PA-8 North Slope 8 CF 145.0 16.6%14.5%107.4 115.5 93%90% 785 N 11/20/2014 PA-8 West Slope 5 CF 148.0 12.5%11.0%113.5 124.5 91%90% 786 N 11/20/2014 PA-8 West Slope 5 CF 150.0 13.1%11.0%112.7 124.5 91%90% 787 N 11/20/2014 PA-3 Lot 103 10 CF 116.0 12.1%10.0%118.9 128.0 93%90% 788 N 11/20/2014 PA-3 Lot 104 10 CF 114.0 12.3%10.0%117.9 128.0 92%90% 789 N 11/20/2014 Wellspring St Sta. 29+80 5 CF 103.0 14.7%11.0%112.3 124.5 90%90% 790 N 11/20/2014 PA-3 Lot 146 5 CF 105.0 14.4%11.0%113.5 124.5 91%90% 791 N 11/22/2014 PA-7 9 CF 112.0 12.5%10.5%119.2 127.5 93%90% 792 N 11/22/2014 PA-7 9 CF 114.0 10.2%10.5%114.8 127.5 90%90% 793 N 11/22/2014 PA-7 9 CF 105.0 11.9%10.5%117.5 127.5 92%90% 794 N 11/22/2014 PA-7 9 CF 107.0 12.3%10.5%119.8 127.5 94%90% 795 N 11/22/2014 Wellspring St Sta. 30+20 9 CF 104.0 11.7%10.5%115.0 127.5 90%90% 796 N 11/22/2014 PA-3 Lot 157 9 CF 102.0 10.8%10.5%116.3 127.5 91%90% 797 N 11/22/2014 PA-3 Lot 149 9 CF 109.0 12.4%10.5%116.0 127.5 91%90% 798 N 11/22/2014 Wellspring St Sta. 28+45 9 CF 107.0 11.8%10.5%117.8 127.5 92%90% 799 N 11/24/2014 PA-7 5 CF 102.0 12.3%11.0%113.7 124.5 91%90% 800 N 11/24/2014 PA-7 West Slope 5 CF 100.0 12.6%11.0%112.3 124.5 90%90% 801 N 11/24/2014 PA-3 Lot 148 5 CF 110.0 13.2%11.0%113.3 124.5 91%90% 802 N 11/24/2014 PA-7 5 CF 108.0 14.1%11.0%112.4 124.5 90%90% 803 N 11/24/2014 PA-3 Lot 126 5 CF 108.0 13.0%11.0%114.6 124.5 92%90% 804 N 11/24/2014 Robertson Rd Sta. 26+65 5 CF 110.0 13.9%11.0%115.5 124.5 93%90% 805 N 11/24/2014 PA-8 9 CF 126.0 11.9%10.5%117.9 127.5 92%90% 806 N 11/24/2014 PA-8 9 CF 128.0 12.6%10.5%119.0 127.5 93%90% 807 N 11/24/2014 PA-8 6 CF 128.0 16.2%13.5%104.7 114.5 91%90% 808 N 11/24/2014 PA-8 6 CF 130.0 15.1%13.5%106.4 114.5 93%90% 809 N 11/24/2014 PA-8 6 CF 127.0 15.6%13.5%109.0 114.5 95%90% 810 N 11/24/2014 PA-8 6 CF 126.0 16.0%13.5%105.3 114.5 92%90% 811 N 11/24/2014 PA-8 5 CF 127.0 11.0%11.0%112.5 124.5 90%90% 812 N 11/24/2014 PA-8 5 CF 128.0 10.2%11.0%113.2 124.5 91%90% 813 N 11/24/2014 PA-8 9 CF 125.0 11.5%10.5%121.7 127.5 95%90% 814 N 11/24/2014 PA-8 11 CF 127.0 15.0%12.5%112.9 122.0 93%90% 815 N 11/24/2014 PA-7 West Slope 8 CF 104.0 17.9%14.5%111.1 115.5 96%90% 816 N 11/24/2014 PA-3 Lot 157 8 CF 106.0 17.2%14.5%109.0 115.5 94%90% 817 N 11/25/2014 PA-6 Lot 197 9 CF 148.0 10.6%10.5%116.7 127.5 92%90% 818 N 11/25/2014 PA-6 Lot 195 5 CF 146.0 12.2%11.0%114.4 124.5 92%90% 819 N 11/25/2014 PA-8 West Slope 5 CF 150.0 11.9%11.0%115.9 124.5 93%90% 820 N 11/25/2014 PA-8 West Slope 5 CF 148.0 12.5%11.0%114.5 124.5 92%90% 821 N 11/24/2014 PA-7 South Slope 8 SF 108.0 16.1%14.5%98.9 115.5 86%90%retest on 821A 822 N 11/24/2014 PA-7 South Slope 3 SF 103.0 13.5%13.5%109.0 118.0 92%90% 823 N 11/25/2014 ECR Slope Sta. 276+50 4 CF 73.0 14.1%11.0%113.8 123.5 92%90% 824 N 11/25/2014 ECR Slope Sta. 276+10 11 CF 76.0 13.5%12.5%112.6 122.0 92%90% 825 N 11/25/2014 PA-7 11 CF 109.0 16.2%12.5%113.0 122.0 93%90% 826 N 11/25/2014 PA-7 4 CF 110.0 14.8%11.0%114.3 123.5 93%90% 827 N 11/25/2014 ECR Slope Sta. 471+50 10 CF 92.0 10.9%10.0%119.3 128.0 93%90% 828 N 11/25/2014 ECR Slope Sta. 471+20 10 CF 91.0 11.1%10.0%118.4 128.0 93%90% 829 N 11/25/2014 ECR Slope Sta. 472+70 10 CF 85.0 11.2%10.0%119.4 128.0 93%90% 830 N 11/25/2014 ECR Slope Sta. 272+15 10 SF 87.0 10.9%10.0%121.7 128.0 95%90% 831 N 11/25/2014 PA-11 4 CF 81.0 13.1%11.0%111.2 123.5 90%90% 832 N 11/25/2014 PA-11 5 CF 83.0 13.3%11.0%116.0 124.5 93%90% 833 N 11/25/2014 PA-11 4 CF 82.0 12.5%11.0%114.0 123.5 92%90% 834 N 11/25/2014 PA-11 4 CF 84.0 12.0%11.0%112.4 123.5 91%90% 835 N 11/25/2014 PA-6 Lot 194 4 CF 149.0 11.3%11.0%112.6 123.5 91%90% 836 N 11/25/2014 PA-6 Lot 196 4 CF 151.0 11.7%11.0%113.6 123.5 92%90% 837 N 11/25/2014 PA-8 North Slope 4 CF 135.0 12.2%11.0%113.9 123.5 92%90% 838 N 11/25/2014 PA-8 North Slope 4 CF 137.0 12.0%11.0%115.2 123.5 93%90% 839 N 11/26/2014 PA-8 North Slope 4 CF 156.0 13.8%11.0%111.3 123.5 90%90% Project No.133023-03 Page C-12 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 840 N 11/26/2014 PA-6 Lot 203 4 CF 154.0 12.7%11.0%112.5 123.5 91%90% 841 N 11/25/2014 PA-7 East Slope 10 SF 100.0 11.4%10.0%122.1 128.0 95%90% 842 N 11/25/2014 ECR Slope Sta. 456+60 10 CF 58.0 11.6%10.0%116.1 128.0 91%90% 843 N 12/1/2014 ECR Slope Sta. 480+70 5 CF 49.0 14.9%11.0%114.9 124.5 92%90% 844 N 12/1/2014 ECR Slope Sta. 480+90 11 CF 48.0 14.4%12.5%110.8 122.0 91%90% 845 N 12/1/2014 ECR Slope Sta. 480+60 11 CF 50.0 14.9%12.5%110.0 122.0 90%90% 846 N 12/1/2014 ECR Slope Sta. 479+60 5 CF 52.0 11.3%11.0%115.1 124.5 92%90% 847 N 12/2/2014 ECR Slope Sta. 481+10 5 CF 55.0 14.4%11.0%114.6 124.5 92%90% 848 N 12/2/2014 ECR Slope Sta. 481+30 5 CF 56.0 14.2%11.0%115.2 124.5 93%90% 849 N 12/2/2014 ECR Slope Sta. 480+00 5 CF 53.0 13.7%11.0%114.0 124.5 92%90% 850 N 12/2/2014 ECR Slope Sta. 479+80 11 CF 54.0 13.9%12.5%110.9 122.0 91%90% 851 N 11/26/2014 PA-8 North Slope 4 CF 147.0 13.3%11.0%112.2 123.5 91%90% 852 N 11/26/2014 PA-8 North Slope 4 CF 145.0 12.9%11.0%113.2 123.5 92%90% 853 N 11/26/2014 PA-6 Lot 208 5 CF 144.0 12.4%11.0%112.3 124.5 90%90% 854 N 11/26/2014 PA-6 Lot 209 5 CF 142.0 12.9%11.0%115.3 124.5 93%90% 855 N 11/26/2014 PA-6 Lot 207 5 CF 146.0 15.1%11.0%113.2 124.5 91%90% 856 N 11/26/2014 PA-6 Lot 204 5 CF 160.0 12.1%11.0%117.6 124.5 94%90% 857 N 11/26/2014 PA-6 Lot 203 5 CF 161.0 15.5%11.0%114.9 124.5 92%90% 858 N 11/26/2014 PA-6 Lot 193 5 CF 151.0 15.3%11.0%113.2 124.5 91%90% 859 N 11/26/2014 PA-6 Lot 192 5 CF 153.0 14.5%11.0%115.7 124.5 93%90% 860 N 11/26/2014 PA-8 5 CF 127.0 15.9%11.0%112.4 124.5 90%90% 861 N 11/26/2014 PA-8 5 CF 129.0 14.8%11.0%113.2 124.5 91%90% 862 N 12/1/2014 PA-6 Lot 167 5 CF 158.0 12.1%11.0%113.6 124.5 91%90% 863 N 12/1/2014 PA-6 Lot 166 5 CF 160.0 11.6%11.0%113.2 124.5 91%90% 864 N 12/1/2014 PA-6 Lot 195 5 CF 152.0 11.0%11.0%114.6 124.5 92%90% 865 N 12/1/2014 PA-6 Lot 193 5 CF 154.0 11.6%11.0%116.2 124.5 93%90% 866 N 12/1/2014 PA-8 5 CF 124.0 10.6%11.0%113.4 124.5 91%90% 867 N 12/1/2014 PA-8 5 CF 126.0 10.9%11.0%113.0 124.5 91%90% 868 N 12/1/2014 PA-8 5 CF 124.0 11.7%11.0%114.9 124.5 92%90% 869 N 12/1/2014 PA-8 5 CF 126.0 11.9%11.0%112.8 124.5 91%90% 870 N 12/1/2014 PA-8 5 CF 127.0 10.3%11.0%116.5 124.5 94%90% 871 N 12/1/2014 PA-8 5 CF 125.0 11.0%11.0%115.3 124.5 93%90% 872 N 12/1/2014 PA-8 5 CF 127.0 10.7%11.0%119.0 124.5 96%90% 873 N 12/1/2014 PA-8 5 CF 125.0 11.1%11.0%117.0 124.5 94%90% 874 N 12/8/2014 ECR Slope Sta. 479+20 4 CF 62.0 11.8%11.0%111.2 123.5 90%90% 875 N 12/8/2014 ECR Slope Sta. 478+10 11 CF 67.0 16.6%12.5%111.4 122.0 91%90% 876 N 12/8/2014 ECR Slope Sta. 481+20 6 CF 59.0 15.4%13.5%106.4 114.5 93%90% 877 N 12/8/2014 ECR Slope Sta. 481+70 6 CF 57.0 16.2%13.5%105.6 114.5 92%90% 878 N 12/9/2014 PA-7 11 CF 113.0 17.5%12.5%110.8 122.0 91%90% 879 N 12/9/2014 PA-7 3 CF 114.0 16.9%13.5%111.4 118.0 94%90% 880 N 12/9/2014 Robertson Rd Sta. 26+95 1 CF 112.0 18.2%16.0%110.9 117.5 94%90% 881 N 12/9/2014 Roberston Rd Sta. 26+90 1 CF 111.0 18.9%16.0%110.7 117.5 94%90% 882 N 12/9/2014 ECR Slope Sta. 476+40 1 CF 83.0 16.9%16.0%109.1 117.5 93%90% 883 N 12/9/2014 PA-8 Southeast Slope 4 SF 23.0 10.2%11.0%111.6 123.5 90%90% 884 N 12/10/2014 PA-3 Lot 104 7 CF 119.0 20.0%19.5%104.5 111.5 94%90% 885 N 12/10/2014 Wellspring St Sta. 26+00 1 CF 118.0 19.0%16.0%106.1 117.5 90%90% 886 N 12/10/2014 PA-3 Lot 157 5 CF 108.0 16.3%11.0%114.1 124.5 92%90% 887 N 12/10/2014 PA-3 Lot 157 1 CF 109.0 17.0%16.0%111.0 117.5 94%90% 888 N 12/10/2014 PA-6 Lot 247 5 CF 118.0 10.7%11.0%114.4 124.5 92%90% 889 N 12/10/2014 Wellspring St Sta. 27+40 11 CF 117.0 16.5%12.5%111.3 122.0 91%90% 890 N 12/10/2014 PA-6 Lot 182 8 CF 155.0 15.9%14.5%110.1 115.5 95%90% 891 N 12/10/2014 ECR Slope Sta. 481+35 5 CF 60.0 14.6%11.0%114.3 124.5 92%90% 892 N 12/10/2014 ECR Slope Sta. 480+20 5 CF 69.0 14.2%11.0%113.8 124.5 91%90% 893 N 12/10/2014 ECR Slope Sta. 481+70 5 CF 64.0 14.6%11.0%111.8 124.5 90%90% 894 N 12/10/2014 ECR Slope Sta. 479+40 5 CF 72.0 12.8%11.0%114.7 124.5 92%90% 895 N 12/11/2014 ECR Slope Sta. 481+50 8 CF 68.0 14.5%14.5%108.8 115.5 94%90% 896 N 12/23/2014 PA-7 South Slope 1 CF 100.0 18.1%16.0%110.1 117.5 94%90% 897 N 12/23/2014 PA-3 Lot 153 9 CF 122.0 14.2%10.5%116.3 127.5 91%90% 898 N 12/23/2014 Roberston Rd Sta. 26+15 5 CF 123.0 15.1%11.0%114.7 124.5 92%90% 899 N 12/23/2014 PA-3 Lot 103 11 CF 122.0 16.6%12.5%112.4 122.0 92%90% 900 N 12/23/2014 PA-3 Lot 114 11 CF 123.0 17.0%12.5%111.9 122.0 92%90% 901 N 12/10/2014 PA-6 Lot 175 Slope 11 CF 170.0 15.4%12.5%111.2 122.0 91%90% 902 N 12/11/2014 PA-6 Lot 170 Slope 9 CF 72.0 9.9%10.5%110.2 127.5 86%90%retest on 902A 903 N 12/11/2014 PA-6 Lot 175 Slope 5 CF 69.0 13.0%11.0%107.9 124.5 87%90%retest on 903A 904 N 12/11/2014 PA-6 Lot 226 Slope 3 CF 142.0 14.5%13.5%108.9 118.0 92%90% 905 N 12/11/2014 Wellspring St Sta. 26+50 5 CF 122.0 14.6%11.0%115.3 124.5 93%90% 906 N 12/11/2014 PA-3 Lot 104 1 CF 123.0 18.2%16.5%108.5 117.5 92%90% 907 N 12/11/2014 PA-3 Lot 126 8 CF 108.0 17.5%14.5%105.4 115.5 91%90% 908 N 12/11/2014 PA-3 Lot 155 7 CF 109.0 19.5%19.5%103.6 111.5 93%90% 909 N 12/11/2014 PA-3 Lot 70 5 CF 160.0 13.9%11.0%112.9 124.5 91%90% Project No.133023-03 Page C-13 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 910 N 12/11/2014 PA-6 Lot 182 8 CF 156.0 17.0%14.5%104.0 115.5 90%90% 911 N 12/11/2014 PA-6 Lot 192 11 CF 151.0 17.2%12.5%112.9 122.0 93%90% 912 N 12/11/2014 PA-6 Lot 194 11 CF 149.0 16.5%12.5%111.1 122.0 91%90% 913 N 12/11/2014 PA-6 Lot 168 5 CF 163.0 12.6%11.0%113.9 124.5 91%90% 914 N 12/11/2014 PA-6 Lot 165 4 CF 165.0 13.0%11.0%111.5 123.5 90%90% 915 N 12/22/2014 PA-6 Lot 226 Slope 11 CF 156.0 15.1%13.5%110.6 122.0 91%90% 916 N 12/23/2014 PA-6 Lot 226 Slope 6 CF 160.0 14.0%13.5%106.2 114.5 93%90% 917 N 12/23/2014 PA-6 Lot 229 Slope 6 CF 135.0 14.1%13.5%106.6 114.5 93%90% 918 N 12/24/2014 PA-6 Lot 229 Slope 6 CF 142.0 15.1%13.5%107.1 114.5 94%90% 919 N 12/24/2014 PA-7 South Slope 11 CF 110.0 14.9%12.5%110.9 122.0 91%90% 920 N 12/24/2014 PA-7 11 CF 114.0 15.1%12.5%109.9 122.0 90%90% 921 N 12/24/2014 PA-6 Lot 181 11 CF 158.0 13.3%12.5%111.2 122.0 91%90% 922 N 12/24/2014 PA-6 Lot 180 6 CF 159.0 17.5%13.5%106.9 114.5 93%90% 923 N 12/24/2014 PA-6 Lot 178 Slope 11 CF 169.0 12.9%12.5%110.3 122.0 90%90% 924 N 12/24/2014 PA-6 Lot 179 Slope 6 CF 168.0 14.0%13.5%108.6 114.5 95%90% 925 N 12/29/2014 PA-6 Lot 229 Slope 6 CF 139.0 14.0%13.5%106.9 114.5 93%90% 926 N 12/29/2014 PA-6 Lot 197 11 CF 161.0 12.4%12.5%110.5 122.0 91%90% 927 N 12/29/2014 PA-6 Lot 198 11 CF 163.0 13.1%12.5%111.4 122.0 91%90% 928 N 12/29/2014 PA-6 Lot 192 6 CF 152.0 14.4%13.5%106.5 114.5 93%90% 929 N 12/29/2014 PA-6 Lot 191 6 CF 154.0 14.1%13.5%106.8 114.5 93%90% 930 N 12/29/2014 PA-7 South Slope 11 CF 111.0 14.2%12.5%106.1 122.0 87%90%retest on 930A 931 N 12/29/2014 PA-3 Lot 104 11 CF 130.0 15.4%12.5%111.8 122.0 92%90% 932 N 12/29/2014 PA-3 Lot 153 11 CF 132.0 16.0%12.5%110.0 122.0 90%90% 933 N 12/29/2014 Wellspring St Sta. 26+50 5 CF 131.0 13.4%11.0%115.8 124.5 93%90% 934 N 12/29/2014 PA-6 Lot 210 5 CF 133.0 12.8%11.0%115.0 124.5 92%90% 935 N 12/29/2014 PA-6 Lot 246 5 CF 157.0 14.0%11.0%115.6 124.5 93%90% 936 N 12/29/2014 PA-6 Lot 205 5 CF 159.0 14.2%11.0%114.7 124.5 92%90% 937 N 12/29/2014 PA-6 Lot 201 5 CF 163.0 12.5%11.0%117.3 124.5 94%90% 938 N 12/29/2014 PA-6 Lot 200 5 CF 164.0 13.9%11.0%115.1 124.5 92%90% 939 N 12/30/2014 PA-6 Lot 229 Slope 6 CF 144.0 17.0%13.5%105.8 114.5 92%90% 940 N 12/30/2014 ECR Sta. 456+10 5 CF 63.0 13.8%11.0%112.8 124.5 91%90% 941 N 12/30/2014 PA-6 Lot 190 4 CF 160.0 14.9%11.0%111.8 123.5 91%90% 942 N 12/30/2014 PA-6 Lot 191 4 CF 162.0 12.8%11.0%112.4 123.5 91%90% 943 N 12/30/2014 PA-6 Lot 192 4 CF 156.0 12.6%11.0%113.8 123.5 92%90% 944 N 12/30/2014 PA-6 Lot 193 4 CF 158.0 13.2%11.0%112.9 123.5 91%90% 945 N 12/30/2014 PA-6 Lot 172 Slope 6 CF 178.0 16.4%13.5%105.8 114.5 92%90% 946 N 12/30/2014 PA-6 Lot 177 Slope 4 CF 180.0 12.7%11.0%114.3 123.5 93%90% 947 N 12/30/2014 PA-6 Lot 180 Slope 4 CF 176.0 12.5%11.0%113.0 123.5 91%90% 948 N 12/30/2014 PA-6 Lot 199 11 CF 165.0 16.5%12.5%110.7 122.0 91%90% 949 N 12/30/2014 PA-6 Lot 202 11 CF 162.0 15.3%12.5%112.7 122.0 92%90% 950 N 12/30/2014 PA-6 Lot 194 4 CF 161.0 12.8%11.0%113.6 123.5 92%90% 951 N 1/5/2015 PA-6 Lot 168 5 CF 168.0 11.4%11.0%114.5 124.5 92%90% 952 N 1/5/2015 PA-6 Lot 167 11 CF 169.0 13.7%12.5%111.2 122.0 91%90% 953 N 1/5/2015 PA-6 Lot 165 9 CF 169.0 12.6%10.5%115.5 127.5 91%90% 954 N 1/5/2015 PA-3 Lot 91 Slope 9 CF 141.0 12.4%10.5%116.9 127.5 92%90% 955 N 1/5/2015 PA-3 Lot 81 9 CF 142.0 13.2%10.5%115.7 127.5 91%90% 956 N 1/5/2015 PA-3 Lot 90 Slope 5 CF 140.0 14.1%11.0%113.5 124.5 91%90% 957 N 1/5/2015 PA-3 Lot 80 5 CF 139.0 15.2%11.0%114.9 124.5 92%90% 958 N 1/6/2015 PA-6 Lot 206 9 CF 148.0 13.4%10.5%115.5 127.5 91%90% 959 N 1/6/2015 PA-6 Lot 207 5 CF 147.0 15.4%11.0%113.7 124.5 91%90% 960 N 1/6/2015 PA-6 Lot 229 Slope 8 CF 158.0 14.6%14.5%110.7 115.5 96%90% 961 N 1/6/2015 PA-6 Lot 191 11 CF 164.0 18.2%12.5%111.9 122.0 92%90% 962 N 1/6/2015 PA-6 Lot 190 11 CF 166.0 17.5%12.5%112.7 122.0 92%90% 963 N 1/6/2015 PA-6 Lot 166 11 CF 166.0 17.5%12.5%109.8 122.0 90%90% 964 N 1/6/2015 PA-6 Lot 167 11 CF 168.0 16.4%12.5%111.0 122.0 91%90% 965 N 1/6/2015 PA-4 11 CF 123.0 16.4%12.5%113.0 122.0 93%90% 966 N 1/6/2015 PA-6 Lot 165 11 CF 170.0 13.0%12.5%109.8 122.0 90%90% 967 N 1/6/2015 PA-6 Lot 165 Slope 4 CF 179.0 13.3%11.0%112.0 123.5 91%90% 968 N 1/6/2015 PA-5 Lot 49 4 CF 181.0 14.2%11.0%112.8 123.5 91%90% 969 N 1/6/2015 PA-6 Lot 173 Slope 11 CF 183.0 16.7%12.5%111.0 122.0 91%90% 970 N 1/6/2015 PA-6 Lot 174 Slope 11 CF 185.0 17.1%12.5%110.4 122.0 90%90% 971 N 1/6/2015 PA-6 Lot 247 5 CF 127.0 11.2%11.0%114.6 124.5 92%90% 972 N 1/6/2015 PA-6 Lot 211 5 CF 130.0 12.1%11.0%115.1 124.5 92%90% 973 N 1/6/2015 PA-3 Lot 102 8 CF 143.0 17.6%14.5%109.3 115.5 95%90% 974 N 1/6/2015 PA-3 Lot 101 8 CF 144.0 17.9%14.5%108.4 115.5 94%90% 975 N 1/8/2015 PA-6 Lot 196 8 CF 166.0 15.9%14.5%106.6 115.5 92%90% 976 N 1/8/2015 PA-6 Lot 194 8 CF 169.0 18.0%14.5%105.1 115.5 91%90% 977 N 1/8/2015 PA-6 Lot 195 8 CF 168.0 16.9%14.5%107.3 115.5 93%90% 978 N 1/8/2015 PA-6 Lot 193 8 CF 171.0 17.2%14.5%106.3 115.5 92%90% 979 N 1/8/2015 PA-6 Lot 191 7 CF 173.0 21.3%19.5%104.2 111.5 93%90% Project No.133023-03 Page C-14 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 980 N 1/8/2015 PA-6 Lot 189 4 CF 173.0 12.4%11.0%112.7 123.5 91%90% 981 N 1/6/2015 PA-6 Lot 179 Slope 11 CF 179.0 16.1%12.5%110.0 122.0 90%90% 982 N 1/6/2015 PA-6 Lot 180 Slope 11 CF 181.0 17.2%12.5%109.8 122.0 90%90% 983 N 1/7/2015 PA-6 Lot 191 11 CF 168.0 12.2%12.5%108.1 122.0 89%90%retest on 983A 984 N 1/7/2015 PA-6 Lot 211 4 CF 136.0 16.3%11.0%112.7 123.5 91%90% 985 N 1/7/2015 PA-6 Lot 193 4 CF 170.0 15.1%11.0%113.6 123.5 92%90% 986 N 1/7/2015 PA-5 Lot 51 8 CF 182.0 15.9%14.5%109.0 115.5 94%90% 987 N 1/7/2015 PA-5 Lot 49 8 CF 184.0 17.0%14.5%108.1 115.5 94%90% 988 N 1/7/2015 PA-6 Lot 249 Slope 11 CF 130.0 15.0%12.5%110.6 122.0 91%90% 989 N 1/7/2015 PA-5 Lot 50 11 CF 184.0 16.1%12.5%110.3 122.0 90%90% 990 N 1/7/2015 PA-5 Lot 48 11 CF 185.0 14.2%12.5%109.8 122.0 90%90% 991 N 1/8/2015 PA-5 Lot 49 11 CF 188.0 14.5%12.5%110.5 122.0 91%90% 992 N 1/8/2015 PA-5 Lot 51 11 CF 190.0 13.9%12.5%110.2 122.0 90%90% 993 N 1/8/2015 PA-6 Lot 166 Slope 7 CF 188.0 20.4%19.5%101.6 111.5 91%90% 994 N 1/8/2015 PA-6 Lot 167 Slope 8 CF 192.0 17.3%14.5%106.1 115.5 92%90% 995 N 1/8/2015 PA-3 Lot 102 1 CF 145.0 18.4%16.0%106.5 117.5 91%90% 996 N 1/8/2015 PA-6 Lot 238 Slope 5 CF 92.0 13.5%11.0%113.6 124.5 91%90% 997 N 1/8/2015 PA-6 Lot 233 Slope 11 CF 138.0 13.5%12.5%110.7 122.0 91%90% 998 N 1/8/2015 PA-3 Lot 90 8 CF 144.0 17.5%14.5%107.4 115.5 93%90% 999 N 1/8/2015 PA-3 Lot 91 8 CF 145.0 18.1%14.5%106.9 115.5 93%90% 1000 N 1/9/2015 PA-3 Lot 146 5 CF 113.0 13.9%11.0%112.8 124.5 91%90% 1001 N 1/9/2015 PA-3 Lot 126 5 CF 113.0 15.8%11.0%112.4 124.5 90%90% 1002 N 1/9/2015 PA-3 Lot 134 11 CF 114.0 19.8%12.5%110.7 122.0 91%90% 1003 N 1/9/2015 PA-3 Lot 113 5 CF 123.0 14.2%11.0%112.7 124.5 91%90% 1004 N 1/9/2015 PA-6 Lot 238 Slope 5 CF 99.0 14.1%11.0%112.6 124.5 90%90% 1005 N 1/9/2015 La Paz Ct Sta. 16+30 11 CF 112.0 15.2%12.5%112.3 122.0 92%90% 1006 N 1/9/2015 PA-6 Lot 171 Slope 11 CF 195.0 16.4%12.5%111.9 122.0 92%90% 1007 N 1/15/2015 PA-3 Lot 125 5 CF 112.0 14.4%11.0%115.2 124.5 93%90% 1008 N 1/15/2015 PA-3 Lot 147 12 CF 114.0 16.6%12.0%113.9 124.0 92%90% 1009 N 1/15/2015 PA-7 West Slope 12 CF 120.0 15.9%12.0%114.2 124.0 92%90% 1010 N 1/9/2015 PA-6 Lot 238 Slope 1 CF 101.0 17.5%16.0%109.2 117.5 93%90% 1011 N 1/13/2015 PA-6 Lot 238 Slope 11 CF 105.0 15.5%12.5%109.9 122.0 90%90% 1012 N 1/13/2015 PA-6 Lot 237 12 CF 107.0 15.0%12.0%114.0 124.0 92%90% 1013 N 1/13/2015 PA-6 Lot 237 Slope 12 CF 109.0 14.9%12.0%112.0 124.0 90%90% 1014 N 1/13/2015 PA-6 Lot 238 12 CF 108.0 14.5%12.0%111.8 124.0 90%90% 1015 N 1/14/2015 PA-6 Lot 238 11 CF 110.0 14.2%12.5%110.8 122.0 91%90% 1016 N 1/14/2015 PA-6 Lot 237 3 CF 112.0 14.8%13.5%106.9 118.0 91%90% 1017 N 1/14/2015 PA-8 12 SF 122.0 14.1%12.0%116.0 124.0 94%90% 1018 N 1/15/2015 PA-6 Lot 206 5 CF 150.0 14.7%11.0%114.0 124.5 92%90% 1019 N 1/15/2015 PA-6 Lot 207 9 CF 148.0 9.0%10.5%116.7 127.5 92%90% 1020 N 1/15/2015 PA-6 Lot 208 5 CF 145.0 15.6%11.0%116.5 124.5 94%90% 1021 N 1/15/2015 PA-6 Lot 209 11 CF 143.0 15.8%12.5%110.7 122.0 91%90% 1022 N 1/15/2015 PA-6 Lot 210 11 CF 141.0 17.4%12.5%110.0 122.0 90%90% 1023 N 