HomeMy WebLinkAbout2699 ROOSEVELT ST; ; CBRA2018-0233; PermitBuilding Permit Finaled
(City of
Carlsbad
Residential Associated Permit
Print Date: 12/03/2020 Permit No: CBRAZ0lS-0233
Job Address: 2699 ROOSEVELT ST, CARLSBAD, CA 92008
Permit Type: BLDG-Associated Permit Residential Work Class:
Parcel#: 2031013811 Track#:
Valuation: $219,509.39 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Project#:
Plan#:
Bedrooms: 2 Construction Type:
Condo
CT140007
11
DEV04098
Bathrooms: 2.5 Orig. Plan Check#: PC2018-0019
Plan Check#:
Project Title: BEACHWALK AT ROOSEVELT
Status:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
Description: BEACHWALK AT ROOSEVELT: BLDG 4 // UNIT 11 // PLAN D // 1,313 SF LIV// 479 SF GARAGE// 70 SF DECK
Applicant:
VESTA PROPERTIES
GEOFF MCCOMIC
18181ST AVE
SAN DIEGO, CA 92101-2662
(616) 481-3830
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outside CFD
TRAFFIC IMPACT Residential Condo Outside CFD
Total Fees: $16,692.86 Total Payments To Date:
Building Division
$13,636.86 Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-85601 I www.carlsbadca.gov
Closed -Finaled
11/15/2018
01/11/2019
MColl
12/03/2020
AMOUNT
$1,0S2.00
$677.49
$66.00
$175.00
$92.00
$182.00
$7,682.83
$9.00
$960.00
$28.54
$3,056.00
$2,712.00
$3,056.00
Page 1 of 1
Permit Type.
Work Clas$
Status
Scheduled
Date
08111/2020
12/02/2020
12/03/2020
BLDG-Associated Permit Residenti, Application Date:
Condo Issue Date:
Closed -Finaled Expiration Date:
Actual
Start Date
IVR Number:
Inspection Type Inspection No.
Checklist Item
BLDG-Building Deficiency
BLOG-17 Interior Lath-Drywall
BLDG-18 Exterior Lath and
Drywall
BLDG-23 Gas-Test-Repairs
COMMENTS
08/1112020 BLOG-Electric Meter
Release
135336-2020
Checklist Item COMMENTS
11/1512018
01/1112019
08/1012020
15500
Inspection
Status
Passed
BLDG-Building Deficiency EMR emailed to SDGE
12/02/2020 BLOG-Final Inspection
Checklist Item
145174-2020
COMMENTS
Failed
Owner:
Subdivision:
Address: 2699 ROOSEVELT ST
CARLSBAD, CA 92008
Primary Inspector
Michael Colllns
Chris Renfro
Reinspection
Passed
Yes
Yes
Yes
Yes
Passed
Yes
Inspection
Complete
Reinspection Incomplete
Passed
No
No
No
Nn
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final Double check GFCl's in garage and kitchen
12/03/2020 BLOG-Final Inspection
Checklist Item
145280-2020
COMMENTS
Passed Chris Renfro
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final Double check GFCl's in garage and kitchen
Passed
Yes
Yes
Yes
Yr:s
Yes
Complete
Thursday, December 3, 2020 Pago 3 of 3
Permit Type: BLDG-Associated Permit Residenti,
Work Class· Condo
Status· Closed -Finaled
Application Date: 11/15/2018
Issue Date: 01/11/2019
Expiration Date: 08/10/2020
15500
Owner:
Subdivision:
Address: 2699 ROOSEVELT ST
CARLSBAD, CA 92008
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Relnspection Inspection
"--~---·--,,~---
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes
BLDG-Building Deficiency Not ready, no super on site N,i
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
10/1112019 10/11/2019 BLDG-13 Shear 107387-2019 Passed Michael Collins Complete
Panels/HD {ok to wrap)
Checklist Item COMMENTS Passod
