September 17, 2020 CTE Job No. 10-13893T
Kovens Cherry Carlsbad
Matt Castriotta, Director
19888 Sycamore Ridge Road
Murrieta, California 92563
Telephone: (951) 440-0441 Via Email:matthew@mynmark.com
Subject: Final Letter for Testing of Compacted Fill
Cherry Field Beach Homes
187,189,191 Cherry Street,
Carlsbad, California
Reference: Certification of Building Preparation
Proposed Cherry Field Beach Homes
187,189,191 Cherry Street
Carlsbad, California
CTE Job No. 10-13893T, dated September 11, 2017
Geotechnical Update Report
Proposed Three (3) Unit Condominium
187, 189, and 191 Cherry Avenue
Carlsbad, California
Coast Geotechnical Job No. W.O. P-493046, dated February 26, 2015
Mr. Castriotta:
As requested, Construction Testing & Engineering, Inc. (CTE) has performed the requested observation and testing of
materials during past and recent earthworks and construction for the Cherry Field Beach Homes and associated
improvements at the referenced site. This letter is provided as certification that the footing inspections, utility
backfills, and asphalt placement has been conducted in substantial conformance with the recommendations specified
in the approved project soils report completed Coast Geotechnical, dated February 26, 2015.
Field-testing of the compacted material indicate that fill materials were compacted to a minimum of 90 or 95, relative
compaction depending on location, of the laboratory maximum dry density as determined by test method ASTM D-
1557. Asphalt pavements were compacted to a minimum 95% relative compaction in accordance with ASTM
D2950/D2950M. Tabulated results of the field compaction testing performed are provided in the attached Table I,
“Compaction Test Summary.” The laboratory maximum density results are provided in Table II, “Laboratory Test
Results.”
This document is subject to the same limitations as the previous project geotechnical documents. The opportunity to
be of service is appreciated. If you have any questions, please do not hesitate to contact this office.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
Dan T. Math, GE #2665
Principal Engineer
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
TABLE I
COMPACTION TEST SUMMARY
** TEST FAILED, SEE RETEST 1
Job Name: Cherry Field Beach Homes Job No.10-13893T
Job Address:187, 189, 191, Cherry Street, Carlsbad, California 92009 Date:9/2/2020
Date Test Location Elevation Density Moisture Relative Soil
No. or Depth pcf Content Compaction Type
Feet % Dry %
Weight
2/28/2018 1 Exterior Walls -3.0 117.1 10..9 97%1
2/28/2018 2 Exterior Walls -3.0 118.3 11.1 98%1
2/28/2018 3 Exterior Walls -3.0 116.9 10.6 97%1
2/28/2018 4 Exterior Walls -3.0 118.0 10.8 98%1
2/26/2020 5 SE Curb and Gutter 61.0 111.8 4.3 92%1
2/26/2020 6 NE Curb and Gutter 61.0 110.3 4.2 91%1
2/26/2020 7 NE Curb and Gutter 61.0 109.6 6.5 91%1
2/26/2020 8 North Curb and Gutter 61.0 109.3 5.6 90%1
2/26/2020 9 Driveway #1 61.0 109.5 8.4 91%1
2/26/2020 10 East Side Walk 61.0 112.5 10.7 93%1
2/26/2020 11 North Side Walk 61.0 109.6 10.9 91%1
2/27/2020 12 SE Curb and Gutter, Retest #5 61.0 115.6 11.5 96%1
2/27/2020 13 NE Curb and Gutter, Retest #6 61.0 115.3 11.8 95%1
2/27/2020 14 NE Curb and Gutter, Retest #7 61.0 117.2 11.7 97%1
2/27/2020 15 North Curb and Gutter, Retest #8 61.0 118.2 12.0 98%1
2/27/2020 16 Driveway #1 61.0 115.6 11.8 96%1
2/27/2020 17 Driveway #2 61.0 116.2 11.6 96%1
2/27/2020 18 Driveway #3 61.0 115.8 11.9 96%1
3/2/2020 19 Curb & Gutter Base, Garfield Base 127.3 10.6 95%2
3/2/2020 20 Curb & Gutter Base, Garfield Base 127.6 9.9 96%2
3/2/2020 21 Curb & Gutter Base at Corner Garfield & Cherry Base 126.8 10.2 95%2
3/2/2020 22 Curb & Gutter Base, Cherry Base 128.9 8.6 97%2
3/2/2020 23 Curb & Gutter Base, Cherry Base 126.9 8.9 95%2
3/2/2020 24 Curb & Gutter Base, Cherry Base 126.8 9.2 95%2
3/4/2020 25 Curb & Gutter/Garfield Street Base 127.3 10.5 95%2
3/4/2020 26 Curb & Gutter/Garfield Street Base 127.9 10.6 96%2
3/4/2020 27 Curb & Gutter/Cherry Ave Base 129.3 10.4 97%2
3/4/2020 28 Curb & Gutter/Cherry Ave Base 129.2 11.1 97%2
3/4/2020 29 Curb & Gutter/Cherry Ave Base 128.2 11.0 96%2
3/4/2020 30 Curb & Gutter/Cherry Ave Base 127.8 10.9 96%2
4/2/2020 31 Garfield Street AC 140.3 -97%3
4/2/2020 32 Garfield Street AC 139.8 -97%3
4/2/2020 33 Cherry Ave AC 141.1 -98%3
4/2/2020 34 Cherry Ave AC 140.6 -97%3
4/2/2020 35 Cherry Ave AC 140.8 -98%3
TABLE II
LABORATORY TEST DATA
2
Job Name:Cherry Field Beach Homes Job No.10-13893T
Job Address:187, 189, 191, Cherry Street, Carlsbad, California 92009 Date 9/2/2020
Maximum Optimum
Sample No.Dry Density Moisture Soil
pcf Content Description
%wt
1 120.9 9.7
2 133.4 7.4
3 144.3 -Asphalt Concrete
Moderate Brown SM
Aggregate Base