Loading...
HomeMy WebLinkAbout1461 SAPPHIRE DR; ; CB981934; Permitl~l/J&-35 B U I L D I N G 09/02/98 11:07 Page 1,of 1 Job Acffi:ress: /1../-{/;I .SPtf'f'J.hR.6 Or P E R M I T Suite: Permit No : CB981934 Project No: A9802560 Development No: DEV89133 Permit Type: SINGLE FAMILY DWLNG -DETACHED Parcel No: .;ll;l.,ICe,i> (70U Lot#: 32 Valuation: 200,143 Con~¥~Jl{<¥6~ ~q1 vt192 Occupancy Group: Reference#: CT84-32 St~~~ Iss-tlWB-79 Description: 2275 SF+591 GAR,PLAN 3,PHASE 4 Applied: 06/03/98 : COBBLESTONE,GREYSTONE Apr/Issue: 09/02/98 Appl/Ownr : GREYSTONE HOMES 5973 AVENIDA ENCINAS CARLSBAD CA 92008 Entered By: RMA 760 804-7700 Plan Check Numbers Fees Required *** > ORIG 971300 PCK 981702 *** *** Fees Collected & Credits *** Fees: Adjustments: Total Fees: Fee description 15,920.79 .00 15,920 .79 Tot,.al e re.di ts : Tot al Payments: Bal anc Due: Units Fee /Unit .00 .00 15,920.79 Ext fee Data -----------------------~---------------------------------------------------Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee Enter Plan Check iscoun or Enter Park-in Lieu Fe & Enter "Y" to Autoc l e P.F.F. Enter "Y" to Autoc le T.I .F. Payoff Fee for CFD . > . > Enter #Units & Code-Pot able Water> Enter "Y" for Plumbin9: Issu~ Fee Each Plumbing Fixture or ~ap Each Building Sewer > > ) Each Install/Repair Water Line Each Water Heater and/or Vent Gas Piping System Each Vacuum Breaker Enter "Y" for Electric Issue Fee > > > > > > Single Phase Per AMP Enter 'Y' for Mechanical Issue Install Furn/Ducts/Heat Pumps Each Install Fireplace Each Exhaust Fan Each Install/Reloc Vent Construct Housing(Y/N)? Enter Impact Fee Fee> > > > > > > 4 2.50 29b5.79 1 15 1 1 1 1 2 125 2 2 2 2 2925 7.00 15.00 7.00 7.00 7.00 7 .00 .25 9.00 6.50 6.50 4.50 AP \· DATE 4.00 2.50 975.00 634.00 20.00 -51.00 1575.00 3 3643.00 y 550.00 y 2965.79 2400.00 DS/8 20.00 y 105.00 15.00 7.00 7.00 7.00 14.00 10.00 y 31.25 15.00 y 18.00 13.00 13 .00 9 .00 N 2925.00 ---~__....--.....---,.... CITY OF CARL ~Q,.. NCI= I-. ~ 4; "tjt;:, \ 5 5 9:d > 2075 Las Palmas Dr., Carlsbad, C )2oo§''?ft9) 4i':....,8-""l~'.ft1A,l""IS;,r-.:Z:..-~ --~_:_.J._.;;.~,:_::_.=_!:.~.!==- City of Carlsbad Inspection Request For: 2/11 /99 Permit# CB981934 Title: 2275 SF+591 GAR,PLAN 3,PHASE 4 Description: COBBLESTONE,GREYSTONE Type:SFD Sub Type: Job Address: Suite: Location: 1461 SAPPHIRE DR Lot ",PPLICANT : GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: 32 CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical pef-Comments Inspection History Date Description Act lnsp Comments 1/27/99 23 Gas/TesURepairs AP PY 1/27/99 39 Final Electrical PA PY EMR 12/29/98 18 Exterior Lath/Drywall AP PY 12/18/98 18 Exterior Lath/Drywall NS PY 12/16/98 18 Exterior Lath/Drywall NS PY 12/9/98 17 Interior Lath/Drywall AP PY 12/9/98 18 Exterior Lath/Drywall NR PY 12/3/98 16 Insulation AP PY 12/1/98 84 Rough Combo AP PY 11/23/98 13 Shear Panels/HD's AP PY 11/18/98 13 Shear Panels/HD's NR PY 11/16/98 13 Shear Panels/HD's NR PY Inspector Assignment: PY ---- Phone: Inspector: ----- Requested By: SHELDON Entered By: BARBARA 11/12/98 13 Shear Panels/HD's NR PY NO SUPER W/PNLS 11/10/98 13 Shear Panels/HD's NR PY 11/5/98 13 Shear Panels/HD's NR PY 11/5/98 15 Roof/Reroof AP PY 11/4/98 15 Roof/Reroof NR PY 10/30/98 15 Roof/Reroof NS PY • City of Carlsbad Inspection Request For: 1/27/99 Permit# CB981934 Title: 2275 SF+591 GAR,PLAN 3,PHASE 4 Description: COBBLESTONE,GREYSTONE Type:SFD Sub Type: Job Address: Suite: Location: 1461 SAPPHIRE DR Lot APPLICANT : GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description 23 Gas/Test/Repairs 39 Final Electrical 32 lnspectionHistory Date Description 12/30/98 12/18/98 18 Exterior Lath/Drywall 