HomeMy WebLinkAboutSDP 96-14I; LEGOLAND PARKING STRUCTURE; FINAL SOILS REPORT; 2017-07-15Legoland Parking Structure -Soils
Carlsbad, CA
TABLE I
Summary of Density Curves
Laboratory Maximum Density ASTM D1557 (All Soil Types)
Soil Type & Description
A Grayish Tan Clayey Sand
B Brown Clayey Sand w/Crushed Asphalt
C Light Brown Clayey Silt
D Yellowish Brown Silty Sand
E Recycled Class II Base
F Recycled Class II Base (Escondido Sand & Gravel)
*Proctor values provided by supplier.
laborat01y Mcvcimum Density ASTM D 1560
AC Type & Description
1/2" Maximum Medium Type B
LEGEND
Test Location
TEST NUMBER
-Indicated by Area on Site
#E Electrical
#B Base
#W Water
#AC Asphalt Concrete
#SD Storm Drain
#SG Sub Grade
#AC Asphalt/Concrete
#MG Mass Grading
NOVA Services, Inc.
Optimum
Moisture
(% dry wt.}
11.9
8.3
9.6
10.9
11.1
11.8*
July2017
Project IO 16525
Maximum
Dry Density
(!bs./cu.ft.}
121.1
128.0
125.0
125.5
121.9
117.0*
Maximum
Wet Density
(!bs./cu.ft.}
143.2
Lego land Parking Structure -Soils July 2017 Carlsbad. CA Project IO I 6525
TABLE IT
Summary of Compaction Test Results
Test Test Test Mat'! Moisture Unit Dry Density Rel. Proj. Pass/ Date Number Suffix Test Location Deeth T~ee T~ee Oet. Field Max. Field Come, Seec. Fail
11/14/16 1 E Electrical Tie-In NE Trench 144.0 N A 11.9 12.8 128.0 123.0 96.1% 95% Pass 2 E Electrical Tie-In NE Trench 143.0 N A 11.9 12.2 128.0 125.2 97.8% 95% Pass 3 E Electrical Tie-In NE Trench 143.0 N A 11.9 11.4 128.0 123 .3 96.3% 95% Pass
11/19/16 4 MG Western Section of Parking Structure 126.0 N C 9.6 16.4 126.0 113.5 90.1% 90% Pass 5 MG Western Section of Parking Structure 126.0 N C 9.6 12.2 126.0 115.0 91.3% 90% Pass 6 MG Western Section of Parking Structure 126.0 N C 9.6 11.4 126.0 115.1 91.3% 90% Pass 7 MG Western Section of Parking Structure 123.0 N C 9.6 16.4 126.0 116.5 92.5% 90% Pass 8 MG Western Section of Parking Structure 129.0 N C 9.6 12.2 126.0 116.3 92.3% 90% Pass 9 MG Western Section of Parking Structure 128.0 N C 9.6 12.8 126.0 115.9 92.0% 90% Pass 10 MG Western Section of Parking Structure 124.0 N C 9.6 12.0 126.0 117.2 93.0% 90% Pass 11 MG Western Section of Parking Structure 123.0 N C 9.6 12.4 126.0 116.0 92.1% 90% Pass 12 MG Western Section of Parking Structure 133.0 N C 9.6 12.0 126.0 117.2 93.0% 90% Pass 13 MG Western Biofiltration Basin Area 133.0 N C 9.6 12.0 126.0 117.8 93.5% 90% Pass 14 MG Western Section of Parking Structure 133.0 N C 9.6 11.9 126.0 118.2 93.8% 90% Pass 15 MG Western Section of Parking Structure 125.0 N C 9.6 12.3 126.0 115.5 91.7% 90% Pass 16 MG Western Section of Parking Structure 125.0 N C 9.6 12.0 126.0 115.7 91 .8% 90% Pass 17 MG Western Section of Parking Structure 122.0 N C 9.6 15.1 126.0 110.7 87.9% 90% Fail 18 MG Western Section of Parking Structure 122.0 N C 9.6 15.0 126.0 113.4 90.0% 90% Pass 19 MG Retest #17 122.0 N C 9.6 13.6 126.0 114.l 90.6% 90% Pass 20 MG Western Section of Parking Structure 122.0 N C 9.6 13.0 126.0 115.6 91.7% 90% Pass