BLDG-Building Deficiency Exterior shear not, see card for minor pick Yes
up
01109/2020 0110912020 BLDG-14 115809-2020 F'artlal ?ass Michael Collins Reinspection Incomplete
Frame/Steel/Boltlng!We
!ding (Decks)
Checklist ttem COMMENTS Passed
BLDG-Building Deficiency Partial Yes
BLDG-Building Deficiency Not ready, no super on site N;,
BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes
01/13/2020 01113/2020 BLDG-16 lnsulatlon 116072-2020 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
0112812020 01128/2020 BLOG-17 Interior 117727-2020 Falled Michael Collins Rcinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
0112912020 0112912020 BLDG-17 Interior 117833-2020 Partial ?ass Michael Collins Re inspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Drywall only Yes
BLDG-Building Deficiency Not ready No
02/12/2020 02/12/2020 BLDG-27 Shower 119220-2020 ?assed Michael Collins Complete
?an/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-82 Drywall, 119301-2020 ?assed Mlchael Collins Complete
Exterior Lath, Gas Test,
Hot Mop
Thursday, December 3, 2020 Page 2 of 3
Building Permit Inspection History Finaled
Permit Type: BLDG-Associated Permit Residenti; ApplIcatIon Date: 11/15/2018 Owner:
Work Class Condo Subdivision:
( City of
Carlsbad
Status· Closed -Finaled
Issue Date 01/11/2019
Expiration Date 08/10/2020
IVR Number: 15500
Address: 2699 ROOSEVELT ST
CARLSBAD, CA 92008
Scheduled
Date
04111/2019
Actual Inspection Type
Start Date
02/2612019 BLDG-21
U nderg ro u nd/U nderf lo
or Plumbing
Checklist !tern
Inspection No. Inspection Primary Inspector
Status
084642-2019 Passed Michael Collins
COMMENTS
BLDG-Building Deficiency Waste to POC only
04111/2019 BLDG-11 088668-2019 Failed Michael Colllns
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
Not ready, complete underground electrical
04115/2019 0411512019 BLDG-11 088928-2019 Passed Michael Collins
06/07/2019
Foundatlon/Ftg/Piers
(Rebar)
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
Ufer ok, see CBRA2018-0223 for conduit
notes
Not ready, complete underground electrical
06/07/2019 BLDG-14 094154-2019 Partial Pass Michael Collins
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item
BLDG-Building Deficiency
COMMENTS
2nd floor, floor sheathing/drag nailing
06127/2019 08/27/2019 BLDG-14 095960-2019 Failed Michael Collins
Frame/Steel/Bolting/We
!ding (Decks)
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
2nd floor, floor sheathing/drag nailing
Not ready, no super on site
06/28/2019 06/28/2019 BLDG-14 096013-2019 Failed Michael Collins
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist !tom
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
Not ready, no super on site
2nd floor, floor sheathing/drag nailing
07/02/2019 07/02/2019 BLDG-14 096332-2019 Partial Pass Michael Collins
Thursday, December 3, 2020
Frame/Steel/Bolting/We
!ding (Decks)
Reinspection Inspection
Complete
Passed
Yes
Rcinspoction Incomplete
Passed
~h:
Complete
Passed
Yes
Yes
Reinspcction Incomplete
Passed
Yes
Re inspection Incomplete
Passed
Yes
Nu
Reinspection tncomplote
Passed
/~1_'
Yes
Reinspection Incomplete
Page 1 of 3
GeoTek, Inc.
