Loading...
HomeMy WebLinkAboutDWG 499-5; 6042; EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD - PHASE 1; 01-39L1L2L3L4L5L6L7 L8 L9L10C1 C2L13 L14C3 L15L16L17L18 C4 C 5 L19 L 2 0 L21L22 L23L24L25L26 L27L28 L29L30 L31L32 L33 L34L35 L36 L37L38L39L40 L41L4 2L43 L44 L45L46L4 7L48L49L50L51 C6 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 30 60 SCALE: 1" = 30' CONSTRUCTION STAGING PLAN 2 4 3 2 1 1 2 3 4 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 20 40 SCALE: 1" = 20' 3 CIVIL IMPROVEMENT PLAN (SOUTHERN SIDE) 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 20 40 SCALE: 1" = 20' 4 CIVIL IMPROVEMENT PLAN (NORTHERN SIDE) PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 10 20 SCALE: 1" = 10' 5 CIVIL EXISTING UTILITY PLAN ” ” 5. ”” 6.” 7.” 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 10 20 SCALE: 1" = 10' 6 CIVIL GRADING PLAN 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 0 SCALE IN FEET 20 40 SCALE: 1" = 20' EROSION AND SEDIMENT CONTROL PLAN 7 1 1 1 1 1 22 2 2 1 3 3 3 3 3 44 “” TRAFFIC39TRANSPORTATION DEPARTMENTEL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-0006ONLY8SIGNING AND STRIPING PLANTURN RIGHTRIGHT LANEMUSTNOT USED WITH THIS PROJECT4-10-202022 TRAFFIC39TRANSPORTATION DEPARTMENTEL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-00069TRAFFIC SIGNAL MODIFICATION PLANEXISTING PHASE DIAGRAMLEGENDDETECTOR ASSIGNMENTNOT USED WITH THIS PROJECT4-10-202022 TRAFFIC39TRANSPORTATION DEPARTMENTEL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-000610TRAFFIC CONTROL PLAN NO 1TURN RIGHTRIGHT LANEMUSTSPEEDLIMIT554-10-202022 TRAFFIC39TRANSPORTATION DEPARTMENTEL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-000611TRAFFIC CONTROL PLAN NO 2TURN RIGHTRIGHT LANEMUSTSPEEDLIMIT554-10-202022 LOTB GENERAL NOTES PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 28 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 4-9-20 6/30/2022 0 SCALE IN FEET 20 40 SCALE: 1" = 20' LOTB PLAN AND LOG (B-1) PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 29 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 4-9-20 6/30/2022 0 SCALE IN FEET 20 40 SCALE: 1" = 20' LOTB PLAN AND LOG (B-2) PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON ARCH D (24"x36") SHEETS. FOR REDUCTIONS, REFER TO GRAPHIC SCALE. 30 39 KLEINFELDER Bright people, Right Solutions. 