GRADING NOTES
(IN ADDlTION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE
CARLSBAD MUNlClP AL CODE.)
1. THIS PLAN SUPERSEDES ALL 011-IER PLANS PREVIOUSLY APPROVED BY THE CITY
OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS.
2. APPROVALOFTHISPLANDOES NOT LESSEN OR WAIVE ANY PORTION OF THE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROV Al., CITY
STANDARDSOROTHERADl)[TIONALDOCUMENTS LISTED HEREON AS THEY MAY
PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL
REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.
3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF-
WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS
DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY
SUBMITTED TO THE CITY ENGINEER FOR APPROVAL.
4. A RIGHT-OF-WAY PERMlT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY
WORK IN THE PUBLIC RIGHT OF WAY.PRIOR TO PERMIT ISSUANCE, A
CERTIFICATE OF INSURANCE MUST BE FILED NAMING THE CITY OF CARLqBAD AS
AL'! ADDITIONAL INSURED ON THE PERMITTEE'S POUCY IN THE MTNIMUM AMOUNT
OF $1,000,00 0 FOR EACH OCCURRENCE OF LIABILITY. THE INSURANCE
COMPANY WRlTJNG THE POLICY MUST HAVE A RATING OF "A" AND A SIZE
CATEGORY OF CLASS VAS ESTABLISHED BY "BESTS" KEY RATING GlJIDR.
5. UNLESS EXEMPTED BY SECTION301.(b)5 OF THE UNIFORM BUILDING CODE,
RETAINING WALLS OUTSIDE OF PUBLIC RIGHT OF WAY REQUIRE SEPARATE
PERMITS FROM THE BUILDING DEPARTMENT.
6. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HA VE BEEN OBTAINED FROM
THE CITY AND OTHER APPROPRIATE AGENCIES.
7. APPROVAL OF THESE PLANS BY THE Cfl'Y ENGINEER DOES NOT AUTHORIZE ANY
WORK OR GRADING TO BE PERFORMED UNTII, TIIE PROPERTY OWNER'S PERMISSION
HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED.
8. NO REVISIONS WILL BE MADE TO TI-IESE PLANS WITHOUT THE WRITTEN APPROVAL
OF11IB CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE
APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET.
9. ORIGINALDRAWJNGSSHALLBECOMETHEPROPERTY OF TI-IE CITY UPON BEING
SIGNED BY THE CITY ENGINEER.
10. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDff!ONS
BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OP TIIE WORK BY THE
CITY.
11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO
THE PROJEC.."T SITE AT ALL TIMES DURING CONSTRUCrION.
12. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED
OF: (A) SUM!v!ARY SHEET, (B) LABORATORY WORKSHEETS AND (C) COMPACTION
CURVES, SHALL Bll SUBMITTED BY A PROl'ESSIONAL ENGINEER OF TI-IE STATE OF
CALIFORNIA., PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS
MEC}IANICS. THE SOILS REPORT WILL BE SUBM!TfED TO THE CITY ENGINEEIUNG
INSPECTOR WITHIN TWO WORKING DAYS OF TI-IE COMPLETION OP PIELD TESTS.
13.A SOILS COMPAC..TION REPORT AND COMPLIANCE VERIFICATION REGARDING
ADHERENCE TO RECOMMENDATIONS OUTLINED IN THE SOILS REPORT IS REQUIRED
PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING
SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE
STATE OF CALIFORNIA PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED
SOILS MECHAL'IICS. ALL FILL OR FUTURE PILL AREAS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIPICATIONS AND TIIE
"EARTHWORK SPECIFICATIONS" ATTACHED TO THE PRELIMINARY SOILS
INVESTIGATION. DAILY FIELD COM!' ACI'ION REPORTS WILL BE SUBMITTED TO THE
PROJECT INSPECTOR.
14.APRECONSTRUCTIONMEETINGSHALLBE HELD_ATTHE_SITE PRIOR TO THE
BEG.INNING OF WORK AND SHALL BE ATfENDED BY ALL REPRESENTATIVES
RESPONS!llW FOR CONSTRUC..TION, INSPEC..TION, SUPERVISION, TESTING AND ALL
OTHERASPECIS OF THE WORK. THE CONTRACTOR SHALi.SCHEDULE TIIE MEETING
TI-ffiOUGII TIIE PERMIT CLER!( (760) 438-3891) AT LEAST FIVE(5) WORKING
DAYS PIUOR TO STARTING CONSTRUC..TION. APPROVED DRAWINGS MUST BE
AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT WILL BE PROVIDED BY
TI-IE PROJECT INSPECTOR AT THE MEETING.
15. ALL TNSPECTION REQUESTS OTHER THAN FOR PRECQNSTRUCTION MEETING WILLBE
MADE BY CALLING THE ENGINEERING 24-HOUR INSPECTION RE.QUEST LINE AT
(760) 438-3891.INSPEC..TION REQUESTS MUST BE RECEIVED PRIOR TO 2:.00 P.M.
ON TIIE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WJLl.-BE MADE
THE NEXT WORK DAY UNLESS YOU REQUEST OTHER WISE. REQUESTS MADE AFTER
2:00 P.M. WILL BE SCHEDULED FOR TWO FULL WORKDAYS LATER.
16. THE OWNER AND/OR APPLICANTTIIROUGII THE DEVELOPER AND/OR CONTRACTOR
Sl!ALLDESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE SOI.ELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL,
STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING
A DETAIL PLAN TO THE C\TY ENGINEER AND/OR CONCERNED AGENCY SHOWING
THE DESIGN OF SHORING, BRACING SLOPING OR 011-IER PROVISIONS TO BE MADE
OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE
EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION
THEREIN. THIS PLAN MUST BE PREPARED FOR ALLTRENC}IES PIVE FEET (5') OR
MORE IN DEP111 AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED
AGENCY PRIOR TO EXCAVATION. IF TI-IE PLAN VARIES PROM TIIE STIORTNG SYSTEM
STANDARDS ESTABLISHED BY T!IB CONSTRUCTION SAFETY ORDERS, TITLE 8
CALJFORNIAADMINISTRATIVE CODE THE PT.AN SHALL HE PREPARED BY A
REGISTERED ENGINEE_B_/1.T Tf-!E CONTRACTORS EXPENSE. A COPY OF THE. OSHA
EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO
EXCAVATION.
18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BT.ASTTNG PERMIT HAS BEEN
OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPLICATION FOR BLASTING
PERMIT WELL IN ADVANCE OP TIIE SCHEDULING-OF BLASTING OPERATIONS.
l9. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK AREA
DURING CONSTRUCf!ON, OPERATIONS WILL CEASE TMMEDTATELY, AND THE
PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART
UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHOIUTY FROM THE Cfl'Y
ENGINEER TO DO SO.
20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING
WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS,
EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT ANO ANY OTHER ASSOCIATED
GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN7:00 A.M. AND
SUNSET EACH DAY, MONDAYTIIRUl'RlDAY AND NO EARTHMOVING OR GRADING
OPERATIONS SHALL BE CONDUC!'ED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY
HOLIDAYS IS AVAILABLEATTIIE ENGINEERING DEPARTMENT COUNTER.)
21. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS Pll!OJ~0ro BEGINNING OF
WORK.
22. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE
DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING AI.ONG THE HAUL
ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION.
23. BRUSH SHALL BE REMOVED ONLY WITHIN THE AIIBATO BE GRADED. NO TREES ARE
TO BE REMOVED UNLESS SPECIFICALLY NOTED ON TI-IE PLAN.
24. ALL AREAS SHALL BE GRADED TO DRAIN.GRADING RESULTING IN THE PONDING OF
WATER JS NOT PERMITTED. ALL EARTI-IEN SW ALES AND DITCHES SHALL HA VE A
MINIMUM ONE PERCENT SLOPE.
25.THESEPLANSARESUBJECl'TO A SIGNED AND APPROVED SET 01' EROSION
CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED BY
THE CITY ENGINEER ORAS DIRECTED BY THE PROJECT INSPECTOR.
26. ALL SLOPES SHALL BR TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM
SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT AND
ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVED
AND DISPOSED OF ATASITEAPPROVEDOF BY THE CITY ENGINEER.
27. ALL SLOPES SHALL BE !RR.I GATED, STABILIZED, PLANTED AND/OR HYDROSEEDED
WITHIN TEN (10) DAYS Ol'THE TIME WHEN EACH SLOPE IS BROUGHT TO GRAJ)E
AS SHOWN ON THE APPROVED GRADING PLANS.
28. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED
BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS !'OR
THIS PROJECT, AND/ORAS DffiEC.."TED BY THE CITY ENGINEER OR PLANNING DIRECTOR.
29. THE OWNER/APPLICANT SHALL INSURE 1HAT AT .T, CONTRACTORS SHALL COORDTNATE
TIIE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE
AND IRRIGATION PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS
WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME REQUIREMENTS.
30. STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE WITH A MINIMUM
D-LOAD OFl,350. FOR PRIVATE STORM DRAIN PIPES, UPTO 15" PVC MAY BE
UTILIZED PROVIDED DEPTH JS LESS THAN 15 FEET AND BACKFILLED WITH 3/4"
ROCK PER SDRSD S-4 TYPE "C" AND PIPE MEETS ASTM STANDA!ill 3034 FOR
SDR35SOLID WALL PIPE.
31. WHERE AN EXISTING PIPELINEISTOBEABANDONED AS A RESULT OF THE
GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING
OR STREET AREAS AND REPLACED WITH PROPERLY COMPACl'ED SOILS. IN OTHER
AREAS THE PIPE WILL BE PLUGGED WIT!! CONCRETE OR REMOVED AS APPROVED BY
TI-IE CITY ENGINEER.
32. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES
(ABOVE GROUND AND UNDER GROUND) WITHIN THE PROJECT SITE SUFFICIENTLY
AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS
FOUNDTHATTHEACfUALLOCATIONSARE IN CONl'LICT WITH THE PROPOSED
WORK.
33. THE CONTRAC.."TOR SHALL NOTIFY AFFECfED UTILITY CO!v!P ANIES (SEE BELOW) AT
LEAST2FUI.L WORKING DAYS PRIOR TO STARTING GRADING NEAi, THEIR
FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTATIVE.
UNDERGROUND SERVICE ALERT 1-800-422-4133
SDG&E (800)660-7343
PACIFIC BELL (800)892-0123
ADELPHIA CABLE COMMUNICATIONS (760)438-7741
COX COMMUNICATIONS (760)806-9809
CITY OF CAl,LSBAD(STREETS & STORM DRAIN) (760)434-2980
CITY OF CARLSBAD(SEWER,WATER & RECLAIMED WATER) (760)438-2722
SAN DIEGUITO WATER DISTR!Cf (760)633-2650
LEUCADIA WASTE WATER DISTRICT (760)753-0155
V ALLECITOS WATER DISTRICT (760)744-0460
OLIVENHAIN WATER DISTRICT (760)753-6466
BUENA SANITATION DISTRICT (760)726-1340
AS APPROPRIATE
34. PERMIT COMPLIANCE REQUIREMENTS:
A. FOR CONTROLLED GRADING-TI-IE APPLICANT HIRES A CIVIL ENGINEER,
SOILS ENGINEER, AND/OR GEOLOGIST TO GIVE TEC}INICAL ADVICE,
OBSERVE AND CONTROL THE WORK IN PROGRESS {!5.16.120A.8}
CARLSBAD MUNICIPAL CODE.
