Loading...
HomeMy WebLinkAbout2689 ROOSEVELT ST; ; CBRA2018-0228; PermitBuilding Permit Finaled (city of Carlsbad Residential Associated Permit Print Date: 12/02/2020 Permit No: CBRA2018-0228 Job Address: 2689 ROOSEVELT ST, CARLSBAD, CA 92008 Permit Type: BLDG-Associated Permit Residential Work Class: Condo CT140007 6 DEV04098 Parcel#: Valuation: 2031013806 $219,509.39 Occupancy Group: #of Dwelling Units: 1 Bedrooms: 2 Bathrooms: 2.5 Project Title: BEACHWALK AT ROOSEVELT Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check #: PC2018-0019 Plan Check #: Status: Applied: Issued: Finaled Close Out: Inspector: Final Inspection: Description: BEACHWALK AT ROOSEVELT: BLDG 4 // UNIT 6 // PLAN D // 1,313 SF LIV// 479 SF GARAGE// 70 SF DECK Applicant: VESTA PROPERTIES GEOFF MCCOMIC 18181ST AVE SAN DIEGO, CA 92101-2662 (616) 481-3830 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFO 561473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1 -MEDIUM Total Fees: $10,268.86 Total Payments To Date: Building Division $10,268.86 Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov Closed -Finaled 11/15/2018 01/11/2019 MColl 12/02/2020 AMOUNT $1,052.00 $677.49 $66.00 $175.00 $92.00 $182.00 $7,682.83 $9.00 $28.54 $246.00 $58.00 $0.00 Page 1 of 1 Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner: Work Class· Condo Issue Date: 01/11/2019 Subdivision; Status: Closed -Finaled Expiration Date: 08/10/2020 Address: 2689 ROOSEVELT ST IVR Number: 15495 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status BLDG-82 Drywall, 119298-2020 Passed Mlchael Colllns Complete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Yes BLDG-18 Exterior Lath and Yes Drywall BLDG-23 Gas-Test-Repairs y,.,s 02/24/2020 02/24/2020 BLDG-27 Shower 120096-2020 Failed Michael Collins Reinspection Incomplete Pan/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency hln 08/05/2020 08105/2020 BLDG-Electric Meter 134818-2020 Passed Chris Renfro Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 12/02/2020 12/02/2020 BLDG-Final Inspection 145171-2020 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Ye~ BLDG-Electrical Final Yes Wednesday, December 2, 2020 Page 3 of 3 Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner: Work Class: Condo 1ssue Data: 01/11/2019 Subdivision: Status· Closed -Finaled Expiration Date: 08/10/2020 Address: 2689 ROOSEVELT ST IVR Number: 15495 CARLSBAD, CA 92008 M••-••MMO-~••• Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, no super on site N,! BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLOG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 09/04/2019 09/04/2019 BLDG-15 Roof/ReRoof 1 02944-2019 Partial Pass Chris Renfro Reinspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency See back of card. Yes 10/11/2019 10/11/2019 BLDG-13 Shear 107386-2019 Passed Michael Collins Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Exterior shear only, see card for minor pick Yes up 01/06/2020 01/06/2020 BLDG-14 115366-2020 Failed Michael Collins Reinspection Incomplete Frame/Steel/Bolting/We ldlng (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, no super on site No BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 01/08/2020 01/06/2020 BLDG-14 115704-2020 Partial Pass Michael Collins Re1nspection Incomplete Frame/Steel/Bolting/We ldlng (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency Not ready, no super on site N"' BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 01/13/2020 01/13/2020 BLDG-16 Insulation 116068-2020 Passed Michael Colllns Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/27/2020 01/27/2020 BLDG-24 Rough/Topout 117725-2020 Failed Luke Storno Ruinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency Work not ready N,, 02/12/2020 02/12/2020 BLDG-27 Shower 119224-2020 Passed Michael Collins Complete Pan/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes Wednesday, December 2, 2020 Page 2 of 3 Building Permit Inspection History Finaled (City of Carlsbad ~::, h ); "*4'7H,* ~yf± *""" '• e, "'"'-= X* $ = J!>"4~ 'ii'Kw ?ti~/: -;:C ·;p:n INSllllaltt HISIDY for ccllliill:L~ -: Permit Type: BLDG-Associated Permit Residentic Work Class Condo Owner: Subdivision: Status: Closed -Finaled Application Date: 11/15/2018 Issue Date: 01/11/2019 Expiration Date 08/10/2020 IVR Number: 15495 Address: 2689 ROOSEVELT ST CARLSBAD, CA 92008 Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Inspection Scheduled Date Start Date -·· --·····---------·-------------------------· .. ···-- 02/2612019 04/1112019 04/1512019 06107/2019 0612712019 06/2812019 07102/2019 02/2612019 BLDG-21 084639-2019 Passed Michael Collins U ndergrou n d/U nderflo or Plumbing Checklist Item BLDG-Building Deficiency COMMENTS Waste to POC only 04/11/2019 BLDG-11 088664-2019 Failed Michael Collins F ou n datlo n/Ftg/Plers (Rebar) Checklist Item BLDG-Building Deficiency