550 West C Street Suite 1200 San Diego, CA 92101 Tel. (619) 831-4600 Fax. (619) 232-1039 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: CDP2018-0031/SUP2018-0005/SUP2018-0006 4-9-20 6/30/2022 EL CAMINO REAL LIMITS OF WORK CANNON ROADLIMITS OF WORK 39 Engineering, Inc. E-MAIL: engineer@treisd.com TREI PROJECT # 17332.S00 Consulting Engineers 4719 PALM AVENUE LA MESA, CA 91941-5221 619 / 466 / 6224 fax 466 / 6233 T U R P I N & R A T T A N H.Lozano 04/09/20 - 12:55pm Drawing Name: J:\17\17332.S00 - El Camino Real Pedestrian Bridge\17332.00\Acadproj\17332.S00_E31 ELECTRICAL SINGLE LINE DIAGRAM, LEGEND AND GENERAL NOTES.dwg Plotted by: H.Lozano | Plot Date: 04/09/20 | Plot Time: 12:55pmCDP2010031/SUP2010005/SUP2010006 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: No.11533 exp.6/30/20 E LECTR I C A LS TATE OF CA L I F O R N IAREGISTERED P R O FESSIONAL E NGI NEERDALE M . FRANC H A K. ELECTRICAL SITE PLAN 31 ELECTRICAL LEGEND SYMBOL DESCRIPTION DESCRIPTIONABBREV. ABBREVIATIONSELECTRICAL LEGEND SYMBOL DESCRIPTION BRANCH CIRCUIT DESIGNATIONS: GENERAL NOTES GENERAL NOTES ELECTRICAL SITE PLAN KEYNOTES GRADE MOUNTED PULLBOX DETAIL PULLBOX DETAIL KEYNOTES ELECTRICAL SITE PLAN, LEGEND AND GENERAL NOTES 4-9-20 6/30/2022 39 Engineering, Inc. E-MAIL: engineer@treisd.com TREI PROJECT # 17332.S00 Consulting Engineers 4719 PALM AVENUE LA MESA, CA 91941-5221 619 / 466 / 6224 fax 466 / 6233 T U R P I N & R A T T A N H.Lozano 04/09/20 - 12:55pm Drawing Name: J:\17\17332.S00 - El Camino Real Pedestrian Bridge\17332.00\Acadproj\17332.S00_E32 LIGHTING PLANS AND DETAILS.dwg Plotted by: H.Lozano | Plot Date: 04/09/20 | Plot Time: 12:55pmCDP2010031/SUP2010005/SUP2010006 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: No.11533 exp.6/30/20 E LECTR I C A LS TATE OF CA L I F O R N IAREGISTERED P R O FESSIONAL E NGI NEERDALE M . FRANC H A K. LIGHTING PLAN AT BRIDGE BRIDGE SECTION WITH LIGHTING LIGHTING ELEVATION AT BRIDGE 32 LIGHTING PLAN AND DETAILS 4-9-20 6/30/2022 39 Engineering, Inc. E-MAIL: engineer@treisd.com TREI PROJECT # 17332.S00 Consulting Engineers 4719 PALM AVENUE LA MESA, CA 91941-5221 619 / 466 / 6224 fax 466 / 6233 T U R P I N & R A T T A N H.Lozano 04/09/20 - 12:55pm Drawing Name: J:\17\17332.S00 - El Camino Real Pedestrian Bridge\17332.00\Acadproj\17332.S00_E33 LIGHTING PHOTOMETRIC STUDY AND FIXTURE SCHEDULE.dwg Plotted by: H.Lozano | Plot Date: 04/09/20 | Plot Time: 12:55pmCDP2010031/SUP2010005/SUP2010006 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: No.11533 exp.6/30/20 E LECTR I C A LS TATE OF CA L I F O R N IAREGISTERED P R O FESSIONAL E NGI NEERDALE M . FRANC H A K. LIGHTING PHOTOMETRIC STUDY LIGHTING FIXTURE SCHEDULE FIXTURE TYPE MANUFACTURER AND CATALOG NUMBER EQUIVALENT MANUFACTURER