11/21/16 21 MG Western Section of Parking Structure 126.0 N C 9.6 11.1 126.0 116.2 92.2% 90% Pass 22 MG Western Section of Parking Structure 128.0 N C 9.6 14.2 126.0 115.3 91.5% 90% Pass 23 MG Western Section of Parking Structure 124.0 N C 9.6 10.9 126.0 117.0 92.9% 90% Pass 24 MG Western Section of Parking Structure 126.0 N C 9.6 12.1 126.0 115.8 91.9% 90% Pass 25 MG Western Section of Parking Structure 130.0 N C 9.6 13.1 126.0 118.2 93 .8% 90% Pass 26 MG Western Section of Parking Structure 130.0 N C 9.6 13.0 126.0 113 .9 90.4% 90% Pass 27 MG Western Section of Parking Structure 130.0 N C 9.6 13.9 126.0 116.4 92.4% 90% Pass 28 MG Western Section of Parking Structure 128.0 N C 9.6 14.0 126.0 114.8 91.1% 90% Pass 29 MG Western Section of Parking Structure 134.0 N C 9.6 12.2 126.0 115.2 91.4% 90% Pass 30 MG Western Section of Parking Structure 134.0 N C 9.6 11.8 126.0 116.1 92.1% 90% Pass
11/22/16 31 MG Western Section of Parking Structure 130.0 N C 9.6 14.3 126.0 114.2 90.6% 90% Pass 32 MG Western Section of Parking Structure 130.0 N C 9.6 14.1 126.0 113.4 90.0% 90% Pass 33 MG Western Section of Parking Structure 130.0 N C 9.6 13.7 126.0 116.4 92.4% 90% Pass 34 MG Western Section of Parking Structure 130.0 N C 9.6 15.2 126.0 117.2 93.0% 90% Pass 35 MG Western Section of Parking Structure 132.0 N C 9.6 17.1 126.0 l 16.9 92 .8% 90% Pass 36 MG Western Section of Parking Structure 133.0 N C 9.6 16.3 126.0 I 18.2 93.8% 90% Pass 37 MG Western Section of Parking Structure 134.0 N C 9.6 14.9 126.0 117.7 93.4% 90% Pass 38 MG Western Section of Parking Structure 136.0 N C 9.6 13.8 126.0 119.1 94.5% 90% Pass 39 MG Western Section of Parking Structure 135.0 N C 9.6 11.9 126.0 118.2 93.8% 90% Pass 40 MG Western Section of Parking Structure 136.0 N C 9.6 12.4 126.0 120.1 95.3% 90% Pass
Nova Services 2 of 6
ii\BU, ll S\lmmar'i o\ Com.\)at\\o\\ 'le~\ Rm1\\~
'Test 'Test Test Mat'\
Uate Number Suffix Test Location Depth Type Type
11/23/16 41 MG Southern Section of Parking Structure 134.0 N D
42 MG Southern Section of Parking Structure 135.0 N D
43 MG Southern Section of Parking Structure 135.0 N D
44 MG Center of Parking Structure 136.0 N D
45 MG Southeastern Section of Parking Structure 134.0 N A
46 MG Northeastern Section of Parking Structure 136.0 N A
47 MG Southeastern Section of Parking Structure 135.0 N A
48 MG Eastern Section of Parking Structure 135.0 N A
49 MG Northern Section of Parking Structure 136.0 N A
50 MG Eastern Section of Parking Structure 136.0 N A
11 /29/16 51 MG Eastern Section of Parking Structure FG N D
