HomeMy WebLinkAbout1592 SAPPHIRE DR; ; CB991308; Permit.. City of Carlsbad
04/26/1999 Residential Permit Permit No:CB991308
Building Inspection Request Line (760) 438-3101
Job Address: 1592 SAPPHIRE DR CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2122011800 Lot#: 144 Applied:
Valuation: $200,143.00 Construction Type: VN Entered By:
Occupancy Group: 6 Reference #: CT84-32
04/05/1999
# Dwelling Units: 1 Structure Type: SFD Issued:
Bedrooms: 4 Bathrooms: 2.5 Inspect Area:
Project Title: COBBLESTONE-PHASE11 Orig PC#:
PLAN 3, SFD 2275 SF, GAR 591 SF
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Plan Check#:
Owner:
GREYSTONE HOMES INC
5973 AVENIDA ENCINAS #101
CARLSBAD CA
92008
ISSUED
03/17/1999
JM
Plan Approved:
04/26/1999
PY
CB971300
990038
Total Fees: $17,493.47 Total Payments To Date: $0.00 Balance Due: $17,493.47
Building Permit $974.58 Reel. Water Con. Fee $0.00
Add'I Building Permit Fee $0.00 Meter Size
Plan Check $633.48 Add'I Reel. Water Con. Fee $0.00
Add'I Plan Check Fee $0.00 CFO Payoff Fee $2,685.23
Plan Check Discount ($50.68) PFF $3,642.60
Strong Motion Fee $20.01 PFF (CFO Fund) $0.00
Park in Lieu Fee $1,575.00 License Tax $0.00
Park Fee $0.00 License Tax (CFO Fund) $0.00
LFM Fee $0.00 Traffic Impact F!;le $550.00
Bridge Fee $0.00 Traffic Impact (CFO Fund) $0.00
Other Bridge Fee $0.00 PLUMBING TOTAL $175.00
BTD #2 Fee $0.00 ELECTRICAL TOTAL $41.25
BTD #3 Fee $0.00 MECHANICAL TOTAL $68.00
Renewal Fee $0.00 Housing Impact Fee $2,925.00
Add'I Renewal Fee $0.00 Housing lnLieu Fee $0.00
Other Building Fee $0.00 Master Drainage Fee: $0.00
Pot. Water Con. Fee $2,400.00 Sewer Fee: $1,854.00
Meter Size 05/8
Add'I Pot. Water Con. Fee $0.00 TOTAL PERMIT FEES $17,493.47
FINAL A
Inspector: Clearance: ,2--2--"t-SS. eu
NOTICE: Please take NOTI E that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
UNSCHEDULED BUILDING INSPECTION
DATE ·2 L l / q INSPECTOR -----'-9_.,,___ __
PERMIT# 1 --I 06 t PLAN CHECK#----
JOB ADDRESS J09 L J~ .
DESCFJPTION 0 9 r,/Jµ. Cg 1 't '.::f: .
CODE DESCRIPTION ACT COMMENTS a;;__J ~/) -,-~~---~
I • •
City of Carlsbad Inspection Request
For: 12/1/1999
Permit# CB991308
Title: COBBLESTONE-PHASE 11
Description: PLAN 3, SFD 2275 SF, GAR 591 SF
Type: RESDNTL Sub Type: SFD
Job Address: 1592 SAPPHIRE DR
Suite: Lot 144
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
Act Comments
Inspector Assignment: PY ---
Phone: 7606030056
Inspector: -----
Requested By: SHELDON
Entered By: CHRISTINE
CD
39
Description
Final Electrical rfaJ----""'-f-'-r-r_, t-.:.b,,.__ ______ _
Associated PCRs
lnsQection Histo!)'
Date Description Act lnsp Comments
11/22/1999 39 Final Electrical NR DM
10/25/1999 18 Exterior Lath/Drywall AP TP
10/22/1999 18 Exterior Lath/Drywall NR PY
10/21/1999 17 Interior Lath/Drywall AP PY
10/21/1999 23 Gas/TesURepairs AP PY
10/12/1999 84 Rough Combo AP PY
10/8/1999 13 Shear Panels/HD's AP PY
1017/1999 13 Shear Panels/HD's NS PY
9/28/1999 13 Shear Panels/HD's NR PY
9/28/1999 15 Roof/Reroof AP PY
8/20/1999 11 Fig/Foundation/Piers AP PD
8/19/1999 11 Ftg/Foundation/Piers NS PY
8/10/1999 21 Underground/Under Floor AP PY
12/28 /99 00:17 FAX
JOB ADDRESS:
OWNERS NAME:
usEtoccuPANQ
BUILDING
OTHER
CB991308 1592 SAPPHIRE OR CBAO
COB8LESTONE-PHASE11
PLAN 3, SFD 2275 SF, GAR 591 SF
RESONTL SFD
Lot#: i 44 GREYSTONE HOMES
Type of Inspection
BUILDING
FOUNDATION
REINFORCED STEEL
,> '"'.SONRY
Notes
: . . ' ..
~ -. ---------------+--~--t--,--,-, ,..,., . --,,,,-, -,+--'--:--------------'-.,ROUT □ WALL DRAINS , · ..
TILT PANELS
POUR STRIPS ·: .• : '• •• I' ,4 ,. ';i . .• ..... -·
COLUMN FOOTINGS
SUBFRAME O FLOOR . □ CEILING
ROOF SHEATHING .. ;•. .. .. ,;.• ·,
EXT. SHEAR PANELS
FRAME
INSULATION ':. :: ·t.
EXTERIOR LATH
INTERIOR LATH & DRYWALL'
FINAL I
PLUMB/NC
□ SEWER AND BL/CO O PL/CO , 1
UNDERGROUND □ WASTE D WATER
TQP OUT D WASTE D WATER ·
TUB AND SHOWER PAN T AS TEST □ GAS PIPING
-tJ'WATER HEATER □ SOLAR WATER
l/tJ/~1/t10 -~·........ .. ·-
· 7 ·: · .. . , .
FINAL
ELECTRICAL .A 1/.. ..
□ ELECTRIC UNDERGROUND "r}'UFER
ROUGH ELECTRIC WALLS
ROUGH ELECTRIC CEILING
0 ELECTRIC SERVICE □ TEMPORARY
□ BONDING D POOL ; .... \
FINAL .-....
MECHANICAL
UNDERGROUND DUCTS & PIPING I
D DUCT & PLEM.□ REF. PIPING
HEAT. AIR COND. SYSTEMS ] ..
VENTILATING SYSTEMS .,.
FINAL ' . '" : I
CALL FOR FINAL INSPECTION WHEN ALLAPPROPRl,HE ITEMS ABOVf.HAVHJEEN~RROVEO'.-·
JINAL SignWhenAppropriate , 1 _-·-:··;"-·~IJ.-,( ·,. ···,: ·",.
\ ,.dingDept.(lnspections) 438-3101 /l/.u/~t/ /:;,,.•;,,_-·
Fire Department ·931-2121 //-. . ,
PlanningOepartment 436-1161 \'2.,·1,,l.-',t-, -~ ,
Engineering Dept. (tnspt!ctions) 436-3891 i '-. ~1 , Gi"'I · (.\ c'1 ~:
Building Inspectors (7am-4pm) 438,35S0 ;
CMWD 438-2722Ext7153 h.~1.l/ff l✓/,M1d'·
Water Inspections 438-3891 • / 7
REV 9/98 SEE BACK FOR SPECIAL NOTES