SUBJECT TO APPROVAL OF SHOP DRAWINGS COLOR TEMP. INPUT VOLTS TOTAL INPUT WATTS DRIVER TYPETYPEWATTS LAMPS FIXTURE MOUNTING DESCRIPTION FIXTURE NOTES 33 LIGHTING PHOTOMETRIC STUDY AND FIXTURE SCHEDULE 4-9-20 6/30/2022 39 Engineering, Inc. E-MAIL: engineer@treisd.com TREI PROJECT # 17332.S00 Consulting Engineers 4719 PALM AVENUE LA MESA, CA 91941-5221 619 / 466 / 6224 fax 466 / 6233 T U R P I N & R A T T A N H.Lozano 04/09/20 - 12:55pm Drawing Name: J:\17\17332.S00 - El Camino Real Pedestrian Bridge\17332.00\Acadproj\17332.S00_E34 OUTDOOR TITLE 24 DOCUMENTATION.dwg Plotted by: H.Lozano | Plot Date: 04/09/20 | Plot Time: 12:55pmCDP2010031/SUP2010005/SUP2010006 EL CAMINO REAL BRIDGE IMPROVEMENTS AT CANNON ROAD IMPROVEMENT PLAN FOR: No.11533 exp.6/30/20 E LECTR I C A LS TATE OF CA L I F O R N IAREGISTERED P R O FESSIONAL E NGI NEERDALE M . FRANC H A K. 34 OUTDOOR TITLE 24 DOCUMENTATION 4-9-20 6/30/2022 EL CAMINO REALCANNON ROAD25'25'EL CAMINO REALCANNON ROADIRRIGATION DEMOLITION PLANRANCHO CARLSBAD OWNER TODISCONNECT/CAP EX. SPRINKLER(S)AND LINE AT CREEK SIDE OF CHAINLINK FENCE.EX. MANUAL IRRIGATION IN OPEN AREA INSIDERANCHO CARLSBAD:OWNER TO CUT AND CAP APPROXIMATELYTHREE (3) EX. FULL CIRCLE IMPACTSPRINKLERS ADJACENT TO AND ON NORTHSIDE OF EX. WALL AT EL CAMINO REAL, ANDCUT AND CAP EX. LINE(S) FOR LATERRECONNECTION AND SYSTEM RESTORATIONBY RANCHO CARLSBAD.EX. MANUAL OVERHEAD IRRIGATION INBETWEEN WALL AND EL CAMINO REAL. REMOVEALL IRRIGATION EQUIPMENT WITH DEMOLITION.CUT AND CAP LINE(S) FROM VALVEOUTSIDE, AND EAST OFCONSTRUCTION AREA. ADJUST EX.IRRIGATION COVERAGE AS REQUIRED.EX. RECYCLED WATER IRRIGATIONSYSTEM (ROBERTSON RANCH EAST H.O.A.)ADJUST EX. 12" POP-UP SPRAY HEADS ATEDGE OF NEW SIDEWALK (APPROX. 6'-8"FROM EX. FACE OF CURB)35REMOVE POP-UP HEADS WITHIN LIMIT OFWORK AND CUT AND CAP LINE(S) OUTSIDEAND WEST OF CONSTRUCTION AREA.ADJUST EX. IRRIGATION COVERAGE ASREQUIRED TO MAINTAIN EVEN COVERAGEOF REMAINING LANDSCAPE AREA.CHAIN LINK FENCESEE CIVIL PLANKLEINFELDERBright people, Right Solutions.550 West C Street Suite 1200 San Diego, CA 92101Tel. (619) 831-4600 Fax. (619) 232-10393916 Normal StreetSan Diego, CA 92103619.294.4477www.ktua.com30201050SCALE: 1"= 10'39EL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-0006LIMITS OF WORKNOTE:SEE GREENBOOK SPECIFICATIONS ANDPROJECT SPECIAL PROVISIONS FORADDITIONAL INFORMATIONALL EXISTING PLANTING AND/ORIRRIGATION DESIGNATED TO REMAIN ONSITE SHALL BE PROTECTED IN PLACE. ANYEXISTING PLANTING ORIRRIGATION DAMAGED DURING THECOURSE OF THE PROJECT SHALL BEREPLACED