Loading...
HomeMy WebLinkAbout2711 ROOSEVELT ST; ; CBRA2018-0238; PermitBuilding Permit Finaled (city of Carlsbad Residential Associated Permit Print Date: 12/03/2020 Permit No: CBRAZ0lS-0238 Job Address: 2711 ROOSEVELT ST, CARLSBAD, CA 92008 Permit Type: BLDG-Associated Permit Residential Work Class: Parcel#: 2031013816 Track#: Valuation: $273,201.07 Lot#: Occupancy Group: #of Dwelling Units: 1 Project#: Plan#: Bedrooms: 3 Construction Type: Condo CT140007 16 DEV04098 Bathrooms: 3.0 Orig. Plan Check#: PC2018-0019 Plan Check#: Project Title: BEACHWALK AT ROOSEVELT Status: Applied: Issued: Finaled Close Out: Inspector: Final Inspection: Description: BEACHWALK AT ROOSEVELT: BLDG 6 // UNIT 16 //PLANE// 1,664 SF LIV// 429 SF GARAGE// 204 SF DECK Applicant: VESTA PROPERTIES GEOFF MCCOMIC 1818 1ST AVE SAN DIEGO, CA 92101-2662 (616) 481-3830 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL TRAFFIC IMPACT Residential Condo Outside CFO TRAFFIC IMPACT Residential Condo Outside CFD Total Fees: $18,896.20 Total Payments To Date: Building Division $15,840.20 Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 i 760-602-8560 f I www.carlsbadca.gov Closed -Finaled 11/15/2018 01/11/2019 MColl 12/03/2020 AMOUNT $1,243.70 $800.94 $66.00 $175.00 $92.00 $182.00 $9,562.04 $11.00 $960.00 $35.52 $3,056.00 $2,712.00 $3,0S6.00 Page 1 of 1 Permit Type BLDG-Associated Permit Residenti, App!icatwn Date Work Class: Condo Issue Date: Status: Closed -Finaled Expiration Date: lVR Number: Scheduled Date Actual Inspection Type Start Date Inspection No. Thursday, December 3, 2020 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS 11/1512018 01/11/2019 01/2512021 15505 Inspection Status Owner· Subdivision: Address: 2711 ROOSEVELT ST CARLSBAD, CA 92008 Primary Inspector Reinspection Inspection Passed Yes Yes Yes Yes Yes Pago 3 of 3 Permit Type: BLDG-Associated Permit Residenti, Application Date: 11/15/2018 Owner: Work Class Condo Issue Date: 01/11/2019 Subdivision: Status· Closed -Finaled Expiration Date: 01/25/2021 Address: 2711 ROOSEVELT ST IVR Number: 15505 CARLSBAD, CA 92008 • -•~~-••-M-M -·--~-·· -.. ,.~. Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed BLOG-Building Deficiency Minor pick up Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLOG-24 Rough-Topout Yes BLOG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 02/03/2020 02/03/2020 BLDG-16 lnsulatlon 118268-2020 Passed Michael Collins Complete Checklist Item COMMENTS Passed BLOG-Building Deficiency Yes 02/18/2020 02/18/2020 BLDG-17 Interior 119653-2020 Passed Luke Storno Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Ne 02/25/2020 02/25/2020 BL0G-17 Interior 120283-2020 Passtm Michael Collins Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-82 Drywall, 120506-2020 Passed Mlchael Collins Complete Exterior Lath, Gas Test, Hot Mop Checklist ltem COMMENTS Passed BLDG-Building Deficiency Ye~ BLOG-17 Interior Lath-Drywall Yes BLDG-18 Exterior Lath and Yes Drywall BLDG-23 Gas-Test-Repairs Yes 07/29/2020 07/29/2020 BLDG-11 134073-2020 Partial Pass Michael Collins Reinspection Incomplete Foundatlon/Ftg/Plers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Deck column footing/steel Yes 08/24/2020 08/24/2020 BLDG-Electrlc Meter 136455-2020 Passed Paul Burnette Complete Release Chec.khst Item COMMENTS Passed BLDG~Building Deficiency Yes 12/03/2020 12/03/2020 BLDG-Final Inspection 145283-2020 Passed Chris Renfro Complete Thursday, December 3, 2020 Page 2 ol 3 Building Permit Inspection History Finaled Permit Type· BLDG-Associated Permit Residenti: Application Date: 11/15/2018 Owner: Work Class· Condo Issue Date: 01/11/2019 Subdivision: ( City of Carlsbad Statlls: Closed -Finaled Expiration Date: 01/25/2021 Addrnss: 2711 ROOSEVELT ST IVR Number 15505 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status ---·-~·---·· 02/27/2019 02/27/2019 BLDG-21 084785-2019 Passed Michael Colllns Complete Underground/Underflo or Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Waste to POC Yes 04/23/2019 04/23/2019 BLDG-11 089717-2019 Passed Michael Collins Complete Foundatlon/Ftg/Plers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Ufer ok Yes 06/10/2019 06/10/2019 BLDG-14 094253-2019 Partial Pass Michael Collins Reinspection Incomplete Frame/Steel/Boltlng/We ldlng (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes 07/02/2019 07/02/2019 BLDG-14 096343-2019 Partial Pass Michael Collins Roinspoction Incomplete Frame/Steel/Bolting/We ldlng (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor, floor sheathing and drag nailing Yes BLDG-Building Deficiency 3rd floor, floor sheathing and drag nailing Yt~S 09/04/2019 09/04/2019 BLDG-15 Rool/ReRoof 102995-2019 Partial Pass Chris Renfro Re inspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency See back of card. Yes 11/14/2019 11/14/2019 BLDG-13 Shear 110852-2019 Passed Michael Collins Complete Panels/HD (ok to wrap) Checklist !tem COMMENTS Passed BLDG-Building Deficiency Ye::, 01/09/2020 01/09/2020 BLDG-Fire Final 105142-2019 Failed Felix Salcedo Roinspoction tncomplc-tc Checklist Item COMMENTS Passed FIRE-Building Final No 01/29/2020 01/29/2020 BLDG-84 Rough 117954-2020 Passed Michael Collins Complete Combo(14,24,34,44) Thursday, December 3, 2020 Page 1 of 3 GeoTek, Inc. 1548 North Maple Street, Corona, California 92880 (951) 710-1160 Office (9S1) 710-1167 Fax www.geotekusa.com DAILY INSPECTION REPORT CLIENT: Vesta pacific development PROJECT NO: 3447-SD ----------PROJECT: Roosevelt DATE: 04/16/19 -------.--:-:,------------------PROJECT LOCATION: :J.. ') ( I Roosevelt, Carlsbad, CA ------~--~--------------------------CONTRACTOR: Verdugo construction PLANS BY: Gouvis engineer DATED: ------BUILDING PERMIT NO:CB/l.lf2.Ol'ii!,-~Z'3f;$ APPROVED BY: Carlsbad PC201B-0019 DATED: ____ _ TYPE OF INSPECTION: Rebar SHEETS & DETAILS: LOCATION OF INSPECTION: see below ~--------------------------------- The following items were observed and / or tested: Inspection and observation continues for SOG I FTG reinforcement for Building #5, Untt 12, 13 and 14, Building #6, units 15 and 16. Permits #CBRA2018-0234, #CBRA2018-0235, #CBRA2018--0236, #CBRA2018--0237, #CBRA2018-0238. Verified rebar is secur&ly tied, with laps, ties and clearance in place. Cont (2)#4 TB, #4@24N ocew for SOG, Reinforcement for spread FTGs, (4}#4ocew, (6)#4ocew, (7)#5ocew, All Ped FTGs verified, P3, P4, PS and P7 per Pad Schedule. FTGs are debris free, Anchors in placed for Sill plates, Simpsons Strong-walls and HDUs, Visqueen topped with 2" clean sand. 2" Dobies being placed. General Notes, SN1, 501, exterior FTGs, foundation plans, Holddowns schedule. 2500psi concrete to be scheduled. TBD. Raguinaga@vestapacificdevelopment.com PAGE 1 OF ~Work observed during this inspection substantially complies to approved plans and specifications. 4 Hours: ------------ SUPERVISOR: ec::::-~ ------------ 0Not Complete. Work observed is still in progress and will require additional inspections. Signature Desmond King SD#1169 / 8132156 Print Name GEOTECHNICAL I ENVIRONMENTAL I MATERIALS K:INGI , ... PLC I ION SICitVICE8 I SPECIAL INSPECTION DAILY REPORT 3406 Texas Street San Diego, CA, 92104 619-261-9022 desmond@Kingisi.com www.Kingisi.com Special Inspection Reports shall be prepared on a Daily Basis. All Non-Compliant conditions must be reported IMMEDIATELY to the Superintendent. Each Inspection Report shall be completed and signed by the Special Inspector conducting the Inspection/ Testing. Project Name: Roosevelt Apartments I Date: 10/17/19 Buildinn Permit#: oUhu ,,o. urn,,, i o. -~·,, •--' io-.... -.... .., Time Arrived: 7am Prolect Location: 267::1 Hooseve1t :::;tree!, liansoaa, ..,,..., 9~00ts Time Denarted: Contractor: Vesta Pacific Development Architect: Sub-Contractor: UPF Engineer: Inspection / Material Description Sheathina, Anchors, nailina, straos, clios Samoles Ticket No#: AirTemo: l Concrete Temo : @ Mins. lSlumo: I I Approved Drawings: SN-1 • General notes Work Inspected: Inspection and Observation continues for Interior and Exterior Shearwalls. Verified stamped sheathing secured in place, All-nails driven flush and staggered. Walls #2: Bd's@4/12, #3:3/12. #4 and #5: 2112. All Header, Sfraps, Blocking, A35. Clips and Brackets. per St:iearwall Schedule. Holddown / anchors in place per plan schedule, engineers details. Hours: 4 Note: Partial interior jnspection, All partyWalls: Afterpli.Jrribin.9, eTeclrical, gas placement and ins1Jl~tioh willbt palace andwall closed, Fire stop @10'0". City inspector will verify prior to building being rapped. Report emailed to Super Raul WORK:~~ INSPECTED l~NCE WITH THE REQUIREMENTS OF THE APPROVED DOCUMENTS. MATERIAL SAMP.UNG:-~ INSPECTED IN ACCORDANCE WITH T-:-~EQ~E~S C/ OF THE APPROVED DOCUMENTS. LAB ID ATTACHED, SAMPLES SCHEDULED FOR PICK·UP THE WORK INSPECTED: ep,p Nm MEEI Signature of Special Inspector: ~ Print Name: Desmond King CERTIFICATION#: SD #1169, ICC #8132156 Signature of Superintendent:¥-;