1/15/2015 PA-6 Lot 211 11 CF 139.0 15.6%12.5%112.1 122.0 92%90% 1024 N 1/15/2015 ECR Slope Sta. 480+70 9 CF 89.0 14.5%10.5%115.9 127.5 91%90% 1025 N 1/15/2015 ECR Slope Sta. 479+60 9 CF 91.0 13.5%10.5%115.6 127.5 91%90% 1026 N 1/15/2015 ECR Slope Sta. 476+90 9 CF 96.0 8.6%10.5%115.2 127.5 90%90% 1027 N 1/15/2015 ECR Slope Sta. 475+20 9 CF 89.0 10.0%10.5%116.7 127.5 92%90% 1028 N 1/15/2015 PA-3 Lot 155 11 CF 120.0 13.8%12.5%107.6 122.0 88%90%retest on 1028A 1029 N 1/15/2015 La Paz Ct Sta. 30+30 12 CF 118.0 16.0%12.0%114.1 124.0 92%90% 1030 N 1/15/2015 PA-3 Lot 148 12 CF 118.0 15.2%12.0%113.0 124.0 91%90% 1031 N 1/16/2015 ECR Slope Sta. 481+00 13 CF 92.0 14.2%11.0%114.3 125.5 91%90% 1032 N 1/16/2015 ECR Slope Sta. 478+50 11 CF 98.0 17.3%12.5%110.5 122.0 91%90% 1033 N 1/16/2015 ECR Slope Sta. 475+80 8 CF 95.0 17.2%14.5%108.1 115.5 94%90% 1034 N 1/16/2015 ECR Slope Sta. 473+20 13 CF 92.0 15.3%11.0%113.5 125.5 90%90% 1035 N 1/16/2015 PA-8 South Slope 10 SF 122.0 11.0%10.0%120.7 128.0 94%90% 1036 N 1/16/2015 PA-8 South Slope 13 SF 118.0 11.8%11.0%114.1 125.5 91%90% 1037 N 1/16/2015 ECR Slope Sta. 480+50 10 CF 100.0 11.2%10.0%117.9 128.0 92%90% 1038 N 1/16/2015 ECR Slope Sta. 479+10 4 CF 101.0 12.7%11.0%112.0 123.5 91%90% 1039 N 1/16/2015 ECR Slope Sta. 476+70 5 CF 100.0 13.0%11.0%113.0 124.5 91%90% 1040 N 1/16/2015 ECR Slope Sta. 473+80 12 CF 96.0 15.9%12.0%112.8 124.0 91%90% 1041 N 1/16/2015 PA-3 Lot 126 4 CF 126.0 12.0%11.0%112.1 123.5 91%90% 1042 N 1/16/2015 Roberston Rd Sta. 26+05 4 CF 128.0 13.8%11.0%112.8 123.5 91%90% 1043 N 1/16/2015 PA-3 Lot 147 11 CF 121.0 17.4%12.5%111.1 122.0 91%90% 1044 N 1/16/2015 PA-3 Lot 134 12 CF 125.0 15.3%12.0%113.0 124.0 91%90% 1045 N 1/16/2015 Wellspring St Sta. 29+35 12 CF 120.0 16.0%12.0%112.5 124.0 91%90% 1046 N 1/16/2015 PA-7 West Slope 13 CF 124.0 14.0%11.0%114.2 125.5 91%90% 1047 N 1/17/2015 PA-5 Lot 30 4 CF 201.0 13.2%11.0%112.3 123.5 91%90% 1048 N 1/17/2015 PA-5 Lot 31 5 CF 201.0 13.9%11.0%114.1 124.5 92%90% 1049 N 1/17/2015 PA-5 Lot 48 12 CF 198.0 12.6%12.0%113.3 124.0 91%90% Project No.133023-03 Page C-15 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1050 N 1/17/2015 PA-5 Lot 49 9 CF 197.0 14.6%10.5%116.3 127.5 91%90% 1051 N 1/16/2015 ECR Slope Sta. 474+30 4 CF 97.0 12.7%11.0%112.0 123.5 91%90% 1052 N 1/17/2015 PA-3 Lot 134 7 CF 129.0 19.4%19.5%104.2 111.5 93%90% 1053 N 1/17/2015 PA-3 Lot 126 10 CF 128.0 14.3%10.0%116.5 128.0 91%90% 1054 N 1/17/2015 PA-3 Lot 149 12 CF 127.0 16.4%12.0%112.8 124.0 91%90% 1055 N 1/17/2015 PA-3 Lot 155 4 CF 128.0 14.7%11.0%115.8 123.5 94%90% 1056 N 1/17/2015 Wellspring St Sta. 28+80 4 CF 126.0 14.9%11.0%114.7 123.5 93%90% 1057 N 1/17/2015 PA-3 Lot 157 12 CF 128.0 17.1%12.0%111.8 124.0 90%90% 1058 N 1/19/2015 PA-6 Lot 205 10 FG 0.0 11.9%10.0%118.9 128.0 93%90% 1059 N 1/19/2015 PA-6 Lot 204 9 FG 0.0 13.5%10.5%115.4 127.5 91%90% 1060 N 1/19/2015 PA-6 Lot 203 10 FG 0.0 13.5%10.0%117.6 128.0 92%90% 1061 N 1/19/2015 PA-6 Lot 211 5 CF 139.5 14.5%11.0%113.5 124.5 91%90% 1062 N 1/19/2015 PA-6 Lot 210 5 CF 142.0 14.4%11.0%114.6 124.5 92%90% 1063 N 1/19/2015 PA-6 Lot 209 5 CF 144.0 13.2%11.0%114.2 124.5 92%90% 1064 N 1/19/2015 PA-6 Lot 208 5 CF 146.0 13.5%11.0%112.2 124.5 90%90% 1065 N 1/19/2015 PA-6 Lot 207 5 CF 149.0 14.3%11.0%113.0 124.5 91%90% 1066 N 1/19/2015 PA-6 Lot 206 5 CF 151.0 13.3%11.0%113.9 124.5 91%90% 1067 N 1/19/2015 PA-5 Lot 50 5 CF 197.0 14.9%11.0%116.2 124.5 93%90% 1068 N 1/19/2015 PA-5 Lot 49 12 CF 200.0 16.0%12.0%112.0 124.0 90%90% 1069 N 1/19/2015 PA-6 Lot 170 Slope 12 CF 200.0 14.7%12.0%113.3 124.0 91%90% 1070 N 1/19/2015 PA-5 Lot 52 12 CF 198.0 15.5%12.0%114.1 124.0 92%90% 1071 N 1/19/2015 PA-5 Lot 32 5 CF 204.0 14.0%11.0%112.5 124.5 90%90% 1072 N 1/19/2015 PA-5 Lot 29 5 CF 198.0 13.3%11.0%112.3 124.5 90%90% 1073 N 1/19/2015 ECR Slope Sta. 474+40 11 SF 94.0 13.8%12.5%109.9 122.0 90%90% 1074 N 1/19/2015 PA-5 Lot 31 5 CF 204.0 12.4%11.0%112.6 124.5 90%90% 1075 N 1/19/2015 PA-5 Lot 30 5 CF 203.0 10.5%11.0%112.9 124.5 91%90% 1076 N 1/19/2015 PA-5 Lot 29 5 CF 200.0 12.9%11.0%113.1 124.5 91%90% 1077 N 1/19/2015 PA-5 Lot 50 11 CF 199.0 16.3%12.5%110.3 122.0 90%90% 1078 N 1/19/2015 PA-5 Lot 53 11 CF 200.0 14.9%12.5%111.5 122.0 91%90% 1079 N 1/19/2015 ECR Slope Sta. 475+70 8 SF 96.0 17.5%14.5%105.6 115.5 91%90% 1080 N 1/19/2015 ECR Slope Sta. 476+80 8 SF 94.0 15.2%14.5%107.0 115.5 93%90% 1081 N 1/19/2015 ECR Slope Sta. 477+80 11 SF 101.0 12.9%12.5%109.8 122.0 90%90% 1082 N 1/20/2015 PA-23A Slope west of Lot 71 11 CF 129.0 13.4%12.5%110.1 122.0 90%90% 1083 N 1/20/2015 PA-23A Slope west of Lot 71 8 CF 132.0 17.2%14.5%108.1 115.5 94%90% 1084 N 1/20/2015 PA-5 Lot 52 9 CF 204.0 11.8%10.5%118.7 127.5 93%90% 1085 N 1/20/2015 PA-5 Lot 50 8 CF 203.0 18.8%14.5%105.0 115.5 91%90% 1086 N 1/20/2015 PA-5 Lot 54 9 CF 201.0 11.5%10.5%117.3 127.5 92%90% 1087 N 1/20/2015 PA-3 Lot 147 8 CF 128.0 17.5%14.5%107.0 115.5 93%90% 1088 N 1/20/2015 PA-3 Lot 101 9 CF 146.0 14.3%10.5%118.7 127.5 93%90% 1089 N 1/20/2015 PA-3 Lot 113 9 CF 138.0 15.0%10.5%117.8 127.5 92%90% 1090 N 1/20/2015 PA-23A Slope west of Lot 71 11 CF 135.0 13.5%12.5%108.8 122.0 89%90%retest on 1090A 1091 N 1/21/2015 ECR Slope Sta. 474+70 11 SF 88.0 14.0%12.5%110.1 122.0 90%90% 1092 N 1/21/2015 ECR Slope Sta. 472+50 11 SF 100.0 15.3%12.5%110.0 122.0 90%90% 1093 N 1/21/2015 PA-23A Slope west of Lot 71 11 CF 137.0 15.8%12.5%111.0 122.0 91%90% 1094 N 1/21/2015 PA-23A Slope west of Lot 71 11 CF 139.0 13.0%12.5%108.7 122.0 89%90%retest on 1094A 1095 N 1/21/2015 PA-3 Lot 149 11 CF 130.0 15.5%12.5%109.9 122.0 90%90% 1096 N 1/21/2015 PA-3 Lot 114 11 CF 136.0 13.4%12.5%110.3 122.0 90%90% 1097 N 1/21/2015 PA-11 10 CF 91.0 14.2%10.0%117.4 128.0 92%90% 1098 N 1/21/2015 PA-11 10 CF 89.0 13.6%10.0%115.7 128.0 90%90% 1099 N 1/21/2015 PA-11 10 CF 87.0 13.8%10.0%116.6 128.0 91%90% 1100 N 1/21/2015 PA-11 10 CF 90.0 14.5%10.0%117.0 128.0 91%90% 1101 N 1/21/2015 ECR Slope Sta. 473+70 11 SF 94.0 13.8%12.5%110.7 122.0 91%90% 1102 N 1/21/2015 ECR Slope Sta. 471+55 11 SF 102.0 14.5%12.5%109.6 122.0 90%90% 1103 N 1/21/2015 PA-10 Lot 299 Slope 5 CF 113.0 14.0%11.0%114.8 124.5 92%90% 1104 N 1/21/2015 PA-10 Lot 299 Slope 5 CF 117.0 14.1%11.0%113.0 124.5 91%90% 1105 N 1/21/2015 PA-23A Lot 71 Slope 5 CF 140.0 13.0%11.0%112.8 124.5 91%90% 1106 N 1/22/2015 PA-10 Lot 299 Slope 5 CF 123.0 14.8%11.0%113.2 124.5 91%90% 1107 N 1/22/2015 PA-23A Lot 63 Slope 11 CF 149.0 12.5%12.5%109.7 122.0 90%90% 1108 N 1/22/2015 PA-23A Lot 71 Slope 11 CF 145.0 12.5%12.5%109.4 122.0 90%90% 1109 N 1/22/2015 PA-23A Lot 71 Slope 9 CF 147.0 9.8%10.5%114.7 127.5 90%90% 1110 N 1/22/2015 PA-23A Lot 71 Slope 11 CF 146.0 14.6%12.5%109.5 122.0 90%90% 1111 N 1/22/2015 PA-11 10 CF 93.0 13.1%10.0%115.8 128.0 90%90% 1112 N 1/22/2015 PA-11 10 CF 90.0 11.5%10.0%125.1 128.0 98%90% 1113 N 1/22/2015 PA-11 10 CF 94.0 13.5%10.0%119.0 128.0 93%90% 1114 N 1/22/2015 PA-11 10 CF 90.0 13.1%10.0%115.2 128.0 90%90% 1115 N 1/22/2015 PA-11 10 CF 92.0 9.0%10.0%116.0 128.0 91%90% 1116 N 1/22/2015 PA-11 10 CF 97.0 13.2%10.0%118.1 128.0 92%90% 1117 N 1/22/2015 PA-11 10 CF 93.0 12.7%10.0%115.6 128.0 90%90% 1118 N 1/22/2015 PA-11 10 CF 95.0 12.9%10.0%115.4 128.0 90%90% 1119 N 1/22/2015 PA-11 10 CF 93.0 13.2%10.0%116.4 128.0 91%90% Project No.133023-03 Page C-16 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1120 N 1/22/2015 PA-11 10 CF 95.0 12.1%10.0%115.6 128.0 90%90% 1121 N 1/23/2015 PA-6 Lot 202 11 FG 0.0 15.6%12.5%111.0 122.0 91%90% 1122 N 1/23/2015 PA-6 Lot 201 13 FG 0.0 15.3%11.0%115.3 125.5 92%90% 1123 N 1/23/2015 PA-6 Lot 200 9 FG 0.0 12.7%10.5%116.2 127.5 91%90% 1124 N 1/23/2015 PA-6 Lot 199 13 FG 0.0 14.0%11.0%115.2 125.5 92%90% 1125 N 1/23/2015 PA-6 Lot 229 Slope 11 SF 155.0 12.0%12.5%110.4 122.0 90%90% 1126 N 1/23/2015 PA-3 Lot 91 11 CF 145.0 16.1%12.5%110.4 122.0 90%90% 1127 N 1/23/2015 PA-3 Lot 90 5 CF 147.0 14.2%11.0%113.5 124.5 91%90% 1128 N 1/23/2015 PA-3 Lot 89 5 CF 149.0 14.7%11.0%112.9 124.5 91%90% 1129 N 1/23/2015 PA-10 Lot 299 Slope 11 CF 132.0 16.2%12.5%109.9 122.0 90%90% 1130 N 1/24/2015 PA-7 South Slope 5 SF 103.0 12.5%11.0%108.7 124.5 87%90%retest on 1130A 1131 N 1/22/2015 PA-10 Lot 299 Slope 11 CF 126.0 12.1%12.5%110.8 122.0 91%90% 1132 N 1/22/2015 PA-11 4 CF 92.0 11.2%11.0%113.0 123.5 91%90% 1133 N 1/22/2015 PA-11 4 CF 93.0 10.9%11.0%113.7 123.5 92%90% 1134 N 1/23/2015 PA-10 Lot 299 Slope 4 CF 128.0 14.9%11.0%111.2 123.5 90%90% 1135 N 1/23/2015 PA-9 Lot 276 Slope 4 CF 131.0 12.1%11.0%112.7 123.5 91%90% 1136 N 1/23/2015 PA-11 East Slope 4 CF 80.0 11.5%11.0%112.0 123.5 91%90% 1137 N 1/23/2015 PA-11 11 CF 94.0 13.8%12.5%111.0 122.0 91%90% 1138 N 1/23/2015 PA-11 11 CF 97.0 14.0%12.5%112.1 122.0 92%90% 1139 N 1/23/2015 PA-11 East Slope 4 CF 88.0 11.7%11.0%111.4 123.5 90%90% 1140 N 1/23/2015 PA-11 4 CF 100.0 11.0%11.0%112.2 123.5 91%90% 1141 N 1/23/2015 PA-11 East Slope 10 CF 86.0 12.9%10.0%116.2 128.0 91%90% 1142 N 1/23/2015 PA-11 East Slope 10 CF 89.0 12.8%10.0%116.9 128.0 91%90% 1143 N 1/23/2015 PA-11 4 CF 96.0 12.9%11.0%114.3 123.5 93%90% 1144 N 1/23/2015 PA-11 4 CF 94.0 11.7%11.0%111.9 123.5 91%90% 1145 N 1/23/2015 PA-11 10 CF 95.0 9.8%10.0%117.1 128.0 91%90% 1146 N 1/23/2015 PA-11 4 CF 97.0 10.7%11.0%112.8 123.5 91%90% 1147 N 1/24/2015 PA-11 10 CF 84.0 13.2%10.0%116.2 128.0 91%90% 1148 N 1/24/2015 PA-11 10 CF 86.0 13.0%10.0%116.0 128.0 91%90% 1149 N 1/26/2015 PA-9 Lot 265 Slope 3 CF 148.0 17.5%13.5%106.4 118.0 90%90% 1150 N 1/26/2015 PA-11 10 CF 80.0 14.8%10.0%117.2 128.0 92%90% 1151 N 1/26/2015 PA-7 East Slope 5 SF 105.0 11.2%11.0%114.2 124.5 92%90% 1152 N 1/26/2015 PA-11 5 CF 88.0 14.0%11.0%112.0 124.5 90%90% 1153 N 1/26/2015 PA-11 5 CF 90.0 13.5%11.0%113.5 124.5 91%90% 1154 N 1/26/2015 PA-11 East Slope 5 CF 98.0 14.5%11.0%113.8 124.5 91%90% 1155 N 1/26/2015 PA-11 East Slope 5 CF 96.0 13.5%11.0%114.2 124.5 92%90% 1156 N 1/26/2015 PA-11 5 CF 97.0 13.9%11.0%114.9 124.5 92%90% 1157 N 1/26/2015 PA-11 East Slope 10 CF 94.0 11.9%10.0%116.0 128.0 91%90% 1158 N 1/27/2015 PA-11 10 CF 100.0 13.0%10.0%116.1 128.0 91%90% 1159 N 1/27/2015 PA-11 5 CF 99.0 14.1%11.0%113.8 124.5 91%90% 1160 N 1/27/2015 PA-11 5 CF 98.0 14.8%11.0%114.1 124.5 92%90% 1161 N 1/26/2015 PA-6 Lot 206 11 FG 0.0 14.2%12.5%110.4 122.0 90%90% 1162 N 1/26/2015 PA-6 Lot 207 5 FG 0.0 12.8%11.0%114.5 124.5 92%90% 1163 N 1/26/2015 PA-6 Lot 208 11 FG 0.0 12.9%12.5%110.8 122.0 91%90% 1164 N 1/26/2015 PA-6 Lot 209 5 FG 0.0 10.1%11.0%113.1 124.5 91%90% 1165 N 1/26/2015 PA-6 Lot 210 9 FG 0.0 14.7%10.5%116.3 127.5 91%90% 1166 N 1/27/2015 PA-6 Lot 194 11 FG 0.0 13.5%12.5%109.7 122.0 90%90% 1167 N 1/27/2015 PA-6 Lot 195 11 FG 0.0 16.3%12.5%109.9 122.0 90%90% 1168 N 1/27/2015 PA-6 Lot 196 11 FG 0.0 16.8%12.5%111.9 122.0 92%90% 1169 N 1/27/2015 PA-6 Lot 197 11 FG 0.0 14.3%12.5%110.5 122.0 91%90% 1170 N 1/27/2015 PA-3 Lot 88 11 CF 149.0 12.4%12.5%109.9 122.0 90%90% 1171 N 1/27/2015 PA-10 Lot 325 Slope 9 CF 94.0 12.1%10.5%115.4 127.5 91%90% 1172 N 1/27/2015 Treatment Basin South of Lot 325 11 CF 91.0 12.6%12.5%109.8 122.0 90%90% 1173 N 1/27/2015 PA-10 Lot 299 Slope 5 CF 134.0 11.9%11.0%112.4 124.5 90%90% 1174 N 1/27/2015 PA-10 Lot 299 Slope 13 CF 135.0 15.1%11.0%113.0 125.5 90%90% 1175 N 1/28/2015 PA-10 Lot 325 Slope 13 CF 96.5 11.9%11.0%116.1 125.5 93%90% 1176 N 1/28/2015 PA-10 Lot 325 Slope 13 CF 97.0 12.0%11.0%115.7 125.5 92%90% 1177 N 1/28/2015 PA-10 Lot 325 Slope 4 CF 77.0 8.4%11.0%112.4 123.5 91%90% 1178 N 1/28/2015 PA-10 Lot 325 Slope 4 CF 77.0 10.7%11.0%113.1 123.5 92%90% 1179 N 1/28/2015 PA-10 Lot 334 Chase Ct. Slope 4 CF 87.0 12.0%11.0%115.4 123.5 93%90% 1180 N 1/28/2015 PA-10 Lot 325 4 CF 100.5 11.4%11.0%116.6 123.5 94%90% 1181 N 1/27/2015 PA-11 10 CF 99.0 9.6%10.0%116.0 128.0 91%90% 1182 N 1/27/2015 PA-11 5 CF 99.0 15.9%11.0%114.7 124.5 92%90% 1183 N 1/27/2015 PA-11 11 CF 93.0 16.0%12.5%110.7 122.0 91%90% 1184 N 1/27/2015 PA-11 11 CF 78.0 14.7%12.5%110.2 122.0 90%90% 1185 N 1/28/2015 PA-11 13 CF 85.0 15.6%11.0%115.1 125.5 92%90% 1186 N 1/28/2015 PA-11 5 CF 86.0 14.8%11.0%112.8 124.5 91%90% 1187 N 1/28/2015 PA-11 11 CF 88.0 14.1%12.5%110.3 122.0 90%90% 1188 N 1/28/2015 PA-11 8 CF 89.0 14.2%14.5%107.2 115.5 93%90% 1189 N 1/28/2015 PA-11 5 CF 94.0 11.2%11.0%113.4 124.5 91%90% Project No.133023-03 Page C-17 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1190 N 1/28/2015 PA-11 5 CF 95.0 10.5%11.0%113.9 124.5 91%90% 1191 N 1/28/2015 PA-11 5 CF 91.0 14.6%11.0%112.7 124.5 91%90% 1192 N 1/28/2015 PA-11 13 CF 89.0 14.1%11.0%114.8 125.5 91%90% 1193 N 1/29/2015 PA-11 13 CF 94.0 15.1%11.0%112.9 125.5 90%90% 1194 N 1/29/2015 PA-11 11 CF 95.0 15.1%12.5%110.2 122.0 90%90% 1195 N 1/29/2015 PA-11 11 CF 97.0 13.3%12.5%111.7 122.0 92%90% 1196 N 1/29/2015 PA-5 Lot 49 8 FG 0.0 13.3%14.5%107.3 115.5 93%90% 1197 N 1/29/2015 PA-5 Lot 50 5 FG 0.0 13.7%11.0%112.4 124.5 90%90% 1198 N 1/30/2015 PA-6 Lot 237 Slope 5 CF 116.0 13.6%11.0%114.4 124.5 92%90% 1199 N 1/30/2015 PA-6 Lot 237 Slope 11 CF 115.0 14.1%12.5%112.0 122.0 92%90% 1200 N 1/30/2015 PA-6 Lot 241 Slope 5 CF 86.0 13.5%11.0%113.0 124.5 91%90% 1201 N 2/4/2015 PA-6 Lot 236 8 CF 42.0 15.6%14.5%107.5 115.5 93%90% 1202 N 2/4/2015 PA-6 Lot 236 8 CF 43.0 17.3%14.5%105.7 115.5 92%90% 1203 N 2/4/2015 PA-6 Lot 241 Slope 11 CF 94.0 13.6%12.5%113.8 122.0 93%93% 1204 N 2/4/2015 PA-6 Lot 241 Slope 11 CF 95.0 14.1%12.5%114.6 122.0 94%93% 1205 N 2/4/2015 ECR Slope Sta. 473+90 10 CF 115.0 10.0%10.0%117.9 128.0 92%90% 1206 N 2/4/2015 ECR Slope Sta. 480+90 10 CF 121.0 12.5%10.0%118.6 128.0 93%90% 1207 N 2/5/2015 ECR Slope Sta. 471+90 11 CF 118.0 14.1%12.5%113.2 122.0 93%90% 1208 N 2/5/2015 ECR Slope Sta. 472+95 5 CF 116.0 13.5%11.0%114.5 124.5 92%90% 1209 N 2/5/2015 ECR Slope Sta. 475+00 5 CF 118.0 15.5%11.0%114.6 124.5 92%90% 1210 N 2/5/2015 ECR Slope Sta. 477+80 11 CF 121.0 14.4%12.5%113.0 122.0 93%90% 1211 N 1/28/2015 PA-10 Lot 334 4 CF 107.0 9.5%11.0%115.3 123.5 93%90% 1212 N 1/29/2015 PA-10 Lot 334 Chase Ct. 4 CF 110.0 10.9%11.0%116.6 123.5 94%90% 1213 N 1/29/2015 PA-10 Lot 326 3 CF 102.0 13.6%13.5%112.3 118.0 95%90% 1214 N 1/29/2015 PA-10 Lot 334 Chase Ct. 4 CF 112.0 9.6%11.0%117.2 123.5 95%90% 1215 N 1/29/2015 PA-10 Lot 334 Chase Ct. 4 CF 113.0 10.3%11.0%116.8 123.5 95%90% 1216 N 1/29/2015 PA-10 Lot 326 4 CF 104.5 8.9%11.0%119.1 123.5 96%90% 1217 N 1/29/2015 PA-10 Lot 326 11 CF 106.0 13.3%12.5%112.8 122.0 92%90% 1218 N 1/30/2015 PA-10 Lot 334 Chase Ct. 5 CF 117.0 13.7%11.0%115.4 124.5 93%90% 1219 N 1/30/2015 PA-10 Lot 326 5 CF 119.0 12.6%11.0%113.9 124.5 91%90% 1220 N 1/30/2015 PA-10 Lot 325 5 CF 119.0 10.7%11.0%113.2 124.5 91%90% 1221 N 2/2/2015 Gage Dr. Sta. 19+50 South Slope 4 CF 52.0 12.6%11.0%118.5 123.5 96%90% 1222 N 2/2/2015 Gage Dr. Sta. 20+10 North Slope 4 CF 58.0 9.2%11.0%115.3 123.5 93%90% 1223 N 2/2/2015 Gage Dr. Sta. 19+50 North Slope 4 CF 52.9 12.7%11.0%119.7 123.5 97%90% 1224 N 2/2/2015 Gage Dr. Sta. 20+20 North Slope 4 CF 59.0 12.9%11.0%112.9 123.5 91%90% 1225 N 2/2/2015 Gage Dr Sta. 20+30 4 CF 60.0 12.5%11.0%118.1 123.5 96%90% 1226 N 2/3/2015 PA-6 Lot 234 13 CF 46.0 13.7%11.0%116.0 125.5 92%90% 1227 N 2/3/2015 PA-6 Lot 234 5 CF 48.0 14.1%11.0%115.4 124.5 93%90% 1228 N 2/3/2015 Gage Dr. Sta. 18+55 10 CF 56.0 11.9%10.0%120.6 128.0 94%93% 1229 N 2/3/2015 Gage Dr. Sta. 18+65 North Side 9 CF 58.0 12.1%10.5%118.4 127.5 93%93% 1230 N 2/3/2015 PA-6 Lot 239 8 CF 123.0 16.0%14.5%108.9 115.5 94%90% 1231 N 1/30/2015 PA-6 Lot 165 Slope 11 SF 194.0 13.3%12.5%111.8 122.0 92%90% 1232 N 1/30/2015 PA-6 Lot 169 Slope 4 SF 192.0 11.7%11.0%112.4 123.5 91%90% 1233 N 1/30/2015 PA-6 Lot 172 Slope 14 SF 193.0 14.5%15.0%107.8 117.0 92%90% 1234 N 1/30/2015 PA-6 Lot 211 5 FG 0.0 12.1%11.0%113.1 124.5 91%90% 1235 N 1/30/2015 PA-6 Lot 198 5 FG 0.0 11.1%11.0%112.9 124.5 91%90% 1236 N 1/30/2015 PA-11 11 CF 94.0 16.5%12.5%111.6 122.0 91%90% 1237 N 1/30/2015 PA-11 11 CF 95.0 14.7%12.5%111.5 122.0 91%90% 1238 N 1/31/2015 PA-5 Lot 31 11 FG 0.0 11.5%12.5%109.9 122.0 90%90% 1239 N 1/31/2015 PA-5 Lot 32 11 FG 0.0 12.7%12.5%110.1 122.0 90%90% 1240 N 1/31/2015 PA-5 Lot 51 5 FG 0.0 10.6%11.0%113.0 124.5 91%90% 1241 N 1/31/2015 PA-5 Lot 52 9 FG 0.0 10.4%10.5%116.1 127.5 91%90% 1242 N 1/31/2015 PA-5 Lot 53 5 FG 0.0 11.2%11.0%113.1 124.5 91%90% 1243 N 1/31/2015 PA-5 Lot 54 13 FG 0.0 13.1%11.0%115.9 125.5 92%90% 1244 N 2/2/2015 PA-6 Lot 240 Slope 3 CF 95.0 13.4%13.5%107.4 118.0 91%90% 1245 N 2/2/2015 PA-6 Lot 237 5 CF 123.0 13.3%11.0%115.0 124.5 92%90% 1246 N 2/2/2015 PA-6 Lot 237 5 CF 124.0 12.7%11.0%115.1 124.5 92%90% 1247 N 2/2/2015 PA-6 Lot 239 Slope 9 CF 101.0 11.1%10.5%116.0 127.5 91%90% 1248 N 2/3/2015 PA-6 Lot 239 Slope 9 CF 102.0 11.8%10.5%116.2 127.5 91%90% 1249 N 2/3/2015 PA-6 Lot 235 12 CF 137.0 13.2%12.0%115.6 124.0 93%90% 1250 N 2/3/2015 PA-6 Lot 235 12 CF 136.0 14.0%12.0%116.1 124.0 94%90% 1251 N 2/4/2015 Gage Dr Sta. 20+25 North Slope 11 CF 69.0 13.1%12.5%113.9 122.0 93%90% 1252 N 2/4/2015 Gage Dr Sta. 20+50 North Slope 11 CF 70.0 14.1%12.5%113.0 122.0 93%90% 1253 N 2/4/2015 PA-10 Lot 325 Slope 11 CF 80.0 14.1%12.5%115.3 122.0 95%90% 1254 N 2/4/2015 Gage Dr. Sta. 20+00 8 CF 68.0 16.4%14.5%108.6 115.5 94%90% 1255 N 2/4/2015 PA-10 Lot 334 Chase Ct. Slope 5 CF 92.0 14.3%11.0%117.0 124.5 94%90% 1256 N 2/4/2015 Gage Dr Sta. 20+25 North Slope 11 CF 76.0 14.2%12.5%114.2 122.0 94%90% 1257 N 2/4/2015 PA-10 Lot 334 Chase Ct. Slope 10 CF 93.0 12.8%10.0%121.5 128.0 95%90% 1258 N 2/4/2015 Gage Dr Sta. 19+90 North Slope 