Loading...
HomeMy WebLinkAbout152 SEQUOIA AVE; ; CBR2017-2932; Recycle· {'Cityof Carlsbad WASTE MANAGEME $ V Development Services I E Building Division Owner: PLAN B-59 DECO 7 Zo11 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov BUILDING D1V1s1it Contractor: 6 rCJk5J i!v&stnci7oi/ Phone Number:.---<-?-6"--'--'0=------..o1'---L-r-=--s --~--1.--q_,__,,Ju"""--- &1 C/1?1 m bed~ CMC Job Addrnss / "Q,, ~ \j \ 'i) Ci\ 11 \LL,. 11rmit #: C8 RJ O \ 1 -Q_ q 3 d--: Estimated Cost of Project: $ 1-: s· -o /,{_ - ~ve-(?~ (f)~t,0o.JZ-1,.P1U-~~<i!.x>I b--Otf 7<Z D Demolition Type of £ProJeot:J ~w Construction □ Remodel or T.I. ~idential □ Commercial (check all that apply) D Other _____________________________ _ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area _______ X 2 lbs. = ________ lbs. of allowable waste. ~Ian on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garbae:e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled ______ % Datet 1 nly Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: _________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only if different than Table 1) Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash/ Garba~e Other: TOTAL lbs.: Actual Percentage Re-Used or Recycled ______ % Official Use Only □ 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by: __________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be token to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt / Concrete 0 3000 Brick / Masonry 1.00 0;50 Cardboard 0 1.50 Drywall 0 so Landscape Debris 0 1.20 Lumber/ Wood 500 0 Metals 300 200 Mixed Waste 1.500 0 Trash / Garbage 300 0 Other: Pool c:; uV\-Lte 0 900 TOTAL lbs.: 2700 S,3J-O Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re-Use Method A"B-C f-tCUA.LLV\,v\ Co. WM / R.e-v\.Sed 'g,yfof<. OV\--SLte A"B-C H-CluLLV\-CI Cn. A "B-C H-Cl uLLV\-CI Co. MuLcvied c; R.e-lA.Sed OV\--SLte WCls.te MClV\-ClCjeV\A..eV\,t WM / A "B-C f-tCl uLLV\,g WM WM v\.Sed els Crnsvied B.Clse OV\--S.Lte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2