Loading...
HomeMy WebLinkAbout2699 ROOSEVELT ST; ; CBRA2018-0233; PermitBuilding Permit Finaled (City of Carlsbad Residential Associated Permit Print Date: 12/03/2020 Permit No: CBRAZ0lS-0233 Job Address: 2699 ROOSEVELT ST, CARLSBAD, CA 92008 Permit Type: BLDG-Associated Permit Residential Work Class: Parcel#: 2031013811 Track#: Valuation: $219,509.39 Lot#: Occupancy Group: #of Dwelling Units: 1 Project#: Plan#: Bedrooms: 2 Construction Type: Condo CT140007 11 DEV04098 Bathrooms: 2.5 Orig. Plan Check#: PC2018-0019 Plan Check#: Project Title: BEACHWALK AT ROOSEVELT Status: Applied: Issued: Finaled Close Out: Inspector: Final Inspection: Description: BEACHWALK AT ROOSEVELT: BLDG 4 // UNIT 11 // PLAN D // 1,313 SF LIV// 479 SF GARAGE// 70 SF DECK Applicant: VESTA PROPERTIES GEOFF MCCOMIC 18181ST AVE SAN DIEGO, CA 92101-2662 (616) 481-3830 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL TRAFFIC IMPACT Residential Condo Outside CFD TRAFFIC IMPACT Residential Condo Outside CFD Total Fees: $16,692.86 Total Payments To Date: Building Division $13,636.86 Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-85601 I www.carlsbadca.gov Closed -Finaled 11/15/2018 01/11/2019 MColl 12/03/2020 AMOUNT $1,0S2.00 $677.49 $66.00 $175.00 $92.00 $182.00 $7,682.83 $9.00 $960.00 $28.54 $3,056.00 $2,712.00 $3,056.00 Page 1 of 1 Permit Type. Work Clas$ Status Scheduled Date 08111/2020 12/02/2020 12/03/2020 BLDG-Associated Permit Residenti, Application Date: Condo Issue Date: Closed -Finaled Expiration Date: Actual Start Date IVR Number: Inspection Type Inspection No. Checklist Item BLDG-Building Deficiency BLOG-17 Interior Lath-Drywall BLDG-18 Exterior Lath and Drywall BLDG-23 Gas-Test-Repairs COMMENTS 08/1112020 BLOG-Electric Meter Release 135336-2020 Checklist Item COMMENTS 11/1512018 01/1112019 08/1012020 15500 Inspection Status Passed BLDG-Building Deficiency EMR emailed to SDGE 12/02/2020 BLOG-Final Inspection Checklist Item 145174-2020 COMMENTS Failed Owner: Subdivision: Address: 2699 ROOSEVELT ST CARLSBAD, CA 92008 Primary Inspector Michael Colllns Chris Renfro Reinspection Passed Yes Yes Yes Yes Passed Yes Inspection Complete Reinspection Incomplete Passed No No No Nn BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Double check GFCl's in garage and kitchen 12/03/2020 BLOG-Final Inspection Checklist Item 145280-2020 COMMENTS Passed Chris Renfro BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Double check GFCl's in garage and kitchen Passed Yes Yes Yes Yr:s Yes Complete Thursday, December 3, 2020 Pago 3 of 3 Permit Type: BLDG-Associated Permit Residenti, Work Class· Condo Status· Closed -Finaled Application Date: 11/15/2018 Issue Date: 01/11/2019 Expiration Date: 08/10/2020 15500 Owner: Subdivision: Address: 2699 ROOSEVELT ST CARLSBAD, CA 92008 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Relnspection Inspection "--~---·--,,~--- Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency Not ready, no super on site N,i BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 10/1112019 10/11/2019 BLDG-13 Shear 107387-2019 Passed Michael Collins Complete Panels/HD {ok to wrap) Checklist Item COMMENTS Passod BLDG-Building Deficiency Exterior shear not, see card for minor pick Yes up 01109/2020 0110912020 BLDG-14 115809-2020 F'artlal ?ass Michael Collins