11 CF 71.0 14.7%12.5%113.6 122.0 93%90% 1259 N 2/4/2015 PA-10 Lot 334 Chase Ct. Slope 10 CF 98.0 12.2%10.0%119.7 128.0 94%90% Project No.133023-03 Page C-18 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1260 N 2/4/2015 Treatment Basin South of Lot 325 11 CF 79.0 14.7%12.5%113.6 122.0 93%90% 1261 N 2/5/2015 PA-10 Lot 325 Slope 9 CF 90.0 11.6%10.5%119.0 127.5 93%90% 1262 N 2/5/2015 Treatment Basin South of Lot 325 9 CF 80.0 7.5%10.5%115.4 127.5 91%90% 1263 N 2/5/2015 PA-10 Lot 324 9 CF 101.0 11.4%10.5%118.0 127.5 93%90% 1264 N 2/5/2015 PA-10 Lot 324 Slope 9 CF 104.0 12.1%10.5%115.0 127.5 90%90% 1265 N 2/6/2015 PA-6 Lot 234 4 CF 147.0 12.9%11.0%115.3 123.5 93%90% 1266 N 2/6/2015 PA-6 Lot 231 4 CF 155.0 12.6%11.0%113.0 123.5 91%90% 1267 N 2/6/2015 PA-6 Lot 235 4 CF 142.0 14.5%11.0%112.0 123.5 91%90% 1268 N 2/9/2015 PA-6 Lot 237 5 CF 138.0 12.6%11.0%113.2 124.5 91%90% 1269 N 2/9/2015 PA-6 Lot 238 5 CF 140.0 11.2%11.0%114.0 124.5 92%90% 1270 N 2/9/2015 PA-6 Lot 240 5 CF 136.0 11.6%11.0%113.8 124.5 91%90% 1271 N 2/5/2015 PA-11 East Slope 8 SF 97.0 15.2%14.5%108.3 115.5 94%90% 1272 N 2/5/2015 PA-11 East Slope 8 SF 96.0 14.7%14.5%107.2 115.5 93%90% 1273 N 2/5/2015 PA-11 East Slope 6 SF 96.0 14.6%13.5%103.7 114.5 91%90% 1274 N 2/5/2015 PA-11 East Slope 6 SF 95.0 13.7%13.5%104.2 114.5 91%90% 1275 N 2/5/2015 PA-11 East Slope 8 SF 95.0 15.8%14.5%107.7 115.5 93%90% 1276 N 2/5/2015 PA-11 East Slope 6 SF 95.0 15.2%13.5%103.8 114.5 91%90% 1277 N 2/5/2015 PA-11 East Slope 8 SF 94.0 15.5%14.5%106.8 115.5 92%90% 1278 N 2/5/2015 ECR Slope Sta. 474+20 8 CF 116.0 14.7%14.5%107.3 115.5 93%90% 1279 N 2/5/2015 ECR Slope Sta. 476+90 11 CF 121.0 12.8%12.5%110.3 122.0 90%90% 1280 N 2/5/2015 ECR Slope Sta. 477+40 5 CF 122.0 14.1%11.0%114.1 124.5 92%90% 1281 N 2/5/2015 ECR Slope Sta. 473+40 4 CF 120.0 13.6%11.0%112.4 123.5 91%90% 1282 N 2/5/2015 ECR Slope Sta. 476+30 11 CF 123.0 16.4%12.5%109.8 122.0 90%90% 1283 N 2/5/2015 ECR Slope Sta. 481+10 11 CF 128.0 15.4%12.5%113.7 122.0 93%90% 1284 N 2/6/2015 ECR Slope Sta. 472+70 11 CF 126.0 15.8%12.5%114.1 122.0 94%90% 1285 N 2/6/2015 ECR Slope Sta. 475+70 11 CF 127.0 16.5%12.5%111.0 122.0 91%90% 1286 N 2/6/2015 ECR Slope Sta. 478+50 11 CF 129.0 13.5%12.5%112.0 122.0 92%90% 1287 N 2/6/2015 PA-3 Lot 145 11 CF 129.0 14.0%12.5%113.6 122.0 93%90% 1288 N 2/6/2015 PA-3 Lot 144 11 CF 128.0 14.9%12.5%114.0 122.0 93%90% 1289 N 2/6/2015 PA-3 Lot 140 5 CF 130.0 12.7%11.0%115.1 124.5 92%90% 1290 N 2/6/2015 PA-3 Lot 141 11 CF 129.0 14.1%12.5%113.5 122.0 93%90% 1291 N 2/9/2015 PA-3 Lot 133 11 CF 132.0 13.1%12.5%114.4 122.0 94%90% 1292 N 2/9/2015 PA-3 Lot 138 11 CF 132.0 13.9%12.5%111.9 122.0 92%90% 1293 N 2/9/2015 PA-3 Lot 138 11 CF 134.0 14.2%12.5%112.1 122.0 92%90% 1294 N 2/9/2015 PA-3 Lot 139 11 CF 131.0 13.5%12.5%112.2 122.0 92%90% 1295 N 2/9/2015 PA-3 Lot 139 11 CF 133.0 14.1%12.5%113.1 122.0 93%90% 1296 N 2/9/2015 PA-3 Lot 142 11 CF 133.0 15.5%12.5%112.3 122.0 92%90% 1297 N 2/9/2015 PA-3 Lot 142 11 CF 135.0 13.9%12.5%113.8 122.0 93%90% 1298 N 2/9/2015 PA-3 Lot 143 11 CF 131.0 14.3%12.5%112.7 122.0 92%90% 1299 N 2/9/2015 PA-3 Lot 143 11 CF 133.0 14.1%12.5%114.5 122.0 94%90% 1300 N 2/9/2015 PA-3 Lot 157 13 CF 130.0 14.0%11.0%116.6 125.5 93%90% 1301 N 2/9/2015 Gage Dr Sta. 22+10 South Slope 5 CF 78.5 9.7%11.0%118.0 124.5 95%90% 1302 N 2/10/2015 PA-10 Gage Dr Sta. 21+60 5 CF 77.0 10.7%11.0%113.5 124.5 91%90% 1303 N 2/10/2015 Treatment Basin South of Lot 325 4 CF 88.0 12.4%11.0%115.0 123.5 93%90% 1304 N 2/10/2015 PA-10 Lot 324 Slope 5 CF 11.0 12.1%11.0%117.1 124.5 94%90% 1305 N 2/10/2015 PA-10 Lot 316 Slope 5 CF 15.0 12.5%11.0%116.3 124.5 93%90% 1306 N 2/11/2015 PA-9 Lot 298 Slope 4 CF 138.0 10.8%11.0%112.1 123.5 91%90% 1307 N 2/11/2015 PA-10Lot 307 Slope 4 CF 130.0 14.1%11.0%112.0 123.5 91%90% 1308 N 2/11/2015 PA-10 Treatment Basin South of Lot 325 5 CF 91.0 9.7%11.0%117.4 124.5 94%90% 1309 N 2/11/2015 PA-10 Lot 306 3 CF 35.0 11.0%13.5%108.2 118.0 92%90% 1310 N 2/11/2015 PA-10 Lot 333 Kentner Ct. Slope 3 CF 25.0 13.1%13.5%107.6 118.0 91%90% 1311 N 2/9/2015 PA-3 Lot 147 13 CF 131.0 13.7%11.0%115.1 125.5 92%90% 1312 N 2/9/2015 PA-3 Lot 156 11 CF 130.0 14.4%12.5%112.7 122.0 92%90% 1313 N 2/9/2015 PA-3 Lot 156 11 CF 131.0 12.4%12.5%111.3 122.0 91%90% 1314 N 2/10/2015 PA-3 Lot 126 11 CF 135.0 16.4%12.5%112.5 122.0 92%90% 1315 N 2/10/2015 PA-3 Lot 125 4 CF 136.0 15.6%11.0%113.0 123.5 91%90% 1316 N 2/10/2015 PA-3 Lot 124 11 CF 137.0 15.2%12.5%110.2 122.0 90%90% 1317 N 2/10/2015 PA-3 Lot 123 11 CF 139.0 16.3%12.5%112.2 122.0 92%90% 1318 N 2/10/2015 PA-3 Lot 103 5 CF 142.0 13.7%11.0%113.7 124.5 91%90% 1319 N 2/10/2015 PA-3 Lot 104 5 CF 143.0 14.1%11.0%113.9 124.5 91%90% 1320 N 2/10/2015 PA-3 Lot 113 5 CF 140.0 13.3%11.0%116.5 124.5 94%90% 1321 N 2/5/2015 PA-6 Lot 175 Slope 11 SF 185.0 11.0%12.5%111.7 122.0 92%90% 1322 N 2/5/2015 PA-8 North Slope 5 SF 155.0 11.9%11.0%112.6 124.5 90%90% 1323 N 2/5/2015 PA-8 North Slope 11 SF 160.0 12.4%12.5%110.7 122.0 91%90% 1324 N 2/5/2015 PA-8 North Slope 5 SF 150.0 12.0%11.0%113.4 124.5 91%90% 1325 N 2/5/2015 PA-8 West Slope 11 SF 155.0 14.9%12.5%109.7 122.0 90%90% 1326 N 2/5/2015 PA-8 West Slope 8 SF 160.0 14.5%14.5%104.9 115.5 91%90% 1327 N 2/5/2015 PA-8 West Slope 9 SF 145.0 11.2%10.5%115.4 127.5 91%90% 1328 N 2/5/2015 PA-6 Lot 179 Slope 11 SF 175.0 14.1%12.5%111.9 122.0 92%90% Project No.133023-03 Page C-19 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1329 N 2/5/2015 PA-8 North Slope 6 SF 170.0 14.0%13.5%106.1 114.5 93%90% 1330 N 2/5/2015 ECR Slope Sta. 471+30 11 CF 123.0 14.5%12.5%112.1 122.0 92%90% 1331 N 2/10/2015 PA-3 Lot 114 4 CF 138.0 14.1%11.0%114.9 123.5 93%90% 1332 N 2/10/2015 PA-3 Lot 111 11 CF 140.0 12.5%12.5%110.8 122.0 91%90%Soil Removed 1333 N 2/10/2015 PA-3 Lot 112 4 CF 140.0 14.4%11.0%113.9 123.5 92%90% 1334 N 2/11/2015 PA-3 Lot 131 9 CF 133.0 13.2%10.5%116.7 127.5 92%90% 1335 N 2/11/2015 PA-3 Lot 132 9 CF 133.0 12.3%10.5%116.2 127.5 91%90% 1336 N 2/11/2015 PA-3 Lot 121 4 CF 142.0 14.1%11.0%113.1 123.5 92%90%1337 N 2/11/2015 PA-3 Lot 119 8 CF 143.0 18.0%14.5%104.6 115.5 91%90% 1338 N 2/11/2015 PA-3 Lot 117 8 CF 143.0 15.4%14.5%107.9 115.5 93%90% 1339 N 2/11/2015 PA-3 Lot 128 5 CF 136.0 11.7%11.0%114.3 124.5 92%90% 1340 N 2/11/2015 PA-3 Lot 78 11 CF 159.0 15.2%12.5%111.1 122.0 91%90% 1341 N 2/11/2015 PA-3 Lot 77 11 CF 161.0 15.0%12.5%110.5 122.0 91%90% 1342 N 2/11/2015 PA-3 Lot 79 4 CF 158.0 14.6%11.0%115.8 123.5 94%90% 1343 N 2/11/2015 PA-3 Lot 80 4 CF 157.0 14.5%11.0%112.6 123.5 91%90% 1344 N 2/12/2015 PA-3 Lot 115 11 CF 144.0 15.4%12.5%111.1 122.0 91%90% 1345 N 2/12/2015 PA-3 Lot 116 11 CF 144.0 15.5%12.5%112.4 122.0 92%90% 1346 N 2/12/2015 PA-3 Lot 118 11 CF 145.0 14.5%12.5%110.5 122.0 91%90% 1347 N 2/12/2015 PA-3 Lot 120 4 CF 144.0 13.3%11.0%114.1 123.5 92%90% 1348 N 2/13/2015 PA-3 Lot 122 3 CF 141.0 17.7%13.5%110.2 118.0 93%90% 1349 N 2/13/2015 PA-3 Lot 123 13 CF 141.0 15.6%11.0%113.6 125.5 91%90% 1350 N 2/13/2015 PA-3 Lot 154 13 CF 140.0 14.6%11.0%113.7 125.5 91%90% 1351 N 2/11/2015 Treatment Basin South of Lot 325 12 CF 85.0 9.7%12.0%118.0 124.0 95%90% 1352 N 2/12/2015 Treatment Basin South of Lot 325 12 CF 90.0 13.5%12.0%114.2 124.0 92%90% 1353 N 2/12/2015 Treatment Basin South of Lot 325 12 CF 88.0 14.0%12.0%112.3 124.0 91%90% 1354 N 2/12/2015 PA-10 Lot 325 Slope 10 CF 95.0 10.2%10.0%117.0 128.0 91%90% 1355 N 2/12/2015 PA-10 Lot 325 Slope 10 CF 97.0 9.7%10.0%116.3 128.0 91%90% 1356 N 2/12/2015 PA-10 Lot 324 12 CF 118.0 12.9%12.0%113.1 124.0 91%90% 1357 N 2/12/2015 PA-10 Lot 324 Slope 12 CF 116.0 12.5%12.0%111.1 124.0 90%90% 1358 N 2/12/2015 PA-10 Lot 330 Slope 1 CF 114.0 15.8%16.0%105.7 117.5 90%90% 1359 N 2/12/2015 PA-10 Lot 330 Slope 1 CF 116.0 17.6%16.0%106.0 117.5 90%90% 1360 N 2/12/2015 PA-9 Lot 298 Slope 9 CF 143.0 10.9%10.5%117.5 127.5 92%90% 1361 N 2/12/2015 PA-9 Lot 298 Slope 9 CF 141.0 10.7%10.5%118.0 127.5 93%90% 1362 N 2/13/2015 PA-10 Lot 316 Slope 5 CF 128.0 13.9%11.0%113.7 124.5 91%90% 1363 N 2/13/2015 PA-10 Lot 316 Slope 5 CF 124.0 12.7%11.0%114.5 124.5 92%90% 1364 N 2/13/2015 PA-10 Lot 324 5 CF 125.0 13.1%11.0%113.5 124.5 91%90% 1365 N 2/13/2015 PA-10 Lot 324 Slope 5 CF 120.0 14.0%11.0%114.1 124.5 92%90% 1366 N 2/13/2015 PA-10 Lot 323 5 CF 127.0 16.3%11.0%113.0 124.5 91%90% 1367 N 2/13/2015 PA-10 Lot 316 Slope 3 CF 126.0 18.0%13.5%107.1 118.0 91%90% 1368 N 2/13/2015 PA-10 Lot 316 3 CF 130.0 17.3%13.5%109.3 118.0 93%90% 1369 N 2/13/2015 PA-10 Lot 322 5 CF 127.0 13.7%11.0%114.7 124.5 92%90% 1370 N 2/13/2015 PA-10 Lot 321 5 CF 125.0 14.0%11.0%114.2 124.5 92%90% 1371 N 2/13/2015 PA-3 Lot 127 13 CF 137.0 15.6%11.0%113.8 125.5 91%90% 1372 N 2/13/2015 PA-3 Lot 129 13 CF 136.0 14.1%11.0%114.2 125.5 91%90% 1373 N 2/13/2015 PA-3 Lot 130 4 CF 135.0 14.6%11.0%112.3 123.5 91%90% 1374 N 2/13/2015 PA-23A Lot 71 Slope 9 CF 152.0 12.1%10.5%118.3 127.5 93%90% 1375 N 2/13/2015 PA-23A Lot 71 Slope 9 CF 153.0 13.2%10.5%116.9 127.5 92%90% 1376 N 2/13/2015 PA-23A Lot 82 Slope 9 CF 153.0 13.6%10.5%116.2 127.5 91%90% 1377 N 2/13/2015 PA-23A Lot 82 Slope 9 CF 154.0 13.7%10.5%115.9 127.5 91%90% 1378 N 2/13/2015 PA-3 Lot 82 13 CF 155.0 15.8%11.0%112.8 125.5 90%90% 1379 N 2/13/2015 PA-23A Lot 71 Slope 13 CF 155.0 14.0%11.0%113.7 125.5 91%90% 1380 N 2/16/2015 PA-23A Lot 71 Slope 13 CF 156.0 14.8%11.0%114.8 125.5 91%90% 1381 N 2/16/2015 PA-23A Lot 63 Slope 13 CF 164.0 14.2%11.0%116.6 125.5 93%90% 1382 N 2/16/2015 West Ranch St Sta. 17+50 4 CF 110.0 12.8%11.0%112.1 123.5 91%90% 1383 N 2/16/2015 West Ranch St Sta. 16+15 3 CF 107.0 13.8%13.5%108.3 118.0 92%90% 1384 N 2/16/2015 PA-3 Lot 149 10 CF 132.0 10.8%10.0%119.0 128.0 93%90% 1385 N 2/16/2015 PA-3 Lot 149 11 CF 134.0 12.9%12.5%109.4 122.0 90%90% 1386 N 2/16/2015 PA-3 Lot 148 10 CF 132.0 13.2%10.0%117.1 128.0 91%90% 1387 N 2/16/2015 PA-3 Lot 148 3 CF 134.0 16.1%13.5%108.8 118.0 92%90% 1388 N 2/16/2015 PA-3 Lot 145 4 CF 131.0 14.7%11.0%112.8 123.5 91%90% 1389 N 2/16/2015 PA-3 Lot 145 4 CF 133.0 12.5%11.0%113.6 123.5 92%90% 1390 N 2/16/2015 West Ranch St Sta. 18+10 7 CF 116.0 22.6%19.5%100.9 111.5 90%90% 1391 N 2/16/2015 PA-10 Lot 323 Slope 1 CF 133.0 18.1%16.0%105.8 117.5 90%90% 1392 N 2/16/2015 PA-10 Lot 324 Slope 1 CF 131.0 19.5%16.0%107.3 117.5 91%90% 1393 N 2/16/2015 PA-10 Lot 324 Slope 1 CF 130.0 18.7%16.0%106.3 117.5 90%90% 1394 N 2/16/2015 PA-10 Lot 324 1 CF 127.0 20.2%16.0%106.1 117.5 90%90% 1395 N 2/16/2015 PA-10 Lot 316 Slope 6 CF 130.0 16.5%13.5%105.3 114.5 92%90% 1396 N 2/16/2015 PA-10 Lot 316 Slope 6 CF 132.0 17.0%13.5%104.7 114.5 91%90% 1397 N 2/16/2015 PA-10 Lot 307 Slope 5 CF 143.0 13.9%11.0%115.0 124.5 92%90% 1398 N 2/16/2015 PA-9 Lot 298 Slope 5 CF 145.0 16.1%11.0%113.8 124.5 91%90% Project No.133023-03 Page C-20 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1399 N 2/16/2015 PA-10 Lot 313 5 CF 143.0 14.3%11.0%114.0 124.5 92%90% 1400 N 2/16/2015 PA-10 Lot 320 5 CF 124.0 16.0%11.0%114.5 124.5 92%90% 1401 N 2/17/2015 PA-10 Lot 316 Slope 5 CF 135.0 15.0%11.0%115.1 124.5 92%90% 1402 N 2/17/2015 PA-10 Lot 315 5 CF 137.0 14.2%11.0%112.8 124.5 91%90% 1403 N 2/17/2015 PA-10 Lot 316 Slope 5 CF 133.0 14.6%11.0%114.7 124.5 92%90% 1404 N 2/17/2015 PA-10 Lot 314 5 CF 140.0 14.7%11.0%115.3 124.5 93%90% 1405 N 2/17/2015 PA-10 Lot 307 4 CF 145.0 14.1%11.0%111.2 123.5 90%90% 1406 N 2/17/2015 PA-10 Lot 306 4 CF 146.0 13.3%11.0%112.0 123.5 91%90% 1407 N 2/17/2015 PA-10 Lot 316 Slope 5 CF 150.0 13.8%11.0%113.5 124.5 91%90% 1408 N 2/17/2015 PA-9 Lot 298 Slope 5 CF 148.0 12.9%11.0%114.9 124.5 92%90% 1409 N 2/17/2015 PA-10 Lot 314 5 CF 144.0 13.1%11.0%111.8 124.5 90%90% 1410 N 2/17/2015 PA-10 Lot 315 5 CF 142.0 11.9%11.0%115.2 124.5 93%90% 1411 N 2/16/2015 West Ranch St Sta. 17+05 7 CF 111.0 19.8%19.5%99.5 111.5 89%90%retest on 1411A 1412 N 2/17/2015 PA-3 Lot 71 13 CF 159.0 13.4%11.0%114.2 125.5 91%90% 1413 N 2/17/2015 PA-1 Lot 63 Slope 13 CF 164.0 14.0%11.0%113.5 125.5 90%90% 1414 N 2/17/2015 PA-3 Lot 82 9 CF 157.0 11.5%10.5%115.2 127.5 90%90% 1415 N 2/17/2015 West Ranch St Sta. 16+45 3 CF 110.0 17.4%13.5%106.8 118.0 91%90% 1416 N 2/17/2015 West Ranch St Sta. 17+35 4 CF 115.0 14.5%11.0%112.2 123.5 91%90% 1417 N 2/17/2015 PA-3 Lot 83 8 CF 56.0 17.7%14.5%104.8 115.5 91%90% 1418 N 2/17/2015 PA-3 Lot 84 3 CF 57.0 15.7%13.5%108.9 118.0 92%90% 1419 N 2/17/2015 PA-3 Lot 73 11 CF 62.0 15.1%12.5%111.4 122.0 91%90% 1420 N 2/17/2015 PA-3 Lot 74 11 CF 63.0 16.1%12.5%110.8 122.0 91%90% 1421 N 2/17/2015 PA-3 Lot 84 1 CF 54.0 17.9%16.0%108.2 117.5 92%90% 1422 N 2/18/2015 PA-3 Lot 69 Slope 11 CF 64.0 15.8%12.5%111.1 122.0 91%90% 1423 N 2/18/2015 PA-3 Lot 71 11 CF 64.0 14.9%12.5%112.1 122.0 92%90% 1424 N 2/18/2015 PA-3 Lot 71 9 CF 66.0 10.7%10.5%115.9 127.5 91%90% 1425 N 2/18/2015 PA-3 Lot 72 11 CF 64.0 14.0%12.5%113.0 122.0 93%90% 1426 N 2/18/2015 PA-3 Lot 73 8 CF 65.0 16.5%14.5%108.8 115.5 94%90% 1427 N 2/18/2015 PA-3 Lot 66 8 CF 62.0 15.2%14.5%107.2 115.5 93%90% 1428 N 2/18/2015 PA-3 Lot 66 8 CF 64.0 14.9%14.5%106.9 115.5 93%90% 1429 N 2/18/2015 PA-3 Lot 65 11 CF 63.0 13.7%12.5%112.1 122.0 92%90% 1430 N 2/18/2015 PA-3 Lot 64 11 CF 65.0 14.4%12.5%111.9 122.0 92%90% 1431 N 2/17/2015 PA-10 Lot 313 5 CF 146.0 12.9%11.0%113.5 124.5 91%90% 1432 N 2/17/2015 PA-10 Lot 316 5 CF 147.0 12.4%11.0%115.9 124.5 93%90% 1433 N 2/18/2015 PA-10 Lot 305 5 CF 146.0 12.7%11.0%112.7 124.5 91%90% 1434 N 2/18/2015 PA-10 Lot 307 5 CF 147.0 11.2%11.0%115.2 124.5 93%90% 1435 N 2/18/2015 PA-10 Lot 311 5 CF 143.0 12.0%11.0%114.6 124.5 92%90% 1436 N 2/18/2015 PA-10 Lot 312 5 CF 145.0 12.8%11.0%114.0 124.5 92%90% 1437 N 2/18/2015 PA-9 Lot 298 5 CF 155.0 12.1%11.0%113.7 124.5 91%90% 1438 N 2/18/2015 PA-9 Lot 297 5 CF 157.0 11.9%11.0%115.3 124.5 93%90% 1439 N 2/18/2015 PA-9 Lot 296 4 CF 159.0 14.4%11.0%112.0 123.5 91%90% 1440 N 2/18/2015 PA-9 Lot 298 Slope 4 CF 151.0 13.4%11.0%111.2 123.5 90%90% 1441 N 2/18/2015 PA-9 Lot 298 3 CF 161.0 13.9%13.5%107.6 118.0 91%90% 1442 N 2/18/2015 PA-9 Lot 293 9 CF 163.0 9.5%10.5%116.4 127.5 91%90% 1443 N 2/18/2015 PA-9 Lot 294 9 CF 165.0 11.3%10.5%115.6 127.5 91%90% 1444 N 2/18/2015 PA-10 Lot 308 Slope 5 CF 138.0 14.1%11.0%114.0 124.5 92%90% 1445 N 2/18/2015 PA-9 Borden Ct. Sta. 18+20 Slope 5 CF 124.0 12.4%11.0%113.0 124.5 91%90% 1446 N 2/18/2015 PA-9 Borden Ct. Sta. 18+80 Slope 5 CF 128.0 10.5%11.0%112.5 124.5 90%90% 1447 N 2/19/2015 PA-9 Borden Ct. Sta. 18+50 Slope 9 CF 132.0 13.4%10.5%119.4 127.5 94%90% 1448 N 2/19/2015 PA-9 Borden Ct. Sta. 18+90 Slope 9 CF 134.0 13.0%10.5%116.5 127.5 91%90% 1449 N 2/19/2015 PA-9 Borden Ct. Sta. 18+40 Slope 5 CF 136.0 13.8%11.0%113.1 124.5 91%90% 1450 N 2/19/2015 PA-9 Borden Ct. Sta. 18+05 Slope 5 CF 138.0 14.1%11.0%112.7 124.5 91%90% 1451 N 2/18/2015 PA-3 Lot 68 Slope 11 CF 173.0 15.0%12.5%111.8 122.0 92%90% 1452 N 2/19/2015 PA-5 Lot 60 12 CF 175.0 14.7%12.0%114.7 124.0 93%90% 1453 N 2/19/2015 PA-5 Lot 60 9 CF 177.0 13.6%10.5%115.8 127.5 91%90% 1454 N 2/19/2015 PA-3 Lot 108 8 CF 144.0 15.9%14.5%107.4 115.5 93%90% 1455 N 2/19/2015 PA-3 Lot 107 11 CF 143.0 16.1%12.5%111.3 122.0 91%90% 1456 N 2/19/2015 PA-3 Lot 109 4 CF 143.0 13.8%11.0%113.5 123.5 92%90% 1457 N 2/19/2015 PA-3 Lot 110 8 CF 144.0 14.5%14.5%108.4 115.5 94%90% 1458 N 2/19/2015 PA-3 Lot 63 4 CF 166.0 14.1%11.0%112.7 123.5 91%90% 1459 N 2/19/2015 PA-8 6 CF 120.0 15.5%13.5%108.6 114.5 95%90% 1460 N 2/19/2015 PA-8 6 CF 122.0 12.5%13.5%108.7 114.5 95%90% 1461 N 2/19/2015 PA-9 Lot 275 Slope 13 CF 153.0 14.7%11.0%116.3 125.5 93%90% 1462 N 2/19/2015 PA-9 Lot 275 13 CF 155.0 14.2%11.0%118.6 125.5 95%90% 1463 N 2/19/2015 Pa-9 Borden Ct. Sta. 18+90 Slope 13 CF 140.0 15.0%11.0%115.0 125.5 92%90% 1464 N 2/19/2015 PA-9 Edinburgh Dr. Sta. 14+40 Slope 4 CF 145.0 12.1%11.0%111.5 123.5 90%90% 1465 N 2/19/2015 PA-9 Borden Ct. Sta. 18+10 Slope 4 CF 143.0 12.7%11.0%112.4 123.5 91%90% 1466 N 2/20/2015 PA-9 Borden Ct. Sta. 18+40 Slope 4 CF 147.0 13.6%11.0%111.6 123.5 90%90% 1467 N 2/20/2015 PA-9 Borden Ct. Sta. 18+00 Slope 4 CF 150.0 12.7%11.0%112.0 123.5 91%90% 1468 N 2/20/2015 PA-10 Lot 322 Slope 3 CF 132.0 17.2%13.5%100.8 118.0 85%90%retest on 1468A Project No.133023-03 Page C-21 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1469 N 2/20/2015 PA-10 Lot 320 Slope 3 CF 132.0 15.7%13.5%108.5 118.0 92%90% 1470 N 2/20/2015 PA-10 Lot 319 Slope 3 CF 128.0 15.9%13.5%109.3 118.0 93%90% 1471 N 2/20/2015 PA-3 Lot 122 11 FG 0.0 15.8%12.5%111.7 122.0 92%90% 1472 N 2/20/2015 PA-3 Lot 123 4 FG 0.0 11.4%11.0%114.4 123.5 93%90% 1473 N 2/20/2015 PA-3 Lot 124 5 FG 0.0 13.1%11.0%113.0 124.5 91%90% 1474 N 2/20/2015 PA-3 Lot 125 9 FG 0.0 14.1%10.5%117.2 127.5 92%90% 1475 N 2/20/2015 PA-3 Lot 126 11 FG 0.0 13.8%12.5%111.4 122.0 91%90% 1476 N 2/20/2015 PA-3 Lot 146 5 FG 0.0 13.9%11.0%115.7 124.5 93%90% 1477 N 2/20/2015 PA-3 Lot 147 5 FG 0.0 11.0%11.0%113.5 124.5 91%90% 1478 N 2/20/2015 PA-3 Lot 148 5 FG 0.0 12.4%11.0%115.1 124.5 92%90% 1479 N 2/20/2015 PA-3 Lot 149 5 FG 0.0 14.3%11.0%113.9 124.5 91%90% 1480 N 2/20/2015 PA-8 11 CF 125.0 13.1%12.5%114.1 122.0 94%90% 1481 N 2/20/2015 PA-8 11 CF 123.0 14.9%12.5%111.9 122.0 92%90% 1482 N 2/20/2015 PA-8 11 CF 124.0 12.6%12.5%111.3 122.0 91%90% 1483 N 2/20/2015 PA-8 11 CF 121.0 12.9%12.5%113.0 122.0 93%90% 1484 N 2/20/2015 PA-8 11 CF 120.0 13.8%12.5%112.4 122.0 92%90% 1485 N 2/20/2015 PA-3 Lot 134 5 FG 0.0 12.5%11.0%116.0 124.5 93%90% 1486 N 2/20/2015 PA-3 Lot 133 10 FG 0.0 9.5%10.0%118.9 128.0 93%90% 1487 N 2/20/2015 PA-3 Lot 132 5 FG 0.0 