IN KIND TO THE SATISFACTIONOF THE CITY AND PER LANDSCAPE MANUALREQUIREMENTS EL CAMINO REALCANNON ROADEL CAMINO REALCANNON ROADIRRIGATION PLAN36VERIFY EXISTING IRRIGATION CONTROLVALVE AND SYSTEM IS OPERATIONAL.TEMPORARILY REMOVE END HEAD(S) ANDFLUSH OUT END OF LINE PRIOR TO ANYWORK.VERIFY EXACT LOCATION OF, ANDCONNECT TO EXISTING LATERAL LINE ANDEXTEND TO NEW IRRIGATION HEADS.ADJUST NEW HEADS TO PROVIDE WATERTO NEW TREES WITHOUT OVERSPRAYONTO SIDEWALK, UTILITIES, D.G., ETC.CHAIN LINK FENCEPER CIVIL PLANKLEINFELDERBright people, Right Solutions.550 West C Street Suite 1200 San Diego, CA 92101Tel. (619) 831-4600 Fax. (619) 232-10393916 Normal StreetSan Diego, CA 92103619.294.4477www.ktua.com30201050SCALE: 1"= 10'39EL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-0006LIMITS OF WORKVERIFY EXACT LOCATION OF EXISTING LATERALLINE. CONNECT TO EXISTING LATERAL LINE ANDEXTEND TO NEW IRRIGATION HEADS. ADJUST NEWHEADS TO PROVIDE WATER TO NEW TREESWITHOUT OVERSPRAY ONTO SIDEWALK OR DG.PROPOSED TREES PERPLANTING PLAN SHEET 38IRRIGATION SCHEDULESYMBOLMANUFACTURER/MODELARCPSIGPMRADIUS6" POP-UP TREE SPRAY HEAD PER DETAIL ARAIN BIRD 1806-SAM-PRS WITH 1800NP COVER& SQ-Q NOZZLEQTR.300.124'x4'6" POP-UP TREE SPRAY HEAD PER DETAIL A1806-SAM-PRS WITH 1800 NP COVER & U8-QNOZZLE90300.268'IRRIGATION LATERAL LINE: 34" PVC SCHEDULE40PIPE SLEEVE: 2" PVC SCHEDULE 40; EXTEND12" BEYOND EDGE OF PAVEMENT AND D.G.SURFACESEXISTING MAINLINE (APPROXIMATE LOCATION.CONTRACTOR TO VERIFY)6" POP-UP TREE SPRAY HEADASECTIONSCALE: N.T.S.LEGENDINSTALL 2" ABOVE FINISH GRADE IN SHRUBAREAS / FLUSH WITH FINISH GRADE INTURF AREASFINISH GRADEPOP-UP BODY WITH SPRAY NOZZLE. REFERTO LEGEND18" MIN. SOIL COVERSWING JOINT ASSEMBLY, (3) PVC SCH 40STREET ELLS WITH (1) 6" THREADED PVCSCH 80 NIPPLELINE SIZE PVC SCH 40 SLIP X SLIP X 12" FIPTTEE OR LINE SIZE SLIP X 12" FIPT ELL ATTERMINAL ENDS34" PVC NON-PRESSURE LATERAL LINE.112233445566724" FROM EDGEOF HARDSCAPE235671NOTES:1.REFER TO PLANS FOR SPECIFICDIMENSIONS AND IRRIGATION NOTES FORSPRINKLER PLACEMENT.2.USE TEFLON TAPE ON ALL THREADEDCONNECTIONS.4EXISTING MAINLINECAPPED AT LIMITOF LANDSCAPEDEMOLITION PERSHEET 35VERIFY EXISTING IRRIGATION CONTROL VALVE ANDSYSTEM IS OPERATIONAL. TEMPORARILY REMOVEEND HEAD(S) AND FLUSH OUT END OF LINE PRIORTO ANY WORK.INSTALL HEAD 36"FROM TREE TRUNKNOTES:1.SEE GREENBOOK SPECIFICATIONS ANDPROJECT SPECIAL PROVISIONS FORADDITIONAL INFORMATION.2.ONLY SUBSURFACE IRRIGATION SHALL BEUSED TO IRRIGATE ANY VEGETATION WITHINTWENTY-FOUR INCHES OF AN IMPERMEABLESURFACE UNLESS THE