52 MG Northern Section of Parking Structure FG N D
53 MG Western Section of Parking Structure FG N C
54 MG Southern Section of Parking Structure FG N D
55 MG Center of Parking Structure FG N D
56 MG Center of Parking Structure FG N D
57 MG Southern Section of Parking Structure FG N D
58 MG Southern Section of Parking Structure FG N D
59 MG Southeastern Section of Parking Structure FG N D
60 MG Southeastern Section of Parking Structure FG N D
11 /30/16 61 MG Center of Parking Structure FG N C
62 MG Center of Parking Structure FG N C
63 MG Center of Parking Structure FG N C
64 MG Northern Section of Parking Structure FG N A
65 MG Southern Section of Parking Structure FG N A
66 MG Southern Section of Parking Structure FG N A 67 MG Western Section of Parking Structure FG N A
68 MG Western Section of Parking Structure FG N A
69 MG Western Section of Parking Structure FG N A
70 MG Western Section of Parking Structure FG N A
1/6/17 71 E Center of Parking Structure 133.0 N A
72 E Center of Parking Structure 133.0 N A
73 E Center of Parking Structure 134.0 N A
74 E Center of Parking Structure 134.0 N A
1/14/17 75 MG Southeastern Section of Parking Structure FG N A
76 MG Southeastern Section of Parking Structure FG N A 77 MG Southeastern Section of Parking Structure FG N A
78 MG Southeastern Section of Parking Structure FG N A
79 MG Southeastern Section of Parking Structure FG N A
80 MG Southeastern Section of Parking Structure FG N A
81 E Southeastern Section of Parking Structure 131.0 N A
82 E Southeastern Section of Parking Structure 131.0 N A
83 E Southeastern Section of Parking Structure 132.0 N A
84 E Southeastern Section of Parking Structure 133.0 N A
Nova Services
Moisture Unit Dry Density
Opt. Field Max. Field
10.9 10.7 125.5 122.4
10.9 11.2 125.5 119.1
10.9 11.6 125.5 120.2
10.9 10.9 125.5 I 18.6
11.9 11.1 128.0 120.5
11.9 12.2 128.0 121.1
11.9 13.1 128.0 120.8
11.9 11.9 128.0 122.2
11.9 10.8 128.0 117.6
11.9 12.1 128.0 118.2
10.9 14.6 125.5 118.7
10.9 14.4 125.5 115.7
9.6 14.8 126.0 117.0
10.9 13.9 125.5 116.2
10.9 15.1 125.5 117.1
10.9 13.5 125.5 113.1
10.9 14.0 125.5 115.1
10.9 14.3 125.5 114.8
10.9 9.9 125.5 114.1
10.9 11.1 125.5 115.2
9.6 10.9 125.0 116.2
9.6 10.2 125.0 117.1
9.6 11.0 125.0 118.3
11.9 13.4 121.1 112.2
11.9 12.1 121.1 114.1
11.9 12.8 121.1 111.4
11.9 13.2 121.1 113.4
11.9 14.1 121.1 114.4
11.9 10.7 121.1 I 13.8
11.9 11.1 121.1 112.0
11.9 13.9 121.1 110.9
11.9 14.0 121.1 110.1
11.9 14.0 121.1 116.5
11.9 13.0 121.1 114.7
11.9 13.1 121.1 109.0
11.9 12.1 121.1 110.2
11.9 11.9 121.1 110.0
11.9 11.9 121.1 110.5
11.9 12.0 121.1 111.3
11.9 12.5 121.1 109.7
11.9 12.8 121.1 109.2
11.9 12.0 121.1 110.3
11.9 11.7 121.1 111.1
11.9 12.6 121.1 109.6
Rel. Proj.
Comp. Spec.
