Loading...
HomeMy WebLinkAbout2869 SEGOVIA WAY; ; CB010288; Permitl City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04/17/2001 Residential Permit Permit No:CB010288 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 04/17/2001 # Dwelling Units: Bedrooms: Project Title: Building Inspection Request Line (760) 602-2725 2869 SEGOVIA WY CBAD RESDNTL Sub Type: 2552804200 Lot #: $325,564.00 Construction Type: Reference #: 1 Structure Type: 4 Bathrooms: ARBOR HEIGHTS-LC VLLY-PHASE 8 PLAN 3, 3590 SF, 701 SF GAR SFD 526 VN CT88-03 SFD 4 Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 01/10/2001 RMA Plan Approved: 04/17/2001 PC99-161 PC01-06 Applicant: KHOVNANIAN STE 100 K HOVNANIAN AT ARBOR HEIGHTS LL C 5900 PASTEUR CT CARLSBAD CA 92008 760 944-9012 Total Fees: $13,547.31 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD#2 Fee BTD#3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee 2495 CAMPUS DR IRVINE CA 92612 6843 04/17/01 0002 01 CGP Total Payments To Date: $0.00 Balance Due: $13,547.31 $1,242.64 $0.00 $807.72 $0.00 ($64.62) $32.56 $0.00 $0.00 $310.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Master Drainage Fee: Sewer Fee: Additional Fees: TOTAL PERMIT FEES FINAL APPROVAL Date: l h -1-:<o:: b I Clearance: $0.00 $0.00 $0.00 $4,374.25 $5,925.26 $0.00 $0.00 $0.00 $600.00 $0.00 $0.00 $196.00 $60.00 $63.50 $0.00 $0.00 $0.00 $0.00 $0.00 $13,547.31 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions: You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otheiwise ex ired. 02 13547-31 I/ ./1 V I;' I 7 c.J,-,,; 0 / .' / UNSCHEDULED BUILDING INSPECTION DATE \ 0 -"'-. S--6 I INSPECTOR --"-AJ""-'-'P __ _ PERMIT# 0 \ -() ~ct~ . PLAN CHECK# ___ _ . JOB ADDRESS '---i fuif ~ ~ DESCRIPTION ~ 15"' R (, CODE DESCRIPTION ACT COMMENTS City of Carlsbad Bldg Inspection Request For: 10/24/2001 Permit# CB010288 Title: ARBOR HEIGHTS-LC VLL Y-PHASE 8 Description: PLAN 3, 3590 SF, 701 SF GAR Type: RESDNTL Sub Type: SFD Job Address: 2869 SEGOVIA WY Suite: Lot 526 Location: APPLICANT K HOVNANIAN Owner: K HOVNANIAN AT ARBOR HEIGHTS LL C Remarks: Total Time: CD Description 19 29 Final Structural Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lns'1eClion HistO(¥ Date Description 09/25/2001 39 Final Electrical 09/25/2001 89 Final Combo 08/14/2001 82 Drywall/Ext Lath/Gas Test 08/13/2001 82 Drywall/Ext Lath/Gas Test 08/06/2001 16 Insulation 08/02/2001 84 Rough Combo 07/19/2001 13 Shear Panels/HD's Act Comments c,o Act lnsp Comments AP NF EMR AP NF AP NF NR NF AP NF AP NF AP NF Inspector Assignment: NF --- Requested By: JUSTIN Entered By: CHRISTINE 07/19/2001 15 Roof/Reroof CA NF APPD ON 7/13 07/13/2001 15 Roof/Reroof AP NF 05/15/2001 11 Fig/Foundation/Piers AP NF 05/15/2001 12 Steel/Bond Beam AP NF 05/08/2001 21 Underground/Under Floor AP NF 05/07/2001 21 Underground/Under Floor NS NF WORKING EARLY 05/04/2001 21 Underground/Under Floor NR NF 05/03/2001 21 Underground/Under Floor AP NF 05/03/2001 22 Sewer/Water Service AP NF \... 