Loading...
HomeMy WebLinkAbout2715 ROOSEVELT ST; ; CB161174; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-14-2016 Demolition Permit Permit No: CB161174 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Occupancy Group: 04/14/2016 PC#: # Dwelling Units: 2715 ROOSEVELT ST CBAD DEMO Full Demo: Y Status: 2031010500 Lot#: 0 Applied: Entered By: Reference#: CT140007 PC160024 O Structure Type: Issued: Bedrooms: 0 Bathrooms: 0 Inspect Area: Project Title: BEAHWALK @ROOSEVELT-DEMOLISH 1978 SF APARTMENT BUILDING IN PREPARATION FOR THE Applicant: VESTA PACIFIC DEVELOPMENT INC 1818 1ST AVE SAN DIEGO CA 92101-2662 858-688-9726 Building Permit Plumbing Fee Other Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 Owner: MR CARLSBAD 22, LLC STE 100 1818 1ST AV SAN DIEGO CA 92101 619 481-3830 ISSUED 03/28/2016 RMA Plan Approved: 04/14/2016 Total Fees: $0.00 Total Payments To Date: $0.00 Balance Due: Inspector: EXPIRED PERMIT ccoRDANCE WITH c.s.c. l'ERMll HAS E.)(PIRSE~::oED BY c.M.C.18.04,030 SECTION1064.4A ~ \'ll '1D I\\.QSIGHATURE_ ".'-.---~ p V ,>. t> DATE_ ' '. tX \~ ~ '\....,A I FINAL APPROVAL Date: Clearance: $0.00 NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to_ any August 26, 2016 MR CARLSBAD 22, LLC STE 100 1818 1ST AV SAN DIEGO CA 92101 RE: BUILDING PERMIT EXPIRATION PERMIT TYPE: DEMOLITION PERMIT {'cityof Carlsbad Pem,it.-Number: CB 16l 17.4 Issue Date: April 14, 2016 VESTA PACIFIC DEVELOPMENT INC 1818 1ST AVE SAN DIEGO CA 92101-2662 ~ODRESS:--2715 ROOSEV-EL -r: ST PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that your building permit will expire by limitation of time on October 11 , 2016 The provisions of CBC, Section 105.5 as amended by the Carlsbad Municipal Code state: "EXPIRATION." Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within one hundred eighty calendar days from the date of such permit, or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of one hundred eighty calendar days, or if the building or work authorized by such permit exceeds three calendar years from the issuance date of the permit. Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within one hundred eighty calendar days of the date of permit issuance. Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each one hundred eighty day period upon the initial commencement of work authorized by such permit. Before such work can be recommenced, a new permit shall be obtained to do so, and the fee therefore shall be one half the amount required for a new permit for such work, and provided that no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new permit fee. Any permittee holding an unexpired permit may apply for an extension of time within which work may commence under that permit when the permittee is unable to commence work within the time period required by this section for good and satisfactory reasons. Please check below indicating your intentions and return this letter to us. Project abandoned. A new permit will be obtained prior to commencing work. No fee extension requested for 180 days. (must attach a letter of explanation) Renewal permit requested. If the project has been completed and only a final inspection is needed, please call the inspection request line at 760- 602-2725. If you have any questions, please contact the Building Inspection Division at 760-602-2700. Rachel Cross Senior Office Specialist Community & Economic Development Building Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov