HomeMy WebLinkAboutDWG 415-5A; PD 03-10; LA COSTA RESORT & SPA-ARENAL LANE SLOPE REPAIR; 01-07GRADING NOTES
(IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15,16 OF THE CARLSBAD MUNICIPAL
CODEI
1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED 8Y THE CITY OF
CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS.
2, APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS
OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS
PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN
NON-CONFORMANCE IS DISCOVERED.
3, CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF-WORK
FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE
CITY ENGINEER FOR APPROVAL.
◄, A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK
IN THE PUBLIC RIGHT-OF-WAY. PRIOR TO F''ERMIT ISSUANCE, A CERTIFICATE OF INSURANCE
MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE
PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRENCE
OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A"
AND A SIZE CATEGORY OF CLASS V AS ESTABLISHED BY 'BESTS" KEY RATING GUIDE._
5. UNLESS EXEMPTED BY SECTION 301.(b)5 OF THE UNIFORM BUILDING CODE, RETAINING
WALLS OUTSIDE OF PUBLIC RIGHT OF WAY REQUIRE SEPARATE PERMITS FROM THE
BUILDING DEPARTMENT.
6. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE
CITY ANO OTHER APPROPRIATE AGENCIES,
7, APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK
OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN
OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED.
8, NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF
THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET
OF THE PLANS AND THE TITLE SHEET.
9. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED
BY THE CITY ENGINEER,
10, THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS BY THE
ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY.
11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE
PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.
12. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF, (A)
SUMMARY SHEET, <B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL
BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA, PRINCIPALLY
DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS, THE SOILS REPORT WILL BE
SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE
COMPLETION OF FIELD TESTS,
13. A SOILS COMPACTION REPORT AND COMPLIANCE VERIFICATION REGARDING ADH£RENCE
TO RECOMMENDATIONS OUTLINED IN THE SIOILS REPORT IS REQUIRED PRIOR TO THE
ISSUANCE OF A BUILDING PERMIT, ALL CONTROLLED GRADING SHALL BE DONE UNDER
THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA PRINCIPALLY
DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL
AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD
SPECIFICATIONS AND THE ''EARTHWORK SPECIFICATIONS "ATTACHED TO THE PRELIMINARY
SOILS INVESTIGATION. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE
PROJECT INSPECTOR.
1◄, A PRE CONSTRUCTION MEETING SHALL 8i HEL,~ AT THT ~'L~ PRIOR TO THE BEGINNING
OF WORK AND SHALL BE ATTENDED BY LL R PRESEN A IV S RESPONSIBLE FOR
CONSTRUCTION, INSPECTION, SUPERVISIOf\ TESTING AND ALL OTHER ASPE'ClSOF1HE
WORK. THE CONTRACTOR SHALL SCHTilU E THE MEETING THROUGH THE PERMIT CLERK
(438-3891) AT LEAST FIVE(51 WORKING DAYS PRIOR TO STARTING
CONSTRUCTION. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING.
THE GRADING PERMIT WILL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING,
15. ALL INSPECTION REQUESTS OTHER CONSTRUCTION MEETING E
BY CALLING THE ENGINEERING 24-H N REQUES LINE ( 6
I S EC 10 EOUEST MUS BE E O 2:00 ,M. ON THE DAY
THE INSPECTION IS NEEDED, INSPEC MADE THE NEXT WORK DAY UNLESS
YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2:00 P.M. WILL BE SCHEDULED FOR
TWO FULL WORK DAYS LATER.
16, THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR
SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING,
AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE ANO
FEDERAL SAFETY AND HEAL TH STANDARDS, LAWS AND REGULATIONS,
17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A
DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE
DESIGN OF SHORING, BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF
WORKER PROTECTION FROM THE HAZARD Of CAVING GROUND DURING THE
EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION
THEREIN. THIS PLAN MUST BE PREPARED F10R ALL TRENCHES FIVE FEET (5) OR MORE IN
DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO
EXCAVATION. IE_IHE._ Pl.Ali YA_RJES ffillt,LJJiE_SHQBl!tG-51SI.EM _5IA!'IJlARll.S
ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFORNIA
A[MINISTRATIVE CODE. THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT
THE CONTRACTORS_EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE
SUBMITTED TO THE INSPECTOR PRIOR TO !EXCAVATION.
18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN
OBTAINED FROM THE CITY OF CARLSBAD, SUBMIT APPLICATION FOR BLASTING PERMIT
WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERATIONS.
19. IF ANY ARCHAEOLOGICAL ~E~OURC~~AR~ ~ISCOVERED WITHIN ANY WORK AREA
DURING CONSTRUCTION, OP R TION 311L~C[ASE IMMEDIATELY, AND THE PERMITTEE
WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART UNTIL THE
PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO,
20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING
UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT,
CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL BE
LIMITED TO THE PERIOD BETWEEN 7100 A.M. AND SUNSET EACH DAY, MONDAY THRU FRIDAY
AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS QR
HOLIDAYS, (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT
COUNTER.l
21, ALL OFF-SITE HAUL ROUTES SHALL BE SUIBMITTED BY THE CONTRACTOR TO THE CITY
~NEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK.
22. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED
AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE
fQRAl'!)'JlEBRIS_IB__QAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS
AS A RESULT OF THE GRADING OPERATION,
23. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE TO BE
REMOVED UNLESS SPECIFICALLY NOTED ON THE PLAN.
i-,or ro SCALE
PACIFIC
OCEAN
£
Y OF MARCOS
JECT
TION
CITY OF ENCINITAS
VICINITY MAP
NOT TO SCALE
GRADING NOTES CONTINUED
24, ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THt PONDING
OF WATER IS NOT PERMITTED, ALL EARTHEN SWALES AND DITCHES SHALL HAVE
A MINIMUM ONE PERCENT SLOPE.
25. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SET OF EROSION
CONTROL PLANS.EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED
BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR.
26. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM
SURFACE AND CROSS SECTION, THE SITE SHALL BE LEFT IN A NEAT AND
ORDERLY CONDITION, ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE
REMOVED AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER,
27. ALL SLOPES SHALL BE IRRIGATED, STABILIZED, PLANTED ANDlOR HYDROSEEDED
WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO GRADE
AS SHOWN ON THE APPROVED GRADING PLANS.
28. LANDSC.Af'ING SHALL BE ACCOMPLISHED ON ALL $LOPES AND PADS AS
REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING
PLANS IFOR THIS PROJECT, DRAWING NO, 402-2S, AND/OR AS DIRECTED
BY THE CITY ENGINEER OR PLANNING DIRECTOR,
29.THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL
COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH
THE LANDSCAPE AND IRRIGATION PLANS AND THE IMPROVEMENT PLANS AS
REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME
REQUIREMENTS,
30.STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE WITH A MINIMUM D·
LOAD OF 1,350. FOR PRIVATE STORM DRAIN PIPES, UP TO 15" PVC MAY BE
UTILIZED PROVIDED DEPTH IS LESS THAN 15 FEET AND BACKFILLED WITH 3/4"
ROCK PER SDRSD S-4 TYPE "C" AND PIPE MEETS ASTM STANDARD 3034 FOR SOR
35 SOLIID WALL PIPE,
31.WHERE AN EXISTING Pll"E LIINE IS TO BE ABANDONED AS A RESULT OF THE
GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING
OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN
OTHER AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS
APPROVED BY THE CITY ENGINEER,
32.THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES
<ABOVEGROUND AND UNDERGROUND) WITHIN THE PROJECT SITE SUFFICIENTLY
AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS
FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLIICT WITH THE PROPOSED
WORK,
33.THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANll::S (SEE BELOl/1
AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR
FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY
REPRESENTATIVE,
UNDERGROUND SERVICE ALERT 1-800-422-4133
SDG&E 1-800-660-7343
PACIFIC BELL 1-800-892-0123
ADELPHIA CABLEVISION 1760) 438-7741
CITY OF CARLSBAD (STREETS & STORM DRAIN) (760) 434-2980
•CITY OF CARLSBAD (WATER & RECLAIMED WATER) (760) 438-2722
•SAN DIEGUITO WATER DISTRICT (760) 633-2650
•LEUCADIA WASTEWATER DISTRICT 1760l 753-0155
•VALLECITOS WATER DISTRICT (760) 744-0460
•OLIVENIHAIN WATER DISTRICT (760) 753-6466
•BUENA SANITATION DISTRICT (760) 726-1340 x1374
•AS APPROPRIATE
34. PERMIT COMPLIANCE REQUIREMENTS.
A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL
ENGINEER, SOILS ENGINEER, AND/OR GEOLOGIST TO GIVE
TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN
PROGRESS 115,16,120A,8) CARLSBAD MUNICIPAL CODE
B. PRIOR TO FINAL APPROVAL OF A GRADING PERMIT -THE
FOLLOWING REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER
VIA THE PROJECT INSPECTOR 115,16,120A,10l CARLSBAD MUNICIPAL
CODE:
(11 FINAL REPORT BY SUPERVISING GRADING ENGINEER STATING
ALL GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE
PLANTING AND IRRIGATION ARE INSTALLED IN CONFORMANCE
WITH CITY CODE AND THE APPROVED PLANS <OBTAIN SAMPLE
OF COMPLIANCE LETTER FROM CITY ENGINEERING
DEPARTMENT).
(2) AS-BUil T GRADING PLAN,
(31 REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES
RECOMMENDED SOIL BEARING CAPACITIES, A STATEMENT AS
TO THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES
OF FIELD AND LABORATORY TESTS. THE REPORT SHALL ALSO
INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE
GRADING WAS DONE IN ACCORDANCE WITH THE
REOUIREIMENTS AND RECOMMENDATIONS OUTLINED IN THE
PRELIMINARY SOILS REPORT AND ANY SUPPLEMENTS
THERETO.
(4) REPORT WITH AS-BUil T GEOLOGIC PLAN, IF REQUIRED BY
THE CITY.
35,UNLESS A GRADING PERMIT FOR THIS PROJECT IS ISSUED llltHIN ONE (1) Y'EAA
AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED TO
BE RESUBMITTED FOR PLAN CHECK, PLAN CHECK FEES WILL BE REQUIRED FOR
ANY SUCH RECHECK,
GRADING PLANS FOR:
SLOPE REPAIR FOR A'RENAL LANE
LA OSTA RESORT & SPA
f
VJ
!:JJ\i IT NO
/ IVIAP C \,··., > ( ,,..,
t
~ ~ .h
y
88
KEV MAP
SCALE: 1''=50'
SOILS ENGINEER'S CERTIFICATE
I, BRETT L. ANDERSON, A REGISTERED CIVIL ENGINEER OF THE STATE OF
CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED
SOILS MECHANICS, HEREBY CERTIFY THAT I REVIEWED A SAMPLING AND
STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE PERFORMED
BY EVANS, COLBAUGH & ASSOC., INC., DONE BETWEEN THE DATES OF
JANUARY 1996 AND JULY 1996. TWO COPIES OF THE SOILS REPORT
COMPILED FROM THIS STUDY DONE BY EVANS, COLBAUGH & ASSOC., INC,
AND SOILS UPDATE LETTER DONE BY SLADDEN ENGINEERING, HAS BEEN
SUBMITTED TO THE OF IC THE CITY ENGINEER. .,.~,·,,:">s· ~~ . I"'' '·,,l,) ,, /()-'1 . , :
SIGNED: --···--, ~}·:~::Z,C.--;\;,.~._ ·i:,\:'.'.