13.9%11.0%116.1 124.5 93%90% 1488 N 2/20/2015 PA-3 Lot 131 11 FG 0.0 13.2%12.5%112.6 122.0 92%90% 1489 N 2/21/2015 PA-9 Lot 265 Slope 5 CF 159.0 11.1%11.0%115.0 124.5 92%90% 1490 N 2/21/2015 PA-9 Lot 265 Slope 5 CF 154.0 12.0%11.0%113.4 124.5 91%90% 1491 N 2/20/2015 PA-10 Lot 318 Slope 11 CF 132.0 15.4%12.5%113.0 122.0 93%90% 1492 N 2/20/2015 PA-10 Lot 321 Slope 11 CF 136.0 16.1%12.5%110.4 122.0 90%90% 1493 N 2/20/2015 PA-10 Lot 315 11 CF 140.0 16.0%12.5%111.7 122.0 92%90% 1494 N 2/21/2015 PA-7 10 FG 0.0 11.3%10.0%122.1 128.0 95%90% 1495 N 2/21/2015 PA-7 10 FG 0.0 11.5%10.0%118.8 128.0 93%90% 1496 N 2/21/2015 PA-7 5 FG 0.0 9.3%11.0%114.6 124.5 92%90% 1497 N 2/21/2015 PA-7 10 FG 0.0 10.2%10.0%119.6 128.0 93%90% 1498 N 2/21/2015 PA-7 10 FG 0.0 9.6%10.0%117.9 128.0 92%90% 1499 N 2/21/2015 PA-7 5 FG 0.0 12.6%11.0%113.3 124.5 91%90% 1500 N 2/21/2015 PA-7 10 FG 0.0 10.1%10.0%120.4 128.0 94%90% 1501 N 2/21/2015 PA-7 10 FG 0.0 9.6%10.0%119.3 128.0 93%90% 1502 N 2/21/2015 PA-7 10 FG 0.0 10.3%10.0%120.8 128.0 94%90% 1503 N 2/21/2015 PA-7 5 FG 0.0 13.0%11.0%112.9 124.5 91%90% 1504 N 2/21/2015 PA-7 5 FG 0.0 12.3%11.0%113.6 124.5 91%90% 1505 N 2/21/2015 PA-7 10 FG 0.0 11.1%10.0%119.1 128.0 93%90% 1506 N 2/21/2015 PA-7 10 FG 0.0 9.9%10.0%122.3 128.0 96%90% 1507 N 2/21/2015 PA-9 Lot 276 Slope 5 CF 148.0 10.9%11.0%114.6 124.5 92%90% 1508 N 2/21/2015 PA-9 Lot 276 Slope 5 CF 144.0 11.3%11.0%114.0 124.5 92%90% 1509 N 2/21/2015 PA-3 Lot 154 13 FG 0.0 10.8%11.0%113.8 125.5 91%90% 1510 N 2/21/2015 PA-3 Lot 127 13 FG 0.0 12.1%11.0%116.1 125.5 93%90% 1511 N 2/21/2015 PA-3 Lot 128 13 FG 0.0 11.6%11.0%117.8 125.5 94%90% 1512 N 2/21/2015 PA-3 Lot 129 13 FG 0.0 11.9%11.0%114.4 125.5 91%90% 1513 N 2/21/2015 PA-3 Lot 130 13 FG 0.0 13.0%11.0%115.5 125.5 92%90% 1514 N 2/23/2015 PA-11 North Slope 8 CF 110.0 18.0%14.5%106.5 115.5 92%90% 1515 N 2/23/2015 PA-11 North Slope 8 CF 112.0 17.7%14.5%105.4 115.5 91%90% 1516 N 2/23/2015 PA-6 Lot 244 5 CF 116.0 10.2%11.0%112.9 124.5 91%90% 1517 N 2/23/2015 PA-6 Lot 242 5 CF 124.0 11.1%11.0%113.3 124.5 91%90% 1518 N 2/23/2015 PA-11 North Slope 11 CF 114.0 15.8%12.5%110.1 122.0 90%90% 1519 N 2/23/2015 PA-11 North Slope 11 CF 116.0 15.0%12.5%111.0 122.0 91%90% 1520 N 2/23/2015 PA-11 North Slope 5 CF 108.0 10.7%11.0%114.6 124.5 92%90% 1521 N 2/23/2015 PA-6 Lot 166 11 FG 0.0 15.6%12.5%110.7 122.0 91%90% 1522 N 2/23/2015 PA-6 Lot 167 11 FG 0.0 15.7%12.5%112.1 122.0 92%90% 1523 N 2/23/2015 PA-6 Lot 168 5 FG 0.0 14.8%11.0%114.3 124.5 92%90% 1524 N 2/23/2015 PA-6 Lot 227 5 CF 165.0 10.5%11.0%112.1 124.5 90%90% 1525 N 2/23/2015 PA-6 Lot 228 11 CF 163.0 14.6%12.5%109.6 122.0 90%90% 1526 N 2/23/2015 PA-6 Lot 229 11 CF 160.0 15.1%12.5%110.7 122.0 91%90% 1527 N 2/23/2015 PA-6 Lot 230 3 CF 158.0 14.0%13.5%108.8 118.0 92%90% 1528 N 2/23/2015 PA-6 Lot 232 12 CF 154.0 15.1%12.0%116.7 124.0 94%90% 1529 N 2/23/2015 PA-6 Lot 233 11 CF 152.0 16.2%12.5%110.3 122.0 90%90% 1530 N 2/23/2015 PA-6 Lot 240 11 CF 123.0 10.0%12.5%109.6 122.0 90%90% 1531 N 2/23/2015 PA-6 Lot 244 5 CF 119.0 11.7%11.0%113.9 124.5 91%90% 1532 N 2/23/2015 PA-6 Lot 243 5 CF 120.0 12.5%11.0%113.0 124.5 91%90% 1533 N 2/24/2015 PA-11 North Slope 11 CF 119.0 13.3%12.5%109.8 122.0 90%90% 1534 N 2/24/2015 PA-11 North Slope 9 CF 117.0 10.5%10.5%116.9 127.5 92%90% 1535 N 2/24/2015 PA-11 North Slope 9 CF 114.0 10.5%10.5%116.5 127.5 91%90% 1536 N 2/24/2015 PA-6 Lot 251 11 CF 116.0 15.8%12.5%112.8 122.0 92%90% 1537 N 2/24/2015 PA-6 Lot 241 9 CF 121.0 10.5%10.5%117.1 127.5 92%90% 1538 N 2/24/2015 PA-6 Lot 239 9 CF 130.0 10.5%10.5%117.5 127.5 92%90% Project No.133023-03 Page C-22 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1539 N 2/24/2015 Gage Dr Sta. 11+60 5 CF 122.0 11.8%11.0%112.6 124.5 90%90% 1540 N 2/24/2015 Gage Dr Sta. 13+10 5 CF 121.0 12.7%11.0%115.8 124.5 93%90% 1541 N 2/24/2015 PA-7 West Slope 4 SF 125.0 13.6%11.0%113.8 123.5 92%90% 1542 N 2/24/2015 PA-7 West Slope 11 SF 127.0 15.5%12.5%110.7 122.0 91%90% 1543 N 2/23/2015 PA-10 Lot 304 Slope 7 CF 149.0 20.0%19.5%103.6 111.5 93%90% 1544 N 2/23/2015 PA-9 Lot 288 11 CF 151.0 16.3%12.5%112.6 122.0 92%90% 1545 N 2/24/2015 PA-9 Lot 289 1 CF 159.0 19.2%16.0%106.2 117.5 90%90% 1546 N 2/24/2015 PA-9 Lot 290 7 CF 164.0 23.9%19.5%101.0 111.5 91%90% 1547 N 2/25/2015 PA-9 Lot 297 11 CF 161.0 12.5%12.5%111.1 122.0 91%90% 1548 N 2/25/2015 PA-9 Lot 296 12 CF 162.0 14.8%12.0%114.8 124.0 93%90% 1549 N 2/25/2015 PA-10 Lot 328 Slope 1 CF 149.0 18.9%16.0%107.5 117.5 91%90% 1550 N 2/25/2015 PA-9 Lot 300 Slope 11 CF 152.0 15.0%12.5%111.2 122.0 91%90% 1551 N 2/25/2015 Gage Dr. Sta. 18+70 North Slope 11 CF 64.0 15.6%12.5%108.1 122.0 89%90%retest on 1551A 1552 N 2/25/2015 PA-6 Lot 241 Slope 5 CF 97.0 12.2%11.0%115.7 124.5 93%90% 1553 N 2/25/2015 PA-6 Lot 240 Slope 5 CF 99.0 13.1%11.0%116.0 124.5 93%90% 1554 N 2/25/2015 Gage Dr. Sta. 18+50 North Slope 4 CF 68.0 11.9%11.0%114.9 123.5 93%90% 1555 N 2/25/2015 Gage Dr. Sta. 18+40 North Slope 4 CF 72.0 12.2%11.0%114.7 123.5 93%90% 1556 N 2/25/2015 Gage Dr. Sta. 19+45 North Slope 5 CF 44.0 13.5%11.0%116.9 124.5 94%90% 1557 N 2/25/2015 Gage Dr. Sta. 18+50 9 CF 72.0 11.6%10.5%119.3 127.5 94%90% 1558 N 2/25/2015 Gage Dr. Sta. 17+95 North Slope 5 CF 76.0 12.7%11.0%115.9 124.5 93%90% 1559 N 2/25/2015 PA-6 Lot 242 Slope 5 CF 99.0 11.3%11.0%113.3 124.5 91%90% 1560 N 2/26/2015 PA-3 Lot 121 13 FG 0.0 13.8%11.0%115.7 125.5 92%90% 1561 N 2/25/2015 PA-10 Lot 302 Slope 5 CF 153.0 13.3%11.0%114.6 124.5 92%90% 1562 N 2/25/2015 PA-10 Lot 329 Slope 1 CF 152.0 19.9%16.0%107.3 117.5 91%90% 1563 N 2/25/2015 PA-10 Lot 305 Slope 10 CF 155.0 10.1%10.0%116.7 128.0 91%90% 1564 N 2/25/2015 PA-10 Lot 306 Slope 5 CF 157.0 11.0%11.0%113.9 124.5 91%90% 1565 N 2/26/2015 PA-10 Lot 315 1 CF 146.0 16.8%16.0%108.2 117.5 92%90% 1566 N 2/26/2015 PA-10 Lot 314 1 CF 147.0 18.1%16.0%110.5 117.5 94%90% 1567 N 2/26/2015 PA-10 Lot 313 1 CF 147.0 16.2%16.0%109.6 117.5 93%90% 1568 N 2/26/2015 PA-10 Lot 312 1 CF 146.0 15.9%16.0%108.3 117.5 92%90% 1569 N 2/26/2015 PA-10 Lot 311 1 CF 145.0 17.4%16.0%110.1 117.5 94%90% 1570 N 2/26/2015 PA-10 Lot 310 12 CF 144.0 13.9%12.0%115.7 124.0 93%90% 1571 N 2/26/2015 PA-3 Lot 120 13 FG 0.0 14.5%11.0%113.3 125.5 90%90% 1572 N 2/26/2015 PA-3 Lot 119 13 FG 0.0 15.1%11.0%114.6 125.5 91%90% 1573 N 2/26/2015 PA-3 Lot 118 13 FG 0.0 13.4%11.0%114.8 125.5 91%90% 1574 N 2/26/2015 PA-3 Lot 117 13 FG 0.0 12.5%11.0%118.2 125.5 94%90% 1575 N 2/26/2015 PA-3 Lot 116 13 FG 0.0 11.9%11.0%117.4 125.5 94%90% 1576 N 2/26/2015 PA-3 Lot 100 9 FG 0.0 11.4%10.5%116.7 127.5 92%90% 1577 N 2/26/2015 PA-3 Lot 101 9 FG 0.0 10.1%10.5%117.7 127.5 92%90% 1578 N 2/26/2015 PA-3 Lot 102 9 FG 0.0 12.6%10.5%118.2 127.5 93%90% 1579 N 2/26/2015 PA-3 Lot 103 9 FG 0.0 9.3%10.5%118.0 127.5 93%90% 1580 N 2/26/2015 PA-3 Lot 104 9 FG 0.0 11.6%10.5%114.8 127.5 90%90% 1581 N 2/26/2015 PA-6 Lot 242 Slope 5 CF 85.0 12.3%11.0%115.2 124.5 93%90% 1582 N 2/26/2015 Gage Dr. Sta. 18+20 North Slope 5 CF 83.0 13.1%11.0%113.0 124.5 91%90% 1583 N 2/26/2015 Gage Dr. Sta. 18+10 North Slope 5 CF 81.0 12.2%11.0%112.1 124.5 90%90% 1584 N 2/26/2015 PA-3 Lot 80 5 FG 0.0 14.3%11.0%114.7 124.5 92%90% 1585 N 2/26/2015 PA-3 Lot 79 5 FG 0.0 12.6%11.0%112.1 124.5 90%90% 1586 N 2/26/2015 PA-3 Lot 78 5 FG 0.0 12.5%11.0%115.0 124.5 92%90% 1587 N 2/26/2015 PA-3 Lot 77 5 FG 0.0 10.9%11.0%115.9 124.5 93%90% 1588 N 2/26/2015 PA-3 Lot 81 5 FG 0.0 11.7%11.0%114.4 124.5 92%90% 1589 N 2/26/2015 PA-6 Lot 240 Slope 9 CF 117.0 13.8%10.5%117.3 127.5 92%90% 1590 N 2/26/2015 PA-6 Lot 241 Slope 9 CF 115.0 12.7%10.5%116.2 127.5 91%90% 1591 N 2/26/2015 Gage Dr. Sta. 19+10 North Slope 5 CF 48.0 12.6%11.0%117.0 124.5 94%93% 1592 N 2/26/2015 PA-3 Lot 111 5 FG 0.0 11.5%11.0%112.1 124.5 90%90% 1593 N 2/26/2015 PA-3 Lot 112 5 FG 0.0 13.0%11.0%112.7 124.5 91%90% 1594 N 2/26/2015 PA-3 Lot 113 5 FG 0.0 13.2%11.0%118.0 124.5 95%90% 1595 N 2/26/2015 PA-3 Lot 114 5 FG 0.0 11.4%11.0%114.5 124.5 92%90% 1596 N 2/26/2015 Gage Dr. Sta. 19+30 North Slope 10 CF 40.0 10.3%10.0%123.2 128.0 96%93% 1597 N 2/26/2015 Gage Dr. Sta. 19+40 North Slope 10 CF 37.0 10.7%10.0%119.1 128.0 93%93% 1598 N 2/26/2015 Gage Dr. Sta. 18+50 South Slope 11 CF 36.0 17.1%12.5%105.5 122.0 86%93% 1599 N 2/26/2015 PA-6 Lot 242 Slope 5 CF 101.0 12.2%11.0%113.9 124.5 91%90% 1600 N 2/26/2015 PA-6 Lot 241 Slope 5 CF 103.0 11.8%11.0%115.9 124.5 93%90% 1601 N 2/26/2015 PA-10 Lot 310 1 CF 143.0 17.9%16.0%106.6 117.5 91%90% 1602 N 2/26/2015 PA-10 Lot 309 7 CF 143.0 20.0%19.5%101.8 111.5 91%90% 1603 N 2/26/2015 PA-10 Lot 308 7 CF 142.0 19.9%19.5%104.0 111.5 93%90% 1604 N 2/26/2015 PA-9 Lot 292 1 CF 163.0 19.7%16.0%112.5 117.5 96%90% 1605 N 2/26/2015 PA-9 Lot 291 13 CF 163.0 17.0%11.0%113.6 125.5 91%90% 1606 N 2/27/2015 Gage Dr. Sta.19+25 5 CF 142.0 13.5%11.0%117.7 124.5 95%93% 1607 N 2/27/2015 PA-9 Lot 298 5 CF 166.0 14.1%11.0%115.4 124.5 93%90% 1608 N 2/27/2015 PA-10 Lot 306 Slope 3 CF 165.0 15.4%13.0%111.4 118.0 94%90% Project No.133023-03 Page C-23 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1609 N 2/27/2015 PA-10 Lot 303 Slope 1 CF 164.0 17.2%16.0%108.2 117.5 92%90% 1610 N 2/27/2015 PA-10 Lot 304 Slope 1 CF 164.0 18.4%16.0%110.1 117.5 94%90% 1611 N 2/27/2015 PA-8 East Slope 5 CF 130.0 11.7%11.0%112.3 124.5 90%90% 1612 N 2/28/2015 PA-8 East Slope 5 CF 128.0 12.0%11.0%115.2 124.5 92%90% 1613 N 2/27/2015 PA-6 Lot 240 Slope 5 CF 120.0 13.2%11.0%115.1 124.5 92%90% 1614 N 2/27/2015 PA-6 Lot 241 Slope 5 CF 117.0 14.4%11.0%112.0 124.5 90%90% 1615 N 2/27/2015 PA-6 Lot 242 Slope 9 CF 100.0 11.2%10.5%118.6 127.5 93%90% 1616 N 2/27/2015 PA-6 Lot 243 Slope 9 CF 96.0 10.9%10.5%116.2 127.5 91%90% 1617 N 3/5/2015 PA-10 Lot 330 5 CF 123.0 13.7%11.0%116.5 124.5 94%90% 1618 N 3/5/2015 PA-10 Lot 330 5 CF 121.0 14.1%11.0%114.0 124.5 92%90% 1619 N 3/5/2015 PA-10 Lot 330 5 CF 120.0 13.8%11.0%112.3 124.5 90%90% 1620 N 3/5/2015 PA-10 Lot 330 Slope 9 CF 107.0 10.7%10.5%115.0 127.5 90%90% 1621 N 2/27/2015 PA-10 Lot 328 Slope 11 CF 159.0 16.8%12.5%112.0 122.0 92%90% 1622 N 2/27/2015 PA-10 Lot 299 Slope 11 CF 150.0 15.1%12.5%113.1 122.0 93%90% 1623 N 3/6/2015 PA-10 Lot 329 Slope 11 CF 164.0 14.8%12.5%111.2 122.0 91%90% 1624 N 3/6/2015 PA-10 Lot 302 Slope 11 CF 164.0 15.3%12.5%110.9 122.0 91%90% 1625 N 3/6/2015 PA-9 Lot 276 1 CF 166.0 17.4%16.0%107.6 117.5 92%90% 1626 N 3/6/2015 PA-9 Lot 276 1 CF 164.0 18.7%16.0%108.7 117.5 93%90% 1627 N 3/6/2015 PA-3 Lot 135 5 CF 139.0 13.5%11.0%114.1 124.5 92%90% 1628 N 3/6/2015 PA-3 Lot 136 5 CF 138.0 14.8%11.0%113.7 124.5 91%90% 1629 N 3/6/2015 ECR Sta. 478+60 Slope 11 CF 128.0 15.0%12.5%110.7 122.0 91%90% 1630 N 3/6/2015 PA-3 Lot 137 9 CF 138.0 11.0%10.5%115.3 127.5 90%90% 1631 N 3/6/2015 PA-3 Lot 138 13 CF 138.0 14.6%11.0%114.8 125.5 91%90% 1632 N 3/6/2015 PA-3 Lot 139 13 CF 137.0 13.9%11.0%115.1 125.5 92%90% 1633 N 3/6/2015 PA-3 Lot 140 1 CF 137.0 16.9%16.0%110.0 117.5 94%90% 1634 N 3/6/2015 PA-3 Lot 141 11 CF 136.0 14.8%12.5%112.4 122.0 92%90% 1635 N 3/6/2015 PA-3 Lot 142 13 CF 136.0 14.9%11.0%114.1 125.5 91%90% 1636 N 3/6/2015 PA-3 Lot 143 12 CF 135.0 16.2%12.0%113.5 124.0 92%90% 1637 N 3/6/2015 PA-3 Lot 144 10 CF 134.0 12.3%10.0%119.7 128.0 94%90% 1638 N 3/6/2015 ECR Sta. 477+10 Slope 1 CF 133.0 16.7%16.0%107.9 117.5 92%90% 1639 N 3/6/2015 ECR Sta. 474+80 Slope 3 CF 130.0 17.2%13.5%108.6 118.0 92%90% 1640 N 3/6/2015 PA-9 Lot 295 11 CF 166.0 16.1%12.5%113.0 122.0 93%90% 1641 N 3/9/2015 PA-6 Lot 240 5 CF 122.0 14.4%11.0%113.1 124.5 91%90% 1642 N 3/9/2015 PA-6 Lot 241 8 CF 120.0 16.0%14.5%106.3 115.5 92%90% 1643 N 3/9/2015 PA-6 Lot 243 Slope 8 CF 107.0 16.4%14.5%105.8 115.5 92%90% 1644 N 3/9/2015 PA-6 Lot 242 8 CF 110.0 15.9%14.5%107.6 115.5 93%90% 1645 N 3/9/2015 PA-6 Lot 242 6 CF 113.0 13.5%13.5%105.6 114.5 92%90% 1646 N 3/9/2015 PA-6 Lot 243 Slope 11 CF 112.0 12.5%12.5%110.7 122.0 91%90% 1647 N 3/9/2015 PA-9 Lot 288 2 CF 170.0 24.1%21.5%96.1 102.0 94%90% 1648 N 3/9/2015 PA-9 Lot 289 6 CF 168.0 14.5%13.5%105.2 114.5 92%90% 1649 N 3/9/2015 PA-9 Lot 290 2 CF 166.0 23.9%21.5%97.0 102.0 95%90% 1650 N 3/9/2015 PA-9 Lot 291 12 CF 165.0 15.5%12.0%114.7 124.0 93%90% 1651 N 3/9/2015 PA-9 Lot 283 3 CF 164.0 14.1%13.5%109.3 118.0 93%90% 1652 N 3/9/2015 PA-9 Lot 285 3 CF 165.0 15.0%13.5%107.1 118.0 91%90% 1653 N 3/10/2015 PA-6 Lot 241 11 CF 128.0 14.3%12.5%109.6 122.0 90%90% 1654 N 3/10/2015 PA-6 Lot 242 10 CF 124.0 9.3%10.0%117.4 128.0 92%90% 1655 N 3/10/2015 PA-6 Lot 243 Slope 11 CF 116.0 14.1%12.5%113.3 122.0 93%90% 1656 N 3/10/2015 PA-6 Lot 244 Slope 11 CF 114.0 11.0%12.5%110.2 122.0 90%90% 1657 N 3/10/2015 PA-6 Lot 171 5 CF 168.0 13.0%11.0%112.5 124.5 90%90% 1658 N 3/10/2015 PA-6 Lot 169 5 CF 171.0 11.8%11.0%112.1 124.5 90%90% 1659 N 3/10/2015 PA-3 Lot 68 5 CF 160.0 14.8%11.0%113.2 124.5 91%90% 1660 N 3/10/2015 PA-3 Lot 69 11 CF 158.0 15.2%12.5%112.4 122.0 92%90% 1661 N 3/10/2015 PA-6 Lot 239 10 CF 135.0 10.2%10.0%120.4 128.0 94%90% 1662 N 3/10/2015 PA-6 Lot 242 5 CF 126.0 13.9%11.0%113.0 124.5 91%90% 1663 N 3/10/2015 PA-6 Lot 242 5 CF 128.0 10.3%11.0%114.1 124.5 92%90% 1664 N 3/10/2015 PA-9 Lot 281 1 CF 163.0 16.9%16.0%108.5 117.5 92%90% 1665 N 3/10/2015 PA-9 Lot 280 5 CF 167.0 15.4%11.0%113.3 124.5 91%90% 1666 N 3/10/2015 PA-9 Lot 278 1 CF 168.0 16.7%16.0%109.9 117.5 94%90% 1667 N 3/10/2015 PA-9 Lot 279 1 CF 166.0 17.1%16.0%107.0 117.5 91%90% 1668 N 3/10/2015 PA-9 Lot 278 Slope 11 CF 176.0 15.8%12.5%109.8 122.0 90%90% 1669 N 3/10/2015 PA-9 Lot 281 Slope 11 CF 176.0 14.7%12.5%112.6 122.0 92%90% 1670 N 3/10/2015 PA-9 Lot 283 Slope 11 CF 174.0 15.3%12.5%111.4 122.0 91%90% 1671 N 3/11/2015 PA-6 Lot 240 10 CF 133.0 11.2%10.0%118.4 128.0 93%90% 1672 N 3/11/2015 PA-6 Lot 241 10 CF 130.0 12.8%10.0%117.5 128.0 92%90% 1673 N 3/11/2015 PA-6 Lot 243 13 CF 122.0 13.5%11.0%115.0 125.5 92%90% 1674 N 3/13/2015 PA-6 Lot 244 13 CF 120.0 12.8%11.0%114.5 125.5 91%90% 1675 N 3/13/2015 Gage Dr. Sta. 18+80 South Slope 5 CF 42.0 13.5%11.0%115.6 124.5 93%93% 1676 N 3/13/2015 Gage Dr. Sta. 18+80 11 CF 48.0 13.6%12.5%114.0 122.0 93%93% 1677 N 3/13/2015 Gage Dr. Sta. 18+50 5 CF 50.0 12.7%11.0%116.3 124.5 93%93% 1678 N 3/13/2015 Gage Dr. Sta. 19+00 North Slope 11 CF 54.0 12.5%12.5%114.2 122.0 94%93% Project No.133023-03 Page C-24 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1679 N 3/13/2015 Gage Dr. Sta 19+30 South Slope 9 CF 47.0 10.5%10.5%118.4 127.5 93%93% 1680 N 3/13/2015 Gage Dr. Sta. 19+20 12 CF 45.0 11.5%12.0%117.6 124.0 95%93% 1681 N 3/6/2015 PA-9 Lot 296 9 CF 166.0 10.1%10.5%114.8 127.5 90%90% 1682 N 3/6/2015 PA-9 Lot 297 11 CF 167.0 14.1%12.5%111.1 122.0 91%90% 1683 N 3/6/2015 PA-9 Lot 298 9 CF 166.0 10.9%10.5%117.1 127.5 92%90% 1684 N 3/7/2015 PA-9 Lot 288 1 CF 164.0 17.3%16.0%110.9 117.5 94%90% 1685 N 3/7/2015 PA-9 Lot 289 11 CF 163.0 16.5%12.5%113.9 122.0 93%90% 1686 N 3/7/2015 PA-6 Lot 170 11 CF 169.0 14.9%12.5%113.8 122.0 93%90% 1687 N 3/12/2015 PA-6 Lot 171 11 CF 170.0 16.6%12.5%114.4 122.0 94%90% 1688 N 3/12/2015 Gage Dr. Sta. 18+65 South Slope 13 CF 40.0 14.2%11.0%118.4 125.5 94%93% 1689 N 3/12/2015 Gage Dr. Sta. 18+80 South Slope 11 CF 38.0 12.6%12.5%113.2 122.0 93%93% 1690 N 3/12/2015 Gage Dr. Sta. 18+45 South Slope 11 CF 38.0 13.1%12.5%113.9 122.0 93%93% 1691 N 3/12/2015 PA-9 Lot 265 Slope 4 CF 176.0 12.0%11.0%113.1 123.5 92%90% 1692 N 3/12/2015 PA-9 Lot 265 4 CF 180.0 15.8%11.0%112.2 123.5 91%90% 1693 N 3/12/2015 PA-9 Lot 277 Slope 3 CF 178.0 17.0%13.5%107.0 118.0 91%90% 1694 N 3/12/2015 PA-9 Lot 279 Slope 3 CF 181.0 16.4%13.5%108.6 118.0 92%90% 1695 N 3/12/2015 PA-9 Lot 280 Slope 3 CF 179.0 16.8%13.5%108.3 118.0 92%90% 1696 N 3/12/2015 Gage Dr. Sta. 19+20 South Slope 5 CF 146.0 12.8%11.0%115.5 124.5 93%93% 1697 N 3/12/2015 Gage Dr. Sta. 18+70 South Slope 5 CF 144.0 11.9%11.0%115.7 124.5 93%93% 1698 N 3/13/2015 PA 10 Lot 315 3 CF 148.0 15.7%13.5%107.7 118.0 91%90% 1699 N 3/13/2015 PA-10 Lot 316 3 CF 149.0 16.0%13.5%106.8 118.0 91%90% 1700 N 3/13/2015 PA-10 Lot 308 5 CF 146.0 11.1%11.0%112.4 124.5 90%90% 1701 N 3/13/2015 PA-10 Lot 309 5 CF 145.0 11.5%11.0%112.6 124.5 90%90% 1702 N 3/16/2015 PA-9 Lot 256 Slope 12 CF 184.0 13.9%12.0%112.1 124.0 90%90% 1703 N 3/16/2015 PA-9 Lot 254 Slope 12 CF 186.0 14.1%12.0%113.4 124.0 91%90% 1704 N 3/16/2015 PA-9 Lot 252 9 CF 181.0 12.9%10.5%118.6 127.5 93%90% 1705 N 3/16/2015 PA-9 Lot 252 Slope 9 CF 179.0 12.6%10.5%117.1 127.5 92%90% 1706 N 3/16/2015 PA-9 Lot 253 7 CF 186.0 23.4%19.5%103.1 111.5 92%90% 1707 N 3/16/2015 PA-9 Lot 254 7 CF 185.0 23.6%19.5%101.5 111.5 91%90% 1708 N 3/16/2015 PA-9 Lot 256 7 CF 184.0 23.3%19.5%102.7 111.5 92%90% 1709 N 3/16/2015 PA-9 Lot 253 Slope 12 CF 190.0 14.1%12.0%114.0 124.0 92%90% 1710 N 3/16/2015 PA-9 Lot 255 Slope 12 CF 194.0 14.6%12.0%113.0 124.0 91%90% 1711 N 3/16/2015 PA-3 Lot 88 13 FG 0.0 11.0%11.0%117.9 125.5 94%90% 1712 N 3/16/2015 PA-3 Lot 89 13 FG 0.0 11.9%11.0%117.6 125.5 94%90% 1713 N 3/16/2015 PA-3 Lot 90 13 FG 0.0 10.5%11.0%115.9 125.5 92%90% 1714 N 3/16/2015 PA-3 Lot 91 13 FG 0.0 11.6%11.0%117.5 125.5 94%90% 1715 N 3/16/2015 Gage Dr. Sta. 18+90 13 CF 158.0 12.2%11.0%117.1 125.5 93%93% 1716 N 3/16/2015 Gage Dr. Sta. 18+90 South Slope 11 CF 155.0 13.3%12.5%114.7 122.0 94%93% 1717 N 3/16/2015 Gage Dr. Sta. 19+00 North 9 CF 159.0 10.9%10.5%118.2 127.5 93%93% 1718 N 3/16/2015 Gage Dr. Sta. 18+75 North Slope 8 CF 157.0 15.5%14.5%111.7 115.5 97%93% 1719 N 3/16/2015 Gage Dr. Sta. 18+85 South Slope 5 CF 156.0 13.7%11.0%115.8 124.5 93%93% 1720 N 3/16/2015 Gage Dr. Sta. 