HomeMy WebLinkAbout1377 SHOREBIRD LN; ; CB990859; Permit• City of Carlsbad
04/12/1999 Residential Permit Permit No:CB990859
BuUding Inspection Request Line (760) 438-3101
Job Address: 1377 SHOREBIRD LN CBAD
Permit Type: RESDNTL Sub Type:
Parcel No: 2157901200 Lot#:
Valuation: $326,888.75 Construction Type:
Occupancy Group: 6
04/12/1999
Reference #:
SFD
32
VN
CB972033 c;r qo~o l
# Dwelling Units: Structure Type: SFD
Bedrooms: 4 Bathrooms: 3.5
Project Title: BELLA LAGO -PHASE 7
PLAN 2, SFD3815 SF, GAR 575, PORCH 115 SF -
Applicant:
BROOKFIELD HOMES
200
12865 POINT DEL MAR
DEL MAR CA 92014
619-794-6172
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
03/07/1999
RMA
Plan Approved:
04/12/1999
CB972033
990021
Total Fees: $18,632.49 · ,lota!Jl'ayments To Date:
« $0.00 4 :-ll~e Due: $18,632.49
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee · •
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD#3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
$1,415.58
$0.00
$920.13
'S0'.00
• • ($73.61')
. t32.69
; )P,OO
$f).,q<l:
$0.00
· · 4'0;00 .• ;~.00
$CHIO'.
$0.00
$0.00
$0.00
$0.00
$2,400.00
05/8
$0.00
Reel. Water Con. Fee.
'Meter Size 1 .
Add'I Reel, Water Cba;F.j :. •
CFO Pay~ ~ee . • , •
~F. . . .. '
PFF (CFO Funlll: • •,
License Ta~ •. , . • , ;· •.
lici,~~e :ie,t~~ J:.wia7 ' • m-=., iu. ·a-e1 F . • , :Jfi.t.11\Ri, ttyp, 98+ + i:
.. Tml'flc fmh~tl.1'und)
:1~t·To}AL
M~t'HANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Master Drainage Fee:
Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$4,254.32
$5,949.38
$0.00
$0.00
$0.00
$550.00
$0.00
$238.00
$60.00
$87.00
$0.00
$0.00
$0.00
$2,799.00
$18,632.49
FINAL APPROVAL
Date: 7-tf·Ct) Clearance: 1-sQ-00 ,,, >
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions: You have 90 days from the date this pennlt was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specrried fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or se1Vice fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
02
18632-49-
02
18632-49
City of Carlsbad Bldg Inspection Request
For 7/18/2000
Permit# CB990859 Inspector Assignment: PS ---
Title: BELLA LAGO • PHASE 7
Description: PLAN 2, SFD3815 SF, GAR 575, PORCH 115 SF· CT90-31
Type: RESDNTL Sub Type: SFD
Phone: 7604380067
Job Address: 1377 SHOREBIRD LN
Suite: Lot 32
Location:
OWNER BROOKFIELD CARLSBAD INC
Owner: BROOKFIELD CARLSBAD INC
Remarks:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsgection Histo(¥
Date Description Act
6/8/2000 39 Final Electrical co
6/2/2000 44 Rough/Ducts/Dampers AP
4/6/2000 17 Interior Lath/Drywall AP
3/30/2000 17 Interior Lath/Drywall AP
3/30/2000 23 Gas/Test/Repairs AP
3/28/2000 17 Interior Lath/Drywall AP
3/23/2000 16 Insulation AP
3/22/2000 16 Insulation NR
3/20/2000 84 Rough Combo AP
3/6/2000 13 Shear Panels/HD's AP
3/6/2000 18 Exterior Lath/Drywall WC
3/2/2000 13 Shear Panels/HD's co
1/31/2000 15 Roof/Reroof AP
12/10/1999 11 Ftg/Foundation/Piers AP
12/7/1999 11 Ftg/Foundation/Piers AP
12/1/1999 21 Underground/Under Floor AP
lnspecto£_L
Requested By: BOB
Entered By: CHRISTINE
Comments
lnsp Comments
PS OK TO RELEASE ELEC
PS KIT HHOD
PS
PS
PS
TL
PS
PS
PS
PS
PS
PS OK TO LA TH BOTTOM
PS
PS GAR SLAB
PS
PS
•
City of Carlsbad Bldg Inspection Request
For: 6/9/2000
Permit# CB990859 Inspector Assignment: PS ---
Title: BELLA LAGO • PHASE 7
Description: PLAN 2, SFD3815 SF, GAR 575, PORCH 115 SF· CT90-31