◄5389 (/,';' /:> \ )' \ ---'-="'-------------! ,:, ., .
-~'i...,./=2.=2.....,,/o"'-,L/,___ _____ ·~--✓--;c " : , _· ,
P.E. N0,1
DATE,
\t, ,_r,,_• ... ,( '>
LICENSE EXPIRATION DATE, 09/30/06 ''<.:.,• · /'
EARTHWORK QUANTITIES
RAW CUT, ◄30 CY
RAW FILL, 0 CY EXPORT, 430 CY
NOTE, GRADING OU.'INTITIES SHOWN ARE FOR PERMIT PURPOSES
ONLY AND ARE NOT TO BE USED FOR FIINAL PAY QUANTITIES,
SOURCE OF TOPOGRAPHY
TOPOGRAPHY SHOWN ON THESE PLAINS WAS
COMPILED BY PHOTOGRA'-METRIC METHODS,
FROM AERIAL PHOTOGRAPHY DATED 08-03-01,
BY RICK ENGINEERING COMPANY.
TOPOGRAPHY SHOWN HEREON CONFORMS TO
NATIONAL MAP ACCURACY STANDARDS.
LEGAL DESCRIPTION
A PORTION OF THE NORTHEAST 1/4 OF SECTION 35,
TOWNSHIP 12 SOUTH, RANGE ◄ WEST, SAN BERNARDINO
MERIDIAN, IN THE CITY OF CARLSBAD, COUNTY
OF SAN DIEGO, STATE OF CALIFORNIA.
APN 215-210-24 AND 215-210-11. BENCH MARK
f j j
' ' ··(, f
( ,ic ~
KEV MAP LEGEND
STORM DRAIN AND APPURTENANCES--------------------
EXIST. SEWER -·----------------------------------s--
EXIST. WATER ------------------------------------~-W ~--
EASEMENT--------------------------------------=--_ ::J
LOT LINE --------------------------------------
SHEET NUMBERS --------··-·--·----·--------·--
PROPERTY BOUNDARY ------------------------------
SHEET INDEX SHEET
NO.
NOTES , KEY MAP & WORK TO BE DONE-----··-· I
ADDITIONAL NOTES, STREET SECTIONS &, DETAILS 2
GRADING PLANS---------------• -------·· • • • • • 3-◄
EROSION CONTROL NOTES AND DETAILS·· -• • • • • --5
EROSION CONTROL PLANS -----• • --------------6
STRUCTURAL PLANS------------------·-··---· 7
DECLARATION OF RESPONSIBLE CHARGE
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS
PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE
DESIGN OF THE PROJECT AS DEF'INED IN SECTION 6703 OF THE
BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS
CONSISTENT WITH CURRENT STANDARDS.
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND
SPECIFICATIONS BY THE CITY OF CARLSBAD DOES NOT RELIEVE
ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR
PROJECT DESIGN.
FIRM, RICK ENGINEERING CO,
ADDRESS, 5620 FRIARS ROAD
SAN DIEGO, CA. 92110-2596 CITY, ST ,1
TELEPH
BY, ~~=~ ~-DA~E, /)4/ltJcf
R.C.E. NO. 1 27678
EXPIRATION DATE, 3/31/2006
OWNER/DEVELOPER A STREET CENTERLINE MONUMENT ON EL
CAMINO REAL 0.88 MILES NORTHERLY FROM
LA COSTA AVENUE,
WORK TO IBE DONE ,
THE GRADING WORK SHALL CONSIST OF THE CONSTRUCTION Of All CUTS Al'() FILLS,
REMEDIAL GRADING, EROSION CONTROL FACILITIES, DRAINAGE FACILITIES, AND PLANTING
OF PERMANENT LANDSCAPING ANO PREPARATION OF AS-BUILT GRADING PLANS,
AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET
OF PLANS AND THE CITY STANDARDS, SPECIFICATIONS, REQUIREMENTS, RESOLUTIONS
AND ORDINANCES CITED ON THESE PLANS.
THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING
DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY
ENGINEER.
1,
2.
3,
CARLSSAD MUNICIPAL CODE
CITY OF CARLSBAD STANDARDS, DATED, 4·20-93
THIS SET OF PLANS
4.
5,
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK), 2000 EDITION
REPORT Of GEOTECHNICAL INVESTIGATION OF SLOPE FAILURES, ARENAL LANE, CARLSBAD, C,ALIFORNIA,
DATED DECEMBER 23, 1999, BY EVANS, COLBAUGH a, ASSOC., INC,
SOILS UPDATE LETTER FOR ARENAL LANE SLOPE REPAIR, DATEO MARCH 24, 2003,
BY SLADDEN ENGINEERING.
6, THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS ANO AS 1!1AY BE MODIFIED BY THE
CITY OF CARLSBAD STANDARDS.
7. STORM WATER POLLUTION PREVENTION PLAN (SWPPPI PREPARED BY RICK ENGINEERING
COMPANY, DATED OCTOBER 17, 2003, WDID • 9 37S318589
8. CALIFORNIA STORM WATER QUALITY ASSOCIATION (CASOAI STORM WATER BEST
MANAGEMENT PRACTICE, CONSTRUCTION HANDBOOK; ANO THE STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION CONSTRUCTION SITE BEST MANAGEMENT PRACTICES
(BMP) MANUAL.
LEGEND
DESCRIPTION STD. DWGS. SYMBOL QUANTITY
EARTH SWALE (1¼ MIN.)----------------
EXISTING CONTOUR----------------190
PROPOSED CONTOUR ------ -------. - --1"'3 -
FILL SLOPE,2:1 MAX.----------~----Y 'r Y 'r
CUT SLOPE,211MAX,---------------y 'I' Y ,,.
DAYLIGHT LINE--------------"----,,___,,,_
CUT/FILL TRANSITION-------------·---11 ~ ,_
PROPERTY BOUNDARY-------------•--- - - -
SPOT ELEVATION----- ----- - ---i---
LOT LINE----------------------
6"CURB l GUTTER-----G-2 TYPE "H" -------====
3" AC/6 1/2' --SEE NOTES ON PLANS FOR PLACEMENT-- -k''.)// )'./;] (PER DETAIL SHEET NO, 21 -------
MODIFIED CONCRETE ll£PRESSION - - -DS-1 - --- - --! > . . I
6"PVC STORM DRAIN IPRIVATEI------------=-=-===cc=="
4'1'VC SUB DRAIN-----PER DETAIL SHT 2-----"'==""'""'
CAISSON -- -PER DETAIL SHT 7 0 e
PER STRUCT. ENGINEER'S RECOMMENDATIONS
REMOVE EXISTING PVC DRAINS - - - - - - - - - - - -
REMOVE EXISTING CURB AND GUTTER ------- - - - -
REMOVE EXISTING PAVEMENT-------------
190 Lf'
3,200 SF
200 SF
195 LF
250 LF
48 EA,
220 LF
240 LF
3,360 SF
ADJUST EXISTING SEWER MANHOLE TO GRADE - - - - ------'®''---1 EA,
,,, ,
' : • ALL STANDARDS ARE SAN DIEGO REGIONAL STANDARD DRAWINGS EXCEPT AS NOTED.
OWNER'S CERTIFICATE
I <WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR
GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER-ALL
GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF
THIS SITE.
1CL.. ff6rlei..
S. CHEVIS HOSEA, VICE PRESIDENT
OF LAND DEVELOPMENT,KSL LA COSTA
RESORT CORPORATION
PLANNING DEPARTMENT APPROVAL
1M .. ·a,,~1qt-,.,O~ ,,1'111 ...
MICHAEL J. HOLZ R, PNNING DIRECTOR ~
RECOMMENDED BY!
BUil T11
DATE
DATE
KSL LA COSTA RESORT CORPORATION
2100 COSTA DEL MAR ROAD
CARLSBAD, CA. 92009
RECORD FROM: NORTH COUNTY VERTICAL
CONTROL DATA, PAGE 184,
~ CITY OF CARLSBAD I SHEETS I t-----1i-----+----------------+----t---+----1----1 L_J__j ENGINEERING DEPARTMENT 7
t---i----i------------------+---+---+---+----1
ELEVATION: 113,122 ADJUSTED GRADING PLANS FOR,
DATUM: NGVD 29
LEUCADIA WASTEWATER DISTRICT t 36.THE SOILS REPORT TITLED REPORT OF GEOTECHNICAL INVESTIGATION OF SLOPE *SEU/'l'!,Y.!MITTl?L Lt:rTU /Jl!TEtJ ! FAILURES, ARENAL LANE, CARLSBAD, CALIFORNIA, PREPARED BY EVANS, COLBAUGH & ~/ / IZ~ Ttl CITY PF CAA'fS'/!110
SLOPE REPAIR FOR ARENAL LANE
LA COSTA RESORT & SPA
APPROVED1dY ASSOC .. INC., DATED DECEMBER 23, 1999 AND SOILS UPDATE LETTER TITLED ARENAL l'lJR MY SCOPE (),F WPKlf' #AIP MY
BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS ANO SPECIFICATIONS "" DATE _
CONTAINED IN SAID SOILS REPORT AND UPDATE LETTER, R.C.E. 2651~ EXP. 31311•6 DATE INITIAL filEVISION DESCRIPTION DATE INITIAL DATE INITIAL CHKD BY: GvP PROJECT NO. DRAWING NO.
I !II EN C J, l3l?OB LANE SLOPE REPAIR, PREPARED BY SLADDEN ENGINEERING DATED MARCH 24, 2003, li'ESPtJNSIIB/t.lTY l?EL/1TIY£ Tfl Tl/ESE J~ ~ A 1 J
'; R1SanCDIK•8" GRlveINEERiroldo 0r..,,.NG PhoentxCMPANYTuc,on SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL ,, /IS-8!/IL.T" Pt.I/NS ;c>,JEP. Hi L. o·EER"'IN.,G.LJl·•··u: "/J/f'/ DWN BY: REC
DISTRICT ENGINEER ENGINEER Of WORK OTHER APPROVAL CITY APPROVAL RVWO BY: I ~;";"~F:,tar;•;Ro;•d~™~, .;s; .. ~Dlo~s<>:;_;, CA~•:!z!!110:,;;-•:;"::,•.;·~<:11::•i,::20:,:;1•:;o,:01~• !;FAX~(:"::!''.!:":.!;'◄:1:oa~• ,::www:::;:.rtcbng!:::·:"":,m __________________________________________________ .,::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::::;::;;::;::;;;;;;;;;;;;;;;;;;;;;;;;;;;:;;;;;;;;;;;;::;:::;::::;::::;::::;:;;;;;;:::;::::;::::;::::;::::;::::;::::;:;;;;;;::;;;;;;;;;;;;;;;;;;;;;;;;;:::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;::;:::;::::;::::;::::;::::;::::;:;::::;:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;J (G)~
1 , \d _ I 31 70\a_ 1 ) ' -,-;b\.ll l',b-~SVl, dgn
PD 03-10 415-5A
\ \s,-,_r!b1 \RI ck~tondorda\ Ip •otv1 0\Pen\c<I l<lOOlj'l. PM
Z2-Al"R·2004 10,11
,,
'12090~ i
...
