HomeMy WebLinkAbout2689 ROOSEVELT ST; ; CBRA2018-0228; PermitBuilding Permit Finaled
(city of
Carlsbad
Residential Associated Permit
Print Date: 12/02/2020 Permit No: CBRA2018-0228
Job Address: 2689 ROOSEVELT ST, CARLSBAD, CA 92008
Permit Type: BLDG-Associated Permit Residential Work Class: Condo
CT140007
6
DEV04098
Parcel#:
Valuation:
2031013806
$219,509.39
Occupancy Group:
#of Dwelling Units: 1
Bedrooms: 2
Bathrooms: 2.5
Project Title: BEACHWALK AT ROOSEVELT
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check #: PC2018-0019
Plan Check #:
Status:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
Description: BEACHWALK AT ROOSEVELT: BLDG 4 // UNIT 6 // PLAN D // 1,313 SF LIV// 479 SF GARAGE// 70 SF DECK
Applicant:
VESTA PROPERTIES
GEOFF MCCOMIC
18181ST AVE
SAN DIEGO, CA 92101-2662
(616) 481-3830
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFO
561473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1 -MEDIUM
Total Fees: $10,268.86 Total Payments To Date:
Building Division
$10,268.86 Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Closed -Finaled
11/15/2018
01/11/2019
MColl
12/02/2020
AMOUNT
$1,052.00
$677.49
$66.00
$175.00
$92.00
$182.00
$7,682.83
$9.00
$28.54
$246.00
$58.00
$0.00
Page 1 of 1
Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner:
Work Class· Condo Issue Date: 01/11/2019 Subdivision;
Status: Closed -Finaled Expiration Date: 08/10/2020 Address: 2689 ROOSEVELT ST
IVR Number: 15495 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
BLDG-82 Drywall, 119298-2020 Passed Mlchael Colllns Complete
Exterior Lath, Gas Test,
Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs y,.,s
02/24/2020 02/24/2020 BLDG-27 Shower 120096-2020 Failed Michael Collins Reinspection Incomplete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency hln
08/05/2020 08105/2020 BLDG-Electric Meter 134818-2020 Passed Chris Renfro Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/02/2020 12/02/2020 BLDG-Final Inspection 145171-2020 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Ye~
BLDG-Electrical Final Yes
Wednesday, December 2, 2020 Page 3 of 3
Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner:
Work Class: Condo 1ssue Data: 01/11/2019 Subdivision:
Status· Closed -Finaled Expiration Date: 08/10/2020 Address: 2689 ROOSEVELT ST
IVR Number: 15495 CARLSBAD, CA 92008
M••-••MMO-~•••
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready, no super on site N,!
BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes
BLOG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
09/04/2019 09/04/2019 BLDG-15 Roof/ReRoof 1 02944-2019 Partial Pass Chris Renfro Reinspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency See back of card. Yes
10/11/2019 10/11/2019 BLDG-13 Shear 107386-2019 Passed Michael Collins Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Exterior shear only, see card for minor pick Yes
up
01/06/2020 01/06/2020 BLDG-14 115366-2020 Failed Michael Collins Reinspection Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready, no super on site No
BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
01/08/2020 01/06/2020 BLDG-14 115704-2020 Partial Pass Michael Collins Re1nspection Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes
BLDG-Building Deficiency Not ready, no super on site N"'
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
01/13/2020 01/13/2020 BLDG-16 Insulation 116068-2020 Passed Michael Colllns Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/27/2020 01/27/2020 BLDG-24 Rough/Topout 117725-2020 Failed Luke Storno Ruinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Work not ready N,,
02/12/2020 02/12/2020 BLDG-27 Shower 119224-2020 Passed Michael Collins Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Wednesday, December 2, 2020 Page 2 of 3
Building Permit Inspection History Finaled
(City of
Carlsbad
~::, h ); "*4'7H,* ~yf± *""" '• e, "'"'-= X* $ = J!>"4~ 'ii'Kw ?ti~/: -;:C ·;p:n INSllllaltt HISIDY for ccllliill:L~ -:
Permit Type: BLDG-Associated Permit Residentic
Work Class Condo
Owner:
Subdivision:
Status: Closed -Finaled
Application Date: 11/15/2018
Issue Date: 01/11/2019
Expiration Date 08/10/2020
IVR Number: 15495
Address: 2689 ROOSEVELT ST
CARLSBAD, CA 92008
Actual Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection Scheduled
Date Start Date -·· --·····---------·-------------------------· .. ···--
02/2612019
04/1112019
04/1512019
06107/2019
0612712019
06/2812019
07102/2019
02/2612019 BLDG-21 084639-2019 Passed Michael Collins
U ndergrou n d/U nderflo
or Plumbing
Checklist Item
BLDG-Building Deficiency
COMMENTS
Waste to POC only
04/11/2019 BLDG-11 088664-2019 Failed Michael Collins
F ou n datlo n/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
Not ready, complete underground electrical
0411512019 BLDG-11 088921-2019 Passed Michael Collins
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
Ufer ok, see CBRA201 B-0223 for conduit
notes
Not ready, complete underground electrical
0610712019 BLDG-14 094152-2019 Partial Pass Mlchael Collins
Frame/Steel/Bolting/We
ldlng (Decks)
Ct1ecklist Item
BLDG-Building Deficiency
COMMENTS
2nd floor, floor sheathing/drag nailing
06127/2019 BLDG-14 095956-2019 Failed Michael Collins
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
Not ready, no super on site
2nd floor, floor sheathing/drag nailing
06128/2019 BLDG-14 096111-2019 Failed Michael Colllns
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist !tern
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
Not ready, no super on site
2nd floor, floor sheathing/drag nailing
07102/2019 BLDG-14 096327-2019 Partial Pass Michael Collins
Frame/Steel/Bolting/We
ldlng (Decks)
Wednesday, December 2, 2020
Complete
Passed
Yes
Rcinspcction Incomplete
Passed
Nu
Complete
Passed
Yes
Nn
Re inspection Incomplete-
Passed
Yes
Reinspection Incomplete
Passed
No
Yes
Reinspoction Incomplete
Passed
CJ
Yes
Ruinsp,~ction Incomplete
Page 1 of 3
GeoTek, Inc.