97.5% 90%
94.9% 90%
95.8% 90%
94.5% 90%
94.1% 90%
94.6% 90%
94.4% 90%
95.5% 90%
91.9% 90%
92.3% 90%
94.6% 90%
92.2% 90%
92.9% 90%
92.6% 90%
93.3% 90%
90.1% 90%
91.7% 90%
91 .5% 90%
90.9% 90%
91 .8% 90%
93.0% 90%
93.7% 90%
94.6% 90%
92.7% 90%
94.2% 90%
92.0% 90%
93.6% 90%
94.5% 90%
94.0% 90%
92.5% 90%
91.6% 90%
90.9% 90%
96.2% 90%
94.7% 90%
90.0% 90%
91.0% 90%
90.8% 90%
91.2% 90%
91.9% 90%
90.6% 90%
90.2% 90%
91.1% 90%
91.7% 90%
90.5% 90%
Pass/
Fail
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
1\\\11~\l ~l\l\t~\ \~\~~l~
3 of 6
Lego land Parking Structure -Soils July 2017 Carlsbad, CA Project IO l 6525
TABLE II
Summary of Compaction Test Results
Test Test Test Mat'l Moisture Unit Dry Density ReL Proj, Pass/ Date Number Suffix Test Location Deeth Tree Tree Oet Field Max, Field Come, Seec, Fail
1/16/17 85 MG Southeastern Section of Parking Structure FG N E 11,J 9.6 121.9 112.2 92.0% 90% Pass 86 E Southeastern Section of Parking Structure FG N E II.I 10.3 121.9 109.9 90.2% 90% Pass 87 E Southeastern Section of Parking Structure FG N E II.I 9.7 121.9 110.4 90.6% 90% Pass 88 E Southeastern Section of Parking Structure FG N E II.I 9.2 121.9 109.8 90.1 % 90% Pass 89 E Southeastern Section of Parking Structure FG N E II.I 9.3 121.9 109.8 90.1 % 90% Pass
1/17/17 90 MG Southern Section of Parking Structure 133.0 N A 11.9 13.4 121.1 115.6 95.5% 90% Pass 91 MG Southern Section of Parking Structure 133.5 N A 11.9 11.2 121.1 119.4 98.6% 90% Pass 92 MG Southern Section of Parking Structure 133.5 N A 11.9 11.5 121.1 116.3 96.0% 90% Pass 93 MG Southern Section of Parking Structure 133.5 N A 11.9 11.9 121.1 117.1 96.7% 90% Pass 94 MG Southeastern Section of Parking Structure 133.0 N A 11.9 12.1 121.1 116.7 96.4% 90% Pass 95 E Southeastern Section of Parking Structure 131.0 N A 11.9 II.I 121.1 114.6 94.6% 90% Pass 96 E Southern Section of Parking Structure 131.0 N A 11.9 12.1 121.1 113.7 93.9% 90% Pass 97 E Southwestern Section of Parking Structure 131.0 N A 11.9 11.5 121.1 114.1 94.2% 90% Pass
1/18/1 7 98 MG Eastern Section of Parking Structure 134.0 N A 11.9 13.7 121.1 111 .2 91.8% 90% Pass 99 MG Eastern Section of Parking Structure 130.0 N A 11.9 11.4 12 l:l 110.7 91.4% 90% Pass 100 MG Eastern Section of Parking Structure 130.0 N A 11.9 12.4 121.1 110.8 91 .5% 90% Pass 101 MG Eastern Section of Parking Structure 134.0 N A 11.9 11.9 121.1 I 11.3 91.9% 90% Pass 102 E Center Section of Parking Structure 135.0 N A 11.9 10.6 121.1 116.5 96.2% 90% Pass 103 E Center Section of Parking Structure 135.0 N A 11.9 12.7 121.1 115.3 95.2% 90% Pass 104 E Center Section of Parking Structure 137.0 N A 11.9 10.8 121.1 11 8.2 97.6% 90% Pass 105 E Center Section of Parking Structure 137.0 N A 11.9 11.2 121.1 117.4 96.9% 90% Pass
