Loading...
HomeMy WebLinkAbout2691 ROOSEVELT ST; ; CBRA2018-0229; PermitBuilding Permit Finaled (City of Carlsbad Residential Associated Permit Print Date: 12/02/2020 Permit No: CBRA2018-0229 Job Address: 2691 ROOSEVELT ST, CARLSBAD, CA 92008 Permit Type: BLDG-Associated Permit Residential Work Class: Parcel#: 2031013807 Track#: Valuation: $267,769.30 Lot#: Occupancy Group: #of Dwelling Units: 1 Project#: Plan#: Bedrooms: 3 Construction Type: Condo CT140007 7 DEV04098 Bathrooms: 3.0 Orig. Plan Check#: PC2018-0019 Plan Check#: Project Title: BEACHWALK AT ROOSEVELT Status: Applied: Issued: Finaled Close Out: Inspector: Final Inspection: Description: BEACHWALK AT ROOSEVELT: BLDG 4 // UNIT 7 //PLANA// 1,623 SF LIV// 434 SF GARAGE// 232 SF DECK Applicant: VESTA PROPERTIES GEOFF MCCOMIC 1818 1ST AVE SAN DIEGO, CA 92101-2662 (616) 481-3830 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL Total Fees: $11,942.37 Total Payments To Date: Building Division $11,942.37 Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov Closed -Finaled 11/15/2018 01/11/2019 MColl 12/02/2020 AMOUNT $1,222.40 $787.23 $66.00 $175.00 $92.00 $182.00 $9,371.93 $11.00 $34.81 $0.00 Page 1 of 1 Permit Type· BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner: Work Class. Condo Issue Date: 01/11/2019 Subdivision: Status: Closed -Finaled Expiration Date: 08/10/2020 Address: 2691 ROOSEVELT ST IVR Number: 15496 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status •--''" ~·-•---··· BLDG-82 Drywall, 119303-2020 Passed Michael Collins Complete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Y(;s BLDG-18 Exterior Lath and YBS Drywall BLDG-23 Gas-Test-Repairs Yes 02/24/2020 02/24/2020 BLDG-27 Shower 120095-2020 Failed Michael Collins Re inspection Incomplete Pan/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency No 08/06/2020 08106/2020 BLOG-Electric Meter 134944-2020 Passed Paul Burnette Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Ye~, ------· 12/02/2020 12/02/2020 BLOG-Final Inspection 145172-2020 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes Wednesday, December 2, 2020 Page 3 of 3 Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner: Work C!ass Condo Issue Date· 01/11/2019 Subdivision: Status: Closed -Finaled Expiration Date: 08/10/2020 Address: 2691 ROOSEVELT ST IVR Number: 15496 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status ~ "·"''~~·-·-·~·-· Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency Not ready, no super on site Nr,, BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 09/0412019 09/04/2019 BLDG-15 Roof/ReRoof 102945-2019 Partial Pass Chris Renfro Reinspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency See back of card. Yes 10/15/2019 10/15/2019 BLDG-13 Shear 107 435-2019 Passed Paul York Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/06/2020 01/0612020 BLDG-14 115367-2020 Failed Michael Collins Roinspection Incomplete Frame/Steel/Boltlng/We !ding (Decks) Checklist ltern COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes BLDG-Building Deficiency Not ready, no super on site No 01/08/2020 01/08/2020 BLDG-14 115703-2020 Partial Pass Mlchael Colllns Reinspection Incomplete Frame/Steel/Bolting/We !ding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, no super on site Nn BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 01/13/2020 01/13/2020 BLDG-16 Insulation 116070-2020 Passed Michael Collins Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/27/2020 01/27/2020 BLDG-17 Interior 117557-2020 Passed Luke Storno Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Drywall only Nu 02/12/2020 02/12/2020 BLDG-27 Shower 119226-2020 Passed Michael Collins Complete Pan/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes Wednesday, December 2, 2020 Page 2 of 3 Building Permit Inspection History Finaled Permit Type: BLDG-Associated Permit Residenti; Work Class Condo Application Date: 11/15/2018 Owner: Subdivision· ( City of Carlsbad Status. Closed -Finaled Issue Date: 01/11/2019 Expiration Date: 08/10/2020 IVR Number: 15496 Address: 2691 ROOSEVELT ST CARLSBAD, CA 92008 Scheduled Date Actual Inspection Type Start Date Inspection No, Inspection Primary Inspector Status -----·---------~-~.