HomeMy WebLinkAbout1011 SAGEBRUSH RD; ; CB051076; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
06-24-2005 Residential Permit Permit No: CB051076
Building Inspection Request Line (760) 602-2725
Job Address: 1011 SAGEBRUSH RD CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2146440900 Lot #: 179
VN
CT98-14
Applied:
Valuation: $379,138.00 Construction Type: Entered By:
Occupancy Group:
06/24/2005
# Dwelling Units:
Reference #:
Structure Type: SFD Issued:
Bedrooms: 5 Bathrooms: 4.5 Inspect Area:
Project Title: CHESAPEAKE BAY-PLAN 4-PHS 5 Orig PC#:
4203 SF,646 SF GAR, 154 SF DECK, 73 SF PORCH Plan Check#:
Applicant:
STANDARD PACIFIC CORP
STE 200
5750 FLEEl ST
CARLSBAD CA 92008
619 292-2200
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,408.96
$0.00
$915.82
$0.00
($73.27)
$37.91
$2,436.00
$0.00
$0.00
$0.00
$0.00
$12,780.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
STANDARD PACIFIC CORP
5750 FLEET ST #200
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
03/03/2005
SB
Plan Approved:
06/24/2005
PD
PC02-32
PC05-23
$0.00
$160.00
$2,461.00
$3,487.76
$6,900.31
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$224.00
$60.00
$85.00
$0.00
$0.00
$0.00
$0.00
$1,994.00
$0.00
$36,536.49
Total Fees: $36,536.49 Total Payments To Date: $0.00 Balance Due: $36,536.49
Inspector:
FINAL APPROVAL
Date: C-3/ -(J(, Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f "h hv r I n N Tl I
City of Carlsbad Bldg Inspection Request
For: 05/30/2006
Permit# CB051076 Inspector Assignment: PD ---
Title: CHESAPEAKE BAY-PLAN 4-PHS 5
Description: 4203 SF,646 SF GAR,154 SF DECK,73 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
1011 SAGEBRUSH RD
Lot 179
Phone: 7602504547
Location: Inspector:
OWNER STANDARD PACIFIC CORP
Owner: STANDARD PACIFIC CORP
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Comments/Notices/Hold
-----
Requested By: LARRY
Entered By: CW
------,----------
------------
Associated PCRs/CVs Original PC# PC05-23
lns12ection Histo,y
Date Description Act lnsp Comments
05/18/2006 89 Final Combo co PD
03/22/2006 39 Final Electrical AP PD EMR
02/13/2006 17 Interior Lath/Drywall AP PD SHOWERS
01/23/2006 82 Drywall/Ext Lath/Gas Test AP PD
01/12/2006 16 Insulation AP PD
01/10/2006 84 Rough Combo AP PD
01/09/2006 84 Rough Combo co PD
12/05/2005 13 Shear Panels/HD's AP PD
10/27/2005 15 Roof/Reroof AP PD
07/26/2005 11 Ftg/Foundation!Piers AP PD
07/14/2005 21 Underground/Under Floor AP PD
07/14/2005 22 Sewer/Water Service AP PD
07/14/2005 81 Underground Combo WC PD
May.31. 2006 8:07AM No. 6023 P. 1
BUILDING
OTH.ER ..
City of Ctirlsb .. i
'1635 Farad.y Aven.,.,, urlsbilld California 92008 .
INSPEC'l;ION RECORD
INSPECTION RECORD C>\RD WITH APPROVED PLANS
MUST BE··KEPT ON THE JOB .
CALL PRIOR TO 4:00 P.M. FOR NEXT WORK OAY INSPECTION
BUILDING INSPECTION: (760) 602-2725
.,•···••; .... .. .. ,:.... •,···•, ., . ' .. "'
:Tr~. of ,lnSfi~:•~,;· ;,; .1:f· ;·· .: : ;; :' ,i \, :::.q~e•, :•;.?! :~/t;~~~g,C:\~-~-:: !;/~};.~;:,. ! .:,._-.-~.,../.::·: ' · . Notes}"·\.,: i: " · B_UILDlffG."-'•i: : ..... ·,;,_ ·=: :: ' ,' : ':J. ~: -.'· .. ::·:~:· :,:=· l\{J1 t):.:1, :.~~-~~-·:.J '("", ;:·.•_;<,r/:·~ .. ~:i:.:_ ,,.:· ,.,. .. ·;·
FOUNDATION, . ,, .. ., . •' " ~· ;-·,.::: :.,,:• ,: JJ,iL : · ·. '.:., :": ··•-.... • •',":•.-·:,:· ,., ' ,. ! ·~::•· -: '• · .. .' .. ' . . . . ..... :-: ' ~-·. . . ...
REINFORCED STEEl " : -,~,.,·((~-;:··(•='.',":::.··~·.1.'..:-·:·. '. -.: . ~--· ' , ". .. ...
MASONRY .. .. ,. ••' .. ,• ' ' ... . . . . •.:.· .. .. , •. ,•, ~ .'''