~
Ol
I
Ol >
SPECIAL NOTES
THE FOLLOWING NOTES ARE PROVIDED TO GIVE DIRECTIONS TO THE CONTRACTOR BY THE
ENGINEER OF WORK. THE CITY ENGINEER'S SIGNATURE ON THESE PLANS DOES NOT
CONSTITUTE APPROVAL OF ANY OF THESE NOTES ANO THE CITY WILL NOT BE RESPONSIBLE
FOR THEIR ENFORCEMENT. THE CONTRACTOR SHALL ENFORCE ALL SAFETY MEASURES.
1. NEITHER THE OWNER, NOR THE ENGINEER OF WORK WILL ENFORCE SAFETY MEASURES OR
REGULATIONS, THE CONTRACTOR SHALL DESIGN, CONSTRUCT ANO MAINTAIN ALL SAFETY
DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING
TO ALL LOCAL,STATE AND FEDERAL SAFETY ANO HEALTH STANDARDS,LAWS AND
REGULATIONS.
2. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
INCLUDING SAFETY OF ALL PERSONS ANO PROPERTY, AND THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY ANO NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY ANO HOLD THE OWNER AND ENGINEER HARMLESS
FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT EXCEPTING LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO INSURE THAT ALL SLOPES, STREETS,
UTILITIES, AND STORM DRAINS ARE BUILT IN ACCORDANCE WITH THESE PLANS. IF
THERE IS ANY QUESTION REGARDING THESE PLANS OR FIELD ST AKES. THE CONTRACTOR
SHALL REQUEST AN INTERPRETATION BEFORE DOING ANY WORK BY CALLING THE
ENGINEER OF WORK AT (619) 291-0707. THE CONTRACTOR SHALL ALSO TAKE THE NECESSARY
STEPS TO PROTECT THE PROJECT AND ADJACENT PROPERTY FROM ANY EROSION AND
SILTATION THAT RESULT FROM HIS OPERATIONS BY APPROPRIATE MEANS (SAND BAGS,
HAY BALES, TEMPORARY OESIL TING BASINS, DIKES, SHORING, ETC.) UNTIL SUCH
TIME THAT THE PROJECT IS COMPLETED AND ACCEPTED FOR MAINTENANCE BY WHATEVER
OWNER, AGENCY OR ASSOCIATION IS TO BE ULTIMATELY RESPONSIBLE FOR
MAINTENANCE.
~-PRECISE LOCATIONS AND ELEVATIONS ARE NOT KNOWN FOR THE EXISTING UNDERGROUND
UTILITIES. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS SUFFICIENTLY AHEAD
OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE
OF ACTUAL LOCATION OF EXISTING FACILITIES, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK.
5. LOCATION AND ELEVATION OF EXISTING IMPROVEMENTS TO BE MET BY WORK TO BE
DONE SHALL BE CONFIRMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW
WORK.
i. BEFORE EXCAVATING FOR THIS CONTRACT, THE CONTRACTOR SHALL VERIFY LOCATION
OF UNDERGROUND UTILITIES, THE EXISTENCE AND LOCATION OF ANY UNDERGROUND
UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH
OF THE AVAILABLE RECORDS, TO THE BEST OF OUR KNOWLEDGE THERE ARE NO OTHER
EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS.
7. CONTRACTOR SHALL NOTIFY THE SAN DIEGO GAS & ELECTRIC COMPANY PRIOR TO
STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE HIS WORK WITH
COMPANY REPRESENTATIVES.
NOTICE, ALL ELECTRICAL AND GAS SERVICES WITHIN THIS PROPERTY ARE
"UNDERGROUND INSTALLATIONS." FOR LOCATION OF ELECTRICAL CABLES AND GAS
PIPING AND APPURTENANCES, CONTACT THE SAN DIEGO GAS & ELECTRIC COMPANY.
TELEPHONE, 600-422-4133.
8. CONTRACTOR SHALL NOTIFY THE PACIFIC BELL TELEPHONE COMPANY PRIOR
TO STARTING WORK NEAR COMPANY FACILITIES ANO SHALL COORDINATE HIS WORK
WITH COMPANY REPRESENTATIVES.
NOTICE, ALL TELEPHONE SERVICES WITHIN THIS PROPERTY ARE ''UNDERGROUND
INSTALLATIONS." FOR LOCATION OF CABLES AND APPURTENANCES, CONTACT PACIFIC
BELL. TELEPHONE, 800-422-4133.
9. CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE
UTILITY LINES SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD
OR NOT SHOWN ON THESE PLANS.
10. WHERE TRENCHES ARE ADJACENT TO FUTURE BUILDING SITES, SOILS REPORTS SHALL
BE SUBMITTED TO THE ENGINEER OF WORK BY A QUALIFIED SOILS ENGINEER WHICH
CERTIFY THAT TRENCH BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS
ENGINEER IN ACCORDANCE WITH THE ONSITE EARTHWORK SPECIFICATIONS.
11. ALL GRADING SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED SOILS
ENGINEER, ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND ALL
FILL SHALL BE PLACED IN ACCORDANCE WITH THE RECOMMENDED GRADING
SPECIFICATIONS AND SPECIAL PROVISIONS ATTACHED TO THE SOILS INVESTIGATION
FOR THIS PROPERTY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND
COMPACT THE FILL IN STRICT ACCORDANCE WITH THESE SPECIFICATIONS.
12. OBSERVATIONS AND COMPACTION TESTS SHALL BE MADE BY THE SOILS ENGINEER
DURING THE FILLING AND COMPACTING OPERATIONS SO THAT HE CAN STATE HIS
OPINION THAT THE FILL WAS CONSTRUCTED IN ACCORDANCE WITH THE EARTHWORK
SPECIFICATIONS.
13, DURING CONSTRUCTION, THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED
SURFACES TO PROVIDE POSITIVE DRAIINAGE AND PREVENT PONDING OF WATER. HE
SHALL CONTROL SURFACE WATER TO AVOID DAMAGE TO ADJOINING PROPERTIES OR TO
FINISHED WORK ON THE SITE. THE CONTRACTOR SHALL TAKE REMEDIAL MEASURES TO
PREVENT EROSION OF FRESHLY GRADED AREAS AND UNTIL SUCH TIME AS PERMANENT
DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED.
AFTER COMPLETION, AFTER GRADING IS COMPLETED AND THE SOILS ENGINEER HAS
FINISHED HIS OBSERVATIONS OF THE WORK, NO FURTHER EXCAVATION OR FILLING
SHALL BE DONE EXCEPT UNDER THE OBSERVATION OF THE SOILS ENGINEER,
14, CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS REQUIRED TO PROTECT
ADJACENT PROPERTIES DURING THE GRADING OPERATIONS.
15. CUT AND FILL SLOPES SHALL BE TRIMMED TO THE FINISH GRADE TO PRODUCE A
SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPE OF THE EXCAVATIONS OR
EMBANKMENTS SHALL BE SHAPED AND TRIMMED AS SHOWN ON THE PLANS AND
LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS, OR OTHER WASTE
MATTER EXPOSED ON EXCAVATION OR EMBANKMENT SLOPES SHALL BE REMOVED AND
DISPOSED OF OFF SITE IN A LEGAL MANNER BY THE CONTRACTOR.
16. WHERE TRENCHES ARE WITHIN EASEMENTS OR WITHIN 10' OF ANY BUILDING, A SOILS REPORT
SHALL BE SUBMITTED TO THE ENGINEER OF WORK BY A QUALIFIED SOILS ENGINEER
WHICH INDICATES THAT TRENCH BACKFILL WAS COMPACTED UNDER THE OBSERVATION OF
THE SOILS ENGINEER AND IN ACCORDANCE WITH THE ABOVE-NAMED SPECIFICATIONS.
17. THE EXISTENCE AHO LOCATION OF UNDERGROUND UTILITIES OR STRUCTURES SHOWN
ON THESE PLANS WERE OBTAINED FROM A SEARCH OF THE AVAILABLE RECORDS. TO
THE BEST OF OUR KNOWLEDGE THERE ARE NO OTHER EXISTING UTILITIES EXCEPT AS
SHOWN ON THESE PLANS, THE CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITY LINES SHOWN HEREON AND ANY OTHER NOT OF
RECORD OR NOT SHOWN ON THESE PLANS. ALL DAMAGES THERETO CAUSED BY THE
CONTRACTOR SHALL BE REPAIRED TO THE APPROPRIATE SPECIFICATIONS AND AT THE
EXPENSE OF THE CONTRACTOR.
18. THE APPLICANT SHALL MINIMIZE EXPOSURE TIME OF DISTURBED SOIL AREAS THROUGH
SCHEDULING OF DISTURBANCE ACTIVITIES AND STORM WATER PROTECTION ACTIVITIES TO
THE SATISFACTION OF THE DIRECTOR OF PUBLIC WORKS.
19. ENSURE COMPLIANCE WITH ALL APPLIICABLE STORM WATER REGULATIONS AT ALL TIMES.
THE ACTIVITIES PROPOSED UNDER THIS APPLICATION ARE SUBJECT TO ENFORCEMENT
UNDER PERMITS FROM THE SAN DIEGO REGIONAL WATER QUALITY CONTROL BOARD
<RWQCBl AND THE SAN DIEGO COUNTY STORM WATER ORDINANCE. THIS
INCLUDES REQUIREMENTS FOR MATERIALS AND WASTES CONTROL, EROSION CONTROL,
AND SEDIMENT CONTROL ON THE PROJECT SITE. PROJECTS THAT INVOLVE AREAS
GREATER THAN 5 ACRES REQUIRE THAT THE PROPERTY OWNER KEEP ADDITIONAL AND
UPDATED INFORMATION ONSITE CONCERNING STORM WATER RUNOFF. THIS
REQUIREMENT SHALL BE TO THE SATISFACTION OF THE DIRECTOR OF PUBLIC WORKS.
