HomeMy WebLinkAbout2580 ROOSEVELT ST; ; CB072204; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
10-28-2009 Residential Permit Permit No: CB072204
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
~ ROOSEVELT ST CBAD
RESDNTL Sub Type:
Lot#: 20310233illO'l
$463,984.00 Construction Type:
Reference #:
CONDO
0
VN
6 Structure Type: MF5+
8 Bathrooms: 6
ROOSEVELT GARDENS-6 UNIT
CONDO BLD 4,890 SF LIV, 360 SF DECKS TO INCLUDE
2572, 2574,
2576, 2578, 2580 ROOSEVELT
Owner:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check#
ISSUED
08/06/2007
LSM
07/30/2008
07/30/2008
PC
PC070048
JOE GILBREATH CITY OF CARLSBAD REDEVELOPMENT AGENCY
10222 SAN DIEGO MISSION RD
SAN DIEGO CA 92102
619 283 4663 X 322
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD#2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
$1,667.68
$0.00
$1,083.99
$0.00
$0.00
$46.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20,334.00
D5/8
$204.00
$0.00
??
PUBLIC AGENCY 00000
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $88,362.51 Total Payments To Date: $88,362.51 Balance Due:
Inspector: f Clearance:
$0.00
$960.00
$26,952.00
$0.00
$8,444.51
$7,794.93
$0.00
$0.00
$6,542.40
$7,377.60
$0.00
$350.00
$110.00
$147.00
$0.00
$0.00
$0.00
$0.00
$6,348.00
$0.00
$88,362.51
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and ffle the protest and any other required info""ation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right lo protest the specified fees/exacl~ns DOES NOT APPLY lo water and sewer connect~n fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . .
SEE CB072204
AND
PC070048
FOR
MORE INFORMATION