B. PRIOR TO FlNAL APPROVAL OF A GRADING PERMIT-THE FOLLOWING
REPORTS MUST BE SlJBMf!TED TO THE CITY ENGINEER VIA THE
PROJECT INSPECTOR {15.16.620A.ID) CARLSBAD MUNICIPAL CODE:
(1) FINAL REPORT BY SUPERVISTNG GRADING ENGINEER STATING ALL
GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING
AND IRRIGATION ARE INSTALLED IN CONFORMANCE WITH CITY
CODE AND THE APPROVED PLANS (OBTAIN SAMPLE OF COMPLIANCE
LETTER FROM CITY ENGINEERING DEPARTMENT).
(2) AS-BUILT GRADING PLAN.
(3) REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES
RECOMMENDED SOIL BEARING CAPACITIES, A STATEMENT AS TO
THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF
LWDSEWERNOTES
I. LWD APPROVAL Ol'THESE PLANS DOES NOT RELIEVE THE APPLICANT,
PRIVATE ENGINEER OF WORK, OR CONTRACTOR FROM RESPONSIBILITY FOR
THE CORREC!lON OF EIU,ORS AND OMISSIONS DISCOVERED DURING OR
AFTER CONSTRUCTION.
2. ALL DESIGN, MATERIALS, AND CONSTRUCf!ON WORK SHALL CONFORM TO
THE LEUCADIA WASTEWATER DISTRICf L WD SEWER STANDARDS AND TO
THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION (GREENBOOK) AND THE REGIONAL STANDARD
DRAWINGS, MOST CURRENT EDff!ONS, IN TI-IE EVENT OF CONFLICT THE
LWD SEWER STANDARDS GOVERN.
3. OSflA SAFETY ORDERS AND OSHA CONFIRMED SPACE ENTRY
REQUIREMENTS SHALL BE FOLLOWED AT ALL TIMES WITHOUT EXCEPTION.
4. THE CONTRACfOR SHALL HA VE A COPY OF THE SEWER NOTES 2. & 3.
DOCUMENTS ON TI-IE JOBSITE AT ALL TIMES.
5. THE CONTRAC"TOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE
YEA!lAFTER Tl-IE DATE OF FINAL ACCEPTANCE BY LWD AND SHALL REPAIR
OR REPLACE WORK THAT MAY PROVE DEFECTIVE IN WORKMANSHIP
AND/OR MATERIALS WITHIN THE ONE YEAR PERIOD WITHOUT EXPENSE
WHATSOEVER TO LWD.
6. PRIOR TO BEGINNING SEWER WORK, CONTARC.."TOR SHALL SECUIIB AL WD
PERMIT FOR CONSTRUCTION AND SHALL PROVIDE A MINIMUM OF 48 HOURS
NOTICE TO LWD PRIOR TO CONSTRUCTION.
7. APPROVAL OF 11-IIS PLAN BY L WD DOES NOT CONSTITUTE A
REPRESENTATIVE OF THE ACCURACY OF THE LOCATION OP, OR TIIE
EXISTENCE OF OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE,
OR STRUCTURE WITHIN THE CITY LIMITS OF THIS PROJECf.
8. ALL IIBVISIONS TO DRAWINGS SHALL BE APPROVED BY THE LWD DISTRICf
ENGINEER IN WRITING PRIOR TO CONSTRUCTION.
9. CONNECTIONS TO EXISTING SEWER PIPE OR MANHOLES Sf!ALL ONLY BE
DONE IN THE DHIBCf PRESENCE OF THE LWD INSPECTOR. NEW SEWER
SHALL NOT BE CONNECI'ED OR ALLOWED TO !'LOW TO EXISTING SEWER
UNTIL AFTER FINAL ACCEPTANCE OF ALL UPSTREAM WORK BY T}IE LWD
INSPECTOR, OR AS APPROVED BY DISTRICT ENGINEER.
JO. ALL SERVICE LATERAL SHALL BE LOCATED AT RIGHT ANGLES TO THE
SEWER MAIN UNLESS 011-IERWISE SHOWN AS APPROVED BY LWD ON THE
PLANS.
11. A 2-INCl-l I-IIGH "S" SHALL BE INSCRIBED ON THE CURB FACE AT EACH
LATERAL LOCATION BY Tl-IE CONTRACIOR.
12. A 10 GAGE SHIELDED COPPER WIIIB SHALL BE BURIED OVER EACH LATERAL.
THE WIRE SHALL EXTEND UP TO A 2" COPPER TAG TIED AND SOLDERED TO
THE WIRE. THE TAG OVER TflE SEWER MAIN SHALL TERMINATE 6" ABOVE
PAVINGSUBGRADE WITH FINAL LOCATION JUST BELOW PAVING. THE TAG
OVER THE CUSTOMER END OF THE LATERAL SHALL EXTEND ABOVE GRADE
UNTIL CONNECTED AND SHALL T}IEREAFTER BE BURIED AT THE POINT OF
CONNECTION.
13. ALL LATERAL SHALL BE CONSTRUC.."TED CLEAR OF DIUVEWAYS.
14. ALL SEWERS AND LATERAL SHALL BE WAYNE BALLED, LOW PRESSURE AIR
TESTED AND TELEVISED AT THE APPLICANT/CONTRACTORS EXPENSE PRIOR
TO CONSIDERATION FOR FINAL ACCEPTANCE BY LWD. AIR TEST SHALL BE
DONE AJTl'ER CONSTRUCTION OF ALL OTHER UTILITIES AND UTILITY
LATERALS.
15. ALL SEWERS AND LATERALS SHALL BE IN PLACE AL'ID SHALL HAVE FINAL
APPROVAL BY THE L WD INSPECTOR PRIOR TO PAVING.
16. Al .L NEW CONNECTIONS TO EXISTING SEWER S}IALL BE MADE TO EXISTING
WYES OR SHALL BE MADE BY INSTALLING NEW MANUFACTURED WYES.
STANDARD BELL AND SPIGOT OR PLAIN END WYES AND PLAIN END PIPE
SPOOLS MATCHING THE ADJACENT EXISTING PIPE MAY BE USED FOR
INSERTING WYES INTO AN EXISTING SEWER.
17. IF NECESSARY DURING THE LATERAL CONSTRUCTION WORK, UPSTREAM
FLOW IN THE EXISTING SEWER SHALL BE TEMPORAIULY PLUGGED AND BY-
PASSED BY PUMPING OR PUMPER TRUCKS FOR DISPOSAL TO A
DOWNSTREAM LWD SEWER. IN LOCATIONS WITH SIGNIFICANT UPSTIIBAM
FLOW,LWD MAY REQUTRE TEMPORARY PROVISION OF DUTY AND BYPASS
EQUIPMENT WITH FULL-TIME MANNED MONITORING. NO UNMANNED
BYPASS SHALL BE ALLOWED.
18. FOR CONNECTION OF PLAIN END TO PLAIN END PVC SEWER, REPAIR
COUPLINGS Sl-lALL BE MADE OF PVC MATERTAL MEETING THE SAME
MATERIAL REQUIREMENTS AND OUTSIDE DIMENSION AS THE PIPE BEING
REPAIRED, PVC SEWER REP AIR COUPLINGS S}IALL BE RUBBER GASKETED
WITH NO CENTER STOP. PIPE ENDS Sl!ALL BE THOROUGHLY CLEANED PRIOR
TO INSTALLATION OF THE REPAIR COUPLING(S). THE REPAIR COUPLING
SHALL BE SLIPPED ALL THE WAY ON TO ONE PLAIN END PIPE, Tl-IEN Tl-IE PIPE
AND THE ADJOINING PIPES SHALL BE ALIGNED TOGETI-IER AND T}IE REP AIR
COUPLING SLIPPED IJACKINTO A POSITION EQUALLY SPACED BETWEEN THE
TWO PLAIN END PIPES. PVC SEWER !IBP AIR COUPLINGS SHALLIJEAS
MANUFAC.."TURED BY PW PIPE, OR EQUAL APPROVED BY THE LWD DISTRICT
ENGINEER.
19. PVC OR VITRIFIED CI.A Y PIPE (VCP) SEWER PIPE AND WYES MAY BE USED TO
TIE IN TO EXISTING VCP, A ROMAC INDUSTRIES, INC. STYLE 501, OR
APPROVED EQUAL, STRAIGHT OR TRANSITION COUPLING SHALL BE USED
CITY OF OCEANSIDE WITH A GASKET RANGE FOR EACH END OF THE COUPLING TO MATCH THE
Hlu>lWA v_ 78 OUTSIDE DIAMETER OF THE PIPE ON THAT SIDE OF T}IE COUPLING BEING
Tr -I JOINED. THE CENTER IUNGS SHALL BE DUCTTLE IRON PER ASTM A536,
Y \_ ~ 1~ GRADE 65-45-12 AND SHALL BE PROVIDED WITH 16 MLS FUSION BONDED
WORK TO BE DONE
THE GRADING WORK SHALL CONSIST OF THE CONSTRUCTION OP A LL CUTS AND FILLS,
REMEDIAL GRADING, DRAINAGE FACILITIES, EROSION CONTROL FACILITIES, AND
PLANTING OF PERMANENT LANDSCAl'ING AND PREPARATION OF AS-BUILT GRADING PLANS,
AS-llUILT GEOLOGICMAPSANDREPORTS,ALLASSHOWNOR REQUIRED ON THIS SET
OF PLANS AND THE CITY STANDARDS, SPECIFICATIONS, REQUIREMENTS, RESOLUTIONS
AND ORDINANCES CITED ON THESE PLANS.
THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING
DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY
ENGINEER.
I. CARLSBAD MUNICIPAL CODE
2. CITY OF CARLSBAD STANDARDS
3. THIS SET OF PLANS
4. NOT USED
5. TI-IE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUC!'ION (GREEN
BOOK).
6. SOILS REPORT AND RECOMMENDATIONS BY GEOTEK INC.
DATED OCTOBER 23, 2002,
7. TflE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY
THE CITY OF CARLSBAD STANDARDS.
8. S.W.P.P.P Dated: AUGUST2004
9. S.W.M.P Dated: AUGUST27 2004
10. LEUCADIA WASTEWATER DISTRICT STANDARD SPECIFICATIONS
DESCRIPTION
EXISTING 1' CONTOUR LINE
PROPOSED 1' CONTOUR LINE
2:1 CUT SLOPES
(unless otherwise shown on plan)
2:1 FILL SLOPES
(unless otherwise shown on plan)
PROPERTY LINE
PROPOSED PRIVATE DRIVEWAY
(See Sheet 3 for section)
PROPOSED RETAINING WALL
(by separate permit)
PROPOSED 10" & 12" PVC
DRAINAGE PIPE
(See Sheet 5 & 6 for Location)
PROPOSED 8" PVC DRAINAGE PIPE
(See Sheet 5 & 6 for Location)
PROPOSED 6" PVC DRAINAGE PIPE
(See Sheet 5 & 6 for Location)
LEGEND
STD. DWG.NO. SYMBOL
-----145 -----------
__ C----'75------
SDRSD G-14
QUANTITY
10,452 S.F.
5,145 SF.
150 L.F.
65 L.F.
170 L.F. FIELD AND LABORATORY TESTS. THE REPORT SHALL ALSO
INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE
GRADING WAS DONE IN ACCORDANCE WITH TI-IE REQUIREMENTS AND
RECOMMENDATIONS OUTLINED IN THE PRELIMINARY SOILS REPORT
AND ANY SUPPLEMENTS 11-IERETO.
(4) REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE
CITY.
~
/<f_), i <'~~~ __ / -, -'/\_/:\ J;'°;, EPOXY COLOR CODED TO TI-IE TYPE IF CONNECTING PIPE. GASKETS SHALL
t,'; ·"), c BESBRPERASTMD2000MBA7!0,COMPOUNDEDFORWATERANDSEWER
\~\\\~/ 1 ";,.···,.-, _) ", L.---,-,"L LOT S:::~::,ALLNUTSAN:T:~:SSHAl~:~=~RD316STAINLESSSTEEL.