20. ALL PVC PIPES AND FITTINGS SHALL BE IN CONFORMANCE WITH ASTM F794,
SPECIAL NOTES CONTINUED
20,. IMPLEMENT AND MAINTAIN BEST MANAGEMENT PRACTICES (BMPs) TO EFFECTIVELY
PREVENT POTENTIALLY NEGATIVE IMPACT ON STORM WATER QUALITY BY THE
PROPOSED OPERATIONS. THE PROPERTY OWNER SHALL REPAIR, RESTORE AND/OR
REPLACE WITH ACCEPTABLE AL TERNA TES, ALL OR PORTIONS OF THE INSTALLED BMPs
THAT FAIL. FAILURE TO PROPERLY INSTALL AND MAINTAIN THE BMPs WILL RESULT IN
ENFORCEMENT ACTION BY THE THE CITY OF CARLSBAD OR OTHER AGENCIES. THE
MINIMUM PERFORMANCE GOALS FOR THE POST-CONSTRUCTION BMPs TO CONTROL
POLLUTION FROM THE PROJECT ARE NO NET INCREASE IN POLLUTANTS ABOVE PRE-
CONSTRUCTION LEVELS. SOURCES OF POTENTIALLY SIGNIFICANT POST-CONSTRUCTION
POLLUTANT LOADING SHALL BE IDENTIFIED AND THE INTRODUCTION OF POLLUTANTS
FROM THESE SOURCES INTO STORM WATER AND NON-STORM WATER DISCHARGES SHALL
BE PREVENTED OR REDUCED TO THE MAXIMUM EXTENT PRACTICABLE. POST-
CONSTRUCTION POLLUTANT LOADS IN STORM WATER AND NON-STORM WATER DISCHARGES
SHALL NOT CAUSE OR CONTRIBUTE TO THE DEGRADATION OF RECEIVING WATERS OR
OTHER ENVIRONMENTALLY SENSITIVE AREAS. POST-CONSTRUCTION PEAK RUNOFF FLOW
RATES AND VELOCITIES FROM THE PROJECT SITE SHALL BE MAINTAINED AT LEVELS
WHICH WILL NOT CAUSE OR CONTRIBUTE TO THE SCOURING OR EROSION OF RECEIVING
WATERS OR OTHER ENVIRONMENTALLY SENSITIVE AREAS (WETLAND, VERNAL POOLS,
ETC.) ABOVE PRE-DEVELOPMENT RATES. POST-CONSTRUCTION MINIMUM RUNOFF
FLOW RATES, VELOCITIES, AND VOLUMES FROM THE PROJECT SITE SHALL BE
MAINTAINED AS NECESSARY TO PREVENT THE DEGRADATION OF RECEIVING WATERS,
OTHER ENVIRONMENTALLY SENSITIVE AREAS, OR FLOW-DEPENDANT BMPs (E.G.,
CONSTRUCTED WETLANDS, ETC.). BMPs WHICH INCORPORATE NATURAL SYSTEMS OR
APPROACHES (E.G., CONSTRUCTED WETLANDS, RETENTION OF EXISTING HABITAT,
INCLUSION OF NATURAL BUFFER ZONES, ETC.l SHALL BE CONSIDERED AND SHALL BE
UTILIZED TO THE MAXIMUM EXTENT PRACTICABLE. POST-CONSTRUCTION STRUCTURAL
BMPs SHALL BE OPERATED AND MAINTAINED TO ENSURE THEIR LONG-TERM
FUNCTIONING AS DESIGNED.
211, DURING THE RAINY SEASON THE AMOUNT OF EXPOSED SOIL ALLOWED AT ONE
TIME SHALL NOT EXCEED THAT WHICH CAN BE ADEOUATEL Y PROTECTED BY THE
PROPERTY OWNER IN THE EVENT OF A RAINSTORM. 125¼ OF ALL SUPPLIES
NEEDED FOR BMP MEASURES SHALL BE RETAINED ON THE JOB SITE IN A
MANNER THAT ALLOWS FULL DEPLOYMENT AND COMPLETE INSTALLATION
IN 48 HOURS OR LESS OF A FORECAST RAIN.
22. A NOTICE OF INTENT (NOil HAS BEEN FILED WITH THE STATE WATER RESOURCES
CONTROL BOARD (SWRCBl AND A STORM WATER POLLUTION PREVENTION
PLAN (SWPPPl HAS BEEN PREPARED IN ACCORDANCE WITH THE REQUIREMENTS
OF THE CALIFORNIA GENERAL PERMIT FOR STORM WATER DISCHARGES
ASSOCIATED WITH CONSTRUCTION ACTIVITY (PERMIT NO. CAS000002l FOR ALL
OPERATIONS ASSOCIATED WITH THESE PLANS. THE NOi NUMBER ASSIGNED BY
SWRCB FOR THIS PROJECT IS 9 37S316569. THE PERMITTEE SHALL KEEP A
COPY OF THE SWPPP ON SITE AND AVAILABLE FOR REVIEW BY THE CITY.
LEUCADIA WASTEWATER
DISTRICT (LWD) SEWER NOTES
1. LWD (FORMERLY LEUCADIA COUNTY WATER DISTRICT) APPROVAL OF
THESE PLANS DOES NOT RELIEVE THE APPLICANT, PRIVATE ENGINEER OR
WORK, OR CONTRACTOR FROM RESPONSIBILITY FOR THE CORRECTION OF
ERRORS AND OMISSIONS DISCOVERED DURING OR AFTER CONSTRUCTION.
2, All DESIGN, MATERIALS, AND CONSTRUCTION WORK RELATIVE TO
SEWER SHALL CONFORM TO THE LEUCADIA WASTEWATER DISTRICT LWD
SEWER STANDARDS ANO TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION (GREENBOOKl AND THE REGIONAL
ST ANOARD DRAWINGS, MOST CURRENT EDITIONS. IN THE EVENT OF
CONFLICT THE LWD SEWER STANDARDS GOVERN.
3. PRIOR TO LWO APPROVAL OF GRADING PLANS, LCR&S SHALL CLEAN AND
CCTV INSPECT ALL EXISTING SEWER IN THE AREA OF GRADING WORK TO BE
DONE.A COPY OF THE CCTV TAPE OR DVD SHALL BE PROVIDED TO THE LWD
ENGINEER FOR REVIEW AND RECORD PURPOSES. A SECOND CCTV INSPECTION
TAPE SHALL BE PROVIDED TO THE LWD DISTRICT ENGINEER AFTER
COMPLETION OF ALL GRADING WORK ANO PRIOR TO ACCEPTANCE OF THE
PROJECT BY LWO. ANY DAMAGE CAUSED TO THE SEWER DURING THE COURSE
OF THE GRADING WORK SHALL BE REPAIRED AND TESTED PRIOR TO
ACCEPTANCE OF THE SEWER AND GRADING BY LWD.
4, ORIVEABLE MAINTENANCE ACCESS SHALL BE PROVIDED IN A MINIMUM
10-FEET WIDE EASEMENT AFTER COMPLETION OF THE GRADING WORK. ANY
NEW EASEMENTS TO MAINTAIN ACCESS SHALL BE SUBMITTED, APPROVED,
AND RECORDED PRIOR TO APPROVAL OF THESE GRADING PLANS.
5. PRIOR TO BEGINNING SEWER WORK, CONTRACTOR SHALL SECURE A LWD
PERMIT FOR CONSTRUCTION AND SHALL PROVIDE A MINIMUM OF 48-HOURS
NOTICE TO L WD PRIOR TO CONSTRUCTION.
6. NO WORK SHALL BE COMMENCED UNTIL All PERMITS HAVE BEEN
OBTAINED FROM THE JURISDICTIONAL CITY, COUNTY, AND/OR OTHER
APPROPRIATE AGENCIES.
7. APPROVAL OF THIS PLAN BY LWD DOES NOT CONSTITUTE A
REPRESENTATION OF THE ACCURACY Of" THE LOCATION OF, OR THE
EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE,
OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT.
8, SEWER ELEVATIONS SHOWN ARE INVERT ELEVATION !I.E.), INSIDE
BOTTOM OF PIPE. SEWER LENGTHS SHOWN ARE FROM CENTER OF MANHOLE
TO CENTER OF MANHOLE.
9. ALL REVISIONS TO DRAWINGS SHALL BE APPROVED BY THE LWD
DISTRICT ENGINEER IN WRITING PRIOR TO CONSTRUCTION,
10. CONTRACTOR IS RESPONSIBLE FOR KEEPING COMPLETE RECORD OF
CHANGES AND SHALL MAKE SUCH RECORD AVAILABLE TO THE PRIVATE
ENGINEER, THE PRIVATE ENGINEER SHALL PROVIDE AS-BUil T DRAWINGS TO
LWD FOR REVIEW AND APPROVAL PRIOR TO FINAL ACCEPTANCE OF THE
PROJECT.
11. A MINIMUM OF 12-INCHES VERTICAL CLEARANCE SHALL BE PROVIDED
BETWEEN THE SEWER PIPE AND ANY OTHER UTILITIES.
12. SEPARATION OF SEWER I WATER ANO SEWER I RECLAIMED WATER SHALL
COMPLY WITH LWD STD DWG S-2 AND WITH ALL COUNTY AND STATE
HEAL TH DEPT REGULATIONS.
13. CONNECTIONS TO EXISTING SEWER PIPE OR MANHOLES SHALL ONLY BE
DONE IN THE DIRECT PRESENCE OF THE LWD INSPECTOR. NEW SEWER SHALL
NOT BE CONNECTED OR ALLOWED TO FLOW TO EXISTING SEWER UNTIL AFTER
FINAL ACCEPTANCE OF ALL UPSTREAM WORK BY THE LWD INSPECTOR, OR
AS APPROVED BY DISTRICT ENGINEER.
14. A 2-INCH HIGH ''S" SHALL BE INSCRIBED ON THE CURB FACE AT EACH
LATERAL LOCATION BY THE CONTRACTOR.
15. ALL SEWERS AND LATERALS SHALL BE IN PLACE AND SHALL HAVE
FINAL APPROVAL BY THE LWD INSPECTOR PRIOR TO PAVING.
12" CAST IRON
FINISH GRADE GATE CAP~
f"
6C"="'l =izi,r
L --11=½~" _____,I
GATE CAP
(HEAVY WTY!
6" PLANTING ARE A
SAND AND SEAL COAT--~
61/( AGGREGATE*_.--
BASE
-i,_. ,ir---_., -';-,~. -L. SECTION OF 12." • •· • • PVC PIPE SUBGRADE --,.
BEDDING MATE.RIAL
TO TOP OF 1/a BEND
STANDARD
1/a BEND·
.·t~-~~·-_,•\,'.:.'. CAP
560-C-3250
CONCRETE
1"rilo.<-_ STANDARD
1/aBEND
NOTE:
RISER TO BE 8" PVC
• FLONLINE ELEVATION PER PLM
'v RIM ELEVATION PER PLAN
Q LEGEND ON PLANS
STORM DRAIN & SEWER CLEANOUT
FINISH GRADE
NO SCALE
FEMALE
THREADED CAP
w i
,$\~
---MAL£ THREADED
r 6" FVC
STANDARD
PVC WYE
\_FLOWLINE ELEV.AS
SHONN ON PLM
0 LEGEND ON PLANS
611 PVC CLEANOUT
NO SCALE
.FVC PIPE-SIZE
AS NOTED ON
PLAN. 4" MIN.
CRUSHtO ROCK OR GRAVEL ENCASED
IN FILTER FABRIC IMIRAFI 140 NS OR
EQUIVALENT!. THE FILTER FABRIC
SHALL BE LAPPED A MINIMUM OF
12 INCHES ON ALL JOINTS.
MINIMUM 4-INCH DIAMETER,
ASPHALT-COATED METAL, PVC SCH
40 OR ABS CLASS SOR 35 WITH A
CRUSHNG STRENGTH OF AT LEAST
1000 POUNDS, WITH MINIMUM OF
8 UNIFORMLY SPACED PERFORATIONS
PER FOOT OF PIPE. INSTALLED WITH
PERFORATIONS ON BOTTOM OF PIPE.