19+00 South Slope 10 CF 156.0 13.2%10.0%122.3 128.0 96%93% 1721 N 3/16/2015 PA-5 Lot 60 4 FG 0.0 12.3%11.0%113.7 123.5 92%90% 1722 N 3/16/2015 PA-3 Lot 68 13 FG 0.0 11.7%11.0%116.8 125.5 93%90% 1723 N 3/16/2015 PA-3 Lot 69 4 FG 0.0 11.4%11.0%113.5 123.5 92%90% 1724 N 3/16/2015 PA-3 Lot 70 5 FG 0.0 12.7%11.0%115.7 124.5 93%90% 1725 N 3/16/2015 PA-6 Lot 182 4 FG 0.0 13.2%11.0%114.8 123.5 93%90% 1726 N 3/16/2015 PA-6 Lot 181 9 FG 0.0 11.3%10.5%118.0 127.5 93%90% 1727 N 3/16/2015 PA-6 Lot 180 13 FG 0.0 12.0%11.0%116.3 125.5 93%90% 1728 N 3/17/2015 PA-6 Lot 169 5 FG 0.0 12.7%11.0%112.7 124.5 91%90% 1729 N 3/17/2015 PA-6 Lot 170 10 FG 0.0 9.7%10.0%121.4 128.0 95%90% 1730 N 3/17/2015 PA-6 Lot 171 11 FG 0.0 9.0%12.5%111.3 122.0 91%90% 1731 N 3/17/2015 PA-9 Lot 298 Slope 5 SF 166.0 11.6%11.0%115.1 124.5 92%90% 1732 N 3/17/2015 PA-10 Lot 307 11 SF 160.0 12.7%12.5%110.5 122.0 91%90% 1733 N 3/17/2015 PA-10 Lot 305 Slope 11 SF 163.0 12.5%12.5%110.0 122.0 90%90% 1734 N 3/17/2015 PA-10 Lot 329 Slope 11 SF 154.0 14.2%12.5%109.8 122.0 90%90% 1735 N 3/17/2015 PA-10 Lot 302 Slope 5 SF 163.0 11.8%11.0%113.8 124.5 91%90% 1736 N 3/17/2015 PA-10 Lot 303 Slope 5 SF 161.0 11.1%11.0%114.9 124.5 92%90% 1737 N 3/17/2015 PA-10 Lot 304 Slope 5 SF 154.0 11.5%11.0%112.1 124.5 90%90% 1738 N 3/17/2015 PA-10 Lot 306 Slope 11 SF 155.0 13.7%12.5%111.7 122.0 92%90% 1739 N 3/17/2015 PA-9 Lot 269 5 CF 182.0 14.5%11.0%116.8 124.5 94%90% 1740 N 3/17/2015 PA-9 Lot 270 5 CF 184.0 14.1%11.0%115.1 124.5 92%90% 1741 N 3/17/2015 PA-9 Lot 265 11 CF 183.0 13.0%12.5%110.8 122.0 91%90% 1742 N 3/17/2015 PA-9 Lot 266 11 CF 185.0 14.7%12.5%111.4 122.0 91%90% 1743 N 3/17/2015 PA-9 Lot 267 13 CF 184.0 15.4%11.0%115.6 125.5 92%90% 1744 N 3/17/2015 PA-9 Lot 268 5 CF 185.0 13.0%11.0%112.1 124.5 90%90% 1745 N 3/17/2015 PA-9 Lot 266 13 CF 187.0 15.0%11.0%115.4 125.5 92%90% 1746 N 3/17/2015 PA-9 Lot 265 13 CF 185.0 14.7%11.0%113.1 125.5 90%90% 1747 N 3/17/2015 PA-9 Lot 298 11 FG 0.0 12.9%12.5%110.2 122.0 90%90% 1748 N 3/17/2015 PA-9 Lot 297 9 FG 0.0 8.5%10.5%115.2 127.5 90%90% Project No.133023-03 Page C-25 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1749 N 3/17/2015 PA-9 Lot 296 9 FG 0.0 10.3%10.5%116.0 127.5 91%90% 1750 N 3/17/2015 PA-9 Lot 295 11 FG 0.0 12.1%12.5%110.6 122.0 91%90% 1751 N 3/17/2015 PA-9 Lot 294 9 FG 0.0 9.2%10.5%117.3 127.5 92%90% 1752 N 3/17/2015 PA-9 Lot 293 9 FG 0.0 9.7%10.5%118.1 127.5 93%90% 1753 N 3/17/2015 PA-9 Lot 292 13 FG 0.0 14.7%11.0%113.7 125.5 91%90% 1754 N 3/18/2015 PA-9 Lot 288 3 FG 0.0 13.6%13.5%108.1 118.0 92%90% 1755 N 3/18/2015 PA-9 Lot 289 7 FG 0.0 18.3%19.5%102.5 111.5 92%90% 1756 N 3/18/2015 PA-9 Lot 290 1 FG 0.0 17.6%16.0%108.6 117.5 92%90% 1757 N 3/18/2015 PA-9 Lot 291 1 FG 0.0 18.2%16.0%108.2 117.5 92%90% 1758 N 3/18/2015 PA-9 Lot 291 Slope 5 SF 163.0 12.5%11.0%113.0 124.5 91%90% 1759 N 3/18/2015 PA-10 Lot 301 Slope 11 SF 158.0 13.0%12.5%109.4 122.0 90%90% 1760 N 3/18/2015 PA-10 Lot 299 Slope 1 SF 161.0 14.0%16.0%106.1 117.5 90%90% 1761 N 3/18/2015 Gage Dr. Sta. 19+20 South Slope 4 CF 60.0 14.2%11.0%116.1 123.5 94%93% 1762 N 3/18/2015 Gage Dr. Sta. 19+30 13 CF 61.0 12.8%11.0%118.7 125.5 95%93% 1763 N 3/18/2015 Gage Dr. Sta. 19+10 South Slope 9 CF 64.0 11.5%10.5%119.8 127.5 94%90% 1764 N 3/18/2015 Gage Dr. Sta. 19+00 South Slope 10 CF 65.0 12.1%10.0%121.0 128.0 95%90% 1765 N 3/18/2015 Gage Dr. Sta. 19+00 10 CF 66.0 13.1%10.0%121.8 128.0 95%93% 1766 N 3/18/2015 Gage Dr. Sta. 19+60 10 CF 67.0 11.7%10.0%120.5 128.0 94%93% 1767 N 3/18/2015 Gage Dr. Sta. 19+50 4 CF 69.0 11.6%11.0%116.9 123.5 95%93% 1768 N 3/18/2015 Gage Dr. Sta. 19+40 North Slope 9 CF 70.0 11.9%10.5%119.1 127.5 93%93% 1769 N 3/19/2015 Gage Dr. Sta. 19+50 South Slope 9 CF 76.0 11.8%10.5%119.8 127.5 94%90% 1770 N 3/19/2015 Gage Dr. Sta. 20+20 South Slope 9 CF 90.0 11.2%10.5%119.3 127.5 94%90% 1771 N 3/18/2015 PA-9 Lot 271 4 CF 177.0 11.6%11.0%111.4 123.5 90%90% 1772 N 3/18/2015 PA-9 Lot 272 4 CF 175.0 12.3%11.0%112.4 123.5 91%90% 1773 N 3/18/2015 PA-9 Lot 273 4 CF 173.0 11.9%11.0%113.5 123.5 92%90% 1774 N 3/18/2015 PA-9 Lot 265 Slope 11 CF 185.0 14.5%12.5%110.2 122.0 90%90% 1775 N 3/18/2015 PA-9 Lot 265 11 CF 187.0 15.0%12.5%111.0 122.0 91%90% 1776 N 3/18/2015 PA-9 Lot 252 1 CF 185.0 17.7%16.0%109.7 117.5 93%90% 1777 N 3/18/2015 PA-9 Lot 252 1 CF 187.0 18.3%16.0%106.5 117.5 91%90% 1778 N 3/18/2015 PA-9 Lot 254 1 CF 187.0 16.0%16.0%111.2 117.5 95%90% 1779 N 3/18/2015 PA-9 Lot 255 1 CF 186.0 17.1%16.0%107.6 117.5 92%90% 1780 N 3/19/2015 PA-9 Lot 274 11 CF 171.0 14.3%12.5%109.8 122.0 90%90% 1781 N 3/19/2015 PA-9 Lot 275 11 CF 169.0 15.0%12.5%110.4 122.0 90%90% 1782 N 3/19/2015 PA-10 Lot 308 1 FG 0.0 16.0%16.0%106.2 117.5 90%90% 1783 N 3/19/2015 PA-10 Lot 309 1 FG 0.0 19.1%16.0%107.9 117.5 92%90% 1784 N 3/19/2015 PA-10 Lot 310 1 FG 0.0 20.1%16.0%107.9 117.5 92%90% 1785 N 3/19/2015 PA-10 Lot 308 Slope 1 SF 139.0 16.4%16.0%107.1 117.5 91%90% 1786 N 3/19/2015 PA-9 Lot 262 7 CF 175.0 20.1%19.5%105.4 111.5 95%90% 1787 N 3/19/2015 PA-9 Lot 263 7 CF 173.0 21.5%19.5%100.9 111.5 90%90% 1788 N 3/19/2015 PA-9 Lot 259 11 CF 181.0 16.0%12.5%109.6 122.0 90%90% 1789 N 3/19/2015 PA-9 Lot 260 11 CF 179.0 15.1%12.5%111.0 122.0 91%90% 1790 N 3/19/2015 PA-9 Lot 257 5 CF 185.0 14.8%11.0%114.8 124.5 92%90% 1791 N 3/19/2015 Gage Dr. Sta. 19+20 South Slope 10 CF 74.0 11.4%10.0%120.1 128.0 94%90% 1792 N 3/19/2015 Gage Dr. Sta. 18+90 South Slope 10 CF 60.0 12.0%10.0%119.9 128.0 94%90% 1793 N 3/19/2015 PA-10 Lot 325 Slope 12 CF 101.0 14.1%12.0%115.5 124.0 93%90% 1794 N 3/19/2015 PA-10 Lot 325 10 CF 102.0 10.9%10.0%121.5 128.0 95%90% 1795 N 3/19/2015 PA-10 Treatment Basin South of Lot 325 10 CF 98.0 10.2%10.0%118.9 128.0 93%90% 1796 N 3/19/2015 PA-10 Treatment Basin South of Lot 325 10 CF 94.0 13.7%10.0%120.6 128.0 94%90% 1797 N 3/19/2015 Gage Dr. Sta. 20+60 11 CF 88.0 16.8%12.5%113.2 122.0 93%90% 1798 N 3/19/2015 Gage Dr. Sta. 20+10 11 CF 82.0 14.6%12.5%114.0 122.0 93%90% 1799 N 3/20/2015 PA-3 Lot 135 10 FG 0.0 9.8%10.0%124.6 128.0 97%90% 1800 N 3/20/2015 PA-3 Lot 136 4 FG 0.0 9.9%11.0%114.4 123.5 93%90% 1801 N 3/19/2015 PA-9 Lot 258 5 CF 183.0 13.8%11.0%112.1 124.5 90%90% 1802 N 3/19/2015 PA-10 Lot 311 11 FG 0.0 15.1%12.5%110.0 122.0 90%90% 1803 N 3/19/2015 PA-10 Lot 312 7 FG 0.0 19.5%19.5%101.9 111.5 91%90% 1804 N 3/19/2015 PA-10 Lot 313 1 FG 0.0 19.4%16.0%107.7 117.5 92%90% 1805 N 3/19/2015 PA-10 Lot 314 13 FG 0.0 15.2%11.0%115.8 125.5 92%90% 1806 N 3/19/2015 PA-10 Lot 315 1 FG 0.0 16.6%16.0%106.4 117.5 91%90% 1807 N 3/19/2015 PA-10 Lot 316 11 FG 0.0 12.8%12.5%109.8 122.0 90%90% 1808 N 3/20/2015 PA-9 Lot 259 Slope 5 CF 190.0 10.6%11.0%112.7 124.5 91%90% 1809 N 3/20/2015 PA-9 Lot 260 Slope 5 CF 194.0 11.4%11.0%113.1 124.5 91%90% 1810 N 3/20/2015 PA-9 Lot 262 Slope 9 CF 184.0 9.4%10.5%116.2 127.5 91%90% 1811 N 3/20/2015 PA-3 Lot 137 9 FG 0.0 11.7%10.5%118.3 127.5 93%90% 1812 N 3/20/2015 PA-3 Lot 138 9 FG 0.0 10.4%10.5%117.8 127.5 92%90% 1813 N 3/20/2015 PA-3 Lot 139 5 FG 0.0 11.5%11.0%113.4 124.5 91%90% 1814 N 3/20/2015 PA-3 Lot 140 9 FG 0.0 12.7%10.5%116.0 127.5 91%90% 1815 N 3/20/2015 PA-3 Lot 141 9 FG 0.0 12.0%10.5%119.2 127.5 93%90% 1816 N 3/20/2015 PA-3 Lot 142 9 FG 0.0 11.9%10.5%119.6 127.5 94%90% 1817 N 3/20/2015 PA-3 Lot 143 9 FG 0.0 12.0%10.5%120.5 127.5 95%90% 1818 N 3/20/2015 PA-3 Lot 144 9 FG 0.0 14.6%10.5%116.1 127.5 91%90% Project No.133023-03 Page C-26 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1819 N 3/20/2015 PA-3 Lot 145 11 FG 0.0 15.5%12.5%113.8 122.0 93%90% 1820 N 3/20/2015 PA-9 Lot 258 Slope 5 CF 200.0 11.0%11.0%112.7 124.5 91%90% 1821 N 3/20/2015 PA-9 Lot 265 Slope 9 CF 180.0 10.7%10.5%117.2 127.5 92%90% 1822 N 3/20/2015 PA-9 Lot 253 11 CF 188.0 17.8%12.5%111.2 122.0 91%90% 1823 N 3/20/2015 PA-9 Lot 260 5 CF 181.0 10.6%11.0%112.6 124.5 90%90% 1824 N 3/20/2015 PA-9 Lot 262 1 CF 177.0 16.4%16.0%109.5 117.5 93%90% 1825 N 3/20/2015 PA-10 Lot 316 Slope 11 SF 147.0 13.7%12.5%110.4 122.0 90%90% 1826 N 3/20/2015 PA-10 Lot 324 Slope 11 SF 141.0 15.2%12.5%109.9 122.0 90%90% 1827 N 3/20/2015 PA-10 Lot 322 Slope 11 SF 135.0 13.8%12.5%113.0 122.0 93%90% 1828 N 3/20/2015 PA-10 Lot 320 Slope 11 SF 140.0 14.4%12.5%111.6 122.0 91%90% 1829 N 3/23/2015 PA-9 Lot 256 Slope 5 CF 204.0 13.1%11.0%113.0 124.5 91%90% 1830 N 3/23/2015 PA-9 Lot 257 Slope 5 CF 209.0 12.0%11.0%112.3 124.5 90%90% 1831 N 3/20/2015 PA-9 North Lot 261 Slope 5 CF 196.0 13.0%11.0%112.6 124.5 90%90% 1832 N 3/23/2015 Robertson Rd. Sta. 11+05 Slope 11 CF 60.0 13.9%12.5%111.6 122.0 91%90% 1833 N 3/24/2015 Robertson Rd. Sta. 11+30 Slope 4 CF 61.0 15.6%11.0%112.4 123.5 91%90% 1834 N 3/24/2015 Robertson Rd Sta. 11+35 5 CF 63.0 10.9%11.0%113.2 124.5 91%90% 1835 N 3/25/2015 PA-3 Lot 71 9 FG 0.0 11.0%10.5%115.9 127.5 91%90% 1836 N 3/25/2015 PA-3 Lot 72 5 FG 0.0 10.3%11.0%112.3 124.5 90%90% 1837 N 3/25/2015 PA-3 Lot 73 5 FG 0.0 12.3%11.0%114.2 124.5 92%90% 1838 N 3/25/2015 PA-5 Lot 29 9 FG 0.0 8.9%10.5%115.7 127.5 91%90% 1839 N 3/25/2015 PA-5 Lot 30 5 FG 0.0 9.0%11.0%112.5 124.5 90%90% 1840 N 3/25/2015 Robertson Rd Sta. 10+90 11 CF 65.0 13.8%12.5%111.1 122.0 91%90% 1841 N 2/23/2015 PA-9 Lot 261 Slope 5 CF 202.0 11.1%11.0%113.9 124.5 91%90% 1842 N 2/23/2015 PA-9 Lot 261 11 CF 178.0 13.8%12.5%111.6 122.0 91%90% 1843 N 2/23/2015 PA-10 Lot 299 4 CF 145.0 11.9%11.0%113.6 123.5 92%90% 1844 N 2/23/2015 PA-10 Lot 301 11 CF 146.0 12.6%12.5%109.7 122.0 90%90% 1845 N 2/24/2015 PA-10 Lot 317 5 CF 127.0 12.4%11.0%115.0 124.5 92%90% 1846 N 2/24/2015 PA-10 Lot 319 5 CF 125.0 11.7%11.0%116.4 124.5 93%90% 1847 N 2/24/2015 PA-10 Lot 381 Slope 5 SF 139.0 13.1%11.0%112.3 124.5 90%90% 1848 N 2/24/2015 Gage Dr. Sta. 21+00 Slope 9 CF 102.0 10.5%10.5%122.0 127.5 96%90% 1849 N 2/24/2015 PA-10 Lot 325 Slope 5 CF 104.0 13.4%11.0%114.7 124.5 92%90% 1850 N 2/24/2015 PA-10 Lot 325 Slope 9 CF 108.0 11.6%10.5%116.5 127.5 91%90% 1851 N 3/25/2015 PA-8 East Slope 14 CF 139.0 15.2%15.0%107.4 117.0 92%90% 1852 N 3/25/2015 PA-8 Northeast Slope 14 CF 137.0 15.0%15.0%109.4 117.0 94%90% 1853 N 3/25/2015 PA-8 Northeast Slope 11 CF 140.0 14.7%12.5%111.5 122.0 91%90% 1854 N 3/25/2015 PA-8 Northeast Slope 11 CF 142.0 14.4%12.5%113.7 122.0 93%90% 1855 N 3/25/2015 PA-6 Lot 227 5 FG 0.0 9.9%11.0%112.1 124.5 90%90% 1856 N 3/25/2015 PA-6 Lot 228 5 FG 0.0 8.4%11.0%113.7 124.5 91%90% 1857 N 3/25/2015 PA-6 Lot 229 9 FG 0.0 9.7%10.5%119.5 127.5 94%90% 1858 N 3/25/2015 PA-6 Lot 230 5 FG 0.0 10.0%11.0%115.1 124.5 92%90% 1859 N 3/25/2015 PA-6 Lot 231 5 FG 0.0 11.6%11.0%113.6 124.5 91%90% 1860 N 3/25/2015 PA-6 Lot 232 5 FG 0.0 11.7%11.0%114.2 124.5 92%90% 1861 N 3/25/2015 Robertson Rd Sta. 10+70 9 CF 66.0 9.8%10.5%115.7 127.5 91%90% 1862 N 3/26/2015 Roberston Rd Sta. 12+00 Slope 5 CF 66.0 12.9%11.0%113.2 124.5 91%90% 1863 N 3/26/2015 Robertson Rd Sta. 11+65 9 CF 64.0 13.1%10.5%118.6 127.5 93%90% 1864 N 3/26/2015 PA-7 South Slope 14 SF 87.0 11.2%15.0%106.8 117.0 91%90% 1865 N 3/27/2015 PA-7 South Slope 14 SF 86.0 16.5%15.0%107.5 117.0 92%90% 1866 N 3/27/2015 PA-7 South Slope 14 SF 75.0 14.6%15.0%108.7 117.0 93%90% 1867 N 3/27/2015 PA-7 South Slope 14 SF 90.0 13.9%15.0%106.5 117.0 91%90% 1868 N 3/27/2015 ECR Slope Sta. 451+50 4 CF 36.0 12.8%11.0%111.9 123.5 91%90% 1869 N 3/27/2015 PA-6 Lot 159 9 CF 68.0 9.8%10.5%115.5 127.5 91%90% 1870 N 3/27/2015 PA-6 Lot 162 9 CF 72.0 8.4%10.5%115.6 127.5 91%90% 1871 N 3/25/2015 PA-6 Lot 233 9 FG 0.0 12.7%10.5%116.1 127.5 91%90% 1872 N 3/25/2015 PA-6 Lot 234 9 FG 0.0 10.5%10.5%121.5 127.5 95%90% 1873 N 3/26/2015 PA-8 Northeast Slope 14 CF 146.0 15.0%15.0%107.4 117.0 92%90% 1874 N 3/26/2015 PA-8 North Slope 14 CF 144.0 15.4%15.0%106.6 117.0 91%90% 1875 N 3/26/2015 PA-9 Lot 270 1 FG 0.0 17.2%16.0%110.1 117.5 94%90% 1876 N 3/26/2015 PA-9 Lot 269 11 FG 0.0 14.5%12.5%112.5 122.0 92%90% 1877 N 3/26/2015 PA-9 Lot 268 11 FG 0.0 14.0%12.5%113.1 122.0 93%90% 1878 N 3/26/2015 PA-9 Lot 267 1 FG 0.0 18.9%16.0%106.3 117.5 90%90% 1879 N 3/26/2015 PA-9 Lot 266 1 FG 0.0 17.7%16.0%109.3 117.5 93%90% 1880 N 3/26/2015 PA-9 Lot 265 10 FG 0.0 14.6%10.0%119.0 128.0 93%90% 1881 N 3/26/2015 PA-6 Lot 218 Slope 14 CF 141.0 16.0%15.0%106.3 117.0 91%90% 1882 N 3/26/2015 PA-8 East Slope 11 CF 145.0 12.4%12.5%110.4 122.0 90%90% 1883 N 3/26/2015 PA-9 Lot 276 Slope 5 SF 178.0 13.4%11.0%115.6 124.5 93%90% 1884 N 3/26/2015 PA-9 Lot 278 Slope 5 SF 183.0 11.9%11.0%113.1 124.5 91%90% 1885 N 3/26/2015 PA-9 Lot 280 Slope 11 SF 175.0 14.0%12.5%110.9 122.0 91%90% 1886 N 3/26/2015 PA-8 Northeast Slope 14 CF 150.0 15.6%15.0%105.3 117.0 90%90% 1887 N 3/26/2015 PA-8 North Slope 11 CF 147.0 13.2%12.5%109.7 122.0 90%90% 1888 N 3/26/2015 PA-9 Lot 299 Slope 4 SF 159.0 9.8%11.0%111.9 123.5 91%90% Project No.133023-03 Page C-27 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1889 N 3/26/2015 PA-9 Lot 288 Slope 4 SF 142.0 10.4%11.0%111.1 123.5 90%90% 1890 N 3/26/2015 PA-10 Lot 325 West Sope 11 CF 114.0 12.4%12.5%110.8 122.0 91%90% 1891 N 3/26/2015 PA-10 Lot 325 Slope 11 CF 112.0 12.7%12.5%111.4 122.0 91%90% 1892 N 3/27/2015 Robertson Road Sta. 13+65 Slope 4 CF 63.0 14.1%11.0%111.6 123.5 90%90% 1893 N 3/27/2015 PA-6 Lot 163 Slope 9 CF 75.0 14.3%10.5%114.8 127.5 90%90% 1894 N 3/27/2015 PA-6 Lot 160 Slope 9 CF 73.0 11.7%10.5%117.0 127.5 92%90% 1895 N 3/27/2015 ECR Slope Sta. 451+90 4 CF 40.0 14.8%11.0%112.2 123.5 91%90% 1896 N 3/30/2015 PA-9 Lot 271 4 FG 0.0 10.1%11.0%114.0 123.5 92%90% 1897 N 3/30/2015 PA-9 Lot 272 4 FG 0.0 10.3%11.0%111.3 123.5 90%90% 1898 N 3/30/2015 PA-9 Lot 273 4 FG 0.0 10.3%11.0%114.1 123.5 92%90% 1899 N 3/30/2015 PA-9 Lot 274 4 FG 0.0 9.5%11.0%111.5 123.5 90%90% 1900 N 3/30/2015 PA-10 Lot 325 Slope 4 CF 120.0 11.2%11.0%110.8 123.5 90%90% 1901 N 3/30/2015 PA-10 Lot 325 Slope 4 CF 124.0 12.1%11.0%113.7 123.5 92%90% 1902 N 3/30/2015 PA-10 Lot 325 5 CF 122.0 11.5%11.0%114.6 124.5 92%90% 1903 N 3/30/2015 PA-10 Lot 326 5 CF 124.0 11.2%11.0%113.5 124.5 91%90% 1904 N 3/30/2015 ECR Slope Sta. 451+30 4 CF 44.0 12.5%11.0%111.0 123.5 90%90% 1905 N 3/30/2015 Robertson Rd. Sta. 12+90 Slope 5 CF 67.0 11.5%11.0%115.0 124.5 92%90% 1906 N 3/30/2015 PA-6 Lot 212 9 CF 160.0 9.5%10.5%116.3 127.5 91%90% 1907 N 3/30/2015 PA-6 Lot 213 9 CF 157.0 10.4%10.5%117.0 127.5 92%90% 1908 N 3/30/2015 PA-8 Northeast Slope 11 CF 154.0 13.3%12.5%110.1 122.0 90%90% 1909 N 3/30/2015 PA-8 Northeast Slope 11 CF 148.0 14.1%12.5%111.3 122.0 91%90% 1910 N 3/30/2015 PA-8 Northeast Slope 5 CF 165.0 11.6%11.0%114.6 124.5 92%90% 1911 N 3/30/2015 Robertson Rd Sta. 11+80 13 CF 69.0 12.3%11.0%114.3 125.5 91%90% 1912 N 3/30/2015 Robertson Rd Sta. 12+20 9 CF 70.0 13.1%10.5%115.2 127.5 90%90% 1913 N 3/31/2015 Robertson Rd Sta. 12+00 12 CF 72.0 13.9%12.0%113.3 124.0 91%90% 1914 N 3/31/2015 Robertson Rd Sta. 11+55 13 CF 71.0 13.4%11.0%114.4 125.5 91%90% 1915 N 3/31/2015 Robertson Rd Sta. 12+60 12 CF 73.0 14.2%12.0%112.9 124.0 91%90% 1916 N 4/1/2015 Robertson Rd Sta. 13+30 12 CF 64.0 13.7%12.0%112.4 124.0 91%90% 1917 N 4/1/2015 Robertson Rd Sta. 13+60 4 CF 68.0 15.6%11.0%111.1 123.5 90%90% 1918 N 4/2/2015 Robertson Rd Sta. 12+90 12 CF 74.0 16.0%12.0%114.3 124.0 92%90% 1919 N 4/2/2015 Roberston Rd Sta. 14+55 Slope 12 CF 74.0 15.3%12.0%113.9 124.0 92%90% 1920 N 4/2/2015 PA-2 13 CF 52.0 9.2%11.0%114.6 125.5 91%90% 1921 N 3/30/2015 PA-8 Northeast Slope 5 CF 160.0 13.1%11.0%113.5 124.5 91%90% 1922 N 3/30/2015 PA-8 North Slope 5 CF 156.0 12.5%11.0%112.7 124.5 91%90% 1923 N 3/30/2015 ECR Slope Sta. 451+70 11 CF 48.0 14.4%12.5%109.8 122.0 90%90% 1924 N 3/31/2015 PA-6 Lot 183 9 CF 169.0 10.2%10.5%118.5 127.5 93%90% 1925 N 3/31/2015 PA-6 Lot 184 9 CF 171.0 10.6%10.5%117.4 127.5 92%90% 1926 N 3/31/2015 PA-6 Lot 161 Slope 5 CF 185.0 10.7%11.0%113.9 124.5 91%90% 1927 N 3/31/2015 PA-6 Lot 162 Slope 5 CF 180.0 11.9%11.0%112.1 124.5 90%90% 1928 N 3/31/2015 PA-8 Northeast Slope 5 CF 173.0 11.6%11.0%115.0 124.5 92%90% 1929 N 3/31/2015 PA-8 Northeast Slope 5 CF 170.0 10.8%11.0%114.1 124.5 92%90% 1930 N 3/31/2015 PA-8 Northeast Slope 5 CF 175.0 12.2%11.0%112.7 124.5 91%90% 1931 N 3/31/2015 PA-6 Lot 163 4 CF 173.0 11.3%11.0%111.5 123.5 90%90% 1932 N 3/31/2015 PA-6 Lot 160 Slope 4 CF 170.0 12.3%11.0%112.3 123.5 91%90% 1933 N 3/31/2015 PA-9 Lot 252 Slope 11 SF 183.0 12.5%12.5%109.8 122.0 90%90% 1934 N 3/31/2015 PA-9 Lot 265 Slope 11 SF 165.0 7.9%12.5%111.4 122.0 91%90% 1935 N 3/31/2015 PA-9 Lot 265 Slope 11 SF 178.0 10.2%12.5%110.0 122.0 90%90% 1936 N 3/31/2015 PA-6 Lot 249 Slope 9 SF 140.0 8.9%10.5%116.5 127.5 91%90% 1937 N 3/31/2015 PA-6 Lot 234 SLope 11 SF 145.0 13.5%12.5%109.6 122.0 90%90% 1938 N 3/31/2015 PA-6 Lot 161 Slope 5 CF 197.0 10.4%11.0%112.2 124.5 90%90% 1939 N 3/31/2015 PA-6 Lot 160 Slope 5 CF 190.0 11.1%11.0%113.0 124.5 91%90% 1940 N 4/1/2015 PA-6 Lot 158 5 CF 167.0 10.3%11.0%115.3 124.5 93%90% 1941 N 4/1/2015 PA-6 Lot 159 11 CF 169.0 13.1%12.5%111.5 122.0 91%90% 1942 N 4/2/2015 PA-2 10 CF 53.0 11.2%10.5%118.8 128.0 93%90% 1943 N 4/2/2015 Robertson Rd. Sta. 12+80 Slope 12 CF 81.0 14.1%12.0%113.7 124.0 92%90% 1944 N 4/2/2015 Robertson Rd Sta. 12+70 12 CF 77.0 15.1%12.0%112.9 124.0 91%90% 1945 N 4/3/2015 PA-6 Lot 164 12 CF 174.0 15.6%12.0%113.5 124.0 92%90% 1946 N 4/3/2015 PA-6 Lot 165 13 CF 173.0 14.3%11.0%114.9 125.5 92%90% 1947 N 4/3/2015 PA-6 Lot 161 10 CF 171.0 10.5%10.0%117.7 128.0 92%90% 1948 N 4/3/2015 PA-6 Lot 245 11 CF 169.0 13.1%12.5%111.1 122.0 91%90% 1949 N 4/3/2015 PA-6 Lot 158 Slope 11 CF 180.0 13.6%12.5%111.0 122.0 91%90% 1950 N 4/7/2015 PA-5 Lot 