, O ~~ c , NO. STATIONOF INVERT STATION OJ ELEVATION DEPTI-I LENGTH DROPTdLATERAL \-:~~,j• ~-~ . _ ~ "'"'1"'0 -1 ___ 1/H&Xiif ,\T tJA1N x~ 11r AL A 1EPL FPt9t& LAirtRAL MAIN SLOPE %
PROPOSED 12" PVC CULVERT
(See Sheet 2 for Details)
PROPOSED STAINLESS STEEL
CONCRETE DECK DRAIN INLET
(By Pipe Size, See Sheet 5 & 6)
35 LF
0 18 EACH
35. UNLESS A GRAJ)ING PERMIT FOR THIS PROJECf IS ISSUED WITHIN ONE(!)
YEAR AFIER CIT-IE CITY ENGINEER'S APPROVAL, TIIESE PLANS MAY BE REQUIRED
TO BE RESUBM!Tl'ED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR
ANY SUCH RECHECK.
36. THE SOILS REPORT TITLED GEO TECHNICAL EVALUATION, LOT l07 APN 215-492-02
PREPARED BY GEOTEK, INC. VISTA, CALIFORNIA _ , J)A1,-E-•D~~
OCIOBER23,2002, SHALL!lE__CONSIDEREDASA PART OF THIS
GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH Tl-IE
RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID SOILS REPORT.
"DECLARATION OF RESPONSIBLE CHARGE"
I HEREBY DECLARE THAT I AM Tl-IE ENGINEER OF WORK !'OR 11-IIS PROJECT, THAT I
HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECf AS DEl'INED
IN SECJ'ION 6703 OP THE BUSINESS AND PROl'ESSIONS CODE, AND Tl-lAT THE DESIGN JS
CONSISTENT WITH CURRENT S'l'ANDAl,DS.
I UNDERSTAND THAT THE CHECK OF PROJECT ORA WINGS AND SPECIFICATIONS BY THE
CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY
RESPONSIBILITIES FOR PROJECT DESIGN. .
ADDRESS: 16089 SAN DIEGUITO ROAD SUITE H-104 P.O. BOX 676221
CITY, STATE: RANCHO SANTA FE CA 92067-6221
TELEPHONE:_ {~58)756-8340
BY, M.H. SHAPQlJRI DATE:. l_::_r_7-Zoo's
(NAME OF ENGINEER)
R.C.E. NO.: C52794
REGISTRATION EXPIRATION DATE: ---12-31-06 ____ _
SOILS ENGINEER'S CERTIFICATE
I, -~l)iRtiJ:S-','\;iJ};i';<" A REGISTERED
ENGINEloR OFTHE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS
IN THE FIELD OF APPLIEO SOILS MECHANICS, HEREBY CERTIFY THAT A
SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS
SITEWASMADEBYMEORUNDERMYDIRECTIONBETWEEN THE DATES OF
_______ AND,_______ . TWO COPIES OF THE SOILS REPORT ~~;;r:i"',,
COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN o -,--. ,,, •
SUBMITTED TO TI-IE OFFICE OF THE CITY ENGINEER. 0" ,,oN . 8-i>:,,;<,
-4~;/d_ _____ ~ .. ~~r,,__0_:_-~~_·'ot'::,;;:J_l!) SIGNED:
P.E. NO.:
):,. CiVI' ','j /z '2' z· r :-.\)0>,..,--=--~:::,<"-""0
_b__ .;L L~------------'';,:.•,~~:(:;,,'FC,\~-✓/ ~-~""'
DATE: ---;,t/~l'-"cBl--'lv~1~· ------~--
LICENSE E;PIR~TION DATE: lot'u%; 5
OWNER'S CERTIFICATE
I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR
GEOLOGIST HAS BEEN OR WILL BE JlliTAINED TO SUPERVISE OVER-ALL
GRADING ACTIVITY AND ADVISE ON TIIE COMP ACTION AND STABILITY OF
CICHIS SITE. l \ ---~----. -~
--L~ 4fC~ J .,.,/4. ·1 l /,7 ~o ~
-NAME DATE
'~\~l_p-"03 ,""o<f-~'< ROAo~crr__Y_OFV~ISTA l07 12+49.85 129.93' 12+49.85 130.53' i 7.37' 28' l.2' 2.14%
,\ '\: -= ,W NOTE: SEWER INFORMATION WAS CALCULATED BASED ON EXI~"TING INFORMATION FROM
\\' o IMP. PLANS OF ALTIVAPLACEAND STROMDRAIN, SHEET l2 OF 25. PROJECT No. 75-20
\ '\ '-?J}
1
~ ~ IN THE CITY OF CARLSBAD DATED: 11-18-75. \ % I ~ ' ,-.. ___...\ \' CITY OF CONTRAC.."TOR: TO VERIFY 'PRIOR TO CONSTRUCTION. \\,;. \ / Ro-'°..-, \ SAN MARCOS \ \~, r-,-J'~:G _{,bl __ / // l PROJECT LOCATION
PAi:~ \ )~\ ~' ,a,~-cu,,~ ''" _,) ~ ,-! I 'II
\\\ 0 I , ,i I /! !1
\\ -,~L I i' 11.r -,J .Lf NOTTO
SCALE CITY OF ENCINITAS
LEGAL DESCRIPTION
VICINITY MAP -@
LOT 107 OF CARLSBAD TRACT NO. 75-4, LA COSTA
ESTATES NORTH, IN THE CITY OF CARLSBAD,
COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,
ACCORDING TO MAP THEREOF NO. 8302 FILED IN
THE OFFICE OF THE COUNTY RECORDER OF SAN
DIEGO COUNTY ON MAY 5,1976
SITEADDRESS 7342ALTIVAPLACE
CARLSBAD, CA 92009
PROPOSED ROCK-LINED CHANNEL
(See Sheet 2 for Detail)
PROPOSED CONCRETE SIDEWALK
DAYLIGHT
LIMIT OF GRADING
(See Sheet 2 & 3)
PROPOSED CONCRETE BROW DITCH
EXISTING BROW DITCH
(See Sheet 2 & 3 for location)
EXISTING WATER LINE
EXISTING SANITARY SEWER
PROPOSED ROCK RIP RAP
(See Plan For Size)
PROPOSED CONCRETE
DRAINAGE BOX
(See Sheet 2 for Details)
PROPOSED STRAIGHT HEADWALL
TYPE "B" FOR 12" CULVERT 180'
SPOT ELEV KEY /~~o.w
T.O.W.
E,G.
295 L.F.
SDRSD G-7 7 260 S.F.
F·
--------
SDRSD D-75 975 L.F.
<=
l8"W1
--; 6" s--
SDRSD D-40 2 EACH
1 EACH
SDRSD D-32 1 EACH
BOTTOM OF WALL
TOP OF WALL
FINISH GRADE (UNPAVED)
01/17/05
EXISTING TOPO FROM SURVEY BY BAKER LAND SURVEYORS,
CARLSBAD, CA, DATED l0/26/02.
EARTHWORK QUANTITIES
CUT:_ _ _:3,7_50 CY SHAPOURI & ASSOCIATES
BASIS OF ELEVATIONS: CITY OF CARLSBAD STREET IMPROVEMENT
PLAN FOR ALTIV A PLACE, TOPO OF PAVEMENT AT CENTER OF
CUL-DE-SAC= 141.96'.
Flil:
IMPORT:
3 750 CY
CY
PRO.TECT 1WANAGEMENT SERVICES
ENGINEERING. INFORMATION SYSTEMS -PLANNING
_JLJI_ JO[ ~-DD U_J
LEUCADIA WASTE WATER DISTRICT
-----_p;AI,(,.,__,,._,(__, 1.}]Ei-,'H_ I/ I J" / 0 S-~'ti~ f DEERING C,
DISTRICT ENGINEER
RCE 26514
£,cf 0311/loC,
THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S)
_,,AP.,___,,Nc_: .,,21Ll5c>-4t29"'2-"'0"'2-'1)0,c0 _____ ------------
TI-IE CALil'ORNIA COORDINATE INDEX OF THIS PROJECT JS:
N 1,980,230 E . 6,254,73Q ________ _
BENCHMARK
DESCRIPTION: SID. BRONZE DISC. CONC. MON.
LOCATION: ABOUT 200' NORTH Of STC. 261 +98.72
RANCHO SANTA FE ROAD RS. 454 NEARFENCE EAST
SIDE ROAD
RECORDED-~·--~F~R=O=M~C=O=U~N=TY~B=E=N=C~H~L=E~V~E=L=J-~03~0~2 ___ _
ELEVATION: 176.18 DATUM: UC~ & G.S.
WDID# 937C328071 .
CITY OF CARLSBAD
FIRE DEPT. APPROVAL
BY: f
DATE: 2-4 / rl.-:_
J '
EXPORT: CY
REMEDIAL: CY 16089 SAN DIEGU/TO
P. 0. BOX 676221, RANCHO
PHONE:(858)756-8340
ROAD, SUITE H-104
SANTA FE, CALIF. 92067
FAX :(858)756-8344
~NING DEPARTMENT APPROVAL 11AS BUILT11
21ur DATE/ (3{ /OS-
A.ss. m (SIGNED)
-~11d1 TI10LilMILLER; PLANNING mRecrort RCE ___ _ EXP. ____ _ DATE
DATE: I /31/ 05° REVIEWED BY:
RECOMMENDED BY: SP.. \VI A C\,t)'js, ESH::;'
(.PRINT NAME) INSPECTOR DATE
L_ ______ _
--1----------------------l----l------l----l WI CI!1N~£N~~~~~¢D
I----+---+---------------------------+------,1----+-----I
L----+----l-------
I----+---+---------
I----+---+-------------------~---+-----1----------
GRADING PLANS FOR: 7342ALTIVAPL.
JA V AHERI RESIDENCE
TITLE SHEET
,-~=-:-=-:-::=--:--::--:-:-:-::---:--::-:-::---:--:-:-:--::::-----:---:-----4-----1---1-------------------'---L----______ ,__ _ __,
CARLSBAD MUNICIPAL WATER DISTRICf 1----+I---+--------------------'-'-----------
PUBLIC WORKS DIRECTOR ~L W/'~
~A __ 4vz _____ _
WILLIAM E. PLUMMER DATE
DISTRICT ENGINEER R.C.E. 28176
1
---·''~=~t---------------------_;_----J--___jc-----+----1 DATE : (NITrAL I DATE
ENG£NEER OF WORK REVISION DESCRIPTION
INITIAL
; OTHERAPPROVAL
DA TE INITIAL
CITY APPROVAL
APPROVEDLl:OYD HUB~S PE
DWNBY: 6 11 PROJECTNO. I DRAWING NO.
CHKD BY: ---' PD 03-06 413-3A RVWDBY: _____ 1 L __________ L ____ ----'
\
;021705 J
0 -c»
0
=E
G)
~ ......
u)
I
u)
)>
I
\
•
I
I
STA: 14+04.18
EXIST F.H. \
(See City of Carlsbad Improvement Plans
Altiva Place & Stormdrain) Project No . 75-20,
14 ~ 00 STA: 14+02.03
END r!DEWALK AT PROP LINE
JOIN WITH EXISTING
SIDEWALK
----+
I
I
Sheet 12 of 25, Dated 11/08/75 by I
RICK ENGINEERING COMPANY) -----•--1
I
I
L~
I
I
\
I
I
w
(J
<
-I
0.
-,_
-I
<
I
I
t CJ)
a
1
I
I EXIST 18"
EUCALYPTUS
STA: 13+39.15
BEGIN NEW /(G-7) SIDEWALK
EXlti:ING SIDEWALK
STA: 13+29.15,----+--
EXIST WATER METER
I
I
0100= 1.01 cfs.