□GROUT □ W~LL DRAINS •, •' .. ,• .. , '. ., ... . •. .,
TILT PANELS ,,, .. ... ·
POUR STRIPS ... •, .,
COLUMN FOOTINGS
SUBFRAME □ FLOOR □.CEILING. "· : •,
ROOF SHEATHING /fl • 2J·v'> YVJ t. ,, ... '
fXT. SHEAR PANELS r~·s ·pJ· :'11-" <
FRAME -l.,i,_.,. DL, I ~ ,,
INSULATION I-/2 '.../J~ IS "f<t
EXTERIOR LATH · nl : ·II I .. ' " AA
INTERIOR LATH & DRYWALL I -J) WCI"' r ,-l '1-· ~-l4f·0C, 4/f"'W~<
RNAL . ' . . .
f'LUMalNG A·
li5 SEWER AND BUCO ,ll PUCO A .,r .• .,,,_ 1'J // ,· :
UNDERGROUND 9WASTE ..(l-WATER ., .... \.,-fl" 11 C:. \-
TOP OUT □WASTE □WATER , II . i. I .://
TUB AND SHOWER PAN I --, -v_ltl ''ff ~ ...
□ GAS TEST D GAS PIPING 1-z,~ -01.. 114
□ WATl:R HEATER 0 SOLAR WATER
FIN,-l JI
ELECTRICAL .,. II
□ ELECTRIC UNDERGROUND ~UFER (-"l,~~'O".:,, I.J~-
ROUGH ELECTRIC WALLS . .. I V. ~.
ROUGH El£CTRIC CEILING I ~IV V'f' §' I
□ ELECTRIC SERVICE □TEMPORARY ~ ·2"2·B~ 1'4-ft,
□ BONDING □POOL
FINAL
MKHANICAL II
UNDERGROUND DUCTS & PIPING 'I ,( /
0 DUCT & PLEM.0 REF. PIPING nv f lv-
HEAT· AIR COND. SYSTEMS (V
VENTILATING SYSTt:MS \
FINAL
CALL FOR RNAL INSPECTION WHEN ALL APP,RO/>RIA TE ITEMS AIOV,;ttAVE IEEN APPROVED
ANAL Sign WIien Appropri«te II ,,
Building Dept. (Inspections) (760) 602-2725 I.'> -~n ,0 kl rt 1~
Fire Department (760) 602-4660
Pf annl ng D~partment (760) 815-67!)8
Engineering Dept. (lns~lons) (760) 438-3891 1..(/ 21 I f'k, (/i,-1
Building Inspectors (7am-4pm) . (760) 602-2700 (
CMWD 17601436-2722 Ext 7151 JJ/11 /0/{J c/1.f-"\
...
·•.
,·
PREFERRED CONSTRUCTION INSPECTIONS, INC.
4888 RONSON COURT "G"
SA~ DlfiGP, C~ 92111 TELEPHONE (858) 576-9110 I JOBNO. -1FOAWEEK // CERTIFIED INSPECTOR'S WEEKLY REPORT ENONl
COVERING WORK PERFORMED D REINFOACEDCONCRETE D STRUCT. STEEL ASSEMBL y D SPRAY-APPLIED FIREPROOFING
WHICH REQUIRED APPROV AL BY 0 PRE-STRESSED CONCRETE D REINFORCED GYPSUM OoTHER
THE SPECIAL INSPECTOR OF D REINFORCED MASONRY D DEEP FOUNDATION
J08AOORESS IUU>ING PERMIT NUMaER I PLAN Fll.E NUMBER
i It. <;. 4 { '-cJlO • I /, , , ' -Ov.M:R OR PROJECT NAME /"I ARCHITECT -{. , ,.. ,f
CONSTR. MAT\.. (TYPE. OAADE, ETC,) I DESIGN I SOUACE OF MFOA. ' ENGINEER STRENGTH J I L) I\..,
OE SCRIBE MAT\. (MIX OESION, RE-BAA ORAOE & MFOA .. WELO-ROO, ETC.) OENEAAL CONTRACTOR
' ./ I •,C. ' •. C. ,.
Ir .. CONTA. DOINO REPORTED WORK
'-( l{JG(.,f ," f--/., L
U8. RECEIVINO & TESTING CONSTA. MAT'l. SAMPLES
INSPEC• ARRIVAL DETAILED TION TIME. REPORT Of LOCATlON OF W0RI< INSPECTED, TEST &NootPl.ES TAKEN. W0RI< REJECTED, JOI PA08LEMS, PAOGAESS. REMARKS, ETC. DATE DEPARTURE TIME
W0AI( ~ -Tl0N MOVT-IO#IIAT1!-. IUCIDOII-N-D:-11. TYl't I IDINT.NO'I. 0# Tl!ITS-.EI TAKEN; ITIIUCT. INSPECTED CCNllc:Tl0NI (WIUll w.lCt. M.T.101.11 ~DI CHICIIID: ITC.
t,., {-' .. ,v 'I<-~ / 1 c_ fr. 141 ~ Iv ,-r,l ,4 .# / /;-.
C.u I .,ft, I C /j N if f._ ~ , u 4/.J
(:',f/ G/2A,,(}1-_ r" -e /,,e; ... , j / ?f <fl-I , •
f ,v{y C)AJJ._ ~~f -11 /( -,-.
