HomeMy WebLinkAbout2568 ROOSEVELT ST; ; CB072203; PermitCity of Carlsbad ·-1635 Faraday Av Carlsbad, CA 92008
02-24-2009 Residential Permit Permit No: CB072203
Job Address:
.!)SI,,'\(
Building Inspection Request Line (760) 602-2725
2560 ROOSEVELT ST CBAD
RESDNTL Sub Type: CONDO Status: ISSUED Permit Type:
Parcel No: 20310233aos-
$375,281.oo
Lot#: 0 Applied: 08/06/2007
Valuation: Construction Type: VN Entered By: LSM
Occupancy Group:
# Dwelling Units:
Reference#: Plan Approved: 07/30/2008
5 Structure Type: MF5+ Issued: 07/30/2008
Bedrooms: 6 Bathrooms: 5 Inspect Area: PC
Project Title: ROOSEVELT GARDENS-5 UNIT Orig PC#: PC070048
CONDO BLDG 3,965 SF LIV nn ~F nECKS TO INCLUDE 2562, Plan Check#:
.2Sw'f, .:2s11c.,, .:ZQo9 12.-~u.,,:r
Owner: Applicant:
JOE GILBREATH CITY OF CARLSBAD REDEVELOPMENT AGENCY
10222 SAN DIEGO MISSION RD
SAN DIEGO 92102
619 283 4663
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD#2 Fee
BTD#3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
$1,396.64
$0.00
$907.82
$0.00
$0.00
$37.53
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$16,945.00
D5/8
$170.00
$0.00
??
PUBLIC AGENCY 00000
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $73,278.03 Total Payments To Date: $73,278.03 Balance Due:
Inspector:
FINAL APPRO AL . '1-, I Date: Clearance:
$0.00
$800.00
$22,460.00
$0.00
$6,830.22
$6,304.82
$0.00
$0.00
$5,452.00
$6,148.00
$0.00
$301.00
$110.00
$125.00
$0.00
$0.00
$0.00
$0.00
$5,290.00
$0.00
$73,278.03
$0.00
NOTICE: Please Jake NOTICE !hat approval of your project lnctu<les the 'lmposHlon' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as -tees/exactions." You have 90 days from the date this permit was Issued to protest Imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required Information with the City Manager for
processing In accoroance wtth Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED !hat your right to protest Iha specified tees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . ' . . .
SEE CB072203
AND
PC070048
FOR
MORE INFORMATION