Loading...
HomeMy WebLinkAboutMS 15-04; GARFIELD STREET CONDOMINIUMS; FINAL SOILS REPORT; 2020-10-23 October 23, 2020 CTE Job No. 10-14115T Ocean Beeze Development, LLC 6241 Yarrow Drive, Suite D Carlsbad, California 92011 CC: Beach City Builders, Mr. Tom Norman,Tom@bcbusa.com Subject: Final Summary of Compaction Testing Proposed Garfield Street Condos 3622 Garfield Street Condos Carlsbad, California To Whom It May Concern: As requested, Construction Testing & Engineering, Inc. (CTE) has performed observation and testing of minor compacted fill materials during recent construction at the above referenced site. This letter is provided as certification that the recent fill or backfill placement has been conducted in substantial conformance with the applicable plans and specifications for the project. Field-testing of the compacted fill material was conducted as scheduled by the contractor between March 8, 2018 and May 19, 2020. Testing was performed in general accordance with ASTM D-6938 (nuclear method). Results of the field-testing indicate that fill materials in the subject areas were compacted to a minimum of 90 and 95 percent (depending on location and requirements) of the laboratory maximum dry density as determined by test method ASTM D-1557. Tabulated results of the field compaction testing performed are provided in the attached Table I, “Compaction Test Summary”. The laboratory maximum density results are provided in Table II, “Laboratory Test Results.” This letter is subject to the same limitations as the other project geotechnical and other construction documents. The opportunity to be of service is appreciated. If you have any questions, please do not hesitate to contact this office. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. Dan T. Math, GE #2665 Principal Engineer DTM:ach Construction Testing & Engineering, Inc. Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying 1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net Final Summary of Compaction Testing Page 2 Proposed Garfield Street Condos 3622 Garfield Street Condos, Carlsbad, California October 23, 2020 CTE Job No. 10-14155T Attachments: Figure 1 – Compaction Location Map Table I – Compaction Test Summary Table II – Laboratory Test Results References: Geotechnical Update Report Proposed Three (3) Unit Apartment Structure 3622 Garfield Street, Carlsbad, California Coast Geotechnical Job No. W.O. P-532077 Dated March 5, 2015 Preliminary Geotechnical Investigation Proposed Three (3) Unit Apartment Structure 3622 Garfield Street, Carlsbad, California Coast Geotechnical Job No. W.O. P-532077 Dated September 27, 2007 TABLE I COMPACTION TEST SUMMARY ** TEST FAILED, SEE RETEST 1 Job Name: Garfield Street Condos Job No.10-14115T Job Address:3622 Garfield Street, Carlsbad Date:10/22/2020 Date Test Location Elevation Density Moisture Relative Soil No. or Depth pcf Content Compaction Type Feet % Dry % Weight 3/8/2018 1 Monolithic Footing SG 121.7 10.7 95%1 3/8/2018 2 Monolithic Footing SG 122.8 10.8 96%1 3/8/2018 3 Monolithic Footing SG 125.5 10.5 98%1 3/8/2018 4 Monolithic Footing SG 120.6 10.9 94%1 3/8/2018 5 Monolithic Footing SG 122.0 10.7 95%1 3/8/2018 6 Monolithic Footing SG 121.9 10.5 95%1 3/8/2018 7 Monolithic Footing SG 124.8 10.4 98%1 3/8/2018 8 Monolithic Footing SG 122.3 11.0 96%1 5/19/2020 9 South Side of Driveway Aproach -6.0 128.9 9.0 97%2 5/19/2020 10 North Side of Driveway Aproach -6.0 130.7 9.0 98%2 TABLE II LABORATORY TEST DATA 2 Job Name:Garfield Street Condos Job No.10-14115T Job Address:3622 Garfield Street, Carlsbad Date 10/22/2020 Maximum Optimum Sample No.Dry Density Moisture Soil pcf Content Description %wt 1 128.0 9.6 2 133.5 7.7 Bottom of excavation (shoring ex) Dark Brown (SM)