Loading...
HomeMy WebLinkAbout1373 SHOREBIRD LN; ; CB990856; Permit04/12/1999 City of Carlsbad ~) Residential Permit Permit No:CB990856 Building Inspection Request Line (760) 438-3101 Job Address: 1373 SHOREBIRD LN CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2157901100 Lot#: 31 Applied: Valuation: $261,243.50 Construction Type: VN Entered By: Occupancy Group: 6 Reference #: CB972033 04/12/1999 C;\ qo-3.' # Dwelling Units: 1 Structure Type: SFD Issued: Bedrooms: 4 Bathrooms: 3.5 Inspect Area: Project Title: BELLA LAGO PHASE 7 Orig PC#: PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF -Plan Check#: Applicant: BROOKFIELD HOMES 200 12865 POINT DEL MAR DEL MAR CA 92014 619-794-6172 Total Fees: $11,833.62 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD#2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee . '.fotat_,►,iyments To Date: $0.00 .+ $1,188.08 Reel. Water Con. °Fee $0.00 Meter Size · • , , $7}2,25 Add'I Reel. Water Ctirt;Fse: ' $0:!)"!) CFD Pa:tdft'Fee ·. • . '+ · ($61.78) PPF . ,$26. 12 PFF (CFD Fun a)~ * • r JQ.oo License Tax . . $0.PO License.Tlfl('.(tl'li> Fl.\l1l:4'.. . ro:: • · · ~=~~:J;.; ___ e~-,;und) SQ.DP ... RWffltil'1 .. iio?Ar $0.ee ~ •~lRIOA."foTAL $0.00 •• MECRANICAL TOTAL $0.00 Housing Impact Fee $0.00 Housing lnlieu Fee $0.00 Master Drainage Fee: $0.00 Sewer Fee: $0.00 TOTAL PERMIT FEES ISSUED 03/07/1999 RMA Plan Approved: 04/12/1999 CB972033 990021 $0.00 $0.00 $4,254.32 $4,754.63 $0.00 $0.00 $0.00 $550.00 $0.00 $203.00 $60.00 $87.00 $0.00 $0.00 $0.00 $0.00 $11,833.62 Clearance: h • ;fJ _cf{:;' that approval of your project includes the "Im sition~ of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. AD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 11833-62- City of Carlsbad Bldg Inspection Request For: 6/23/2000 Permit# CB990856 Inspector Assignment: PS ---Title: BELLA LAGO PHASE 7 Description: PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF. CT90- 31 Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: OWNER 1373 SHOREBIRD LN Lot 31 BROOKFIELD CARLSBAD INC Owner: BROOKFIELD CARLSBAD INC Remarks: Total Time: Phone: 7604380067 Inspector: A Requested By: BOB Entered By: CHRISTINE CD Description 19 Final Structural ~mments 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsQection Histo01 Date Description Act lnsp Comments 6/8/2000 39 Final Electrical co PS OK TO RELEASE ELEC 6/2/2000 44 Rough/Ducts/Dampers AP PS KIT HOOD 4/6/2000 17 Interior Lath/Drywall AP PS 3/27/2000 82 Drywall/Ext Lath/Gas Test AP TL 3/22/2000 16 Insulation AP PS 3/20/2000 24 Rough/Topout AP PS 3/20/2000 84 Rough Combo AP PS 3/16/2000 84 Rough Combo co PS 3/15/2000 84 Rough Combo NR PS 3/6/2000 13 Shear Panels/HD's AP PS 3/6/2000 18 Exterior Lath/Drywall WC PS 3/2/2000 13 Shear Panels/HD's co PS OK TO LATH BOTTOM 2/24/2000 13 Shear Panels/HD's NR PS 1/31/2000 15 Roof/Reroof AP PS 12/10/1999 11 Ftg/Foundation/Piers AP PS GAR SLAB 12/7/1999 11 Ftg/Foundation/Piers AP PS j City of Carlsbad Bldg Inspection Request For: 6/9/2000 Permit# CB990856 Inspector Assignment: PS --- Title: BELLA LAGO PHASE 7 Description: PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF -CT90- 31 Type: RESDNTL Sub Type: SFD Job Address: 1373 SHOREBIRD LN Suite: Lot 31 Location: OWNER BROOKFIELD CARLSBAD INC Owner: BROOKFIELD CARLSBAD INC Remarks: Total Time: Phone: 7604380067 Inspector:~ Requested By: BOB Entered By: ROBIN CD Description Act Comments 39 Final Electrical <TQ_ c9f< ro rf<-d~-e ECe r= Associated PCRs lnsgection Histoiy Date Description Act lnsp Comments 6/2/2000 44 Rough/Ducts/Dampers AP PS KIT HOOD 4/6/2000 17 Interior Lath/Drywall AP PS 3/27/2000 82 Drywall/Ext Lath/Gas Test AP TL 3/22/2000 16 Insulation AP PS 3/20/2000 24 Rough/T opout AP PS 3/20/2000 84 Rough Combo AP PS 3/16/2000 84 Rough Combo co PS 3/15/2000 84 Rough Combo NR PS 3/6/2000 13 Shear Panels/HD's AP PS 3/6/2000 18 Exterior Lath/Drywall WC PS 3/2/2000 13 Shear Panels/HD's co PS OK TO LATH BOTTOM 2/24/2000 13 Shear Panels/HD's NR PS 1/31/2000 15 Roof/Reroof AP PS 12/10/1999 11 Ftg/Foundation/Piers AP PS GAR SLAB 12n/1999 11 Ftg/Foundation/Piers AP PS 12/1/1999 21 Underground/Under Floor AP PS 11/30/1999 21 Underground/Under Floor NR PS ', cnv 11 Carlsbad · Final Building Inspection """"1' •• , 2 3 Dept: ~uildin~ Planning CMWD St Lite Fire Plan Check#: 990021 Date: 6/23/2000 Permit#: CB990856 Permit Type: RESDNTL Project Name: BELLA LAGO PHASE 7 Sub Type: SFD PLAN 1 , SFD 3011 SF, GAR 604 SF, PORCH 62 SF • CT9 Address: 1373 SHOREBIRD LN Lot: 31 Contact Person: 808 Phone: 7604380067 Sewer Dist: CA Water Dist: CA .......................................................................................................................................................... Inspected :Ott? Date ~J7 Disapproved:&_ By: Inspected: Approved: Inspected <;J'S\ i Date ~ \ 'l, i \, Q'o Approved: _$_ Disapproved: __ By: Inspected: Inspected Date By: Inspected: Approved: Disapproved: __ ........................................................................................................................................................... '\ _ • liJ ;~"'~;;;;ldlnu Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit#: Project Name: 990021 CB990856 BELLA LAGO PHASE 7 Date: 6/23/2000 Permit Type: RESDNTL Sub Type: SFD PLAN 1, SFD 3011 SF, GAR 604 SF. PORCH 62 SF · CT9 Address: 1373 SHOREBIRD LN Lot: 31 Contact Person: BOB Phone: 7604380067 Sewer Dist: CA Water Dist: CA ·························································································································································· Inspected yt-1-5> Date ~/!7 Disapproved: &_ By: Inspected: Approved: Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ I ll 11 I I If I I I I Ill 1111 I I Ill I II II I I II I I 11111111 I I I I I I I II I I I 1111 I II I I II II I 11111111111 I I 11 I I I f l lfl I Ill I I II I I I I I I 111111 I ll I I I I I Ill I I Ill f l 111111 I II II I Ill Ill 1111 1 1