(/~<?a LEGEND ON PLANS
*NOTE, PAVEMENT SECTION THICKNESSES ARE PRELIMINARY,
ACTUAL SECTION THICKNESS AND POSSIBLE REINFORCEMENT
SHALL BE AS REQUIRED BY THE SOILS ENGINEER
TYPICAL PAVING SECTION
NO SCALE
6" MIN. NATIVE
SOIL COVER I. CURB AND · · · GUTTER ITYP.l ,--L-,----..1 ·., ·:-~~~
' ·. :,;·,:.·~ '
6" MIN. BEL OW If ~ BASE OF PAVEMENT
I'.:;::_ L ~,,,.
I 6"MIN 6" MIN
3/2" DIAMETER
TYPICAL PERFORATION
1----18" MIN ___ .,
SUBDRAIN
NO SCALE
ENGINEER OF WORK
,e'l-6~
INSPECTOR DATE
IIS-BU!lT ~
i-----1---+-----------+------l---l---l----l CITY . 0 W CARLSBAD I SHEETS I ENGINEERING DEPARTMENT 7
BENCH MARK
A STREET CENTERLINE MONUMENT ON EL
NOTES FOR,
SLOPE REPAIR FOR ARENAL LANE
LA COSTA RESORT & SPA SERIES 46 FOR PIPES 16 INCHES THROUGH 36 INCHES.
U
~ CAMINO REAL 0.88 MILES NORTHERLY FROM ~ LA COST A AVENUE. t---t---t-----------------1----1--+---1---l APPROVED, #Y LLOYD B. HUBBS
! ~ -RIS-~DlKegoENGRlvelrNEE,1d, ~~G CPho~PANYTJ.u1css1on10B !~:~:!l~}:~3~;!:::J~:~::y VERTICAL DATE INITIAL REVISION DESCRIPTION DATE INITIAL DATE INITIAL ~R~VKWNDDBJB~Y': ~" •:::::,;•:,.12'WP::::,:
~,~g;;~~ .. ~~=~~:.,:!:;:.::,.,;.;~,!:=-~-=.!~!!!!!;•.:,::=~====---------------------------------------------------..!~~~~Wl.---------~=E=NG:IN;EE;R;;;O;;F;:W;OR;K;!::;;;;:;;;;:;;;;:;;;;:;;;;:;;;;:;;;;:;;;;========~O;T:HE:R:;AP;;P:RO;v;A;;L~C;IT:;Y;:A:;P;PR;O;:V:AL:f;;:;:=;::~~~===p=o=Q=3=•=1=Q==~=4=1=5=•5;A;;~ 5620 Fri•n Road , San Diego, CA 92110-259• • (619) 291-0707 • FAX (e19) 291-41•• • www.rlc~com DATUM: NGVD 29
@
R• \::L 1 31 , ,:,-,<J_ I 31 TOD ,31 70t,·qs()2. J'JCI
\. \&r v_r I bl \Rk~5tariMl"ds\ lpl 0~~1 Q\hr'l\oOI comp. P41"
1 )-Y ... Y-2004 O<h 05
120904
/
/
/
,/
/ / /
/ I I
/ /
/ I
/
/ /
/
;
;
/
/
I
I
/
/
/
(
I /
/
/
/
i
I
/ I
./
I /
/ ,
I
/
t / (/
\ J" '\. ;
' /· '
.i
\-I \
./ / 0 .,
r l
Lo-r 9 j
-.. ·--·,. ,, ' ·,. '
;·,/ At· . 1 /. •,, . ,,,,,., / _ _..,.,,, '''-,.
_,"f _,,.t.;: .t ' 1l '°' ,,"'/ ✓j-✓ f ~.,~
, , '/,' ),<-,,/ // '· /,// // "·-...., / ;: ·17·· / '• ,··1:·. , . ./ "·
,, ✓' /. "'~ ~ ~,)<-1/ r-A_L_L_EX-IS_T_IN-G-LW_D_S_EW_E_R_M_A_IN_S_IN_W_OR_K_A-RE-A-TO--. i--N-0-T-ES-,--------------. ·••.
V~ , . ·., .... .✓ / BE INSPECTED BY CLOSED CIRCUIT TELEVISION (CCTV), 1. CONTRACTOR TO FIELD VERIFY THE LOCATION
r,,~'\' , ,,•J/,, // PER THE "STANDARD SPECIFICATIONS FOR PUBLIC OF ALL EXISTING PRIVATE DRAINS PRIOR TO ,,,,;J. ,,f·:"' / WORKS CONSTRUCTION", SUPPLEMENT AMENDMENT CONNECTION TO NEW PVC DRAIN PIPES, '?" .,,,,/ / (LATEST EDITION), SECTION 306·1,4,8, AND LWD STD, 2, ALL TREES/SHRUBS WITHIN LIMITS OF GRADING
":;-')' '•· ·✓· / SPECIFICATIONS PRIOR TO AND AFTER THE TO BE REMOVED.
. ,/, .• / CONSTRUCTION OF IMPROVEMENTS. INITIAL CCTV TO 3. CONTRACTOR TO PROTECT-IN-PLACE ALL
_,," _./'/ BE REVIEWED BEFORE GRADING PLAN APPROVAL, EXISTING PRIVATE IMPROVEMENTS WHICH ARE
. · TO REMAIN.
,,-' _/,,, /
--).,,,,/ /,,, /
,) ,/ /'
_,'",(// /" . , i /•' ,,' ,,/' ~:, ,, ,, /:," ,, ,,, ' '
\
· 120904
\
APPROVED, 6
AIN
' ' ' ' ' ' ' ' ' ' ' '
' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
' '
' ' ' ' ' ' ' ' ' ' ' '
' ' ' '
I NOTES:
/ 1. CONTRACTOR TO FIELD VERIFY THE LOCATION
I OF ALL EXISTING PRIVATE DRAINS PRIOR TO
CONNECTION TO NEW PVC DRAIN PIPES.
I 2. ALL TREES/SHRUBS WITHIN LIMITS OF GRADING
TO BE REMOVED.
/ 3. CONTRACTOR TO PROTECT-IN-PLACE ALL
I EXISTING PRIVATE IMPROVEMENTS WHICH ARE
TO REMAIN.
,·---~--ALL .EXl~TING LWO SEWER MAINS IN WORK AREA TO
BE INSPECTED BY CLOSED CIRCUIT TELEVISION (CCTV),
PER THE ''STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION", SUPPLEMENT AMENDMENT
(LATEST EDITION). SECTION 306-1.4.8, AND LWD STD.
SPECIFICATIONS PRIOR TO AND AFTER THE
CONSTRUCTION OF IMPROVEMENTS, INITIAL CCTV TO
BE REVIEWED BEFORE GRADING PLAN APPROVAL.
LJ\
.I
/ / /
/
89
CFF 61.19)
V.ALL£Y
JVJ.AP
"""''°'-•m "\,,
····•··· ..... , .,) ")
,i
UN l -r
I----:-::-;:;;;;;;-;;;;;ow:;iiiiiM~~rf"'•·"ftf:·:r·~ t I 1i ~
LU /Si. IO'JT01'M Otrflfl'f · , , , g ai w10ENE.D TD JS' PEK ooc. '·, : : I\ LU 118-/ ::
I 1~-t~.04~~~~-· 1··· -·1·~7 .. -
•=' .. '""" ..
17 LF~6" PVC I 2.4¼
(f) ~-3: ,._ .
---~-·~··"··
II
-
(TYP.)
CP SEWE
j 4 j
1,1,, ..
" "
CONNECTION
.;.\\. •····
\\ 1, " "
\ \
I u!
.·'\.
,/~,,,,,
// ',,_
"'·,~
LJ\ cos~r J-\/ v~d~y UN 1-r./ilo" ,3,
,,/ / JYJ~,/No" s 73.4
\ Ii••''"'~,,
\ I ! ~,. ™ RICK ENGINEERING COMPANY
~ ~ 81111 Dteso Rlver1!d1 (lranae Phoenix Tucoon
0£,i 5820 Friars Road • San Diego, CA 92110-2596 • (819) 21t1-01fJ1 • FAX (tilt) 291•4168 • www.rickq.com
\ \frv_r I D1 \FllckStondord&s I pl oh I 0\Pen\<loloomp. pen
IJ-MAY-2004 Cii,06
,,./' /
'""··
Lo-r 88
CFF 59.68)
~ffed ,_,,
10 0
~~"''/:?" ~ .. •' £,~,,~ . -.
/
\
10 20 ---
GRAPHIC SCALE 1''= 10'
\
30
\
\
\ \
\
I
I
/
BENCH MARK '--------A STREET CENTERLINE MONUMENT ON EL
CAMINO REAL 0.88 MILES NORTHERLY FROM
LA COSTA AVENUE.
RECORD FROM: NORTH COUNTY VERTICAL
CONTROL DAT A, PAGE 184.
ELEVATION: 113.122 ADJUSTED
DATUM:NGVD 29
I
I
I
. )'
/
i i
!
/ /
I
J
/ I
I
/
/
/
I
/
\
60-
50-
40-
30-
SDG&E .EASEMENT PER DOC
NO. 61466 REC. 05/25/1966
i
\ ·. /
sgG&E EASEMENT PER DOC
N , 79507125 REC. 12-03-1979
\
\
\
l ·43
I llS-B/JILT
--
/
·-
·-
I '/
/
"¾,,~
EXISTING INLX"J¾ .,---PER TM 2617 '•
PROPOSED 6'' PVC
FL 35.0
PROPOSED 6"PVC
FL ~5.0
CAISSON
EXISTING 18" RCP
PER TM 2617,
0100°13.56 CFS
<FL 33.90)
DETAIL OF EXISTING INLET
I
I
I· I ,
I
I
I
I
NO SCALE
I EXISTING 10'
/JSEWER EASEMENT
/,1
t
I
I
I
I
~ I ;:,.._
I
I ,:.,,j_
PROPOSED
SURFACE
l ~EXISTING 8" SEWER
SECTION A-A
SCALE: HOR. 1"=10', VERT. 1"=10'
t\'IH.SS/
L,
t:; -... °:I o.C2767e !;i
" " ~
OFC~~
ENGINEER OF WORK
RICr~NGINEERING CO.
~-~/4-/1!.rA-
DATE
DATE
INSPECTOR DATE
~ CITY OF CARLSBAD ~====⇒====⇒~==============================t=:::j=:=:j=::::t:=:j L.1__i ENGINEERING DEPARTMENT
GRADING PLANS FOR,
DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL
OTHER APPROVAL CITY APPROVAL
SLOPE REPAIR FOR ARENAL LANE
LA COSTA RESORT & SPA
CITY ENGINE
OWN BY: -=RE~C-
CHKD BY: GVP
RVWO BY:
LLOYD B.HUBBS
~-~· k---c~='I/W•~ 23889 EXP. 12/31/05DATE
PROJECT NO. DRAWING NO.
PD 03-10 415-SA
110904 ,
EROSION CONTROL NOTES
1, IN CASE EMERGENCY WORK IS REQUIRED, CONTACT MIKE CUSICK AT ( 760 l 931 -75 75.