43 14 CF 173.0 13.1%15.0%108.4 117.0 93%90% 1951 N 4/6/2015 PA-9 Borden Ct. Sta. 18+00 11 CF 154.0 14.7%12.5%112.3 122.0 92%90% 1952 N 4/6/2015 PA-9 Borden Ct. Sta. 18+35 Slope 11 CF 156.0 13.1%12.5%110.3 122.0 90%90% 1953 N 4/6/2015 PA-9 Edinburgh Dr. St. 13+90 5 CF 158.0 11.4%11.0%114.1 124.5 92%90% 1954 N 4/6/2015 PA-9 Borden Ct. Sta. 18+60 11 CF 160.0 14.2%12.5%111.5 122.0 91%90% 1955 N 4/6/2015 PA-9 Lot 263 Slope 11 SF 190.0 10.1%12.5%111.3 122.0 91%90% 1956 N 4/6/2015 PA-9 Lot 261 Slope 5 SF 196.0 9.0%11.0%116.4 124.5 93%90% 1957 N 4/6/2015 PA-9 Lot 259 Slope 5 SF 204.0 9.6%11.0%113.3 124.5 91%90% 1958 N 4/6/2015 PA-9 Lot 257 Slope 11 SF 192.0 10.0%12.5%111.8 122.0 92%90% Project No.133023-03 Page C-28 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 1959 N 4/6/2015 PA-9 Lot 255 Slope 5 SF 202.0 9.1%11.0%115.0 124.5 92%90% 1960 N 4/6/2015 PA-9 Lot 253 Slope 5 SF 195.0 8.5%11.0%112.8 124.5 91%90% 1961 N 4/7/2015 PA-5 Lot 41 14 CF 174.0 15.2%15.0%107.4 117.0 91%90% 1962 N 4/7/2015 PA-5 Lot 42 11 CF 173.0 12.3%12.5%110.3 122.0 90%90% 1963 N 4/7/2015 PA-5 Lot 43 14 CF 175.0 15.5%15.0%106.3 117.0 90%90% 1964 N 4/8/2015 PA-5 Lot 41 5 CF 176.0 10.8%11.0%114.9 124.5 92%90% 1965 N 4/8/2015 PA-5 Lot 42 5 CF 175.0 9.8%11.0%112.9 124.5 91%90% 1966 N 4/8/2015 PA-2 13 CF 57.0 14.0%11.0%114.0 125.5 91%90% 1967 N 4/8/2015 PA-2 5 CF 55.0 11.7%11.0%113.7 124.5 91%90% 1968 N 4/9/2015 PA-2 10 CF 50.0 11.0%10.0%120.7 128.0 94%90% 1969 N 4/9/2015 PA-2 10 CF 49.0 11.5%10.0%119.8 128.0 94%90% 1970 N 4/9/2015 PA-9 Borden Ct. Sta. 18+50 11 CF 162.0 13.1%12.5%110.2 122.0 90%90% 1971 N 4/9/2015 PA-9 Edinburgh Dr. Sta. 13+60 11 CF 166.0 13.3%12.5%111.2 122.0 91%90% 1972 N 4/9/2015 PA-2 9 CF 54.0 11.0%10.5%115.2 127.5 90%90% 1973 N 4/9/2015 PA-2 13 CF 52.0 12.3%11.0%114.9 125.5 92%90% 1974 N 4/9/2015 PA-9 Lot 282 5 CF 165.0 10.2%11.0%118.2 124.5 95%90% 1975 N 4/9/2015 PA-9 Lot 284 5 CF 166.0 11.1%11.0%117.0 124.5 94%90% 1976 N 4/9/2015 PA-9 Lot 286 5 CF 167.0 10.6%11.0%118.9 124.5 96%90% 1977 N 4/9/2015 PA-9 Borden Ct. Sta. 18+15 Slope 11 CF 164.0 13.6%12.5%111.1 122.0 91%90% 1978 N 4/9/2015 PA-9 Borden Ct. Sta. 17+80 Slope 11 CF 168.0 14.0%12.5%112.0 122.0 92%90% 1979 N 4/9/2015 PA-9 Lot 275 Slope 5 CF 170.0 12.0%11.0%115.9 124.5 93%90% 1980 N 4/9/2015 PA-9 Lot 282 Slope 5 CF 175.0 9.8%11.0%114.8 124.5 92%90% 1981 N 4/10/2015 PA-2 10 CF 53.0 11.0%10.0%119.2 128.0 93%90% 1982 N 4/10/2015 PA-9 Lot 285 Slope 5 SF 171.0 10.0%11.0%113.5 124.5 91%90% 1983 N 4/10/2015 PA-2 10 CF 57.0 14.5%10.0%118.4 128.0 93%90% 1984 N 4/10/2015 PA-2 10 CF 50.0 10.5%10.0%120.1 128.0 94%90% 1985 N 4/10/2015 PA-10 Lot 325 5 CF 125.0 11.1%11.0%114.1 124.5 92%90% 1986 N 4/13/2015 PA-2 9 CF 57.0 14.8%10.5%117.2 127.5 92%90% 1987 N 4/13/2015 PA-2 9 CF 56.0 13.6%10.5%116.6 127.5 91%90% 1988 N 4/13/2015 PA-2 10 CF 57.0 12.9%10.0%118.8 128.0 93%90% 1989 N 4/13/2015 PA-2 9 CF 55.0 14.1%10.5%117.3 127.5 92%90% 1990 N 4/13/2015 PA-5 Lot 48 14 CF 197.0 13.8%15.0%106.9 117.0 91%90% 1991 N 4/13/2015 PA-5 Lot 47 14 CF 195.0 15.2%15.0%108.2 117.0 92%90% 1992 N 4/14/2015 PA-2 10 CF 52.0 13.0%10.0%120.1 128.0 94%90% 1993 N 4/14/2015 PA-2 10 CF 53.0 13.2%10.0%118.9 128.0 93%90% 1994 N 4/14/2015 PA-5 Lot 47 11 CF 196.0 15.0%12.5%112.2 122.0 92%90% 1995 N 4/14/2015 PA-5 Lot 46 1 CF 192.0 16.4%16.0%109.4 117.5 93%90% 1996 N 4/15/2015 PA-6 Lot 189 9 FG 0.0 11.5%10.5%119.9 127.5 94%90% 1997 N 4/15/2015 PA-6 Lot 190 9 FG 0.0 11.0%10.5%121.6 127.5 95%90% 1998 N 4/15/2015 PA-6 Lot 191 5 FG 0.0 11.6%11.0%112.2 124.5 90%90% 1999 N 4/15/2015 PA-6 Lot 192 5 FG 0.0 9.5%11.0%115.4 124.5 93%90% 2000 N 4/15/2015 PA-6 Lot 193 5 FG 0.0 9.0%11.0%114.1 124.5 92%90% 2001 N 4/14/2015 ECR Slope Sta. 471+70 11 SF 78.0 10.0%12.5%110.1 122.0 90%90% 2002 N 4/14/2015 ECR Slope Sta. 475+30 11 SF 75.0 11.6%12.5%110.4 122.0 90%90% 2003 N 4/14/2015 ECR Slope Sta. 477+15 9 SF 80.0 11.5%10.5%117.7 127.5 92%90% 2004 N 4/14/2015 ECR Slope Sta. 478+60 9 SF 67.0 11.6%10.5%117.6 127.5 92%90% 2005 N 4/14/2015 ECR Slope Sta. 479+70 11 SF 60.0 12.4%12.5%110.9 122.0 91%90% 2006 N 4/14/2015 PA-2 10 CF 64.0 12.1%10.0%122.0 128.0 95%90% 2007 N 4/14/2015 PA-2 10 CF 59.0 11.9%10.0%118.0 128.0 92%90% 2008 N 4/14/2015 PA-2 10 CF 56.0 10.5%10.0%120.8 128.0 94%90% 2009 N 4/14/2015 PA-2 10 CF 57.0 10.8%10.0%120.3 128.0 94%90% 2010 N 4/15/2015 PA-2 9 CF 62.0 12.9%10.5%116.7 127.5 92%90% 2011 N 4/15/2015 PA-2 10 CF 61.0 10.9%10.0%121.4 128.0 95%90% 2012 N 4/15/2015 PA-2 10 CF 59.0 11.1%10.0%120.1 128.0 94%90% 2013 N 4/15/2015 PA-2 10 CF 58.0 12.6%10.0%121.4 128.0 95%90% 2014 N 4/16/2015 PA-2 10 CF 51.0 11.1%10.0%120.9 128.0 94%90% 2015 N 4/16/2015 PA-2 10 CF 53.0 10.9%10.0%122.3 128.0 96%90% 2016 N 4/16/2015 PA-2 10 CF 56.0 10.8%10.0%120.7 128.0 94%90% 2017 N 4/16/2015 PA-2 10 CF 51.0 9.7%10.0%119.7 128.0 94%90% 2018 N 4/17/2015 Robertson Rd. Sta. 14+10 4 CF 91.0 13.6%11.0%112.8 123.5 91%90% 2019 N 4/17/2015 PA-2 5 CF 48.0 10.6%11.0%113.9 124.5 91%90% 2020 N 4/17/2015 PA-2 9 CF 50.0 11.5%10.5%116.5 127.5 91%90% 2021 N 4/15/2015 PA-6 Lot 183 9 FG 0.0 8.7%10.5%119.7 127.5 94%90% 2022 N 4/15/2015 PA-6 Lot 184 9 FG 0.0 9.0%10.5%116.6 127.5 91%90% 2023 N 4/15/2015 PA-5 Lot 45 11 CF 189.0 13.3%12.5%110.0 122.0 90%90% 2024 N 4/15/2015 PA-10 Lot 307 Slope 14 SF 140.0 14.1%15.0%106.6 117.0 91%90% 2025 N 4/15/2015 PA-10 Lot 316 Slope 14 SF 126.0 15.0%15.0%105.3 117.0 90%90% 2026 N 4/15/2015 PA-10 Lot 316 Slope 11 SF 132.0 12.4%12.5%110.0 122.0 90%90% 2027 N 4/15/2015 PA-10 Lot 324 Slope 11 SF 121.0 11.2%12.5%109.7 122.0 90%90% 2028 N 4/15/2015 PA-10 Lot 324 Slope 11 SF 124.0 11.7%12.5%112.7 122.0 92%90% Project No.133023-03 Page C-29 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2029 N 4/15/2015 PA-10 Lot 324 Slope 11 SF 113.0 12.5%12.5%109.5 122.0 90%90% 2030 N 4/16/2015 PA-9 Lot 276 Slope 14 SF 159.0 14.4%15.0%107.0 117.0 91%90% 2031 N 4/16/2015 PA-9 Lot 276 Slope 11 SF 148.0 11.2%12.5%109.7 122.0 90%90% 2032 N 4/16/2015 PA-9 Lot 288 Slope 11 SF 159.0 12.8%12.5%111.5 122.0 91%90% 2033 N 4/16/2015 Robertson Rd Sta. 13+10 11 CF 82.0 13.9%12.5%112.0 122.0 92%90% 2034 N 4/16/2015 Robertson Rd Sta. 13+85 11 CF 87.0 14.4%12.5%111.1 122.0 91%90% 2035 N 4/17/2015 PA-5 Lot 41 5 FG 0.0 12.0%11.0%112.4 124.5 90%90% 2036 N 4/17/2015 PA-5 Lot 42 5 FG 0.0 12.6%11.0%114.7 124.5 92%90% 2037 N 4/17/2015 PA-5 Lot 42 5 FG 0.0 11.4%11.0%113.5 124.5 91%90% 2038 N 4/17/2015 PA-5 Lot 43 5 FG 0.0 8.5%11.0%113.1 124.5 91%90% 2039 N 4/17/2015 PA-5 Lot 43 5 FG 0.0 11.1%11.0%114.2 124.5 92%90% 2040 N 4/17/2015 PA-10 Lot 299 Slope 11 SF 142.0 12.0%12.5%110.1 122.0 90%90% 2041 N 4/17/2015 PA-10 Lot 334 Kentner Ct. West Slope 11 SF 139.0 12.8%12.5%109.8 122.0 90%90% 2042 N 4/17/2015 PA-9 Lot 252 9 FG 0.0 10.6%10.5%121.0 127.5 95%90% 2043 N 4/17/2015 PA-9 Lot 253 9 FG 0.0 8.0%10.5%117.3 127.5 92%90% 2044 N 4/17/2015 PA-9 Lot 254 9 FG 0.0 11.1%10.5%116.8 127.5 92%90% 2045 N 4/17/2015 PA-9 Lot 255 9 FG 0.0 9.2%10.5%118.9 127.5 93%90% 2046 N 4/17/2015 PA-9 Lot 256 9 FG 0.0 8.4%10.5%115.3 127.5 90%90% 2047 N 4/17/2015 PA-9 Lot 257 9 FG 0.0 9.2%10.5%115.7 127.5 91%90% 2048 N 4/17/2015 PA-9 Lot 258 10 FG 0.0 10.2%10.0%118.8 128.0 93%90% 2049 N 4/17/2015 PA-9 Lot 259 10 FG 0.0 7.5%10.0%125.6 128.0 98%90% 2050 N 4/17/2015 PA-9 Lot 260 9 FG 0.0 11.2%10.5%114.8 127.5 90%90% 2051 N 4/17/2015 PA-9 Lot 261 9 FG 0.0 10.5%10.5%117.9 127.5 92%90% 2052 N 4/17/2015 PA-9 Lot 262 5 FG 0.0 13.5%11.0%113.1 124.5 91%90% 2053 N 4/17/2015 PA-9 Lot 263 5 FG 0.0 12.7%11.0%114.8 124.5 92%90% 2054 N 4/17/2015 PA-9 Lot 264 5 FG 0.0 10.1%11.0%118.0 124.5 95%90% 2055 N 4/17/2015 PA-3 Lot 63 11 FG 0.0 9.8%12.5%111.1 122.0 91%90% 2056 N 4/17/2015 PA-3 Lot 64 11 FG 0.0 8.7%12.5%109.9 122.0 90%90% 2057 N 4/17/2015 PA-3 Lot 65 11 FG 0.0 9.2%12.5%111.6 122.0 91%90% 2058 N 4/17/2015 Robertson Rd Sta. 14+60 7 CF 97.0 19.4%19.5%101.1 111.5 91%90% 2059 N 4/17/2015 Robertson Rd Sta. 14+85 7 CF 100.0 20.1%19.5%100.7 111.5 90%90% 2060 N 4/20/2015 PA-9 Lot 286 5 FG 0.0 8.2%11.0%114.7 124.5 92%90% 2061 N 4/20/2015 PA-9 Lot 285 5 FG 0.0 11.2%11.0%118.0 124.5 95%90% 2062 N 4/20/2015 PA-9 Lot 284 5 FG 0.0 9.3%11.0%120.9 124.5 97%90% 2063 N 4/20/2015 PA-9 Lot 283 5 FG 0.0 11.7%11.0%118.2 124.5 95%90% 2064 N 4/20/2015 PA-9 Lot 282 5 FG 0.0 9.9%11.0%118.9 124.5 96%90% 2065 N 4/20/2015 Robertson Rd Sta. 13+80 9 CF 87.0 11.3%10.5%119.0 127.5 93%90% 2066 N 4/20/2015 Roberston Rd Sta. 14+20 Slope 9 CF 93.0 12.1%10.5%115.1 127.5 90%90% 2067 N 4/20/2015 PA-6 Lot 226 5 CF 166.0 8.9%11.0%114.7 124.5 92%90% 2068 N 4/20/2015 PA-9 Lot 277 5 CF 170.0 10.2%11.0%112.9 124.5 91%90% 2069 N 4/20/2015 PA-5 Lot 44 1 CF 186.0 17.0%16.0%108.0 117.5 92%90% 2070 N 4/20/2015 PA-8 Northeast Slope 9 SF 165.0 8.5%10.5%120.6 127.5 95%90% 2071 N 4/20/2015 PA-2 10 CF 61.0 11.0%10.0%119.8 128.0 94%90% 2072 N 4/20/2015 PA-2 10 CF 62.0 9.0%10.0%121.2 128.0 95%90% 2073 N 4/21/2015 PA-2 9 CF 52.0 11.0%10.5%116.9 127.5 92%90% 2074 N 4/21/2015 PA-2 9 CF 53.0 11.0%10.5%117.6 127.5 92%90% 2075 N 4/22/2015 PA-2 10 CF 61.0 11.9%10.0%120.7 128.0 94%90% 2076 N 4/22/2015 PA-2 10 CF 62.0 12.3%10.0%121.4 128.0 95%90% 2077 N 4/22/2015 PA-2 5 CF 62.0 12.0%11.0%117.4 124.5 94%90% 2078 N 4/22/2015 PA-2 5 CF 63.0 11.0%11.0%113.4 124.5 91%90% 2079 N 4/23/2015 PA-2 5 CF 60.0 12.1%11.0%117.3 124.5 94%90% 2080 N 4/23/2015 PA-2 9 CF 61.0 11.5%10.5%117.7 127.5 92%90% 2081 N 4/20/2015 PA-8 Northeast Slope 5 SF 160.0 12.3%11.0%115.3 124.5 93%90% 2082 N 4/20/2015 PA-8 Northeast Slope 5 SF 169.0 11.7%11.0%113.5 124.5 91%90% 2083 N 4/20/2015 PA-6 Lot 212 5 SF 164.0 10.4%11.0%112.8 124.5 91%90% 2084 N 4/21/2015 PA-10 Lot 330 Slope 5 CF 118.0 11.2%11.0%114.5 124.5 92%90% 2085 N 4/21/2015 PA-10 Lot 330 Slope 5 CF 122.0 10.9%11.0%112.4 124.5 90%90% 2086 N 4/21/2015 PA-10 Lot 330 5 CF 124.0 12.5%11.0%115.1 124.5 92%90% 2087 N 4/21/2015 PA-10 Lot 330 5 CF 125.0 12.2%11.0%113.5 124.5 91%90% 2088 N 4/22/2015 PA-6 Lot 212 11 FG 0.0 10.5%12.5%111.2 122.0 91%90% 2089 N 4/22/2015 PA-6 Lot 213 11 FG 0.0 10.1%12.5%113.2 122.0 93%90% 2090 N 4/22/2015 PA-10 Lot 307 Slope 11 SF 148.0 10.0%12.5%109.7 122.0 90%90% 2091 N 4/22/2015 PA-9 Lot 298 Slope 11 SF 149.0 11.7%12.5%111.5 122.0 91%90% 2092 N 4/22/2015 PA-9 Lot 298 Slope 11 SF 158.0 8.9%12.5%109.9 122.0 90%90% 2093 N 4/23/2015 PA-10 Lot 321 14 FG 0.0 15.7%15.0%107.3 117.0 92%90% 2094 N 4/23/2015 PA-10 Lot 322 13 FG 0.0 12.4%11.0%116.6 125.5 93%90% 2095 N 4/23/2015 PA-10 Lot 323 13 FG 0.0 12.9%11.0%116.0 125.5 92%90% 2096 N 4/23/2015 PA-10 Lot 324 13 FG 0.0 13.0%11.0%113.2 125.5 90%90% 2097 N 4/23/2015 PA-10 Lot 324 14 FG 0.0 15.5%15.0%108.2 117.0 92%90% 2098 N 4/23/2015 PA-8 East Slope 11 SF 143.0 9.5%12.5%111.2 122.0 91%90% Project No.133023-03 Page C-30 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2099 N 4/23/2015 PA-8 East Slope 11 SF 140.0 9.4%12.5%111.8 122.0 92%90% 2100 N 4/23/2015 PA-8 Northeast Slope 11 SF 145.0 10.0%12.5%110.7 122.0 91%90% 2101 N 4/23/2015 PA-2 4 CF 56.0 15.0%11.0%114.2 123.5 92%90% 2102 N 4/23/2015 PA-2 4 CF 57.0 14.7%11.0%115.1 123.5 93%90% 2103 N 4/23/2015 PA-2 4 SF 51.0 12.1%11.0%113.9 123.5 92%90% 2104 N 4/23/2015 PA-2 9 SF 56.0 11.0%10.5%116.4 127.5 91%90% 2105 N 4/23/2015 PA-2 13 SF 62.0 10.5%11.0%114.6 125.5 91%90% 2106 N 4/23/2015 PA-2 13 SF 64.0 9.4%11.0%114.1 125.5 91%90% 2107 N 4/23/2015 PA-2 Slope 13 CF 69.0 9.9%11.0%114.6 125.5 91%90% 2108 N 4/23/2015 PA-2 11 CF 59.0 12.9%12.5%112.5 122.0 92%90% 2109 N 4/23/2015 PA-2 11 CF 60.0 13.1%12.5%113.7 122.0 93%90% 2110 N 4/27/2015 PA-8 11 SF 143.0 12.8%12.5%110.2 122.0 90%90% 2111 N 4/23/2015 PA-10 Lot 317 13 FG 0.0 8.4%11.0%116.7 125.5 93%90% 2112 N 4/23/2015 PA-10 Lot 318 13 FG 0.0 10.9%11.0%115.9 125.5 92%90% 2113 N 4/27/2015 PA-8 North Slope 5 SF 148.0 11.2%11.0%114.1 124.5 92%90% 2114 N 4/27/2015 PA-8 North Slope 11 SF 140.0 12.5%12.5%111.1 122.0 91%90% 2115 N 4/27/2015 PA-23A Lot 63 Slope 11 SF 163.0 11.9%12.5%109.7 122.0 90%90% 2116 N 4/27/2015 PA-23A Lot 71 Slope 11 SF 159.0 12.2%12.5%110.9 122.0 91%90% 2117 N 4/27/2015 PA-23A Lot 71 Slope 11 SF 145.0 12.6%12.5%110.1 122.0 90%90% 2118 N 4/27/2015 PA-10 Lot 305 13 FG 0.0 12.2%11.0%115.4 125.5 92%90% 2119 N 4/27/2015 PA-10 Lot 306 13 FG 0.0 12.8%11.0%116.2 125.5 93%90% 2120 N 4/27/2015 PA-10 Lot 307 9 FG 0.0 10.2%10.5%118.2 127.5 93%90% 2121 N 4/27/2015 PA-10 Lot 301 11 FG 0.0 10.8%12.5%110.8 122.0 91%90% 2122 N 4/27/2015 PA-10 Lot 300 14 FG 0.0 13.4%15.0%106.8 117.0 91%90% 2123 N 4/27/2015 PA-10 Lot 299 14 FG 0.0 14.0%15.0%108.4 117.0 93%90% 2124 N 4/28/2015 Robertson Rd. Sta. 11+60 Slope 4 SF 68.0 8.9%11.0%112.4 123.5 91%90% 2125 N 4/28/2015 Robertson Rd. Sta. 12+70 Slope 11 SF 75.0 11.5%12.5%111.2 122.0 91%90% 2126 N 4/29/2015 Robertson Rd. Sta. 15+10 Slope 5 SF 98.0 11.8%11.0%114.4 124.5 92%90% 2127 N 4/29/2015 Robertson Rd. Sta. 14+00 Slope 5 SF 85.0 8.2%11.0%116.6 124.5 94%90% 2128 N 4/29/2015 Robertson Rd. Sta. 14+70 Slope 5 SF 75.0 10.8%11.0%113.3 124.5 91%90% 2129 N 4/29/2015 Robertson Rd. Sta. 14+15 Slope 11 SF 92.0 13.8%12.5%111.2 122.0 91%90% 2130 N 4/29/2015 PA-10 Lot 317 Slope 6 SF 113.0 10.3%13.5%108.4 114.5 95%90% 2131 N 4/29/2015 PA-10 Lot 334 Slope 6 SF 102.0 10.6%13.5%107.3 114.5 94%90% 2132 N 4/29/2015 PA-10 Lot 325 Slope 6 SF 111.0 10.8%13.5%103.7 114.5 91%90% 2133 N 4/29/2015 PA-8 East Slope 11 SF 136.0 11.2%12.5%110.9 122.0 91%90% 2134 N 4/29/2015 PA-10 Lot 330 Slope 11 SF 125.0 11.0%12.5%112.1 122.0 92%90% 2135 N 4/29/2015 PA-10 Lot 330 Slope 11 SF 131.0 11.9%12.5%109.7 122.0 90%90% 2136 N 5/1/2015 PA-4 5 CF 127.0 11.0%11.0%113.0 124.5 91%90% 2137 N 5/1/2015 PA-4 13 CF 128.0 12.7%11.0%113.8 125.5 91%90% 2138 N 5/1/2015 PA-4 13 CF 127.0 12.9%11.0%114.0 125.5 91%90% 2139 N 5/1/2015 PA-4 11 CF 125.0 13.1%12.5%112.9 122.0 93%90% 2140 N 5/1/2015 PA-8 North Slope 9 CF 145.0 12.5%10.5%119.5 127.5 94%90% 2141 N 5/4/2015 ECR Sta. 483+15 Bioretention Area 5 CF 43.0 9.7%11.0%113.1 124.5 91%90% 2142 N 5/4/2015 PA-8 9 FG 0.0 11.3%10.5%123.4 127.5 97%90% 2143 N 5/4/2015 PA-8 9 FG 0.0 9.4%10.5%115.5 127.5 91%90% 2144 N 5/4/2015 PA-8 9 FG 0.0 11.8%10.5%115.6 127.5 91%90% 2145 N 5/4/2015 PA-8 9 FG 0.0 10.9%10.5%119.1 127.5 93%90% 2146 N 5/4/2015 PA-8 9 FG 0.0 7.5%10.5%122.1 127.5 96%90% 2147 N 5/4/2015 PA-8 9 FG 0.0 10.7%10.5%117.4 127.5 92%90% 2148 N 5/4/2015 PA-8 9 FG 0.0 9.8%10.5%118.3 127.5 93%90% 2149 N 5/4/2015 PA-10 Lot 320 13 FG 0.0 11.1%11.0%113.2 125.5 90%90% 2150 N 5/4/2015 PA-10 Lot 319 13 FG 0.0 12.3%11.0%115.8 125.5 92%90% 2151 N 5/5/2015 PA-10 Lot 326 5 FG 0.0 10.2%11.0%113.9 124.5 91%90% 2152 N 5/5/2015 PA-10 Lot 325 5 FG 0.0 10.7%11.0%113.5 124.5 91%90% 2153 N 5/6/2015 PA-6 Lot 162 Slope 11 SF 194.0 12.4%12.5%110.2 122.0 90%90% 2154 N 5/6/2015 PA-6 Lot 160 Slope 11 SF 180.0 11.9%12.5%112.6 122.0 92%90% 2155 N 5/6/2015 PA-6 Lot 158 Slope 4 SF 188.0 13.1%11.0%111.9 123.5 91%90% 2156 N 5/6/2015 PA-2 11 CF 66.0 12.9%12.5%112.7 122.0 92%90% 2157 N 5/6/2015 PA-2 4 CF 65.0 11.2%11.0%113.3 123.5 92%90% 2158 N 5/7/2015 PA-2 5 CF 59.0 13.6%11.0%116.0 124.5 93%90% 2159 N 5/7/2015 PA-2 13 CF 60.0 14.4%11.0%117.9 125.5 94%90% 2160 N 5/7/2015 PA-10 Lot 330 11 CF 123.0 13.0%12.5%111.9 122.0 92%90% 2161 N 5/7/2015 PA-10 Lot 330 5 CF 124.0 12.3%11.0%114.8 124.5 92%90% 2162 N 5/11/2015 PA-2 4 CF 62.0 13.4%11.0%113.8 123.5 92%90% 2163 N 5/11/2015 PA-2 4 CF 63.0 14.4%11.0%114.9 123.5 93%90% 2164 N 5/11/2015 ECR Sta. 450+00 Slope 5 CF 34.0 13.1%11.0%114.0 124.5 92%90% 2165 N 5/12/2015 PA-9 Lot 275 11 FG 0.0 10.0%12.5%111.3 122.0 91%90% 2166 N 5/12/2015 PA-9 Lot 287 11 FG 0.0 10.2%12.5%109.8 122.0 90%90% 2167 N 5/12/2015 PA-9 Lot 276 9 FG 0.0 9.9%10.5%118.9 127.5 93%90% 2168 N 5/12/2015 PA-9 Lot 277 9 FG 0.0 10.1%10.5%116.6 127.5 91%90% Project No.133023-03 Page C-31 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2169 N 5/12/2015 PA-9 Lot 278 11 FG 0.0 11.4%12.5%113.0 122.0 93%90% 2170 N 5/12/2015 PA-9 Lot 279 11 FG 0.0 11.6%12.5%115.0 122.0 94%90% 2171 N 5/12/2015 PA-9 Lot 280 5 FG 0.0 12.1%11.0%115.0 124.5 92%90% 2172 N 5/12/2015 PA-9 Lot 281 5 FG 0.0 10.1%11.0%115.1 124.5 92%90% 2173 N 5/12/2015 PA-2 11 CF 64.0 12.6%12.5%112.3 122.0 92%90% 2174 N 5/12/2015 PA-6 Lot 165 5 FG 0.0 8.7%11.0%112.5 124.5 90%90% 2175 N 5/12/2015 PA-6 Lot 164 5 FG 0.0 8.8%11.0%112.7 124.5 91%90% 2176 N 5/12/2015 PA-6 Lot 163 5 FG 0.0 9.2%11.0%113.1 124.5 91%90% 2177 N 5/12/2015 PA-10 Lot 325 Slope 11 SF 120.0 9.2%12.5%109.7 122.0 90%90% 2178 N 5/12/2015 PA-10 Lot 325 Slope 11 SF 104.0 8.8%12.5%109.5 122.0 90%90% 2179 N 5/12/2015 PA-10 Lot 325 Slope 11 SF 117.0 9.4%12.5%110.4 122.0 90%90% 2180 N 5/13/2015 PA-2 9 CF 51.0 11.9%10.5%116.1 127.5 91%90% 2181 N 5/13/2015 PA-6 Lot 226 5 FG 0.0 9.1%11.0%116.7 124.5 94%90% 2182 N 5/13/2015 PA-6 Lot 158 10 FG 0.0 10.2%10.0%120.3 128.0 94%90% 2183 N 5/13/2015 PA-6 Lot 159 10 FG 0.0 11.8%10.0%119.7 128.0 94%90% 2184 N 5/13/2015 PA-6 Lot 160 10 FG 0.0 9.9%10.0%123.0 128.0 96%90% 2185 N 5/13/2015 PA-6 Lot 161 10 FG 0.0 10.1%10.0%120.8 128.0 94%90% 2186 N 5/13/2015 PA-6 Lot 162 10 CF 174.4 11.5%10.0%120.8 128.0 94%90% 2187 N 5/13/2015 PA-10 Lot 330 13 CF 128.0 13.5%11.0%115.6 125.5 92%90% 2188 N 5/13/2015 PA-10 Lot 330 11 CF 126.0 12.9%12.5%111.6 122.0 91%90% 2189 N 5/14/2015 PA-10 Lot 330 13 CF 127.0 13.8%11.0%114.5 125.5 91%90% 2190 N 5/14/2015 PA-6 Lot 245 5 FG 0.0 9.5%11.0%112.5 124.5 90%90% 2191 N 5/13/2015 PA-2 13 FG 0.0 12.2%11.0%119.2 125.5 95%90% 2192 N 5/13/2015 PA-2 9 FG 0.0 12.5%10.5%117.3 