Loading...
HomeMy WebLinkAbout1497 SAPPHIRE DR; ; CB982959; PermitB U I L D I N G 10/08/98 16:05 Page 1 of 1 P E R M I T Permit No: CB982959 Project No : A9803853 Development No: DEV89133 Job Address: 1497 SAPPHIRE DR Suite: Permit Type: SINGLE FAMIL~ DWLNG -DETACHED Parcel No: ell ;). lq, 1 "u'7D Lo t#: ~ 1Valuation: 200,143 Construction Type : VN ISSUED 06/03/98 10/09/98 RMA Occupancy Group: Referen ce#: Description: 2275 SF+591 GAR,PLAN 3,PHASE 5 : COBBLESTONE ,GREYSTONE Appl/Ownr : GREYSTONE HOMES 5973 AVENIDA ENCINAS CARLSBAD CA 92008 CT84-32 Status: Applied: Apr/Issue: Entered By: 760 804-7700 Plan Check Numbers > ORIG 971300 PCK 982849 *** Fees Required *** *** Fees Collectedz!sr6C.ro)".m'983 0001 01 *liOe ------------------------------------€-PRM'f----45640-23 Fees: 15,640.23 Adjustments: .00 ['otal Cred ·ts: Total Fees : 15,640 .23 Total Payments: Balance-Due: Fee description Units F efun·t Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee > . . > or Enter Park-in-Li u Fee & AcctR-f' Enter "Y" to Autocal P.F .F. "> Enter "Y" to Autocalc T.I .F. t ~ 4 2.50 Enter Plan Check Dis o t ? ~ Payoff Fee for CFD > ~ 26~5.20 Enter #Uni ts & Code-Po able Wat~ ) \ 1 Enter "Y" for Plumbing ssue Fee > iR1 ° Each Plumbing Fixture or Tra > Each Building Sewer > Each Install/Repair Water Line > Each Water Heater and/or Vent Gas Piping System > --~-1 Each Vacuum Breaker > 2 Enter 11y11 for Electric Issue Fee > Single Phase Per AMP > 125 Enter 'y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > 2 Each Install Fireplace > 2 Each Exhaust Fan > 2 Each Install/Reloc Vent ) 2 Construct Housing(Y/N)? > Enter Impact Fee > 2925 .25 9 .00 6.50 6,50 4.50 ,00 .00 15,640.23 Ext fee Data 4.00 2.50 975.00 634.00 20.00 -51.00 1575 .00 3 3643.00 y 550.00 y 2685.23 2400 .00 D5/8 20.00 y 105.00 15.00 7.00 7.00 7.00 14.00 10 .00 y 31.25 15.00 y 18.00 13.00 13.00 9.00 N 2925 .00 A~ )VAL -, /''JSP.-t--lJ'--DA1$/; 7 /c;1 -1 CITY OF CARLSBA8 LEARANCE CJ 's-t 31 \1,\90., J 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 ' City of Carlsbad Inspection Request For: 3/9/99 Permit# CB982959 Title: 2275 SF+591 GAR,PLAN 3,PHASE 5 Description: COBBLESTONE,GREYSTONE Type:SFD Sub Type: Job Address: Suite: Location: 1497 SAPPHIRE DR Lot O.PPLICANT : GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description 23 Act Comments Inspector Assignment: PY --- Phone: Inspector: ----- Requested By: SHELDON Entered By: BARBARA 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical pf----- Inspection History Date Description Act lnsp Comments 3/2/99 39 Final Electrical WC PY 2/26/99 39 Final Electrical PA PY EMR 1/29/99 23 Gas/TesURepairs AP PY 1/19/99 17 Interior Lath/Drywall AP PY 1/19/99 18 Exterior Lath/Drywall AP PY 1/8/99 16 Insulation AP PY 1/6/99 84 Rough Combo AP PY 12/23/98 13 Shear Panels/HD's AP PY 12/21/98 13 Shear Panels/HD's NS PY 12/9/98 15 Roof/Reroof AP PY 10/28/98 11 Ftg/Foundation/Piers AP PY 10/22/98 21 Underground/Under Floor AP PY F!:;!I CltYafCarlsbad