Loading...
HomeMy WebLinkAboutMS 15-08; CHERRY- FIELD BEACH HOMES; FINAL SOILS REPORT; 2020-09-17 September 17, 2020 CTE Job No. 10-13893T Kovens Cherry Carlsbad Matt Castriotta, Director 19888 Sycamore Ridge Road Murrieta, California 92563 Telephone: (951) 440-0441 Via Email:matthew@mynmark.com Subject: Final Letter for Testing of Compacted Fill Cherry Field Beach Homes 187,189,191 Cherry Street, Carlsbad, California Reference: Certification of Building Preparation Proposed Cherry Field Beach Homes 187,189,191 Cherry Street Carlsbad, California CTE Job No. 10-13893T, dated September 11, 2017 Geotechnical Update Report Proposed Three (3) Unit Condominium 187, 189, and 191 Cherry Avenue Carlsbad, California Coast Geotechnical Job No. W.O. P-493046, dated February 26, 2015 Mr. Castriotta: As requested, Construction Testing & Engineering, Inc. (CTE) has performed the requested observation and testing of materials during past and recent earthworks and construction for the Cherry Field Beach Homes and associated improvements at the referenced site. This letter is provided as certification that the footing inspections, utility backfills, and asphalt placement has been conducted in substantial conformance with the recommendations specified in the approved project soils report completed Coast Geotechnical, dated February 26, 2015. Field-testing of the compacted material indicate that fill materials were compacted to a minimum of 90 or 95, relative compaction depending on location, of the laboratory maximum dry density as determined by test method ASTM D- 1557. Asphalt pavements were compacted to a minimum 95% relative compaction in accordance with ASTM D2950/D2950M. Tabulated results of the field compaction testing performed are provided in the attached Table I, “Compaction Test Summary.” The laboratory maximum density results are provided in Table II, “Laboratory Test Results.” This document is subject to the same limitations as the previous project geotechnical documents. The opportunity to be of service is appreciated. If you have any questions, please do not hesitate to contact this office. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. Dan T. Math, GE #2665 Principal Engineer Construction Testing & Engineering, Inc. Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying 1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net TABLE I COMPACTION TEST SUMMARY ** TEST FAILED, SEE RETEST 1 Job Name: Cherry Field Beach Homes Job No.10-13893T Job Address:187, 189, 191, Cherry Street, Carlsbad, California 92009 Date:9/2/2020 Date Test Location Elevation Density Moisture Relative Soil No. or Depth pcf Content Compaction Type Feet % Dry % Weight 2/28/2018 1 Exterior Walls -3.0 117.1 10..9 97%1 2/28/2018 2 Exterior Walls -3.0 118.3 11.1 98%1 2/28/2018 3 Exterior Walls -3.0 116.9 10.6 97%1 2/28/2018 4 Exterior Walls -3.0 118.0 10.8 98%1 2/26/2020 5 SE Curb and Gutter 61.0 111.8 4.3 92%1 2/26/2020 6 NE Curb and Gutter 61.0 110.3 4.2 91%1 2/26/2020 7 NE Curb and Gutter 61.0 109.6 6.5 91%1 2/26/2020 8 North Curb and Gutter 61.0 109.3 5.6 90%1 2/26/2020 9 Driveway #1 61.0 109.5 8.4 91%1 2/26/2020 10 East Side Walk 61.0 112.5 10.7 93%1 2/26/2020 11 North Side Walk 61.0 109.6 10.9 91%1 2/27/2020 12 SE Curb and Gutter, Retest #5 61.0 115.6 11.5 96%1 2/27/2020 13 NE Curb and Gutter, Retest #6 61.0 115.3 11.8 95%1 2/27/2020 14 NE Curb and Gutter, Retest #7 61.0 117.2 11.7 97%1 2/27/2020 15 North Curb and Gutter, Retest #8 61.0 118.2 12.0 98%1 2/27/2020 16 Driveway #1 61.0 115.6 11.8 96%1 2/27/2020 17 Driveway #2 61.0 116.2 11.6 96%1 2/27/2020 18 Driveway #3 61.0 115.8 11.9 96%1 3/2/2020 19 Curb & Gutter Base, Garfield Base 127.3 10.6 95%2 3/2/2020 20 Curb & Gutter Base, Garfield Base 127.6 9.9 96%2 3/2/2020 21 Curb & Gutter Base at Corner Garfield & Cherry Base 126.8 10.2 95%2 3/2/2020 22 Curb & Gutter Base, Cherry Base 128.9 8.6 97%2 3/2/2020 23 Curb & Gutter Base, Cherry Base 126.9 8.9 95%2 3/2/2020 24 Curb & Gutter Base, Cherry Base 126.8 9.2 95%2 3/4/2020 25 Curb & Gutter/Garfield Street Base 127.3 10.5 95%2 3/4/2020 26 Curb & Gutter/Garfield Street Base 127.9 10.6 96%2 3/4/2020 27 Curb & Gutter/Cherry Ave Base 129.3 10.4 97%2 3/4/2020 28 Curb & Gutter/Cherry Ave Base 129.2 11.1 97%2 3/4/2020 29 Curb & Gutter/Cherry Ave Base 128.2 11.0 96%2 3/4/2020 30 Curb & Gutter/Cherry Ave Base 127.8 10.9 96%2 4/2/2020 31 Garfield Street AC 140.3 -97%3 4/2/2020 32 Garfield Street AC 139.8 -97%3 4/2/2020 33 Cherry Ave AC 141.1 -98%3 4/2/2020 34 Cherry Ave AC 140.6 -97%3 4/2/2020 35 Cherry Ave AC 140.8 -98%3 TABLE II LABORATORY TEST DATA 2 Job Name:Cherry Field Beach Homes Job No.10-13893T Job Address:187, 189, 191, Cherry Street, Carlsbad, California 92009 Date 9/2/2020 Maximum Optimum Sample No.Dry Density Moisture Soil pcf Content Description %wt 1 120.9 9.7 2 133.4 7.4 3 144.3 -Asphalt Concrete Moderate Brown SM Aggregate Base