1548 North Maple Street, Corona, California 92880
(951) 710-1160 Office (951) 710-1167 Fax www.geotekusa.com
DAILY INSPECTION REPORT
CLIENT: Vesta pacific development PROJECT NO: 3447-So ---------PROJECT: :;:Roos~e:!v!:'.elt~--1.s;:t::w,~?7~"----------------DATE: 04110119
PROJECT LOCATION: ... Roosevelt, Carlsbad, CA
CONTRACTOR: Verdugo construction PLANS BY: Gouvls engineer DATED: _____ _
BUILDING PERMIT NOC-/!JM20l(3-0~ 33 APPROVED BY: CarlsbadPC2018-0019 DATED: ____ _
TYPE OF INSPECTION: Rebar SHEETS & DETAILS:
LOCATION OF INSPECTION: ..=See=bel:::::ow:::_ _______________________ _
The following items were observed and / or tested:
Inspection and observation continues for SOG / FTG reinforcement for Building #2 Units 1 &2, building #3 units 3,4,5, building #1 units 8&9, Buliding #4
unit86,7,10and 11.
Pennits #CBRA2018-0223, CBRA2018-0224, CBRA2018-0225, CBRA2018·0226, CBRA2018-0227, CBRA2018-0230, CBRA2018-0231,
CBRA2018-0228, CBRA2018-0229, CBRA2018-0232, CBRA2018-0233
Verified rebar is securety tied, with laps and clearance in place. #3@24" ocew, Cont (2)#4 TB, reinforcement 1or spread FT Gs,
All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule.
FTGs are debris free, Anchors in placed for sill plates, strong wall and HDUs,
Visqueen topped with 2" clean sand.
General Notes, SN1. S01, exterior FTGs, foundation plans, Holddowns schedule
2500 psi Conaete scheduled for 04/11/19®0700am TBD.
Raguinaga@vestapaciftedevelopment.com
PAGE ___ _ OF ____ _
~ Work observed during this inspection substantially
complies to approved plans and specifications. ONot Complete. Work observed is still in progress and
will require additional inspections.
~
Hours: _• __________ _ Signature
SUPERVISOR: ~-;, Desmond King S0#1169 / 8132156
Print Name
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS
KINGI ! DUP.t.C nvlll SEJtVICl:II !
SPECIAL INSPECTION DAILY REPORT
3406 Texas Street
San Diego, CA, 92104
619-261-9022
desmond@Kingisi.com
www.Kingisi.com
Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported
IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special
Inspector conducting the Inspection/ Testing.
Project Name: Roosevelt Apartments I Date: 09/26/19
Buildlna Permit#: Build #4. Unit #11: CBRA2018-0233 Time Arrived: 1030am
Proiect Location: 2675 nooseve1t Street, vansbaa, CA, 9.!008 Time Oenarted:
Contractor: Vesta Pacific Development Architect:
Sub-Contractor: UPF Engineer:
Inspection / Material Description Sheathina, Anchors, nailina, straos, clios
Samoles
Ticket No#: AirTemo: I Concrete Temo : @ Mins. lSlumo:
I I
Approved Drawings: SN-1 , General notes
Work Inspected:
Inspection and Observation continues for Interior and Exterior Shearwalls.
Verified stamped sheathing secured in place, All nails driven flush and staggered.
Walls #2: 8d's@4/12, #3:3/12. #4 and #5: 2/12.
All Header, Straps. Blocking, A35 Clips and Brackets per Shearwall Schedule.
Holddown / anchors in place per plan schedule, engineers details.
Hours: 4
Note : Partial interior inspection, All party walls: After plumbing, electrical, gas placement and insulation will be
palace and wall closed, Fire stop @1 O'O".
City inspector will verify prior to building being rapped.
Report emailed to Super Raul
WORK: ~ ~----
INSPECTED 1k:.~ANCE WITH THE REQUIREMENTS
OF THE APPROVED OOCUMENTS.
MATERIAL SAMPLING:-~)
INSPECTED IN ACCORDANCE WITH T-H~EQ~~~S C/
OF THE APPROVED DOCUMENTS.
LAB 10 ATTACHED. SAMPLES SCHEDULED FOR PICK-UP
THE WORK INSPECTED: (3)rno NOT MFET .. ---
Signature of Special Inspector: ,;;p.--
Print Name: Desmond King
CERTIFICATION#: SD #1169, ICC #8132156
Signature of Supenntendent: ¥;