12/16/98 18 Exterior Lath/Drywall 12/9/98 17 Interior Lath/Drywall 12/9/98 18 Exterior Lath/Drywall 12/3/98 16 lnsulation 12/1/98 84 Rough Combo 11/23/98 13 Shear Panels/HD's 11/18/98 13 Shear Panels/HD's 11/16/98 13 Shear Panels/HD's 11/12/98 13 Shear Panels/HD's 11/10/98 13 Shear Panels/HD's 11/5/98 13 Shear Panels/HD's 11/5/98 15 Roof/Reroof 11/4/98 15 Roof/Reroof 10/30/98 15 Roof/Reroof 10/29/98 83 Roof Sheathing/Ext Shear 9/24/98 81 Underground Combo 9/14/98 21 Underground/Under Floor Inspector Assignment: PY --- Phone: Inspector: Requested By: SUZANNE Entered By: CHRISTINE Act Comments AP ,PC} e-M ((_ Act lnsp Comments AP PY NS PY NS PY AP PY NR PY AP PY AP PY AP PY NR PY NR PY NR PY NO SUPER W/PNLS NR PY NR PY AP PY NR PY NS PY NR PY AP PY AP PY Dept: Buildin Plan Check #: ing 11s1ecdon lanning CMWD St Lite Fire Date: FEB I O 1999 2/10/99 Permit#: CB981934 Permit Type: SFD Project Name: Address: 2275 SF+591 GAR.PLAN 3,PHASE 4 COBBLESTONE,GREYSTONE 1461 SAPPHIRE DR Contact Person: SHELDON Phone: 7606030056 Sewer Dist: Water Dist: CA Sub Type: Lot: 32 -l-7.&.p,,.9'\--'--+-7'1--,\---= .. -,:-·~-"-"_""_"_""~:~~~:~~:-~~16;---:~~~~~~:-----7 ~;~~~~:~~~~:---.. -----· Date __________ Inspected: _____ Approved: __ _ Disapproved: __ Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ ■■■■II I I ■■■■I 111111 I ■■II Ill I I ■■l■l■I I 1■11 I 1■11 I II I I II 11■11■■■11111 I■ I I I■ 1■■■111 ■I■■■■ 1■1 ••••••••••• 1111■111■1■■■ ■■■■■ I ■II I ■■II ■11111 ■111111■ 111 ■ 11■■■■■■■11 Comments: ------------------------------- ~ CIIY DI Carlsbad B3 Final Buildin~ Inspection Dept: Building EngineerinL~MWD St Lite Fire Plan Check #: Date: 2/10/99 Permit#: CB981934 Permit Type: SFD Project Name: 2275 SF+591 GAR.PLAN 3,PHASE 4 COBBLESTONE,GREYSTONE Address: 1461 SAPPHIRE DR Contact Person: SHELDON Phone: 7606030056 Sewer Dist: CA Water Dist: CA Sub Type: Lot: 32 .......................................................................................................................................................... Inspected Date -1 S-. Ci CzApproved: ✓ By: Ill\?, Inspected: 1, Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ .......................................................................................................................................................... , Comments: _______________________________ _ ~ Cltvof Carlsbad ea Final Building lnspectio~~ Dept: Building Engineering Planning CMW(~/Fire Plan Check#: Permit#: Project Name: CB981934 2275 SF+591 GAR.PLAN 3,PHASE 4 COBBLESTONE,GREYSTONE Address: 1461 SAPPHIRE DR Contact Person: SHELDON Phone: 7606030056 Sewer Dist: CA Water Dist: CA Inspected Date By: Inspected: Inspected Date By: Inspected: Date: Permit Type: Sub Type: Lot: 32 Approved: Approved: 2/10/99 SFD Disapproved: __ Disapproved: __ .......................................................................................................................................................... , ' ~ CIIJ al Carlsbad 1Ja Flnal Bulldina lnspeelion Dept: Building Engineering Plannln@ t Lite Plan Check #: Permit#: Project Name: Address: Contact Person: Sewer Dist: CB981934 2275 SF+591 GAR.PLAN 3,PHASE 4 COBBLESTONE,GREYSTONE 1461 SAPPHIRE DR SHELDON Phone: 7606030056 CA Water Dist: CA Inspected Date Lot: Fire Date: Permit Type: Sub Type: 32 By: __________ Inspected: _____ Approved: ___ Disapproved: __ Inspected Date By: Inspected: _____ Approved: ___ Disapproved: __ 111 II I I I 11111111 ••·•••••■■I I II 1111111111111111 I 111 Ill 111111111 Ill I II I Ill 11111 I·•••••■ ■111111111111111111111111111111111 I I I I·····•••••••··••■ 1■ ■ ■ ■■■■■ ■ ■11 I I Comments: _____ -fl----r---------/)----,H---------------- {/ ~ fMJtrYL Of=!-