10/25/01 THU 12 : H Fil 7809449845 K HOVNANIAN ARBOR HTS City of Carlsbad 1,95 fQraday Avenue, C.rbbed caJlfomla 92008 INSPECHON .RECORD INSPECTION RECC>RO CARD WiTH APPROVED PLANS M'UST BE KEPT ON THE JOB . CALL PRIOR TO.2:00 P.M. FOR NEXT WORK DAY INSPECTION BUILDIN9 INSPECTION:. (760) 602-2725 raioo3 JOB ADDRESS: ________________ _ _ __ LOT NO./SUITE: ______ _ OWNERS NAME: __ _ YSE/OCEUPANC) BUILDING OTHER OB010288 2869 SEGOVIA WY CBAD ARBOR HEIGHTS-LC Vll Y-PHASE B PLAN 3, 3590 SF. 701 SF GAR RESDNTL SFD Loi#: 528 K HOVNANIAN APl'ROVID TO COVER Type of lnspKt!Oll Datt Inspector IUILDINC . FOUNDATION I~_,,. () REINFORCED STEEL -, iof"""""""'<,,• MASONRY □GROUT □WALL DRAINS TILT PANELS POUR STRIPS ./ COLUMN FOOTINGS SUBFRAME (:]FLOOR □ CEJLING ~ ROOF SHEATHING 1'1 -, .. . A J . EXT. SHEAR PANELS l'i-1111_., -:Y. •~we l1t-").·•I o,.' \. ... UlATION ~ ~ '-"l __ v • EXTERIOR lAlrl a_ 1..J T INTIRIOR LATH & DRYWALL ... , ·.,<. I FINAL l'LUMIING □ SEWER t.NO Bl/CO □~UCO .,, UNDERGROUND RWASTE □WATEP,.· ~-9-0/ -· --. TOPOUT l!!lWASTE Ji(WATER \ l<l: --'f }> "1 TUB ANO SHOWER Pt.N ' --. . ~ ,u,.I J,IKiAS TEST ll(CAS PIP1NC -,~~"' ., . □ WATER HEATEk · C SOLAR WATER • .,. ANAL ELECTRICAL □ ELECTRIC UNDERGROUND CUFER ROUCH ELECTRIC WALi.$ Q._ -I) ROUGH ELECTRIC CEILING . .,( ~/' C ELECTRIC SER~ □TEMPORARY .. :• CBONOING CPOOL FINAi. Ml!CHANl<;AL UNDE~ROUNO OUCiS·& PIPING -( 1JISf & PlEM.llLREF. PIPING I' ·..: ... ~ T I) •-•T• NR CONO. SYSTEMS U( ~-VENTILATINC,S~TEMS flNAl ' . . ,ST :ONTRACTOR Notes .. ,• .. J_ 1.,~01 "· -r.. • .. / / CALL FOIi FINAL INSl'ECTION WHEN ALL .Al'f'IIO~IATE ITEMS AIOVE HA VE IUN Af"f'ROVEO , / FINAL ·s1p1 wi-Appropriate _J -/ Building Oel)t. Unspec1ionS) !7601 602-2ns HY.:lS ~til ~ ... ~.._. / .Fin, Oopa,tment (760) 602-<1660 1 ,. I Planning Oepartlnent (760) 815-6703 ,. •/'2.. o,: ·l>/ZS ' Engineering OepL Or»pectlon,) (7&0) 438-3891 h//.1 /-,/ 7!,ftJ• ... BuildlnC lrupedDrs (1"'!1-4Pm) (760) 602-2700 CMWO (760) 438-2722 bl 7151 REV 5/2000 .UF . ~ City Of Carlsbad 1113 Final Building lnspecuon Dept: Buildin CMWD St Lite Fire Plan Check #: Permit#: CB010288 Project Name: ARBOR HEIGHTS-LC VLLY-PHASE 8 PLAN 3, 3590 SF, 701 SF GAR Address: 2869 SEGOVIA WY Contact Person: Phone: Sewer Dist: LC Water Dist: 0 Inspected P./!1! Date 10/1,/01 By: Inspected: • Inspected Date By: Inspected: Inspected Date By: Inspected: Date: Permit Type: Sub Type: Lot: 526 Approved: ti Approved: Approved: OCT I r 10/09/2001 RESDNTL SFD Disapproved: __ Disapproved: __ Disapproved: __ Comments: ______________________________ _