ADJACENTIMPERMEABLE SURFACES ARE DESIGNEDAND CONSTRUCTED TO CAUSE WATER TODRAIN ENTIRELY INTO A LANDSCAPED AREA.ALL EXISTING PLANTING AND/ORIRRIGATION DESIGNATED TO REMAIN ONSITE SHALL BE PROTECTED IN PLACE. ANYEXISTING PLANTING ORIRRIGATION DAMAGED DURING THECOURSE OF THE PROJECT SHALL BEREPLACED IN KIND TO THE SATISFACTIONOF THE CITY AND PER LANDSCAPE MANUALREQUIREMENTS EL CAMINO REALCANNON ROAD25'25'TREE REMOVAL PLANREMOVE EX. TREESSEE CHART FOR TYPE AND SIZEEX. TREE TO REMOVE (TYP.)REFER TO CHART FOR TYPEAND SIZEEX. OAK TREE TOREMAIN; PROTECT INPLACEEX. TREE TO REMAIN;PROTECT IN PLACEREMOVE ALL WEEDS SUCH AS CASTORBEAN (RICINUS COMMUNIS) FROMCREEK AREA WITHIN LIMIT OF WORK.PROTECT ALL NATIVE VEGETATION.37CHAIN LINK FENCEPER CIVIL PLANKLEINFELDERBright people, Right Solutions.550 West C Street Suite 1200 San Diego, CA 92101Tel. (619) 831-4600 Fax. (619) 232-10393916 Normal StreetSan Diego, CA 92103619.294.4477www.ktua.com30201050SCALE: 1"= 10'39EL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-00061234657101189121314151816171921202223#LIMITS OF WORK2524EX. TREE TO REMAIN;PROTECT IN PLACENOTES:1.SEE GREENBOOK SPECIFICATIONS AND PROJECTSPECIAL PROVISIONS FOR ADDITIONALINFORMATION.2.REFER TO CIVIL PLANS FOR EROSION CONTROLHYDROSEED INFORMATION.3.ANY TREES LOCATED WITHIN A VEHICULAR SIGHTLINE MUST HAVE ALL LIMBS REMOVED TO A HEIGHTOF 6 FEET ABOVE THE ADJACENT TOP OF CURB.LEGENDEXISTING TREES LEGEND EL CAMINO REALCANNON ROAD25'25'LANDSCAPE MATERIAL AND PLANTING PLANCOBBLE (DETAIL C, SHEET 39)STABILIZED DECOMPOSED GRANITE (DETAIL D, SHEET 39)RECOMPACT SOIL 12 INCHES FROM FINISHED SIDEWALK EDGE2"-3" SIZE COBBLESTABILIZEDDECOMPOSEDGRANITECONCRETESIDEWALK PERCIVIL PLANSRECOMPACT IMPACTEDEDGE, MIN. 12" FROMFINISHED SIDEWALK2"-3" SIZE COBBLESTABILIZEDDECOMPOSEDGRANITEEX. TREE TO REMAIN;PROTECT IN PLACEEX. TREE TO REMAIN;PROTECT IN PLACELEGEND6" CONCRETE CURBUNDER RAILING(RAILING PER BARRIERREPLACEMENT PLAN)6" CONCRETE CURBUNDER RAILING (RAILINGPER BARRIERREPLACEMENT PLAN)6" CONCRETE CURBUNDER RAILING(RAILING PER BARRIERREPLACEMENT PLAN)6" CONCRETE CURBUNDER RAILING (RAILINGPER BARRIERREPLACEMENT PLAN)6" CONCRETEMOW CURB6" CONCRETEMOW CURB6" CONCRETEMOW CURB6" CONCRETEMOW CURBSTABILIZEDDECOMPOSEDGRANITE6" CONCRETE MOW CURB (DETAIL E, SHEET 39)38CHAIN LINK FENCEPER CIVIL PLANKLEINFELDERBright people, Right Solutions.550 West C Street Suite 1200 San Diego, CA 92101Tel. (619) 831-4600 Fax. (619) 232-10393916 Normal StreetSan Diego, CA 92103619.294.4477www.ktua.com30201050SCALE: 1"= 