HomeMy WebLinkAbout2711 ROOSEVELT ST; ; CBRA2018-0238; PermitBuilding Permit Finaled
(city of
Carlsbad
Residential Associated Permit
Print Date: 12/03/2020 Permit No: CBRAZ0lS-0238
Job Address: 2711 ROOSEVELT ST, CARLSBAD, CA 92008
Permit Type: BLDG-Associated Permit Residential Work Class:
Parcel#: 2031013816 Track#:
Valuation: $273,201.07 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Project#:
Plan#:
Bedrooms: 3 Construction Type:
Condo
CT140007
16
DEV04098
Bathrooms: 3.0 Orig. Plan Check#: PC2018-0019
Plan Check#:
Project Title: BEACHWALK AT ROOSEVELT
Status:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
Description: BEACHWALK AT ROOSEVELT: BLDG 6 // UNIT 16 //PLANE// 1,664 SF LIV// 429 SF GARAGE// 204 SF DECK
Applicant:
VESTA PROPERTIES
GEOFF MCCOMIC
1818 1ST AVE
SAN DIEGO, CA 92101-2662
(616) 481-3830
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outside CFO
TRAFFIC IMPACT Residential Condo Outside CFD
Total Fees: $18,896.20 Total Payments To Date:
Building Division
$15,840.20 Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 i 760-602-8560 f I www.carlsbadca.gov
Closed -Finaled
11/15/2018
01/11/2019
MColl
12/03/2020
AMOUNT
$1,243.70
$800.94
$66.00
$175.00
$92.00
$182.00
$9,562.04
$11.00
$960.00
$35.52
$3,056.00
$2,712.00
$3,0S6.00
Page 1 of 1
Permit Type BLDG-Associated Permit Residenti, App!icatwn Date
Work Class: Condo Issue Date:
Status: Closed -Finaled Expiration Date:
lVR Number:
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No.
Thursday, December 3, 2020
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
11/1512018
01/11/2019
01/2512021
15505
Inspection
Status
Owner·
Subdivision:
Address: 2711 ROOSEVELT ST
CARLSBAD, CA 92008
Primary Inspector Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Pago 3 of 3
Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner:
Work Class Condo Issue Date: 01/11/2019 Subdivision:
Status· Closed -Finaled Expiration Date: 01/25/2021 Address: 2711 ROOSEVELT ST
IVR Number: 15505 CARLSBAD, CA 92008
• -•~~-••-M-M -·--~-·· -.. ,.~.
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Minor pick up Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLOG-24 Rough-Topout Yes
BLOG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
02/03/2020 02/03/2020 BLDG-16 lnsulatlon 118268-2020 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
02/18/2020 02/18/2020 BLDG-17 Interior 119653-2020 Passed Luke Storno Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ne
02/25/2020 02/25/2020 BL0G-17 Interior 120283-2020 Passtm Michael Collins Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-82 Drywall, 120506-2020 Passed Mlchael Collins Complete
Exterior Lath, Gas Test,
Hot Mop
Checklist ltem COMMENTS Passed
BLDG-Building Deficiency Ye~
BLOG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
07/29/2020 07/29/2020 BLDG-11 134073-2020 Partial Pass Michael Collins Reinspection Incomplete
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Deck column footing/steel Yes
08/24/2020 08/24/2020 BLDG-Electrlc Meter 136455-2020 Passed Paul Burnette Complete
Release
Chec.khst Item COMMENTS Passed
BLDG~Building Deficiency Yes
12/03/2020 12/03/2020 BLDG-Final Inspection 145283-2020 Passed Chris Renfro Complete
Thursday, December 3, 2020 Page 2 ol 3
Building Permit Inspection History Finaled
Permit Type· BLDG-Associated Permit Residenti: Application Date: 11/15/2018 Owner:
Work Class· Condo Issue Date: 01/11/2019 Subdivision:
( City of
Carlsbad
Statlls: Closed -Finaled Expiration Date: 01/25/2021 Addrnss: 2711 ROOSEVELT ST
IVR Number 15505 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status ---·-~·---··
02/27/2019 02/27/2019 BLDG-21 084785-2019 Passed Michael Colllns Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Waste to POC Yes
04/23/2019 04/23/2019 BLDG-11 089717-2019 Passed Michael Collins Complete
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ufer ok Yes
06/10/2019 06/10/2019 BLDG-14 094253-2019 Partial Pass Michael Collins Reinspection Incomplete
Frame/Steel/Boltlng/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
07/02/2019 07/02/2019 BLDG-14 096343-2019 Partial Pass Michael Collins Roinspoction Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes
BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yt~S
09/04/2019 09/04/2019 BLDG-15 Rool/ReRoof 102995-2019 Partial Pass Chris Renfro Re inspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency See back of card. Yes
11/14/2019 11/14/2019 BLDG-13 Shear 110852-2019 Passed Michael Collins Complete
Panels/HD (ok to wrap)
Checklist !tem COMMENTS Passed
BLDG-Building Deficiency Ye::,
01/09/2020 01/09/2020 BLDG-Fire Final 105142-2019 Failed Felix Salcedo Roinspoction tncomplc-tc
Checklist Item COMMENTS Passed
FIRE-Building Final No
01/29/2020 01/29/2020 BLDG-84 Rough 117954-2020 Passed Michael Collins Complete
Combo(14,24,34,44)
Thursday, December 3, 2020 Page 1 of 3
GeoTek, Inc.
1548 North Maple Street, Corona, California 92880
(951) 710-1160 Office (9S1) 710-1167 Fax www.geotekusa.com
DAILY INSPECTION REPORT
CLIENT: Vesta pacific development PROJECT NO: 3447-SD ----------PROJECT: Roosevelt DATE: 04/16/19 -------.--:-:,------------------PROJECT LOCATION: :J.. ') ( I Roosevelt, Carlsbad, CA ------~--~--------------------------CONTRACTOR: Verdugo construction PLANS BY: Gouvis engineer DATED: ------BUILDING PERMIT NO:CB/l.lf2.Ol'ii!,-~Z'3f;$ APPROVED BY: Carlsbad PC201B-0019 DATED: ____ _
TYPE OF INSPECTION: Rebar SHEETS & DETAILS:
LOCATION OF INSPECTION: see below ~---------------------------------
The following items were observed and / or tested:
Inspection and observation continues for SOG I FTG reinforcement for Building #5, Untt 12, 13 and 14, Building #6, units 15 and 16.
Permits #CBRA2018-0234, #CBRA2018-0235, #CBRA2018--0236, #CBRA2018--0237, #CBRA2018-0238.
Verified rebar is secur&ly tied, with laps, ties and clearance in place. Cont (2)#4 TB, #4@24N ocew for SOG,
Reinforcement for spread FTGs, (4}#4ocew, (6)#4ocew, (7)#5ocew, All Ped FTGs verified, P3, P4, PS and P7 per Pad Schedule.
FTGs are debris free, Anchors in placed for Sill plates, Simpsons Strong-walls and HDUs,
Visqueen topped with 2" clean sand. 2" Dobies being placed.
General Notes, SN1, 501, exterior FTGs, foundation plans, Holddowns schedule.
2500psi concrete to be scheduled. TBD.
Raguinaga@vestapacificdevelopment.com
PAGE 1 OF
~Work observed during this inspection substantially
complies to approved plans and specifications.
4 Hours: ------------
SUPERVISOR: ec::::-~
------------
0Not Complete. Work observed is still in progress and
will require additional inspections.
Signature
Desmond King SD#1169 / 8132156
Print Name
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS
K:INGI
, ... PLC I ION SICitVICE8 I
SPECIAL INSPECTION DAILY REPORT
3406 Texas Street
San Diego, CA, 92104
619-261-9022
desmond@Kingisi.com
www.Kingisi.com
Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported
IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special
Inspector conducting the Inspection/ Testing.
Project Name: Roosevelt Apartments I Date: 10/17/19
Buildinn Permit#: oUhu ,,o. urn,,, i o. -~·,, •--' io-.... -.... .., Time Arrived: 7am
Prolect Location: 267::1 Hooseve1t :::;tree!, liansoaa, ..,,..., 9~00ts Time Denarted:
Contractor: Vesta Pacific Development Architect:
Sub-Contractor: UPF Engineer:
Inspection / Material Description Sheathina, Anchors, nailina, straos, clios
Samoles
Ticket No#: AirTemo: l Concrete Temo : @ Mins. lSlumo:
I I
Approved Drawings: SN-1 • General notes
Work Inspected:
Inspection and Observation continues for Interior and Exterior Shearwalls.
Verified stamped sheathing secured in place, All-nails driven flush and staggered.
Walls #2: Bd's@4/12, #3:3/12. #4 and #5: 2112.
All Header, Sfraps, Blocking, A35. Clips and Brackets. per St:iearwall Schedule.
Holddown / anchors in place per plan schedule, engineers details.
Hours: 4
Note: Partial interior jnspection, All partyWalls: Afterpli.Jrribin.9, eTeclrical, gas placement and ins1Jl~tioh willbt
palace andwall closed, Fire stop @10'0".
City inspector will verify prior to building being rapped.
Report emailed to Super Raul
WORK:~~
INSPECTED l~NCE WITH THE REQUIREMENTS
OF THE APPROVED DOCUMENTS.
MATERIAL SAMP.UNG:-~
INSPECTED IN ACCORDANCE WITH T-:-~EQ~E~S C/
OF THE APPROVED DOCUMENTS.
LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK·UP
THE WORK INSPECTED: ep,p Nm MEEI
Signature of Special Inspector: ~
Print Name: Desmond King
CERTIFICATION#: SD #1169, ICC #8132156
Signature of Superintendent:¥-;