Reinspection Incomplete Frame/Steel/Boltlng!We !ding (Decks) Checklist ttem COMMENTS Passed BLDG-Building Deficiency Partial Yes BLDG-Building Deficiency Not ready, no super on site N;, BLDG-Building Deficiency 2nd floor, floor sheathing/drag nailing Yes BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yes 01/13/2020 01113/2020 BLDG-16 lnsulatlon 116072-2020 Passed Michael Collins Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 0112812020 01128/2020 BLOG-17 Interior 117727-2020 Falled Michael Collins Rcinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No 0112912020 0112912020 BLDG-17 Interior 117833-2020 Partial ?ass Michael Collins Re inspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Drywall only Yes BLDG-Building Deficiency Not ready No 02/12/2020 02/12/2020 BLDG-27 Shower 119220-2020 ?assed Michael Collins Complete ?an/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-82 Drywall, 119301-2020 ?assed Mlchael Collins Complete Exterior Lath, Gas Test, Hot Mop Thursday, December 3, 2020 Page 2 of 3 Building Permit Inspection History Finaled Permit Type: BLDG-Associated Permit Residenti; ApplIcatIon Date: 11/15/2018 Owner: Work Class Condo Subdivision: ( City of Carlsbad Status· Closed -Finaled Issue Date 01/11/2019 Expiration Date 08/10/2020 IVR Number: 15500 Address: 2699 ROOSEVELT ST CARLSBAD, CA 92008 Scheduled Date 04111/2019 Actual Inspection Type Start Date 02/2612019 BLDG-21 U nderg ro u nd/U nderf lo or Plumbing Checklist !tern Inspection No. Inspection Primary Inspector Status 084642-2019 Passed Michael Collins COMMENTS BLDG-Building Deficiency Waste to POC only 04111/2019 BLDG-11 088668-2019 Failed Michael Colllns Foundatlon/Ftg/Plers (Rebar) Checklist Item BLDG-Building Deficiency COMMENTS Not ready, complete underground electrical 04115/2019 0411512019 BLDG-11 088928-2019 Passed Michael Collins 06/07/2019 Foundatlon/Ftg/Piers (Rebar) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Ufer ok, see CBRA2018-0223 for conduit notes Not ready, complete underground electrical 06/07/2019 BLDG-14 094154-2019 Partial Pass Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Checklist Item BLDG-Building Deficiency COMMENTS 2nd floor, floor sheathing/drag nailing 06127/2019 08/27/2019 BLDG-14 095960-2019 Failed Michael Collins Frame/Steel/Bolting/We !ding (Decks) Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS 2nd floor, floor sheathing/drag nailing Not ready, no super on site 06/28/2019 06/28/2019 BLDG-14 096013-2019 Failed Michael Collins Frame/Steel/Bolting/We ldlng (Decks) Checklist !tom BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS Not ready, no super on site 2nd floor, floor sheathing/drag nailing 07/02/2019 07/02/2019 BLDG-14 096332-2019 Partial Pass Michael Collins Thursday, December 3, 2020 Frame/Steel/Bolting/We !ding (Decks) Reinspection Inspection Complete Passed Yes Rcinspoction Incomplete Passed ~h: Complete Passed Yes Yes Reinspcction Incomplete Passed Yes Re inspection Incomplete Passed Yes Nu Reinspection tncomplote Passed /~1_' Yes Reinspection Incomplete Page 1 of 3 GeoTek, Inc. 1548 North Maple Street, Corona, California 92880 (951) 710-1160 Office (951) 710-1167 Fax www.geotekusa.com DAILY INSPECTION REPORT CLIENT: Vesta pacific development PROJECT NO: 3447-So ---------PROJECT: :;:Roos~e:!v!:'.elt~--1.s;:t::w,~?7~"----------------DATE: 04110119 PROJECT LOCATION: ... Roosevelt, Carlsbad, CA CONTRACTOR: Verdugo construction PLANS BY: Gouvls engineer DATED: _____ _ BUILDING PERMIT NOC-/!JM20l(3-0~ 33 APPROVED BY: CarlsbadPC2018-0019 DATED: ____ _ TYPE OF INSPECTION: Rebar SHEETS & DETAILS: LOCATION OF INSPECTION: ..