m Rnal BUIiding Inspection Dept: Building Enginee · Plan Check #: Permit#: Project Name: CB982959 2275 SF+591 GAR.PLAN 3,PHASE 5 COBBLESTONE,GREYSTONE Address: 1497 SAPPHIRE DR Contact Person: SHELDON Phone: Sewer Dist: Water Dist: MWD St Lite Fire Date: Permit Type: Sub Type: Lot: 23 3/9/99 SFD ■II 111111 Il l I 1111111111111111111111111111■■■■■ I I I I·······•••·•••■ 1■■ ■ ■■■■1tl■ •••••• ■ ■ ••••••••••••••••• ■ ■ •••·••• ■ t■II I Ill I II IJI I 11■11111 Ill I I 11I111111111 1 1 1 Inspected Date By: ~ Inspected:~. l ~ • 't 't Approved: v Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ 11111 I 111111111 I 11111 Ill I I 1111111111111111111 I I ti I••••··•• ■■I I l l I Ill I I II 111111■■■■■■ I ■■■■■■■■■■■111111 I I•••••••■ ■I■■ I I ■I I I I I I I···•••••■ ■II I 11111111111 Ill 11 Comments: _______________________________ _ ' a CIIJ 11 Carlsbad m Rnal Bulldinu Inspection Dept: Building Engineering Planning CMWD St Li Plan Check #: Date: 3/9/99 Penni!#: Project Name: CB982959 2275 SF+591 GAR.PLAN 3,PHASE 5 COBBLESTONE,GREYSTONE Address: 1497 SAPPHIRE DR Contact Person: SHELDON Phone: Sewer Dist: Water Dist: Inspected Date By: Q, {hcgch Inspected: 3{ I] {?1 Inspected Date By: Inspected: Inspected Date By: Inspected: Penni! Type: SFD Sub Type: Lot: 23 MAR • 9 1999 Approved: ~ Disapproved: __ Approved: Disapproved: __ Approved: Disapproved: __ Comments: ______________________________ _ ~ Cttv ., Carlsbad -m Rnal Buildlna Inspection ' Dept: Building ning CMWD St Lite Fire Plan Check #: Date: Permit#: CB982959 Permit Type: Project Name: 2275 SF+591 GAR.PLAN 3,PHASE 5 Sub Type: COBBLESTONE,GREYSTONE Address: 1497 SAPPHIRE DR Lot: 23 Contact Person: SHELDON Phone: RECEIVED MAR -91999 3/9/99 SFD Sewer Dist: Water Dist: -i:.~~~;rt ·u 1=··········~:~~~:~~:·~/~'i··~~······~~~;~~~~::z··~;~~~~:~~~~:·= Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ Comments: ----------------------------- ~ CllVIICarlsbad lfa Final Bulldlng IDSP~OD Dept: Building Engineering Plannin ~~=D Jt Lite Fire Plan Check#: C/ Date: 3/9/99 Peonit#: Project Name: CB982959 2275 SF+591 GAR,PLAN 3,PHASE 5 COBBLESTONE,GREYSTONE Address: 1497 SAPPHIRE DR Contact Person: SHELDON Phone: Sewer Dist: Water Dist: Peonit Type: SFD Sub Type: Lot: 23 By: ) ~ Inspected: ']-//-f1 Approved: Inspected ( ~ Date ~sapproved: __ Inspected Date By: ___________ Inspected: ______ Approved: ___ Disapproved: __ Inspected Date By: Inspected: ______ Approved: ___ Disapproved: __ Comments: _______________________________ _ cnv or Carlsbad ~ ·; Final Building Inspection • -"lli'"" • Dept: 0 ~uilding Engineering Planning CMWb St Lite -~re Plan Check#: ~ J Date: 3/9/99 Permit#: CB982959 Permit Type: SFD Project Name: 2275 SF+591 GAR.PLAN 3,PHASE 5 Sub Type: COBBLESTONE,GREYSTONE Address: 1497 SAPPHIRE DR Lot: 23 Contact Person: SHELDON Phone: Sewer Dist: Water Dist: Inspected Lf~ Date ✓ By: Inspected: .,3-I() Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Comments: _______________________________ _