127.5 92%90% 2193 N 5/13/2015 PA-2 13 FG 0.0 10.9%11.0%116.3 125.5 93%90% 2194 N 5/13/2015 PA-2 13 FG 0.0 10.0%11.0%116.0 125.5 92%90% 2195 N 5/13/2015 PA-2 13 FG 0.0 12.0%11.0%116.2 125.5 93%90% 2196 N 5/14/2015 PA-6 Lot 245 5 FG 0.0 10.2%11.0%114.0 124.5 92%90% 2197 N 5/18/2015 ECR Sta. 446+50 Retention Basin Slope 5 CF 37.0 13.1%11.0%113.3 124.5 91%90% 2198 N 5/19/2015 ECR Sta. 447+90 Retention Basin Slope 5 CF 34.0 10.1%11.0%112.7 124.5 91%90% 2199 N 5/19/2015 ECR Sta. 446+80 Retention Basin Slope 9 CF 35.0 8.7%10.5%116.0 127.5 91%90% 2200 N 5/19/2015 ECR Sta. 447+50 Retention Basin Slope 5 CF 38.0 11.3%11.0%113.8 124.5 91%90% 2201 N 5/20/2015 ECR Sta. 446+10 Retention Basin Slope 5 CF 40.0 12.0%11.0%114.4 124.5 92%90% 2202 N 5/20/2015 Edinburgh Dr. Sta. 14+40 Slope 11 SF 160.0 9.5%12.5%110.1 122.0 90%90% 2203 N 5/20/2015 Borden Ct. Sta. 19+05 Slope 11 SF 152.0 11.6%12.5%110.4 122.0 90%90% 2204 N 5/20/2015 Borden Ct. Sta. 18+20 Slope 11 SF 137.0 14.4%12.5%110.0 122.0 90%90% 2205 N 5/20/2015 Borden Ct. Sta. 18+60 Slope 11 SF 158.0 12.3%12.5%110.2 122.0 90%90% 2206 N 5/26/2015 PA-11 North Slope 9 SF 112.0 11.2%10.5%116.2 127.5 91%90% 2207 N 5/26/2015 PA-11 North Slope 11 SF 109.0 13.1%12.5%111.9 122.0 92%90% 2208 N 5/26/2015 PA-11 North Slope 11 SF 111.0 11.2%12.5%110.9 122.0 91%90% 2209 N 5/26/2015 PA-11 North Slope 5 SF 116.0 10.0%11.0%115.0 124.5 92%90% 2210 N 5/27/2015 ECR Sta. 450+00 Box Culvert Slope 5 CF 42.0 10.2%11.0%113.2 124.5 91%90% 2211 N 5/27/2015 ECR Sta. 450+00 Box Culvert Slope 11 CF 40.0 12.2%12.5%109.9 122.0 90%90% 2212 N 6/2/2015 PA-6 Lot 235 9 FG 0.0 9.6%10.5%118.2 127.5 93%90% 2213 N 6/2/2015 PA-6 Lot 236 9 FG 0.0 10.2%10.5%120.9 127.5 95%90% 2214 N 6/2/2015 PA-6 Lot 237 9 FG 0.0 9.9%10.5%121.2 127.5 95%90% 2215 N 6/2/2015 PA-6 Lot 238 9 FG 0.0 8.1%10.5%121.3 127.5 95%90% 2216 N 6/2/2015 PA-6 Lot 239 9 FG 0.0 7.1%10.5%117.7 127.5 92%90% 2217 N 6/2/2015 PA-6 Lot 240 9 FG 0.0 9.2%10.5%120.3 127.5 94%90% 2218 N 6/2/2015 PA-6 Lot 241 9 FG 0.0 9.8%10.5%123.6 127.5 97%90% 2219 N 6/2/2015 PA-6 Lot 242 9 FG 0.0 9.7%10.5%120.5 127.5 95%90% 2220 N 6/2/2015 PA-6 Lot 243 9 FG 0.0 9.4%10.5%119.1 127.5 93%90% 2221 N 6/2/2015 PA-6 Lot 244 9 FG 0.0 8.4%10.5%117.9 127.5 92%90% 2222 N 6/9/2015 PA-3 Lot 99 9 CF 152.0 14.4%10.5%118.1 127.5 93%90% 2223 N 6/9/2015 PA-3 Lot 98 4 CF 153.0 14.7%11.0%111.4 123.5 90%90% 2224 N 6/15/2015 PA-10 Lot 303 1 CF 146.0 16.9%16.0%105.8 117.5 90%90% 2225 N 6/15/2015 PA-10 Lot 304 1 CF 147.0 16.3%16.0%106.7 117.5 91%90% 2226 N 6/15/2015 PA-10 Lot 302 1 CF 145.0 17.1%16.0%106.1 117.5 90%90% 2227 N 6/15/2015 PA-3 Lot 115 9 FG 0.0 10.0%10.5%118.6 127.5 93%90% 2228 N 6/15/2015 PA-3 Lot 109 9 FG 0.0 12.4%10.5%117.7 127.5 92%90% 2229 N 6/15/2015 PA-3 Lot 110 9 FG 0.0 11.1%10.5%118.8 127.5 93%90% 2230 N 6/15/2015 PA-3 Lot 99 9 FG 0.0 9.9%10.5%115.3 127.5 90%90% 2231 N 6/15/2015 PA-3 Lot 98 9 FG 0.0 8.8%10.5%115.7 127.5 91%90% 2232 N 6/16/2015 PA-10 Lot 330 Slope 9 SF 125.0 7.0%10.5%116.0 127.5 91%90%2233 N 6/16/2015 PA-10 Lot 330 Slope 11 SF 117.0 11.1%12.5%109.7 122.0 90%90% Project No.133023-03 Page C-32 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2234 N 6/16/2015 PA-10 Lot 330 Slope 13 SF 123.0 10.1%11.0%114.0 125.5 91%90% 2235 N 6/16/2015 PA-10 Lot 330 13 FG 0.0 7.2%11.0%114.1 125.5 91%90% 2236 N 6/16/2015 PA-10 Lot 330 13 FG 0.0 7.9%11.0%114.2 125.5 91%90% 2237 N 6/16/2015 PA-10 Lot 330 13 FG 0.0 8.2%11.0%115.0 125.5 92%90% 2238 N 6/16/2015 PA-10 Lot 304 1 FG 0.0 15.3%16.0%112.6 117.5 96%90% 2239 N 6/16/2015 PA-10 Lot 303 1 FG 0.0 15.5%16.0%107.5 117.5 91%90% 2240 N 6/16/2015 PA-10 Lot 302 1 FG 0.0 14.5%16.0%109.3 117.5 93%90% 2241 N 7/1/2015 Animal Crossing North Headwall 11 CF 46.0 14.8%12.5%113.1 122.0 93%93% 2242 N 7/2/2015 Animal Crossing North Headwall 7 CF 48.0 21.5%19.5%105.2 111.5 94%93% 2243 N 7/2/2015 Animal Crossing North Headwall 14 CF 49.0 16.5%15.0%110.6 117.0 95%93% 2244 N 7/2/2015 Animal Crossing North Headwall 14 CF 50.0 18.0%15.0%109.1 117.0 93%93% 2245 N 7/2/2015 Animal Crossing North Headwall 8 CF 51.0 17.2%14.5%108.7 115.5 94%93% 2246 N 7/2/2015 Animal Crossing North Headwall 8 CF 50.0 16.0%14.5%108.2 115.5 94%93% 2247 N 7/2/2015 Animal Crossing North Headwall 5 CF 52.0 13.0%11.0%116.0 124.5 93%93% 2248 N 7/2/2105 Animal Crossing South Headwall 6 CF 42.0 18.3%13.5%107.0 114.5 93%93% 2249 N 7/6/2105 Animal Crossing South Headwall 9 CF 35.0 11.3%10.5%120.5 127.5 94%93% 2250 N 7/6/2015 Animal Crossing South Headwall 8 CF 38.0 14.9%14.5%110.7 115.5 95%93% 2251 N 7/6/2015 Animal Crossing South Headwall 11 CF 40.0 12.2%12.5%112.2 122.0 92%93%Retest on 2251A 2252 N 7/6/2015 Animal Crossing South Headwall 11 CF 42.0 14.8%12.5%115.6 122.0 95%93% 2253 N 7/6/2015 Animal Crossing South Headwall 10 CF 44.0 11.1%10.0%118.8 128.0 93%93% 2254 N 7/6/2015 Animal Crossing South Headwall 5 CF 46.0 13.4%11.0%116.7 124.5 94%93% 2255 N 8/19/2015 Animal Crossing South Side Slurry Wall 11 CF 47.0 13.1%12.5%114.2 122.0 93%93% 2256 N 8/19/2015 Animal Crossing South Side Slurry Wall 5 CF 50.0 11.2%11.0%115.7 124.5 93%93% 2257 N 8/19/2015 Animal Crossing South Side Slurry Wall 13 CF 49.0 11.5%11.0%117.3 125.5 93%93% 2258 N 8/19/2015 Animal Crossing South Side Slurry Wall 13 CF 53.0 9.8%11.0%118.1 125.5 94%93% 2259 N 8/19/2015 Animal Crossing South Side Slurry Wall 5 CF 51.0 12.0%11.0%115.7 124.5 93%93% 2260 N 8/20/2015 Animal Crossing North Side Slurry Wall 11 CF 54.0 12.3%12.5%113.8 122.0 93%93% 2261 N 8/20/2015 Animal Crossing North Side Slurry Wall 11 CF 56.0 11.8%12.5%113.4 122.0 93%93% 2262 N 8/20/2015 Animal Crossing North Side Slurry Wall 11 CF 56.0 15.2%12.5%144.0 122.0 93%93% 2263 N 8/20/2015 Animal Crossing North Side Slurry Wall 11 CF 58.0 14.3%12.5%114.5 122.0 94%93% 2266 N 9/21/2015 Gage Dr. Sta. 18+40 5 CF 59.0 12.4%11.0%115.9 124.5 93%93% 2267 N 9/22/2015 Gage Dr. Sta. 18+70 South Slope 5 CF 60.0 9.2%11.0%115.9 124.5 93%93% 2268 N 9/22/2015 Gage Dr. Sta. 18+70 5 CF 62.0 11.2%11.0%117.0 124.5 94%93% 2269 N 9/22/2015 Gage Dr. Sta. 19+00 North Slope 5 CF 63.0 10.1%11.0%117.5 124.5 94%93% 2270 N 9/24/2015 Gage Dr. Sta. 18+40 South Slope 13 CF 61.0 13.3%11.0%119.4 125.5 95%93% 2271 N 9/24/2015 Gage Dr. Sta. 18+20 5 CF 62.0 14.5%11.0%115.9 124.5 93%93% 2272 N 9/24/2015 Gage Dr. Sta. 18+30 South Slope 9 CF 64.0 10.5%10.5%118.4 127.5 93%93% 2273 N 9/24/2015 Gage Dr. Sta. 18+60 North Slope 13 CF 65.0 14.4%11.0%116.9 125.5 93%93% 2274 N 9/24/2015 Gage Dr. Sta. 18+20 South Slope 13 CF 66.0 11.3%11.0%116.7 125.5 93%93% 2275 N 9/25/2015 Gage Dr. Sta. 18+90 South Slope 1 CF 69.0 15.6%16.0%109.1 117.5 93%93% 2276 N 9/28/2015 Gage Dr. Sta. 18+30 13 CF 67.0 13.7%11.0%117.1 125.5 93%93% 2277 N 9/28/2015 Gage Dr. Sta. 18+20 South Slope 13 CF 68.0 11.4%11.0%116.9 125.5 93%93% 2278 N 9/28/2015 Gage Dr. Sta. 18+40 North Slope 13 CF 71.0 11.7%11.0%117.5 125.5 93%93% 2279 N 9/29/2015 Gage Dr. Sta. 18+60 North Slope 5 CF 72.0 13.7%11.0%115.5 124.5 93%93% 2280 N 9/29/2015 Gage Dr. Sta. 18+70 13 CF 73.0 13.0%11.0%116.9 125.5 93%93% 2281 N 9/29/2015 Gage Dr. Sta. 18+50 South Slope 12 CF 71.0 14.0%12.0%115.8 124.0 93%93% 2282 N 9/29/2015 Gage Dr. Sta. 17+90 South Slope 12 CF 73.0 13.3%12.0%115.8 124.0 93%93% 2283 N 9/30/2015 Gage Dr. Sta. 18+00 12 CF 74.0 11.7%12.0%115.9 124.0 93%93% 2284 N 9/30/2015 Gage Dr. Sta. 19+30 13 CF 71.0 13.5%11.0%116.7 125.5 93%93% 2285 N 10/1/2015 Gage Dr. Sta. 18+70 South Slope 11 CF 77.0 15.0%12.5%111.5 122.0 91%90% 2286 N 10/1/2015 Gage Drive Sta. 18+25 3 CF 75.0 13.5%13.5%108.7 118.0 92%90% 2287 N 10/2/2015 Gage Drive Sta. 19+50 North Slope 4 CF 77.0 11.5%11.0%111.5 123.5 90%90% 2288 N 10/2/2015 Gage Drive Sta. 18+30 South Slope 11 CF 77.0 15.2%12.5%112.5 122.0 92%90% 2289 N 10/8/2015 PA-8 14 CF 133.0 17.5%15.0%110.8 117.0 94%90% 2290 N 10/8/2015 PA-8 11 CF 133.0 14.5%12.5%111.7 122.0 92%90% 2291 N 10/12/2015 PA-8 4 CF 133.0 14.9%11.0%114.3 125.5 93%90% 2292 N 10/12/2015 PA-8 11 CF 133.0 16.0%12.5%112.4 122.0 92%90% 2293 N 10/13/2015 Robertson Rd. Sta. 18+90 Slope 1 CF 124.0 19.7%16.0%100.7 117.5 86%90%Retest on 2293A 2294 N 10/13/2015 Robertson Rd. Sta. 18+80 Slope 1 CF 129.0 20.0%16.0%105.7 117.5 90%90% 2295 N 10/13/2015 PA-3 Lot 106 1 CF 144.0 19.7%16.0%108.5 117.5 92%90% 2296 N 10/15/2015 PA-3 Lot 105 11 CF 143.0 15.7%12.5%110.2 122.0 90%90% 2297 N 10/15/2015 Robertson Rd. Sta. 18+95 Slope 11 CF 135.0 14.7%12.5%110.3 122.0 90%90% 2298 N 10/15/2015 Robertson Rd. Sta. 17+40 Slope 1 CF 139.0 16.8%16.0%106.9 117.5 91%90% 2299 N 10/16/2015 PA-7 N/W Driveway 4 CF 122.0 15.4%11.0%113.5 123.5 92%90% 2300 N 10/16/2015 PA-7 N/W Driveway 4 CF 120.0 12.7%11.0%13.6 124.5 92%90% 2301 N 10/16/2015 PA-7 N/W Driveway 5 CF 121.0 12.9%11.0%114.0 124.5 92%90% 2302 N 10/17/2015 PA-3 Lot 106 13 CF 146.0 13.6%11.0%116.5 125.5 93%90% 2303 N 10/17/2015 PA-3 Lot 105 9 CF 145.0 12.6%10.5%117.3 127.5 92%90% 2304 N 10/17/2015 PA-3 Lot 93 5 CF 155.0 14.0%11.0%112.9 124.5 91%90% 2305 N 10/17/2015 PA-3 Lot 95 14 CF 153.0 17.6%15.0%107.4 117.0 92%90% Project No.133023-03 Page C-33 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2306 N 10/19/2015 PA-3 Lot 96 5 CF 155.0 11.7%11.0%113.9 124.5 92%90% 2307 N 10/19/2015 PA-3 Lot 92 11 CF 157.0 16.0%12.5%111.6 122.0 91%90% 2308 N 10/19/2015 PA-3 Lot 94 11 CF 156.0 15.8%12.5%111.5 122.0 91%90% 2309 N 10/20/2015 PA-7 N/W Driveway 13 CF 127.0 13.4%11.0%114.2 125.5 91%90% 2310 N 10/21/2015 PA-8 9 CF 134.0 12.2%10.5%118.3 127.5 93%90% 2311 N 10/20/2015 PA-8 5 CF 130.0 10.9%11.0%113.5 124.5 91%90% 2312 N 10/20/2015 PA-8 9 CF 131.0 10.4%10.5%121.0 127.5 95%90% 2313 N 10/20/2015 PA-8 5 CF 132.0 11.2%11.0%114.5 124.5 92%90% 2314 N 10/20/2015 PA-8 9 CF 132.5 12.1%10.5%118.2 127.5 93%90% 2315 N 10/20/2015 PA-3 Lot 87 11 CF 153.0 13.5%12.5%110.2 122.0 90%90% 2316 N 10/21/2015 PA-8 9 CF 133.0 14.5%10.5%118.3 127.5 93%90% 2317 N 10/22/2015 PA-6 Lot 243 Slope 13 CF 90.0 12.4%11.0%112.9 125.5 90%90% 2318 N 10/22/2015 PA-6 Lot 243 Slope 11 CF 97.0 12.1%12.5%110.3 122.0 90%90% 2319 N 10/26/2015 PA-3 Lot 86 3 CF 154.0 13.3%13.5%109.7 118.0 93%90% 2320 N 10/26/2015 PA-3 Lot 85 6 CF 154.0 13.4%13.5%107.7 114.5 94%90% 2321 N 10/26/2015 PA-3 Lot 84 11 CF 155.0 12.5%12.5%111.6 122.0 91%90% 2322 N 10/26/2015 PA-3 Lot 85 4 CF 155.0 14.4%11.0%111.9 123.5 91%90% 2323 N 10/26/2015 PA-3 Lot 75 4 CF 162.0 12.5%11.0%112.0 123.5 91%90% 2324 N 10/27/2015 PA-3 Lot 76 6 CF 162.0 11.9%13.3%107.4 114.5 94%90% 2325 N 10/27/2015 PA-3 Lot 75 14 CF 164.0 14.6%15.0%110.0 117.0 94%90% 2326 N 10/28/2015 PA-3 Lot 76 14 CF 164.0 16.0%15.0%110.1 117.0 94%90% 2327 N 10/30/2015 PA-6 Lot 240 Slope 4 CF 112.0 10.7%11.0%111.4 123.5 90%90% 2328 N 10/30/2015 PA-6 Lot 242 Slope 11 CF 109.0 13.8%12.5%111.1 122.0 91%90% 2329 N 10/30/2015 PA-6 Lot 240 Slope 4 CF 115.0 9.8%11.0%112.1 123.5 91%90% 2330 N 10/30/2015 PA-6 Lot 242 Slope 4 CF 112.0 10.0%11.0%111.6 123.5 90%90% 2331 N 11/2/2015 PA-6 Lot 242 Slope 9 CF 114.0 10.0%10.5%114.7 127.5 90%90% 2332 N 11/2/2015 PA-6 Lot 239 Slope 9 CF 116.0 11.3%10.5%117.0 127.5 92%90% 2333 N 11/3/2015 PA-6 Lot 241 Slope 11 CF 125.0 14.4%12.5%110.8 122.0 91%90% 2334 N 11/3/2015 PA-3 Lot 66 13 CF 163.0 13.6%11.0%116.7 125.5 93%90% 2335 N 11/3/2015 PA-6 Lot 240 Slope 4 CF 127.0 11.0%11.0%111.6 123.5 90%90% 2336 N 11/5/2015 Glasgow Sta. 18+75 9 CF 193.0 12.4%10.5%115.6 127.5 91%90% 2337 N 11/5/2015 PA-5 Lot 30 11 FG 0.0 11.9%12.5%110.2 122.0 90%90% 2338 N 11/9/2015 PA-8 13 FG 0.0 7.7%11.0%114.2 125.5 91%90% 2339 N 11/9/2015 PA-8 13 FG 0.0 9.8%11.0%115.9 125.5 92%90% 2340 N 11/9/2015 PA-8 13 FG 0.0 8.2%11.0%113.9 125.5 90%90% 2341 N 11/9/2015 PA-8 4 FG 0.0 12.3%11.0%111.7 123.5 90%90% 2342 N 11/9/2015 PA-4 11 FG 0.0 8.3%12.5%109.7 122.0 90%90% 2343 N 11/9/2015 PA-4 4 FG 0.0 12.0%11.0%112.5 123.5 91%90% 2344 N 11/9/2015 PA-8 4 FG 0.0 7.9%11.0%122.6 123.5 91%90% 2345 N 11/9/2015 PA-8 13 FG 0.0 10.5%11.0%116.6 125.5 93%90% 2346 N 11/12/2015 PA-3 Lot 74 9 FG 0.0 12.7%10.5%117.5 127.5 92%90% 2347 N 11/12/2015 PA-3 Lot 75 11 FG 0.0 13.6%12.5%111.2 122.0 91%90% 2348 N 11/12/2015 PA-3 Lot 76 11 FG 0.0 13.4%12.5%111.6 122.0 91%90% 2349 N 11/12/2015 PA-3 Lot 93 13 FG 0.0 12.2%11.0%116.3 125.5 93%90% 2350 N 11/12/2015 PA-3 Lot 94 13 FG 0.0 14.3%11.0%115.4 125.5 92%90% 2351 N 11/12/2015 PA-3 Lot 95 11 FG 0.0 15.8%12.5%111.5 122.0 91%90% 2352 N 11/12/2015 PA-8 9 FG 0.0 11.4%10.5%122.6 127.5 96%90% 2353 N 11/12/2015 PA-8 9 FG 0.0 8.2%10.5%116.9 127.5 92%90% 2354 N 11/12/2015 PA-8 9 FG 0.0 10.8%10.5%116.0 127.5 91%90% 2355 N 11/12/2015 PA-8 9 FG 0.0 9.6%10.5%121.6 127.5 95%90% 2356 N 11/12/2015 PA-8 9 FG 0.0 10.1%10.5%116.2 127.5 91%90% 2357 N 11/12/2015 PA-8 9 FG 0.0 11.8%10.5%117.7 127.5 92%90% 2358 N 11/12/2015 PA-8 9 FG 0.0 12.9%10.5%117.9 127.5 93%90% 2359 N 11/12/2015 PA-8 9 FG 0.0 12.7%10.5%116.7 127.5 92%90% 2360 N 11/12/2015 PA-8 5 FG 0.0 11.8%11.0%112.4 124.5 90%90% 2361 N 11/12/2015 PA-8 9 FG 0.0 9.7%10.5%117.7 127.5 92%90% 2362 N 11/12/2015 PA-8 9 FG 0.0 8.9%10.5%115.8 127.5 91%90% 2363 N 11/12/2015 PA-8 5 FG 0.0 12.2%11.0%113.7 124.5 91%90% 2364 N 11/14/2015 PA-5 Lot 41 4 CF 175.0 11.7%11.0%112.0 123.5 91%90% 2365 N 11/16/2015 Animal Crossing North Headwall 5 CF 70.0 13.0%11.0%112.2 124.5 90%90% 2366 N 11/16/2015 Animal Crossing North Headwall 5 CF 74.0 10.6%11.0%11.2 124.5 90%90% 2367 N 11/16/2015 PA-3 Lot 84 9 FG 0.0 11.5%10.5%115.4 127.5 91%90% 2368 N 11/16/2015 PA-3 Lot 96 9 FG 0.0 11.3%10.5%120.9 127.5 95%90% 2369 N 11/16/2015 PA-3 Lot 97 9 FG 0.0 8.9%10.5%119.6 127.5 93%90% 2370 N 11/16/2015 Animal Crossing North Headwall 5 CF 78.0 13.8%11.0%111.5 124.5 90%90% 2371 N 11/17/2015 PA-3 Lot 85 9 FG 0.0 12.9%10.5%114.8 127.5 90%90% 2372 N 11/17/2015 Animal Crossing North Headwall 9 CF 72.0 10.0%10.5%117.1 127.5 92%90% 2376 N 11/18/2015 Animal Crossing North Headwall 4 CF 80.0 12.9%11.0%110.8 123.5 90%90% 2377 N 11/18/2015 Animal Crossing North Headwall 4 CF 84.0 15.8%11.0%109.8 123.5 90%90% 2378 N 11/18/2015 Animal Crossing North Headwall 4 CF 78.0 13.7%11.0%109.7 123.5 90%90% Project No.133023-03 Page C-34 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 2379 N 11/19/2015 Animal Crossing South Headwall 5 CF 65.0 14.0%11.0%113.6 124.5 91%90% 2382 N 11/20/2015 Animal Crossing South Headwall 5 CF 68.0 11.0%11.0%111.9 124.5 90%90% 2383 N 11/20/2015 Animal Crossing South Headwall 4 CF 70.0 13.5%11.0%110.9 123.5 90%90% 2384 N 11/23/2015 Gage Dr. Sta. 18+40 North Slope 14 CF 82.0 13.5%15.0%106.7 117.0 91%90% 2385 N 11/23/2015 Gage Dr. Sta. 19+55 North Slope 14 CF 80.0 14.0%15.0%108.3 117.0 93%90% 2386 N 11/24/2015 Gage Dr. Sta. 18+10 North Slope 11 CF 86.0 12.0%12.5%111.1 122.0 91%90% 2387 N 11/24/2015 Gage Dr. Sta. 19+45 South Slope 14 CF 80.0 14.0%15.0%106.9 117.0 91%90% 2388 N 11/25/2015 Gage Dr. Sta. 17+70 South Slope 5 CF 76.0 10.8%11.0%113.9 124.5 92%90% 2389 N 11/25/2015 Gage Dr. Sta. 19+30 South Slope 5 CF 84.0 9.0%11.0%112.3 124.5 90%90% 2390 N 11/30/2015 Gage Dr. Sta. 19+05 14 CF 78.0 14.8%15.0%109.0 117.0 93%90% 2391 N 11/30/2015 Gage Dr. Sta. 17+70 South Slope 9 CF 86.0 12.9%10.5%117.4 127.5 92%90% 2392 N 12/1/2015 Gage Dr. Sta. 18+70 South Slope 10 CF 89.0 12.7%10.0%117.8 128.0 92%90% 2393 N 12/1/2015 Gage Dr. Sta. 19+60 North Slope 10 CF 91.0 12.5%10.0%118.4 128.0 93%90% 2394 N 12/1/2015 Gage Dr. Sta. 19+10 South Slope 9 CF 93.0 11.4%10.5%116.3 127.5 91%90% 2395 N 12/1/2015 Gage Dr. Sta. 18+00 South Slope 10 CF 92.0 12.1%10.0%118.1 128.0 92%90% 2396 N 12/2/2015 Gage Dr. Sta. 19+50 9 CF 96.0 10.4%10.5%115.4 127.5 91%90% 2397 N 12/2/2015 Gage Dr. Sta. 18+00 North Slope 4 CF 97.0 11.8%11.0%111.6 123.5 90%90% 2398 N 12/2/2015 Gage Dr. Sta. 17+60 9 CF 99.0 9.5%10.5%115.9 127.5 90%90% 2399 N 12/2/2015 Gage Dr. Sta. 19+90 13 CF 103.0 12.9%11.0%114.6 125.5 91%90% 2400 N 12/3/2015 PA-3 Lot 86 9 FG 0.0 11.5%10.5%114.7 127.5 90%90% 2401 N 12/4/2015 PA-6 Lot 241 Slope 11 SF 98.0 9.2%12.5%110.1 122.0 90%90% 2402 N 12/4/2015 PA-6 Lot 241 Slope 11 SF 91.0 10.1%12.5%109.8 122.0 90%90% 2403 N 12/4/2015 PA-6 Lot 242 Slope 11 SF 100.0 11.3%12.5%112.1 122.0 90%90% 2404 N 12/4/2015 Gage Dr. Sta. 20+70 11 CF 104.0 13.4%12.5%110.3 122.0 90%90% 2405 N 12/4/2015 Gage Dr. Sta. 20+40 Slope 5 CF 105.0 12.0%11.0%114.4 124.5 92%90% 2406 N 12/4/2015 Gage Dr. Sta. 19+20 South SLope 9 CF 101.0 9.9%10.5%117.5 127.5 92%90% 2407 N 12/7/2015 Gage Dr. Sta. 17+50 11 CF 108.0 11.5%12.5%109.8 122.0 90%90% 2408 N 12/7/2015 Gage Dr. Sta. 17+00 5 CF 111.0 10.8%11.0%114.6 124.5 92%90% 2409 N 12/7/2015 PA-6 Lot 243 Slope 11 SF 100.0 10.3%12.5%111.2 122.0 91%90% 2410 N 12/7/2015 PA-6 Lot 244 Slope 11 SF 90.0 11.4%12.5%110.6 122.0 91%90% 2411 N 12/7/2015 Gage Dr. Sta. 17+10 North Slope 11 CF 114.0 11.2%12.5%111.3 122.0 91%90% 2412 N 12/7/2015 PA-3 Lot 87 9 FG 0.0 11.1%10.5%115.9 127.5 91%90% 2413 N 12/7/2015 PA-3 Lot 92 9 FG 0.0 12.7%10.5%118.0 127.5 93%90% 2414 N 12/7/2015 PA-3 Lot 105 9 FG 0.0 11.9%10.5%118.3 127.5 93%90% 2415 N 12/7/2015 PA-3 Lot 106 9 FG 0.0 10.7%10.5%119.9 127.5 94%90% 2416 N 12/18/2015 Gage Dr. Sta. 18+50 4 CF 115.0 10.0%11.0%112.1 123.5 91%90% 2417 N 12/18/2015 Gage Dr. Sta. 18+40 13 CF 116.0 13.5%11.0%115.5 125.5 92%90% 2418 N 12/29/2015 PA-11 9 CF 104.5 10.8%10.5%116.9 127.5 92%90% 2419 N 12/29/2015 PA-11 5 CF 106.0 11.0%11.0%112.1 124.5 90%90% 2420 N 12/29/2015 PA-11 5 CF 104.0 11.2%11.0%112.4 124.5 90%90% 2421 N 12/30/2015 PA-11 14 CF 104.0 13.8%15.0%107.6 117.0 92%90% 2422 N 12/30/2015 PA-11 