Loading...
HomeMy WebLinkAbout1341 SHOREBIRD LN; ; CB990853; PermitCity of Carlsbad 04/12/1999 Residential Permit Permit No:CB990853 ✓ ~d'~ 16\ \ Building Inspection Request Line (760) 438-3101 Job Address: 1341 SHOREBIRD LN CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2157912200 Lot#: 23 Applied: Valuation: $326,888.75 Construction Type: VN Entered By: Occupancy Group: 6 Reference #: CT90-31 03/15/1999 # Dwelling Units: 1 Structure Type: SFD Issued: Bedrooms: 4 Bathrooms: 3.5 Inspect Area: Project Title: BELLA LAGO -PHASE 6 Orig PC#: PLAN 2, SFD 3815 SF, GAR 575, PORCH 115 SF Plan Check#: Applicant: Owner: BROOKFIELD HOMES 200 BROOKFIELD CARLSBAD INC 12865 ~OINTE DEL MAR WAY 12865 POINT DEL MAR DEL MAR CA 92014 619-794-6172 DELMARC1 92014 ISSUED 03/07/1999 RMA Plan Approved: 04/12/1999 CB972033 990021 Total Fees: $1 8,632.49 Total Payments To Date: Balance Due: $18,632.49 Building Permit $1,415.58 Reel. Water Con. Fee $0.00 Add'I Building Permit Fee $0.00 Meter Size Plan Check $920.13 Add'I Reel. Water Con. Fee $0.00 Add'I Plan Check Fee $0.00 CFD Payoff Fee $4,254.32 Plan Check Discount ($73.61) PFF $5,949.38 Strong Motion Fee $32.69 PFF (CFD Fund) $0.00 Park in Lieu Fee $0.00 License Tax $0.00 Park Fee $0.00 License Tax (CFD Fund) $0.00 LFM Fee $0.00 Traffic Impact Fee $550.00 Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00 Other Bridge Fee $0.00 PLUMBING TOTAL $238.00 BTD #2 Fee $0.00 ELECTRICAL TOTAL $60.00 BTD #3 Fee $0.00 MECHANICAL TOTAL $87.00 Renewal Fee $0 .00 Housing Impact Fee $0.00 Add'I Renewal Fee $0.00 Housing lnLieu Fee $0.00 Other Building Fee $0.00 Master Drainage Fee: $0.00 Pot. Water Con. Fee $2,400.00 Sewer Fee: $2,799.00 Meter Size D5/8 Add'I Pot. Water Con. Fee $0.00 TOTAL PERMIT FEES $18,632.49 FIN Clearance: s-n-oo c,J NOTICE: Please take NOTICE that approval of your project includes the 'I position' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 City of Carlsbad Bldg Inspection Request For: 5/18/2000 Permit# CB990853 Inspector Assignment: PS --- Tille: BELLA LAGO -PHASE 6 Description: PLAN 2, SFD 3815 SF, GAR 575, PORCH 115 SF Type: RESDNTL Sub Type: SFD Job Address: 1341 SHOREBIRD LN Suite: Lot 23 Location: OWNER BROOKFIELD CARLSBAD INC Owner: BROOKFIELD CARLSBAD INC Remarks: Total Time: Phone: 7604380067 Inspector:~ Requested By: BOB Entered By: CHRISTINE CD Description Act Comments 19 Final Structural &, 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsgection History Date Description Act lnsp Comments 5/9/2000 89 Final Combo co PD 3/30/2000 39 Final Electrical co PS OK TO RELEASE ELEC 3/29/2000 39 Final Electrical AP PS 3/27/2000 45 Hoods AP TL 12/20/1999 82 Drywall/Ext Lath/Gas Test AP PS 12/15/1999 16 Insulation we PS 12/8/1999 16 Insulation AP PS 12/6/1999 84 Rough Combo AP PS 11/16/1999 13 Shear Panels/HD's AP PS 10/29/1999 15 Roof/Reroof AP RB 9/10/1999 11 Ftg/Foundation/Piers AP PS 9/9/1999 11 Ftg/Foundation/Piers CA PS BY DOUG ON SITE 9/3/1999 21 Underground/Under Floor AP PS