HomeMy WebLinkAbout1373 SHOREBIRD LN; ; CB990856; Permit04/12/1999
City of Carlsbad ~)
Residential Permit Permit No:CB990856
Building Inspection Request Line (760) 438-3101
Job Address: 1373 SHOREBIRD LN CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2157901100 Lot#: 31 Applied:
Valuation: $261,243.50 Construction Type: VN Entered By:
Occupancy Group: 6 Reference #: CB972033
04/12/1999 C;\ qo-3.'
# Dwelling Units: 1 Structure Type: SFD Issued:
Bedrooms: 4 Bathrooms: 3.5 Inspect Area:
Project Title: BELLA LAGO PHASE 7 Orig PC#:
PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF -Plan Check#:
Applicant:
BROOKFIELD HOMES
200
12865 POINT DEL MAR
DEL MAR CA 92014
619-794-6172
Total Fees: $11,833.62
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD#2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
. '.fotat_,►,iyments To Date: $0.00
.+
$1,188.08 Reel. Water Con. °Fee
$0.00 Meter Size · • , ,
$7}2,25 Add'I Reel. Water Ctirt;Fse: '
$0:!)"!) CFD Pa:tdft'Fee ·. • . '+
· ($61.78) PPF .
,$26. 12 PFF (CFD Fun a)~ * • r
JQ.oo License Tax . .
$0.PO License.Tlfl('.(tl'li> Fl.\l1l:4'.. . ro:: • · · ~=~~:J;.; ___ e~-,;und)
SQ.DP ... RWffltil'1 .. iio?Ar
$0.ee ~ •~lRIOA."foTAL
$0.00 •• MECRANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing lnlieu Fee
$0.00 Master Drainage Fee:
$0.00 Sewer Fee:
$0.00 TOTAL PERMIT FEES
ISSUED
03/07/1999
RMA
Plan Approved:
04/12/1999
CB972033
990021
$0.00
$0.00
$4,254.32
$4,754.63
$0.00
$0.00
$0.00
$550.00
$0.00
$203.00
$60.00
$87.00
$0.00
$0.00
$0.00
$0.00
$11,833.62
Clearance: h • ;fJ _cf{:;'
that approval of your project includes the "Im sition~ of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
AD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
11833-62-
City of Carlsbad Bldg Inspection Request
For: 6/23/2000
Permit# CB990856 Inspector Assignment: PS ---Title: BELLA LAGO PHASE 7
Description: PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF. CT90-
31
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
OWNER
1373 SHOREBIRD LN
Lot 31
BROOKFIELD CARLSBAD INC
Owner: BROOKFIELD CARLSBAD INC
Remarks:
Total Time:
Phone: 7604380067
Inspector: A
Requested By: BOB
Entered By: CHRISTINE
CD Description
19 Final Structural
~mments
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsQection Histo01
Date Description Act lnsp Comments
6/8/2000 39 Final Electrical co PS OK TO RELEASE ELEC
6/2/2000 44 Rough/Ducts/Dampers AP PS KIT HOOD
4/6/2000 17 Interior Lath/Drywall AP PS
3/27/2000 82 Drywall/Ext Lath/Gas Test AP TL
3/22/2000 16 Insulation AP PS
3/20/2000 24 Rough/Topout AP PS
3/20/2000 84 Rough Combo AP PS
3/16/2000 84 Rough Combo co PS
3/15/2000 84 Rough Combo NR PS
3/6/2000 13 Shear Panels/HD's AP PS
3/6/2000 18 Exterior Lath/Drywall WC PS
3/2/2000 13 Shear Panels/HD's co PS OK TO LATH BOTTOM
2/24/2000 13 Shear Panels/HD's NR PS
1/31/2000 15 Roof/Reroof AP PS
12/10/1999 11 Ftg/Foundation/Piers AP PS GAR SLAB
12/7/1999 11 Ftg/Foundation/Piers AP PS
j
City of Carlsbad Bldg Inspection Request
For: 6/9/2000
Permit# CB990856 Inspector Assignment: PS ---
Title: BELLA LAGO PHASE 7
Description: PLAN 1, SFD 3011 SF, GAR 604 SF, PORCH 62 SF -CT90-
31
Type: RESDNTL Sub Type: SFD
Job Address: 1373 SHOREBIRD LN
Suite: Lot 31
Location:
OWNER BROOKFIELD CARLSBAD INC
Owner: BROOKFIELD CARLSBAD INC
Remarks:
Total Time:
Phone: 7604380067
Inspector:~
Requested By: BOB
Entered By: ROBIN
CD Description Act Comments
39 Final Electrical <TQ_ c9f< ro rf<-d~-e ECe r=
Associated PCRs
lnsgection Histoiy
Date Description Act lnsp Comments
6/2/2000 44 Rough/Ducts/Dampers AP PS KIT HOOD
4/6/2000 17 Interior Lath/Drywall AP PS
3/27/2000 82 Drywall/Ext Lath/Gas Test AP TL
3/22/2000 16 Insulation AP PS
3/20/2000 24 Rough/T opout AP PS
3/20/2000 84 Rough Combo AP PS
3/16/2000 84 Rough Combo co PS
3/15/2000 84 Rough Combo NR PS
3/6/2000 13 Shear Panels/HD's AP PS
3/6/2000 18 Exterior Lath/Drywall WC PS
3/2/2000 13 Shear Panels/HD's co PS OK TO LATH BOTTOM
2/24/2000 13 Shear Panels/HD's NR PS
1/31/2000 15 Roof/Reroof AP PS
12/10/1999 11 Ftg/Foundation/Piers AP PS GAR SLAB
12n/1999 11 Ftg/Foundation/Piers AP PS
12/1/1999 21 Underground/Under Floor AP PS
11/30/1999 21 Underground/Under Floor NR PS
', cnv 11 Carlsbad
· Final Building Inspection
""""1' •• , 2 3
Dept: ~uildin~ Planning CMWD St Lite Fire
Plan Check#: 990021 Date: 6/23/2000
Permit#: CB990856 Permit Type: RESDNTL
Project Name: BELLA LAGO PHASE 7 Sub Type: SFD
PLAN 1 , SFD 3011 SF, GAR 604 SF, PORCH 62 SF • CT9
Address: 1373 SHOREBIRD LN Lot: 31
Contact Person: 808 Phone: 7604380067
Sewer Dist: CA Water Dist: CA ..........................................................................................................................................................
Inspected :Ott? Date ~J7 Disapproved:&_ By: Inspected: Approved:
Inspected <;J'S\ i Date ~ \ 'l, i \, Q'o Approved: _$_ Disapproved: __ By: Inspected:
Inspected Date
By: Inspected: Approved: Disapproved: __ ...........................................................................................................................................................
'\ _ • liJ ;~"'~;;;;ldlnu Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #:
Permit#:
Project Name:
990021
CB990856
BELLA LAGO PHASE 7
Date: 6/23/2000
Permit Type: RESDNTL
Sub Type: SFD
PLAN 1, SFD 3011 SF, GAR 604 SF. PORCH 62 SF · CT9
Address: 1373 SHOREBIRD LN Lot: 31
Contact Person: BOB Phone: 7604380067
Sewer Dist: CA Water Dist: CA
··························································································································································
Inspected yt-1-5> Date ~/!7 Disapproved: &_ By: Inspected: Approved:
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
I ll 11 I I If I I I I Ill 1111 I I Ill I II II I I II I I 11111111 I I I I I I I II I I I 1111 I II I I II II I 11111111111 I I 11 I I I f l lfl I Ill I I II I I I I I I 111111 I ll I I I I I Ill I I Ill f l 111111 I II II I Ill Ill 1111 1 1