2. EQUIPMENT AND WORKERS FOO EMERGENCY WORK SHALL BE MADE AVAILABL! AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT,
3. DEVICES SHOWN ON PLANS SHALL i'IIOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR,
◄. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE ANO SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION.
7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON.
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY.
9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE ENO OF EACH WORKING DAY WHEN THE FIVE (Sl DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (407.l. SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
10, ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/41NCH MINIMLt.4 AGGREGATE.
11, SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90¾ COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCHED STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STATE OF CALIFORNIA,
TEMPORARY EROSION CONTROL
PLANTING AND IRRIGATION
All PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIFICATIONS AND THE FOLLOWING•
A, HYDROSEEDING SHALL BE APPLIED TO,
1, ALL SLOPES THAT ARE GRADED 611 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE• a. THREE FEET OR MORE IN HEIGHT ANO ADJACENT TO A PUBLIC WALL
OR STREET. b, ALL SLOPES 4 FEET OR MORE IN HEIGHT.
2. AREAS GRADED FLATTER THAN 611 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST• a. NOT SCHEDULED FOR IMPROVEMENTS <CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHLY VISIBLE TO THE PUBLIC. o. HAVE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT.
B, HYDROSEEDED AREAS SHALL BE IRRIGATED IN ACCORDANCE WITH THE FOLLOWING CRITERIA•
1. ALL SLOPES THAT ARE GRADED 6•1 OR STEEPER AND THAT ARE• a. THREE TO EIGHT FEET IN HEIGHT SHALL BE IRRIGATED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 1007. COVERAGE. b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100¾ COVERAGE. 2. AREAS SLOPED LESS THAN 611 SHALL BE IRRIGATED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE IRRIGATION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES ANO COSTS OF THE ELEMENTS OF THE PROPOSED SYSTEM. 3. IRRIGATION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEOED GROWTH,
C, HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING•
1. SEED MIX SHALL CONSIST OF NO LESS THAN• a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs. PER ACRE OF ZORRO FESCUE o. 3 lbs. PER ACRE OF E SCHOOL CIA CALIFORNICA
d. ◄ lbs. PER ACRE OF ACHILLEA MILLEFOLIA e. 3 lbs. PER ACRE OF ALYSSUM (CARPET OF SNOW)
f. 1/~lb. PER ACRE OF DIMORPHOLECA,
g. ITEMS o, d, e, AND f OF THIS SUBSECTION MAY BE OMITTED ON EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. h. ITEM a OF TH 15 SUBSECT II ON MUST BE I NOC ULA TED WI TH A NITROGEN FIXING BACTERIA ANO APPLIED ORY EITHER BY DRILLING OR BROADCASTING BEFORE HYOROSEEOING. I. All SEED MATERIALS SHALL BE TRANSPORTED TO THE JOB SITE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CERTIFICATION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS,
J, NON-PHYTO-TOXIC WETTING AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR.
2. TYPE 1 MULCH APPLIED AT THE RATE OF NO LESS THAN 2000 lb$, PER ACRE, TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR HYDRAULICALLY APPLIED FIBER MATERIAL, WHEN STRAW 15 USED IT MUST BE ANCHORED TO THE SLOPE BY MECHANICALLY PUNCHING NO LES$ THAN 50¾ OF THE STRAW INTO THE SOIL.
3, FERTILIZER CONSISTING OF ,Al,NONIUM PHOSPHATE SULFATE, 16-20-0, WITH 15¾, SULPHUR APPLIED AT THE RATE OF 500 lbs. PER ACRE.
O. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYOROSEEOING BY•
1, ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A
COMB I NAT ION OF• a. TRACK WALKING SLOPES STEEPER THAN 611, b, HARROWING AREAS 6•1 OR FLATTER THAT ARE SUFFICIENTLY FR I ABLE. o. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b
ABOVE,
PUBLIC R/GHT-
OF-WAY
5 'MN.
8" MIN. I PROFILE
EX /STING GROUND
eJ.Atj
PUBLIC RI HT-OF-WAY
PROVIDE 'APPROPRIATE TRANSITION
BETWEEN SfABILJZED CONSTRUCTION
ENTRANCE AND PUBLIC RIGHT-OF-
WAY
STABILIZED CONSTRUCTION ENTRANCE
ANGLE FIRST STAKE TOWARD
PREVIOUSLY LAID BALE
FL OW ---<~
~k--~ fij\~ ~~
WIRE OR NYLON
BOUND BALES
( PLACED ON THE
)'; CONTOUR
s,:t,, 2 RE-BARS,STEEL P/CKETS,OR
2"X 2" STAKES 1 1/2' TO
2' IN GROUND
ANCHORING D£TAIL * ORA /NAGE AREA LESS THAN 1 ACRE
STRAW BALE DIKE
1. SET POSTS ANO EXCAVATE A
4 BY 4 IN r JO BY 10 CM I
TRENCH UPSLOPE FROM AND
ALONG THE LINE OF POSTS.
3. ATTACH THE FllTER FABRIC TO
THE WIRE FENCE AND EXTEND IT
l NTO THE TRENCH.
2, $TAP~£ WIRE FENCING TO
THE POSTS,
4 [N (10 CM!
4. BACKFlll ANO COMPACT THE
EXCAVATED SOIL.
SILT FENCE
9 [N. EARTHEN RIDGE
FILL
GRAVEL FILTER
WIRE SCREEN
FILTERED WATER
OROP INLET
WITH GRATE
CONCRETE Bl OCK
BLOCK-SCREEN-GRAVEL SILT BASIN
COMPACTED SOIL
TO PREVENT PIPING
STAKED
STRAW BALE
•
DROP INLET
WITH GRATE
RUNOFF WATER
WITH SEDIMENT
2X6 STRUT/Si
FIL TEREO
WATfR
2X6 STRUT/SI
-=c::::::-r,;, ~~:+.~~~c..:;. -
STRAW BALES
STAKED WITH TWO
STAKES PER BALE
END AND SIDE
OVERLAP AT
CORNERS
2X6 STRUT/SI
REQUIRED WHEN
NOTED ON PLANS
HAY BALE SILT BARRIER
GRAVEL BAGS OVERLAP
ONTO CURB
RUNOFF
GAP BETWEEN BAGS
ACTS AS SPILLWAY
3 FT /0.9 Mi MIN,
THREE LAYERS OF GRAVEL BAGS
WITH ENOS OVERLAPPED
GRAVEL BAGS
A
POINTS A SHOULD BE HIGHER THAN POINT B
FLOW ...
HAY BALE CHECK DAM
6 IN r15 CM!
r A !
COARSE AGGREGRA TE~
FLOW
0
~4
I B !
L=DISTANCE SUCH THAT POINTS
A AND BARE OF EOUAL ELEVATION
GRAVEL CHECK DAM
4 "-6 11 LOGS
0
------}0!i'J 11111----
0
0
0
LOG CHECK DAM
24 IN 161 CM/
j
I
IN (61 CM/
I
24 "
18" I
LEGEND
DESCRIPTION QUANTITY SYMBOL
SILT FENCE 375 LF
GRAVEL BAGS 30 EA ==
FIBER ROLL 300 LF --<l---0--
~~Sif ESS Io.
~fjj-L, lJA"
c,,, 1/ ~ -v< ;, .:; ~ 'cli. No.c21na !;;:
* ~~~ *
~ C~\.\~
_ENGIN_EER OF WORK
RICK~NGINEERING CO.
ROGER L~ -;1.. ~,._.R..,..c'!O'""E.~2-76-78______:f,~,~~~~=---'':=.cT!~-
2. CONDITIONING THE SOILS SO, THAT IT IS SUITABLE FOR PLANTING BY• a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT
NOT SATURATED SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING OR COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR
GROWTH.
l------f--+------------1---4---l-----l-----l ~ CI TY OF CARLSBAD I SHEETS [ ~ ENGINEERING DEPARTMENT 7
E, HYOROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS BENCH MARK GROWTH UNTIL THE PROJECT 15 PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE PERMANENT LANDSCAPING, UNTIL A STREET CENTERLINE MONUMENT ON EL
EROSION CONTROL NOTES ANO DETAILS FOR,
SLOPE REPAIR FOR ARENAL LANE
LA COSTA RESORT & SPA
[ THE PROJECT 15 COMPLETED ANO ALL BONDS RELEASED. CAMINO REAL 0,88 MILES NORTHERLY FROM ~· LA COSTA AVENUE, LLOYD B,HUBBS
1 , 131708 • • ,,/w-"'
! II. ~~EN~~~ UNLINED SWALE & BERM ~::~::~~j:~J:;:' ,ERT,CAL 1-E-~~-,A:==:E-R-t0f-11N-,~1=--~:-KL+----R-E_V_IS_I_O_N_D_E_S_C_R_IP_T_IO-N-----+-o-~:-:-~-A4P_:~-1~-~AA-LL-1--:-1~-~-\-P1-PR-1~-:~-At--1 2~~isi~', J,~~ -~~~~~i12;311o~~i.~;·
~ L.;so:;z:o!Fri:ar~, R:oa:d.,;•~Sm:;!Dt:•ao:;,, ;;;CA~921!;;10:;:-•;::19::,• .:,• Jl•:19:!_l 2:a,:;:-0:10::_1 .:,· ,!F~~~1e1:01,::20::;1-!!u:•s.,;•~www=;:·r1cken;::s!;::•com:.------L..-------------------------J..----------------~D~A~T~U::::M!.' N:G~V:!;0~29~ _________ .:;;;;;;;;;;;;;;;;;;;;;;;;;!;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:;:;:;:;:;:;;;;;;;;;;;;;;;;:;:;;;;;;!;;;;:;:;;;;;;;;;;;;;;;:;!:;;;;;;;;;;;:;:;:;:;;!;;:;:;;;;;;:;:;;;;;::;;;;;;;;:;:;;;;;;;;;;;;;;;;;;;;:;::;;;;;;;;;;;;;;;;:;:;;;;;;:;:;;;;;::;,J (9
q,\d_1J110,d_l 111ot,,5170ti•gs05.d~n •
, \$rv.r· I b1 \IHc~St·orioorOll\!pl otVI 0\P..,.,\c,ol comp. P<Bn
13-w.Y-2004 09, 06
i / I
i
/ (
-,_
Z'x2"WOOD """°-ST AKES MAX.
4' SPACING
TYPICAL SECTION FOR FIBER ROLL
'
l
NO SCN.E
;,_..__FIBER ROLL PER DETAILS
ON THIS SHEET <TYP.l
• I
.j,
.j,
4'
.j, .j,
.j,
.j, .j, .j,
.J,. 4' .j,
NOTE: ,
INST ALL FIBER ROLL!