V 100= 9.8 fps.
0 CONCRETE TRA SITION
EXIST 12"
EUCALYPTUS
~ r PROVIDE SMOOIH
j o FROM ROCK-LI D DIT I cl TO CONCRETE RAINA E OX ~ 0100= 0.94 cfs . z V 100= 9. 00 f~s.
STA: 12+98.32 I
CENTER OF DRIVEWAY----J.
I 13 00 2%DN
CONSTRUCTNEWDRIVEWAY ,:-4' _ PER SDR STD. DWG G14A-----j------~-~*, °'V
I
I
EXIST. SW Manhole (I\
LWD No. 11-1715
REMOVE EX!St BROW
EXIST .fONC. I
CURB, GUTTER & SIDIWALK ____ __.___....._.L//
STA: 12+64.85
EXIST S. LATERAL
---
STA: 169.81 -
PROP LINE I
' ' ' ' '
8
0 f2 -;;-' ,,., oO ....., oO z s
El f/
<;::,
ff_ ELEV. 144'
(See Section i
Sh,12 /
°'
ENERGY DISSIPATER
STA: 12 1~7.61-----7
EXIST ELEC.1RANS
ELEV . 136' PER SDRSD D-40, No. 2 Backing
O,oo= 3.55 cfs.
EXTEND SIDEWALK
APPROX 66 LN. FT.
TO NORTH PROPERTY LINE
ROCK-LINED CHANNEL~-
SEE DETAIL "C-C" ON SHT. 2 \
---
\~24• W~DE CONCRETE
BROW DITCH .,,.,,-,
/ ,
EXISTING 24"± WIDE
CONCRETE DIT
TO REMAI 7..:, -
--1' __j__ 3'
~--DRIVEWAY "A"
N ,.....
3" -6" COBBLES
\
\
\_
18.5% ----
....
'b 4:1
N -
DETAIL C-C
3/4'=P::-0"--
-=~-----'--✓---\
24" WIDE CONCRETE-'-
--_ BROW DITCH
-"--__ -::--..... ~ ' A .... ,-.. -..__~.I'<...._., K __.. ~·-"" ~"---~ _ _,,.A., ----"'~ ·~ t
' "---
_.......-::
14:1
I
I
("f"")
~
~ ~
V).
0 ~ 4:1 ~
V).
'-"
~
I~
~
Special Notes
Codes and Ordinances: All construction must be in according with applical local, state and federal regulations, including but
not limited to: The California Building Code (Current Edition) and the City of Carlsbad Building, Grading, Erosion and
Sediment Control standards and ordinances.
Cut and Fill Slopes: Slope inclinations must be 2:1 (horizontal:vertical) or less.
Fill Placement: Fills shall be constructed in layers (maximum loose thickness of 8") of earthen material with no detrimental
amounts of organic matter and no rocks larger than 12". Placement of larger rock may be permitted under the authority of a
Geotechnical or Civil Engineer.
Fill Compaction: All fills must be compacted to a minimum of 90%, or as directed by the geotechnical consultant ot the City.
Ground Preparation for Fill Placement: The natural ground must be prepared for receiving fill by removing vegetation, top
soil, unsuitable material and existing non-complying fill. Where the existing slope is 5:1 or steeper, the fill must be benched
into competent original material with a 10' minimum width keyway at the bottom.
Grading Setbacks: All grading must comply with the setbacks specified in the California Building Code.
Drainage: Drainage must be designed to protect cut and fill slopes and structures from erosion and water damage and shall
direct flows to the nearest adequate street, stonn drain, or natural water course. When surface drainage is discharged onto
adjoining property, it shall be in such a manner that it will not cause erosion or sedimentation or endanger any cuts, fills or
structures on the adjoining property.
CONCRETE
WALL
3'-5"
CONCRETE SHALL
,---BE 560-C-3250
6" --2'-71/2"
~~~~~~J--~.=a.----_-_-_-_-_
• •
OF ROCK-LINED DITCH
2'-0"
• •
-I/2" .,
2'-0"
D 12"
6"
f 5.4'
• •
-
1 2'-0"
3'-0"
ALL REINFORCED STEEL
#4 BARS. ALL VERTICAL
AND HORIZONTAL TIE BARS
@ 12" SPACING
8"
DETAIL A-A
PROVIDE SMOOTH
TRANSITION TO
DRAINAGE BOX
3/4"=1'-0"
PROVIDE2"
CONCRETE SLAB
ELEV: 139.66' ELEV: 138.86'
DRIVEWAY "A"
BOTIOM OF 24"
CONCRETE DITCH
TOP ELEV: 137.62'---
-DRAINAGE
--STRUCTURE GRATE
r<~1):._,_•~' l;....:.;;;;;;:2~.00%=o __ _
--D-15, MODIFIED --3'-7 1/2" -
•: .
'
2'-8" 2.0' ... ~·
l "·
0 ·• •
'
4 3~-5"44 ~ ..
k 3'-6"
1
.
1 '-6" • • ...
12"
6"
' .. , . • -.-. . . '
k 2'-0"
Jt:LEV: 136.15'
I
I
1
LENGHT 34.30'
SLOPEl.00%
DIA 12in.PVC
CENTER LINE DATA TABLE FOR
DRIVEWAY "A"
I 1,. ~
NO LI /RC ARING F:ADI J'.
-..!/ S74°20'00"E --
/2' ,-/ 42°19'41" R=40.00
'']' ,,/ N63°20'19"E -., ,4/ 40"36'46" R=50.00
/5'-v, N22°43'33"E 1«~ 109°03'44" R=36.00
1<7) S48°12'43"E
/8' '-" / 32°53'24" R=36.00
q-
'-Sl5°19'19"E
I< 08°51'53" R=36.00
L[NGTI I
13.00'
29.55'
3.92'
35.44'
4.92'
68.53'
7.25'
20.67'
19.58'
5.57'
DETAIL B-B
3/4"=1'-0" 01/17/05
SHAPOURI & ASSOCIATES
PROJECT MANAGEMENT SERVICES
ENGINEERING· INFORMATION SYSTEMS . PLANNING
16089 SAN DIEGUITO
P. 0 . BOX 676221, RANCHO
PHONE:(858)756-8340
EE
ROAD , SUITE H-104
SANTA FE , CALIF. 92067
FAX :(858)756 -8344
,N~ ;-B.M. 135.40
_____ 30:1'.' _F'_ER BAKER LA ~URVEYOR~ -
V100= 5.98 fps. O' 1 0' 20' 30' 40' I I< C S24°1l'l2"E 23.04' oles.s10,,~
S' e
LIC
"AS BUILT" Existing 2' CURB OUTLET
W/ STEEL COVER PLATE NORTH SCALE 1 "= 1 0' 30.0'
FINISHED GROUND ~
AT ROCK-LINED DITCH o.. -EFILNIEVSHE14o100GROUND ~
~---------~ 8.0' 8.0' : · o.. ,,,------ori __ _/ ___ ........_ N
FINISJ'.IED GROUND ~ ~ _.,...-_,.,,..-'--....___ ~
II A'Y24" CONCRETE ~ I .,,-'-~ , •y• ' -----......... f") -.__ •)!_DITCH ?;;~ '-. ..----'---.__ ..____ :~ , -ELEV: 139.02 -, -\ DRIVEWAY"A" ,~ / \ ELEV: 138.86
I D OP EJ-fi;'k 137.62 1 >' / ______1,00% ....k{filL_ .,,-.,,-..____ ..____ ..____ • ' ~ (
-PROVIDE STRAIGHT HEADWALL
PER SDRSD D-32, TYPE B
ELEV: 135.82 / I STR RE GRATE I Z;,~_?f~-+------___::=:..:;;::;_ ____ r _____ ...:..,;=:._-----------,--.,,-• , :
D-15, M FIED /-• .' , ..____ >
h.., -----. // ---___ -------_ ----'-";z:) //
\ • ' / 1 ~ (SEE DETAIL "B-B", 2.0' ~ PROVIDE 5'± LONG
I '1:--.---~~ --:: -__ f" ~ -_ -1 I THIS SHEET) / 7ROCK RIP RAP,
------EIJEV: 136.15 I TYPE No. 2 Backing
\ 2.0' I ----------LEJJWT\4.-30,----------I \ ~1:i'H'.JJJi
\2'-' ~-:r-1:------------------------;;;:~::::;;~;:;"~-:;:--:;:-----js51wf;f:P~E~1~.00~%~--------------------------,---¥6.:s:.iisLJ_ob:SPE29i~j-f'1:J:0:&'.l,~L PROPOSEDPOND J ,' ,·,,___· -------'-'----'...Jc.,_~1.____..,,.~·/____J·~ ts" SECTION LL ~::1]~li~~c ------1------co~A=TE~,=NlTI=A-ccL-+---
-, SCALE 1/2" = 1'-0111 ' 3'-6" ..-/2-0" -ENGINEER OF WORK
+
I< 28°58'17"
I< S53°09'29"E
I< 02°31'17"
I< 20"55'30"
\<,, S34°45'16"E
I< 43°43'39"
S78°28'55"E
REVISION DESCRIPTION
R=36.00 18.20'
24.95' r
R=36.00 1.58'
R=36.00 13.15'
9.16'
R=39.00 29.76'
--82.26'
DATE INITIAL DATE INITIAL
I OTIIER APPROVAL CITY AP PROV AL
RCE __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PLANS FOR: 7342ALTIVA PL.
JA V AHERI RESIDENCE
GRADING PLAN
PUBLIC WORKS DIRECTOR
~/ ,_.y~ F«f.
APPROVEDLLOYD HUBBS PE EXP.
;z/10/,S"
DATE
OWNBY:~ 1 PROJECTNO. DRAWINGNO.
CHKDBY:
RVWDBY: PD 03-06 I 413-3A
~---------
021705
(,.)
I
(,.)
)>
I
>
I
RETAINING WALL "A"
SEE STRUCTURAL DRAWINGS
BY OTHERS
(Constructed by Separate Permit)
T.O.W. = 200'
8.O.W. = 196'
T.O.W. = 205'
B.O.W. = 199' T.O.W. = 205'
8.O.W. = 199'
I
T.O.W. = 210'
8.O.W. = 207'
EXISTING FENCE
./
~TO REMAIN
24" WIDE CONCRETE
BROW DITCH
ELEV. 219'
26.0'
f
5.0'
/
_ ..... -~-
'-'-
T.O.W. = 167'
B.O.W . = 166'
I
I
I
\
I
~ >-' + 1-1 t--) ..... < Vl
~ I
~ I
I
I
I
q)
0 V) + ......
I
I
I
1 'Bo --
1
I
I
I
'8
T.O.W. = 193'
8 .O.W. = 190'
RESIDENCE
F.F.=194.0'
\ T.O.W. = 195'
B.O.W. = 194'
193
F.G.
T.O.W. = 197'
B.O.W. = 193'
>-----192 __ _./
T.O.W. = 195'
8.O.W. = 193'
T.O.W. = 193'
8.O.W. = 190'
RETA NING WALl==------t.7
.--.------...l------,--.1---------(donstructed by Sep rate Permit)
~------------l89 ------------,
T.O.W. = 188'
8 .O.W. = 185
J.._..)--;~'=PROPOSED STAIRS & RETAINING WALL
RESIDENCE
F.F.=192.0'
RAISED FLOOR
(Constructed by Separate Permit)
F C
RESIDENCE
F.F.=190.0'
RAISED FLOOR
PROPOSED STAIRS
(Constructed by Separate Permit) N T 4.2
T.O.W. = 193'
8.O.W. = 190'
1~
~-------185------------1
ET 4.3
-,.-----------------180
T.O.W. = 90'
8 .O.W. = 87'
o.w. = 195'
8 O.W. = 197' INLET
2.4
POOL
\ 205~ F.G.