10'39EL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-00066" CONCRETEMOW CURBLIMITS OF WORKLANDSCAPE MULCH 3" DEEPLANDSCAPE MULCHEX. TREE TO REMAIN;PROTECT IN PLACELAG TUS24" BOX9NOTES:1.SEE GREENBOOK SPECIFICATIONSAND PROJECT SPECIAL PROVISIONSFOR ADDITIONAL INFORMATION.2.REFER TO SHEET 39 FORMATERIALS SCHEDULE.PROTECT IN PLACE EXISTINGLANDSCAPE TO THE EXTENTPRACTICABLE. REPLACE IN KIND ANYLANDSCAPE DISTURBED BY PROJECTCONSTRUCTION.ALL EXISTING PLANTING AND/ORIRRIGATION DESIGNATED TO REMAIN ONSITE SHALL BE PROTECTED IN PLACE. ANYEXISTING PLANTING ORIRRIGATION DAMAGED DURING THECOURSE OF THE PROJECT SHALL BEREPLACED IN KIND TO THE SATISFACTIONOF THE CITY AND PER LANDSCAPE MANUALREQUIREMENTSSIGHT TRIANGLEEXISTINGSTREET LIGHT(TYP.)·TREES SHALL BE PLANTED TO MEET THE 2:1 RATIO PRESCRIBED BY THE CITY OF CARLSBAD COMMUNITY FOREST MANAGEMENT PLAN.COORDINATION WITH CITY OF CARLSBAD PARKS AND RECREATION FOR ADDITIONAL 8 - 24" BOX TREES TO BE PLANTED ALONG THE ELCAMINO REAL CORRIDOR TO SATISFY THE PLAN REQUIREMENTS.·ANY TREES LOCATED WITHIN A VEHICULAR SIGHT LINE MUST HAVE ALL LIMBS REMOVED TO A HEIGHT OF 6 FEET ABOVE THEADJACENT TOP OF CURBHYDROSEEDAREA PER CIVILSHEET 7HYDROSEEDAREA PER CIVILSHEET 7HYDROSEED PER CIVIL PLANS, SHEET 7QUE AGR24" BOX2PLA RAC24" BOX3TREESCODEBOTANICAL NAMECOMMON NAMESIZEQTYREMARKSLAG TUSLagerstroemia x `Tuscarora`Crape Myrtle Coral Pink24" BOX9SELECT FOR PINK FLOWER COLOR. STAKEPER DETAIL A, SHEET 39.PLA RACPlatanus racemosaCalifornia Sycamore24" BOX3TREE SHALL HAVE A STRONG LEADER,SYMMETRICAL CANOPY, AND GOOD COLOR.STAKE PER DETAIL A, DRAIN PIPE PERDETAIL B, SHEET 39.QUE AGRQuercus agrifoliaCoast Live Oak Multi-Trunk24" BOX2TREE SHALL HAVE A STRONG LEADER,SYMMETRICAL CANOPY, AND GOOD COLOR.STAKE PER DETAIL A, DRAIN PIPE PERDETAIL B, SHEET 39.PLANT_SCHEDULE MATERIALS SCHEDULESYMBOLDETAILREFERENCEDESCRIPTIONSIZE, OR COLOR/FINISHREMARKSSUPPLIER (ALL MAY BEAPPROVED EQUAL)N/AREMOVE EXISTINGTREESN/AGRIND STUMP TO 36" BELOWGRADE, MIN. AND REMOVE ALLROOTS LARGER THAN 3" INDIAMETER. RECOMPACT SOIL ANDPREPARE PER CIVIL PLANSN/ACCOBBLE2"-3" SIZE MEXICANBEACH PEBBLE,BUFF(TYPE 10 MULCH)SOUTHWEST BOULDERAND STONEDSTABILIZEDDECOMPOSEDGRANITE (D.G.)CALIFORNIA GOLDFINESSOUTHWEST BOULDERAND STONEAFOREST MULCHTYPE 1 GROUNDWOODAGRISERVICELANDSCAPE MATERIAL AND PLANTING DETAILSCOBBLE ON GRADENOT TO SCALESECTIONCLEGENDGRADES VARY, SEE CIVIL PLANSCOBBLE MULCHPERMEABLE WEED BLOCKING FABRICPER SPECIFICATIONSSUBGRADE8" (MIN.) TURN WEED BLOCKINGFABRIC UNDER AT ALL EDGES, (TYP.)SECURE FABRIC WITH STEEL "U"STAKES @ 24" O.C. AT EDGESPLANTING