ALONG A LEVEL CONfOUA
),
-~· 1
FIB£/'/ ROLLS--._
.j, " .J,
.j,
VERTICAL SPACING
VAIi/ES BETWtEN
8' AND 20'
l /"' ~. " ) \ ) . ' '"· . '
• ' •
4' .J, .J,
.j,
.j,
'
TYPICAL FIBER ROLL INSTALLATION
NO SCALE
\
ENGINEER OF WORK
il)fESS/
.._ .,, -;.; ~ ~ ~ * Exp,:5/'!1 *
CIVIL
DATE
20 10 ---0 20 ◄O 80
fsHFi7 CITY O CARLSBAD I SHEETS j ~==:=⇒;===⇒;=:=================:=======:==t====j==:cjcccc:t:::j ~ . ENGINEERING DEPARTMENT 7
Ei!lOSION CONTROL PLANS FOR1
GRAPHIC SCALE 1"= 20'
BENCH MARK
i A STREET CENTERLINE MONUMENT ON EL
CAMINO REAL 0,88 MILES NORTHERLY FROM
LA COST A AVENUE,
SLOPE REPAIR FOR ARENAL LANE
LA COSTA RESORT & SPA
LLOYD B.HUBBS : II TJTCK ENGINEERING CoMBll ~1
~7 RECORD FROM: NORTH COUNTY VERTICAL : lU Tli" .l CONTROL DATA, PAGE 184. CITY ENGINEER
ELEVATION, 113.122 ADJUSTED DATE INlllAL DATE INITIAL DATE INITIAL ~~~D BJ~, ~i,~ PROJECT NO, DRAWING NO.
!.~•J"t:
7
~•§0"~:~:~:,f;:~,~T;~T:,~~-E:.:§~anj:~'80:Di:·•flO:CA:12~1=10;:-2:::::::,:.;~.1:,;!::,:9~) •::,•1:;:-0::;,~::;:'..;.· _:;FAX;:::_,::1e:1e::_1Ph:2e09::;1-::::",:6a:..:,• .:www:,:::;;::~,::c1nm:
00:!s:::com:::., _________________________________________________________ ~D!A~T~U~M~: ~N~G~V2D~Z?9 ___________ _;;:EN:G:IN;:EE:R:O;:F:W:;O:;RK~====R:E;;;V=IS:l:O:N=D:E:S;;;C:;;;R:IP:T:;;;IO:N=====f0:TH:E:R:A:P;P;R;O;VA;L:1;;;:C:;IT;:Y:;A~P;P;R;OV;A~Ld:~R~V~W:D~B~Y~: ;:;;:;;:~:;::;:~P;D~~0~3~•~1~0~=~~4~1~5~•~5~A~~
. o/'f'•"' EXP. 12/31/05 D TE
\ \S~v_r, bl \RlcakStandorda\ I pJo~~1 0\P'en\oOl<>Oll'lf>. ll¥l
1 ~•M,t,Y•2004 09• 01
1. All work not detdlled, epec1r1ed or noted e.h!II be conetructed the &ame lie elmllllr
work e,t,c,wn In t.hs construction documsnte. ll.h9rs the work. le not delc!illed,
•peclrled or noted It shall be: ln accord.ance with scc!!!rpted lr~de: el.5ndard& for
900d and workm.anehlp llk.19 cane.trucllon.
DM&ION ~ Cll!Nl!tUI. leQUll'lll!t1l!NT& ~Al NO, PM
01000 CisENERAL ~QUIREMENT5 AND CODE5,
I. Work •hall c:ompl::1 wlth thee• &tructur.tl epaclflcaltona, not••• •nd drawing•
toeeth9r wllh d&eoclated spscltlcatlon•, note& and draw1nge--collsctlvel!:J
rl9:r«rf!Jd to cH the ConetructJOf'I Document&. u.h!trs the cone.tructlon document& do
not 9rve ,peclflc lne.truct..1on, work e.hall be In accordAncs wlth accepted trade
&t.!ndArd• for good and workmantrke con&truct !on.
2. Work •h•II compl~ with th!I 1997 Unlt,wn Bufldln'-Code /UBC> a• adopl"d •nd
-.,mended b!:j the C411fornla Cods or Begulat.lone, <CCl'i!:J, J1t.1e 2-4 Calrfornia
Build!nQ Code .!nd ,U .!ldopted ..,nd amended b~ tht!I local clt!:j or count~ and any
a9encls• having Jurlodlcllon--collsctlvsl~ rsrsrred lo•• th" Building Cods.
3. Work &hall compl!:j with •ppllcable federal lawa, etats etatuts&, local orcHMnccH, and
the re9ulat1on, or d98ncls• having Jurisdiction. The Contractor &hall aeaume full
rsaponalbllit~ ror compl~ln9 with ths conetructlon ta!lfsty order& and the: 9ensrt1I
lnduetrlal e.afety order, of the 8Ute Dlvl1lon of lndue.trlal sarst~. lhs rseul.!!lt.lon&
of the F•d•ral and Stt!lle Occupatlonal Sarst~ and Health Admlnletratlona, and euch
other a9enc1s11 9ovarntn9 the COt"ltractor'e, act&. Th• Contractor ahall be
reoponelbls ror and hold harmlsu th, 5tructural En91ns<9r for an~ ddma9e• and
p•na ltf•• or both ree.ultlng rrom hl1, ratlur• to comp!~ with eald lawe, eta tut••·
ordinance&, and r•gul<!ttlone.
4. Ths deol9n, ade<1u•c~ and uret~ of erection bracing, ohorln!,l, lempor•r~ oupporlo,
etc. I• the &ole re:epon&!b!llt!:j or the Contrllctor, and 1-lae not been coneldered by
the Structural Englne:sr. Th9 Contract.or It retpontlbls ror the etabll!t~ or this
etruct.ure prior to the application of all.ehear wall&, roor and rloor dlap1T~9m& and
r1nl•h mllterlala. 1--1• ah!ll provldc trul nisca&&ar~ bracing to provide &tabllrt~ prior
to th. appllc.allon or tha aroremsntionsd matsr!ale. Obesrvatlon vfelte to the &!ts
b~ tM Structural l=n9lnesr or hie-deslgnse &hall not Include lnepsctlOfl or the
above !tdfflt•.
OIi= ALTERNATIVE!. AND Dll!Cl'l!El"'ANCIE5,
I. No alternate method• or con11tructlon or •ube.tllutlon& ,hall be allowed without
wrlttl!ln approval of the Ownsr and Structural Englnssr.
2. Th• Contr.actor ehall v•rlf~ all c::Hm.-n&!on& and condition& en th• Cofletruct!on
Docum,entt and at the elt• and eh.all not.Jr~ tha Architect and 5tructural Engineer
or an~ dl&crsp.!nclee, round prior t.o cornmsnc1n9 work. The &Lructur.!I drawrnge, t.!lk.e
pr•cedenc• ov.-ap•clflcatlon•. D•Ulllecl clrawlnge and d•tafled 11ipsclrlcatlone
tak.d precedenc:e ov• 9sn•ral draw1n9& and 98rleral e,pec1r1catTOf11. Dlmene.lone
tab pr19cedencs ovm-eca led msa&ursme!lll"lt&.
01430 501L6 IN6FeCTION,
I. The own.-ah.all rstaln U,s ••vlc•• or the $otl• En91neer, when •uch &111ryfcs• 11re
rs"lulr,,,d, •• noted In ths INSPECTION AND O65ERVATION F!'!OGRAM.
2. The 5oll• !n91neer •hdill ln•pdtet and documsnt, In accordance with ths Soll•
P't~ort, the 1.11ork or trw Contractor.
3. Ths 5oli• !n9lnesr ohall rurnloh lnepsctlon rsporlo lo ths l'!>ulldln9 Orrlclal,
Arch!tect and e»tructur.t! En91n-r aa lo the conrormancs or the contractor'• work
with the eorl• r9port. and bufldln9 cods.
DIVl&ION 2, &l'TW \001'1 ~ NC> l'OlNPATION6
~Al NO, DIY2
02010 5U1"15URFACI, INVE6TICisATION,
I. Foundation dsolgn lo psr toll report b~ Sladden En91nser1ng report no. 554-2063,
dated March 24, 2003. This aoll& report la hereb~ Incorporated Into the1e
drawing,. Recommctndatlone made therein !!oha 11 be compiled with
023!:>0 CONVENTIONAL FOUNDATION!!>,
I. The Conlrac:lor eha 11 take • II neceHars msa•urso to rully protect adJacsnt
propl!'rthH.
2. All •ll• and pad prs,::,aratlon, ouch•• but not 11.,rtsd lo, gr•drn9, compaction or
the till, pre-1aturat1on, concrt!l:tdS &lab b.ae preparation !Ind vapor retarder
Jnotallallon •hall bs perrorm,rd In acc:ordancs with th, 5olle engineer'•
r•commsndatron& ae. lncluded ln the eolle rs1=1ort.
?i. Tha bottom• or rooting exc.i.tvat.lon• shall be l•v•I, c!•an, Ind rr .. of looe•
material or water when concrete I• placsd. Ovsr exc•vatron oh.!111 bs rilled with
concrete •• ror lhe roolln91. Back rill ohall not be placed unlll ,upport1ng
foundation•, walle, and 111.!b have ~tla!ned e,ufrlclerit &tren9th to 1upport laldlr.!I
toll preuur•.
4. Thl!III C0r1tractor aria II arran9e for obaervatlon of thlll work. b~ the-Soll& l=n91nee-.
P:ollowln9 ~r• r•quk"ementa of the Sall• Englnemr:
a) All pad prsp•rallon and fooling •xcavat1one &hall be lnopscled and c9rllfled
In compliance LUrth the eoll& report b~ the 5o11e l=nglnser prior to placing or
concrete or eteel.
bi A Cerllrlcale or Compliance re9uard1n9 pad pr•p•ratlon and rooting
excavation/ &hall be &ubmltted to th!I Bulldln9 Orrlclal prior lo hi• roundauon
lnepec\Jon •nd • cop~ or lhe csrllflcalJon •hall bs tubmltled to lh" Architect
and Structura I Eng fnesr.
Gl!!OTl!CI-NICAL l!NGN!Eflttl &TA,S JENT
The undsr,19ned hae. reviewed th••• dr"wlnge .and rlnde them In 9enera I conformance
with the fnt.-itlona or the 9eotech-11cal recommendation&. 5eal Je, not an lndicl!ltlon of
the drawlnEJ& havrn9 bel!!m rrep"'red undsr the &l9nator'& eupsrvle.lon.
/
/
PIYI ION:,,, CONC~TE
eAI NO, DIV3
03230 RelNFORCINCis 5TEEL FOR CONVENTIONAL FOUNDATION5,
I. 5tsel rs1nrorc1n9 baro •hall conform lo A5111 A c-1?-. Deformed and Plain BIiis\
5lcMI B,t1r1 for Rolnforcrn1c1 Steel. Bar& sNII be 9rade 60 except that No. 3 • 4
bare, ma~ be grade 40. 6arE1-shall be deF'ormed. HIii cerurrcat.e& for reinforcing
bare •hall be e.ubmltt.ed to the eu1ld1n9 Offrcral prior to uee, llnd tot.he Architect
and Structural Englns,sr.
2. Placement of relnforctn9 &tssl sh.!111 bs ln$pacted b~ a epecl"I lnapector.
_ 033= CONCRETE, CA5T IN PLACE,
I. Csment ehall conform with AS111 C l!'>O < C !:>'al&. Forlland C,on,ent I E!lsnd"d
t"l~draullc C$ffl$f'1lt.