I u---
T.O.W. = 210'
8.O.W. =207'
----RETAINING WALL
(Constructed by Separate Permit) 1
I
I
, T.O.W. = 210' (\
\_ <-' 8.O.W. = 206' \
-0
ROPOSED STAIRS
T.O .. = 205'
8 .O.W. = 201'
T.O.W. = 211'
8.O.W. = 206'
1-~-----RETAINING WALLc------
(Constructed by Separate Permit)
'-.._ T.O.W. = 205'
8.O.W. = 200'
6" DRAIN PIPE
T.O.W. = 204'
8.O.W. = 200'
205
IN E
T.O.W. = 209'
8.O.W. = 206'
I I
l I
I
I
ROCK-LINED CHANNEL
SEE DETAIL SHT. 2
(SEE PLAN FOR LOCATION)
T.O.W. = 210'
8.O.W. = 205'
~~ <f>
.:;,
x-x-x-x-x
0 0
"'>' l k}
, 1,.; ~
/
I .. w. = 179'
I B.O .. = 178'
/
J.O.W. = 179'
.O.W. = 178'
GARAGE
F.F.=180.0'
10" PVC DRAIN PIPE
---a----
.3 25 8.50 %DN
~ Driveway A :1
~ 3+75 00 -'
N
T.O.W. = 170' I
8 .O.W. = 169'
END 8" PVC
DRAINAGE PIPE _J
OUT. ELEV. 168'
T.O.W. = 175'
8.O.W. = 172'
r PROVIDE 6"\W.IDE 470-C-2000
CONCRETE WALL TO
/ HOLD 8" PVC D,RA!NAGE
IN PLACE
__________ _J
.,----/-RETAINING WALL
-. --=7.1-------------
T.O.W. = 176'
8.O.W. = 173'
by Separate Permit) ~ ~ 180 -,:;,-;;-----
T.O.W.=177'
B.O.W. = 175'
00
T.O.W. = 182'
8 .O.W. = 181'
~ DO NOT DISTURBED THIS PORTION
(SHADED AREA) OF THE EXISTING DITCH.
T.O.W. = 183'
8 .O.W. = 181'
NEW 8" PVC DRAINAGE PIPE,
108' ± OF LENGHT TO REPLACE EXISTING CONC. "'0=1T=c~H~(=sE~0E~□=E=T~AILS)
T.O.W. = 184'
8.O.W. = 181'
4+
RETAINING WAL~~---•
(Constructed by Separate Permit) o.
-?. T.O.W. = 186'
8.O.W. = 183'
T.O.W . = 185'
8.O.W. = 181'
-.. z ~
I
NLET 4.5
T.O.W. = 204'
8.O.W. = 201'
I
T.O.W. = 204'
8.O.W. 'f 203'
INLET
2.1
I I I
I
I
I I I
I I
I 'f I
1c-----~-.1 I
I I
1--:---1 -,1-j
I I I
li!!ll!!!!!!!!!--""'!!'-;1--200 'I-~ I
I
I
I
. I I
T.O.W. = 200'
8.O.W. = 196'
RETAINING WALL
24" WIDE CONCRETE
BROW DITCH
(See Section "II")
T.O.W. = 205'
8 .O.W. = 200'
BROW DITCH
TRANSITION AT CORNER
OF PROPERTY
FROM 24" WIDE TO 18" WIDE
(See Sheet 4, for sections)
ff_ ELEV. 203'
"-DITCH DEPTH
VARIES FROM 12"
TO 24" UNDER
FINISHED GRADE
EXISTING BROW DITCH ' T.O.W. = 190'
T.O.W. = 195'
B.O.W. = 191'
18" WIDE CONCRETE
BROW DITCH
(Constructed by separate permrt)
8.O.W. = 186' MERGE WITH PROPOSED
DITCH (AS SHOWN).
SEE PERMISSION TO GRADE,
RELEASE OF LIABILITY FROM
ADJOINING PROPERTY
OWNER, DATED 06-23-04
DITCH DEPTH VARIES
FROM 12" TO 24"
L oo NOT DISTURBED THIS PORTION
(SHADED AREA) OF THE EXISTING DITCH.
DRAINAGE DITCH \ PERSTD.DWG.
D-75 'TYPE B" , .
;., -:~PROVIDE 6" WIDE 470-C-2000
, : .. j -':; 1 .,' , CONCRETE WALL ON TOP OF
r : ~~'.\€=J:::;;;~rt~~ . 8" PVC DRAINAGE PIPE TO HOLD
SECTION ATDRIVEWAY"A"
1/4"=1'-0"
SECTION AT DRIVEWAY "B"
1/4"=1'-0"
CONCRETE DRIVEWAY,
5.5" CONCRETE SLAB
OVER 4" CL. IT A.B.
REINF: #3@ 18" E.W.
CONCRETE DRIVEWAY,
5.5" CONCRETE SLAB
OVER 4" CL. II A.B.
REINF: #3@ 18" E.W.
INLc. ELL VA TONS
2.1 RIM203.90
INV 202.50
2.2 RIM204.48
INV 202.18
2.3 RIM 204.49
INV 201.89
2.4 RIM 199.74
INV 197.64
1.4 RIM 199.48
INV 196.98
1.3 RIM 199.86
INV 197.36
1.2 RIM 205.15
INV 203.24
1.1 RIM 205.19
INV 203.58
1.5 RIM 194.79
INV 191.99
3.3 RIM 197.54
INV 193.04
4.1 RIM 190.IO
CENTER LINE DATA TABLE FOR DRIVEWAY "B" INV 188.49
RJM 189.82
NO
<.!,,
/2' 'v
/]' " /4 ' \t
; 6' ,.,
,<7)
,1 /BE/\RINC RADIUS
N74°40'41"E -
18°34'16" R=37.00
N56°06'26"E -
135°35'37" R=39.00
Sll 042'03"W -
43°32'41" R=36.00
S55°14'44"W -
LENGTH ~[MARKS 4.2 INV 188.42
1.11' 4.3 RIM 187.38
INV 184.43
11.99' 4.4 RIM 183.80
INV 181.05
24.24' -
92.30'
29.69'
4.5 RIM 180.30
INV 177.05
4.6 RIM 179.53
INV 176.23
27.36' -5 RIM 187.00
INV 183.70
14.54' 6 RIM 184.98
INV 183.30
01/17/05
SHAPOURI & ASSOCIATES
PROJECT MANAGEMENT SERVICES
ENGINEER/NG . INFORMATION SYSTEMS -PLANNING
i; w 83
16089 SAN DIEGUITO
P. 0. BOX 676221, RANCHO
PHONE:(858) 756-8340
ROAD, SUITE H-104
SANTA FE, CALIF. 92067
FAX :(858)756-8344
"AS BUILT''
RCE __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
--+---t----t-----t u: l [ CirJIN~£N~~~~~ w
--+----r----1------1 GRADING PLANS FOR: 7342ALTIVAPL. --BEGIN DRAINAGE DITCH PER STD. DWG. NORTH
~
, , ·---' ,, IN PLACE I ~ . r---~:-' • : FINISHED GRADE
-------------+ JA V AHERI RESIDENCE
GRADING PLAN
D-75 'TYl.jE B",
I
' FINISHED GRADE
DETAIL
NTS
O' 10' 20' 30'
SCALE 1 "=1 0'
40'
~\ \
\
DETAIL
NTS
'--SECTION, MODIFIED
CONCRETE DITCH
L BEGIN 8" PVC
DRAINAGE PIPE
BOTTOM ELEV.184'
I
DATE INTilAL
ENGINEER OF WORK REVISION DESCRIPTION
DA TE lNITlAL
OTifER APPROVAL
DATE INITIAL
CITY APPROVAL
PUBLIC WORKS DIRECTOR
~ p/. 14-"~ ,?,~
APPROVEDLl'OYD Hl'iBBS PE EXP.
PROJECT NO.
PD 03-06
------
DRAWINGNOj
413-3A
021705
c,.,
I c,.,
'.l>,
170
160
150
gi
B
"' 0
t:l 20' i1.
0\ ~ g 00
+ ::1 0 ~ ~ "' "' 140 , }
I
t
130
DATUJf ELEV
125. 00 i:;:;tc---
. o
I
I
I
I
w l
~I _,
a. I
<(
> I ...
~I
I
I
I
I
I
I
I
I
I
I
I
STJ 12...i981
PROPLINl'c
001 • r'loo ,...., C') .__,,....,
0+00
(
0
1
~
8 -~ R b -~
I 2
I
t ~
I
+
PVI STA= 0+29.46
PVI ELEV = B8:S9-
A.D. = 16.47
K = 2.06
B4.o' vc
\
I
ri I w > u
"' 55
I
180-
PVI STA= 1 +70
PY! ELEV = 164.54
A.D. = -13,.80
K = 3.62
Finish Ground (
-t \
Existing Ground
I , _Q I STA: 0+26.67 ELEV: 137.02
"' Top Of 12" PVC Pipe I
(See Sheet 2, Section "LIL") -~-~--
,__loo
'; 00 N .
"'" 00 ,...., C') .__,,....,
,.-._ 00 "1 C') \0 . '1-N ,...., "'" .__, ,....,
0+50
"O .:;
;::l
2 c.:i
,.-._ ,....,
00 \0 ,...., ,...., V) V) ,...., .__, ,....,
1+00
\
150
,__I
Co 00 C') ,....,
N 00 \0 \0 0 0 V) \0 ,...., V) \0 ,...., :::::, ,....,
1+50
Driveway A
Vertical Scale 1"= 4'
Horizontal Scale 1"=20'
ti
' \ "'
\ " l'e,
' ' "' \
\
\
\
\
\
\ "' \<,-
\
\
\
\
,.-._ N
~N C') •
\0 "'" ,...., \0 .__,,....,
STA: 2+94.94 ELEV: 175.26
INTERSECTION WITH DRIVEWAY "B"
PY! STA= 2+20
PY! ELEV = [66.87
A.D. = 8.71
K = 4.SQ
~>----------<-,0 !.8
40.0' VC V a,_ + SC N-
··uj 1'.lu > > ~olo w w \0:,'.':i
PY! STA = 2+ 75
PY! ELEV = 174.24
A.O.= -8.23
K = 4.25
35.0i V.C
/
Finish G:roilud
/
/ + /-t _,.,
STA: l +91.36 ELEV: 165.52
/
/
/
INTERSECTION WITH DRIVEWAY "B"
Existing Ground
,.-._ "'" ~°' r'l I • \0 V) ,...., 1'° .__,,....,
2+00
,.-._ 0, aq r-
e') •
\0 c---,...., \0 .__, ,....,
610. • 00 \0 .
\00 ,...., c---.__,,....,
2+50
~ ~
~
~
00
•
,-.. r-
t--; 00 00 • \0 C') ,...., c---.__, ,-;
N N V) 0 . 9r ,...., ,....,
3+00
"'
)
I
6 .,, m oz -..., ~n ~
N 0 c---,....,
r
t
j
N
V)
V) c---,....,
3+00
~---+8"r------,
PVI STA= 3+20
PY! ELEV = 176.5
A.O.= 3.85
K = 6.49
,.-._ V)
~o "'" . c---c---,...., c---.__,,....,
~------+so...r----j
f----+84ii-, --1
I
PVI STA= 3+55
PVI ELEV= 179.70
A.O.= -8.47
K = 5.31
45.0' vc
190
Finish Ground
\0 c---• 0, 00 • c---00 ,...., c---,....,
3+50
0-
Existing Ground
c---0 • 00 N . 00 0, ,-; c---,....,
0
I
I
I
I
I I
I
I
I
' I
t-
170
160
150
@O N "'" 0, .o
V) 0, \0 .