AREA, WHERE OCCURS123456NOTE:COBBLE MULCH TO COVER 100% OVER WEED BLOCKING FABRICAND SHALL NOT BE VISIBLE THROUGHTOUT AREA OFAPPLICATION.512346DECOMPOSED GRANITE SURFACE (D.G.)SCALE: 1"=1'-0"SECTIONDLEGENDADJACENT PAVED SURFACE OR CURB.WHERE D.G. IS ADJACENT TOWALKABLE SURFACE, TOP OF D.G. ISTO BE LEVEL WITH PAVEMENT'S FINISHSURFACE.COMPACTED SUBGRADE TO 6" DEEPSTABILIZED DECOMPOSED GRANITESURFACE2" DEPTHFINISH GRADECONCRETE CURB PER DETAIL D1234566526"413NOTE:STABILIZED DECOMPOSED GRANITE SURFACE SHALL BEMAINTAINED SO THAT A LEVEL, FIRM, STABLE, RESISTANTSURFACE IS PROVIDED. RE-APPLY STABILIZER PERMANUFACTURER'S RECOMMENDATIONS (5-10 YEARS).4"NOTE:INSTALL EXPANSION JOINTSAT 30' O.C. & CAULK6"453211LANDSCAPE AREA PER PLANTINGPLAN26" WIDE CONCRETE MOW CURB3#3 REBAR- CONTINUOUS CENTERIN MOW CURB (LAP 12"@SPLICES)4STABILIZED DG OR COBBLE PER PLANS5SUBSOIL COMPACTED 95% TOMIN. 12" DEPTHSCALE: 2"=1'-0"SECTIONE39KLEINFELDERBright people, Right Solutions.550 West C Street Suite 1200 San Diego, CA 92101Tel. (619) 831-4600 Fax. (619) 232-10393916 Normal StreetSan Diego, CA 92103619.294.4477www.ktua.com39EL CAMINO REAL BRIDGEIMPROVEMENTS AT CANNON ROADIMPROVEMENT PLAN FOR:CDP2018-0031/SUP2018-0005/SUP2018-0006#6"NOTE:1.SEE GREENBOOK SPECIFICATIONSAND PROJECT SPECIAL PROVISIONSFOR ADDITIONAL INFORMATION.LEGENDWOOD STAKE (SEE SPECIFICATIONS)TREE TIE (MIN. 4 REQUIRED, NAIL TOSTAKE)MULCH, REFER TO SPECIFICATIONSAND PLANTING NOTES FOR DEPTHAND TYPETREE OBSERVATION TUBE FORCAMPHOR TREES. SEE DETAIL B, THISSHEETFINISH GRADEPLANT TABLETS (3" BELOW GRADE)PLANTING PIT W/ ROUGHENED SIDESBACKFILL MIX (PUDDLE AND SETTLE)2x ROOTBALL DIAMETER MIN.ROOTBALLDEPTH OF ROOTBALL6" WATERING BASIN (EXCEPT IN LAWN)TREE COLLARTREE TRUNKCUT ALL STAKES 6" BELOW TREECANOPY123456789101112131415NOTES:A.REFER TO SPECIFICATIONS FOR PLANTING PROCEDURES ANDADDITIONAL INFORMATION.B.REMOVE FROM BOX WITH AS LITTLE DISTURBANCE TO THEROOTBALL AS POSSIBLE.TREE PLANTING WITHDOUBLE STAKING AND OBSERVATION TUBENOT TO SCALESECTIONA 12"MIN.24"151413121191012345678 H.P.+534126'-0" MIN. 6"12"MIN. DIA.2" MAX.68" MIN.4321LEGENDBACKFILL MIXGRAVEL FILL AROUND PIPE3" PERFORATED PIPE WITH FILTERSOCK (LENGTH AS REQUIRED)PLASTIC ATRIUM DRAIN GRATEFINISH GRADEUNDISTURBED ROOTBALL123456NOTES:A.EXTEND PERFORATED PIPE BELOWBOTTOM OF ROOTBALL. SLANT BOTTOMOF PLANTER PIT TO ALLOWACCUMULATED WATER TO COLLECT ATBASE OF PERFORATED PIPE. SIPHON OFFAS REQUIRED TO PREVENT ROOT ROT.B.DO NOT FILL PERFORATED PIPE WITHGRAVEL.TREE OBSERVATION TUBENOT TO SCALEPLAN & SECTIONBPLANSECTION6