' ... yL,AJJl,., Aµd) <I I J,,,. p Le ....
,I-,~ '(
I ,
/\/ C: I' ~ -r~,.O fJLAr f MS. Al-, of -r
-A.L'? I-. t ') /'pJ SJ '"iJ ( K..; _, .{) I R..r~ • /1/1/ ,/11 'I 11B o/l.l
-4 G() ~-CuA L,~ f .> ' ')
WoP!L.. <"')~ t;,j I/ lf,J .s A CLv /? J2 , A ) ' -. .,
( ' 1-'I /1.l) /J ~ r;:, .ti A/4 cO C/~r . 4 ,)
1 ,.j
... ;d ,Pt) , r ,; 'j
I I 1 7og~ GI& ..51A,LL Ve.. D/1 c_fJ ()£'I I I f
I ; t 7o9o ,, I I I I' 7 I
I 11 Io Ir ....._) A q f 1s ~ (J -/./ 't< V I 10'1~ t 1 <~ I) I (/ I I I h' I
I 7 I ~,I
I
/ l / J , L , '1 .
MPECTOR~•ffllll L.A-~~Y E i~/ ... r.; , 1
/0 •
IGNAT\JAE 4 •,
01\TEIIQNED I I CERTFICATE NO. -,, .
IIOrl:ALL_,_.aM'l ___ r,_yo,ne••~--1DIIIA,_,
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all ol the reported work, unless otherwise noted, substantially complies with approved planf
specilicalions and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin·
ion or project control.
. ~~.~QR~ GEOTECHNICAL CONSULTANTS t~
6960 FLANDERS DRIVE ■ SAN DIEGO, CALIFORNIA 92121-297 4 ■ TEL 1858) 558-6900 ■ FAX 1858) 558-6159 .,
FOUNDATION OBSERVATION REPORT
PROJECT NAME: 1'ftPMf?"H -~b.-:r.,J.p t,/;.e~l'eake l}o/ PROJECT NO. ()vzto~:{ -?"2-IClA-
LOCATION : ---=f_ol.'-----------',-'--/'?_1_-_/_=r'J...:_____.f'--
1
_,.{.:;_¢-=-~ ---=-,K/_8_-_ff_1 ____ _ DATE : 1--2->"-0)
FOUNDATION LOCATION ("f 1 no en ,re UI lnQ
PLAN FILE NO. PERMIT NOS : BO /Jly-O ~ J".:1~ -C 5"
lrA I ::f-'3 -GeO 'J(O{t,,.
Lo+ 1:rq -CF30$"/O't'7
0 ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE :
0 CONVENTIONAL
I.A,,+ C1tl -C8~ S7(l// Jk SUBSTANTIAL CONFORMANCE )If POST-TENSIONED lC4 lcr=f -CB~5"1°~1
• PURPOSE Of OBSERVATION
;gf Verify soil conditions exposed are similar to those anticipated
~ Verify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
E Verify footings have been extended to an appropriate bearing strata
0 Other
•APPLICABLE SOIL REPORT : TITLE : f":JAl,'J,, Tl-t'POILT ?P. 'Te-!>1"7.A.JG, 4 c,8'5E£✓A--r~orJ 5e1Zvtce<::.
7:>t/i<JhC"'t ~1=-1~ (:}ZU)).1 JJ9 I 1:rltJM1)$<?#J-r~Ar,( I (>,TU. 9lA]) t'A DATE : 12-2-°'I
• SOIL REPORT RECOMMENDATIONS BASED ON:
)ZI Expansion Condition ~VERY LOW
.JlJ Fill Geometry c.ltT :X. ! l-ol~ ;=,:; -1~'1
0 LOW
.. lf'H-/91
0 MEDIUM 0 HIGH □,VERY HIGH
0 Other:--------------------------------------
• MINIMUM FOUNDATION RECOMMENDATIONS:
}'l Footing Depth : QJ:..12 Inches D 18 Inches D 24 Inches OTHER _____________ _
Footing Reinforcement: 0 No.4 T&B O 2-No.4 T&B O 2-No.5 T&B O Post-Tensioned OTHER : _____ _
D No.3@24Inches D No.3@18Inches ,,!E(Post-Tensioned
Vapor Barrier : t/1~,0;1
Interior Slab Reinforcement : D 6x6-10/10 D 6x~-6/6
Slab Bedding Material and Thickness : -~~---=-d ________ _
/I
Foundation Width : --=-/2,--_,A,<IZJ_f..:..."1'-'J.'-"'&..,.__,,.::/.c..::M:..,:_i.__., ________________________ _
• OBSERVATIONS :
J8___substantial conformance with Soil Reports (see "Purpose of Observation")
D Substantial conformance with Foundation Plans. Identify : --------------------
0 Other
• COMMENTS :
IS ASSUMED THAT All FOOTING EXCAVATIONS Will SE CLEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT THE SOIL MOISTURE
~~)\ ~~kl~" -Sttt~ ,J 'P Qi< R l,
FIELD COPIES TO