5 CF 105.0 11.3%11.0%114.7 124.5 92%90% 2423 N 12/30/2015 PA-11 9 CF 104.0 12.3%10.5%121.2 127.5 95%90% 2424 N 12/30/2015 PA-11 11 CF 103.0 11.2%12.5%109.8 122.0 90%90% 2425 N 12/30/2015 PA-11 5 CF 104.0 9.8%11.0%113.1 124.5 91%90% 2426 N 12/30/2015 PA-11 9 CF 105.0 10.2%10.5%114.6 127.5 90%90% 2437 N 12/31/2015 PA-11 East Slope 11 SF 99.0 11.3%12.5%111.3 122.0 90%90% 2438 N 12/31/2015 Gage Dr. Sta. 17+50 South Slope 11 SF 87.0 11.6%12.5%109.8 122.0 90%90% 2439 N 12/31/2015 Gage Dr. Sta. 18+00 South Slope 5 SF 99.0 11.7%11.0%113.4 124.5 91%90% 2440 N 12/31/2015 Gage Dr. Sta. 18+30 South Slope 11 SF 102.0 10.4%12.5%109.9 122.0 90%90% 2441 N 12/31/2015 Gage Dr. Sta. 19+00 South Slope 11 SF 89.0 10.7%12.5%111.0 122.0 90%90% 2442 N 12/31/2015 Gage Dr. Sta. 19+30 South Slope 5 SF 74.0 8.9%11.0%113.0 124.5 91%90% 2443 N 12/31/2015 Gage Dr. Sta. 18+90 South Slope 11 SF 72.0 10.7%12.5%111.6 122.0 90%90% 2451 N 4/26/2016 PA-13 Lot 3 North Center 3 CF 79.0 15.0%12.5%111.8 122.0 91%90% 2452 N 4/26/2016 PA-13 Lot 4 North Center 1 CF 80.0 19.9%16.0%105.4 117.5 90%90% 2453 N 4/26/2016 PA-13 Lot 3 South Center 1 CF 81.0 19.1%16.0%105.4 117.5 90%90% 2454 N 4/26/2016 PA-13 Lot 4 South Center 9 CF 81.0 13.5%10.5%118.3 127.5 93%90% 2455 N 4/26/2016 PA-13 Lot 4 Center Finish Grade 11 FG 0.0 13.8%12.5%111.4 122.0 90%90% 2456 N 4/26/2016 PA-13 Lot 3 Center Finish Grade 9 FG 0.0 12.7%10.5%114.8 127.5 90%90% 1028A N 1/15/2015 PA-3 Lot 155 12 CF 120.0 15.1%12.0%112.3 124.0 91%90%retest of 1028 1090A N 1/20/2015 PA-23A Slope west of Lot 71 11 CF 135.0 13.7%12.5%110.1 122.0 90%90%retest of 1090 1094A N 1/21/2015 PA-23A Slope west of Lot 71 11 CF 139.0 14.1%12.5%110.4 122.0 90%90%retest of 1094 1130A N 1/24/2015 PA-7 South Slope 5 SF 103.0 11.6%11.0%113.6 124.5 91%90%retest of 1130 126A N 9/26/2014 PA-11 1 CF 89.0 20.2%16.0%107.5 117.5 91%90%retest of 126 127A N 9/26/2014 PA-7 South Slope 3 CF 39.0 15.4%13.5%111.0 118.0 94%93%retest of 127 1411A N 2/16/2015 West Ranch St Sta. 16+95 7 CF 111.0 20.3%19.5%101.6 111.5 91%90%retest of 1411 1468A N 2/20/2015 PA-10 Lot 322 Slope 11 CF 130.0 15.0%12.5%109.8 122.0 90%90%retest of 1468 14A N 9/10/2014 PA-11 4 CF 96.0 12.4%11.0%113.7 123.5 92%90%retest of 14 1551A N 2/25/2015 Gage Dr. Sta. 18+70 North Slope 11 CF 64.0 13.1%12.5%113.5 122.0 93%90%retest of 1551 1598A N 2/27/2015 Gage Dr. Sta. 18+50 South Slope 4 CF 37.0 14.7%11.0%115.8 123.5 94%93%retest of 1598 Project No.133023-03 Page C-35 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 185A N 10/1/2014 West Ranch St Sta. 16+90 3 TX 76.0 15.7%13.5%108.3 118.0 92%90%retest of 185 1A N 9/3/2014 PA-13 Lot 21 2 CF 65.0 21.8%21.5%94.0 102.0 92%90%retest of 1 2251A N 7/6/2015 Animal Crossing South Headwall 11 CF 40.0 13.2%12.5%114.5 122.0 94%93%Retest of 2251 2293A N 10/13/2015 Robertson Rd. Sta. 19+00 Slope 1 CF 124.0 19.1%16.0%106.2 117.5 90%90%Retest of 2293 262A N 10/6/2014 West Ranch St Sta. 14+90 3 TX 80.0 13.8%13.5%108.4 118.0 92%90%retest of 262 2A N 9/3/2014 PA-13 Lot 17 2 CF 67.0 21.6%21.5%92.6 102.0 91%90%retest of 2 312A N 10/13/2014 PA-7 South Slope 10 CF 55.0 10.2%10.0%119.4 128.0 93%93%retest of 312 313A N 10/13/2014 PA-7 South Slope 11 CF 57.0 12.8%12.5%114.1 122.0 94%93%retest of 313 36A N 9/15/2014 PA-11 1 CF 86.0 14.6%16.0%112.6 117.5 96%95%retest of 36 40A N 9/15/2014 PA-11 3 CF 88.0 14.2%13.5%112.3 118.0 95%95%retest of 40 421A N 11/24/2014 PA-7 South Slope 4 SF 91.0 13.6%11.0%113.6 123.5 92%90%retest of 421 422A N 11/24/2014 PA-7 South Slope 4 SF 97.0 12.1%11.0%111.4 123.5 90%90%retest of 422 44A N 9/15/2014 PA-11 6 CF 90.0 13.2%13.5%111.6 114.5 97%95%retest on 44A 470A N 10/24/2014 PA-8 9 CF 101.0 10.0%10.0%117.4 127.5 92%90%retest of 470 479A N 10/28/2014 Robertson Rd Sta. 30+00 5 TX 99.0 10.7%11.0%112.8 124.5 91%90%retest of 479 641A N 11/6/2014 Wellspring St Sta. 15+30 8 TX 145.0 17.4%14.5%106.6 115.5 92%90%retest of 641 650A N 11/8/2014 ECR Slope Sta. 472+65 11 CF 60.0 11.6%12.5%110.8 122.0 91%90%retest of 650 779A N 11/22/2014 ECR Slope Sta. 477+80 6 CF 57.0 13.0%13.5%107.9 114.5 94%90%retest of 779 821A N 11/24/2014 PA-7 South Slope 8 SF 108.0 18.4%14.5%104.7 115.5 91%90%retest of 821 902A N 12/11/2014 PA-6 Lot 170 Slope 4 CF 72.0 11.0%11.0%111.4 123.5 90%90%retest of 902 903A N 12/11/2014 PA-6 Lot 174 Slope 5 CF 69.0 13.9%11.0%112.1 124.5 90%90%retest of 903 930A N 12/29/2014 PA-7 South Slope 11 CF 112.0 14.0%12.5%109.8 122.0 90%90%retest of 930 983A N 1/7/2015 PA-6 Lot 191 11 CF 168.0 13.8%12.5%111.7 122.0 92%90%retest of 983 RW1 N 12/10/2014 South Verdura Wall Sta. 37+05 9 BF 69.0 11.7%10.5%116.4 127.5 91%90% RW2 N 12/10/2014 South Verdura Wall Sta. 37+15 9 BF 70.5 11.3%10.5%115.8 127.5 91%90% RW3 N 12/10/2014 South Verdura Wall Sta. 36+97 9 BF 72.5 10.9%10.5%114.9 127.5 90%90% RW4 N 12/10/2014 South Verdura Wall Sta. 36+95 9 BF 73.5 11.4%10.5%115.4 127.5 90%90% RW5 N 12/10/2014 South Verdura Wall Sta. 37+35 9 BF 74.5 12.8%10.5%115.7 127.5 91%90% RW6 N 12/11/2014 South Verdura Wall Sta. 36+90 9 BF 76.0 12.6%10.5%116.4 127.5 91%90% RW7 N 12/11/2014 South Verdura Wall Sta. 36+60 5 BF 76.5 10.9%12.0%114.6 124.0 90%90% RW8 N 12/11/2014 South Verdura Wall Sta. 37+45 8 BF 78.0 15.6%14.5%108.0 115.5 93%90% RW9 N 12/11/2014 South Verdura Wall Sta. 36+50 5 BF 78.5 11.5%11.0%112.8 124.5 91%90% RW10 N 12/11/2014 South Verdura Wall Sta. 38+25 5 BF 80.0 12.4%11.0%112.0 124.5 90%90% RW11 N 12/11/2014 South Verdrua Wall Sta. 37+30 5 BF 80.5 11.7%11.0%111.8 124.5 90%90% RW12 N 12/23/2014 South Verdura Wall Sta. 36+50 8 BF 82.0 15.0%14.5%109.3 115.5 90%90% RW13 N 12/23/2014 South Verdura Wall Sta. 37+60 8 BF 81.5 18.5%14.5%108.3 115.5 90%90% RW14 N 12/23/2014 South Verdura Wall Sta. 38+80 5 BF 82.0 16.8%11.0%113.3 124.5 90%90% RW15 N 12/23/2014 South Verdura Wall Sta. 36+15 8 BF 83.5 14.6%14.5%107.3 115.5 93%90% RW16 N 12/23/2014 South Verdura Wall Sta. 39+40 11 BF 83.0 12.5%12.5%110.6 122.0 91%90% RW17 N 12/24/2014 South Verdura Wall Sta. 34+40 8 BF 83.5 17.2%14.5%108.3 115.5 94%90% RW18 N 12/24/2014 South Verdura Wall Sta. 38+03 5 BF 83.5 11.9%11.0%112.1 124.5 90%90% RW19 N 12/24/2014 South Verdura Wall Sta. 35+00 5 BF 84.5 11.2%11.0%112.5 124.5 90%90% RW20 N 12/24/2014 South Verdura Wall Sta. 39+02 5 BF 84.0 14.8%11.0%113.0 124.5 91%90% RW21 N 12/30/2014 South Verdura Wall Sta. 31+77 11 BF 79.0 12.0%12.5%110.6 122.0 91%90% RW22 N 12/30/2014 South Verdura Wall Sta. 31+10 10 BF 79.0 10.0%10.0%119.2 128.0 93%90% RW23 N 12/30/2014 South Verdura Wall Sta. 33+30 11 BF 80.0 13.0%12.5%110.7 122.0 91%90% RW24 N 12/30/2014 South Verdura Wall Sta. 32+30 4 BF 81.0 14.0%11.0%112.2 123.5 91%90% RW25 N 12/30/2014 South Verdura Wall Sta. 35+30 9 BF 86.5 11.6%10.5%115.4 127.5 91%90% RW26 N 12/30/2014 South Verdura Wall Sta. 34+70 9 BF 86.5 11.9%10.5%117.1 127.5 92%90% RW27 N 12/30/2014 South Verdura Wall Sta. 33+00 11 BF 82.5 13.0%12.5%109.9 122.0 90%90% RW28 N 12/30/2014 South Verdura Wall Sta. 32+00 9 BF 82.5 13.3%10.5%116.3 127.5 91%90% RW29 N 1/5/2015 South Verdura Wall Sta. 30+25 8 BF 83.5 14.8%14.5%107.3 115.5 93%90% RW30 N 1/5/2015 South Verdura Wall Sta. 32+45 8 BF 83.5 15.8%14.5%105.0 115.5 91%90% RW31 N 1/5/2015 South Verdura Wall Sta. 33+45 1 BF 84.5 17.0%16.0%107.7 117.5 92%90% RW32 N 1/5/2015 South Verdura Wall Sta. 30+80 1 BF 84.0 17.3%16.0%106.8 117.5 91%90% RW33 N 1/5/2015 South Verdura Wall Sta. 33+70 8 BF 86.0 14.3%14.5%108.1 115.5 94%90% RW34 N 1/5/2015 South Verdura Wall Sta. 31+30 8 BF 85.5 15.0%14.5%107.8 115.5 93%90% RW35 N 1/5/2015 South Verdura Wall Sta. 30+30 1 BF 86.5 17.1%16.0%106.4 117.5 91%90% RW36 N 1/6/2015 South Verdura Wall Sta. 34+60 11 BF 88.0 12.0%12.5%111.5 122.0 91%90% RW37 N 1/6/2015 South Verdura Wall Sta. 35+40 8 BF 88.0 14.0%14.5%110.5 115.5 96%90% RW38 N 1/7/2015 South Verdura Wall Sta. 34+00 11 BF 90.0 113.1%12.5%110.4 122.0 90%90% RW39 N 1/7/2015 South Verdura Wall Sta. 30+60 11 BF 89.0 13.0%12.5%109.8 122.0 90%90% RW40 N 1/7/2015 South Verdura Wall Sta. 31+80 11 BF 86.5 12.0%12.5%110.5 122.0 91%90% RW41 N 1/7/2015 South Verdura Wall Sta. 33+00 9 BF 88.0 10.0%10.5%114.9 127.5 90%90% RW42 N 1/7/2015 South Verdura Wall Sta. 34+90 5 BF 90.0 11.0%11.0%113.4 124.5 91%90% RW43 N 1/22/2015 North Verdura Wall Sta. 17+50 5 BF 95.5 11.0%11.0%112.0 124.5 90%90% RW44 N 1/22/2015 North Verdura Wall Sta. 17+00 5 BF 96.0 11.1%11.0%112.4 124.5 90%90% RW45 N 1/22/2015 North Verdura Wall Sta. 17+30 5 BF 98.5 13.6%11.0%112.7 124.5 90%90% RW46 N 1/22/2015 North Verdura Wall Sta. 16+70 11 BF 98.0 15.7%12.5%109.7 122.0 90%90% Project No.133023-03 Page C-36 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 RW47 N 1/23/2015 North Verdura Wall Sta. 16+60 5 BF 100.5 12.9%11.0%113.1 124.5 91%90% RW48 N 1/23/2015 North Verdura Wall Sta. 18+00 5 BF 100.5 15.0%11.0%111.3 124.5 90%90% RW49 N 1/23/2015 North Verdura Wall Sta. 18+40 5 BF 102.0 13.9%11.0%113.8 124.5 91%90% RW50 N 1/23/2015 North Verdura Wall Sta. 17+00 5 BF 102.0 13.7%11.0%111.9 124.5 90%90% RW51 N 1/23/2015 North Verdura Wall Sta. 15+70 11 BF 102.5 16.6%12.5%109.5 122.0 90%90% RW52 N 1/23/2015 North Verdura Wall Sta. 17+60 11 BF 102.5 16.2%12.5%110.4 122.0 91%90% RW53 N 1/23/2015 North Verdura Wall Sta. 18+70 11 BF 102.5 16.2%12.5%112.3 122.0 92%90% RW54 N 1/24/2015 North Verdura Wall Sta. 11+45 11 BF 96.0 14.0%12.5%110.2 122.0 90%90% RW55 N 1/24/2015 North Verdura Wall Sta. 19+05 11 BF 104.5 16.0%12.5%110.0 122.0 90%90% RW56 N 1/24/2015 North Verdura Wall Sta. 17+95 11 BF 104.5 15.5%12.5%110.4 122.0 90%90% RW57 N 1/24/2015 North Verdura Wall Sta. 16+25 11 BF 104.5 15.2%12.5%112.5 122.0 92%90% RW58 N 1/24/2015 North Verdura Wall Sta. 11+45 11 BF 98.0 14.5%12.5%109.9 122.0 90%90% RW59 N 1/24/2015 North Verdura Wall Sta. 11+05 11 BF 98.5 15.4%12.5%110.7 122.0 91%90% RW60 N 1/26/2015 North Verdura Wall Sta. 11+25 11 BF 102.0 14.1%12.5%111.1 122.0 91%90% RW61 N 1/26/2015 North Verdura Wall Sta. 12+60 8 BF 102.0 15.0%14.5%108.7 115.5 94%90% RW62 N 1/26/2015 North Verdura Wall Sta. 11+65 11 BF 102.0 11.5%12.5%109.9 122.0 90%90% RW63 N 1/26/2015 North Verdura Wall Sta. 12+50 11 BF 102.5 15.0%12.5%109.9 122.0 90%90% RW64 N 1/26/2015 North Verduta Wall Sta. 11+25 6 BF 102.5 14.1%13.5%106.4 114.5 93%90% RW65 N 1/27/2015 North Verdura Wall Sta. 14+40 13 BF 104.5 16.6%11.0%115.1 125.5 92%90% RW66 N 1/27/2015 North Verdura Wall Sta. 13+25 8 BF 104.5 17.6%14.5%105.2 115.5 91%90% RW67 N 1/27/2015 North Verdura Wall Sta. 12+30 11 BF 104.5 12.5%12.5%109.9 122.0 90%90% RW68 N 1/27/2015 North Verdura Wall Sta. 15+65 11 BF 106.0 12.5%12.5%110.4 122.0 90%90% RW69 N 1/27/2015 North Verdura Wall Sta. 16+65 5 BF 106.0 12.9%11.0%112.4 124.5 90%90% RW70 N 1/27/2015 North Verdura Wall Sta. 15+00 11 BF 106.0 14.1%12.5%110.7 122.0 90%90% RW71 N 1/27/2015 North Verdura Wall Sta. 17+20 11 BF 106.0 13.1%12.5%111.9 122.0 92%90% RW72 N 1/27/2015 North Verdura Wall Sta. 19+00 5 BF 106.0 10.2%11.0%113.1 124.5 91%90% RW73 N 1/28/2015 North Verdura Wall Sta. 16+50 9 BF 108.0 11.1%10.5%117.7 127.5 92%90% RW74 N 1/28/2015 North Verdura Wall Sta. 15+25 5 BF 108.0 10.0%11.0%113.5 124.5 91%90% RW75 N 1/28/2015 North Verdura Wall Sta. 14+30 11 BF 108.0 12.6%12.5%110.0 122.0 90%90% RW76 N 1/28/2015 North Verdura Wall Sta. 12+70 11 BF 108.0 11.4%12.5%110.0 122.0 90%90% RW77 N 1/28/2015 North Verdura Wall Sta. 11+70 11 BF 108.0 12.4%12.5%110.0 122.0 90%90% RW78 N 1/29/2015 North Verdura Wall Sta. 16+65 10 BF 110.0 13.9%11.0%116.8 128.0 92%90% RW79 N 1/29/2015 North Verdura Wall Sta. 14+75 11 BF 110.0 11.7%12.5%112.7 122.0 92%90% RW80 N 1/29/2015 North Verdura Wall Sta. 19+85 11 BF 109.0 15.0%12.5%110.5 122.0 91%90% RW81 N 1/29/2015 North Verdura Wall Sta. 10+80 11 BF 110.0 13.3%12.5%111.7 122.0 92%90% RW82 N 1/29/2015 North Verdura Wall Sta. 12+45 9 BF 109.5 11.5%10.5%114.6 127.5 90%90% RW83 N 1/30/2015 North Verdura Wall Sta. 13+35 5 BF 111.5 11.4%11.0%107.7 124.5 87%90%Retest on RW83A RW83A N 1/30/2015 North Verdura Wall Sta. 13+45 5 BF 111.0 13.4%11.0%112.4 124.5 90%90%Retest of RW83 RW84 N 1/30/2015 North Verdura Wall Sta. 11+30 5 BF 111.5 12.3%11.0%112.7 124.5 91%90% RW85 N 1/30/2015 North Verdura Wall Sta. 14+65 9 BF 111.5 11.1%10.5%115.1 127.5 91%90% RW86 N 1/30/2015 North Verdura Wall Sta. 20+15 11 BF 112.0 12.3%12.5%109.6 122.0 90%90% RW87 N 1/30/2015 North Verdrua Wall Sta. 15+30 9 BF 112.5 13.2%10.5%116.8 127.5 92%90% RW88 N 1/30/2015 North Verdura Wall Sta. 16+90 5 BF 111.0 13.4%11.0%113.2 124.5 91%90% RW89 N 1/30/2015 North Verdura Wall Sta. 13+90 8 BF 113.5 14.0%14.5%105.2 115.5 91%90% RW90 N 1/30/2015 North Verdura Wall Sta. 12+25 8 BF 113.5 14.6%14.5%106.9 115.5 93%90% RW91 N 1/31/2015 North Verdura Wall Sta. 10+90 8 BF 114.5 11.4%12.5%115.5 122.0 89%90%Retest on RW91A RW91A N 1/31/2015 North Verdura Wall Sta. 10+90 11 BF 114.5 14.1%12.3%112.4 122.0 92%90%Retest of RW91 RW92 N 1/31/2015 North Verdura Wall Sta. 11+55 11 BF 116.0 12.9%12.5%110.1 122.0 90%90% RW93 N 1/31/2015 North Verdura Wall Sta. 10+60 9 BF 118.0 13.2%10.5%115.5 127.5 91%90% RW94 N 1/31/2015 North Verdura Wall Sta. 10+40 12 BF 120.0 14.0%12.0%112.7 124.5 91%90% RW95 N 1/31/2015 North Verdura Wall Sta. 10+35 12 BF 122.0 14.1%12.0%113.2 124.0 91%90% RW96 N 2/2/2015 North Verdura Wall Sta. 10+30 12 BF 124.0 13.8%12.0%114.0 124.0 92%90% RW97 N 10/22/2015 Verdura Wall #24 Sta. 10+65 13 BF 139.0 11.8%11.0%113.0 125.5 90%90% RW98 N 10/22/2015 Verdura Wall #24 Sta. 10+50 13 BF 141.0 10.6%11.0%112.8 125.5 90%90% RW99 N 10/22/2015 Verdura Wall #24 Sta. 10+80 13 BF 143.0 12.5%11.0%113.9 125.5 91%90% RW100 N 10/23/2015 Verdura Wall #24 Sta. 10+35 13 BF 145.0 12.4%11.0%109.9 125.5 88%90%Retest On RW100A RW100A N 10/23/2015 Verdura Wall #24 Sta. 10+33 13 BF 145.0 13.1%11.0%113.0 125.5 90%90%Retest of RW100 RW101 N 10/23/2015 Verdura Wall #24 Sta. 10+45 11 BF 147.0 13.1%12.5%110.4 122.0 90%90% RW102 N 10/23/2015 Verdura Wall #24 Sta. 10+20 9 BF 149.0 11.5%10.5%114.8 127.5 90%90% RW103 N 10/27/2015 Verdura Wall #30 Sta. 10+55 5 BF 98.0 11.0%11.0%112.9 124.5 91%90% RW104 N 10/27/2015 Verdura Wall #30 Sta. 11+50 5 BF 100.0 10.9%11.0%112.6 124.5 90%90% RW105 N 10/27/2015 Verdura Wall #30 Sta. 10+45 5 BF 99.0 11.0%11.0%114.1 124.5 92%90% RW106 N 10/27/2015 Verdura Wall #30 Sta. 11+00 11 BF 100.0 13.5%12.5%110.9 122.0 91%90% RW107 N 10/27/2015 Verdura Wall #30 Sta. 11+70 4 BF 102.5 13.4%11.0%111.8 123.5 91%90% RW108 N 10/28/2015 Verdura Wall #30 Sta. 11+45 5 BF 103.0 12.5%11.0%112.9 124.5 91%90% RW109 N 10/28/2015 Verdura Wall #30 Sta. 10+75 11 BF 103.0 13.5%12.5%111.6 122.0 91%90% RW110 N 10/28/2015 Verdura Wall #30 Sta. 11+75 5 BF 105.0 14.1%11.0%113.4 124.5 91%90% RW111 N 10/28/2015 Verdura Wall #30 Sta. 10+20 5 BF 103.0 13.1%11.0%113.8 124.5 91%90% RW112 N 10/28/2015 Verdura Wall #30 Sta. 11+40 13 BF 106.0 12.4%11.0%114.6 125.5 91%92% RW113 N 10/30/2015 Verdura Wall #24 Sta. 10+40 5 BF 151.0 10.8%11.0%112.3 124.5 90%90% Project No.133023-03 Page C-37 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I Project Number: Client: Project Name: Location: Field Optimum Field Maximum Obtained Required 133023-03 Toll Brothers Robertson Ranch Carlsbad, California RKW Summary of Field Density Test Results Reviewed By: Test # Nuclear Gauge (N), or Sand Cone (S) Test Date Test Location Soil Type CommentsTest of Elevation or Depth (in feet) Moisture (%)Dry Density (pcf)Relative Compaction (%) LGC Valley, Inc. 2420 Grand Avenue, Suite F2, Vista, California 92081 760-599-7000 / Fax 760-599-7007 RW132 N 2/8/2016 PA-13 Wall Lot 22 1 BF 74.0 18.2%16.0%106.2 117.5 90%90% RW133 N 2/8/2016 PA-13 Wall Lot 22 11 BF 76.0 13.6%12.5%109.6 122.0 90%90% RW134 N 2/9/2016 PA-13 Wall Lot 22 5 BF 78.0 13.7%11.0%114.9 124.5 92%90% RW135 N 2/9/2016 PA-13 Wall Lot 12 5 BF 82.0 13.6%11.0%114.2 124.5 92%90% RW136 N 2/15/2016 PA-13 Wall Lot 12 1 BF 79.0 17.4%16.0%105.8 117.5 90%90% RW137 N 2/24/2016 PA-13 Upper Wall Lot 11 1 BF 82.0 15.7%16.0%108.8 117.5 93%90% RW138 N 2/24/2016 PA-13 Upper Wall Lot 11 1 BF 83.0 15.0%16.0%108.6 117.5 93%90% RW139 N 2/26/2016 PA-13 Upper Wall Lot 11 1 BF 83.0 15.2%16.0%108.0 117.5 93%90% RW140 N 2/26/2016 PA-13 Upper Wall Lot 11 1 BF 84.0 15.8%16.0%107.5 117.5 91%90% Test # Prefix: SD = Storm Drain, S = Sewer, W = Water, JU = Joint Utility, G = Gas, E = Elecrtrical, SG = Subgrade Soil, AC = Asphalt Concrete, AB = Aggregate Base, LTS = Lime Treated Soil, RW = Retaining Wall, O = Other Test of: CF = Compacted Fill, FG = Finish Grade, OG = Original Ground, M = Main Trench Backfill, L = Lateral Trench Backfill, S = Shading/Pipe Zone Backfill, FL = Fire Line Trench Backfill, SW = Sidewalk, C = Curb, CG = Curb/Gutter, XG = Cross Gutter, BF= Wall Backfill, O = Other KEY: FG = Finish Grade, FSG = Finish Subgrade, FS = Finish Surface, FBG = Finish Base Grade, BOF = Bottom of Footing, TOW = Top of Wall, TOP = Top of PipeN = Nuclear Gauge, S = Sand Cone Notes: 1) Tests were performed by a nuclear density gauge in accordance with the ASTM D2922 Method or Sand Cone Method (ASTM D 1556). 2) The maximum dry density and optimum moisture data was tested in accordance with the ASTM D1557 test method (Modified Proctor). 3) The field density test results represent the moisture content and density only at the depths and locations reported. 4) No guarantee or warranty of the contractor's work is made or implied. Project No.133023-03 Page C-38 June 28, 2016 i!#I:I I I I I I I I I I I I I I I I