COMMENTS Not ready, complete underground electrical 0411512019 BLDG-11 088921-2019 Passed Michael Collins Foundatlon/Ftg/Plers (Rebar) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Ufer ok, see CBRA201 B-0223 for conduit notes Not ready, complete underground electrical 0610712019 BLDG-14 094152-2019 Partial Pass Mlchael Collins Frame/Steel/Bolting/We ldlng (Decks) Ct1ecklist Item BLDG-Building Deficiency COMMENTS 2nd floor, floor sheathing/drag nailing 06127/2019 BLDG-14 095956-2019 Failed Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Not ready, no super on site 2nd floor, floor sheathing/drag nailing 06128/2019 BLDG-14 096111-2019 Failed Michael Colllns Frame/Steel/Bolting/We ldlng (Decks) Checklist !tern BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Not ready, no super on site 2nd floor, floor sheathing/drag nailing 07102/2019 BLDG-14 096327-2019 Partial Pass Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Wednesday, December 2, 2020 Complete Passed Yes Rcinspcction Incomplete Passed Nu Complete Passed Yes Nn Re inspection Incomplete- Passed Yes Reinspection Incomplete Passed No Yes Reinspoction Incomplete Passed CJ Yes Ruinsp,~ction Incomplete Page 1 of 3 GeoTek, Inc. I S48 North Maple Street, Corona, California 92880 (9S1) 710-1160 Office (951) 710-1167 Fax www.geotekusa.com DAILY INSPECTION REPORT PROJECT NO: 3447-so CLIENT: Vesta pacific development ----------PROJECT: ;_R::::oos=e•:.::elt::,__..;9c..,,"-1(l,r,.::;.'}c__ ______________ DATE: 04110119 PROJECT LOCATION: -,r Roosevelt, Carlsbad, CA CONTRACTOR: Verdugoccnstruction PLANS BY: Gouvisenglneer DATED: --'-------~------------BUILDING PERMIT NO:CB RA:;201~ -(P 22. e APPROVED BY: Carlsbad PC2018-0019 DATED: ----- TYPE OF INSPECTION: Rebar SHEETS & DETAILS: LOCATION OF INSPECTION: _.::::See=be:::::low:::,_ _______________________ _ The following items were observed and / or tested: Inspection and obServatlon continues for SOG I FTG reinforcement for Building #2 Units 1 &2, building #3 units 3,4,5, building #1 units 8&9, Buliding #4 units 6,7,10 and 11. PermitsllCBAA2018-o223, CBRA2018-o224, CBRA2018-o225, CBRA2018-o226, CBRA2018-0227, CBRA2018-o230, CBAA20t8-0231, CBRA2018-o228, CBRA2018-0229, CBAA2018-0232, CBRA2018-o233 Verified rebar is securely tied, with laps and ctearance in place. #3@24" ocew, Cont (2)#4 TB, reinforcement for spread FTGs, All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule. FTGs are debris free, Anchors in ptaced for sm plates, strong wall and HDUs, Visqueen topped with 2• clean sand. General Notes, SN1, S01, exterior FTGs, foundation plans, Holddowns schedule 2500 psi Concrete scheduled for 04/11/t9@0700am TBD. Raguinaga@vestapacificdevelopment.com PAGE -----OF ------ !!]work observed during this inspection substantially complies to approved plans and specifications. ONot Complete. Work observed is still in progress and will require additional inspections. 4 Hours: ---------- SUPERVISOR: ~~ ~ Signature Desmond King S0#1169 /8132156 Print Name GEOTECHNICAL I ENVIRONMENTAL I MATERIALS I ™&h.C I iuN n::JtVICEII ! 3406 Texas Street San Diego, CA, 92104 619-261-9022 desmond@Kingisi.com www.Kingisi.com SPECIAL INSPECTION DAILY REPORT Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported IMMEDIATELY to the Superintendent. Each lnspeclion Report shall be completed and signed by the Special Inspector conducting the Inspection/ Testing. Project Name: Roosevelt Apartments / Date: 09/26/19 Buildin"" Permit#: Build #4 / Unit #6: CBAA2018-0228 Time Arrived: 1030am Proiect Location: 2875 RoosevelfStreet,----CarlsbBd; liA, 92008 Time Denarted: Contractor: Vesta Pacific Development Architect: Sub-Contractor: UPF Engineer: Inspection/ Material Description Sheathina, Anchors, nailina, strans, clins Samnles Ticket No#: AirTemn: lconcrete Temn: @ Mins. lSlumn: I I Aooroved Drawings: SN-1 , General notes Work Inspected: Inspection and Observation continues for Interior and Exterior Shearwalls. Verified stamped sheathing secured in place, All nails driven flush and staggered. Walls #2: 8d's@4/12, #3:3/12. #4 and #5: 2/12. All Header, Straps, Blocking, A35 Clips and Brackets per Shearwall Schedule. Holddown / anchors in place per plan schedule, engineers details. Hours: 4 Note : Partial interior inspection, All party walls: After plumbing, electrical, gas placement and insulation will be palace and wall closed, Fire stop @10'0". City inspector will verify prior to building being rapped. Report emailed to Super Raul WORK: ~ ~- INSPECTED l~ANCE WITH THE R~EMENTS OF THE APPROVED DOCUMENTS. MATERIAL SAMPLING:-~-;,:7 INSPECTED IN ACCORDA-NCE WITH T~EQ~S C/" OF THE APPROVED DOCUMENTS. LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK-UP THE WORK INSPECTED: ~PIP NQJ MfEI Signature of Special Inspector: ~ -- Print Name: Desmond King CERTIFICATION# SD #1169, ICC #8132156 S,gnature of Supenntendent ti;