1/26/1 7 106 MG Southern Section of Parking Structure 132.0 N A 11.9 15.0 121.1 111 .2 91.8% 90% Pass 107 MG Southern Section of Parking Structure 132.0 N A 11.9 12.1 121.1 111.4 92.0% 90% Pass 108 MG Southern Section of Parking Structure 132.0 N A 11.9 10.2 121.1 118.0 97.4% 90% Pass 109 MG Eastern Section of Parking Structure 132.0 N A 11.9 10.2 121.1 109.3 90.3% 90% Pass 110 MG Eastern Section of Parking Structure 133.0 N A 11.9 13.1 121.1 112.4 92.8% 90% Pass Ill MG Eastern Section of Parking Structure 134.0 N A 11.9 13.7 121.1 112.8 93.1% 90% Pass
1/27/17 112 MG Southern Section of Parking Structure 134.0 N A 11.9 14.9 121.1 110.3 91.1 % 90% Pass 113 MG Southern Section of Parking Structure 134.0 N A 11.9 12.1 121.1 110.8 91.5% 90% Pass 114 MG Southern Section of Parking Structure 134.0 N A 11.9 11.7 121.1 112.1 92.6% 90% Pass 115 MG Southern Section of Parking Structure 132.5 N A 11.9 13.0 121.1 l 11 .2 91.8% 90% Pass 116 MG Southern Section of Parking Structure 132.5 N A 11.9 II.I 121.1 117.0 96.6% 90% Pass 117 MG Southern Section of Parking Structure 132.5 N A 11.9 12.6 121.1 114.3 94.4% 90% Pass
Nova Services 4 of 6
Legoland Parking Structure -Soils July 2017 Project IO 16525 Carlsbad. CA
TABLE TI
Summary of Compaction Test Results
Test Test Test Mat'l Moisture Unit Dry Density Rel. Proj. Pass/
Date Number Suffix Test Location Del!th Tyl!e Trl!e Ol!t. Field Max. Field Com!!. Sl!ec. Fail
1/28/17 118 MG Southwestern Section of Parking Structure 134.0 N A 11.9 10.4 121.1 114.6 94.6% 90% Pass
119 MG Southwestern Section of Parking Structure 134.0 N A 11.9 12.3 121.1 114.9 94.9% 90% Pass
120 MG Southwestern Section of Parking Structure 134.0 N A 11.9 12.2 121.1 116.2 96.0% 90% Pass
121 MG Southwestern Section of Parking Structure 134.0 N A 11.9 14.0 121.1 110.0 90.8% 90% Pass
122 MG Eastern Section of Parking Structure Ramp 136.0 N A 11.9 12.1 121.1 115.3 95.2% 90% Pass
123 MG Eastern Section of Parking Structure Ramp 137.0 N A 11.9 11.6 121.1 117.7 97.2% 90% Pass 124 MG Eastern Section of Parking Structure Ramp 137.0 N A 11.9 12.4 121.1 115.6 95.5% 90% Pass
125 MG Eastern Section of Parking Structure Ramp 136.0 N A 11.9 11.6 121.1 114.3 94.4% 90% Pass
4/27/17 126 SG Parking Lot West of Parking Structure FG N B 8.3 10.4 128.0 122.6 95.8% 95% Pass
127 SD Northeastern Parking Lot 138.0 N A 11.9 16.4 121.1 109.0 90.0% 90% Pass
128 SD Northeastern Parking Lot 141.0 N A 11.9 17.4 121.1 109.3 90.3% 90% Pass
129 SD Northeastern Parking Lot 137.0 N A 11.9 17.8 121.1 109.0 90.0% 90% Pass 130 SD Northeastern Parking Lot 137.0 N A 11.9 16.5 121.1 109.5 90.4% 90% Pass
131 SD East Biofiltration Basin Area 137.0 N A 11.9 17.6 121.1 109.0 90.0% 90% Pass
132 SD East of Parking Structure Roadway 134.5 N A 11.9 17.2 121.1 109.3 90.3% 90% Pass
4/28/17 133 SD East of Parking Structure FG N A 11.9 16.2 121.1 109.9 90.8% 90% Pass
134 SD East of Parking Structure 134.0 N A 11.9 14.7 121.1 112.1 92.6% 90% Pass
135 SD East of Parking Structure 133.0 N A 11.9 13.8 121.1 109.0 90.0% 90% Pass
136 SD East of Parking Structure 132.0 N A 11.9 14.0 121.1 110.3 91.1% 90% Pass
137 SD East of Parking Structure FG N A 11.9 11.1 121.1 119.7 98.8% 90% Pass
138 SD East of Parking Structure FG N A 11.9 11.8 121.1 117.9 97.4% 90% Pass
139 SD East of Parking Structure FG N A 11.9 10.3 121.1 109.9 90.8% 90% Pass
5/1/17 140 SD Southeast Comer ofBiofiltration Basin Area 128.0 N A 11.9 14.0 121.1 110.1 90.9% 90% Pass
141 SD Southeast Comer ofBiofiltration Basin Area 129.0 N A 11.9 15.0 121.1 109.5 90.4% 90% Pass
142 SD Southeast Comer of Bio filtration Basin Area FG N A 11.9 13.9 121.1 112.0 92.5% 90% Pass
5/13/17 143 w Northwestern Comer of Site 139.0 N B 8.3 12.0 128.0 115.5 90.2% 90% Pass
144 w Northwestern Comer of Site 139.0 N B 8.3 14.0 128.0 116.1 90.7% 90% Pass
145 w Northwestern Comer of Site 139.0 N B 8.3 15.0 128.0 111.0 86.7% 90% Fail
5/16/17 146 SG Roadway West of Parking Structure 142.0 N B 8.3 10.3 128.0 119.8 93.6% 90% Pass
147 SG Roadway West of Parking Structure 138.5 N B 8.3 9.1 128.0 121.4 94.8% 90% Pass
148 SG Roadway West of Parking Structure 137.0 N B 8.3 9.2 128.0 120.7 94.3% 90% Pass 149 SG Roadway West of Parking Structure 136.5 N B 8.3 10.0 128.0 119.4 93.3% 90% Pass
150 SG Roadway West of Parking Structure 135.0 N B 8.3 8.9 128.0 120.6 94.2% 90% Pass
151 SG Roadway West of Parking Structure 133.0 N B 8.3 10.0 128.0 121.1 94.6% 90% Pass 152 SG Roadway West of Parking Structure 135.0 N B 8.3 9.7 128.0 120.4 94.1% 90% Pass
153 SG Roadway West of Parking Structure 137.0 N B 8.3 12.1 128.0 117.8 92.0% 90% Pass 154 SG Roadway West of Parking Structure 138.0 N B 8.3 11.7 128.0 116.7 91.2% 90% Pass
155 w Retest #145 139.0 N B 8.3 11.4 128.0 116.9 91.3% 90% Pass
Nova Services 5 of 6
Legoland Parking Structure -Soils July 2017
Carlsbad. CA Project IO 16525
TABLE II
Summary of Compaction Test Results
Test Test Test Mat'l Moisture Unit Dry Density Rel. Proj. Pass/
Date Number Suffix Test Location Dceth T}'.ec T}'.ec Oet. Field Max. Field Come, Seec. Fail
5/17/17 156 w Northeastern Comer Irrigation Trench 145.5 N B 8.3 11.2 128.0 115.9 90.5% 90% Pass
157 w Northeastern Comer Irrigation Trench 146.0 N B 8.3 11.0 128.0 116.7 91.2% 90% Pass
158 w Northeastern Comer Irrigation Trench 146.0 N B 8.3 10.4 128.0 116.5 91.0% 90% Pass
159 w Northeastern Comer Irrigation Trench 146.3 N B 8.3 JO.I 128.0 117.7 92.0% 90% Pass
5/18/17 160 SG Roadway East of Parking Structure SG N A 11.9 16.0 121.1 11 8.2 97.6% 95% Pass
161 SG Roadway East of Parking Structure SG N A 11.9 14.0 121.1 I 15.0 95.0% 95% Pass
162 SG Roadway East of Parking Structure SG N A 11.9 17.2 121.1 116.8 96.4% 95% Pass
163 SG Roadway East of Parking Structure SG N A 11.9 17.0 121.1 11 7.9 97.4% 95% Pass
5/19/17 164 B West Parking Area Base N F 12.0 12.6 117.0 111.5 95.3% 95% Pass
165 B West Parking Arca Base N F 12.0 11.5 117.0 111.7 95.5% 95% Pass
166 B West Parking Area Base N F 12.0 11.5 117.0 111.8 95.6% 95% Pass
167 B West Parking Area Base N F 12.0 11.8 11 7.0 11 2.1 95.8% 95% Pass
168 B West Parking Area Base N F 12.0 13.4 117.0 112.9 96.5% 95% Pass
169 B West Parking Area Base N F 12.0 13.0 117.0 11 6.0 99.1% 95% Pass
117.0
5/20/17 170 B West Parking Area Base N F 12.0 13.0 117.0 111.7 95.5% 95% Pass
171 B West Parking Area Base N F 12.0 13.0 117.0 111.6 95.4% 95% Pass
172 B Northwestern Parking Area Base N F 12.0 12.9 117.0 115.5 98.7% 95% Pass
173 B Northwestern Parking Area Base N F 12.0 13.1 117.0 116.2 99.3% 95% Pass
174 B Northwestern Parking Area Base N F 12.0 13.0 117.0 115.9 99.1% 95% Pass
175 B East Parking Area/Roadway Base N F 12.0 9.1 117.0 115.2 98.5% 95% Pass
176 B East Parking Area/Roadway Base N F 12.0 9.7 117.0 112.9 96.5% 95% Pass
177 B East Parking Area/Roadway Base N F 12.0 9.0 117.0 115.3 98.5% 95% Pass
178 B East Parking Arca/Roadway Base N F 12.0 10.0 117.0 112.9 96.5% 95% Pass
5/22/17 179 AC West Parking Arca FS N AC NIA NIA 143.2 135.9 95.0% 95% Pass
180 AC West Parking Area FS N AC NIA N/A 143.2 137.0 95.7% 95% Pass
181 AC Southwestern Entrance to Parking Area FS N AC NIA NIA 143.2 136.3 95.2% 95% Pass
182 AC Southwestern Entrance to Parking Area FS N AC N/A NIA 143.2 138.2 96.5% 95% Pass
183 AC Northwestern Parking Arca FS N AC N/A N/A 143.2 136.9 95.6% 95% Pass
184 AC Northwestern Parking Area FS N AC NIA NIA 143.2 136.1 95.0% 95% Pass
185 AC Northwestern Parking Arca FS N AC N/A N/A 143.2 136.0 95.0% 95% Pass
186 AC Southwestern Entrance to Parking Area FS N AC NIA N/A 143.2 135.9 95.0% 95% Pass
187 AC West Parking Area FS N AC N/A N/A 143.2 140.0 97.8% 95% Pass
188 AC Southwestern Entrance to Parking Area FS N AC N/A N/A 143.2 137.9 96.3% 95% Pass
189 AC Northeastern Ramp Entrance FS N AC N/A N/A 143.2 137.6 96.1% 95% Pass
190 AC East Parking Area/Roadway FS N AC N/A N/A 143.2 136.0 95.0% 95% Pass
191 AC East Parking Area/Roadway FS N AC NIA NIA 143.2 136.3 95.2% 95% Pass
192 AC East Parking Area/Roadway FS N AC N/A N/A 143.2 135.9 95.0% 95% Pass
Nova Services 6 of 6