I S48 North Maple Street, Corona, California 92880
(9S1) 710-1160 Office (951) 710-1167 Fax www.geotekusa.com
DAILY INSPECTION REPORT
PROJECT NO: 3447-so CLIENT: Vesta pacific development ----------PROJECT: ;_R::::oos=e•:.::elt::,__..;9c..,,"-1(l,r,.::;.'}c__ ______________ DATE: 04110119
PROJECT LOCATION: -,r Roosevelt, Carlsbad, CA
CONTRACTOR: Verdugoccnstruction PLANS BY: Gouvisenglneer DATED: --'-------~------------BUILDING PERMIT NO:CB RA:;201~ -(P 22. e APPROVED BY: Carlsbad PC2018-0019 DATED: -----
TYPE OF INSPECTION: Rebar SHEETS & DETAILS:
LOCATION OF INSPECTION: _.::::See=be:::::low:::,_ _______________________ _
The following items were observed and / or tested:
Inspection and obServatlon continues for SOG I FTG reinforcement for Building #2 Units 1 &2, building #3 units 3,4,5, building #1 units 8&9, Buliding #4
units 6,7,10 and 11.
PermitsllCBAA2018-o223, CBRA2018-o224, CBRA2018-o225, CBRA2018-o226, CBRA2018-0227, CBRA2018-o230, CBAA20t8-0231,
CBRA2018-o228, CBRA2018-0229, CBAA2018-0232, CBRA2018-o233
Verified rebar is securely tied, with laps and ctearance in place. #3@24" ocew, Cont (2)#4 TB, reinforcement for spread FTGs,
All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule.
FTGs are debris free, Anchors in ptaced for sm plates, strong wall and HDUs,
Visqueen topped with 2• clean sand.
General Notes, SN1, S01, exterior FTGs, foundation plans, Holddowns schedule
2500 psi Concrete scheduled for 04/11/t9@0700am TBD.
Raguinaga@vestapacificdevelopment.com
PAGE -----OF ------
!!]work observed during this inspection substantially
complies to approved plans and specifications. ONot Complete. Work observed is still in progress and
will require additional inspections.
4 Hours: ----------
SUPERVISOR: ~~
~
Signature
Desmond King S0#1169 /8132156
Print Name
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS
I ™&h.C I iuN n::JtVICEII !
3406 Texas Street
San Diego, CA, 92104
619-261-9022
desmond@Kingisi.com
www.Kingisi.com
SPECIAL INSPECTION DAILY REPORT
Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported
IMMEDIATELY to the Superintendent. Each lnspeclion Report shall be completed and signed by the Special
Inspector conducting the Inspection/ Testing.
Project Name: Roosevelt Apartments / Date: 09/26/19
Buildin"" Permit#: Build #4 / Unit #6: CBAA2018-0228 Time Arrived: 1030am
Proiect Location: 2875 RoosevelfStreet,----CarlsbBd; liA, 92008 Time Denarted:
Contractor: Vesta Pacific Development Architect:
Sub-Contractor: UPF Engineer:
Inspection/ Material Description Sheathina, Anchors, nailina, strans, clins
Samnles
Ticket No#: AirTemn: lconcrete Temn: @ Mins. lSlumn:
I I
Aooroved Drawings: SN-1 , General notes
Work Inspected:
Inspection and Observation continues for Interior and Exterior Shearwalls.
Verified stamped sheathing secured in place, All nails driven flush and staggered.
Walls #2: 8d's@4/12, #3:3/12. #4 and #5: 2/12.
All Header, Straps, Blocking, A35 Clips and Brackets per Shearwall Schedule.
Holddown / anchors in place per plan schedule, engineers details.
Hours: 4
Note : Partial interior inspection, All party walls: After plumbing, electrical, gas placement and insulation will be
palace and wall closed, Fire stop @10'0".
City inspector will verify prior to building being rapped.
Report emailed to Super Raul
WORK: ~ ~-
INSPECTED l~ANCE WITH THE R~EMENTS
OF THE APPROVED DOCUMENTS.
MATERIAL SAMPLING:-~-;,:7
INSPECTED IN ACCORDA-NCE WITH T~EQ~S C/"
OF THE APPROVED DOCUMENTS.
LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK-UP
THE WORK INSPECTED: ~PIP NQJ MfEI
Signature of Special Inspector: ~
--
Print Name: Desmond King
CERTIFICATION# SD #1169, ICC #8132156
S,gnature of Supenntendent ti;