00 ooO c---,...., 00 ,...., ,...., ,....,
4+00
~
:::'.J
DATE
DATE
180
170
160
I
DATUAf ELEV -
/6(} ()(}
\0 N V)
C')
\0 V)
\0 -,....,
0+00
o· 20'
-
-
PVI STA= 0+25
PVI ELEV = 167.54
A.O. [ 6.93
K = 5.77
40:o!vc
f
I
STA: 0,+00 ELEV: 165.52
INTERSECTION WITH DRIVEWAY "A"
,-..00 C') 0, r-: 00 N c---• N \0 c---c---,....,
,...., \0 c---,...., .__,,-, ,....,
0+50
DrivewayB
Vertical Scale l"= 4'
Horizontal Scale 1"=20'
~
NORTH
40' 60' so·
SCALE 1 "=20'
-f--
,-.. "'" aq 0 \0 . c---V) ,...., c---.__, ,....,
t
I
~ -----
-----------
1-----~
- - - --1------
---------
INITL\L DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL
HIGH POINT ELEV= 181.00 HIGH POINT ELEV= 181.00
I-IIGI-1 POINT STA= 1 +29.73 I-IIGI-1 POINT STA= 1 +35
"' ,-
"' "' + 0
in u > "'
~
PVT STA= 1 + 14.73
PVT ELEV = 181.00
A.O.= -15.00
K = 2.00 .. ..
30.0' VC
"' ,-
00 ,-..
"' ,-
"' N -+ w u > "'
-in u > w
-
I "' '" + -in u > a:i
~ -00 -t > w
T
PVI STA= I +50
PVT ELEV= 181.00
A.D. = -13.55
K = 2.21
30.0' VC 0 ~ -00 -~ > a:i
PVI STA= 1 +85
PVI ELEV = 176.26
A.D. = 7.39
K = 4.06
30.0' vc
-_,.,
"' "' .:; .:;
0 0 ·-·---"' "' > > <l) <l) --I.ii I.ii
"O "O
.:; .:;
;::l ;::l
0 0 .... ....
0 c.:i
00 "O .:; <l) ·-..c:: -"' "' ·-·-~ ~ ·-µ.,
! ,...., c---0, c---00 c---,...., ,....,
+
I
I
I r
STA: 2+01:24 ELEV:·1?5.26
t-
INTERSECTION WITH DRIVEWAY "A"
+
,-.. "'" r--; 0, C') 0,
"'" 0, . c---0 ,...., 00 .__,,-,
00 0 c---00 ,...., ,....,
I
t
I
I
~"'" \0 §Ji--: c---,....,
'"' 6.J50,, -"'o
C') \0 N 0 V) c---c---,...., ,....,
1+00 1+50 2+00
•
12/13/04
SHAPOURI & ASSOCIATES
PROJECT MANAGEMENT SERVICES
ENG/NEERING. INFORMATION SYSTEMS . PLANNING
# ·' m
0 w
16089 SAN DIEGUITO ROAD, SUITE H-104
P. 0. BOX 676221, RANCHO SANTA FE, CALIF. 92067
PHONE:(858) 756-8340 FAX :(858)756-8344
"AS BUILT"
RCE EXP. DATE
REVIEWED BY:
INSPECTOR DATE
I SH4T I CITY OF CARLSBAD [SHEETS
ENGINEERING DEPARTMENT 1 8
GRADING PLANS FOR: 7342 ALTIVA PL.
JA V AHERI RESIDENCE
GRADING PLAN
-
PUBLIC WORKS DIRECTOR
~14"'~
,.,,,. ;?-/,D/~s
APPROVED OYD BBS PE EXP. DATE
--
OWNBY: b" I PROJECT NO. I DRAWING NO. DATE INITIAL CHKDBY: l PD 03-06 413-3A I CITY APPROVAL RVWDBY:
021705
00 c,.,
I c,.,
)>
192
SEE:----........_
INLET 1.1
188
186
184
182
180
182
INLET4.2
r--RIM ELEV: 189.82
-.--
!NV. ELEV: !88.42
FINISHED CONCRETE FLOOR
BY ARCHITECT
-STA: 0+43.50 ELEV: 189.93
1.00%
- - -· -...l.
. . . .. ----· ---
16.8]%
L== 24.01'
Q100= 0.81 CFS
V100= 10.64 FPS
-FINISHED CONCRETE FLOOR
STA: 0+46.50 ELEV: 187.59
6" PVC DRAINAGE PIPE
INLET 4 5 BY ARCHITECT
INLET4.3 r--RIM ELEV: 187.38
\
NV. ELEV: "184.43
FINISHED CONCRETE FLOOR
BY ARCHITECT
ELEV: 187.42
_0.50%
,--.._ ELEV: 183.92
1.00%_
·-t
JNLET4.4
RIM ELEV: 183.80
FINISHED CONCRETE FLOOR
BY ARCHITECT
_0.50 %
ELEV: 183.86
__ ·._.~-...-0 "'--. ....!... -_.-.-.--. ~---=·--. -. _._,_
I \ .__ ..._,. .....,.___,
!NV. ELEV: 181.05 t~J9%
Q100= 1.04CFS
V100 = 11.41 FPS
8" PVC DRAINAGE PIPE
I
I
I
I
I
I
I
I~ .-la
ELEV: 180.36
1E--<
Ii
I
- --1.1)()~
r
I
I
I
182
I ---~RIM ELEV: 180.30 , 1.()()% --------------------------------
I
I
l8Cf
6" PVC DRAINAGE PIPE
(SEE PLAN FOR LOCATION)
Q100= 0.14 CFS
E--, ~ ,· c===;:-:-===~-------Ll)~-;-----------------(f•~~V~100~7~.6~9_!':FP~S~----------------------------------------~---------------------~1~7~8=----_j' i -. 1.07% ( ) I .I 0
L Ll.40 1.07% E--,
1 I Q,oo 1.09 CFS ~ L 54.26' -<t:
1 17 6 !NV. ELEV 177.05 V!OO= 4.12 FPS I Q100= 1.20 CFS I 17 6 . ::8
\ VIOO= 4.24 FPS
I FINISHED CONCRETE FLOOR
I BY ARCHITECT
-1~-1.00~,----------
I
I ..
I
I
I
I
I
I
-. ··-. ~ . ·. ~ ~ . . .
178
176
174
172
I
.
-CONNECT W/10" PVC DRAINAGE PIPE
(SEE PLAN FOR LOCATION
INV ELEV: I 76.82
.
'
'
I
I
--INLET4.6 RIM ELEV: 179.53
-I
I', I ,,,, I
I I , I
' . I I• .
.
[NV. ELEV: 176.23
188
186
184
1
180
178
. . -
FINISHED SURFACE
I
I
l-
,
FINISHED SURFACE
I
I
I
~ '
I
I
10" PVC DRAINAGE PIPE
6" PVC-DRATNAGE PIPE
(SEE PLAN FOR LOCATION)
I
10" PVC DRAINAGE PIPE
5.81%
L 54.12'
Q100 2.13 CFS
v,oo 9.16 FPS
CONNECTW/10" PVC
DRAINAGE PIPE \
(SEE PLAN FOR LOCATIO)'I)
ELEV: 183.00
INLETS ,-.._ RIM ELEV: 187.00
I
I
I
188
I 186
184
NV ELEl 183.70
182
6" PVC DRAINAGE PIPE
(SEE PLAN FOR LOCATION)
1 180
178
1 80
DRIVEWAY"A" 1 78
q, ,
DRAINAGE
SECTION
SCALE 6" = l'
-,.
J -r
~ ~ +--+ l= ~
D ATE INITI.AL r
ENGINEER OF WORK
1 76
ELEV: 173.09
I (See Sheet 6, detail E · E) I I Q100= 2.13 CFS I ~. ~
I --1 ' ' I r:::1 . BOTTOM OF
I PROPOSED 18"
I CONCRETE DITCH
(See plan for location)
74
L ~ ;i
1 .. 72
'
12/13/04
SHAPOURI & ASSOCIATES "AS BUILT"
PROJECT MANAGEMENT SERVI CES
ENGINEERING . INFORMATION SYSTEMS . PLANNTNG RCE __ _
16089 SAN DIEGUITO ROAD, SUITE H -104 REVlEWEDBY:
P . 0. BOX 676221, RANC HO SANTA FE, CALIF. 92067
PHO NE: ( 8 5 8) 7 5 6 · 8 3 4 0 FA X : ( 8 5 8) 7 5 6 · 8 3 4 4 INSPECTOR
EXP. ___ _ DATE
DATE
-+-
i t I SHEfil I CITY OF CARLSBAD 1··sHESETS 5 I ENGINEERING DEPARTMENT r-r
~
t t-
t-+ t-
i =r
T ---;
DATE INITIAL
OTHER APPROVAL
GRADING PLANS FOR: 7342 ALTIVA PL. 7
t
_ JA V AHERI RESIDENCE
DRAINAGE DETAIL
_J_
DATE INITIAL
CITY APPROVAL
PUBLIC WORKS DIRECTOR l~/n/~~ t'-o--< ~P/t:>~
APPROVED L_W_YD H_UB_BS PE _EXP. --DATE_
OWNBY: ~ CHKDBY: _
RVWDBY: --
11 L
PROJECT NO.
PD 03-06 llDRAWING NO.
413-3A
021705
0
:E
0, (i)
2. .a:=.
01) -u)
I
u)
)>
I
I
I
I
1.00% 1
INLET2.1
r--RIM ELEV: 203.90
208
206 INLET2.2 r----RIM ELEV: 204.48
-----
----------------1 _______ \._ ___________ -,.2_.oog.!L ____ _
--------2 00%----------. ' \. . . .· . . . . . . . . ' . .. . .
----
' --•--------------------------
202
INV. ELEV: 202.50
200
198
--------------------· -rm-·----------------------------
L= 29.80'
Q100= 0.05 CFS
V100= l.84 FPS
6" PVC DRAINAGE PIPE
--------
\
' L INV. ELEV: 202.18
ELEV: 202.71
204
INLET2.4
RIM ElEV: 199.74
FINISHED CONCRETE FLOOR
BY ARCHITECT INLET 1.4
/ELEV: 199.79
RIM ELEV: 199.48
2.00_%_
\ .-.-------=...,._ • LS.0%
•. I • .'
I ' l
·1-
I
I
... -,
•
"' 198
6" PVC DRAINAGE PIPEl:r-j___-----t---~--S:I·fBt'Yo~o~-~=-=-~-~=-~=-=-=·=-=-=-=·=-=-=-=-=-=' =· lt L= 12.87' '--...c
Q100=0.16CFS \ ! ·--...,_ INV. ELEV: 197.64
196
194
192
190
188
INLET 1.1
RIM ELEV: 205.19
204 ! L= 7.86' ~
Qioo=0.02 CFS
-INV. ELEV: 203.58 V100=2.29 FPS ' \ 202
200
198
196
I
I
\
. '.
V 100= 4.36 FPS \\
!NV. ElEV: 196.
\
\
I
6" PVC DRAINAGE PIPE
INLET 1.2
,---RIM ELEV: 205.15
0.50%
..
6" PVC DRAINAGE PIPE \
I
' I
ElEV: 199.91
--......;: ' '""
r.,1?}7§?,---..., . .