2. Fl~ aeh or pozzol•n•, rr uoed, •hall conform with A5111 C 618. Coal Fl~ Aoh and R•w
or Calclned Natural Fp;z;z;Q!.st_r1 for Uee 4• ,! Minoral .Admixture In Concrete. Ue-a9e
ehall not excsed 25' ~ercsnt, b~ wsrght or the lot.di or the csmentltlou& materlala.
u.hen pozzolane, ar• ueed to mltlgats the srrsct or eulfate conta1n1n9 eorle ths~
aha II ba or~ t.~ps that has dl!llfflonetrated auch "blllt~ b~ t•et or e.ervlcs r111cord.
3. Watsr shall be potable and frlS'e from deleterloue quanlltlee or aclde, alkc'lllle, and
organic material&. Sulrate (804) In water aha II not excseid 150 parte psr mllll0ti.
4. A99re9ate eht!l!l conform with ASTI1 C 33, Concrete A1c1.iros.1at.ee. The nominal
m.axlmum e.lze or coures ia99re9ats shall be not larger than .an~ or the rollowln9:
a) One-F'lfth the nllrrow"9&l dl-menelon between the eldea or the rorm.
bi °"'" third th!I dspth or the elab.
c) fuse tl'ourthe the minimum clear &pacing betwssn lndlvldua! bar, or bundll!I• or
bar&.
d) I inch.
5'. Adm!xturee containing c.!llcfum chlorlclee ehdll not be ue,,ed.
b. The ContMctor ehdll retain the a.ervfcea. or d qul!lllrl•d ltc•need sn91nssr to
provide a Concrete Mix Deelgn ror each Claee, of Concrste to be ueeol. Thdi
•n9Jn919r &hall e,Jgn dnd eedl lhe mix deelgne.
1. Concret!!I: Mix Dee.19ne. ue.ed &hall have the fo\low1n9 propertlee and b• eubJsct to
lhs lleted ,quallt~ COf"ltrol F>roceduree,:
a) Strength, elump, te&tln9, dnd fnepectlon of ths COf"lcrete ehall be:
Concrete Uea9e Schedule,
Cla&& '1B Dll~ Maximum Special lnepector
( & f n r Min. Str th E>lum re ulred ulred
Drlll9d CaJ•eono 4000 PSI ~SCjulr"d
Note: The maximum elump or the concrste ma!:-} be lncrsae.ed bH 1 rnch whsn the
concrsts le Mnd cone,olldatsd. The &lump 91vsn le b.!l&dld on mschanlcal
coneolldlltlon.
~-Concrsls ohall be mlxsd and d91iv.,red In accordancs with A5111 C ~.
'9sad~-Mixed Concro:t.o
~-TeetlflEJ of concrete:
.!I) Ts&t& need not be made ae noted above provided the total G1u.!lntly of
concretdll F>laced 1& leH th!ln rift~ (&O) cu. ~d. In placs of ti... ldtate,, a L•tt•r
of Certification ehall be rurnloh!ld b~ the Matsrlal 6uppllsr lo th• Burld1n9
Orrlc!c!I I, Archftect. dnd Slruclur~ I En91ne.sr prlor lo dsllver!;,J or tM materf.!!1 la lo
the Job olle. Th, letter •hall •••ur• that the concrete will havs lhs elren9th
&F'eclfled.
10. Curing. Concrete •hall bs m•lnlalns.:I abovs 5o•F and In • conllnuou•I~ moltl
condition ror a\ lsaol eeven (1/ d•~• arter placsm.,,nl.
It. Minimum concrl!lte protectr011 for relnrorclng &teel &hall be cU rollow1i:
~slriforclng Bar Cover E>chedule:
Cond!tion Clso!llrtinee
Ca&t ll9llln11t llnd permllnentlH expoaed to earth. 4°
&n.JCTIJ~ Pl!&IQN CfltlT!!l"IA, eA1 ""'" a1'lOUC><Ot
I. IS':11 Uniform Build1n9 Cods. (2001 Calrrornl• Burld1n9 Cods)
IN&l"'l!CTl0N ANP Ol!!l&el'IIYATION ~
I.
2.
Thie lntpsctfon llnd obe.ervatlon progr.!tm applls& only to the: 11tructurc1 I drllwln9•
and &peclrlcatlon&. The ContMclor eha II coordfnate fn .!I tlmely manner lnepectlon
and obe.ervt'ltl~ of the project.
Ths Bulld1n9 omcral &hall lnopsct ths proJ9cl rn accord•nce wllh th,o bulldln9
psrmlt and lhs prov101ono or the Building Code.
I. All e.tructurl! I a&pect&.
Individual or rlrm lo Dulls• or Building
errorm ln& scllon: fne, ector:
euildlng lnepsctor 5ha II b• ln accordatice
dee.lgnated b~ ths with U6C 8ect!on 1oa-
Bulldin9 Orrlcla I Inspection•
.;,, The Solle e:n91neer ehd II lnepect and documc9nt, In accorclancs with the Solle
f'eport, the followlng. Th!& ltemlzat.ron ls not Intended to supersede .!!l"'.:j
requlremenh or the 0o!le Engineer or the: Bullc:Hn9 orricl.!!I but le Intended to be
.uppl~~t.ar~ thsrc9to. lnd1v1cfual or r1rm to Dutlee or 5olls
Portion of work re ulrln errorm In& ectJon: En lneer:
I. Drfllsd plls holes-lndlvfdual or ilrm
de• 19nated by the
5o 11& Eng lnesr
IN8f"l!CTION AND oe&l!lltll'ATION ~.
5ha II be ln accordance
with the &oil& report.
0 o,.,,.o, .,..,
i,,A I No~ IN&f-~Q-1
1. A 5pecla I lne.pector (~9l&tsred Dlf!put~ lne.petctor) eh.a II provide contfnuoue
"''· rne.pectlon of the: following portion& of th9 work.:
Fort.Ion of •work reciu1rrn9 contlnuoue, Individual or firm to Dulle& or s,::>eclal
lne.pectlon, errorm In& ectlon: lne, ector:
I. F'lacement of concret.s. A qualified person who
sha 11 h.!!lve demone.trate
competet"'tce to tht
&Btrtfact.!on or the
Bulldln9 orrrcral
Confirm placsrnent ln
c!lccordance with
&t~ndard prdctlce
2. A 5pscral ln•psclor (~9!,llel,9rsd Deput~ ln&pector/ •hall provlds psrlodlc
lnop9cllon or lhe rollow1n9 portion or the work,
Portion or work r,o"{ulrlng psrlodlc Individual or firm to Dulle• or !lpeclal
lne.pectlon: erform 1M ecllon: ln1 l!lctor:
I. Placement or concrels,
convsntlon.!11 rslnforcln9 &teel.
A qu.a llr!ed psre.on who
e.hall havt9' demon&trate
compi9tence to the
e.atrefdcLlon or tli•
Building orf1c1a1
Confirm pl.!cenent ln
accordance with
standard practice
LOT 90
(ff 6U, 0'1-J
f"X. Hl'll:1
D ll/N 1-llLL 51DE UP 1-llLL 51DE
cc DETAIL
"II VERTICAL BAR&
•4 5FIRAL TIE& W/ 6"
FITCl-l
24" CONCRETE
CAl&&ON
LDT 142
•10 VERTICAL BAR5
•4 5Pll'l:AL TIE5 ll// 6"
PITCl-l
. ~24" CONCRETE
· .. · CAl&&ON ~, .
I, JM79
l P-EJ. roe
RIT 12-03-19?9
NOTE,
I. eEE CIVIL DRAWING,
FOR PRECISE CAI ON
LOCATIONS
2. SEE CIVIL RAll/lNGS
FOR APP XIMATE /
LDT 143
/
/
/ 7
LOCAT 5 OF EXISTINC,
CAI t)lS<~TILITIES\
ENGINEER □F WLIRK RICK ENGINEERING
:l XFAtilel SOIL/
OMINAL ARING ,,tooo FSF. / tJ < \/ > f/ /
'.__--SOIL FILL
(B) • B BAR& IN
CAl55ON
•4 &PIRAL TIE& ll// i&"
FITCl-l
:i~24" CONCRETE
CAIS&ON
'AS BU
STRUCTURAL ENGINEERS
~Tl! Ol"FICI!,
!:>!:>S Anton Boulsvard, Sult" eso
Coo la Meoa, Ca lffornla ':12626
(114) Sl3-1SOO Tslsphone
/114) Sl3-1SSS Facolmlle
E-Mail, w,slomallel:,orm.com
UJ.LW.loorm.eom
COPYRIOHT 2003, IORM ASSOCIATH, INC.
ALL RIOtfTS RESERVEC
le.el.lED~,
PRELIMINAR'r
ffi FLAN Cl4ECK
&TAMP,
<JL> 02-10-04
(514) O4-1':l-O4
D ll/N 141LL 51DE UF 1-llLL &IDE
(2 > •11 VERTICAL ElARS
AT FRONT OF CAISSON
CONCRETE CAl&&ON
•4 SPIRAL ll// b" FITCl-l
(b! •11 VERT. ElAR& <IN
BUNDLE& OF TUJO! !:>"
OC AT ElACK SIDE
OF CAl55ON
ICAI!, 1• • 1'-0' C C DATE, a-,-~, -
l!IAI NO. ' x◄,ieco, BB
BENCH MARK
DETAIL
(2! •10 VERTICAL ElARS
AT FRONT OF CAl&SON
CONCRETE CAl550N
___.-•4 SFIRAL ll// b" PITCl-l
(b) "10 VERT. BAR& /IN
BUNDLES OF TWO) 5"
OC AT BACK 51DE OF
CAl&SON
t llS-BU!LT
AA DETAIL
(8) •a BARS IN CAies
___ 24" DIA CONCRETE
CAl550N
'4 5Fl~L ll// b" FITCl-l HAS BU IL TH
• -f•1/-,:,(.
R. C. rJ 70f4 EXP. DATE
~ CITY OF CARLSBAD I Sl£ETSI f----+--+---------------+---+-----+-----1 LU ENGINEERING DEPARTMENT 7 1---,f--+---------------+---,f-----t---1
STRUCTURAL PLANS F1lRi
SLOPE REPAIR FDR ARENAL LANE
LA COSTA RESORT i SPA A STREET CENTERLINE MONUMENT ON EL
CAMINO REAL 0. 88 MILES NORTHERLY FROM
LA COSTA AVENUE. l---+---1~----------------+--+-----+---, AP~ LLOYD .. HUBBS .tL/d-c.J
RECORD FROM, NORTH COUNTY VERTICAL CONTROL DA TA, PAGE I 84.
ELEVATION, 113. 122 ADJUSTED
DATUM, NGVD 29
1----+----+--------------------+---1------+----I 1'c'"'1:".!T"°Y~Ec-:N'=G-:,1 N~E:;E:::R,,...,R=-.-=c=-,-=r,....,.2,.3a"'s"'9,....,E::x"'P=-."Tf""2"'Z,.3T">f 10~ !111 TE
f--::=c--+-::=:-:c,1,------------------+==-+==:-:-==-+-:==LIDWN BY,-~--, DATE !NIT! L DATE INITIAL DATE INITI CHKD BY• GYP
REVISION DESCRIPTION OTHER APPROVAL CITY APPROV RVWD BY, ENGINEER Dr
PROJECT ND,
PD 03-10
DRAWING N□,
415-SA
· 120904