--- 02/28/2019 02/26/2019 BLDG-21 084640-2019 Passed Michael Collins Underground/LI nderflo or Plumbing BLDG-Building Deficiency COMMENTS Waste to POC only 04/11/2019 04/11/2019 BLDG-11 088666-2019 Failed Michael Collins 04/15/2019 08/07/2019 06/27/2019 Foundatlon/Ftg/Plers (Rebar) Checklist Item BLDG-Building Deficiency COMMENTS Not ready, complete underground electrical 04/15/2019 BLDG-11 Foundation/Ftg/Plers (Rebar) 088922-2019 Passed Michael Colllns Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Ufer ok, see CBRA2018-0223 for conduit notes Not ready, complete underground electrical 06/07/2019 BLDG-14 094153-2019 Partial Pass Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Checklist Item BLDG-Building Deficiency COMMENTS 2nd floor, floor sheathing/drag nailing 06/27/2019 BLDG-14 095957-2019 Failed Michael Collins Frame/Steel/Bolting/We lding (Decks) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Not ready, no super on site 2nd floor, floor sheathing/drag nailing 08/28/2019 06/28/2019 BLDG-14 096112-2019 Failed Michael Collins Frame/Steel/Boltlng!We ldlng (Decks) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS 2nd floor, floor sheathing/drag nailing Not ready, no super on site 07/02/2019 07/02/2019 BLDG-14 096492-2019 Partial Pass Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Wednesday, December 2, 2020 Reinspection Inspection Complete Passed 'res Rcinspection Incomplete Passed No Complete Passed Yes Reinspection Incomplete Passed Yes Reinspection Incomplete Passed No Yes Roinspection lncomplote Passed Yes f\i,; Reinspection Incomplete Page 1 of 3 KINGI ! IIISPECTION SElt.YJCES ! SPECIAL INSPECTION DAILY REPORT 3406 Texas Street San Diego, CA, 92104 619-261-9022 desmond@Kingisi.com www.Kingisi.com Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special Inspector conducting the Inspection/ Testing. Project Name: Roosevelt Apartments / Date: 09/26/19 Buildina Permit#: Build #4 / Unit #7: CBRA2018-0229 Time Arrived: 1030am Proiect Location: .::1;115 Roosevet .:itreet, 1...anscaa, CA, 92000 Time Denarted: Contractor: Vesta Pacific Development Architect: Sub-Contractor: UPF Engineer: Inspection / Material Description Sheathina, Anchors, nailina, straos, clips Samoles Ticket No#: AirTemo: [Concrete Temo: @ Mins. lSlumo : I I Approved Drawings; SN-1, General notes Work Inspected: Inspection and Observation continues for Interior and Exterior Shearwalls. Verified stamped sheathing secured in place, All nails driven flush and staggered. Walls #2: 8d's@4/12, #3:3/12. #4 and #5: 2/12. All Header, Straps, Blocking, A35 Clips and Brackets per Shearwall Schedule. Holddown I anchors in place per plan schedule,-engineers details. Hours: 4 Note: Partial interior inspection, All party walls: After plumbing, electrical, gas placement and insulation will be palace and wall closed, Fire stop @10'0". City inspector will verify prior to building being rapped. Report emailed to Super Raul WORK: ~ ~ INSPECTED l~CCei<o:ANCE WITH THE REQUIREMENTS OF THE APPROVED DOCUMENTS. MATERIAL SAMPJJNG:--~) INSPECTED IN ACCORDANCE WITH .;:;REQ~~~S C/ OF THE APPROVED DOCUMENTS. LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK-UP THE WORK INSPECTED: Bprp NOTMFFI Signature of Special Inspector: ~ Print Name: Desmond King CERTIFICATION#: SD #1169, ICC #8132156 Signature of Supenntendent: ¥; GeoTek, Inc. 1548 North Maple Street, Corona. California 92880 (951) 710-1160 Office (951) 710-1167 Fax www.geotekusa.com DAILY INSPECTION REPORT CLIENT: _~_e_•_••.;_P_•C1-·fi_·c_de_v_e1opm_.;___en_1 _________________ PROJECT NO: _344_7_.s_o ______ _ PROJECT: Roosevelt 9,(,9' DATE: 04/10/19 PROJECT LOCATION: .!