<68,
Q100= 0.25 CFS
V 100= 10.13 FPS
ELEV: 194.82
INLET 1.5
---\RIM ELEV: 194.79
1.00% _ --_ 0.50%
' 1
6" PVC DRAINAGE PIPE
,--FINISHED CONCRETE FLOOR
BY ARCHITECT
INLET 1.4
ELEV: 194.81
.[~
',:,~. .,.__--,
I Q100 = 0.31 CFS
, V100= 10.44 FPS
1L_6" PVC DRAINAGE PIPE
RIM ELEV: 199.48
--------;
INV. ELEV: 197.36
L= 8.60'
Qioo=0.10 CFS
V 100=4.35 FPS
-------~-,
I
I
!INV. ELEV: 196.98
2.0Q%_ . '.: .
FINISHED CONCRETE FLOOR
BY ARCHITECT
INLET2.3 ,---_ RIM ELEV: 204.49
-2)0,50%
.___-=~ ------r=--EIBV: 202.73 • I ......_ . ......_
I
I
I
I
I
I ......_ ......_
1].4% ----------------------------•------------'-
L= 26.11'
Q100= 0.13 CFS
V100= 2.41 FPS
6" PVC DRAINAGE PIPE
INLET4.5
RIM ELEV: 180.30
INV. ELEV: 201.8
KEYSTONE 4" CAP UNIT
"' NOTE: KEYSTONE RETAINING --{
BY SEPARATE PERMIT
KEYSTONE COMPACT UNIT
FINISHED CONCRETE FLOOR
r---ilY ARCHITECT
I
'1
7
3'G
I~ ·~
""1 .]3, ::r:
Q100= 0.15 CFS ~
Vtoo= 7.96 FPS 1 ~ 1~
I
INLET6
\RIM ELEV: 184.98
I
I
I
i I -
I
RElkFORCED
BACKFILL7
IDIBNGTH 1· -1-
__ 1%~
!NV. ELEV: 183.30
1 % --l ,.1-,-~_.c._---,-_,....~_;;............-=---,------:---'<-11 I ~ ---UNIT CORE FILL
(3/4" CRUSHED
ROCK OR STONE)
' UNREINFORCED CONCRE.Ji O~d ·.• ✓
CRUSHED STONE LEVELING PAD \
j
, PERFORATED DRAIN PIPE (OPTIONAL)
r I
II
I
FINISHED CONCRETE FLOOR
BY ARCHITECT
!NV. ELEV: 177.05
DETAIL F-F
ELEV: 190.13
INLET4.1 1\
RIM ElEV: 190.10
\
_,._ -\
2.80% . . .
1.00%
L= 7.06'
Q100= 0.31 CFS
V100= 2.93 FPS
I
\
DRAINAGE
SECTION
SCALE 6''=1'
\'foless10,.,
06 H <i/
0<. ~ S Ao~~ -...: . 0 ,, ~ ~·uc No :.si.,.. ~ ~ . . :'.) r1 C52794 ~
.;: EXP. DATE: ...
/2-3f-o~ * 0 · 'i,\ oS'l 11/J Engit<e :J .,
9 of ca\i\J;?' // no
/11 .t . ~=:v -
(2,(1,o'f
-
-
-I--
-~
DATE INITIAL
ENGINEER OF WORK
INLET4.2
r--RIM ELEV: 189.82
I
INV. ELEV: 188.42
SHAPOURI&
4'" KEYSTONE CAP UNIT\
ASSOCIATES
SEE RET. WALL "I''\
SAW CUT UNITS TO FIT
WJTI-IIN 1 /2" OF PIPE
"AS BUILT"
\
12/13/04
PROJECT MANAGEMENT SERVICES
ENGINEERING. INFORMATION SYSTEMS . PLANNING
DATE # :::l nn RC£ EXP.
L~
16089 SAN DJEGUITO ROAD , SUITE H-104 REVIEWED BY:
P. 0. BOX 676221 , RANCHO SANTA FE , CALIF. 92067
PHONE:(858)756-8340 FAX :(858)756-8344 INSPECTOR DATE
-SHEET CITY OF CARLSBAD SHSTSJ + ~ 6 ENGINEERING DEPARTMENT ' t -GRADING PLANS FOR: 7342 ALTIV A PL
--+ -JA V AHERI RESIDENCE
DRAINAGE DETAIL
-
PUBLIC WORKS DIRECTOR
,4..'1',rce/',,,e,'~ f',~ ;,../1•/~ + -
APPROVED LLOYD HUBBS PE EXP. DATE
OWNBY --:t= L PROJE~ DRAWING NO. DATE INITIAL DATE rNffiAL CHKDBY: _ ---r PD 03--06 413-3A OTI !ER APPROVAL CITY APPROVAL 'RVWDBY: I
021705
0-
0 -
EROSION CONTROL :\OTES
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT HENRY JAVAHERI AT (916)-715-0081
(PHONE NUMBER)
2. EQUTPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE A VAfLABLE AT ALL
TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE
STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID
CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMTNENT.
3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL
OF THE ENGINEERING INSPECTOR.
4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKTNG ORDER
TO 1HE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING
RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE
REQUTRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CTRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TRESPASS ONTO ARE.AS WHERE IMPOUNDED WATERS CREATE A
HAZARDOUS CONDITION.
7. ALL EROSION CONTROL MEASURES PROVTDED PER 1HE APPROVED GRADING PLAN SHALL
BE INCORPORATED HEREON.
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN A WAY FROM THE FACE OF
SLOPE AT THE CONCLUSTON OF EACH WOR.KlNG DAY.
9. ALL REMOVABLE PROTECTIVE DEVTCES SHOWN SHALL BE IN PLACE AT THE END OF EACH
WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
10. ALL GRAVEL BAGS SHALL BE BUR.LAP TYPE WITH 3/4 INCH MINIMUM AGGREGRA TE.
11. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAfL TO PROVTDE EFFECTIVE COVERAGE
OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE
STABILIZED BY PUNCH STRAW INST ALI.ED IN ACCORDANCE WITH SECTION 35.023 OF
THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION,
STA TE OF CALIFORNIA.
TEMPORARY EROSION CONTROL
PLANTING AND IRRIGATION
ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION SHALL BE
INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD
SPECIF/CATIONS AND THE FOLLOWING:
A. HYDROSEEDING SHALL BE APPLIED TO:
1. ALL SLOPES THAT ARE GRADED 6:1 (HORIZONTAL TO VERTICAL) OR STEEPER
WHEN THEY ARE:
a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR
STREET
b. ALL SLOPES 4 FEET OR MORE IN I-JEIGHJ'.
2. AREAS GRADED FLATTER THAN 6:1 WHEN ANY OF THE FOLLOWING CONDTTIONS
EXIST:
"· NOT SCHEDULED FOR IMPROVEMENTS(CONSTRUCTION OR GENERAL
LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING.
b. IDEN11FIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHLY
VISIBLE TO 1HE PUBLIC.
c. HA VE ANY SPECIAL CONDITfON IDENTIFIED BY THE CITY ENGINEER
TH.AT WARRANTS IMMEDIATE TREATMENT.
B. HYDROSEEDED AREAS SHALL BE TRRfGATED IN ACCORDANCE WITH THE FOLLOWING
CRITERIA:
1. ALL SLOPES Tf·IAT ARE GRADED 6:1 OR STEEPER AND THAT ARE:
a. THREE TO EIGHT FEET TN HEIGHT SHALL BE IRRIGATED BY HAND
WATERING FROM QU!CK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM
OF LOW PRECTPITA TfON SPRINKLER HE.ADS PROVIDING I00% COVERAGE.
b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTION-
AL SYSTEM OF LOW PRECIPITATION SPRINKLER HE.ADS PROVIDING JOO%
COVERAGE.
2. AREAS SLOPED LESS THAN 6:1 SHALL BE IRRIGATED AS APPROVED BY THE CITY
ENGINEER, PRIOR TO HYDROSEEDING. 1HE DEVELOPER SHALL SUBMIT A
PROPOSED SCHEME TO PROVTDE TRRTGATION TO 11-/E CITY ENGINEER. THE
PROPOSAL SHALL BE SPECIFfC REGARDING THE NUMBERS,TYPES AND COSTS OF
THE ELEMENTS OF THE PROPOSED SYSTEM.
3. IRRIGATION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE
OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH.
C. HYDROSEEDfNG MIX SHALL CONSIST OF ALL OF THE FOLLOWING:
1. SEED MIX SHALL CONSIST OF NO LESS THAN:
a. 20 lbs. PER ACRE OF ROSE CLOVER
b. 20 lbs. PER ACRE OF ZORRO FESCUE
c. 3 lbs. PER ACRE OF E SCHOOL CIA CALJFORNICA
d. 4 lbs. PER ACRE OF ACHlLLEA MILLEFOL/A
e. 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW)
t 1/2 lb. PER ACRE OF DIMORPHOLECA
g. ITEMS c,d,e, AND f OF T/-l/S SUBSEC11ON MAY BE OMITTED ON
LOCATIONS WHERE THE AREA BEING HYDROSEEDED JS NOT VISIBLE FROM
EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES.
h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN
FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR
BROADCASTING BEFORE HYDROSEEDING.
1. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE TN
UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD
AND AGRICULTURE CERTIFICATION TAG A TT ACHED TO, OR PRINTED ON
SAID CONTAINERS.
j. NON-PHYTO-TOXIC WETTfNG AGENTS MAY BE ADDED TO THE HYDROSEED
SLURRY AT THE DISCRE11ON OF THE CONTRACTOR.
2. TYPE J MULCH APPLIED AT THE RATE OF NO LESS THAN 20()() lbs PER ACRE.
TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR
f TYDRA UL/CALLY APPLIED FIBER MATERIAL. WHEN STRAW TS USED IT MUST BE
ANCHORED TO Tl TE SLOPE BY MECHANICALLY PUNCHING NO LESS THAN 50% OF
THE STRAW INTO THE SOIL.
3. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0, WITH
15% SULPHUR APPUED AT THE RA TE OF 500 lbs. PER ACRE.
D. A REAS TO BE HYDROSEEDED SHALL BE PR EPARED PRIOR TO HYDROSEEDING BY:
1. ROUGffENfNG THE SURFACE TO BE PLANTED BY ANY OR A COMBINA11ON OF:
a. TRACK WALKING SLOPES STEEPER THAN 6:1
b. HARROWING AREAS 6:1 OR FLATTER THAT ARE SUFFICIENTLY FRIABLE.
c. RIPPING AREAS IBAT WILL NOT BREAK UP USING ITEMS a OR b ABOVE.
2. CONDITIONING THE SOILS SO THAT IT TS SUITABLE FOR PL.ANTING BY:
a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT
SATURATED SEED BED.
b. THE ADDITfON OF SOIL AMENDMENTS, PH ADJUSTMENJ; LEACHING OR
COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH.
E. HYDROSEEDED ARE.AS SHALL BE MA INTAINED TO PROV/DE A VIGOROUS GROWTH UNTIL
THE PROJECT TS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS
THE PERMANENT LANDSCAPING, UNTIL ffiE PROJECT IS COMPLETED AND ALL BONDS
RELEASED.