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
OWNER
1377 SHOREBIRD LN
Lot 32
BROOKFIELD CARLSBAD INC
Owner: BROOKFIELD CARLSBAD INC
Remarks:
Total Time:
Phone: 7604380067
Inspector:$
Requested By: BOB
Entered By: ROBIN
CD Description Act Comments
39 Final Electrical
Associated PCRs
lnsgection HistO!Y
Date Description Act lnsp Comments
6/2/2000 44 Rough/Ducts/Dampers AP PS KIT HHOD
4/6/2000 17 Interior Lath/Drywall AP PS
3/30/2000 17 Interior Lath/Drywall AP PS
3/30/2000 23 Gas/Test/Repairs AP PS
3/28/2000 17 Interior Lath/Drywall AP TL
3/23/2000 16 Insulation AP PS
3/22/2000 16 Insulation NR PS
3/20/2000 84 Rough Combo AP PS
3/6/2000 13 Shear Panels/HD's AP PS
3/6/2000 18 Exterior Lath/Drywall we PS
3/2/2000 13 Shear Panels/HD's co PS OK TO LA TH BOTTOM
1/31/2000 15 Roof/Reroof AP PS
12/10/1999 11 Ftg/Foundation/Piers AP PS GAR SLAB
12/7/1999 11 Ftg/Foundation/Piers AP PS
12/1/1999 21 Underground/Under Floor AP PS
11/30/1999 21 Underground/Under Floor NR PS
~ CitY or Carlsbad 113 Final Buil~ing Inspection
,'
Dept: Buildin lanning CMWD St Lite Fire
Plan Check#:
Permit#:
Project Name:
Address:
990
CB990859
BELLA LAGO -PHASE 7
PLAN 2, SFD3815 SF, GAR 575, PORCH 115 SF-CT90-3
1377 SHOREBIRD LN Lot:
Contact Person: BOB Phone: 7604380067
Date: 7/18/2000
Permit Type: RESDNTL
Sub Type: SFD
32
Sewer 01st: Water Dist: i:~~ ?1L ·· -~:i,: ~J;~z~ ··::~:~: -;··::::::::·· ····
Inspected Date
By: ___________ Inspected: ______ Approved: ___ Disapproved: __
Inspected Date
By: ___________ Inspected: ______ Approved: ___ Disapproved: __
···························································································································································
Comments: _______________________________ _
Joi ADDRESS:_,:_ .
OWNERSHAME;_;
w,og;ypaj -
81JILDINC
Cl!IIQill& 1377SHOReBIRDLNCBAD
B13.1.A LAGO-PHASE 7
PI.AN2. SFD3815 SF, GAR575, PORCH 115.SF-
RleSOffl. SFO
Loi#: 32 8AOOl<Fl8..0 c.ARLSSAD INC
t:CONST,
. ...---~----_____ LOT N0./5UITE: ______ _ pAn#f
CONTRACTOR
OTHER
APl'ltO\IEO TO COVER
Tpvf~•P .... Data· ,__,, Natfl
81JIID/NC /J ,~.,,1.~$ . I
FOUNDATION .'ilC,, ,,--.... p
IQ:INFOtiCED STEEL I z. -I • ..«f-
MASONRY -.
□GROUT □ WALL DRAINS -. TILT PANELS ·-. r
l'OURSTIUPS . '
COLUMN FOOTINGS
SUIIFIIAME OFlOOR 0 Cl:IUIIIC
ROOF SHEATHINO -· lb••--EXT. SHEAR PANELS ~ -o15
FRAMI: r.,.-.cfD -INSUlATION ,..,_~ ---EXTERIOR LATH r~A~•
INTEklOR LATH & DRVWAU. u ,;, I O(J I -
ANAL . I I
PLUMB/NC
O~ANDlll/CO □PllCO -
UNDERGIIDUND U..,WASTE □WATER v..,.,;-., ,_
TOPOUT □WASTE □WATER---_,-. .JI?'
TI)B AND SHOWER PAN :.. ..,.. C -
p:r;;;ASTEST OGASPl""'Q ~11.-.
C WATER HEATER -0 SOLAR WATER . ,
FINAL
ELECTRIOU
iffl.ECT1tlC UN~QllOUND §l'UFER 111'.,_~., -~/
ROUQH a.ECTRIC WAUS . -~ ROUGH ElECTIUC CEIL/NC ,--::.
□el.ECTitlCSEIMcr □TEMPORARY
□80NDINC -OPOOL
FINAL
MECHAHICAJ;
UNDERGROUND DUcrS & PIPII\IO
A~
D
0 DUCT lie Pl.EM.□ llEf, PIPINC ,_, ;'/
HEAT-AIR CoNO. J ,,,,_ -\/l;NTllATING SYSTEMS ., \A. .
flHA1
OW. IOR RNAL I "nnN WHEN ALllil't'ROPRMTE IT9,,IS ABOVE fl-.: BEEN APPl{OVED
flNAl ................. -II I lluildirv Dtpt. (lnspe, low,;) 438-3101 .,.,,.,n , \,f\
FIN Depllblll!III !IJl-2121 .
PlannlnB Dapalinmt 438-1161 "1·lo •-15: ~ Dlpt. llnlllemonsl -08-3891 -t~I .B::::!J!J. c..<-
Buiklir,g 111>;,e. lbi• (7a,n-.4plnl 436-35SO -.
CMWD 4311-2722 Ext 7153 la -, . (17JI.J>IOOiWI I ldll :2t 0002 ·i; t '"Tlf_ ,.u .. --, __ ...... 1-2/J: • d t,t,t ...... _..,,.. 1on•