HomeMy WebLinkAbout1580 SAPPHIRE DR; ; CB991314; PermitCity of Carlsbad
04/26/1999 Residential Permit Permit No:CB991314
Building Inspection Request Line (760) 438-3101
Job Address: 1580 SAPPHIRE DR CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2122011500 Lot#: 141 Applied:
Valuation: $198,213.00 Construction Type: VN Entered By:
Occupancy Group: 6 Reference #: CT84-32
04/05/1999
# Dwelling Units: Structure Type: SFD Issued:
Bedrooms: 4 Bathrooms: 2.5 Inspect Area:
Project Title: COBBLESTONE -PHASE11 Orig PC#:
PLAN 4, SFD 2284 SF, GAR 475 SF
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
760-804-7700
Plan Check#:
Owner:
GREYSTONE HOMES INC
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
760-804-7700
ISSUED
03/17/1999
JM
Plan Approved:
04/26/1999
CB971300
990038
Total Fees: $17,447.48 Total Payments To Date: $0.00 Balance Due: $17,447.48
Building Permit $967.58 Reel. Water Con. Pee $0.00
Add'I Building Permit Fee $0.00 Meter Size
Plan Check $628.93 Add'I Re~I. Water Con. Fee $0.00
Add'I Plan Check Fee $0.00 CFp Payoff Fee $2,685.23
Plan Check Discount ($50.31) PFF $3,607.48
Strong Motion Fee $19.82 PFF (CFO Fund) $0.00
Park in Lieu Fee $1 ,575.00 license Tax $0.00
Park Fee $0.00 License Tax (CFO Fune!) $0.00
LFM Fee $0.00 Traffic Impact Fee $550.00
Bridge Fee $0.00 Traffk; Impact (CFO Fund) $0.00
Other Bridge Fee $0.00 PLUMBING TOTAL $182.00
BTD #2 Fee $0.00 ELECTRICAL TOTAL $41 .25
BTD #3 Fee $0.00 MECHANICAL TOTAL $61 .50
Renewal Fee $0.00 Housing Impact Fee $2,925.00
Add'I Renewal Fee $0.00 Housing lnlieu Fee $0.00
Other Building Fee $0.00 Master Drainage Fee: $0.00
Pot. Water Con. Fee $2,400.00 Sewer Fee: $1,854.00
Meter Size 05/8
Add'I Pot. Water Con. Fee $0.00 TOTAL PERMIT FEES $17,447.48
Clearance: \+·~-AA
()I,)
NOTICE: Please take NOTI E that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions.· You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
L BAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
('.ity of Carlsbad Inspection Request
For: 12/21/1999
Permit# CB99: 314
Tille: COBFJLESTONE -PHASE 11
Description: PLA~I 4, SFD 2284 SF, GAR 475 SF
Type: RESUNTL Sub Type: SFD
Job Address: 1580 SAPPHIRE DR
Suite: Lot 141
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks: RESET FROM MONDAY
Total Time:
CD Description Act Comments
19 Final Structural ~ 29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsi;iection Hisloet
Date Description Act lnsp Comments
Inspector Assignment: PY ---
Phone: 7606030056
Inspector: -----
Requested By: SHELDON
Entered By: CHRISTINE
12/20/1999 89 Final Combo NS PD RESET FOR TUES
11/22/1999 39 Final Electrical AP DM EMR
10/25/1999 18 Exterior Lath/Drywall AP TP
10/22/1999 18 Exterior Lath/Drywall NR PY
10/15/1999 17 Interior Lath/Drywall AP PD
10/15/1999 18 Exterior Lath/Drywall NS PD
10/15/1999 23 GasfTesVRepairs AP PD
10/8/1999 84 Rough Combo AP PY
10/5/1999 13 Shear Panels/HD's AP PY
10/5/1999 15 Roof/Reroof WC PY
10/4/1999 13 Shear Panels/HD's CA PY
10/1/1999 13 Shear Panels/HD's NR PY
9/23/1999 13 Shear Panels/HD's NR PY
9/23/1999 15 Roof/Reroof AP PY
8/19/1999 11 Ftg/Foundation/Piers AP PY
8/6/1999 21 Underground/Under Floor AP PY
8/6/1999 22 Sewer/Water Service AP PY
12/28/99 00:17 FAX
City of Carl~bAA ...
207S °Las •Pal mas Drive, Carlsbad C&lifo~ia 92009 .
• '·.. t. --
1 NS P ECT ION · RECO RO.-:-:-_. -
)8 ADDRESS: __ _
•WNERS NAME: CB991314 1580 SAPPHIRE DR CBAD
SE/OCCUPANCY COBBLESTONE -PHASE 11
PLAN 4, SFD 2284 SF, GAR 475 SF
BUILDING
OTHER-
RESDNTL SFD
Lot#: 141 GREYSTONE HOMES
APPROVED TO COVER .-_-.'. -· ·,: .. :
Type of Inspection
BUILDING
FOUNDATION
REINFORCED STEEL
ONRY
ROUT 0 WALL DRAINS
TILT PANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME □ FLOOR □ CEILING
ROOF SHEATHING
EXT. SHEAR PANELS
FRAME
INSULATION
EXTERIOR lA TH
INTERIOR LATH 8c DRYWALL
FINAL
PLUMB/NC
D SEWER AND BUCO· 0 PUCO
UNDERGROUND O WASTE □WATER
TOP OUT □ WASTE · 0 WATER
TUB AND SHOWER PAN
L'AS TEST □ GAS Plf'ING
□ WATER HEATER O SOLAR WATER
FINAL
ELECTRICAL
□ ELECTRIC UNDERGROUND □ UFER
ROUCH ELECTRIC WALLS
ROUGH ELECTRIC CEILING
iilELECTRIC SERVICE □ TEMPORARY
□ BONDING □ POOL
FINAL
MECHANICAL
UNDERGROUND DUCTS & PIPING
D DUCT & PLEM.□ REF. PIPING
HEAT-AIR COND. SYSTEMS
VENTILATING SYSTEMS
FINAL
Pate
4 /.
I
.
J J
I I ..
Inspector ·.:
'··"
·,
. . . . : ·,: :
,'•
' .. 1 •: ~. -... ..
., .,
•. ,.
-. ' i: ..
• ' I ·,
,• ... '·
,t-1-_ ...... ,. ·-
-.• '' •' ..
I ' / .'/ '
, J (J/ ..,-,_ ' y. '. ,:
.• ,,.
CALL FOR FINAL INSPECTION WHEN ALLAPPROPRIA TE ITEMS ABOVE HAVE BEEN APPROVED
AL Sign When Appropriate
ing Dept. (Inspections) 438-3101
Fire Department 931-2121
Planning Department 438-1161
Engineering DepL (Inspections) •436-3891
Building Inspectors (7am-4pml 43&-3550 ;··, : ·.
CMWD · 438-2722 Ext 71 :SJ
Water Inspections 438-3891
Notes
EV 9/98 '. SEE ~ACK FOR SPECIAL NOTES
~06