_,!'!l!!..!:R~oo~seve~!!:.lt,.!:'.C~•rl~•ba~d,:_!:C~Ac_ ______________________ _ DATED: ____ _ CONTRACTOR:V _e.;_rd_u.,:go_con_stru __ cti_·on _____ .....,,__ PLANS BY: Gouvis engineer BUILDING PERMIT NO:CBt.ft 2016 -O '22. 'J APPROVED BY: Carlsbad PC2018-0019 DATED: ____ _ TYPE OF INSPECTION: .:.A.:,:eba=.r _______ SHEETS & DETAILS: LOCATION OF INSPECTION: ...:See2!!.~be~low!!_ _______________________ _ The following items were observed and / or tested: Inspection and observation continues for SOG / FTG reinforcement for Building 112 Units 1 &2, building #3 units 3,4,5, building #1 unhs 8&9, Bulidlng #4 unlts6,7,10and 11. Permits #CBAA2018-0223, CBRA2018-0224, CBRA2018-0225, CBAA2018-0226, CBRA2018·0227, CBAA2018-0230, CBRA2018-0231, CBAA201B-0228, CBRA2018-0229, CBRA2018-0232, CBRA2018-0233 Verified rebar Is securely tied, with laps and clearance in place. #3@24" ocew, Cont (2)#4 TB, reinforcement for spread FTGs, All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule. FTGs are debris free, Anchors in placed for sill plates, strong wall and HDUs, Visqueen topped wtth 2" ciean sand. General Notes, SN1, S01, exterior FTGs, foundation plans, Holddowns schedule 2500 psi Conaete scheduled for 04/11/19@0700am TBD. Raguinaga@vestapacfficdevelopment.com El Work observed during this inspection substantially complies to approved plans and specifications. 4 Hours: ---------- SUPERVISOR: ~"? PAGE OF ----------- □ Not Complete. Work observed is still in progress and will require additional inspections. ~ Signature Desmond King S0#1169 / 8132156 Print Name GEOTECHNICAL I ENVIRONMENTAL I MATERIALS EAGLE AIR 616 W. 3"0 AVE. ESCONDIDO, CA. 92025 PHONE: ?6D·4BD•0599 F'AX: 760•480•0698 January 2, 2020 Re: Vesta Pacific Development, Beachwalk @ Roosevelt To whom it may concern, The Bath fan installed at the BWR baths 2 and 3 with a 4" Connection will meet the required cfm for those rooms. The cfm for the size of the secondary baths calculates out to be 50 CFM. The 4" fan with the 5" duct will exceed the minimum by 30 cfm. Please see ASHRAE Standard 62.2 Table below. ASHRAE Standard 62 2 Table 71 T-7.1_ ..... _. -OuctT ...... Flea Duct Smooth Duct Fan Rating elm tD 0.25 so 80 100 125 so 80 100 in.w.1. Maximum Allowable Duct Lenoth (ft) Diameter, (In) Flex Duct Smooth Duct 3 X X X X 5 X X 4 70 3 X X 105 35 s 5 NL 70 35 20 NL 135 85 6 NL NL 125 95 NL NL NL 7 and abmie NL NL NL NL NL NL NL This table assumes no elbows. Dedud: 15 ft of allowable duct lanadh for each tum elbow or fittin•. NL"' no limit on duct IHloth of this size X ... not allowed am1 lenoth of duct of this size with assumed tums. elbows. flttlnos will exceed t~ rated IH'M.tt.ure dron Sincerely, Gary Boberg President • ,-..;:.::,:;Ml~.-:~'> . .,1,"t- 1\\.l~(Jf-:, ,~tCORD COPY CALIF"OANIA STATE CONTRACTORS LICENSE NUMBER 958703 125 X X 55 145 NL December 18, 2019 R. Geoffrey McComic Vesta Pacific Development 1818 First Ave, Suite I 00 San Diego, CA 92101 Re: Beachwalk at Roosevelt Stair Head-Out GECG Job No. 64139-505 Dear Mr. McComic, A TRUSTED PARTNf..R IN INNOVATION. QUA! ITY & srnv,cE Pursuant to your request regarding the above captioned project, we submit the following: It is structurally acceptable to rip I 3/4"xl4" LSL to I 3/4"x9" LSL at first floor right above the entry at Building 3, unit 4 and Building 5, unit 13 for head height clearance. We have reviewed the calculations for the beam and all the allowable stresses are still met. If you have any questions please do not hesitate to contact this office. Sincerely, GOUVIS ENGINEERING CONSULTING GROUP, INC. ,-~~/ Huan Nguyen, P.E. Executive Vice President, Partner 949.752.1612 15 Studebaker Irvine, CA 92618 www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam ■ ' 0.. 0 (.) 0 a: 0 (.) w a: