Loading...
HomeMy WebLinkAbout1580 SAPPHIRE DR; ; CB991314; PermitCity of Carlsbad 04/26/1999 Residential Permit Permit No:CB991314 Building Inspection Request Line (760) 438-3101 Job Address: 1580 SAPPHIRE DR CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2122011500 Lot#: 141 Applied: Valuation: $198,213.00 Construction Type: VN Entered By: Occupancy Group: 6 Reference #: CT84-32 04/05/1999 # Dwelling Units: Structure Type: SFD Issued: Bedrooms: 4 Bathrooms: 2.5 Inspect Area: Project Title: COBBLESTONE -PHASE11 Orig PC#: PLAN 4, SFD 2284 SF, GAR 475 SF Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 Plan Check#: Owner: GREYSTONE HOMES INC 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 ISSUED 03/17/1999 JM Plan Approved: 04/26/1999 CB971300 990038 Total Fees: $17,447.48 Total Payments To Date: $0.00 Balance Due: $17,447.48 Building Permit $967.58 Reel. Water Con. Pee $0.00 Add'I Building Permit Fee $0.00 Meter Size Plan Check $628.93 Add'I Re~I. Water Con. Fee $0.00 Add'I Plan Check Fee $0.00 CFp Payoff Fee $2,685.23 Plan Check Discount ($50.31) PFF $3,607.48 Strong Motion Fee $19.82 PFF (CFO Fund) $0.00 Park in Lieu Fee $1 ,575.00 license Tax $0.00 Park Fee $0.00 License Tax (CFO Fune!) $0.00 LFM Fee $0.00 Traffic Impact Fee $550.00 Bridge Fee $0.00 Traffk; Impact (CFO Fund) $0.00 Other Bridge Fee $0.00 PLUMBING TOTAL $182.00 BTD #2 Fee $0.00 ELECTRICAL TOTAL $41 .25 BTD #3 Fee $0.00 MECHANICAL TOTAL $61 .50 Renewal Fee $0.00 Housing Impact Fee $2,925.00 Add'I Renewal Fee $0.00 Housing lnlieu Fee $0.00 Other Building Fee $0.00 Master Drainage Fee: $0.00 Pot. Water Con. Fee $2,400.00 Sewer Fee: $1,854.00 Meter Size 05/8 Add'I Pot. Water Con. Fee $0.00 TOTAL PERMIT FEES $17,447.48 Clearance: \+·~-AA ()I,) NOTICE: Please take NOTI E that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions.· You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. L BAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 ('.ity of Carlsbad Inspection Request For: 12/21/1999 Permit# CB99: 314 Tille: COBFJLESTONE -PHASE 11 Description: PLA~I 4, SFD 2284 SF, GAR 475 SF Type: RESUNTL Sub Type: SFD Job Address: 1580 SAPPHIRE DR Suite: Lot 141 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: RESET FROM MONDAY Total Time: CD Description Act Comments 19 Final Structural ~ 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsi;iection Hisloet Date Description Act lnsp Comments Inspector Assignment: PY --- Phone: 7606030056 Inspector: ----- Requested By: SHELDON Entered By: CHRISTINE 12/20/1999 89 Final Combo NS PD RESET FOR TUES 11/22/1999 39 Final Electrical AP DM EMR 10/25/1999 18 Exterior Lath/Drywall AP TP 10/22/1999 18 Exterior Lath/Drywall NR PY 10/15/1999 17 Interior Lath/Drywall AP PD 10/15/1999 18 Exterior Lath/Drywall NS PD 10/15/1999 23 GasfTesVRepairs AP PD 10/8/1999 84 Rough Combo AP PY 10/5/1999 13 Shear Panels/HD's AP PY 10/5/1999 15 Roof/Reroof WC PY 10/4/1999 13 Shear Panels/HD's CA PY 10/1/1999 13 Shear Panels/HD's NR PY 9/23/1999 13 Shear Panels/HD's NR PY 9/23/1999 15 Roof/Reroof AP PY 8/19/1999 11 Ftg/Foundation/Piers AP PY 8/6/1999 21 Underground/Under Floor AP PY 8/6/1999 22 Sewer/Water Service AP PY 12/28/99 00:17 FAX City of Carl~bAA ... 207S °Las •Pal mas Drive, Carlsbad C&lifo~ia 92009 . • '·.. t. -- 1 NS P ECT ION · RECO RO.-:-:-_. - )8 ADDRESS: __ _ •WNERS NAME: CB991314 1580 SAPPHIRE DR CBAD SE/OCCUPANCY COBBLESTONE -PHASE 11 PLAN 4, SFD 2284 SF, GAR 475 SF BUILDING OTHER- RESDNTL SFD Lot#: 141 GREYSTONE HOMES APPROVED TO COVER .-_-.'. -· ·,: .. : Type of Inspection BUILDING FOUNDATION REINFORCED STEEL ONRY ROUT 0 WALL DRAINS TILT PANELS POUR STRIPS COLUMN FOOTINGS SUBFRAME □ FLOOR □ CEILING ROOF SHEATHING EXT. SHEAR PANELS FRAME INSULATION EXTERIOR lA TH INTERIOR LATH 8c DRYWALL FINAL PLUMB/NC D SEWER AND BUCO· 0 PUCO UNDERGROUND O WASTE □WATER TOP OUT □ WASTE · 0 WATER TUB AND SHOWER PAN L'AS TEST □ GAS Plf'ING □ WATER HEATER O SOLAR WATER FINAL ELECTRICAL □ ELECTRIC UNDERGROUND □ UFER ROUCH ELECTRIC WALLS ROUGH ELECTRIC CEILING iilELECTRIC SERVICE □ TEMPORARY □ BONDING □ POOL FINAL MECHANICAL UNDERGROUND DUCTS & PIPING D DUCT & PLEM.□ REF. PIPING HEAT-AIR COND. SYSTEMS VENTILATING SYSTEMS FINAL Pate 4 /. I . J J I I .. Inspector ·.: '··" ·, . . . . : ·,: : ,'• ' .. 1 •: ~. -... .. ., ., •. ,. -. ' i: .. • ' I ·, ,• ... '· ,t-1-_ ...... ,. ·- -.• '' •' .. I ' / .'/ ' , J (J/ ..,-,_ ' y. '. ,: .• ,,. CALL FOR FINAL INSPECTION WHEN ALLAPPROPRIA TE ITEMS ABOVE HAVE BEEN APPROVED AL Sign When Appropriate ing Dept. (Inspections) 438-3101 Fire Department 931-2121 Planning Department 438-1161 Engineering DepL (Inspections) •436-3891 Building Inspectors (7am-4pml 43&-3550 ;··, : ·. CMWD · 438-2722 Ext 71 :SJ Water Inspections 438-3891 Notes EV 9/98 '. SEE ~ACK FOR SPECIAL NOTES ~06