Loading...
HomeMy WebLinkAbout2564 ROOSEVELT ST; ; CB072203; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 02-24-2009 Residential Permit Permit No: CB072203 Job Address: Permit Type: Building Inspection Request Line (760) 602-2725 2:56!t ROOSEVELT ST CBAD RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: 20310233.0 I $375,287.00 Lot#: 0 Applied: 08/06/2007 Valuation: Construction Type: VN Entered By: LSM Occupancy Group: # Dwelling Units: Reference#: Plan Approved: 07/30/2008 5 Structure Type: MF5+ Issued: 07/30/2008 Bedrooms: 6 Bathrooms: 5 Inspect Area: PC Project Title: ROOSEVELT GARDENS-5 UNIT Orig PC#: PC070048 CONDO BLDG 3,965 SF LIV ?~n RF OECKS TO INCLUDE 2562, Plan Check#: .2Sw'#, .:1st-<,, ;:tSo9 tl-~u .. :r Applicant: Owner: JOE GILBREATH CITY OF CARLSBAD REDEVELOPMENT AGENCY 10222 SAN DIEGO MISSION RD SAN DIEGO 92102 619 283 4663 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD#2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee $1,396.64 $0.00 $907.82 $0.00 $0.00 $37.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16,945.00 D5/8 $170.00 $0.00 ?? PUBLIC AGENCY 00000 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL · ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES Total Fees: $73,278.03 Total Payments To Date: $73,278.03 Balance Due: Inspector: FINAL APPRO AL . J-, I Date: Clearance: $0.00 $800.00 $22,460.00 $0.00 $6,830.22 $6,304.82 $0.00 $0.00 $5,452.00 $6,148.00 $0.00 $301.00 $110.00 $125.00 $0.00 $0.00 $0.00 $0.00 $5,290.00 $0.00 $73,278.03 $0.00 NOTICE: Please take NOTICE that approval of your project indudea the 'lmposttion' of feea, dedications, reservations, or other exactkJns hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was Issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and me the protest and any other required informaUon with the City Manager for processing in accordance with Cartsbad Municipal Code Section 3.32.030. FaUure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their Imposition. You are hereby FURTHER NOTIFIED that your right to protest the specffied fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . . . . . . . . . SEE CB072203 AND PC070048 FOR MORE INFORMATION