!CRUSHED RCCK TO BE L" MINUS
Ii ,r-Fli ffR F ASR/C
I ,~O,R/CiNA/
I GRADE _, ----~IQO Ds,
12" MIN UNLESS 0/Hl:_f/W/SI:_
SPt.C/cil:_D EJY A SOILS ENGINEER
SECTION B-B
!\TS
1 C.RUSHED ROCK TO BE 2" MINUS
/ ~coRRUGA TFD STEFL PANEL s
1 ,1 , OR/G/lv/\L , L-uo.n. a.n.n.cc ,·-cTn,.-'-,c\'~'f:tQ~7~~'R:,~r;c,cir.,_ G,R AO[
u<0~--V'..Lo, 0 0 0 r \
12" MIN UNLFSS OTHFRWISF
SPfCiFitO BY A SOILS tNG/1\'f_f.,q '\_FIi TfR F },BF'IIC
NOT.~:
SECTION .1\-A
NTS
CONS liiUC I Sl:_/J/Ml:_N I 13/\iiRIER
AND CH/INNEL/ZE RUNOFF TO
S[O!M[NT TRAPPING O[V/CC SEO/MEN T TRAPPING
OFVICF
MA TC! I CXIS!TNG
GRADE
OR FOUR Ti'A[S IHI:_ C!iiCUMfl:_f/1:_NCL
Oc IHI:_ L/\f/G[ST CONSTRUCTION 'ICHICLC
,~Y/Ch[VCR IS GFICA TCR
PLAN
NTS
TIRC
STABILIZED CONSTRUCTION ENTRANCE /EXIT TC -1
SI/ IY!S IS AND tXcAVA ff A 2 STA PL[ W/R[ FENCING TO
4 B'f 4 1/'v' (10 BY 10 CA,1) ff-IF P(Y)TS
TRFNC;i-1 UPS[ QPF" FRC)M ANO
ALONG TH[ Llt\j[ or POSTS ,_
~-
. -~ .
~ -· ----....-----------.--/ ./._~!'
\!:J~fillE~ / ---~ ----:=_-:_:___.-/ nt¢;JE~ffi'._1~u1----=---_ ili~:;y_~~-,=; ~--""' I 1.lJ~ill 11·' / .,..,-------==---· .,..,-----=~~,~ t_i: r::; /
---.......-_______..,,,.--IF;~--1: ~ -_.,., / 1=11 1=111==111,-......:2"c!'~ ( ) _....---/ ~'Jlf llf,';ITT~ifcr 4 IN 10 CM
3. ATTACH Th'E F"JLTEF? FI\BRlC TO
TH[ ~HRE FE/\.'CE ANO EXTEND IT
iN l O THE TRE.NCH.
1 B!,CKF/LL MIO COMPACT Tri[
[XCA 'I!, TED SOIL
SILT FENCE
9 iN. c AR THEN RIDGE
CNLINED S)VALE & DER~1
GR A vEL FIL :ER
I
RUNOFF
WATER W/Th'
SEDlMENT
OVERF! OW
SFDIMFN T
/ Wi!/l SCI/LLN
FU TF.R.r-D WA TF,9
0,ROP il\li_[T
WITH CPA ff
~--CON(RFTF 81 OCK
BLOCK -SCREEN-GEAVEL SILT BASIN
o TAK[O
'OMc'AC /LU SOIi STRAW BAL[
~...c=~s
DROP l/vl_[T
WITH GRA/[
--:-IT~
~::::.____::_ -¥. ~·-· = _____.....
STRA/1 ,SAi [C
STAKfl) WITH TWO
S ! AKt.S PL/,! BAU.
TO PR[\/EN T PIP/NC
2X6 STRUT(S)
/
ENO ANO 5'0[
OV[RU\P ;\ T
CORNERS
2X5 S/i/Ui(S)
17[0U/R[O WH[N
NO rLO ON Fl A/v'S
/
(I'\ I '\I\ I I I I\ I, I ' \ \1;1 1 p 1 I~ i I I /l \ ·'N,; -.,-,
I □-:~ ~· ~ -□-_,
Jt: '
/n ,
( I I ' '\ V\' /i'i\11"\ □ /' □ I I \1 I I / 'I / I l I I '/
, 2X6 S TRU T(S)
i ', \ I \ i(1 / I { I \ I \, I\. I
I I I-\\ / I ', I
i1 0 iR 'I p / /1 □ I Al'A f !1\';i1,,f A, I ,\ I/ '
J □':.
" -Ill / -~ -□--~
-1:'i':. --'/□ ::-
~
V'iVl.'iiV'i, \' lo /\ ',□ 1[ I / / '\\ 1/ \!
ti'; I\\;','; 11 \ 9' 1' □ ' I ,1 I i \ \ I I
IIAY UALE S ILT BAI{RIER
FLOW
GAR B[TW[[N [)/,GS
ACTS AS Sf'/ILWAf
IHRff IAYFRS QF GRAV[L BAGS
WITH [~OS OV[RLAPP[O
;~ ~ J ' ' 0 '
I'' 0 \i'
c Ii/ : ) : ~
o 1 I 0
0
: ~
GRAV EL BAGS
4" o" 1 ,.J,;s-.....
/.,
5"
LOG CilECK DAY!
18"
I ,_
l
24"
I
A
POINTS A SHOUW 8[ HIGHER THAN POINT B
HAY BA LE CHECK DAM
5 IN (Jo CM)
?4 IN (61 CM)
I
(A) J
COAPS[ AGGR[GRA ff
FLOW 0 4 IN i6! CM)
(B)
L=OISTt..f✓Ct SUCI-I THAl PCINIS
A ANO [3 A.R[ or [QUA.I n rvA T/ON
GRAV EL CHECK DAM
4" VER //CAL f A Cc
FMB[D0/NG D[TA/L
LEGEND
DESCRIPTION QUANTITY SYMBOL
STABILIZED CONSTRUCTION ENTRANCE/TC-I 1 EACH
STRAW BALE DIKE N.A. ------------
SILT FENCE 745 LN. FT.
UNLINED SWALE & BERM N.A. --
D-75 CONCRETE DITCH 101 5 LN. FT.
BLOCK-SCREEN-GRAVEL SLLT BASIN N.A.
HAY BALE SILT BARRIER N.A.
LIMITS OF CLEARING & GRADING N.A.
GRAVEL BAGS 600EACH
PUNCHED STRAW N.A. WWV/\//
LOG CHECK DAM N.A. t rnruxxxnxn
HAY BALE CHECK DAM N.A. ~►■ ►I
GRAVEL CHECK DAM N.A
RIPRAP 2EACH
FIBER ROLL 1850LN. FT.
HYDRO-SEEDDED 22050 SQ. FT.
CONSTRUCTION STAGING AND
MA TE.RA IL STORAGE AREA !EACH
LLLL LLLLLLL LLLLLLL LLL
L L I I I I I I I L_LLLLL-LLL_
otess10
. SHAoo
IC. NO .
52794
P. DATE :
I-o
0 0
12/13/04
SHAPOURI & ASSOCIATES
PROJECT MANAGEMEN T SERVI CES
ENG I NEE RI NG. I NFO RMATIO N SYSTE M S . PLANNfNG
16089 SAN DTEG U ITO
P . 0 . BOX 676221, RANCHO
PHONE : (858) 756-8340
E8
RO AD , SU ITE H -104
SAN TA FE , CAL IF. 92067
FAX :(858)75 6 -83 44
"AS BUILT"
RCE ___ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
ENGINEERING DEPARTMENT
--+--~'---+---+---< I SH7EET] CITY OF CARLSBAD I SHESETS
------------+-_ _ '-G=R~A=o=IN~G~P=LA...;:~N:=S:;::;F;;O;;R:;:==7-3=4=2--A-LT=l=V=A=P=L=. ===-'====--1
--
-r DA TE INITIAL
ENGINEER OF WORK -
-
-------+---+---+---!
-
JA V AHERI RESIDENCE
EROSION CONTROL DETAILS I
UC WORKS DIRECTOR I
-+----1 ~/,rY~ ~.,~ ,;t.//o/oS
--+---< QV_EJ)L'tOYD iluBBS PE EXP. DATE .
DATE INITIAL DATE INITIAL
OTHER APPROVAL CIIT APPROVAL
~----====--:-;~~-~
DWNBY: -~ -I PROJECTNO. 1-DRAWINGNO.
CHKDBY: PD 03-06 413-JA RVWDBY: ~--------~
021705
-..J
0 -00
----
/
I
I
T
I
I
I
I
I
I
PROVIDE TEMPORARY SILT FENCE
"' 1 PROTECTION DURING CONSTRUCTION
.\ AT PROPERTY LINE
111\
\
P OVIDE TEMPORARY FIBER ROLL-1
PROVI DE GRAVEL BAG
SPACED @25' INTERVALS-,
ALONG LENGTH OF DRIVEWAY .
\
PROVIDE FIBER ROLL SEDIMENT CONTROL
AROUND PROJECT PROPERTY PER
CALIFORNIA STORMWATER BMP '1
HANDBOOK STANDARD SE-5 1
PROVIDE TEMPORARY FIBER ROLL -.
N7 "29'3 "W
.J .16'
I
\ ~~""':;~"' I
-----7
\
\
\
I
w l
~I
..J
o. I
<
> I ...
:: I
I
I
I
I
I
I
I I
PROVID E STABILIZED CONSTRUCTIJ N
ACCESS PEf CITY STANDARD Ti::-1--------
(SEE 1HEET 11 FOR DETAIJ.-S)
I
I
I
I
I
I
I
I
' ' I I
I ' I \ ' PROVIDE GRAVEL BAGS __J
ACROSS EXISTING BROW DITCH
I
I
I
I
I
\
' ' .....
-··-. ·-
\
\
\
PROVIDE TEMPORARY FIBER ROLL SEDIMENT
CONTROL SPACED @15' INTERVALS-
\__ PROVIDE TEMPORARY FIBER ROLL
SEDIMENT CONTROL AROUND
DESILTATION BASIN
-, ,.._
I
I
II ALL DISTURBED GROUN D NOT
I INTENDED FOR PERMANENT
L_PAVEMENT SHALL BE
HYDRO-SEEDED IN A TIMELY
MANNER. TYPICAL FOR ALL
GRADED OR DISTURBED AREAS
----
-------------"--~ (
~/ --'-, ✓ '\)
\ X
V
\
\
PROVIDE TEMPORARY FIBER ROLL
O'
-~--~--~~-
'° "' ~ •
):-I
00
~-----,-8",----~
~-------+so_,-------i
I
/ \
~--~D-
'-----+ s--, _ ____,
PROVIDE TEMPORARY SILT FEN CE
-PROTECTI ON DU RIN G CONSTRUCTION
AT PROPERTY LINE
~
NORTH
20' 40' 60'
SCALE 1 "=20'
I
80'
a
PROVIDE TEMPORARY FIBER ROLL
--
-i---------
DATE rNfTIAL
ENGTNEER OF WORK
PROVIDE TEMPORARY SILT FENCE
PROTECTION DURING CONSTRUCTION
AT PROPERTY LINE
ALL DISTURBED GROUND NOT
INTENDED FOR PERMANENT
PAVEMENT SHALL BE
HYDRO-SEEDED IN A TIMELY
MANNER. TYPICAL FOR ALL
GRADED OR DISTURBED AREAS
-+-
------
--
12/13/04
SHAPOURI & ASSOCIATES
P R OJECT MANAGEM ENT SERVICES
ENG I NEE RI NG. I N F O RMA T TO N SYSTE M S -P LANNI NG
aa+ 0 cl er e=,,.-.l
16089 S A N DTE CU TTO ROAD , SUT T £ H -104
P . 0. B O X 676221 , R ANC HO S A N TA F E , CAL IF. 92067
PHO N E : (858) 75 6 -83 4 0 FAX :(858)756-834 4
"AS BUILT"
RCE EXP. DATE
REVIEWED llY:
INSPECTOR DATE
I SHESTS I [SHS ET I CITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PLANS FOR: 7342 ALTIVA PL.
~ JA V AHERI RESIDENCE
-~ EROSION CONTROL PLAN
' PUBLIC WORKS DIRECTOR
j ~~~""--= ~/,D/&?
ROVED LLOYD HUBBS PE EXP. DATE
'---
~WNBY a PROJECT NO. DRAWING NOj DATE INITIAL DATE INITIAL HKDBY: _ -PD 03-06 413-3A OTHER APPROVAL CITY APPROVAL VWDBY:
011705
00
0 -00 w
I w
)>