=See=bel:::::ow:::_ _______________________ _ The following items were observed and / or tested: Inspection and observation continues for SOG / FTG reinforcement for Building #2 Units 1 &2, building #3 units 3,4,5, building #1 units 8&9, Buliding #4 unit86,7,10and 11. Pennits #CBRA2018-0223, CBRA2018-0224, CBRA2018-0225, CBRA2018·0226, CBRA2018-0227, CBRA2018-0230, CBRA2018-0231, CBRA2018-0228, CBRA2018-0229, CBRA2018-0232, CBRA2018-0233 Verified rebar is securety tied, with laps and clearance in place. #3@24" ocew, Cont (2)#4 TB, reinforcement 1or spread FT Gs, All Pad FTGs verified, P3, P4, PS and P7 per Pad Schedule. FTGs are debris free, Anchors in placed for sill plates, strong wall and HDUs, Visqueen topped with 2" clean sand. General Notes, SN1. S01, exterior FTGs, foundation plans, Holddowns schedule 2500 psi Conaete scheduled for 04/11/19®0700am TBD. Raguinaga@vestapaciftedevelopment.com PAGE ___ _ OF ____ _ ~ Work observed during this inspection substantially complies to approved plans and specifications. ONot Complete. Work observed is still in progress and will require additional inspections. ~ Hours: _• __________ _ Signature SUPERVISOR: ~-;, Desmond King S0#1169 / 8132156 Print Name GEOTECHNICAL I ENVIRONMENTAL I MATERIALS KINGI ! DUP.t.C nvlll SEJtVICl:II ! SPECIAL INSPECTION DAILY REPORT 3406 Texas Street San Diego, CA, 92104 619-261-9022 desmond@Kingisi.com www.Kingisi.com Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special Inspector conducting the Inspection/ Testing. Project Name: Roosevelt Apartments I Date: 09/26/19 Buildlna Permit#: Build #4. Unit #11: CBRA2018-0233 Time Arrived: 1030am Proiect Location: 2675 nooseve1t Street, vansbaa, CA, 9.!008 Time Oenarted: Contractor: Vesta Pacific Development Architect: Sub-Contractor: UPF Engineer: Inspection / Material Description Sheathina, Anchors, nailina, straos, clios Samoles Ticket No#: AirTemo: I Concrete Temo : @ Mins. lSlumo: I I Approved Drawings: SN-1 , General notes Work Inspected: Inspection and Observation continues for Interior and Exterior Shearwalls. Verified stamped sheathing secured in place, All nails driven flush and staggered. Walls #2: 8d's@4/12, #3:3/12. #4 and #5: 2/12. All Header, Straps. Blocking, A35 Clips and Brackets per Shearwall Schedule. Holddown / anchors in place per plan schedule, engineers details. Hours: 4 Note : Partial interior inspection, All party walls: After plumbing, electrical, gas placement and insulation will be palace and wall closed, Fire stop @1 O'O". City inspector will verify prior to building being rapped. Report emailed to Super Raul WORK: ~ ~---- INSPECTED 1k:.~ANCE WITH THE REQUIREMENTS OF THE APPROVED OOCUMENTS. MATERIAL SAMPLING:-~) INSPECTED IN ACCORDANCE WITH T-H~EQ~~~S C/ OF THE APPROVED DOCUMENTS. LAB 10 ATTACHED. SAMPLES SCHEDULED FOR PICK-UP THE WORK INSPECTED: (3)rno NOT MFET .. --- Signature of Special Inspector: ,;;p.-- Print Name: Desmond King CERTIFICATION#: SD #1169, ICC #8132156 Signature of Supenntendent: ¥;